City of Cotati
Sonoma County
City of Cotati is a city authority in the State of California, serving 7,584 residents. 522 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — Instantaneous for SolarAPP+-eligible systems (automated online issuance); general over-the-counter permits '2-3 business days,' up to 30 days for larger projects… Q18 Where you file — Cloudpermit (us.cloudpermit.com/cotaticity) for general building permits, and SolarAPP+ (gosolarapp.org, Q20
- Permit required
- Yes95% source
- What it costs
- $450 flat for residential roof-mount up to 15 kW; $15/kW for each kW over 15 kW (residential). Commercial: $1,000 flat up to 50 kW, $7/kW from 51-250 kW, $5/kW above 250 kW.95% source
- Plan review turnaround
- Instantaneous for SolarAPP+-eligible systems (automated online issuance); general over-the-counter permits '2-3 business days,' up to 30 days for larger projects not using SolarAPP+.85% source
- Key document
- published checklist cited by 6 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes 92% · department page
- What does this authority permit itself, and what does it delegate? Both 82% · fee schedule
- Is a permit required for a residential rooftop PV system? Yes 95% · published checklist
- Is there a separate electrical permit, or is it combined? Combined 78% · fee schedule
- Is a Specific Use Permit or Council approval ever required? Likely No for SolarAPP+-eligible systems 55% · department page + inference
- Is there a system-size cap on residential generation? No hard residential size cap found; the fee schedule tiers a per-kW rate above 15 kW rather than prohibiting larger systems. 62% · fee schedule + inference
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? Either 85% · permit application form
- Must the contractor be registered with this authority before applying? Yes 85% · permit application form + fee schedule
- Is a homeowner permitted to self-install and self-permit? Yes 85% · permit application form
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Per the city's PV checklist: general project/applicant info, a completed system-detail worksheet and site plan, a basic site plan (structure + equipment location), array configuration/placement with dimensioned access pathways, an electrical single-line drawing (main/sub panel size, service adequacy, grounding, combiner/junction box, AC/DC disconnect, conduit sizing, inverter string/branch-circuit sizing, conductor/grounding methods), panel/disconnect/conductor signage, manufacturer cut sheets for modules/racking/mounting/grounding/inverters, and equipment listing/testing-agency approvals. 92% · published checklist
- How many copies, and in what format? Electronic only — the city's Building Permit Process page states 'we accept electronic plans set submittals ONLY,' via email to permits@cotaticity.gov or the Cloudpermit portal (large files via WeTransfer/Dropbox); no paper-copy count applies. 82% · department page
- Is a site plan required, and what must it show? Yes — a 'basic site plan' showing location of structure and equipment, plus array configuration/placement of equipment and modules on the roof with dimensioned access and pathways. 90% · published checklist
- Is a one-line / three-line diagram required? Yes 92% · published checklist
- Are string and conductor calculations required? Yes 75% · published checklist
- Is a structural PE stamp required, and at what threshold? Yes, conditionally — the city's own worksheet states: 'RAFTERS THAT ARE OVER-SPANNED OR IF THE ARRAY IS OVER 5 LBS. PER SF., DESIGN BY A LICENSED PROFESSIONAL MAY BE REQUIRED.' 90% · published checklist
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Cloudpermit (us.cloudpermit.com/cotaticity) for general building permits, and SolarAPP+ (gosolarapp.org, jurisdiction=Cotati) for eligible residential rooftop PV instant permitting. 90% · department page
- Can the whole application be completed online? Yes 88% · department page
- What does a residential solar permit cost? $450 flat for residential roof-mount up to 15 kW; $15/kW for each kW over 15 kW (residential). Commercial: $1,000 flat up to 50 kW, $7/kW from 51-250 kW, $5/kW above 250 kW. 95% · published fee schedule
- How is the fee calculated? Tiered 90% · published fee schedule
- Is there a separate plan-check fee? No 72% · published fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? Instantaneous for SolarAPP+-eligible systems (automated online issuance); general over-the-counter permits '2-3 business days,' up to 30 days for larger projects not using SolarAPP+. 85% · department page
- Which utility handles interconnection here? Pacific Gas & Electric (PG&E) for interconnection/wires; Sonoma Clean Power (a CCA) for generation/billing on the same PG&E-delivered service. 85% · utility's own page (not PowerToChoose)
28 questions answered against City of Cotati’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes
Why the confidence is not higherCity's own Community Development Department pages (Building, SolarAPP+, Building Permit Process) describe the city issuing, reviewing and inspecting residential solar permits directly through its own Cloudpermit and SolarAPP+ portals.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both
Why the confidence is not higherMaster Fee Schedule (eff. 8/10/2026) lists a single 'Photovoltaic Systems (Solar Systems)' flat-rate fee under Miscellaneous Fees — not separate Building and Electrical permit lines — and the city's own permit application/process pages show Community Development handling the whole PV submittal itself, with fire-life-safety review/variances delegated to Sonoma County Fire District (formerly Rancho Adobe FPD).
fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherSolarAPP+ page, Building Permit Process page and the 'Residential Rooftop Photovoltaic Systems Plan Submittal Information and Checklist' all treat a PV permit as required; the checklist states it applies to 'residential (one- and two-family dwellings...) roof mounted PV systems.'
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined
Why the confidence is not higherThe Master Fee Schedule's 'Photovoltaic Systems (Solar Systems)' entry is a single flat fee ($450 up to 15kW residential), not separate Building Permit Fee + Electrical Permit Fee lines the way the generic Building Permit Application form otherwise itemizes those as separate blanks for non-solar projects. Read together this indicates solar is billed/issued as one combined permit.
fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Either
Why the confidence is not higherThe city's Building Permit Application has a full 'Contractor Information' section (license number, expiration) AND a separate 'Owner-Builder's Declaration' citing B&P Code §7044 self-perform exemption — both paths are available with no language restricting solar specifically to licensed electricians.
permit application form checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1451/Building-Permit-Application
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes
Why the confidence is not higherThe Building Permit Application itself has a field for 'City Business License Number and Expiration Date' under Contractor Information, and the Master Fee Schedule's Business Tax section states the tax 'applies to businesses that operate in the City limits. This includes all contractors who perform work in the City.' This is a general city business-tax registration, not a solar-specific registry, but it is required at intake per the city's own application form.
permit application form + fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1451/Building-Permit-Application
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes
Why the confidence is not higherBuilding Permit Application's 'Owner-Builder's Declaration' explicitly provides for an owner, through personal effort, to 'do all of OR portions of the work' under B&P Code §7044; nothing in the PV checklist excludes solar from this general path.
permit application form checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1451/Building-Permit-Application
Q8 What documents make up a complete submittal? Core Submittal package
Per the city's PV checklist: general project/applicant info, a completed system-detail worksheet and site plan, a basic site plan (structure + equipment location), array configuration/placement with dimensioned access pathways, an electrical single-line drawing (main/sub panel size, service adequacy, grounding, combiner/junction box, AC/DC disconnect, conduit sizing, inverter string/branch-circuit sizing, conductor/grounding methods), panel/disconnect/conductor signage, manufacturer cut sheets for modules/racking/mounting/grounding/inverters, and equipment listing/testing-agency approvals.
Why the confidence is not higherExtracted directly from the 'Plans Submittal Requirements' section of the city's own checklist PDF via pdftotext -layout (not a summary).
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q9 How many copies, and in what format? Submittal package
Electronic only — the city's Building Permit Process page states 'we accept electronic plans set submittals ONLY,' via email to permits@cotaticity.gov or the Cloudpermit portal (large files via WeTransfer/Dropbox); no paper-copy count applies.
Why the confidence is not higherRead directly from the Building Permit Process page.
department page checked 2026-08-31 https://www.cotaticity.gov/203/Building-Permit-Process
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes — a 'basic site plan' showing location of structure and equipment, plus array configuration/placement of equipment and modules on the roof with dimensioned access and pathways.
Why the confidence is not higherItem 1-2 of the checklist's 'Plans Submittal Requirements.'
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes
Why the confidence is not higherChecklist item 3 requires an 'Electrical single line drawing' covering panel sizes, grounding, combiner/junction box, AC/DC disconnects, conduit sizing, inverter string/branch-circuit sizing, and conductor/grounding methods.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q12 Are string and conductor calculations required? Drawings & calculations
Yes
Why the confidence is not higherThe checklist requires 'inverter string sizing or micro inverter branch circuit details' and conductor wiring/insulation ratings in the single-line drawing, plus a worksheet capturing Imp/Vmp/Voc/Isc and max series fuse — effectively string/conductor calculation inputs, though the document does not use the word 'calculations' outright.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Yes, conditionally — the city's own worksheet states: 'RAFTERS THAT ARE OVER-SPANNED OR IF THE ARRAY IS OVER 5 LBS. PER SF., DESIGN BY A LICENSED PROFESSIONAL MAY BE REQUIRED.'
Why the confidence is not higherVerbatim from the checklist's roof-design worksheet, extracted directly from the PDF text.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Nothing published by this authority.
Where we lookedFull text of the city's PV submittal checklist (pdftotext -layout) and its worksheet fields — a structural-PE threshold is stated (q13) but no equivalent electrical-PE-stamp valuation or capacity threshold is stated anywhere in the same document.
Q15 What does a residential solar permit cost? Core Fees
$450 flat for residential roof-mount up to 15 kW; $15/kW for each kW over 15 kW (residential). Commercial: $1,000 flat up to 50 kW, $7/kW from 51-250 kW, $5/kW above 250 kW.
Why the confidence is not higherCurrent Master Fee Schedule, effective August 10, 2026 (Resolution 2026-37) — read directly from the PDF, not summarized. Note the document is served from a URL still titled 'Effective-October-2023,' but the PDF's own cover page and running footer read 'August 2026' / 'Effective August 10, 2026, Resolution 2026-37' — the city updates this file in place under the old filename/URL, so I dated it from the document's own text, not the link.
published fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q16 How is the fee calculated? Core Fees
Tiered
Why the confidence is not higherFlat $450 up to 15kW then a per-kW rate above that threshold for residential (and a different flat+per-kW tiering for commercial) — not pure Flat or pure Per-kW.
published fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q17 Is there a separate plan-check fee? Fees
No
Why the confidence is not higherThe PV fee sits under the schedule's 'MISCELLANEOUS FEES – FLAT RATE PERMITS' heading (footnoted 'Fees in this section are set by Government Code §66015'), distinct from the separate 'BUILDING PERMIT AND PLAN CHECK FEES' section that has its own 'Building Plan Check — 65% of Building Permit Fee' line for valuation-based permits. No separate plan-check line appears against the PV entry, suggesting the flat PV fee is all-inclusive, but the schedule does not say so explicitly in words.
published fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Instantaneous for SolarAPP+-eligible systems (automated online issuance); general over-the-counter permits '2-3 business days,' up to 30 days for larger projects not using SolarAPP+.
Why the confidence is not higherSolarAPP+ page states instantaneous issuance for eligible PV; Building Permit Process page states the 2-3 day / 30 day general figures.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q19 How long is an issued permit valid before it expires? Timeline & validity
Nothing published by this authority.
Where we lookedBuilding Permit Process page and PV checklist — neither states a permit-validity/expiration period. The generic default would be in Title 14 (Building and Construction) code-adoption chapter, hosted on eCode360 (ecode360.com/CO4398), which returned a Cloudflare 'Just a moment' challenge to a direct curl fetch (with and without the iccsafe.org Referer) and to two separate headless-Chrome --dump-dom attempts (fresh profiles, up to 25s virtual-time-budget); the only Wayback Machine capture available (20251022190017) is the homepage only, no Title 14 sub-page archived.
Q20 Which permit portal does this authority use? Core Portal & process
Cloudpermit (us.cloudpermit.com/cotaticity) for general building permits, and SolarAPP+ (gosolarapp.org, jurisdiction=Cotati) for eligible residential rooftop PV instant permitting.
Why the confidence is not higherBoth are named and linked directly from the city's own Building and SolarAPP+ pages.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q21 Can the whole application be completed online? Core Portal & process
Yes
Why the confidence is not higherSolarAPP+ page states the system 'provides instantaneous permitting' — 'Register and submit design,' 'Pay permit fees through the portal and download approved plans' — a fully online path for eligible systems.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q22 Which utility handles interconnection here? Core Utility interconnection
Pacific Gas & Electric (PG&E) for interconnection/wires; Sonoma Clean Power (a CCA) for generation/billing on the same PG&E-delivered service.
Why the confidence is not higherSonoma Clean Power's own 'Who We Are' page states plainly that 'PG&E charges you for distribution — maintaining the poles and wires' for SCP customers, and confirms Cotati is a member city of the SCP JPA. The city's own 'A Guide to Electrifying Your Home' page independently names Sonoma Clean Power for local rebates. No municipal electric utility exists in Cotati.
utility's own page (not PowerToChoose) checked 2026-08-31 https://sonomacleanpower.org/who-we-are
Q23 Where does the utility sit in the sequence? Core Utility interconnection
Nothing published by this authority.
Where we lookedCity's SolarAPP+ and Building Permit Process pages — neither states where PG&E interconnection sits relative to city permit issuance. Did not fetch PG&E's own Rule 21/DG interconnection handbook this run, so this is a genuine gap rather than a proven absence at the utility level.
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding Permit Application form, PV checklist, and city's Property Zoning and Permit Information page — none mentions HOA approval as a permit prerequisite for solar.
https://www.cotaticity.gov/DocumentCenter/View/1451/Building-Permit-Application
Q25 Is there a historic-district review? Overlays & special cases
Nothing published by this authority.
Where we lookedCity's Planning page and Downtown Specific Plan page (table of contents only, chapter PDFs not opened this run) — neither surfaces a historic-district/architectural-review trigger specific to rooftop solar. The municipal code's historic-preservation chapter, if any, would be in Title 17 (Land Use) on eCode360, which was Cloudflare-blocked (see q19 for documented attempts).
Q26 Is a wind or windstorm certification required? Overlays & special cases
Nothing published by this authority.
Where we lookedCity's Building, SolarAPP+, and Checklists/Handouts pages — no design-criteria or wind-speed handout was found for Cotati (unlike some other CA cities that publish one), so I could not confirm either a windstorm-certification requirement or its absence from a city-authored document this run.
https://www.cotaticity.gov/1599/Checklists-Handouts-and-Helpful-Resource
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Likely No for SolarAPP+-eligible systems
Why the confidence is not higherThe city's SolarAPP+ instant-permitting page describes no discretionary/Council step for eligible systems, consistent with the state Solar Rights Act's ministerial-review mandate. I could not confirm the zoning code's land-use table (MC §17.22.020, referenced on the city's own 'Property Zoning and Permit Information' page as the source of Use-Permit/Minor-Use-Permit triggers) because the code is hosted on eCode360 and returned a Cloudflare challenge to curl, two headless-Chrome attempts, and the only Wayback Machine capture available is the homepage (no Title 17 sub-page archived).
department page + inference checked 2026-08-31 https://www.cotaticity.gov/1676/Property-Zoning-and-Permit-Information
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No hard residential size cap found; the fee schedule tiers a per-kW rate above 15 kW rather than prohibiting larger systems.
Why the confidence is not higherMaster Fee Schedule's PV line structure ('Residential Roof Mount (Up to 15 kW)' then 'Per kW over 15 kW') implies the city routinely permits larger residential systems rather than capping at 15kW; I could not check the zoning code (Title 17, eCode360, Cloudflare-blocked) for any separate zoning-based ceiling.
fee schedule + inference checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2023 NEC (as the basis of the 2025 CEC, statewide-mandatory as of 1 Jan 2026) 58% · inference (statewide code cycle) + stale city document
- Which building code edition is in force? 2025 California Building Code (based on the 2024 IBC), by operation of the statewide triennial code cycle 55% · inference (statewide code cycle)
- Which fire code edition is in force? 2025 California Fire Code (based on the 2024 IFC), by operation of the statewide triennial code cycle 55% · inference (statewide code cycle)
- What is the installation judged against? Per the city's own checklist: 'adoption and effective date of 2022 California Code of Regulations, Title 24 Part 2.5, and/or local amendments' (i.e., the state-adopted CBC/CRC/CEC/CFC as locally amended). 70% · published checklist (dated reference)
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
- What ridge setback and access pathways are required? Hip roof: one 3-ft-wide clear pathway from eave to ridge per roof slope with panels. Single-ridge roof: two 3-ft-wide pathways from eave to ridge per slope. Hips/valleys: panels no closer than 18in to a hip or valley when panels are on both sides (may be placed directly adjacent if only one side is used and the hip/valley sides are of equal length). Modules must be located no higher than 3 ft below the ridge. Non-conforming designs are directed to contact Rancho Adobe Fire Protection District (now Sonoma County Fire District) before submittal. 92% · published checklist
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Not stated in the city's own words — the checklist cites CEC Article 690 generally and CEC Sec. 690.47(C)(2) for the grounding-electrode conductor, but never uses the phrase 'rapid shutdown' or cites §690.12 specifically, even though the 2025 CEC (adopted statewide, based on 2023 NEC) applies §690.12 by reference. 55% · published checklist (control-checked absence)
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? DC disconnect sign reading 'PHOTOVOLTAIC POWER SOURCE' with rated MPP current/voltage and max system/circuit voltage; an inverter-OCPD-and-AC-disconnect sign with AC output current and nominal AC voltage; a microinverter-system label on the exterior of the main service panel reading 'Microinverter System Solar Breaker Inside Panel is PV System Disconnect'; and general signage 'on panel(s), disconnects and transmission line conductors.' 85% · published checklist
- Does the authority specify placard wording of its own? Yes, for one specific case — the checklist gives verbatim required wording for the microinverter disconnect label: 'Microinverter System Solar Breaker Inside Panel is PV System Disconnect.' Other signage content (DC/AC disconnect placards) is specified by required data fields (voltage/current ratings) rather than fixed prose, deferring general format to UL 969 / CEC Article 690. 75% · published checklist
- Does it specify letter height, colour or material? Colour and material: 'red background and white lettering resistant to fading pursuant to UL 969 and California Electrical Code Article 690, and permanently affixed.' No specific numeric letter-height figure was found in the city's own document. 78% · published checklist
- Where must the labels be placed? On the panel(s), disconnects, and transmission line conductors; the PV disconnect itself must be in 'a readily accessible location and located together when possible' with the main service disconnect. 80% · published checklist
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Must equipment be on a specific approved list? Yes 90% · published checklist
- Are batteries permitted, and under what conditions? Yes, conditionally — Sonoma County Fire District's current fee schedule (eff. 18 Sep 2025) requires an annual 'Battery System Stationary Storage / Energy Storage System' operational permit ($521 flat) for systems 'more than 50 gallons or for stationary and mobile energy storage systems regulated by [CFC] Section 1207.' The city's own building-side PV checklist and fee schedule are otherwise silent on battery-specific mounting/venting rules. 72% · fire district fee schedule/application form
- Is there a separate ESS permit or inspection? Yes, at the fire-district level — a separate annual Battery System Stationary Storage operational permit ($521) is required by Sonoma County Fire District; no separate ESS line exists in the city's own building-permit fee schedule (which appears to fold ESS into the general PV/solar permit if bundled with a PV system). 68% · fee schedule (city, control-checked) + fire district fee schedule
- Is a specific mounting system or attachment spacing required? No city-mandated proprietary mounting system; the checklist requires plans to show manufacturer-specific 'style, diameter, length of embedment of bolts or other approved fastener' since 'depending on your manufacturer's specifications attachment methods may vary.' 75% · published checklist
20 questions answered against City of Cotati’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2023 NEC (as the basis of the 2025 CEC, statewide-mandatory as of 1 Jan 2026)
Why the confidence is not higherI could not reach Cotati's own code-adoption chapter (Title 14, Building and Construction, MC guid 46696519) — it is hosted on eCode360 and returned a Cloudflare 'Just a moment' challenge to curl with the required iccsafe.org Referer, to two separate headless-Chrome --dump-dom attempts (fresh profiles, up to 25s virtual-time-budget), and the Wayback Machine holds only the ecode360.com/CO4398 homepage capture, not the Title 14 sub-page. This answer is inferred from California's mandatory statewide triennial code-adoption schedule (all local jurisdictions apply the new base code automatically as of its effective date regardless of when a local-amendment ordinance is passed) plus the city's own 2023-dated PV checklist, which cites 'the 2022 California Code of Regulations, Title 24 Part 2.5' as of its own effective date — one full cycle stale by Aug 2026. Flagging this explicitly rather than presenting it as confirmed.
inference (statewide code cycle) + stale city document checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q30 Which building code edition is in force? Core Code editions in force
2025 California Building Code (based on the 2024 IBC), by operation of the statewide triennial code cycle
Why the confidence is not higherSame access limitation as q29 — Cotati's own Title 14 code-adoption chapter was unreachable (Cloudflare-blocked eCode360, documented attempts). Reported as the statewide-mandatory base code effective 1 Jan 2026; not independently confirmed against the city's own adoption ordinance.
inference (statewide code cycle) checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q31 Which fire code edition is in force? Code editions in force
2025 California Fire Code (based on the 2024 IFC), by operation of the statewide triennial code cycle
Why the confidence is not higherSame access limitation as q29/q30 — Cotati's Title 14 fire-code-adoption text was unreachable (Cloudflare-blocked eCode360, documented attempts).
inference (statewide code cycle) checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q32 Are there local amendments to any of the above? Core Code editions in force
Nothing published by this authority.
Where we lookedTitle 14 (Building and Construction), eCode360 guid 46696519 — Cloudflare-blocked to curl (with iccsafe.org Referer) and to two headless-Chrome --dump-dom attempts; only the code-library homepage is in the Wayback Machine, not the Title 14 chapter. Cannot confirm presence or absence of local amendments without reading the chapter itself.
Q33 What is the installation judged against? Core Electrical
Per the city's own checklist: 'adoption and effective date of 2022 California Code of Regulations, Title 24 Part 2.5, and/or local amendments' (i.e., the state-adopted CBC/CRC/CEC/CFC as locally amended).
Why the confidence is not higherVerbatim from the checklist, though the checklist itself is dated Jan 2023 and cites the 2022 cycle, now one code cycle behind the 2025 cycle presumptively in force statewide as of Aug 2026 (see q29-31 caveats).
published checklist (dated reference) checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedPV checklist and Master Fee Schedule — no service-upgrade or busbar-sizing rule stated in either; only a generic 'Panel Upgrade' MEP fee line ($285) exists with no accompanying technical rule.
https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
No city-mandated proprietary mounting system; the checklist requires plans to show manufacturer-specific 'style, diameter, length of embedment of bolts or other approved fastener' since 'depending on your manufacturer's specifications attachment methods may vary.'
Why the confidence is not higherRead directly from the checklist's plans-submittal and worksheet sections.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Hip roof: one 3-ft-wide clear pathway from eave to ridge per roof slope with panels. Single-ridge roof: two 3-ft-wide pathways from eave to ridge per slope. Hips/valleys: panels no closer than 18in to a hip or valley when panels are on both sides (may be placed directly adjacent if only one side is used and the hip/valley sides are of equal length). Modules must be located no higher than 3 ft below the ridge. Non-conforming designs are directed to contact Rancho Adobe Fire Protection District (now Sonoma County Fire District) before submittal.
Why the confidence is not higherVerbatim from the 'Access Requirements and Array Configurations' section of the city's own checklist, extracted directly from the PDF.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Not stated in the city's own words — the checklist cites CEC Article 690 generally and CEC Sec. 690.47(C)(2) for the grounding-electrode conductor, but never uses the phrase 'rapid shutdown' or cites §690.12 specifically, even though the 2025 CEC (adopted statewide, based on 2023 NEC) applies §690.12 by reference.
Why the confidence is not higherGrepped the full extracted checklist text for '690.12' and 'rapid shutdown' — zero hits, alongside a positive control (Article 690/690.47 does appear) confirming the search itself worked. The requirement likely still applies through wholesale state-code adoption even though the city's own document doesn't name it.
published checklist (control-checked absence) checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
DC disconnect sign reading 'PHOTOVOLTAIC POWER SOURCE' with rated MPP current/voltage and max system/circuit voltage; an inverter-OCPD-and-AC-disconnect sign with AC output current and nominal AC voltage; a microinverter-system label on the exterior of the main service panel reading 'Microinverter System Solar Breaker Inside Panel is PV System Disconnect'; and general signage 'on panel(s), disconnects and transmission line conductors.'
Why the confidence is not higherCompiled directly from the checklist's Photovoltaic Disconnect Requirements section and its worksheet's DC-disconnect/AC-disconnect sign fields, extracted from the PDF text.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Yes, for one specific case — the checklist gives verbatim required wording for the microinverter disconnect label: 'Microinverter System Solar Breaker Inside Panel is PV System Disconnect.' Other signage content (DC/AC disconnect placards) is specified by required data fields (voltage/current ratings) rather than fixed prose, deferring general format to UL 969 / CEC Article 690.
Why the confidence is not higherVerbatim quote found in the checklist; other placard content is field-based, not a full custom sentence, so this is a partial 'Yes.'
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Colour and material: 'red background and white lettering resistant to fading pursuant to UL 969 and California Electrical Code Article 690, and permanently affixed.' No specific numeric letter-height figure was found in the city's own document.
Why the confidence is not higherVerbatim from the checklist's Plans Submittal Requirements item 7; letter-height not stated anywhere in the same document (checked the full 4-page extract).
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedFull text of the PV checklist — it requires a site plan as part of the submittal package but names no dedicated site-plan/facility-map PLACARD (NEC 705.10-style) to be posted at the service equipment.
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedDid not fetch PG&E's own Rule 21/Greenbook DG interconnection manual this run; this is a utility-level document outside what the city itself publishes.
Q43 Where must the labels be placed? Core Labels Signage & labelling
On the panel(s), disconnects, and transmission line conductors; the PV disconnect itself must be in 'a readily accessible location and located together when possible' with the main service disconnect.
Why the confidence is not higherChecklist's Plans Submittal Requirements item 4 and Photovoltaic Disconnect Requirements section.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q44 Must equipment be on a specific approved list? Equipment listing
Yes
Why the confidence is not higherChecklist requires 'Equipment type, listing, testing agency approvals, etc.' in both the design/review bullet list and the Plans Submittal Requirements list.
published checklist checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1524/Residential-Rooftop-Photovoltaic-Systems-Plan-Submittal-Information-and-Checklist
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, conditionally — Sonoma County Fire District's current fee schedule (eff. 18 Sep 2025) requires an annual 'Battery System Stationary Storage / Energy Storage System' operational permit ($521 flat) for systems 'more than 50 gallons or for stationary and mobile energy storage systems regulated by [CFC] Section 1207.' The city's own building-side PV checklist and fee schedule are otherwise silent on battery-specific mounting/venting rules.
Why the confidence is not higherRead directly from the Sonoma County Fire District plan-review/fee-schedule PDF hosted on Cotati's own Building Forms page (which explicitly names 'the City of Cotati'). Control-checked: 'fire'/'electrical' occurs 24x in this document, a fabricated term 'zzqqx' 0x, so the search method is sound.
fire district fee schedule/application form checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/3455/Sonoma-County-Fire-District-Plan-Review-Application
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Yes, at the fire-district level — a separate annual Battery System Stationary Storage operational permit ($521) is required by Sonoma County Fire District; no separate ESS line exists in the city's own building-permit fee schedule (which appears to fold ESS into the general PV/solar permit if bundled with a PV system).
Why the confidence is not higherCity's own Master Fee Schedule was grepped for 'batter' and 'energy storage' — zero hits (positive control: 'electrical' appears twice in the same document, confirming the extraction worked), while the fire district's own fee schedule has the FP-8/FP-4 Battery System Stationary Storage line described above.
fee schedule (city, control-checked) + fire district fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedPV checklist's ground-mount language ('If the project is a ground mount system, additional requirements for review may be required') is too vague to confirm whether a ground-mount array is formally treated as a 'structure' requiring separate structural/foundation permitting; no further detail found in the checklist, fee schedule, or building-permit application.
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Nothing published by this authority.
Where we lookedPV checklist, SolarAPP+ page — neither states a required AC-disconnect-to-meter placement rule; this is typically a PG&E service-equipment requirement, not fetched this run.
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Phone (voicemail) — for SolarAPP+-eligible systems, contact Community Development at 707-665-3632 to schedule. 85% · department page
- How much notice is required? 24-48 business hours after SolarAPP+ approval before an inspection may be scheduled. 62% · department page
- Are same-day or AM/PM windows offered? No same-day option found; inspections for SolarAPP+ jobs are booked into fixed weekly windows: Mondays & Wednesdays 9am-noon, Thursdays 1-4pm. 75% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes 85% · department page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? For SolarAPP+-eligible systems the process implies a single final inspection: register/submit design, pay fees and receive approved plans online, then wait 24-48 business hours before scheduling one inspection. 55% · department page (inference)
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
Nothing recorded for City of Cotati on this step yet — 3 questions checked and found unpublished. The guidance above is general.
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- Is there a re-inspection fee? $325/hour (1-hour minimum) for re-inspection; the same $325/hour (2-hour minimum) rate applies to inspections outside normal business hours. 88% · published fee schedule
14 questions answered against City of Cotati’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Phone (voicemail) — for SolarAPP+-eligible systems, contact Community Development at 707-665-3632 to schedule.
Why the confidence is not higherSolarAPP+ page: 'Contact Community Development to schedule: Phone: 707-665-3632 (leave voicemail).' No portal-based self-scheduling was found for solar specifically (Cloudpermit's general scheduling function was not independently confirmed for solar this run).
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q50 How much notice is required? Core Booking & scheduling
24-48 business hours after SolarAPP+ approval before an inspection may be scheduled.
Why the confidence is not higherSolarAPP+ page: 'Allow 24-48 business hours before scheduling inspection.' This is stated as a post-approval processing window rather than explicitly framed as inspector 'notice,' so I am flagging the ambiguity rather than presenting it as a clean notice-period figure.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
No same-day option found; inspections for SolarAPP+ jobs are booked into fixed weekly windows: Mondays & Wednesdays 9am-noon, Thursdays 1-4pm.
Why the confidence is not higherSolarAPP+ page's 'Available times' list.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes
Why the confidence is not higherSolarAPP+ page describes Community Development itself scheduling and performing the inspection; no delegation to an outside inspector was found for the building/electrical final.
department page checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q53 If delegated, to whom? Core Who inspects
Nothing published by this authority.
Where we lookedNot applicable — q52 establishes the city performs its own final building/electrical solar inspection in-house; there is no delegate to name for that function. (Fire-side plan review/variances are delegated to Sonoma County Fire District, but that district does not perform the final building/electrical inspection.)
Q54 Which inspections are required, and in what order? Core Stages & sequence
For SolarAPP+-eligible systems the process implies a single final inspection: register/submit design, pay fees and receive approved plans online, then wait 24-48 business hours before scheduling one inspection.
Why the confidence is not higherInferred from the SolarAPP+ page's linear description of the process; the city does not publish an explicit multi-stage inspection sequence for PV, and I found no dedicated Building Inspections page (distinct from the general Building Permit Process page) describing a broader residential inspection sequence.
department page (inference) checked 2026-08-31 https://www.cotaticity.gov/1585/SolarAPP
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Nothing published by this authority.
Where we lookedSolarAPP+ page and Building Permit Process page — neither describes a separate rough-in or mid-roof inspection stage for solar; only a single scheduled inspection is mentioned.
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedSolarAPP+ and Building Permit Process pages describe scheduling and performing the inspection but never explicitly state that the inspector checks equipment labels/listings as a discrete step, even though listing is required at submittal (q44).
Q57 Is there a published inspection checklist? Core What is checked
Nothing published by this authority.
Where we lookedChecklists, Handouts and Helpful Resources page — the PV document found there is a submittal/design checklist, not a published field-inspection checklist used at the actual site visit; no separate inspection-day checklist was found.
https://www.cotaticity.gov/1599/Checklists-Handouts-and-Helpful-Resource
Q58 What must be on site at inspection? Core Documents on site
Nothing published by this authority.
Where we lookedSolarAPP+ and Building Permit Process pages — neither states what must be physically present on-site at the time of inspection (e.g., approved plans, ladder, permission-to-enter form).
Q59 Is there a re-inspection fee? Corrections & re-inspection
$325/hour (1-hour minimum) for re-inspection; the same $325/hour (2-hour minimum) rate applies to inspections outside normal business hours.
Why the confidence is not higherCurrent Master Fee Schedule, read directly from the extracted PDF text ('Re-Inspection Hourly (1 hr. min.) $325.00').
published fee schedule checked 2026-08-31 https://www.cotaticity.gov/DocumentCenter/View/1071/Master-Fee-Schedule-Effective-August-10-2026
Q60 How are corrections issued and cleared? Corrections & re-inspection
Nothing published by this authority.
Where we lookedBuilding Permit Process and SolarAPP+ pages — neither describes how post-inspection correction notices are issued or cleared.
Q61 What is issued on pass? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedSolarAPP+, Building Permit Process pages, and Master Fee Schedule — none names a specific document type (Final, Green Tag, Letter, CO) issued upon a passed solar inspection.
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedSolarAPP+ and Building Permit Process pages — neither states who submits interconnection-completion/PTO paperwork to PG&E (installer, homeowner, or AHJ); did not fetch PG&E's own Rule 21 process this run.
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Jurisdiction & key facts
The standing 62-question set, answered for City of Cotati against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Cotati is the authority having jurisdiction 90% confidence
- Holds
- Building and Electrical (issued as a single combined 'Photovoltaic Systems' permit by the Community Development Department); fire-life-safety plan review, fire-access-pathway variances, and the annual Battery/ESS operational permit are held by Sonoma County Fire District, a special district external to the city.
- Delegated to
- Sonoma County Fire District (fire component only) — the same agency that, per its own site, has absorbed/rebranded the former Rancho Adobe Fire Protection District, which historically served Cotati and Penngrove. rafd.org itself now states "This site is no longer updated. For service, information, and assistance, visit us at sonomacountyfd.org." A Sonoma County Fire District plan-review application form hosted on Cotati's own Building Forms page names "the City of Cotati" explicitly in its terms.
- Overridden by
- CA Gov. Code §65850.5 (Solar Rights Act / AB 2188) mandates nondiscretionary expedited review for small residential rooftop solar; Gov. Code §65850.52 (SB 379) underlies the city's SolarAPP+ instant-permitting program; AB 130 (Stats. 2025, Ch. 22) freezes the city from adopting any residential building-code amendment MORE restrictive than the state code from 1 Oct 2025 to 1 Jun 2031.
- Why not higher
- City's own Community Development Department (201 W Sierra Ave) runs its own Cloudpermit portal, its own SolarAPP+ instant-permitting page, and its own Master Fee Schedule with a dedicated 'Photovoltaic Systems (Solar Systems)' fee line — clear first-party evidence the city self-performs building/electrical review and issuance. The city's own PV submittal checklist tells applicants to contact 'the Rancho Adobe Fire Protection District' only for non-conforming fire-access-pathway designs, and a fire-district plan-review application form hosted on the city's own site (modified Aug 2026) is titled for 'Sonoma County Fire District' and names Cotati by name — confirming a live fire-agency rebrand/succession mid-survey that the fire agency's own legacy site (rafd.org) explicitly flags. Not full 100 because I could not independently verify with Sonoma County (the county government, distinct from the fire district) that it disclaims any residual permitting role, and because the fire-district succession is evidenced by the fire agency's own transitional notice rather than a formal LAFCo order I could locate this run.
- Permit required
- Yes95%
- Permit cost
- $450 flat for residential roof-mount up to 15 kW; $15/kW for each kW over 15 kW (residential). Commercial: $1,000 flat up to 50 kW, $7/kW from 51-250 kW, $5/kW above 250 kW.95%
- Plan review
- Instantaneous for SolarAPP+-eligible systems (automated online issuance); general over-the-counter permits '2-3 business days,' up to 30 days for larger projects not using SolarAPP+.85%
- Portal
- Cloudpermit (us.cloudpermit.com/cotaticity) for general building permits, and SolarAPP+ (gosolarapp.org, jurisdiction=Cotati) for eligible residential rooftop PV instant permitting.90%
- Electrical code
- 2023 NEC (as the basis of the 2025 CEC, statewide-mandatory as of 1 Jan 2026)58%
- Own placard wording
- Yes, for one specific case — the checklist gives verbatim required wording for the microinverter disconnect label: 'Microinverter System Solar Breaker Inside Panel is PV System Disconnect.'…75%
- Booking an inspection
- Phone (voicemail) — for SolarAPP+-eligible systems, contact Community Development at 707-665-3632 to schedule.85%
Labels & placards for this authority
City of Cotati writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.
Wording 75%
Yes, for one specific case — the checklist gives verbatim required wording for the microinverter disconnect label: 'Microinverter System Solar Breaker Inside Panel is PV System Disconnect.' Other signage content (DC/AC disconnect placards) is specified by required data fields (voltage/current ratings) rather than fixed prose, deferring general format to UL 969 / CEC Article 690.
Size, colour & material 78%
Colour and material: 'red background and white lettering resistant to fading pursuant to UL 969 and California Electrical Code Article 690, and permanently affixed.' No specific numeric letter-height figure was found in the city's own document.
Where they go 80%
On the panel(s), disconnects, and transmission line conductors; the PV disconnect itself must be in 'a readily accessible location and located together when possible' with the main service disconnect.
What the utility wants on top None%
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.