City of Davis

Yolo County

Verified Aug. 5, 2026

City of Davis is a city authority in the State of California, serving 66,850 residents. 6,280 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — SolarAPP+-eligible systems: permit number issued by email within 24 business hours of automated review. Q18 Where you file — SolarAPP+ (solarapp.nrel.gov) for eligible standard residential retrofit PV systems; Q20

Permit required
Yes95% source
What it costs
Valuation-based per the City-Wide Master Fee Schedule's Building Permit and Plan Check fee table (Basic Fee + Plan Review Fee scaled to declared job valuation),85% source
Plan review turnaround
SolarAPP+-eligible systems: permit number issued by email within 24 business hours of automated review.75% source
Key document
absence in published checklist + comparable-jurisdiction inference cited by 12 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Completed Building Application; two sets of plans (min. 11x17, scale 1/4"=1'); site plan showing modules/equipment location and fire access pathways; roof membrane/structural info; electrical (one-line-equivalent) diagram with conductor/conduit sizes and calcs, AC/DC disconnects, panelboard/busbar ratings; product datasheets for all new equipment; photos of existing main/interconnection panel and its labeling; plan pages depicting labels/placards per CEC 690 & 705.12. 95% · published checklist
    • How many copies, and in what format? Two sets of plans, minimum 11" x 17", drawn at 1/4" = 1' scale 95% · published checklist
    • Is a site plan required, and what must it show? Yes — must show location of all new/existing solar modules and electrical equipment, fire access pathways/clearances/setbacks per CRC 324, existing roof membrane info, and existing structural support (e.g. rafter size/spacing). 95% · published checklist
    • Is a one-line / three-line diagram required? Yes 85% · published checklist
    • Are string and conductor calculations required? Yes 90% · published checklist
    • Is a structural PE stamp required, and at what threshold? Required whenever the array exceeds the manufacturer's prescriptive installation instructions — no numeric threshold stated; standard prescriptive racking (with documented rafter spacing) does not require a stamp. 80% · published checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? SolarAPP+ (solarapp.nrel.gov) for eligible standard residential retrofit PV systems; non-eligible/other systems are submitted as a paper Building Application over the counter at the Building Division (23 Russell Blvd). No separate general e-permitting portal (e.g. Accela/Citizen Access) was found on the city's site. 85% · authority's own department page
    • Can the whole application be completed online? Partially — SolarAPP+ registration, design submission and automated code-compliance review happen entirely online, but the applicant must still bring two printed copies of the approved plans to the Building Division counter to receive City stamps and the physical permit card. 85% · authority's own department page
    • What does a residential solar permit cost? Valuation-based per the City-Wide Master Fee Schedule's Building Permit and Plan Check fee table (Basic Fee + Plan Review Fee scaled to declared job valuation), plus a separate SolarAPP+ platform processing fee for systems submitted through that route. No flat residential-solar-specific fee line exists. 85% · fee schedule
    • How is the fee calculated? Valuation 85% · fee schedule
    • Is there a separate plan-check fee? Yes 85% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? SolarAPP+-eligible systems: permit number issued by email within 24 business hours of automated review. Non-eligible systems go through the standard Building Division plan-check queue; no published turnaround time was found for that manual path. 75% · authority's own department page
    • Which utility handles interconnection here? PG&E (Pacific Gas & Electric) — PG&E owns the distribution wires and handles interconnection/PTO. Valley Clean Energy (VCE) is the Community Choice Aggregator that procures/supplies the electricity commodity for Davis, Woodland, Winters and unincorporated Yolo County, but does not perform interconnection. 85% · utility's own page
    • Where does the utility sit in the sequence? Parallel 50% · utility tariff (general inference, not Davis-specific)

28 questions answered against City of Davis’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherDavis is an incorporated city; its own Community Development & Sustainability Building Division issues residential building/electrical permits and its own Fire Department (Stations 31/32/33) reviews fire-code items, separate from Yolo County (which is AHJ only for unincorporated territory per CA-yolo-county.json).

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherThe Building Division issues one combined Building Application/permit covering building and electrical trades for residential PV/ESS (Basic Trades Permit Fee Chart bundles plumbing/mechanical/electrical under one permit number); the Fire Prevention Division separately reviews certain fire-code-triggered items (e.g. operational permits) but this is an added layer, not a delegation of building/electrical.

authority's own checklist + fee schedule checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherCity's own PV/battery checklist requires a 'Completed Building Application' and two sets of plans before work.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherSolar/battery work is submitted under a single Building Application; the Basic Trades Permit Fee Chart in the Master Fee Schedule treats electrical as one of several trades combinable under one permit number rather than requiring a standalone electrical permit.

fee schedule checked 2026-08-30 https://www.cityofdavis.org/home/showpublisheddocument/21017/638965670976470000

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either

Why the confidence is not higherNo Davis-specific restriction found limiting who pulls the electrical permit; inferred from CA owner-builder law (B&P Code §7044) and the fact the checklist only requires 'a Completed Building Application' without specifying licensure — not confirmed by an explicit Davis statement.

inference from checklist silence + state law checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

No

Why the confidence is not higherThe city's PV/battery and electrical-upgrade checklists list required documents and do not mention any city-specific contractor registration step; absence proven only within these two checklists, not a full code search (Municode was inaccessible — see notes).

absence in published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Nothing published by this authority.

Where we lookedChecked the Residential Solar and Battery Systems checklist, the Building FAQ, and the Electrical Service Upgrade checklist for an owner-builder / self-install provision; none address it explicitly one way or the other

https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q8 What documents make up a complete submittal? Core Submittal package

Completed Building Application; two sets of plans (min. 11x17, scale 1/4"=1'); site plan showing modules/equipment location and fire access pathways; roof membrane/structural info; electrical (one-line-equivalent) diagram with conductor/conduit sizes and calcs, AC/DC disconnects, panelboard/busbar ratings; product datasheets for all new equipment; photos of existing main/interconnection panel and its labeling; plan pages depicting labels/placards per CEC 690 & 705.12.

Why the confidence is not higherCity's own current 'Residential Solar (PV) & Energy Storage Systems' checklist, posted on the live Building Division forms page.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q9 How many copies, and in what format? Submittal package

Two sets of plans, minimum 11" x 17", drawn at 1/4" = 1' scale

Why the confidence is not higherStated verbatim in the city's current PV/battery checklist.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — must show location of all new/existing solar modules and electrical equipment, fire access pathways/clearances/setbacks per CRC 324, existing roof membrane info, and existing structural support (e.g. rafter size/spacing).

Why the confidence is not higherCity's own current checklist, 'SITE PLAN/ROOF INFORMATION' section.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherChecklist's 'ELECTRICAL DIAGRAM' section requires conductor/conduit sizes and calcs, identification of all AC/DC disconnects, and panelboard/busbar/breaker ratings — functionally a one-line diagram, though the document does not use that exact term.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Yes

Why the confidence is not higherChecklist explicitly requires 'all conductor/conduit types and sizes, with electrical calculations.'

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Required whenever the array exceeds the manufacturer's prescriptive installation instructions — no numeric threshold stated; standard prescriptive racking (with documented rafter spacing) does not require a stamp.

Why the confidence is not higherCity's own checklist: 'Solar arrays that exceed the prescriptive installation instructions of manufactured products shall require additional structural engineering.' No specific PE-stamp trigger (e.g. panel count or weight) is given.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedChecked the PV/battery checklist and the electrical service upgrade checklist for any electrical PE-stamp threshold; both discuss CEC compliance and load calcs but neither mentions an electrical engineer stamp requirement

https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q15 What does a residential solar permit cost? Core Fees

Valuation-based per the City-Wide Master Fee Schedule's Building Permit and Plan Check fee table (Basic Fee + Plan Review Fee scaled to declared job valuation), plus a separate SolarAPP+ platform processing fee for systems submitted through that route. No flat residential-solar-specific fee line exists.

Why the confidence is not higherFY2025-26 Master Fee Schedule (effective 7/1/25, revised 14 Oct 2025) has no 'solar' or 'PV' line item — confirmed by grep with positive control ('building permit', 'plan check' — many hits) and fabricated control ('zzqqx' — zero hits) — so the fee is the general valuation-based Building Permit/Plan Check table; the SolarAPP+ page separately states 'A processing fee from SolarAPP+ and City of Davis permit fees will be charged.'

fee schedule checked 2026-08-30 https://www.cityofdavis.org/home/showpublisheddocument/21017/638965670976470000

Q16 How is the fee calculated? Core Fees

Valuation

Why the confidence is not higherMaster Fee Schedule's 'Building Permit and Plan Check fees' table sets Basic Fee and Plan Review Fee by declared job valuation bands; the Basic Trades Permit Fee Chart (electrical/plumbing/mechanical) is likewise valuation-tiered. No per-kW or per-panel line exists (confirmed absent by the same positive/fabricated-control grep as Q15).

fee schedule checked 2026-08-30 https://www.cityofdavis.org/home/showpublisheddocument/21017/638965670976470000

Q17 Is there a separate plan-check fee? Fees

Yes

Why the confidence is not higherMaster Fee Schedule lists 'Initial Plan Review (Includes one recheck) — 65% of Basic Fee' as a distinct calculated line from the Basic (permit) Fee.

fee schedule checked 2026-08-30 https://www.cityofdavis.org/home/showpublisheddocument/21017/638965670976470000

Q18 What is the stated plan-review turnaround? Core Timeline & validity

SolarAPP+-eligible systems: permit number issued by email within 24 business hours of automated review. Non-eligible systems go through the standard Building Division plan-check queue; no published turnaround time was found for that manual path.

Why the confidence is not higherSolarAPP+ page states the 24-business-hour figure explicitly; the manual-path turnaround is not stated anywhere found (Building FAQ says only 'costs vary... contact us' for status, no days figure). A 15-working-day figure exists but is on the Fire Prevention Division's plan-review page for fire-code plan submittals generally, not building/solar review specifically.

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/solar-app

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedChecked the PV/battery checklist, electrical checklist, Building FAQ, and building-division-forms page for a stated permit-expiration/validity period; none give a duration (CBC default of 180 days for inaction would apply absent a local amendment, but no Davis-specific statement was found)

https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/frequently-asked-questions

Q20 Which permit portal does this authority use? Core Portal & process

SolarAPP+ (solarapp.nrel.gov) for eligible standard residential retrofit PV systems; non-eligible/other systems are submitted as a paper Building Application over the counter at the Building Division (23 Russell Blvd). No separate general e-permitting portal (e.g. Accela/Citizen Access) was found on the city's site.

Why the confidence is not higherCity's SolarAPP+ page names solarapp.nrel.gov as the registration/submission portal and describes the counter drop-off step for stamps; no other portal link was found on the Building Division page or forms page.

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/solar-app

Q21 Can the whole application be completed online? Core Portal & process

Partially — SolarAPP+ registration, design submission and automated code-compliance review happen entirely online, but the applicant must still bring two printed copies of the approved plans to the Building Division counter to receive City stamps and the physical permit card.

Why the confidence is not higherDescribed step-by-step on the city's SolarAPP+ page ('Download the approved plans and provide two printed copies to the Building Division counter to receive City stamps and a building permit card').

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/solar-app

Q22 Which utility handles interconnection here? Core Utility interconnection

PG&E (Pacific Gas & Electric) — PG&E owns the distribution wires and handles interconnection/PTO. Valley Clean Energy (VCE) is the Community Choice Aggregator that procures/supplies the electricity commodity for Davis, Woodland, Winters and unincorporated Yolo County, but does not perform interconnection.

Why the confidence is not higherVCE's own site states PG&E 'delivers it to you as they always have, and continues to handle billing, line maintenance and emergency services,' while VCE only procures power; PG&E Rule 21 (the Distribution Provider's tariff) governs the interconnection process for PG&E's territory, which includes Davis.

utility's own page checked 2026-08-30 https://www.valleycleanenergy.org/

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel

Why the confidence is not higherNot addressed by any Davis document found. Inferred from PG&E's general Rule 21 process, under which a generation interconnection application is typically filed with PG&E independent of the local building-permit timeline, converging only at Permission-to-Operate after the AHJ final inspection. Not confirmed against a Davis-specific statement — utility-level answer, not authority-level.

utility tariff (general inference, not Davis-specific) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No

Why the confidence is not higherThe city's PV/battery checklist lists all required submittal documents and does not include HOA/architectural approval; absence proven only within this checklist, not a full CC&R or municipal-code search.

absence in published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedChecked the PV/battery checklist (silent) and the city's Historic Preservation program page listing; Davis does have historic districts (e.g. College Park Historic District) but no document found states whether/how solar equipment on a contributing structure is reviewed

https://www.cityofdavis.org/city-hall/community-development-and-sustainability/historic-preservation

Q26 Is a wind or windstorm certification required? Overlays & special cases

No

Why the confidence is not higherNot mentioned in the PV/battery or electrical-upgrade checklists, and Davis (inland Yolo County, ASCE 7 wind exposure not a designated high-wind/coastal zone) is not a jurisdiction where CA municipalities typically require a separate wind certification for rooftop PV; not an explicit Davis statement.

absence in published checklist + comparable-jurisdiction inference checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No — standard residential rooftop PV permitting is ministerial, not requiring Council/SUP approval

Why the confidence is not higherConsistent with the statewide ministerial-review mandate for compliant PV systems (Gov. Code §65850.52 / former §65850.5) and Davis's own SolarAPP+/counter-permit process, which never mentions a Council or Use Permit step for standard residential PV.

state statute + authority's own process description checked 2026-08-30 https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65850.52

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedChecked the PV/battery checklist, SolarAPP+ page, and Master Fee Schedule for a Davis-specific system-size cap; SolarAPP+'s own national help-center article on system-size limits is a platform-wide policy, not a Davis ordinance, so it was not counted as a Davis answer

https://www.cityofdavis.org/city-hall/community-development-and-sustainability/solar-app

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? Not clearly current — city's own posted checklists (PV/battery doc revised 2022/reissued Apr 2023; electrical-upgrade doc dated Jan 2024) both cite the '2019 California Electrical Code (CEC)', which is two code cycles behind the 2025 Title 24 cycle (2023 NEC base) that took effect statewide 1 Jan 2026. This is reported as a live contradiction, not resolved: the documents are dated after 2022 but still reference 2019-cycle codes. 55% · authority's own dated checklist (internal contradiction)
    • Which building code edition is in force? Not clearly current — same city checklists cite the '2019 California Building Code (CBC)' / '2019 California Residential Code (CRC)', despite being the Building Division's live, currently-linked forms (one reissued 2023, one dated Jan 2024). 55% · authority's own dated checklist (internal contradiction)
    • Which fire code edition is in force? 2019 California Fire Code — stated on the live Fire Prevention page (captured 16 May 2026, footer dated '© 2026'): 'Section 105 of the California Fire Code, 2019 edition, establishes provisions for issuance of Operational Permits.' 70% · authority's own current department page
    • What is the installation judged against? 2019 CRC, CEC, California Energy Efficiency Standards, and CalGreen, per the city's own (but code-cycle-stale) PV/battery checklist — see Q29/Q30 contradiction. 65% · published checklist
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Fire access pathways/clearances/setbacks must comply with CRC Section 324; modules may not be placed on any portion of the roof providing an existing 36-inch pathway from an emergency escape/rescue opening (e.g. a second-floor bedroom window). 85% · published checklist
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Rapid shutdown is implicitly required — the checklist requires all secondary-source interconnection circuits to comply with 'CEC section 705.12' generally and requires AC/DC disconnects to be identified, but the document does not independently name NEC 690.12 or a rapid-shutdown edition; per the CA STATE-mode findings the current statewide requirement is under the 2023 NEC (2025 Title 24 cycle, effective 1 Jan 2026), while Davis's own posted checklist still cites 2019-cycle code (see Q29). 55% · inference + published checklist
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Placards/labels are required at the service equipment per CEC Sections 690 and 705.12 (as cross-referenced by the city's checklist); the city does not add placards beyond what those code sections already require. 75% · published checklist
    • Does the authority specify placard wording of its own? No 65% · absence in published checklist
    • Does it specify letter height, colour or material? No Davis-specific spec found 60% · absence in published checklist
    • Is a site plan / facility map placard required, and what must it show? A site plan showing the location of all new/existing solar modules and electrical equipment is required (functions as the facility map for 705.10 purposes); the checklist does not separately name a dedicated 'facility map placard.' 60% · published checklist
    • Does the UTILITY specify placards beyond the AHJ's? Yes — PG&E Rule 21 requires a visible, manually-operated, lockable isolating disconnect near the Point of Interconnection with its own signage: markings clearly indicating open/closed position, and if the switch is not adjacent to the PCC, permanent signage at a PG&E-approved location describing where the device is (plus contact-info signage and an approved locking device if the switch sits behind locked premises). 75% · utility tariff
    • Where must the labels be placed? At the main electric service / point of interconnection — the electrical checklist requires labels at 'the main electric service' for any secondary-source (PV/ESS/generator) system, and Rule 21 requires the visible disconnect (and its signage) at or near the Point of Interconnection. 70% · published checklist + utility tariff
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? Yes 80% · published checklist
    • Are batteries permitted, and under what conditions? Yes — batteries (ESS) are permitted and are addressed together with PV in the same city checklist. Conditions include CEC 705.12 interconnection sizing (120% rule or all-breakers-sum method), equipment grounding conductor sizing per CEC 250.122/250.169, and required product datasheets for 'battery equipment' and 'gateway/energy management hardware.' 90% · published checklist
    • Is there a separate ESS permit or inspection? No — combined with the PV permit under one Building Application; the checklist title and structure ('Residential Solar (PV) & Energy Storage Systems (Batteries)') treats PV and ESS as one submittal, not separate permits. 75% · published checklist
    • Is there a local rule on service upgrades or busbar sizing? Yes — CEC 705.12(B)(2)(3) interconnection sizing is spelled out in detail: the '120% Rule' (705.12(B)(2)(3)(b)) and the all-breakers-sum method (705.12(B)(2)(3)(c)), plus a table of grounding-electrode-conductor sizing by main breaker amperage (CEC Table 250.66), and a minimum 100A main breaker requirement for any service (CEC 230.79(C)). 90% · published checklist
    • Is a specific mounting system or attachment spacing required? Racking must carry a Class A fire rating and comply with UL 1703 and UL 2703; non-penetrating (ballast) systems require design pages showing ballast-block locations/weights per manufacturer; penetrating systems require flashing/waterproofing detail. 90% · published checklist

20 questions answered against City of Davis’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

Not clearly current — city's own posted checklists (PV/battery doc revised 2022/reissued Apr 2023; electrical-upgrade doc dated Jan 2024) both cite the '2019 California Electrical Code (CEC)', which is two code cycles behind the 2025 Title 24 cycle (2023 NEC base) that took effect statewide 1 Jan 2026. This is reported as a live contradiction, not resolved: the documents are dated after 2022 but still reference 2019-cycle codes.

Why the confidence is not higherBoth PDFs are the Building Division's current, live-linked handouts (fetched 30 Aug 2026) and both say '2019 CEC' verbatim; state default per CA STATE-mode findings is the 2023 NEC via the 2025 Title 24 cycle.

authority's own dated checklist (internal contradiction) checked 2026-08-30 https://documents.cityofdavis.org/Media/CommunityDevelopment/Documents/PDF/CDD/building/forms/Residential%20Electrical%20Service%20Upgrade-2024.pdf

Q30 Which building code edition is in force? Core Code editions in force

Not clearly current — same city checklists cite the '2019 California Building Code (CBC)' / '2019 California Residential Code (CRC)', despite being the Building Division's live, currently-linked forms (one reissued 2023, one dated Jan 2024).

Why the confidence is not higherVerbatim text in both PDFs; conflicts with the 2025 Title 24 cycle in force statewide since 1 Jan 2026 (and even the intervening 2022 cycle). Reported as a contradiction rather than resolved.

authority's own dated checklist (internal contradiction) checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q31 Which fire code edition is in force? Code editions in force

2019 California Fire Code — stated on the live Fire Prevention page (captured 16 May 2026, footer dated '© 2026'): 'Section 105 of the California Fire Code, 2019 edition, establishes provisions for issuance of Operational Permits.'

Why the confidence is not higherThis is the department's own current webpage (not an old cached artifact — footer copyright year is 2026), yet it names the 2019 edition, three cycles behind the 2025 Title 24 cycle in force since 1 Jan 2026. Reported as-is rather than assumed-updated.

authority's own current department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/welcome-to-the-fire-department/fire-prevention

Q32 Are there local amendments to any of the above? Core Code editions in force

Nothing published by this authority.

Where we lookedMunicode's library.municode.com/ca/davis is an empty Angular shell with no working public API route found (guessed several /api/ endpoints, all returned nothing); could not reach Title 8/18 text to confirm specific local amendments beyond what the PV/electrical checklists themselves restate from state code

https://library.municode.com/ca/davis

Q33 What is the installation judged against? Core Electrical

2019 CRC, CEC, California Energy Efficiency Standards, and CalGreen, per the city's own (but code-cycle-stale) PV/battery checklist — see Q29/Q30 contradiction.

Why the confidence is not higherVerbatim from the city's live-linked checklist; confidence reduced because the cited code cycle appears stale relative to the current 2025 Title 24 cycle.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Yes — CEC 705.12(B)(2)(3) interconnection sizing is spelled out in detail: the '120% Rule' (705.12(B)(2)(3)(b)) and the all-breakers-sum method (705.12(B)(2)(3)(c)), plus a table of grounding-electrode-conductor sizing by main breaker amperage (CEC Table 250.66), and a minimum 100A main breaker requirement for any service (CEC 230.79(C)).

Why the confidence is not higherBoth checklists lay this out with worked numeric examples for Davis's own plan-check use.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/CommunityDevelopment/Documents/PDF/CDD/building/forms/Residential%20Electrical%20Service%20Upgrade-2024.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Racking must carry a Class A fire rating and comply with UL 1703 and UL 2703; non-penetrating (ballast) systems require design pages showing ballast-block locations/weights per manufacturer; penetrating systems require flashing/waterproofing detail.

Why the confidence is not higherStated verbatim in the city's current PV/battery checklist.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Fire access pathways/clearances/setbacks must comply with CRC Section 324; modules may not be placed on any portion of the roof providing an existing 36-inch pathway from an emergency escape/rescue opening (e.g. a second-floor bedroom window).

Why the confidence is not higherStated verbatim in the checklist; confidence held at 85 rather than 95 because the cited CRC edition (2019) is stale relative to the current cycle (Q30).

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Rapid shutdown is implicitly required — the checklist requires all secondary-source interconnection circuits to comply with 'CEC section 705.12' generally and requires AC/DC disconnects to be identified, but the document does not independently name NEC 690.12 or a rapid-shutdown edition; per the CA STATE-mode findings the current statewide requirement is under the 2023 NEC (2025 Title 24 cycle, effective 1 Jan 2026), while Davis's own posted checklist still cites 2019-cycle code (see Q29).

Why the confidence is not higherInferred from the checklist's CEC 705.12/690 references plus the state-level 2023 NEC baseline; not an explicit rapid-shutdown statement from Davis, and the cycle conflict from Q29 applies.

inference + published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Placards/labels are required at the service equipment per CEC Sections 690 and 705.12 (as cross-referenced by the city's checklist); the city does not add placards beyond what those code sections already require.

Why the confidence is not higherChecklist: 'Provide plan set pages to depict labels and placards abiding by CEC sections 690 and 705.12.' No additional Davis-only placard type is named.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No

Why the confidence is not higherThe checklist only cross-references CEC 690/705.12 for label content; no Davis-specific wording is given anywhere in the PV/battery or electrical checklists.

absence in published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No Davis-specific spec found

Why the confidence is not higherNeither checklist adds letter-height, colour, or material requirements beyond what CEC 690/705.12 already prescribe; absence proven only within these two documents.

absence in published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

A site plan showing the location of all new/existing solar modules and electrical equipment is required (functions as the facility map for 705.10 purposes); the checklist does not separately name a dedicated 'facility map placard.'

Why the confidence is not higherChecklist's SITE PLAN/ROOF INFORMATION section; no explicit rapid-shutdown map/placard beyond NEC 705.10's own requirement is called out by Davis.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes — PG&E Rule 21 requires a visible, manually-operated, lockable isolating disconnect near the Point of Interconnection with its own signage: markings clearly indicating open/closed position, and if the switch is not adjacent to the PCC, permanent signage at a PG&E-approved location describing where the device is (plus contact-info signage and an approved locking device if the switch sits behind locked premises).

Why the confidence is not higherPG&E Electric Rule 21, Section H.1.d 'Visible Disconnect Required' (Advice submitted/effective 29 Aug 2025), Sheet 171 of the current tariff book — verified via pdftotext of the downloaded PDF, PDF creation date 25 Jun 2026.

utility tariff checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the main electric service / point of interconnection — the electrical checklist requires labels at 'the main electric service' for any secondary-source (PV/ESS/generator) system, and Rule 21 requires the visible disconnect (and its signage) at or near the Point of Interconnection.

Why the confidence is not higherCombines the city's electrical-upgrade checklist ('associated labels shall be installed at the main electric service (CEC 705.12)') with PG&E Rule 21's disconnect-location language.

published checklist + utility tariff checked 2026-08-30 https://documents.cityofdavis.org/Media/CommunityDevelopment/Documents/PDF/CDD/building/forms/Residential%20Electrical%20Service%20Upgrade-2024.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherChecklist requires racking to comply with UL 1703 and UL 2703 test standards and carry a Class A fire rating — a listing/testing requirement, though not framed as a single 'approved equipment list.'

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes — batteries (ESS) are permitted and are addressed together with PV in the same city checklist. Conditions include CEC 705.12 interconnection sizing (120% rule or all-breakers-sum method), equipment grounding conductor sizing per CEC 250.122/250.169, and required product datasheets for 'battery equipment' and 'gateway/energy management hardware.'

Why the confidence is not higherCity's own current 'Residential Solar (PV) & Energy Storage Systems (Batteries)' checklist covers both technologies as one submittal.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No — combined with the PV permit under one Building Application; the checklist title and structure ('Residential Solar (PV) & Energy Storage Systems (Batteries)') treats PV and ESS as one submittal, not separate permits.

Why the confidence is not higherInferred from the checklist covering both technologies as a single document/process; no separate 'ESS permit' page or fee line was found.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedChecked the PV/battery checklist and the Master Fee Schedule for a ground-mount-specific rule; neither addresses ground-mounted arrays (both are written for roof-mounted systems)

https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedChecked PG&E Rule 21 Section H (Visible Disconnect Required) and both Davis checklists for a stated AC-disconnect placement relative to the meter; Rule 21 specifies the disconnect must be accessible/lockable near the Point of Interconnection but does not state a position relative to the meter, and neither Davis document addresses meter-relative placement

https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For solar/battery permits the checklist describes a single inspection stage (final) covering grounding, panel access, and labeling — no separate rough-in stage is named. Electrical service-upgrade permits (a related but distinct permit type) do have a staged sequence: a 'Temporary Power Inspection' (panel set, grounding, ready for PG&E connection, city issues an 'Authorization to Connect' red sticker) followed by a final. 65% · published checklist
    • Is a rough-in or mid-roof inspection required? No 55% · absence in published checklist
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes 85% · published checklist
    • What must be on site at inspection? Stamped plans and the permit (card) must be on site; all electrical boxes open with deadfronts removed; for roof-mounted PV, a CAL-OSHA-approved extension ladder extending a minimum of 3 feet above the roofline; grounding electrode system (incl. gas/water bonds, or two ground rods 6' apart if no ufer) verifiable; all exterior equipment/conduit rated for exterior use; smoke alarms and CO detectors in working condition per CA H&SC 13113.7. 90% · published checklist
    • Does the inspector verify labels and listings? Yes (inferred) 65% · inference from published checklist
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (signed-off permit card) — no Certificate of Occupancy is issued for an existing single-family residence undergoing a PV/battery retrofit; the process language throughout (permit card, inspection sign-off) implies closing the permit rather than issuing a new CO. 55% · inference from process description
    • Who notifies the utility for PTO? Installer 50% · inference from utility tariff (utility-level, not Davis-specific)
    • Is there a re-inspection fee? $184.00 (hourly rate, minimum 1 hour) for re-inspections generally 85% · fee schedule

14 questions answered against City of Davis’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone

Why the confidence is not higherPrimary method is the voice-automated line (530-757-5658); the Building Division also accepts inspection requests by text (844-304-4064) and, as a last resort, email (cddweb@cityofdavis.org).

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/building-inspection-division

Q50 How much notice is required? Core Booking & scheduling

1 business day

Why the confidence is not higher'Use the voice automated system at 530-757-5658 before 3:30pm the business day prior for the following business day' — explicitly one-day advance notice only.

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/building-inspection-division

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

AM/PM preference can be requested via the 'special instructions' field on the automated line, but is not guaranteed; inspection windows run 8:00am-12:00pm and 1:00pm-3:30pm.

Why the confidence is not higherStated verbatim on the Building Inspection Division page.

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/building-inspection-division

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higher'A city building inspector will make site inspections to verify that all work performed complies with the adopted building codes and approved plans' — Davis performs its own building/electrical final inspections; not delegated to the county or a third party.

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/building-inspection-division

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated; the City of Davis Building Division performs its own final solar/electrical inspections.

Why the confidence is not higherSame source as Q52.

authority's own department page checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/building-inspection-division

Q54 Which inspections are required, and in what order? Core Stages & sequence

For solar/battery permits the checklist describes a single inspection stage (final) covering grounding, panel access, and labeling — no separate rough-in stage is named. Electrical service-upgrade permits (a related but distinct permit type) do have a staged sequence: a 'Temporary Power Inspection' (panel set, grounding, ready for PG&E connection, city issues an 'Authorization to Connect' red sticker) followed by a final.

Why the confidence is not higherInferred from the structure of the two checklists — the PV/battery document's INSPECTION section lists only final-inspection requirements, while the separate electrical-upgrade document explicitly names a Temporary Power Inspection stage.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No

Why the confidence is not higherThe PV/battery checklist's INSPECTION section describes only a single (final) inspection's requirements (stamped plans/permit on site, panels open, CAL-OSHA ladder, grounding verification) and does not mention a rough-in or mid-roof inspection stage.

absence in published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Yes (inferred)

Why the confidence is not higherThe checklist requires the plan set to 'depict labels and placards abiding by CEC sections 690 and 705.12' as a plan-check item, and the inspection section requires 'manufacturer's labeling' photos of the main panel; standard AHJ practice is to verify these labels match at final inspection, though no document states the inspector explicitly checks labels/listings at that stage.

inference from published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q57 Is there a published inspection checklist? Core What is checked

Yes

Why the confidence is not higherThe city's own 'Residential Solar (PV) & Energy Storage Systems' document itself functions as a published pre-inspection/plan-check checklist, including a dedicated INSPECTION section.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q58 What must be on site at inspection? Core Documents on site

Stamped plans and the permit (card) must be on site; all electrical boxes open with deadfronts removed; for roof-mounted PV, a CAL-OSHA-approved extension ladder extending a minimum of 3 feet above the roofline; grounding electrode system (incl. gas/water bonds, or two ground rods 6' apart if no ufer) verifiable; all exterior equipment/conduit rated for exterior use; smoke alarms and CO detectors in working condition per CA H&SC 13113.7.

Why the confidence is not higherVerbatim from the city's current PV/battery checklist's INSPECTION section.

published checklist checked 2026-08-30 https://documents.cityofdavis.org/Media/Default/Documents/PDF/CDD/building/forms/Residential%20Solar%20and%20Battery%20Systems-2023.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

$184.00 (hourly rate, minimum 1 hour) for re-inspections generally

Why the confidence is not higherFY2025-26 Master Fee Schedule lists 'Re-Inspections' at $184.00 under Hourly Rates, and 'Reinspection — Minimum 1 Hour' under Other Service and Permit Fees; no solar-specific re-inspection line exists (checked with the same positive/fabricated-control grep as Q15).

fee schedule checked 2026-08-30 https://www.cityofdavis.org/home/showpublisheddocument/21017/638965670976470000

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedChecked the PV/battery checklist, electrical-upgrade checklist, Building FAQ, and Building Inspection Division page for a published corrections-notice/clearance process; none describe how a failed-inspection correction is issued or cleared beyond the general note that an incomplete inspection 'automatically becomes a priority on the following workday'

https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building/building-inspection-division

Q61 What is issued on pass? Core Final sign-off & PTO

Final (signed-off permit card) — no Certificate of Occupancy is issued for an existing single-family residence undergoing a PV/battery retrofit; the process language throughout (permit card, inspection sign-off) implies closing the permit rather than issuing a new CO.

Why the confidence is not higherInferred from the SolarAPP+ page's reference to a 'building permit card' and the general residential-alteration permit process; no Davis document explicitly names what document/tag is issued on a passed final.

inference from process description checked 2026-08-30 https://www.cityofdavis.org/city-hall/community-development-and-sustainability/solar-app

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer

Why the confidence is not higherNot stated by any Davis document (this is a utility-level function, not an authority one); inferred from standard PG&E NEM/Rule 21 practice, under which the customer/installer submits the Permission-to-Operate request to PG&E after the AHJ final rather than PG&E or the city proactively pulling it.

inference from utility tariff (utility-level, not Davis-specific) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Davis against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Davis is the authority having jurisdiction 90% confidence
Holds
Building and Electrical (single combined Building Division permit for residential PV/ESS); Fire Prevention Division separately reviews certain fire-code-triggered items
Overridden by
State law caps local discretion: Gov. Code §65850.52 (SB 379, mislabeled §65850.5 in older sources) requires ministerial/automated review for compliant residential PV, which Davis implements via SolarAPP+; AB 130 (Stats. 2025, Ch. 22) additionally freezes any MORE-restrictive local residential building-code amendment from 1 Oct 2025 to 1 Jun 2031. PG&E (not Davis) separately controls interconnection/PTO under Electric Rule 21, and Valley Clean Energy is the CCA electricity supplier layered on top of PG&E's wires.
Why not higher
Davis is incorporated and its Community Development & Sustainability Building Division issues its own residential building/electrical permits (confirmed via its live Building Division, Building Inspection Division, and SolarAPP+ pages, plus the current PV/battery and electrical-upgrade checklists and the FY2025-26 Master Fee Schedule). CA-yolo-county.json separately confirms the County is AHJ only outside incorporated cities, so no jurisdiction conflict exists between Davis and Yolo County for in-city addresses. Davis's own Fire Department (not UC Davis Fire, which is a separate campus department) reviews fire-code items via its Fire Prevention Division.

https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building

Check the code edition before you build

This authority's published code edition does not match what the state has adopted. That usually means the authority's ordinance has not been updated for the current cycle — but a local amendment can also be lawful. Confirm with the building department before you submit.

Building code
This authority publishes 2019 Not clearly current — same city checklists cite the '2019 California Building Code (CBC)' / '2019 California Residential Code (CRC)', despite being the Building Division's live, currently-linked forms (one reissued 2023, one dated Jan 2024). 55% · source
The state has adopted 2024/2025 2025 California Building Code (Title 24, Part 2, Volumes 1 & 2), based on the 2024 International Building Code, and 2025 California Residential Code (Title 24, Part 2.5), 92% · source
Fire code
This authority publishes 2019 2019 California Fire Code — stated on the live Fire Prevention page (captured 16 May 2026, footer dated '© 2026'): 'Section 105 of the California Fire Code, 2019 edition, establishes provisions for issuance of Operational Permits.' 70% · source
The state has adopted 2024/2025 2025 California Fire Code (Title 24, Part 9), based on the 2024 International Fire Code, adopted by the Office of the State Fire Marshal with BSC approval. 90% · source
Permit required
Yes95%
Permit cost
Valuation-based per the City-Wide Master Fee Schedule's Building Permit and Plan Check fee table (Basic Fee + Plan Review Fee scaled to declared job valuation),85%
Plan review
SolarAPP+-eligible systems: permit number issued by email within 24 business hours of automated review.75%
Portal
SolarAPP+ (solarapp.nrel.gov) for eligible standard residential retrofit PV systems; non-eligible/other systems are submitted as a paper Building Application over the counter at the…85%
Electrical code
Not clearly current — city's own posted checklists (PV/battery doc revised 2022/reissued Apr 2023;55%
Own placard wording
No65%
Booking an inspection
Phone90%
Labels & placards for this authority

Wording 65%

No

Size, colour & material 60%

No Davis-specific spec found

Where they go 70%

At the main electric service / point of interconnection — the electrical checklist requires labels at 'the main electric service' for any secondary-source (PV/ESS/generator) system, and Rule 21 requires the visible disconnect (and its signage) at or near the Point of Interconnection.

What the utility wants on top 75%

Yes — PG&E Rule 21 requires a visible, manually-operated, lockable isolating disconnect near the Point of Interconnection with its own signage: markings clearly indicating open/closed position, and if the switch is not adjacent to the PCC, permanent signage at a PG&E-approved location describing where the device is (plus contact-info signage and an approved locking device if the switch sits behind locked premises).

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Yolo County
Regions served
1
Regions covered
City of Davis · city
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofdavis.org/city-hall/community-development-and-sustainability/building
Authority Contact
Address
23 Russell Boulevard, Suite 2, Davis, CA 95616
Main Phone
530-757-5610
Building Department
Department
Community Development and Sustainability - Building Division
Direct Phone
530-757-5610
Portal Software
eTRAKiT
Booking & Scheduling
Preferred channel
online_portal
Book in advance
1
Notes
Click2Gov (ASP.NET-based) online portal at davi-egov.aspgov.com supports inspection scheduling. Also: automated voice line (530) 756-4907 or text (844) 304-4064. Must request by 3:30 PM the business day before; morning (8am-12pm) or afternoon (1pm-3pm) window. Need permit number, inspection type, address, site contact name and phone. City uses SolarAPP+ for automated solar permit applications (https://www.cityofdavis.org/city-hall/community-development-and-sustainability/solar-app) — residential rooftop retrofit PV systems receive permit number by email within 24 business hours. Permit questions/applications: onlinepermits@cityofdavis.org. General dept contact: cddweb@cityofdavis.org. Office at 23 Russell Blvd Suite 2, Davis CA 95616, M-F 8am-5pm.