City of Dixon
Solano County
City of Dixon is a city authority in the State of California, serving 18,988 residents. 3,640 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — 3 business days for expedited/checklist-eligible small residential rooftop solar systems. Q18 Where you file — Dixon Civic Access Portal (DCAP) -- Tyler Enterprise Permitting & Licensing (EnerGov) self-service portal, launched 1 Dec 2025, Q20
- Permit required
- Yes95% source
- What it costs
- $450 flat for a residential PV system ≤15 kW AC, plus $15 per kW for each kW above 15 (Building Division fee).90% source
- Plan review turnaround
- 3 business days for expedited/checklist-eligible small residential rooftop solar systems.95% source
- Key document
- published checklist/handout cited by 5 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes 95% · authority's own code/department page
- What does this authority permit itself, and what does it delegate? Both 88% · department page + staff directory
- Is a permit required for a residential rooftop PV system? Yes 95% · adopted code text quoted on department FAQ
- Is there a separate electrical permit, or is it combined? Combined 72% · city handout + fee schedule
- Is a HOA or architectural approval required first? No 55% · code (absence, control-checked)
- Is there a historic-district review? No 55% · code (absence, control-checked)
- Is a wind or windstorm certification required? No dedicated windstorm-certification requirement beyond the standard code wind-design value -- the Non-Residential PV checklist states 'Basic velocity 110 mph, 3 second gust, exposure C or provide wind speed calculations from California Registered Engineer,' which is a design criterion, not a separate certification process. 60% · published checklist
- Is a Specific Use Permit or Council approval ever required? Conditionally yes -- the Building Official may require an applicant to apply for a use permit if there is substantial evidence the solar system 'could have a specific, adverse impact upon the public health and safety'; such a use-permit denial, or the underlying requirement, may be appealed to the Planning Commission (not directly to Council). 90% · codified ordinance (current)
- Is there a system-size cap on residential generation? Yes -- 10 kW AC / 30 kW thermal, and the ordinance's 'small residential rooftop solar energy system' definition is further scoped to systems on a single or duplex family dwelling not exceeding the maximum legal building height. No separate/uncoordinated cap was found: Dixon's zoning code has no Agricultural district at all (checked the full Table 18.03.010 base-district list), so the Shafter-style hidden ag-use-table cap does not apply here, and the city's own linked 'SolarAPP+ Eligibility Checklist' is simply an outbound link to the national solar-app.org help article rather than a Dixon-specific document with its own kW figure. 90% · codified ordinance (current)
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? Either 68% · city form + SolarApp+ handout
- Must the contractor be registered with this authority before applying? No 55% · department page (absence)
- Is a homeowner permitted to self-install and self-permit? Yes 65% · city form
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Completed application; two (2) sets of plans (11"x17" minimum) plus one electronic (PDF) set; a Residential Load Calculation Worksheet; two or more photos of the existing panel with the deadfront cover removed (to verify CEC 705.12 compliance); a one-line diagram showing conductor/grounding/conduit sizing, main panel disconnect/busbar rating, PV equipment locations, bonding points, AC/DC disconnect locations, and point of interconnection; a roof/site plan showing roof layout, pathways, points of access, prior solar installations and clearances, and orientation; and manufacturer's cut sheets for all components (module listing, fire class, Voc, Isc, max fuse rating, wattage). 95% · published checklist/handout
- How many copies, and in what format? Two (2) hard-copy sets, 11"x17" minimum size, plus one electronic (PDF) set for the conventional/non-SolarAPP+ path; non-residential requires plan sheets a minimum of 24"x36", all pages the same size, two complete stapled sets unless submitted through the Dixon Civic Access Portal (DCAP). 92% · city handouts
- Is a site plan required, and what must it show? Yes -- a roof/site plan (plan view) showing roof layout including all pathways, points of access, previous solar installations and clearances, an orientation (north) arrow, and PV module orientation; the non-residential checklist additionally requires lot lines, structure locations, main service panel location, array configuration, percent roof-area coverage (fire department review triggered), and ridge/valley-to-array distances. 95% · published checklist
- Is a one-line / three-line diagram required? Yes 95% · published checklist
- Are string and conductor calculations required? Yes 90% · published checklist
- Is a structural PE stamp required, and at what threshold? Non-residential: yes, always -- 'Structural Plans Included – Stamped and Signed (original) by a California Registered Engineer.' Residential: no blanket threshold found, but a stamp is triggered functionally wherever CBC structural provisions are triggered -- e.g. wall-mounted ESS ≥200 lb (CBC §1603.1.8) or floor-mounted ESS ≥400 lb (CBC §1616.10.15), or where mounting-system components are substituted/mixed across listed systems ('additional engineering shall be required'). 68% · published checklist
- Is an electrical PE stamp required, and at what threshold? Non-residential: yes, always -- 'Electrical sheets must be designed and stamped by California Licensed Electrical Engineer.' Residential: no PE-stamp requirement found; residential electrical sheets may be contractor-prepared. 68% · published checklist
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Dixon Civic Access Portal (DCAP) -- Tyler Enterprise Permitting & Licensing (EnerGov) self-service portal, launched 1 Dec 2025, with SolarAPP+ integrated for eligible residential PV/ESS systems. 95% · department page (dated)
- Can the whole application be completed online? Yes 90% · department page (dated)
- What does a residential solar permit cost? $450 flat for a residential PV system ≤15 kW AC, plus $15 per kW for each kW above 15 (Building Division fee). A separate Fire Department construction-permit fee of $341 applies to 'Solar photovoltaic power systems' generically (not broken out by residential/non-residential in the fire schedule). 90% · fee schedule (current)
- How is the fee calculated? Tiered / Flat-plus-per-kW: $450 flat ≤15 kW AC, then $15 per additional kW; non-residential/multi-family PV uses three further flat-plus-per-kW tiers (≤50 kW; 50-250 kW; >250 kW). 90% · fee schedule (current)
- Is there a separate plan-check fee? Ambiguous/likely yes as a percentage add-on -- the Master Fee Schedule's 'BUILDING PLAN CHECK' section prices plan check at 65% of the Building Permit fee for Residential/Commercial/Multi-Family/Industrial generally (25% for a residential subsequent identical plan), with fire plan review billed separately under the Fire schedule. It is not clear from the schedule whether the flat 'Solar Systems' line already nets in plan check the way other flat items (Reroof, Pool) appear to, or whether the 65% is added on top. 55% · fee schedule (ambiguous)
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? 3 business days for expedited/checklist-eligible small residential rooftop solar systems. 95% · codified ordinance (current)
- How long is an issued permit valid before it expires? Not locally amended -- defaults to the unamended 2025 CBC §105.5 standard (permit expires if work is not commenced within, or is suspended for, 180 days). 55% · code (inference from absence)
- Which utility handles interconnection here? Pacific Gas & Electric (PG&E) 80% · department page (program notice)
- Where does the utility sit in the sequence? After permit / at final -- utility interconnection approval (Permission to Operate) is contingent on the AHJ's final electrical inspection clearance, per PG&E's own tariff. 60% · utility tariff
28 questions answered against City of Dixon’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes
Why the confidence is not higherCity of Dixon's own codified Title 16 DMC adopts the 2025 CBC/CEC/CFC/CRC by reference and its Building Division (Chief Building Official Larry Paisley) is named on the city's own domain as the permitting/inspection authority; Chapter 16.18 DMC is the city's own codified small-residential-rooftop-solar streamlining ordinance.
authority's own code/department page checked 2026-08-31 https://www.cityofdixonca.gov/departments/communitydevelopment/buildingcodes
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both
Why the confidence is not higherBuilding Division staff (Chief Building Official, Building Inspector II, Permit Technician II) are all listed on the cityofdixonca.gov domain with no staffing-appendix or portal-domain evidence of a contracted plan-check/inspection firm; the city issues both building and electrical permits directly through its own Dixon Civic Access Portal (Tyler EnerGov). Fire plan review is a partial exception -- see jurisdiction.why.
department page + staff directory checked 2026-08-31 https://www.cityofdixonca.gov/departments/CommunityDevelopment/BuildingDIvision
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higher2025 CFC §105.6.20 (adopted verbatim, quoted on the city's own Permits FAQ page): 'A construction permit is required to install or modify solar photovoltaic power systems.' Building Division's own Residential Rooftop Solar PV handout likewise requires a completed application and permit submittal.
adopted code text quoted on department FAQ checked 2026-08-31 https://www.cityofdixonca.gov/permits
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined
Why the confidence is not higherSolarAPP+ Instructions Handout has applicants apply under permit type 'Photovoltaic – Electrical (SolarApp)' -- a single combined permit type -- and the Master Fee Schedule prices 'Solar Systems' as its own flat/tiered category distinct from the separate 'Standalone Electrical' fee line, implying the electrical work is bundled into the one solar permit rather than billed/issued as a second separate electrical permit.
city handout + fee schedule checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/SolarApp+%20Instructions%20Handout.pdf
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Either
Why the confidence is not higherThe city publishes a standard Owner-Builder Acknowledgement form with no PV-specific carve-out barring its use, so a homeowner may act as owner-builder; SolarAPP+'s own instructions separately ask applicants to 'have Contractors license information available,' the normal path for a licensed electrician/contractor. No Dixon document restricts the PV electrical permit to one class exclusively.
city form + SolarApp+ handout checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Required/Owner-Builder_Form.pdf
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
No
Why the confidence is not higherNo city-specific contractor pre-registration/database requirement was found; the Dixon Civic Access Portal and SolarAPP+ path both simply require the contractor's state CSLB license number at the time of application. Absence checked across the Building Division, Contractors, and permits pages.
department page (absence) checked 2026-08-31 https://www.cityofdixonca.gov/departments/communitydevelopment/Contractors
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes
Why the confidence is not higherThe city's standard Owner-Builder Acknowledgement and Information Verification Form is offered for all permit types including presumably solar (no PV carve-out found), letting a property owner be the permit's responsible party of record; SolarAPP+'s path separately assumes a licensed contractor.
city form checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Required/Owner-Builder_Form.pdf
Q8 What documents make up a complete submittal? Core Submittal package
Completed application; two (2) sets of plans (11"x17" minimum) plus one electronic (PDF) set; a Residential Load Calculation Worksheet; two or more photos of the existing panel with the deadfront cover removed (to verify CEC 705.12 compliance); a one-line diagram showing conductor/grounding/conduit sizing, main panel disconnect/busbar rating, PV equipment locations, bonding points, AC/DC disconnect locations, and point of interconnection; a roof/site plan showing roof layout, pathways, points of access, prior solar installations and clearances, and orientation; and manufacturer's cut sheets for all components (module listing, fire class, Voc, Isc, max fuse rating, wattage).
Why the confidence is not higherCity's own dated (Rev. 11/17/2025) Residential Rooftop Solar PV handout, read in full with pdftotext.
published checklist/handout checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/Residential-Rooftop-Solar-PV.pdf
Q9 How many copies, and in what format? Submittal package
Two (2) hard-copy sets, 11"x17" minimum size, plus one electronic (PDF) set for the conventional/non-SolarAPP+ path; non-residential requires plan sheets a minimum of 24"x36", all pages the same size, two complete stapled sets unless submitted through the Dixon Civic Access Portal (DCAP).
Why the confidence is not higherResidential Rooftop Solar PV handout (Rev. 11/17/2025) and Non-Residential PV Submittal Checklist (dated 18 Nov 2025), both read directly.
city handouts checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/Residential-Rooftop-Solar-PV.pdf
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes -- a roof/site plan (plan view) showing roof layout including all pathways, points of access, previous solar installations and clearances, an orientation (north) arrow, and PV module orientation; the non-residential checklist additionally requires lot lines, structure locations, main service panel location, array configuration, percent roof-area coverage (fire department review triggered), and ridge/valley-to-array distances.
Why the confidence is not higherResidential Rooftop Solar PV handout and Non-Residential PV Submittal Checklist, both current city documents read directly.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/Residential-Rooftop-Solar-PV.pdf
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes
Why the confidence is not higherResidential Rooftop Solar PV handout requires a 'One line diagram' showing conductor type/sizing, grounding, conduit, disconnect ratings, equipment locations and bonding points; Non-Residential checklist separately requires a 'Sample One-Line Diagram for PV System including derating load calculations.'
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/Residential-Rooftop-Solar-PV.pdf
Q12 Are string and conductor calculations required? Drawings & calculations
Yes
Why the confidence is not higherA 'Residential Load Calculation Worksheet' is a required submittal item on the Residential Rooftop Solar PV handout; the Non-Residential checklist separately requires a 'Verification of Wire Size for PV System Calculation form,' CEC Table 310.16 reference, and PV power-source short-circuit-rating calculations.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/Residential-Rooftop-Solar-PV.pdf
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Non-residential: yes, always -- 'Structural Plans Included – Stamped and Signed (original) by a California Registered Engineer.' Residential: no blanket threshold found, but a stamp is triggered functionally wherever CBC structural provisions are triggered -- e.g. wall-mounted ESS ≥200 lb (CBC §1603.1.8) or floor-mounted ESS ≥400 lb (CBC §1616.10.15), or where mounting-system components are substituted/mixed across listed systems ('additional engineering shall be required').
Why the confidence is not higherNon-Residential PV Submittal Checklist (always requires a stamp) and the ESS Submittal Handout / Residential ESS handout (weight-triggered stamp), read directly; no equivalent blanket residential-PV threshold found in the Residential Rooftop Solar PV handout itself.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Non-residential: yes, always -- 'Electrical sheets must be designed and stamped by California Licensed Electrical Engineer.' Residential: no PE-stamp requirement found; residential electrical sheets may be contractor-prepared.
Why the confidence is not higherNon-Residential PV Submittal Checklist, read directly; absence checked against the Residential Rooftop Solar PV handout, which lists no PE-stamp item.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q15 What does a residential solar permit cost? Core Fees
$450 flat for a residential PV system ≤15 kW AC, plus $15 per kW for each kW above 15 (Building Division fee). A separate Fire Department construction-permit fee of $341 applies to 'Solar photovoltaic power systems' generically (not broken out by residential/non-residential in the fire schedule).
Why the confidence is not higherCity's FY26-27 Master Fee Schedule, Resolution No. 26-090 (adopted 21 Apr 2026, effective 1 Jul 2026), Exhibit A -- Building ('Solar Systems: Residential Photovoltaic') and Fire fee pages, read via OCR at 300 dpi since the PDF's text layer is image-only. Figures shown are unchanged from the prior fee cycle (no CPI increase applied to this line).
fee schedule (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/CityResolutions/2026/26-090.pdf
Q16 How is the fee calculated? Core Fees
Tiered / Flat-plus-per-kW: $450 flat ≤15 kW AC, then $15 per additional kW; non-residential/multi-family PV uses three further flat-plus-per-kW tiers (≤50 kW; 50-250 kW; >250 kW).
Why the confidence is not higherSame Master Fee Schedule (Reso 26-090, Exhibit A -- Building), OCR-read table.
fee schedule (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/CityResolutions/2026/26-090.pdf
Q17 Is there a separate plan-check fee? Fees
Ambiguous/likely yes as a percentage add-on -- the Master Fee Schedule's 'BUILDING PLAN CHECK' section prices plan check at 65% of the Building Permit fee for Residential/Commercial/Multi-Family/Industrial generally (25% for a residential subsequent identical plan), with fire plan review billed separately under the Fire schedule. It is not clear from the schedule whether the flat 'Solar Systems' line already nets in plan check the way other flat items (Reroof, Pool) appear to, or whether the 65% is added on top.
Why the confidence is not higherMaster Fee Schedule, Reso 26-090 Exhibit A -- Building, 'BUILDING PLAN CHECK' section, OCR-read; the ambiguity is noted rather than resolved.
fee schedule (ambiguous) checked 2026-08-31 https://www.cityofdixonca.gov/media/CityResolutions/2026/26-090.pdf
Q18 What is the stated plan-review turnaround? Core Timeline & validity
3 business days for expedited/checklist-eligible small residential rooftop solar systems.
Why the confidence is not higherDMC §16.18.060(A): 'the Building Department shall issue a building permit or other nondiscretionary permit within three (3) business days' for an application meeting the approved checklist and standard plan.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q19 How long is an issued permit valid before it expires? Timeline & validity
Not locally amended -- defaults to the unamended 2025 CBC §105.5 standard (permit expires if work is not commenced within, or is suspended for, 180 days).
Why the confidence is not higherDMC §16.03.030 (Amendment of adopted codes) was read in full and contains no amendment to CBC §105.5/permit-validity; no separate validity period is stated in any of the city's solar handouts.
code (inference from absence) checked 2026-08-31 https://ecode360.com/47179320
Q20 Which permit portal does this authority use? Core Portal & process
Dixon Civic Access Portal (DCAP) -- Tyler Enterprise Permitting & Licensing (EnerGov) self-service portal, launched 1 Dec 2025, with SolarAPP+ integrated for eligible residential PV/ESS systems.
Why the confidence is not higherBuilding Division page 'NEWS/UPDATES' item (dated) describing the portal launch and giving its URL; SolarApp+ Permitting Instructions page confirms the same portal is used for the SolarAPP+ path.
department page (dated) checked 2026-08-31 https://www.cityofdixonca.gov/departments/CommunityDevelopment/BuildingDIvision
Q21 Can the whole application be completed online? Core Portal & process
Yes
Why the confidence is not higherBuilding Division page states: 'the on-line portal will be the method by which applicants will apply for, participate in plan review, and pay for and obtain building permits. The online portal will also be the method by which applicants will schedule inspections and review inspections results,' effective 1 Dec 2025.
department page (dated) checked 2026-08-31 https://www.cityofdixonca.gov/departments/CommunityDevelopment/BuildingDIvision
Q22 Which utility handles interconnection here? Core Utility interconnection
Pacific Gas & Electric (PG&E)
Why the confidence is not higherConfirmed from a city-side document rather than PowerToChoose: the city's own Building Division page carries a dated news item for the 'EV Charger Installation Program for Qualified PG&E Electric Customers,' describing 'Pacific Gas and Electric Company's (PG&E)' program for Dixon-area properties. No franchise-fee budget line was located to corroborate further given time constraints.
department page (program notice) checked 2026-08-31 https://www.cityofdixonca.gov/departments/CommunityDevelopment/BuildingDIvision
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit / at final -- utility interconnection approval (Permission to Operate) is contingent on the AHJ's final electrical inspection clearance, per PG&E's own tariff.
Why the confidence is not higherPG&E Electric Rule 21 §D.13.b requires 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction' before PTO is processed. This is the utility's own tariff, not a Dixon-specific document -- no city document was found addressing sequencing directly.
utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf
Q24 Is a HOA or architectural approval required first? Overlays & special cases
No
Why the confidence is not higherNo HOA/architectural-approval requirement for solar was found in DMC Title 16 (Ch. 16.18) or Title 18 (Zoning); 'homeowners association' and 'HOA' return zero hits in either title. Civil Code §714 (Solar Rights Act) would preempt such a requirement in any case.
code (absence, control-checked) checked 2026-08-31 https://ecode360.com/47179613
Q25 Is there a historic-district review? Overlays & special cases
No
Why the confidence is not higherNo historic-preservation, landmark, or historic-district chapter was found anywhere in Title 18 Zoning (searched for 'historic', 'landmark', 'Certificate of Appropriateness' -- the only 'historic' hits are an SB9 exclusion criterion, not a review process). Dixon's zoning code appears to have no dedicated historic-preservation ordinance at all.
code (absence, control-checked) checked 2026-08-31 https://ecode360.com/47180441
Q26 Is a wind or windstorm certification required? Overlays & special cases
No dedicated windstorm-certification requirement beyond the standard code wind-design value -- the Non-Residential PV checklist states 'Basic velocity 110 mph, 3 second gust, exposure C or provide wind speed calculations from California Registered Engineer,' which is a design criterion, not a separate certification process.
Why the confidence is not higherNon-Residential PV Submittal Checklist, 'DESIGN CRITERIA' section, read directly; no equivalent item appears in the Residential Rooftop Solar PV handout.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Conditionally yes -- the Building Official may require an applicant to apply for a use permit if there is substantial evidence the solar system 'could have a specific, adverse impact upon the public health and safety'; such a use-permit denial, or the underlying requirement, may be appealed to the Planning Commission (not directly to Council).
Why the confidence is not higherDMC §16.18.060(A) and (C), read in full.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Yes -- 10 kW AC / 30 kW thermal, and the ordinance's 'small residential rooftop solar energy system' definition is further scoped to systems on a single or duplex family dwelling not exceeding the maximum legal building height. No separate/uncoordinated cap was found: Dixon's zoning code has no Agricultural district at all (checked the full Table 18.03.010 base-district list), so the Shafter-style hidden ag-use-table cap does not apply here, and the city's own linked 'SolarAPP+ Eligibility Checklist' is simply an outbound link to the national solar-app.org help article rather than a Dixon-specific document with its own kW figure.
Why the confidence is not higherDMC §16.18.020 definitions ('Small residential rooftop solar energy system'), read in full; Table 18.03.010 Base and Overlay Districts confirms no AG district exists.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2023 NEC (incorporated by reference and amended as the 2025 California Electrical Code) 95% · codified adopting ordinance (current)
- Which building code edition is in force? 2025 California Building Code (Title 24, Part 2), incorporating the 2024 International Building Code by reference 95% · codified adopting ordinance (current)
- Which fire code edition is in force? 2025 California Fire Code (Title 24, Part 9), incorporating the 2024 International Fire Code by reference 95% · codified adopting ordinance (current)
- Are there local amendments to any of the above? Yes for Building, Fire, and Residential codes; No standalone technical amendment for Electrical (Ch. 16.01 contains only Title/Adoption/Penalties/Administrative-citations sections, no amendment section) -- confirmed by contrast with the Fire chapter, which has an extensive, itemized 'Amendments of 2025 California Fire Code' section (DMC §16.02.200). 90% · codified ordinance (current)
- What is the installation judged against? The current, locally-amended 2025 CBC/CRC/CEC/CFC/CALGreen/WUI (DMC Title 16, Ch. 16.01-16.20), plus DMC Ch. 16.18's own small-residential-rooftop-solar requirements (health/safety standards, CEC Article 690 performance standards, listing/testing-lab certification) and Civil Code §714 / Gov't Code §65850.5 solar-rights compliance. 90% · codified ordinance (current)
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
- What ridge setback and access pathways are required? Not locally amended beyond the base, unamended 2025 CFC §1205.2 pathway/setback table -- DMC §16.02.200's itemized fire-code amendments do not touch CFC Chapter 12 (Photovoltaic Systems) at all. The Non-Residential PV checklist requires the plot plan to show 'Distance from ridge to array(s)' and 'Distance from valley/hip to array(s)' but labels both '(Subject to Fire Code Official)' rather than stating a fixed local number, meaning the CFC's own default table controls case by case. 65% · codified ordinance + published checklist
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, per CEC 690.12 (2023 NEC basis, adopted via the 2025 CEC). 90% · published checklist, citing current CEC
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? The CEC 705.10 permanent plaque/directory denoting all electric power sources, installed at the main service panel and at every power-source location; CEC 690.13-compliant AC/DC disconnect labeling; for ESS, a subpanel label reading 'NO BRANCH CIRCUIT LOADS LARGER THAN XX AMPS...' for Tesla Powerwall installations. No AHJ-specific placard beyond what the adopted code itself requires was found. 75% · published checklist
- Does the authority specify placard wording of its own? No 70% · absence across all published handouts
- Does it specify letter height, colour or material? No 70% · absence across all published handouts
- Is a site plan / facility map placard required, and what must it show? The CEC 705.10 'permanent plaque or directory denoting all electric power sources on or in the premises,' required at the main service panel and at all interconnected power-source locations, functions as this; no separate site-plan/facility-map placard distinct from the plan-set roof/site plan itself was found. 60% · published checklist
- Does the UTILITY specify placards beyond the AHJ's? PG&E's Rule 21 §H.1.d requires a visible AC interconnection disconnect with open/closed position markings, lockable and reachable 24/7, shown on the single-line diagram -- a utility-level requirement beyond whatever the AHJ requires. Not confirmed as Dixon-specific; this is PG&E's standard territory-wide tariff. 55% · utility tariff
- Where must the labels be placed? At the main service panel and at every location of an interconnected electric power-production source (CEC 705.10); the AC disconnect itself must be within 5 feet of, and within sight of, the main service panel. 80% · published checklist
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Within 5 feet of, and within sight of, the main service panel (not specified relative to the meter itself). 80% · published checklist
- Must equipment be on a specific approved list? No dedicated city-approved-products list; standard NRTL/UL listing is required instead -- PV modules UL 1703 listed, inverters UL 1741 listed (multi-mode inverters per UL 1741 for ESS), and ESS listed/labeled per UL 9540. 70% · published checklist
- Are batteries permitted, and under what conditions? Yes, under the adopted (unamended) 2025 CRC §R330: unit rating capped at 20 kWh, aggregate rating capped by location (40 kWh in utility closets/basements/storage; 80 kWh in attached/detached garages, on exterior walls, or outdoors on the ground); permitted locations are detached garages/accessory structures, attached garages separated per R302.6, exterior walls ≥3 ft from doors/windows, or enclosed utility/storage spaces with fire-rated finishes; smoke/heat detection, 3 ft unit-to-unit spacing, and vehicle-impact protection (bollards/wheel barriers) required where applicable. The city's own ESS Submittal Handout restates and supplements this in detail (encourages exterior/garage siding, garage clear-space dimensions, screening from the street). 95% · code text + city handout (current)
- Is there a separate ESS permit or inspection? Yes -- 'A separate application and building permit is required for Energy Storage Systems.' Where PV and ESS are permitted together on a new production home, the city technician removes the duplicate ESS fee, but a separate ESS permit is still issued/used 'for reporting and inspection purposes only.' 90% · published handout (current)
- Is a ground mount treated as a structure? Yes -- DMC §18.11.020(A)(1) defines the zoning code's 'Accessory structures' provisions to reach not only roofed accessory structures but also 'unroofed structures that are over thirty (30) inches in height' detached from the main building, which captures a typical ground-mount PV rack; such structures are then subject to the accessory-structure side/rear setbacks (3 ft up to 10 ft height, 5 ft up to 14 ft height, capped at 30% of the required rear setback area or 400 sq ft). The Non-Residential PV checklist separately requires foundation details 'if ground mounted,' consistent with structure treatment. 75% · codified zoning ordinance (current)
- Is there a local rule on service upgrades or busbar sizing? No local rule found -- DMC Chapter 16.01 (Electrical Code) contains only a Title, an Adoption section, Penalties, and Administrative citations; there is no amendment section at all (contrast with Fire's lengthy, itemized amendment chapter at the same code, which proves the search mechanism works). No busbar-sizing or service-upgrade rule analogous to Palm Springs' PSMC 8.04.055 was found anywhere in Title 16. 75% · codified ordinance (absence, control-checked)
- Is a specific mounting system or attachment spacing required? No single fixed spacing number is codified; the Non-Residential PV checklist requires the submittal to 'indicate the style, diameter, length of embedment of bolts into framing members and location of attachments' and 'number of bolts per panel,' with 'mounting details and certified engineering or listed mounting installation,' and requires additional engineering where mounting-system components are substituted or mixed across listed systems. 75% · published checklist
20 questions answered against City of Dixon’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2023 NEC (incorporated by reference and amended as the 2025 California Electrical Code)
Why the confidence is not higherDMC §16.01.020: 'the 2025 California Electrical Code... which incorporates and amends by reference the 2023 National Electrical Code (NEC).'
codified adopting ordinance (current) checked 2026-08-31 https://ecode360.com/47179301
Q30 Which building code edition is in force? Core Code editions in force
2025 California Building Code (Title 24, Part 2), incorporating the 2024 International Building Code by reference
Why the confidence is not higherDMC §16.03.020, read in full.
codified adopting ordinance (current) checked 2026-08-31 https://ecode360.com/47179320
Q31 Which fire code edition is in force? Code editions in force
2025 California Fire Code (Title 24, Part 9), incorporating the 2024 International Fire Code by reference
Why the confidence is not higherDMC §16.02.100, read in full.
codified adopting ordinance (current) checked 2026-08-31 https://ecode360.com/47179306
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes for Building, Fire, and Residential codes; No standalone technical amendment for Electrical (Ch. 16.01 contains only Title/Adoption/Penalties/Administrative-citations sections, no amendment section) -- confirmed by contrast with the Fire chapter, which has an extensive, itemized 'Amendments of 2025 California Fire Code' section (DMC §16.02.200).
Why the confidence is not higherAll of Title 16's chapters (16.01-16.20) were read in full via the eCode360 print route; only 16.02 (Fire), 16.03 (Building), and 16.16 (Residential) carry a distinct amendment section.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179282
Q33 What is the installation judged against? Core Electrical
The current, locally-amended 2025 CBC/CRC/CEC/CFC/CALGreen/WUI (DMC Title 16, Ch. 16.01-16.20), plus DMC Ch. 16.18's own small-residential-rooftop-solar requirements (health/safety standards, CEC Article 690 performance standards, listing/testing-lab certification) and Civil Code §714 / Gov't Code §65850.5 solar-rights compliance.
Why the confidence is not higherDMC §16.18.040 (Solar energy system requirements) and the Title 16 adoption chapters generally.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
No local rule found -- DMC Chapter 16.01 (Electrical Code) contains only a Title, an Adoption section, Penalties, and Administrative citations; there is no amendment section at all (contrast with Fire's lengthy, itemized amendment chapter at the same code, which proves the search mechanism works). No busbar-sizing or service-upgrade rule analogous to Palm Springs' PSMC 8.04.055 was found anywhere in Title 16.
Why the confidence is not higherDMC Chapter 16.01, read in full via the eCode360 print route; control-checked against Chapter 16.02 (Fire), which does have a substantive amendment section, and a fabricated-term search ('zzqqx') returning zero hits.
codified ordinance (absence, control-checked) checked 2026-08-31 https://ecode360.com/47179301
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
No single fixed spacing number is codified; the Non-Residential PV checklist requires the submittal to 'indicate the style, diameter, length of embedment of bolts into framing members and location of attachments' and 'number of bolts per panel,' with 'mounting details and certified engineering or listed mounting installation,' and requires additional engineering where mounting-system components are substituted or mixed across listed systems.
Why the confidence is not higherNon-Residential PV Submittal Checklist, 'Mounting System for Panel Installation' section, read directly; same descriptive (non-numeric) requirement appears in the Residential Rooftop Solar PV handout.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Not locally amended beyond the base, unamended 2025 CFC §1205.2 pathway/setback table -- DMC §16.02.200's itemized fire-code amendments do not touch CFC Chapter 12 (Photovoltaic Systems) at all. The Non-Residential PV checklist requires the plot plan to show 'Distance from ridge to array(s)' and 'Distance from valley/hip to array(s)' but labels both '(Subject to Fire Code Official)' rather than stating a fixed local number, meaning the CFC's own default table controls case by case.
Why the confidence is not higherDMC §16.02.200, read in full (no CFC Ch.12/1205 amendment found); Non-Residential PV Submittal Checklist plot-plan requirements.
codified ordinance + published checklist checked 2026-08-31 https://ecode360.com/47179306
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, per CEC 690.12 (2023 NEC basis, adopted via the 2025 CEC).
Why the confidence is not higherNon-Residential Photovoltaic Checklist states explicitly: 'Provide Rapid Shutdown of PV per 690.12'; the Residential and ESS handouts separately require showing 'location and/or method of rapid shutdown initiation... (CEC 690.12).'
published checklist, citing current CEC checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
The CEC 705.10 permanent plaque/directory denoting all electric power sources, installed at the main service panel and at every power-source location; CEC 690.13-compliant AC/DC disconnect labeling; for ESS, a subpanel label reading 'NO BRANCH CIRCUIT LOADS LARGER THAN XX AMPS...' for Tesla Powerwall installations. No AHJ-specific placard beyond what the adopted code itself requires was found.
Why the confidence is not higherESS Submittal Handout and Non-Residential PV Submittal Checklist, read directly; both cite CEC 705.10/690.13 by number without adding a local placard of their own.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Submittal%20Guidelines/ESS%20Submittal%20Checklist.pdf
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No
Why the confidence is not higherNo Dixon document specifies its own placard wording -- checked the Residential PV handout, Remove-and-Replace handout, Non-Residential checklist, ESS handout/checklist, and SolarAPP+ Instructions Handout; all reference generic code-required signage ('Location of required signage,' 'all labels and paint installed') without quoting specific text.
absence across all published handouts checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
No
Why the confidence is not higherNone of the city's PV/ESS handouts specify letter height, colour, or material for placards (the only dimensioned specs found are for ESS bollards/wheel barriers under CRC R330.8.3, not signage). Checked all six downloaded solar/ESS PDFs with pdftotext.
absence across all published handouts checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Submittal%20Guidelines/ESS%20Submittal%20Checklist.pdf
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
The CEC 705.10 'permanent plaque or directory denoting all electric power sources on or in the premises,' required at the main service panel and at all interconnected power-source locations, functions as this; no separate site-plan/facility-map placard distinct from the plan-set roof/site plan itself was found.
Why the confidence is not higherESS Submittal Handout, item on CEC 705.10; Residential/Non-Residential handouts' roof/site-plan requirements.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Submittal%20Guidelines/ESS%20Submittal%20Checklist.pdf
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
PG&E's Rule 21 §H.1.d requires a visible AC interconnection disconnect with open/closed position markings, lockable and reachable 24/7, shown on the single-line diagram -- a utility-level requirement beyond whatever the AHJ requires. Not confirmed as Dixon-specific; this is PG&E's standard territory-wide tariff.
Why the confidence is not higherPG&E Electric Rule 21 §H.1.d (utility tariff, not a Dixon document).
utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
At the main service panel and at every location of an interconnected electric power-production source (CEC 705.10); the AC disconnect itself must be within 5 feet of, and within sight of, the main service panel.
Why the confidence is not higherESS Submittal Handout and Non-Residential PV Submittal Checklist ('A visible external A/C disconnect within 5' of the main service panel'), read directly.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Submittal%20Guidelines/ESS%20Submittal%20Checklist.pdf
Q44 Must equipment be on a specific approved list? Equipment listing
No dedicated city-approved-products list; standard NRTL/UL listing is required instead -- PV modules UL 1703 listed, inverters UL 1741 listed (multi-mode inverters per UL 1741 for ESS), and ESS listed/labeled per UL 9540.
Why the confidence is not higherNon-Residential PV Submittal Checklist and ESS Submittal Handout, read directly; no separate 'approved equipment list' page or document was found on the Building Division site.
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, under the adopted (unamended) 2025 CRC §R330: unit rating capped at 20 kWh, aggregate rating capped by location (40 kWh in utility closets/basements/storage; 80 kWh in attached/detached garages, on exterior walls, or outdoors on the ground); permitted locations are detached garages/accessory structures, attached garages separated per R302.6, exterior walls ≥3 ft from doors/windows, or enclosed utility/storage spaces with fire-rated finishes; smoke/heat detection, 3 ft unit-to-unit spacing, and vehicle-impact protection (bollards/wheel barriers) required where applicable. The city's own ESS Submittal Handout restates and supplements this in detail (encourages exterior/garage siding, garage clear-space dimensions, screening from the street).
Why the confidence is not higherR330 text quoted verbatim in the city's own ESS Submittal Checklist (dated Rev. 11/18/2025) and Residential Energy Storage System handout (Rev. 11/19/2025), both read directly with pdftotext.
code text + city handout (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Submittal%20Guidelines/ESS%20Submittal%20Checklist.pdf
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Yes -- 'A separate application and building permit is required for Energy Storage Systems.' Where PV and ESS are permitted together on a new production home, the city technician removes the duplicate ESS fee, but a separate ESS permit is still issued/used 'for reporting and inspection purposes only.'
Why the confidence is not higherESS Submittal Handout / Residential Energy Storage System handout, and the Residential Production Home Solar Permit handout (Rev. 3/9/2026), read directly.
published handout (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/Residential%20Energy%20Storage%20System%20ESS.pdf
Q47 Is a ground mount treated as a structure? Core Ground mount
Yes -- DMC §18.11.020(A)(1) defines the zoning code's 'Accessory structures' provisions to reach not only roofed accessory structures but also 'unroofed structures that are over thirty (30) inches in height' detached from the main building, which captures a typical ground-mount PV rack; such structures are then subject to the accessory-structure side/rear setbacks (3 ft up to 10 ft height, 5 ft up to 14 ft height, capped at 30% of the required rear setback area or 400 sq ft). The Non-Residential PV checklist separately requires foundation details 'if ground mounted,' consistent with structure treatment.
Why the confidence is not higherDMC §18.11.020, read in full via the eCode360 print route for Title 18; Non-Residential PV Submittal Checklist. No PV-specific ground-mount carve-out or exemption was found anywhere in Title 18.
codified zoning ordinance (current) checked 2026-08-31 https://ecode360.com/47180441
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Within 5 feet of, and within sight of, the main service panel (not specified relative to the meter itself).
Why the confidence is not higherNon-Residential PV Submittal Checklist ('A visible external A/C disconnect within 5' of the main service panel') and the ESS handouts (AC disconnect within 5 ft and within sight of the main panel).
published checklist checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Non-Residential/Non%20Residential%20PV%20Submittal%20Checklist.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Portal (Dixon Civic Access Portal 'Request Inspection' button) or Phone (24-hour inspection request line, 707-678-7005). 95% · department page (current)
- How much notice is required? By 3:00 pm, one business day before the desired inspection date (portal cut-off and phone-line cut-off are the same); a request left after 3:00 pm on Wednesday rolls to the following Monday (or next business day if a holiday). 90% · department page (current)
- Are same-day or AM/PM windows offered? Yes -- the SolarApp+ inspection-scheduling step asks the applicant to provide 'Inspection date and time (AM or PM).' 80% · published handout (current)
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes 95% · codified ordinance (current)
- If delegated, to whom? N/A -- not delegated; the Building Department performs the (single) required inspection itself. 90% · codified ordinance (current)
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? For expedited-eligible small residential rooftop solar systems: a single, consolidated final inspection, scheduled within 2 business days of the request. Larger/ineligible systems are not separately documented but would be expected to follow the city's ordinary building-permit inspection sequence (no solar-specific rough-in stage was found). 70% · codified ordinance (current)
- Is a rough-in or mid-roof inspection required? No, for expedited-eligible systems -- 'Only one inspection shall be required.' 75% · codified ordinance (current)
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Yes -- multiple published checklists exist: the Non-Residential PV Submittal Checklist, the ESS Submittal Handout/Checklist, the SolarApp+ Instructions Handout's own 'required for inspection' list, and the Remove-and-Replace handout's 'Field Inspector to verify' list. 90% · published checklists (current)
- What must be on site at inspection? Signed permit on site (electronic copy acceptable); complete load calculations reflecting all installed circuits/devices/loads; photos of the panel with deadfront both installed and removed; a copy of the submitted checklist; all deadfronts removed and equipment opened for inspector access; an acceptable Type 3 (or CAL-OSHA-approved) extension ladder set up and secured, extending a minimum of 3 feet above the roofline; and all required labels/paint installed. 95% · published handout (current)
- Does the inspector verify labels and listings? Yes 85% · published handout (current)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- Who notifies the utility for PTO? Not stated in any Dixon document (checked all downloaded PV/ESS handouts and checklists for 'PTO'/'permission to operate'/utility-notification language -- zero hits). Under PG&E's own tariff, the installer typically submits proof of the AHJ's final inspection clearance to PG&E to trigger PTO. 55% · utility tariff (Dixon silent)
- Is there a re-inspection fee? $62.00 flat ('Missed Inspection or Reinspection Fee') 90% · fee schedule (current)
- How are corrections issued and cleared? A written correction notice detailing all deficiencies is sent to the applicant for resubmission (standard expedited-review path per DMC §16.18.060(E)). For SolarAPP+ permits specifically, the revision is first submitted through SolarAPP+ itself (yielding a revised SolarAPP+ Approval Document), then the revised documents are uploaded as an 'Attachment' of the correct document type in the Dixon Civic Access Portal and resubmitted. 85% · codified ordinance + published handout (current)
14 questions answered against City of Dixon’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Portal (Dixon Civic Access Portal 'Request Inspection' button) or Phone (24-hour inspection request line, 707-678-7005).
Why the confidence is not higherBuilding Inspection Information department page, read directly.
department page (current) checked 2026-08-31 https://www.cityofdixonca.gov/departments/communitydevelopment/buildinginspection
Q50 How much notice is required? Core Booking & scheduling
By 3:00 pm, one business day before the desired inspection date (portal cut-off and phone-line cut-off are the same); a request left after 3:00 pm on Wednesday rolls to the following Monday (or next business day if a holiday).
Why the confidence is not higherBuilding Inspection Information page and SolarApp+ Instructions Handout, both stating the same 3:00 pm / one-day-prior cutoff.
department page (current) checked 2026-08-31 https://www.cityofdixonca.gov/departments/communitydevelopment/buildinginspection
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Yes -- the SolarApp+ inspection-scheduling step asks the applicant to provide 'Inspection date and time (AM or PM).'
Why the confidence is not higherSolarApp+ Instructions Handout, Step 3 ('Schedule Your Inspection'), read directly.
published handout (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/SolarApp+%20Instructions%20Handout.pdf
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes
Why the confidence is not higherDMC §16.18.060(F): 'Only one inspection shall be required and performed by the Building Department for small residential rooftop solar energy systems eligible for expedited review' -- near-verbatim the same model-ordinance sentence found in several other CA cities (Claremont, La Verne), confirming self-performance rather than delegation.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q53 If delegated, to whom? Core Who inspects
N/A -- not delegated; the Building Department performs the (single) required inspection itself.
Why the confidence is not higherSame source as Q52, DMC §16.18.060(F).
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q54 Which inspections are required, and in what order? Core Stages & sequence
For expedited-eligible small residential rooftop solar systems: a single, consolidated final inspection, scheduled within 2 business days of the request. Larger/ineligible systems are not separately documented but would be expected to follow the city's ordinary building-permit inspection sequence (no solar-specific rough-in stage was found).
Why the confidence is not higherDMC §16.18.060(F)-(G) for the expedited path; no separate multi-stage sequence document was found for non-expedited PV.
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
No, for expedited-eligible systems -- 'Only one inspection shall be required.'
Why the confidence is not higherDMC §16.18.060(F).
codified ordinance (current) checked 2026-08-31 https://ecode360.com/47179613
Q56 Does the inspector verify labels and listings? Core What is checked
Yes
Why the confidence is not higherSolarApp+ Instructions Handout lists as required for inspection: 'Photos of panel – with deadfront installed and removed,' 'All deadfronts removed and equipment opened,' and 'All labels and paint installed,' with failure to have these ready resulting in a cancelled/rescheduled inspection.
published handout (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/SolarApp+%20Instructions%20Handout.pdf
Q57 Is there a published inspection checklist? Core What is checked
Yes -- multiple published checklists exist: the Non-Residential PV Submittal Checklist, the ESS Submittal Handout/Checklist, the SolarApp+ Instructions Handout's own 'required for inspection' list, and the Remove-and-Replace handout's 'Field Inspector to verify' list.
Why the confidence is not higherAll five documents downloaded from the city's own Permits page and read directly.
published checklists (current) checked 2026-08-31 https://www.cityofdixonca.gov/permits
Q58 What must be on site at inspection? Core Documents on site
Signed permit on site (electronic copy acceptable); complete load calculations reflecting all installed circuits/devices/loads; photos of the panel with deadfront both installed and removed; a copy of the submitted checklist; all deadfronts removed and equipment opened for inspector access; an acceptable Type 3 (or CAL-OSHA-approved) extension ladder set up and secured, extending a minimum of 3 feet above the roofline; and all required labels/paint installed.
Why the confidence is not higherSolarApp+ Instructions Handout and Residential Rooftop Solar PV handout, read directly.
published handout (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/SolarApp+%20Instructions%20Handout.pdf
Q59 Is there a re-inspection fee? Corrections & re-inspection
$62.00 flat ('Missed Inspection or Reinspection Fee')
Why the confidence is not higherMaster Fee Schedule, Reso 26-090 Exhibit A -- Building, 'Additional Inspection Fees' section, OCR-read; effective 1 Jul 2026 (up from $60.00).
fee schedule (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/CityResolutions/2026/26-090.pdf
Q60 How are corrections issued and cleared? Corrections & re-inspection
A written correction notice detailing all deficiencies is sent to the applicant for resubmission (standard expedited-review path per DMC §16.18.060(E)). For SolarAPP+ permits specifically, the revision is first submitted through SolarAPP+ itself (yielding a revised SolarAPP+ Approval Document), then the revised documents are uploaded as an 'Attachment' of the correct document type in the Dixon Civic Access Portal and resubmitted.
Why the confidence is not higherDMC §16.18.060(E) and the SolarApp+ Instructions Handout's 'Revision Steps for SolarApp+' section, both read directly.
codified ordinance + published handout (current) checked 2026-08-31 https://www.cityofdixonca.gov/media/Permits/Forms/Residential/SolarApp+%20Instructions%20Handout.pdf
Q61 What is issued on pass? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedChecked the Residential Rooftop Solar PV handout, Remove-and-Replace handout, Non-Residential PV Submittal Checklist, ESS handout/checklist, SolarApp+ Instructions Handout, and the Building Inspection Information / Building Division department pages for 'CO', 'certificate of occupancy', 'green tag', 'final approval' or similar sign-off terminology -- none specify what document/status is issued when a solar inspection passes.
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Not stated in any Dixon document (checked all downloaded PV/ESS handouts and checklists for 'PTO'/'permission to operate'/utility-notification language -- zero hits). Under PG&E's own tariff, the installer typically submits proof of the AHJ's final inspection clearance to PG&E to trigger PTO.
Why the confidence is not higherPG&E Electric Rule 21 §D.13.b (utility tariff); absence confirmed across all six downloaded Dixon PV/ESS PDFs.
utility tariff (Dixon silent) checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Jurisdiction & key facts
The standing 62-question set, answered for City of Dixon against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Dixon is the authority having jurisdiction 88% confidence
- Holds
- building and electrical (in-house); fire code adoption sits with the City, but fire prevention plan-review/inspection cost is jointly attributed to a legally distinct 'Dixon Fire Protection District' -- see why
- Overridden by
- CA Gov't Code §65850.5 (expedited review, codified as DMC Ch. 16.18), §65850.52/SB 379 and §65850.55 (fee cap) apply statewide; AB 130 (Stats. 2025, Ch. 22) freezes any new more-restrictive residential amendment 1 Oct 2025-1 Jun 2031, though Dixon's 2025-cycle code adoption (Ord. 25-007, eff. 1 Jan 2026) is itself a standard code-cycle adoption, not a new restriction.
- Why not higher
- City of Dixon is an incorporated California city; DMC Title 16 codifies adoption of the 2025 CBC/CEC/CFC/CRC/CALGreen/WUI codes, and its Building Division (Chief Building Official Larry Paisley, Building Inspector II Joel Engrahm, Permit Technician II Terra Hudson) is named on the city's own cityofdixonca.gov domain with no staffing-appendix, portal-domain, or pdfinfo-Author evidence of a contracted plan-check/inspection firm -- ten tells checked, all clean in-house. The fire side is more complicated and is reported rather than resolved: the codified DMC §16.02.100/.200 (Fire Code) speaks throughout of the 'Dixon Fire Department' / 'City of Dixon Fire Department' as if it were a plain city department, and its Fire Prevention Division office is given a city-run address. But the city's own current (21 Apr 2026) Master Fee Schedule resolution states its Initial/Subsequent/Commercial Residential Construction Plan Review fee lines '(Applies to both City of Dixon and Dixon Fire Protection District)' -- first-party, dated proof that Dixon Fire Protection District is a legally distinct agency from the City, not just a department name. The Fire Department's own contact email (fireadmin@dixonfireca.gov) sits on a separate domain from the city's, though that domain returns NXDOMAIN for a website (checked by direct DNS lookup) so no independent web presence could be found to further characterize governance (e.g. a board-fusion test against the City Council roster, as done for American Canyon/Barstow, was not possible in this run). The brief's flagged utility (PG&E) was verified from a city-side document rather than PowerToChoose: the city's own Building Division page carries a dated news item for 'Pacific Gas and Electric Company's (PG&E)' EV-charger program for Dixon customers.
https://www.cityofdixonca.gov/departments/communitydevelopment/buildingcodes
- Permit required
- Yes95%
- Permit cost
- $450 flat for a residential PV system ≤15 kW AC, plus $15 per kW for each kW above 15 (Building Division fee).90%
- Plan review
- 3 business days for expedited/checklist-eligible small residential rooftop solar systems.95%
- Portal
- Dixon Civic Access Portal (DCAP) -- Tyler Enterprise Permitting & Licensing (EnerGov) self-service portal, launched 1 Dec 2025,95%
- Electrical code
- 2023 NEC (incorporated by reference and amended as the 2025 California Electrical Code)95%
- Own placard wording
- No70%
- Booking an inspection
- Portal (Dixon Civic Access Portal 'Request Inspection' button) or Phone (24-hour inspection request line, 707-678-7005).95%
Labels & placards for this authority
Wording 70%
No
Size, colour & material 70%
No
Where they go 80%
At the main service panel and at every location of an interconnected electric power-production source (CEC 705.10); the AC disconnect itself must be within 5 feet of, and within sight of, the main service panel.
What the utility wants on top 55%
PG&E's Rule 21 §H.1.d requires a visible AC interconnection disconnect with open/closed position markings, lockable and reachable 24/7, shown on the single-line diagram -- a utility-level requirement beyond whatever the AHJ requires. Not confirmed as Dixon-specific; this is PG&E's standard territory-wide tariff.
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.