City of Foster City
San Mateo County
City of Foster City is a city authority in the State of California, serving 33,805 residents. 942 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — 5 business days (1st review cycle) / 3 business days (2nd review cycle) for a rooftop PV system Q18 Where you file — eTRAKiT (permit.fostercity.org/etrakit), with the PV-specific application layered through the national SolarAPP+ platform for eligible standard installs Q20
- Permit required
- Yes98% source
- What it costs
- $0 (Building Permit fee) for standard residential rooftop PV; $450 flat for residential ESS (SMCFD fire review/inspection billed separately, not included)90% source
- Plan review turnaround
- 5 business days (1st review cycle) / 3 business days (2nd review cycle) for a rooftop PV system92% source
- Key document
- department handout cited by 9 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes 95% · department page
- What does this authority permit itself, and what does it delegate? Both 95% · municipal code
- Is a permit required for a residential rooftop PV system? Yes 98% · municipal code
- Is there a separate electrical permit, or is it combined? Combined 70% · department page
- Is a HOA or architectural approval required first? Only for houses within a Planned Development (HOA letter required); otherwise no separate architectural/design review for compliant systems 85% · department handout
- Is there a historic-district review? No 55% · municipal code
- Is a wind or windstorm certification required? No 55% · department handout
- Is a Specific Use Permit or Council approval ever required? Only if the Planning Division makes a written finding, based on substantial evidence, that the system would have a 'specific, adverse impact' on public health/safety under the Solar Rights Act framework -- otherwise no Use Permit/Council approval is required 90% · municipal code
- Is there a system-size cap on residential generation? 10 kW AC nameplate / 30 kW thermal, for eligibility under the 'small residential rooftop solar' expedited-review chapter (2015 AB 2188-era cap, unchanged) 85% · municipal code
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? Either 85% · department handout
- Must the contractor be registered with this authority before applying? Yes 85% · department page
- Is a homeowner permitted to self-install and self-permit? No 70% · department handout
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Building Permit Application, Authorization to Act as an Agent, HOA approval letter (if in a Planned Development), cover sheet with code list/project data/scope, site & roof plans, elevation view, structural attachment table, PE-stamped structural calcs (advisory), site map placard dimensions/color, electrical panel photo (dead-front removed, nameplate visible), service size/rating info, isometric/3-line diagram, grounding electrode detail, residential electrical load calculation, line/supply-side tap equipment listing (if used), manufacturer spec sheets for all equipment, tile-hook flashing detail (tile roofs), and for ESS: battery location/separation/fire-detection/anchorage/bollard details. 92% · department handout
- How many copies, and in what format? Electronic only, via eTRAKiT 85% · department handout
- Is a site plan required, and what must it show? Site and roof plans showing electrical supply panel, PV array/modules (each string identified), combiner box, inverter, AC/DC disconnects, conduit, junction boxes, battery banks, and property-line setback distances if the array is not roof-attached. 92% · department handout
- Is a one-line / three-line diagram required? Yes 95% · department handout
- Are string and conductor calculations required? Yes 85% · department handout
- Is a structural PE stamp required, and at what threshold? Advisory PE-stamped structural plans/calcs 'required' per CRC R301.1, no numeric kW/weight threshold stated -- applies whenever roof structural attachment details are submitted. 75% · department handout
- Is an electrical PE stamp required, and at what threshold? Not specified as a separate stamp threshold beyond the structural PE advisory; battery components over 400 lbs require structural anchorage/calcs per ASCE 7-22 13.3/13.6 (a structural, not electrical, PE trigger). 60% · department handout
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? eTRAKiT (permit.fostercity.org/etrakit), with the PV-specific application layered through the national SolarAPP+ platform for eligible standard installs 95% · department page
- Can the whole application be completed online? Yes 85% · department page
- What does a residential solar permit cost? $0 (Building Permit fee) for standard residential rooftop PV; $450 flat for residential ESS (SMCFD fire review/inspection billed separately, not included) 90% · fee schedule
- How is the fee calculated? Flat/Exempt 85% · fee schedule
- Is there a separate plan-check fee? No (effectively $0) 70% · fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? 5 business days (1st review cycle) / 3 business days (2nd review cycle) for a rooftop PV system 92% · department handout
- How long is an issued permit valid before it expires? Base CBC/CRC 105.5 (180 days to commence work / 180 days suspension triggers expiration), with a local amendment allowing reactivation at half the original permit fee if the suspension/abandonment period does not exceed 1 year 75% · municipal code
- Which utility handles interconnection here? PG&E (Pacific Gas & Electric Company) 90% · department page
- Where does the utility sit in the sequence? After permit (Permission to Operate is gated on the AHJ's final inspection clearance) 90% · utility tariff
28 questions answered against City of Foster City’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes
Why the confidence is not higherCity of Foster City's own Building Division (Community Development Department) issues residential building and electrical permits in-house, confirmed by staff roster all on @fostercity.org and FCMC Ch.15.45 'Small Residential Rooftop Solar Systems'. The co-terminous Estero Municipal Improvement District (EMID) is a separate legal entity but its own code (Estero MIDC) contains no building/electrical/fire chapter -- it is not the AHJ for solar.
department page checked 2026-08-30 https://www.fostercity.org/436/Building-Division
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both
Why the confidence is not higherBuilding Division (in-house City of Foster City staff, Community Development Dept.) issues both the building permit and the electrical permit for residential PV; nothing is delegated to EMID (checked Estero MIDC Titles 1-9: General Provisions, Admin, Finance, Health&Safety, Water&Sewer, Public Property -- no building/electrical chapter exists). Fire plan review/inspection is delegated to San Mateo Consolidated Fire Department (SMCFD), a JPA of San Mateo/Belmont/Foster City, for ESS and 'if required' per FCMC 15.45.060.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherFCMC 15.45.030 Applicability: 'This chapter applies to the permitting of all small residential rooftop solar energy systems in the city of Foster City.' Current Building Division checklist confirms a Building Permit Application must be submitted via eTRAKiT.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined
Why the confidence is not higherSolarAPP+ workflow on the city's Solar Permits page has applicants apply for a single 'SOLARAPP PLUS' permit type in eTrakit covering the PV work; the Master Fee Schedule likewise books 'Solar (Photovoltaic) Panels' as a single Building-Division line (CDB-17.9) rather than a separate electrical-permit line item, though the general Electrical Permit Fee schedule (CDB-06) still exists for non-solar electrical work. Not stated explicitly as combined vs separate anywhere on the city's own pages, so this is an inference from the fee schedule and portal workflow.
department page checked 2026-08-30 https://www.fostercity.org/424/Solar-Permits
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Either
Why the confidence is not higherResidential Re-roof with Existing Solar handout: 'Removal and re-installation/modification of the solar PVT system must be performed by a Licensed C-46 Solar Contractor, a C-10 Electrical Contractor, an A General Engineering Contractor, or a B General Building Contractor.' Homeowner self-install of the electrical/PV work itself is separately advised against (see Q7).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3731/Residential-Reroof-with-Existing-Solar-Handout-Form
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes
Why the confidence is not higherSolar Permits page, SolarAPP+ step 1: 'Confirm that you have an active City of Foster City Business License before applying.'
department page checked 2026-08-30 https://www.fostercity.org/424/Solar-Permits
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
No
Why the confidence is not higherCity's MSP-Upgrade handout: 'Advisory: Owner-Builder is not permitted to install the electrical work. A CA Licensed C10 - Electrical Contractor is required to perform the electrical work.' The Re-roof-with-solar handout similarly excludes the homeowner/C-39 roofer from PV removal/reinstall, restricting it to C-46/C-10/A/B licensees. This is city practice for the electrical/PV trade specifically; the general CA owner-builder exemption for the building permit itself is not addressed on these pages.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3704/MSP-Upgrade-Handout
Q8 What documents make up a complete submittal? Core Submittal package
Building Permit Application, Authorization to Act as an Agent, HOA approval letter (if in a Planned Development), cover sheet with code list/project data/scope, site & roof plans, elevation view, structural attachment table, PE-stamped structural calcs (advisory), site map placard dimensions/color, electrical panel photo (dead-front removed, nameplate visible), service size/rating info, isometric/3-line diagram, grounding electrode detail, residential electrical load calculation, line/supply-side tap equipment listing (if used), manufacturer spec sheets for all equipment, tile-hook flashing detail (tile roofs), and for ESS: battery location/separation/fire-detection/anchorage/bollard details.
Why the confidence is not higherDirectly enumerated, item-by-item, in the current (Updated 05/2026, 2025 code cycle) 'Submittal Requirements for Residential Photovoltaic Projects' handout issued by the Building Division.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q9 How many copies, and in what format? Submittal package
Electronic only, via eTRAKiT
Why the confidence is not higherChecklist: 'All applications, plans, and supporting documents are to be submitted electronically via eTRAKiT.' FCMC 15.45.050 also allows electronic signatures in lieu of a wet signature. No copy count is specified because submittal is digital-only.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q10 Is a site plan required, and what must it show? Core Submittal package
Site and roof plans showing electrical supply panel, PV array/modules (each string identified), combiner box, inverter, AC/DC disconnects, conduit, junction boxes, battery banks, and property-line setback distances if the array is not roof-attached.
Why the confidence is not higherChecklist item 2-3: 'Site and roof plans shall clearly show the location of the electrical supply panel, PV array, modules... Show property line setback distances to the proposed equipment when the solar array is not attached to the structure (CRC R106.2).'
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes
Why the confidence is not higherChecklist item 11: 'Provide an Isometric / Three-Line Diagram showing all system components: wire sizes, conductor insulation type, method of protection... number of modules per string, strings per array, and total number of modules.'
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q12 Are string and conductor calculations required? Drawings & calculations
Yes
Why the confidence is not higherThe 3-line diagram requirement (item 11) requires wire sizes, insulation type, conductor protection method and grounding conductor sizing; item 13 separately requires a Residential Electrical Load Calculation per CEC Article 220/Annex D. Not a separately labeled 'string calculation' line, so scored slightly below the diagram requirement itself.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Advisory PE-stamped structural plans/calcs 'required' per CRC R301.1, no numeric kW/weight threshold stated -- applies whenever roof structural attachment details are submitted.
Why the confidence is not higherChecklist item 7: 'Structural Attachment Details for the proposed rooftop equipment are required (CRC R301.1)... Advisory: PE Stamped Plans and Calculations required (CRC R301.1).' No specific size/weight threshold is given in the city's own document, so this reads as a blanket advisory rather than a triggered threshold.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Not specified as a separate stamp threshold beyond the structural PE advisory; battery components over 400 lbs require structural anchorage/calcs per ASCE 7-22 13.3/13.6 (a structural, not electrical, PE trigger).
Why the confidence is not higherChecklist item 17: 'Suspended (wall-hung) doubled-up Storage Batteries / components weighing over 400 lbs require structural anchorage and calculations per ASCE 7-22 Sections 13.3 and 13.6.' No electrical-PE-specific threshold found in city documents (control-checked: no 'electrical engineer' stamp threshold appears in the current PV checklist or FCMC 15.20).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q15 What does a residential solar permit cost? Core Fees
$0 (Building Permit fee) for standard residential rooftop PV; $450 flat for residential ESS (SMCFD fire review/inspection billed separately, not included)
Why the confidence is not higherFY2026-27 Master Fee & Service Charges Schedule (jointly titled 'City of Foster City/Estero Municipal Improvement District', dated 30 Jun 2026), item CDB-17.9: 'Solar (Photovoltaic) Panels (Formerly CDB-02 I) -- Exempt from Building Permit Fees.' Item CDB-17.10: 'Energy Storage System (ESS) for Single-Family and Two-Family Dwellings (San Mateo Consolidated Fire Department (SMCFD)'s Review and Fire Inspection excluded) -- $450.' Whether the standard per-unit Electrical Permit fee schedule (CDB-06, e.g. $119.59 issuance) still applies on top of the exempted Building Permit fee for the PV installation's electrical component is not stated explicitly, so this could understate the true out-of-pocket cost.
fee schedule checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3996/Master-Fee-and-Service-Charges-Schedule-Fiscal-Year-2026-Through-2027-PDF
Q16 How is the fee calculated? Core Fees
Flat/Exempt
Why the confidence is not higherThe fee schedule treats residential PV as a flat exemption (CDB-17.9, 'Exempt from Building Permit Fees') and residential ESS as a flat $450 (CDB-17.10), not a valuation-, per-kW-, or per-panel-based formula.
fee schedule checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3996/Master-Fee-and-Service-Charges-Schedule-Fiscal-Year-2026-Through-2027-PDF
Q17 Is there a separate plan-check fee? Fees
No (effectively $0)
Why the confidence is not higherCDB-01 Plan Checking Fees: '1st Plan Check -- 70% of building fee.' Since the Building Permit fee for solar is exempted (CDB-17.9), 70% of $0 is $0, though the schedule does not state this arithmetic outcome for solar explicitly -- it is an inference from the two line items read together, hence not scored higher.
fee schedule checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3996/Master-Fee-and-Service-Charges-Schedule-Fiscal-Year-2026-Through-2027-PDF
Q18 What is the stated plan-review turnaround? Core Timeline & validity
5 business days (1st review cycle) / 3 business days (2nd review cycle) for a rooftop PV system
Why the confidence is not higherBuilding Division 'Building Plan Review Approximate Time Frames' handout, Residential Plan Review table: 'Roof top Photovoltaic System -- 5 business working days (1st Review Cycle) / 3 business working days (2nd Review Cycle).' Separately, FCMC 15.45.060 sets a 45-calendar-day deemed-approved backstop for small residential rooftop solar consistent with the Solar Rights Act -- the two are not in conflict, the handout states the department's practiced target and the ordinance states the statutory outer limit.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3737/Plan-Review-Turn-Around-Time
Q19 How long is an issued permit valid before it expires? Timeline & validity
Base CBC/CRC 105.5 (180 days to commence work / 180 days suspension triggers expiration), with a local amendment allowing reactivation at half the original permit fee if the suspension/abandonment period does not exceed 1 year
Why the confidence is not higherFCMC 15.02.080 (Ord. 697 §2, 2025) amends CBC 105.5.1: 'Before such work can be recommenced, a new permit shall first be obtained... the fee therefor shall be one-half the amount required for a new permit... provided... such suspension or abandonment has not exceeded one (1) year.' The base 180-day expiration trigger itself is unamended standard CBC 105.5 language, not separately quoted on a city page.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1502.html
Q20 Which permit portal does this authority use? Core Portal & process
eTRAKiT (permit.fostercity.org/etrakit), with the PV-specific application layered through the national SolarAPP+ platform for eligible standard installs
Why the confidence is not higherSolar Permits page: applicants create a SolarAPP+ project, then 'apply for a Building Permit... Go to our Online Permit Center [eTRAKiT]... Select SOLARAPP PLUS as your Permit Type.'
department page checked 2026-08-30 https://www.fostercity.org/424/Solar-Permits
Q21 Can the whole application be completed online? Core Portal & process
Yes
Why the confidence is not higherSolar Permits page workflow describes account creation, application, fee payment, plan upload and inspection scheduling entirely through SolarAPP+ and eTRAKiT online, for eligible standard PV installs (main panel upgrades and battery storage are currently excluded from the SolarAPP+ automated path and require the standard, still-electronic, plan-check submittal).
department page checked 2026-08-30 https://www.fostercity.org/424/Solar-Permits
Q22 Which utility handles interconnection here? Core Utility interconnection
PG&E (Pacific Gas & Electric Company)
Why the confidence is not higherCity's own 'Winter Storm Preparation' page: 'Contact PG&E for power-related issues at 800-743-5000,' and multiple city Utility Projects pages describe PG&E gas/electric infrastructure work within Foster City. PG&E is the wires/interconnection utility; the community-choice aggregator (see Q-notes) is Peninsula Clean Energy, which does not touch interconnection.
department page checked 2026-08-30 https://www.fostercity.org/782/Winter-Storm-Preparation
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit (Permission to Operate is gated on the AHJ's final inspection clearance)
Why the confidence is not higherPG&E Electric Rule 21, Section D.13.b (Cal. P.U.C. Sheet 45, effective 29 Aug 2025 revision): PTO for NEM systems is 'processed not later than thirty (30) Business Days following Distribution Provider's receipt of... evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction over the Generating Facility.'
utility tariff checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Only for houses within a Planned Development (HOA letter required); otherwise no separate architectural/design review for compliant systems
Why the confidence is not higherChecklist: 'LETTER FROM HOMEOWNERS' ASSOCIATION (if applicable): For houses located within Planned Developments, a letter demonstrating the written action by the HOA on the proposal shall be obtained prior to submitting plans.' FCMC 15.45.060 separately bars the city from conditioning solar approval on HOA approval generally, and limits review to health/safety compliance absent a documented specific adverse impact.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q25 Is there a historic-district review? Overlays & special cases
No
Why the confidence is not higherNo historic-preservation or historic-district chapter appears in the Title 17 Zoning chapter list (17.02-17.96, checked in full), and neither the current PV checklist nor FCMC 15.45 references historic review. Foster City is a single-era (1960s) master-planned community; absence is inferred from a full TOC read rather than a targeted historic-chapter search, so scored as a moderate-confidence absence rather than certainty.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity17/FosterCity17.html
Q26 Is a wind or windstorm certification required? Overlays & special cases
No
Why the confidence is not higherNo wind/windstorm certification is referenced anywhere in the current PV submittal checklist, FCMC 15.45, or the MSP-Upgrade handout; CA jurisdictions generally fold wind design into CBC/ASCE 7 structural review (captured under Q13's structural-PE advisory) rather than a separate windstorm certificate as used in coastal/TDI states. Absence checked against the current PV documents only, not a full-code search.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Only if the Planning Division makes a written finding, based on substantial evidence, that the system would have a 'specific, adverse impact' on public health/safety under the Solar Rights Act framework -- otherwise no Use Permit/Council approval is required
Why the confidence is not higherFCMC 15.45.060: 'The city of Foster City planning division may require an applicant to apply for a use permit if the planning division finds, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety... Such decisions may be appealed to the city of Foster City planning commission.'
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q28 Is there a system-size cap on residential generation? Overlays & special cases
10 kW AC nameplate / 30 kW thermal, for eligibility under the 'small residential rooftop solar' expedited-review chapter (2015 AB 2188-era cap, unchanged)
Why the confidence is not higherFCMC 15.45.020.B.1 (Ord. 595 §1, 2015, still in force): 'Small residential rooftop solar energy system' means... 'a solar energy system that is no larger than ten kilowatts alternating current nameplate rating or thirty kilowatts thermal.' Systems above this size are not barred outright but fall outside this chapter's expedited/streamlined process and the SolarAPP+ pathway; the city's documents do not state what happens to larger systems beyond losing the expedited track, so that inference is scored lower than the cap figure itself.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2023 90% · municipal code
- Which building code edition is in force? 2025 California Building Code / 2025 California Residential Code, effective 1 Jan 2026 95% · department page
- Which fire code edition is in force? 2025 California Fire Code (based on the 2024 International Fire Code with CA amendments) 92% · municipal code
- Are there local amendments to any of the above? Yes 90% · municipal code
- What is the installation judged against? The 2025 CEC/NEC(2023 base)/CBC/CRC/CFC as locally amended by FCMC Title 15, plus the Building Division's current PV submittal checklist which layers CRC, CEC, CFC and Foster City Municipal Code citations item-by-item 90% · department handout
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
- What ridge setback and access pathways are required? Access pathways and fire setbacks must be shown on plans per 2025 CFC Section 1205.2; no local numeric ridge-setback amendment found beyond the base fire code 75% · municipal code
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes -- required, to the 2023 NEC (690.12) as adopted via the 2025 CEC/CFC; the city's own checklist cross-cites the fire code's mirror provision 90% · department handout
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? A site map/facility placard at the service equipment per CEC 705.10 / CFC 1205.4.1; the checklist requires the applicant to propose dimensions and color scheme rather than the city prescribing its own placard text 78% · department handout
- Does the authority specify placard wording of its own? No 65% · municipal code
- Does it specify letter height, colour or material? Not specified by the city; letter height/color/material are left to the base CEC 705.10 / CFC 1205.4.1 requirements, with the applicant proposing the dimensions/color scheme for city approval 65% · department handout
- Is a site plan / facility map placard required, and what must it show? Yes -- a Site Map Placard is required, citing CEC 705.10/CFC 1205.4.1, but the city's document does not itself enumerate what the map must show beyond 'dimensions and color scheme' 70% · department handout
- Does the UTILITY specify placards beyond the AHJ's? Not directly found on a public PG&E DG-manual page during this run; the checklist instead points installers to 'the PG&E Greenbook for Standards and Clearances' for panel/service-related placards and markings, and PG&E Rule 21 requires the visible AC disconnect itself to carry open/closed position markings 60% · utility tariff
- Where must the labels be placed? Not specified beyond 'behind the gate/fence line' for surface-mounted equipment and 'adjacent to the Main Electrical Service Panel' for the rapid-shutdown initiation device; exact placard placement dimensions are not stated by the city 70% · department handout
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Not stated by the city; advisory refers installers to 'the PG&E Greenbook for Standards and Clearances' for panel/meter clearances and approved locations 55% · department handout
- Must equipment be on a specific approved list? Yes 75% · municipal code
- Are batteries permitted, and under what conditions? Yes, with detailed conditions: CRC R328.4 permitted locations, 3 ft separation from door/window openings, automatic smoke/radiant-energy detection if in a garage (CFC 1207.5.4), 2-hour fire-rated separation for indoor ESS rooms (CFC 1207.7.4), structural anchorage/calcs for suspended units over 400 lbs (ASCE 7-22 13.3/13.6), vehicular-path bollard protection (CFC 1207.4.5), and a listed rapid-shutdown device adjacent to the main service panel (CFC 1205.4.1.2) 95% · department handout
- Is there a separate ESS permit or inspection? Yes 90% · fee schedule
- Is a ground mount treated as a structure? Yes, by inference from a broad, PV-unqualified zoning definition of 'structure' 70% · municipal code
- Is there a local rule on service upgrades or busbar sizing? Minimum 100A, 3-wire service disconnecting means for a single-family dwelling (CEC 230.79(C)); grounding electrodes must comply with a local amendment (FCMC 15.20.160) mandating corrosion-resistant rod/backfill choices for Foster City's salty groundwater; no local busbar-sizing (e.g. 120% rule) amendment found 85% · department handout
- Is a specific mounting system or attachment spacing required? Structural attachment details (roof member sizes/span/spacing/material, array/rack weight and weight-per-attachment) must be tabulated; tile-hook flashing required on clay/concrete/composite tile roofs; no specific attachment-spacing figure (e.g. inches on-center) is mandated by the city itself 80% · department handout
20 questions answered against City of Foster City’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2023
Why the confidence is not higherFCMC 15.20.030 (Ord. 697 §7, 2025): 'All electrical work... shall be in conformity... with the California Electrical Code, 2025 Edition.' The 2025 CEC (Title 24 Part 3) is based on the 2023 NEC. Note a drafting error at FCMC 15.20.010 in the same ordinance, which literally reads 'National Electrical Code, 2024 Edition' -- there is no 2024 NEC; recorded here as written per the error, but the correct base edition is 2023 NEC via the 2025 CEC.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1520.html
Q30 Which building code edition is in force? Core Code editions in force
2025 California Building Code / 2025 California Residential Code, effective 1 Jan 2026
Why the confidence is not higherAdopted Codes page lists '2025 California Building Code (Volumes 1 and 2)' and '2025 California Residential Code' with links to the codified FCMC 15.02/15.04, and separately notes the 2025 CBC 'is in effect from January 1, 2026.'
department page checked 2026-08-30 https://www.fostercity.org/437/Adopted-Codes
Q31 Which fire code edition is in force? Code editions in force
2025 California Fire Code (based on the 2024 International Fire Code with CA amendments)
Why the confidence is not higherFCMC 15.24.010.A/E (Ord. 697 §8, 2025): 'The San Mateo consolidated fire department hereby adopts the 2025 California Fire Code... adopting the 2024 International Fire Code of the International Code Council with necessary California amendments... as the fire code of the San Mateo consolidated fire department.'
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1524.html
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes
Why the confidence is not higherOrd. 697 (2025) repealed and replaced FCMC Chs. 15.02, 15.04, 15.06, 15.08, 15.16, 15.20, 15.24 and 15.44 with extensive California local amendments (e.g. grounding-electrode rules at 15.20.160, permit-expiration reactivation at 15.02.080, survey/pad-certificate rule at 15.02.090). None of these local amendments is solar-specific (checked; see Q34-37 absences), so 'yes' refers to local amendments generally, not PV-specific ones.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1502.html
Q33 What is the installation judged against? Core Electrical
The 2025 CEC/NEC(2023 base)/CBC/CRC/CFC as locally amended by FCMC Title 15, plus the Building Division's current PV submittal checklist which layers CRC, CEC, CFC and Foster City Municipal Code citations item-by-item
Why the confidence is not higherCurrent 'Submittal Requirements for Residential Photovoltaic Projects' handout states requirements are 'based on the 2025 California Residential Code (CRC), California Electrical Code (CEC), California Plumbing Code (CPC), California Mechanical Code (CMC), California Fire Code (CFC), California Energy Code (CEnC), California Green Building Standards Code (CALGreen), and Foster City Municipal Code (FCMC) -- effective January 1, 2026.'
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Minimum 100A, 3-wire service disconnecting means for a single-family dwelling (CEC 230.79(C)); grounding electrodes must comply with a local amendment (FCMC 15.20.160) mandating corrosion-resistant rod/backfill choices for Foster City's salty groundwater; no local busbar-sizing (e.g. 120% rule) amendment found
Why the confidence is not higherChecklist item 10.b: 'For a single-family dwelling, the minimum service disconnecting means shall be a minimum rating of 100 AMP, 3-wire (CEC 230.79(C)).' Item 12: 'Grounding electrodes shall comply with FCMC SEC 15.20.160,' and the MSP-Upgrade handout gives the corrosive-soil grounding advisory in detail. No PV-specific busbar rule was found in FCMC 15.20 (checked; control-verified absence -- 'electrical' appears 38 times, no busbar/120% hit).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Structural attachment details (roof member sizes/span/spacing/material, array/rack weight and weight-per-attachment) must be tabulated; tile-hook flashing required on clay/concrete/composite tile roofs; no specific attachment-spacing figure (e.g. inches on-center) is mandated by the city itself
Why the confidence is not higherChecklist items 7 and 16: structural attachment table requirement, and 'For Tile Hook installations on Clay Tile, Concrete Tile, and Composite Tile Roofs, flashing is required at the Tile Hook Penetrations... per CRC R903.2 and manufacturer specifications.' No local numeric spacing standard found in FCMC 15.02/15.04 (checked; 'solar' appears twice, both pointing to base CBC/CRC roof sections, not a local spacing rule).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Access pathways and fire setbacks must be shown on plans per 2025 CFC Section 1205.2; no local numeric ridge-setback amendment found beyond the base fire code
Why the confidence is not higherChecklist item 6: 'Access pathways and fire setbacks shall be clearly shown on plans (2025 CFC Section 1205.2).' FCMC 15.24 (the local fire code amendment chapter) has zero hits for '1205', 'solar', or 'photovoltaic' after a positive/fabricated control check (positive term 'electrical' = 2 hits, fabricated 'zzqqx' = 0), meaning the city has not locally amended the base CFC 1205 pathway/setback figures for PV.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1524.html
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes -- required, to the 2023 NEC (690.12) as adopted via the 2025 CEC/CFC; the city's own checklist cross-cites the fire code's mirror provision
Why the confidence is not higherCurrent PV checklist, item 17: 'A Listed Rapid Shutdown Device is required to be installed adjacent to the Main Electrical Service Panel per CFC 1205.4.1.2.' This is the 2025 CFC's cross-reference to the NEC 690.12 rapid-shutdown requirement; FCMC 15.20 (local electrical amendments) does not separately touch 690.12 (checked, zero hits, control-verified).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
A site map/facility placard at the service equipment per CEC 705.10 / CFC 1205.4.1; the checklist requires the applicant to propose dimensions and color scheme rather than the city prescribing its own placard text
Why the confidence is not higherChecklist item 8: 'On Site Map Placard, provide dimensions and color scheme for placard (CEC 705.10 / CFC 1205.4.1).'
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No
Why the confidence is not higherThe checklist asks the applicant to 'provide dimensions and color scheme for placard' rather than supplying the city's own fixed wording; no placard-wording text was found in FCMC 15.24 (local fire amendments, control-verified absence) or FCMC 15.45. This is an absence proved against the current PV checklist and the codified fire chapter, not a full-code search.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1524.html
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Not specified by the city; letter height/color/material are left to the base CEC 705.10 / CFC 1205.4.1 requirements, with the applicant proposing the dimensions/color scheme for city approval
Why the confidence is not higherChecklist item 8 language ('provide dimensions and color scheme') implies the applicant proposes these to the base-code standard rather than the city dictating its own figures; no local letter-height/color/material spec found in FCMC 15.24 or 15.45 (control-verified absence, same search as Q39).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Yes -- a Site Map Placard is required, citing CEC 705.10/CFC 1205.4.1, but the city's document does not itself enumerate what the map must show beyond 'dimensions and color scheme'
Why the confidence is not higherChecklist item 8 is the only Site Map Placard reference found; base CEC 705.10 governs its content (equipment locations, disconnects) but Foster City's own document does not add local content requirements beyond citing the code section.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Not directly found on a public PG&E DG-manual page during this run; the checklist instead points installers to 'the PG&E Greenbook for Standards and Clearances' for panel/service-related placards and markings, and PG&E Rule 21 requires the visible AC disconnect itself to carry open/closed position markings
Why the confidence is not higherChecklist advisory: 'Electric Panel changeouts/upgrades require an electrical permit... Refer to the PG&E Greenbook for Standards and Clearances.' PG&E Electric Rule 21, Section H.1.d (ii): the required visible disconnect device must 'include markings or signage that clearly indicates open and closed positions.' The finer Greenbook DG placard/label spec (document TD-2306M) is a gated PG&E document not reachable during this run -- see not_found.
utility tariff checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
Not specified beyond 'behind the gate/fence line' for surface-mounted equipment and 'adjacent to the Main Electrical Service Panel' for the rapid-shutdown initiation device; exact placard placement dimensions are not stated by the city
Why the confidence is not higherChecklist note under item 1: 'All surface-mounted equipment (e.g. AC Disconnects, Combiner Boxes, Gateways, Inverters) shall be placed behind the gate / fence line per FCMC.' Item 17: rapid shutdown device 'installed adjacent to the Main Electrical Service Panel.'
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q44 Must equipment be on a specific approved list? Equipment listing
Yes
Why the confidence is not higherFCMC 15.45.040: electricity-producing solar systems 'shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories'; the checklist separately requires manufacturer spec sheets for every major component (item 15), consistent with a listed-equipment requirement rather than a city-maintained approved-products list.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, with detailed conditions: CRC R328.4 permitted locations, 3 ft separation from door/window openings, automatic smoke/radiant-energy detection if in a garage (CFC 1207.5.4), 2-hour fire-rated separation for indoor ESS rooms (CFC 1207.7.4), structural anchorage/calcs for suspended units over 400 lbs (ASCE 7-22 13.3/13.6), vehicular-path bollard protection (CFC 1207.4.5), and a listed rapid-shutdown device adjacent to the main service panel (CFC 1205.4.1.2)
Why the confidence is not higherCurrent PV checklist, item 17 (ESS section), quoted in full in the record notes; this is the most detailed city-specific ESS requirement found in this run.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/4445/Submittal-Requirements-for-PV
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Yes
Why the confidence is not higherMaster Fee Schedule CDB-17.10 prices ESS for single/two-family dwellings separately from standard PV ($450, SMCFD review/inspection excluded); checklist advisory: 'ESS / Battery Backups require an electrical permit with additional fees and review by the Fire Department.' SMCFD's own 2026 fee schedule separately lists 'Energy Storage Systems (ESS)' both as an Annual Operational Permit category and at $980/system under Development Plan Review (residential/commercial split not stated for that line -- see not_found).
fee schedule checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3996/Master-Fee-and-Service-Charges-Schedule-Fiscal-Year-2026-Through-2027-PDF
Q47 Is a ground mount treated as a structure? Core Ground mount
Yes, by inference from a broad, PV-unqualified zoning definition of 'structure'
Why the confidence is not higherFCMC 17.04.020: '"Structure" means anything constructed or erected which requires a location on the ground.' No solar/PV carve-out exists in this definitions chapter (checked; control-verified: 'single-family' appears, 'zzqqx' does not). Checklist item 3 separately requires 'property line setback distances to the proposed equipment when the solar array is not attached to the structure,' consistent with ground-mount equipment being treated as a setback-triggering structure. Zoning chapters checked directly for a PV/ground-mount carve-out (R-1 District 17.12, Unique Uses 17.42, Architectural Control 17.58, Districts Generally 17.10, Fences/Walls/Hedges 17.52) show none; the full ~50-chapter Title 17 was not walked chapter-by-chapter, so this is scored as inference, not certainty.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity17/FosterCity1704.html
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Not stated by the city; advisory refers installers to 'the PG&E Greenbook for Standards and Clearances' for panel/meter clearances and approved locations
Why the confidence is not higherMSP-Upgrade handout: 'Refer to PG&E Greenbook for Approved Locations' (for panel siting near the meter). The specific meter-to-AC-disconnect distance figure lives in PG&E's Greenbook DG interconnection document (TD-2306M), which is access-gated and was not reachable during this run -- see not_found. General minimum working-clearance figures (36in x 30in x 6ft-6in per CEC 110.26) are given for the panel itself, not disconnect-to-meter distance specifically.
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3704/MSP-Upgrade-Handout
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Portal (eTRAKiT) 90% · department page
- How much notice is required? 24 hours (business-day) minimum 90% · department page
- Are same-day or AM/PM windows offered? One-hour scheduled windows (not general AM/PM blocks); results/window viewable in eTRAKiT after 8:30 am on the inspection day 80% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes, for the building/electrical final; fire inspection is delegated to SMCFD when triggered (ESS, or 'if required' for other systems) 85% · municipal code
- If delegated, to whom? San Mateo Consolidated Fire Department (SMCFD), for the fire-code portion only (mandatory for ESS, discretionary/'if required' for standard PV) 85% · municipal code
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? Standard eligible PV: a single final Building Division inspection (per 15.45.060). Re-roof-with-existing-solar scenario: pre-construction inspection then a separate PVT final inspection, plus the roof's own tear-off/sheathing/final sequence. 85% · department handout
- Is a rough-in or mid-roof inspection required? No for a standard new PV install (single final inspection per 15.45.060); Yes for the re-roof-with-existing-solar scenario, which requires a pre-construction inspection ahead of the PVT final 75% · municipal code
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Yes, via the SolarAPP+ platform 80% · department page
- What must be on site at inspection? The approved plans, the SolarAPP+ Approval Document and its Inspection Checklist, the issued permit, and (for panel work) the 8x11 electrical-panel photo package submitted at plan check 75% · department page
- Does the inspector verify labels and listings? Yes (implied) 55% · municipal code
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? Final (permit finaled/closed in eTRAKiT) 65% · department handout
- Who notifies the utility for PTO? Installer (as the interconnection Applicant, submitting evidence of the AHJ's final inspection clearance to PG&E) 60% · utility tariff
- Is there a re-inspection fee? Actual Cost (time and materials; no flat fee) 85% · fee schedule
- How are corrections issued and cleared? A written correction notice detailing all deficiencies is issued to the applicant for resubmission; corrections are cleared through the same eTRAKiT/SolarAPP+ resubmission and re-review cycle 85% · municipal code
14 questions answered against City of Foster City’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Portal (eTRAKiT)
Why the confidence is not higherBuilding Inspections page: 'Schedule Your Building Permit using our eTRAKiT portal.' Solar Permits page confirms the same for SolarAPP+ permits: 'you can schedule your inspections in our Online Permit Center.'
department page checked 2026-08-30 https://www.fostercity.org/1197/Building-Inspections
Q50 How much notice is required? Core Booking & scheduling
24 hours (business-day) minimum
Why the confidence is not higherBuilding Inspections page: 'Twenty-four-hour notice minimum is required.'
department page checked 2026-08-30 https://www.fostercity.org/1197/Building-Inspections
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
One-hour scheduled windows (not general AM/PM blocks); results/window viewable in eTRAKiT after 8:30 am on the inspection day
Why the confidence is not higherBuilding Inspections page: 'To view your scheduled one-hour window, please visit our eTRAKiT portal on the day of your inspection, after 8:30 am.'
department page checked 2026-08-30 https://www.fostercity.org/1197/Building-Inspections
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes, for the building/electrical final; fire inspection is delegated to SMCFD when triggered (ESS, or 'if required' for other systems)
Why the confidence is not higherFCMC 15.45.060: 'Only one inspection shall be required and performed by the building division for small residential rooftop solar energy systems eligible for expedited review... A separate fire inspection may be performed by the city of Foster City fire department, if required.' 'City of Foster City fire department' in this 2015-era ordinance is now San Mateo Consolidated Fire Department per the 2025 fire-code adoption (FCMC 15.24).
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q53 If delegated, to whom? Core Who inspects
San Mateo Consolidated Fire Department (SMCFD), for the fire-code portion only (mandatory for ESS, discretionary/'if required' for standard PV)
Why the confidence is not higherFCMC 15.24.010/103.1 (Ord. 697 §8, 2025) establishes SMCFD as the fire code official for Foster City; Building Inspections page separately directs commercial fire-inspection scheduling to 'San Mateo Consolidated Fire at (650) 522-7940.'
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1524.html
Q54 Which inspections are required, and in what order? Core Stages & sequence
Standard eligible PV: a single final Building Division inspection (per 15.45.060). Re-roof-with-existing-solar scenario: pre-construction inspection then a separate PVT final inspection, plus the roof's own tear-off/sheathing/final sequence.
Why the confidence is not higherFCMC 15.45.060: 'Only one inspection shall be required and performed by the building division... eligible for expedited review.' Contrast with the current Re-roof-with-Existing-Solar handout: 'PVT Permit -- following inspections are required... i. Pre-construction inspection ii. Final Inspection (PVT).'
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3731/Residential-Reroof-with-Existing-Solar-Handout-Form
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
No for a standard new PV install (single final inspection per 15.45.060); Yes for the re-roof-with-existing-solar scenario, which requires a pre-construction inspection ahead of the PVT final
Why the confidence is not higherSee sources for Q54; the two document sets give different answers depending on project type, both from the city's own current handouts.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q56 Does the inspector verify labels and listings? Core What is checked
Yes (implied)
Why the confidence is not higherNot stated as an explicit inspector checklist item on any city page found in this run; inferred from FCMC 15.45.040's requirement that systems meet UL/testing-lab listing standards and from the checklist's requirement to submit manufacturer spec sheets for every component, which an inspector would need to reconcile with the installed equipment at final. Scored as inference, not a direct statement.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q57 Is there a published inspection checklist? Core What is checked
Yes, via the SolarAPP+ platform
Why the confidence is not higherSolar Permits page: '... Maintain the Inspection Checklist to be reviewed during the inspection... The SolarAPP+ Approval Document is required before inspections will occur.' This is a SolarAPP+-generated checklist (the platform, not a city-authored PDF) required by the city for SolarAPP+-eligible projects.
department page checked 2026-08-30 https://www.fostercity.org/424/Solar-Permits
Q58 What must be on site at inspection? Core Documents on site
The approved plans, the SolarAPP+ Approval Document and its Inspection Checklist, the issued permit, and (for panel work) the 8x11 electrical-panel photo package submitted at plan check
Why the confidence is not higherSolar Permits page requires the SolarAPP+ Approval Document to be uploaded before inspections occur and the Inspection Checklist to be maintained for the inspection; general practice inferred from the submittal checklist's documentation list plus the SolarAPP+ workflow description.
department page checked 2026-08-30 https://www.fostercity.org/424/Solar-Permits
Q59 Is there a re-inspection fee? Corrections & re-inspection
Actual Cost (time and materials; no flat fee)
Why the confidence is not higherFY2026-27 Master Fee Schedule, CDM-01.1: 'Reinspection Fee -- Actual Cost.'
fee schedule checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3996/Master-Fee-and-Service-Charges-Schedule-Fiscal-Year-2026-Through-2027-PDF
Q60 How are corrections issued and cleared? Corrections & re-inspection
A written correction notice detailing all deficiencies is issued to the applicant for resubmission; corrections are cleared through the same eTRAKiT/SolarAPP+ resubmission and re-review cycle
Why the confidence is not higherFCMC 15.45.060: 'If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission.' SolarAPP+ FAQ on the Solar Permits page describes the same resubmission/re-check cycle for post-issuance revisions.
municipal code checked 2026-08-30 https://www.codepublishing.com/CA/FosterCity/html/FosterCity15/FosterCity1545.html
Q61 What is issued on pass? Core Final sign-off & PTO
Final (permit finaled/closed in eTRAKiT)
Why the confidence is not higherRe-roof-with-Existing-Solar handout: it is the contractor/owner-builder's responsibility 'for scheduling the required inspections and ensuring the permit is FINALED.' No separate 'green tag' or CO terminology was found for a residential PV retrofit specifically (a PV addition to an existing single-family home would not typically generate a new Certificate of Occupancy).
department handout checked 2026-08-30 https://www.fostercity.org/DocumentCenter/View/3731/Residential-Reroof-with-Existing-Solar-Handout-Form
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Installer (as the interconnection Applicant, submitting evidence of the AHJ's final inspection clearance to PG&E)
Why the confidence is not higherPG&E Electric Rule 21 D.13.b frames the interconnection request and the final-inspection-clearance evidence as coming from the 'Applicant' (the installer acting for the homeowner), not from the city; Foster City's own pages do not state who transmits the clearance to PG&E, so this is standard-practice inference rather than a city- or utility-stated fact.
utility tariff checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Jurisdiction & key facts
The standing 62-question set, answered for City of Foster City against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Foster City is the authority having jurisdiction 92% confidence
- Holds
- Building and Electrical -- held by the City of Foster City (Community Development Department, Building Division), NOT by the Estero Municipal Improvement District (EMID). EMID is a genuinely separate legal entity (created 1960 by CA SB 51/Ch.82) sharing the same City Council as its Board of Directors and the same administrative staff, but its own codified law (Estero Municipal Improvement District Code, Titles 1,2,4,6,8,9) covers only General Provisions, Administration, Revenue/Finance, Health & Safety (dumping/garbage), Water & Sewer Service, and Public Property/Watercourses (the lagoon and levee system) -- it has no building, electrical, or fire chapter. Building and electrical permitting for residential solar sits entirely in Foster City Municipal Code Title 15, administered by City of Foster City staff (all @fostercity.org, e.g. Chief Building Official Chuck Venook). Fire code enforcement/inspection is further delegated to San Mateo Consolidated Fire Department (SMCFD), a JPA of San Mateo, Belmont and Foster City formed 13 Jan 2019, codified at FCMC 15.24 (Ord. 697 Sec.8, 2025) as the fire code official; SMCFD performs ESS fire review/inspection routinely and standard-PV fire inspection 'if required' per FCMC 15.45.060.
- Delegated to
- San Mateo Consolidated Fire Department (fire-code portion only)
- Overridden by
- CA Solar Rights Act (Civil Code Sec.714 / Sec.4600) and Gov. Code Sec.65850.5/.52 (AB 2188/SB 379 expedited & automated permitting), both incorporated into FCMC 15.45; AB 130 (Stats. 2025 Ch.22) freezes more-restrictive local residential code amendments 1 Oct 2025-1 Jun 2031, noted by name on the city's own Adopted Codes page; PG&E Electric Rule 21 governs interconnection/PTO as a parallel track gated on, but administratively separate from, the city's own final inspection.
- Why not higher
- Confirmed from the City's own Building Division staff directory (all City of Foster City emails, no contract-firm markers -- an in-house negative), FCMC Title 15 (City code, not Estero MIDC), and the Estero Municipal Improvement District's own code Titles 1-9 which contain no building/electrical/fire chapter at all. The Master Fee Schedule's cover page is jointly titled 'City of Foster City/Estero Municipal Improvement District,' confirming the two entities share fee-setting/administration even though only the City exercises the building/electrical AHJ function.
- Permit required
- Yes98%
- Permit cost
- $0 (Building Permit fee) for standard residential rooftop PV; $450 flat for residential ESS (SMCFD fire review/inspection billed separately, not included)90%
- Plan review
- 5 business days (1st review cycle) / 3 business days (2nd review cycle) for a rooftop PV system92%
- Portal
- eTRAKiT (permit.fostercity.org/etrakit), with the PV-specific application layered through the national SolarAPP+ platform for eligible standard installs95%
- Electrical code
- 202390%
- Own placard wording
- No65%
- Booking an inspection
- Portal (eTRAKiT)90%
Labels & placards for this authority
Wording 65%
No
Size, colour & material 65%
Not specified by the city; letter height/color/material are left to the base CEC 705.10 / CFC 1205.4.1 requirements, with the applicant proposing the dimensions/color scheme for city approval
Where they go 70%
Not specified beyond 'behind the gate/fence line' for surface-mounted equipment and 'adjacent to the Main Electrical Service Panel' for the rapid-shutdown initiation device; exact placard placement dimensions are not stated by the city
What the utility wants on top 60%
Not directly found on a public PG&E DG-manual page during this run; the checklist instead points installers to 'the PG&E Greenbook for Standards and Clearances' for panel/service-related placards and markings, and PG&E Rule 21 requires the visible AC disconnect itself to carry open/closed position markings
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.