City of Hawthorne
Los Angeles County
City of Hawthorne is a city authority in the State of California, serving 88,083 residents. 1,297 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Where you file — Tyler Technologies EnerGov 'Citizen Self Service' (CSS) portal at hawthorneca-energovweb.tylerhost.net, Q20
- Permit required
- Yes92% source
- Key document
- department page cited by 5 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes 95% · department page
- What does this authority permit itself, and what does it delegate? Both 88% · AHJ guide (LACoFD)
- Is a permit required for a residential rooftop PV system? Yes 92% · department page
- Is there a separate electrical permit, or is it combined? Combined 68% · department page
- Is there a system-size cap on residential generation? No published cap on residential PV generation size was located. LACoFD does impose ESS capacity caps at R-3/R-4 occupancies: 20 kWh (nameplate) maximum per individual ESS unit, and 80 kWh maximum aggregate energy capacity per site (and per specific location type on the site). 82% · AHJ inspection checklist (LACoFD)
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
Nothing recorded for City of Hawthorne on this step yet — 3 questions checked and found unpublished. The guidance above is general.
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Base PV: SolarAPP+ standardized submittal (obtain a SolarAPP+ Approval ID, then submit through the city's Tyler EnerGov Citizen Self-Service portal). Where an ESS/BESS or BIPV is included, LACoFD additionally requires an ESS Scope-of-Work note (unit count/type/chemistry, per-unit and total kWh capacity, unit locations) and a Disconnect Schedule identifying every power-source disconnect. 68% · AHJ guide (LACoFD)
- Is a site plan required, and what must it show? Yes for ESS/BIPV portions: LACoFD requires a site plan showing quantity/names/locations of ESS units and graphic locations of all utility meters, AC & DC disconnects, inverters, automatic relays, load centers, and rapid-shutdown initiation devices. A site plan is also the standard input required by the SolarAPP+ process the city has adopted for base PV, though Hawthorne's own page does not itself spell out site-plan content. 62% · AHJ guide (LACoFD)
- Is a one-line / three-line diagram required? Yes (for ESS/BIPV plan sets reviewed by LACoFD, graphic locations of disconnects/inverters/relays function as a one-line-style diagram; SolarAPP+, which the city uses for base PV, also requires an electrical/one-line diagram as a standard input). 58% · AHJ guide (LACoFD)
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Tyler Technologies EnerGov 'Citizen Self Service' (CSS) portal at hawthorneca-energovweb.tylerhost.net, paired with SolarAPP+ (gosolarapp.org) specifically for residential solar, which issues an Approval ID used to unlock the streamlined permit in the CSS portal. 95% · department page
- Can the whole application be completed online? Yes 85% · department page
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- Which utility handles interconnection here? Southern California Edison (SCE) 92% · department page (document listing)
28 questions answered against City of Hawthorne’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes
Why the confidence is not higherHawthorne's Building & Safety Division page describes itself as responsible for enforcing Building/Electrical/Mechanical/Plumbing code and hosts a dedicated residential Solar Permit Application via SolarAPP+.
department page checked 2026-08-30 https://web.archive.org/web/20240906181643/https://www.cityofhawthorne.org/departments/building-safety
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both
Why the confidence is not higherCity Building & Safety issues both building and electrical permits for conventional rooftop PV (SolarAPP+/EnerGov). However LACoFD's own guide states it 'has historically delegated fire-official authority for plan review and inspection of conventional residential solar-on-roof installations...to the jurisdictional building and safety department' but withholds that delegation for ESS/BESS and BIPV, which it reviews and inspects itself.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherBuilding & Safety page describes a mandatory Solar Permit Application process via SolarAPP+ with an Approval ID required before use of the city's CSS permit portal.
department page checked 2026-08-30 https://web.archive.org/web/20240906181643/https://www.cityofhawthorne.org/departments/building-safety
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined
Why the confidence is not higherHawthorne's own Building & Safety page states its 'Plan Check functions are responsible for reviewing all submitted plans for compliance of applicable Building, Plumbing, Electrical and Mechanical codes' as a single function, and SolarAPP+ (which the city has adopted) is designed to issue one combined permit per project covering all trades. No page explicitly uses the word 'combined,' so this is an inference from the city's own plan-check description plus the SolarAPP+ program design, not a direct statement.
department page checked 2026-08-30 https://web.archive.org/web/20240906181643/https://www.cityofhawthorne.org/departments/building-safety
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Nothing published by this authority.
Where we lookedHawthorne Building & Safety department page, Building Forms library (Drawings/Fire Bulletin/Forms/Information Bulletins folders), Inspections page
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Nothing published by this authority.
Where we lookedBuilding & Safety department page and Building Forms library; no contractor-registration-with-city requirement specific to solar was stated
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Nothing published by this authority.
Where we lookedBuilding & Safety department page and Building Forms library; no owner-builder/self-permit statement for solar found
Q8 What documents make up a complete submittal? Core Submittal package
Base PV: SolarAPP+ standardized submittal (obtain a SolarAPP+ Approval ID, then submit through the city's Tyler EnerGov Citizen Self-Service portal). Where an ESS/BESS or BIPV is included, LACoFD additionally requires an ESS Scope-of-Work note (unit count/type/chemistry, per-unit and total kWh capacity, unit locations) and a Disconnect Schedule identifying every power-source disconnect.
Why the confidence is not higherHawthorne's own page names SolarAPP+ + the CSS portal as the submittal route for base PV; the ESS-specific submittal content comes directly from LACoFD's guide, which is fire-department authority, not the city's own generic checklist (none was found on the city site).
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q9 How many copies, and in what format? Submittal package
Nothing published by this authority.
Where we lookedBuilding & Safety page and Inspections page; both describe portal-based submission but neither states a copy count or file-format requirement
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes for ESS/BIPV portions: LACoFD requires a site plan showing quantity/names/locations of ESS units and graphic locations of all utility meters, AC & DC disconnects, inverters, automatic relays, load centers, and rapid-shutdown initiation devices. A site plan is also the standard input required by the SolarAPP+ process the city has adopted for base PV, though Hawthorne's own page does not itself spell out site-plan content.
Why the confidence is not higherLACoFD content is explicit and dated; the base-PV portion is inferred from the SolarAPP+ national standard the city has adopted rather than a Hawthorne-specific statement.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes (for ESS/BIPV plan sets reviewed by LACoFD, graphic locations of disconnects/inverters/relays function as a one-line-style diagram; SolarAPP+, which the city uses for base PV, also requires an electrical/one-line diagram as a standard input).
Why the confidence is not higherDirectly stated for the LACoFD-reviewed ESS/BIPV scope; the base-PV portion is inferred from the SolarAPP+ standard rather than a Hawthorne-specific statement.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedLACoFD guide/checklist and Building & Safety page; neither states string/conductor calculations as a required submittal item (SolarAPP+'s underlying engine performs compliance calculations automatically but does not describe this as an applicant-submitted document)
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Nothing published by this authority.
Where we lookedBuilding & Safety page, Building Forms library (Drawings, Forms, Information Bulletins folders); no structural PE stamp threshold for residential PV was published
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Nothing published by this authority.
Where we lookedSame Building Forms folders as q13; no electrical PE stamp threshold was published
Q15 What does a residential solar permit cost? Core Fees
Nothing published by this authority.
Where we lookedBuilding & Safety page, all four Building Forms subfolders, and guessed Finance/City Clerk fee-schedule URL paths (master-fee-schedule, fee-schedule) via Wayback's availability API -- none archived; no fee schedule PDF was located on the city's own domain
Q16 How is the fee calculated? Core Fees
Nothing published by this authority.
Where we lookedSame as q15
Q17 Is there a separate plan-check fee? Fees
Nothing published by this authority.
Where we lookedSame as q15
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedBuilding & Safety page; describes SolarAPP+ as accelerating review but states no specific business-day turnaround commitment for Hawthorne
Q19 How long is an issued permit valid before it expires? Timeline & validity
Nothing published by this authority.
Where we lookedHawthorne's own Title 15 (Buildings and Construction) chapter text could not be retrieved -- eCode360 Cloudflare-blocks the iccsafe.org-Referer bypass, and the specific node (Title 15, node ID 42646403) is not in the Wayback CDX index even though the code's table-of-contents page (HA4935) is. Only the CBC statewide default (permit expiration after 180 days without progress) is known, not a Hawthorne-confirmed figure.
https://web.archive.org/web/20251101193040/https://ecode360.com/HA4935
Q20 Which permit portal does this authority use? Core Portal & process
Tyler Technologies EnerGov 'Citizen Self Service' (CSS) portal at hawthorneca-energovweb.tylerhost.net, paired with SolarAPP+ (gosolarapp.org) specifically for residential solar, which issues an Approval ID used to unlock the streamlined permit in the CSS portal.
Why the confidence is not higherDirectly named and linked on the city's own Building & Safety page.
department page checked 2026-08-30 https://web.archive.org/web/20240906181643/https://www.cityofhawthorne.org/departments/building-safety
Q21 Can the whole application be completed online? Core Portal & process
Yes
Why the confidence is not higherSolarAPP+ is an automated online permitting system; the city's page frames it as the complete route to an approved residential solar permit, feeding directly into the CSS portal. The page's marketing language does not give a hard guarantee of zero human touchpoints, so this is not a 100.
department page checked 2026-08-30 https://web.archive.org/web/20240906181643/https://www.cityofhawthorne.org/departments/building-safety
Q22 Which utility handles interconnection here? Core Utility interconnection
Southern California Edison (SCE)
Why the confidence is not higherConfirmed from a city-side source, not a ZIP-code lookup tool: Hawthorne's own Building Forms library (Forms folder) hosts a document titled 'SCE Meter & Service Procedures,' which only makes sense if SCE is the interconnecting utility for the city.
department page (document listing) checked 2026-08-30 https://web.archive.org/web/20260519223146/https://www.cityofhawthorne.org/departments/building-forms/-folder-145
Q23 Where does the utility sit in the sequence? Core Utility interconnection
Nothing published by this authority.
Where we lookedBuilding & Safety page and LACoFD documents; neither states whether SCE interconnection happens before, after, or parallel to permit issuance. SCE's own Rule 21 and Interconnection Handbook were unreachable both live (hung/timed out) and via Wayback (CDX search for wwwsysb.sce.com Rule21 PDF and sce.com Rule21 paths both returned zero captures) during this run.
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding & Safety page, Building Forms library, LACoFD guide; no HOA/architectural review requirement for solar was stated
Q25 Is there a historic-district review? Overlays & special cases
Nothing published by this authority.
Where we lookedSame as q24; no historic-district review requirement for solar was stated (and no historic-district overlay was referenced anywhere in the pages checked)
Q26 Is a wind or windstorm certification required? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding & Safety page, LACoFD guide/checklist; no wind or windstorm certification requirement was stated in any document reviewed
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding & Safety page and Planning department pages (zoning, planning applications); no Specific Use Permit/Council-approval trigger for residential solar was stated
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No published cap on residential PV generation size was located. LACoFD does impose ESS capacity caps at R-3/R-4 occupancies: 20 kWh (nameplate) maximum per individual ESS unit, and 80 kWh maximum aggregate energy capacity per site (and per specific location type on the site).
Why the confidence is not higherThe ESS caps are stated plainly and numerically in LACoFD's dated inspection checklist; no city ordinance or fee-schedule page stating a PV kW cap was found despite checking Building & Safety and Building Forms pages.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2023 NEC, adopted statewide as the 2025 California Electrical Code (Title 24, Part 3), effective 1 January 2026. 60% · state adopting agency page
- Which building code edition is in force? 2025 California Building Code (Title 24, Part 2), effective 1 January 2026 statewide. 58% · state adopting agency page
- Which fire code edition is in force? 2023 Los Angeles County Fire Code (LACFC) -- a locally-amended version of the 2022 California Fire Code -- per LACoFD, which holds fire-code authority for Hawthorne as a contract city. 75% · AHJ guide (LACoFD)
- Are there local amendments to any of the above? Yes 72% · AHJ guide (LACoFD)
- What is the installation judged against? Base PV/electrical work is judged against the state-adopted CBC/CRC/CEC family in force at permit issuance (2022 cycle through 31 Dec 2025; 2025 cycle -- 2023 NEC basis -- from 1 Jan 2026). ESS, BIPV, and all power-source disconnects/placarding are additionally judged against the 2023 Los Angeles County Fire Code (locally amended 2022 CFC) Sections 509, 603.4, 1207.11, and 2022 CEC Sections 225.37, 230.70, 230.85, 705.10 and 705.20, per LACoFD. 68% · AHJ inspection checklist (LACoFD)
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for City of Hawthorne on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, rapid shutdown is required. LACoFD's placarding system explicitly requires a placarded initiation device for 'Rapid Shutdown' or 'Hazard Control System' functions on any PV/BIPV system that has one, citing 2022 CEC Sections 705.10 and 705.20 (as of the 2023-09-01 dated guide; the state has since moved to the 2023 NEC/2025 CEC cycle effective 1 Jan 2026, which retains the equivalent rapid-shutdown requirement at NEC 690.12). 72% · AHJ guide (LACoFD)
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? LACoFD's 'Electrical Power Source Disconnect Placarding System': (1) an Exterior Placard reading 'F.D. -- ELECTRICAL BLDG DISCONNECT / # X of Y' placed on/adjacent to each panel, enclosure, or standalone disconnect switch that must be operated; and (2) a smaller Panel-Interior Placard reading '#X' identifying specific breakers/switches inside a panel when multiple switches in one panel must be operated. 95% · AHJ guide (LACoFD)
- Does the authority specify placard wording of its own? Yes 95% · AHJ guide (LACoFD)
- Does it specify letter height, colour or material? Exterior placards: minimum 2 in. tall x 3.5 in. wide, weather-resistant plastic, verbiage engraved; red letters engraved into a yellow background; solid all-capitals Arial font minimum size 24 ('F.D.' and '#X of Y' bold, minimum size 28). Panel-interior placards: minimum 7/16 in. tall x 3/4 in. wide, same material/color, solid all-capitals bold Arial minimum size 24. Attachment by permanent, material/weather/surface-compatible epoxy. 95% · AHJ guide (LACoFD)
- Is a site plan / facility map placard required, and what must it show? Not a standalone 'facility map' placard, but a functionally equivalent 'Disconnect Schedule' is required on plan sets submitted to LACoFD: a table listing every power source (utility, ESS, PV, other), the minimum number of disconnects, the '#X of Y' designation used on the placards, and the disconnect type/rating for each. At the panel itself, the Exterior/Panel-Interior placard set (q38-40) performs the field-identification role that NEC 705.10 calls for. 80% · AHJ guide (LACoFD)
- Where must the labels be placed? Exterior placards: on or immediately adjacent to each panel/enclosure or standalone disconnect switch that must be operated (additional placards required where an enclosure houses multiple panels, or more than the 'Main' must be operated). Panel-Interior placards: inside the panel, next to the specific switches/breakers, when multiple switches within one panel must be operated. All placarded devices must be accessible from the exterior of the structure and located within 6 feet of the main service panel on the same wall plane. 88% · AHJ guide (LACoFD)
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Electrical disconnection means and rapid-shutdown activation devices for all power sources (utility, PV, ESS, etc.) serving a structure must be on the exterior, within 6 feet of the main service panel, on the same wall plane, not separated from one another by walls/gates/fences/vegetation/architectural features (2023 LACFC Section 509.3), unless the fire code official grants a case-by-case exception (in which case alternative signage is required). 78% · AHJ inspection checklist (LACoFD)
- Must equipment be on a specific approved list? For ESS: yes -- individual units (or all components) must carry UL 9540 listing, and inverters must carry UL 1741 listing (or be covered within the UL 9540 listing). Units listed/labeled solely for utility or commercial use may not be used residentially. No equivalent city-published approved-equipment list was found for base PV modules/inverters beyond standard UL listing implied by SolarAPP+/code compliance. 80% · AHJ inspection checklist (LACoFD)
- Are batteries permitted, and under what conditions? Yes, with detailed conditions: ESS allowed in detached garages, in attached garages (if separated from living/sleeping space per CRC R302.6), or outdoors/on the exterior wall (subject to setbacks). Prohibited inside dwelling units/ADUs, sleeping units, spaces opening into sleeping rooms, closets, bathrooms, basements, non-garage accessory structures, and vaults. Individual units separated by 3 ft minimum; outdoor/exterior-wall units kept 3 ft from openings/vents, 5 ft from lot lines/public ways/other buildings/combustibles, 10 ft from vegetation. Impact protection (bollards) required where subject to vehicular impact. Max 20 kWh per unit, 80 kWh aggregate per site. UL 9540/1741 listing required. Detection/notification required for garage installations. 92% · AHJ guide (LACoFD)
- Is there a separate ESS permit or inspection? Yes -- ESS installations with a capacity greater than 3 kWh require a separate LACoFD Fire Prevention Division plan submittal (unless state-exempted) and a separate LACoFD field inspection and fee, in addition to whatever the City's Building & Safety Division issues/inspects. 90% · AHJ inspection checklist (LACoFD)
20 questions answered against City of Hawthorne’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2023 NEC, adopted statewide as the 2025 California Electrical Code (Title 24, Part 3), effective 1 January 2026.
Why the confidence is not higherThe statewide adoption and effective date are stated plainly by the CA Building Standards Commission. Hawthorne's own municipal code (eCode360) shows its Title 15 (Buildings and Construction) last amended by Ord. No. 2257 on 27 May 2025 -- before the 1 Jan 2026 statewide effective date -- so it is not confirmed whether Hawthorne's local code text has yet been updated to reference the 2025/2023 cycle by name; LACoFD's own 2023-09-01 guide still cites the 2022 CEC. This tension is flagged, not resolved.
state adopting agency page checked 2026-08-30 https://www.dgs.ca.gov/BSC/Codes
Q30 Which building code edition is in force? Core Code editions in force
2025 California Building Code (Title 24, Part 2), effective 1 January 2026 statewide.
Why the confidence is not higherSame caveat as q29: statewide effective date is confirmed by DGS/BSC, but Hawthorne's own Title 15 (Buildings and Construction) was last amended 27 May 2025, before this cycle took effect, and the actual chapter text adopting a specific edition could not be retrieved (eCode360 403s the bypass method and Wayback has not archived that specific node).
state adopting agency page checked 2026-08-30 https://www.dgs.ca.gov/BSC/Codes
Q31 Which fire code edition is in force? Code editions in force
2023 Los Angeles County Fire Code (LACFC) -- a locally-amended version of the 2022 California Fire Code -- per LACoFD, which holds fire-code authority for Hawthorne as a contract city.
Why the confidence is not higherStated directly and repeatedly, with an effective/publication date of 2023-09-01, in both LACoFD PDFs. Note the statewide code family has since moved to the 2025 cycle (effective 1 Jan 2026); whether LACoFD has issued an updated 2026 LACFC guide was not checked and is not claimed here.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes
Why the confidence is not higherLACoFD's guide states the Los Angeles County local amendments to the CFC are published separately (via Municode) and 'create the 2023 LACFC.' Hawthorne's own eCode360 table of contents also shows an active, separately-numbered Title 15 (Buildings and Construction) implying local building-code amendments exist, but that chapter's specific amendment text could not be retrieved (eCode360 Cloudflare-blocks the bypass, and the specific node was not in Wayback).
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q33 What is the installation judged against? Core Electrical
Base PV/electrical work is judged against the state-adopted CBC/CRC/CEC family in force at permit issuance (2022 cycle through 31 Dec 2025; 2025 cycle -- 2023 NEC basis -- from 1 Jan 2026). ESS, BIPV, and all power-source disconnects/placarding are additionally judged against the 2023 Los Angeles County Fire Code (locally amended 2022 CFC) Sections 509, 603.4, 1207.11, and 2022 CEC Sections 225.37, 230.70, 230.85, 705.10 and 705.20, per LACoFD.
Why the confidence is not higherThe fire-code citation list is stated verbatim in LACoFD's checklist; the base building-code cycle is the statewide default, not a Hawthorne-specific confirmation.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedLACoFD guide/checklist (covers disconnect/panel rules, not busbar sizing) and Building Forms library; no city or LACoFD statement on service-upgrade or busbar-sizing rules specific to solar was found
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedLACoFD guide/checklist (spacing rules found are for ESS units, not PV panel racking/attachment) and Building Forms library; no PV-specific mounting/attachment-spacing requirement was found
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedLACoFD guide/checklist; ridge-setback/pathway dimensions live in CFC Section 605.11, which is ICC-copyrighted text not reproduced in any LACoFD or city document retrieved in this run
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, rapid shutdown is required. LACoFD's placarding system explicitly requires a placarded initiation device for 'Rapid Shutdown' or 'Hazard Control System' functions on any PV/BIPV system that has one, citing 2022 CEC Sections 705.10 and 705.20 (as of the 2023-09-01 dated guide; the state has since moved to the 2023 NEC/2025 CEC cycle effective 1 Jan 2026, which retains the equivalent rapid-shutdown requirement at NEC 690.12).
Why the confidence is not higherDirectly stated in LACoFD's Appendix B, though the specific CEC section numbers are from a document dated before the current 2025/2026 code cycle -- flagged, not silently updated.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
LACoFD's 'Electrical Power Source Disconnect Placarding System': (1) an Exterior Placard reading 'F.D. -- ELECTRICAL BLDG DISCONNECT / # X of Y' placed on/adjacent to each panel, enclosure, or standalone disconnect switch that must be operated; and (2) a smaller Panel-Interior Placard reading '#X' identifying specific breakers/switches inside a panel when multiple switches in one panel must be operated.
Why the confidence is not higherVerbatim from LACoFD's Appendix B, with the exact figures/verbiage reproduced.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Yes
Why the confidence is not higherLACoFD's guide specifies the exact verbiage and word arrangement of both placard types verbatim, with 'X' and 'Y' filled in per a C-10 electrician's determination and fire-code-official approval.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Exterior placards: minimum 2 in. tall x 3.5 in. wide, weather-resistant plastic, verbiage engraved; red letters engraved into a yellow background; solid all-capitals Arial font minimum size 24 ('F.D.' and '#X of Y' bold, minimum size 28). Panel-interior placards: minimum 7/16 in. tall x 3/4 in. wide, same material/color, solid all-capitals bold Arial minimum size 24. Attachment by permanent, material/weather/surface-compatible epoxy.
Why the confidence is not higherVerbatim spec from LACoFD's Appendix B.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Not a standalone 'facility map' placard, but a functionally equivalent 'Disconnect Schedule' is required on plan sets submitted to LACoFD: a table listing every power source (utility, ESS, PV, other), the minimum number of disconnects, the '#X of Y' designation used on the placards, and the disconnect type/rating for each. At the panel itself, the Exterior/Panel-Interior placard set (q38-40) performs the field-identification role that NEC 705.10 calls for.
Why the confidence is not higherThe Disconnect Schedule table and its purpose are described and illustrated directly in LACoFD's guide; it is explicitly tied to plan sets 'where plan submittals are required' rather than to every project.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedCity's own 'SCE Meter & Service Procedures' document (Building Forms > Forms folder) returned HTTP 403 on every fetch attempt (live curl, WebFetch, and browser-header curl all blocked by Akamai on cityofhawthorne.org, and the specific document endpoint is not archived by Wayback). SCE's own Rule 21 / Interconnection Handbook were also unreachable live and via Wayback CDX during this run.
Q43 Where must the labels be placed? Core Labels Signage & labelling
Exterior placards: on or immediately adjacent to each panel/enclosure or standalone disconnect switch that must be operated (additional placards required where an enclosure houses multiple panels, or more than the 'Main' must be operated). Panel-Interior placards: inside the panel, next to the specific switches/breakers, when multiple switches within one panel must be operated. All placarded devices must be accessible from the exterior of the structure and located within 6 feet of the main service panel on the same wall plane.
Why the confidence is not higherDirectly stated in LACoFD's Appendix B and Section 509.3 discussion.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q44 Must equipment be on a specific approved list? Equipment listing
For ESS: yes -- individual units (or all components) must carry UL 9540 listing, and inverters must carry UL 1741 listing (or be covered within the UL 9540 listing). Units listed/labeled solely for utility or commercial use may not be used residentially. No equivalent city-published approved-equipment list was found for base PV modules/inverters beyond standard UL listing implied by SolarAPP+/code compliance.
Why the confidence is not higherStated as a Y/N/NA checklist item in LACoFD's dated inspection checklist.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, with detailed conditions: ESS allowed in detached garages, in attached garages (if separated from living/sleeping space per CRC R302.6), or outdoors/on the exterior wall (subject to setbacks). Prohibited inside dwelling units/ADUs, sleeping units, spaces opening into sleeping rooms, closets, bathrooms, basements, non-garage accessory structures, and vaults. Individual units separated by 3 ft minimum; outdoor/exterior-wall units kept 3 ft from openings/vents, 5 ft from lot lines/public ways/other buildings/combustibles, 10 ft from vegetation. Impact protection (bollards) required where subject to vehicular impact. Max 20 kWh per unit, 80 kWh aggregate per site. UL 9540/1741 listing required. Detection/notification required for garage installations.
Why the confidence is not higherAll figures and conditions are stated verbatim/numerically in LACoFD's dated guide and checklist.
AHJ guide (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Yes -- ESS installations with a capacity greater than 3 kWh require a separate LACoFD Fire Prevention Division plan submittal (unless state-exempted) and a separate LACoFD field inspection and fee, in addition to whatever the City's Building & Safety Division issues/inspects.
Why the confidence is not higherStated directly in LACoFD's checklist ('ESS installations requiring LACoFD inspection: ...capacity of more than 3 kWh'), including its own fee-payment and scheduling process.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedLACoFD guide/checklist and Building Forms library; no statement on whether a ground-mounted PV array is treated as a separate structure under the building code was found
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Electrical disconnection means and rapid-shutdown activation devices for all power sources (utility, PV, ESS, etc.) serving a structure must be on the exterior, within 6 feet of the main service panel, on the same wall plane, not separated from one another by walls/gates/fences/vegetation/architectural features (2023 LACFC Section 509.3), unless the fire code official grants a case-by-case exception (in which case alternative signage is required).
Why the confidence is not higherStated directly and with the specific 6-foot/same-wall-plane figure in both LACoFD documents; this is the fire-code-driven answer rather than an SCE service-requirements-manual answer, because SCE's own Rule 21 and Interconnection Handbook were unreachable both live and via Wayback (empty CDX, hanging connection) during this run.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Portal 90% · department page
- How much notice is required? Roughly 1-2 business days ahead, per the city's posted scheduling table (e.g., a request submitted Monday is tentatively scheduled for Wednesday; a Friday request for the following Monday or Tuesday depending on whether Fridays are 'closed' that week). 70% · department page
- Are same-day or AM/PM windows offered? No fixed AM/PM window is offered; the page states inspection times 'may vary' and instructs applicants to call before 9 a.m. on the inspection date to get the exact time slot. 72% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Delegated 85% · AHJ inspection checklist (LACoFD)
- If delegated, to whom? Los Angeles County Fire Department (LACoFD), Fire Prevention Division -- for ESS/BESS, BIPV, and electrical power-source disconnect placarding only. 85% · AHJ inspection checklist (LACoFD)
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
Nothing recorded for City of Hawthorne on this step yet — 2 questions checked and found unpublished. The guidance above is general.
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Yes 95% · AHJ inspection checklist (LACoFD)
- What must be on site at inspection? For the LACoFD-inspected scope: digital proof of the construction permit obtained via the expedited permitting process (SolarAPP+ or comparable), any inspection checklist provided with that permit, the disconnect placarding already installed, and confirmation that LACoFD Fire Prevention fees have been paid (unpaid invoices cause cancellation). Equipment cut/spec sheets and the full installation manual must be immediately available upon the inspector's request. 85% · AHJ inspection checklist (LACoFD)
- Does the inspector verify labels and listings? Yes -- for the LACoFD-inspected scope, the checklist explicitly requires confirming UL 9540 (ESS) and UL 1741 (inverter) listings, and confirming the disconnect placarding is in place, as prerequisites the inspector checks. 82% · AHJ inspection checklist (LACoFD)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? Letter 55% · AHJ inspection checklist (LACoFD)
14 questions answered against City of Hawthorne’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Portal
Why the confidence is not higherCity's Inspections page states contractors/applicants schedule inspections through the Tyler EnerGov CSS web portal; only permits issued before July 2022 require calling the office instead.
department page checked 2026-08-30 https://web.archive.org/web/20260123072221/https://www.cityofhawthorne.org/departments/building-safety/request-for-inspection-form
Q50 How much notice is required? Core Booking & scheduling
Roughly 1-2 business days ahead, per the city's posted scheduling table (e.g., a request submitted Monday is tentatively scheduled for Wednesday; a Friday request for the following Monday or Tuesday depending on whether Fridays are 'closed' that week).
Why the confidence is not higherThe exact table of request-day to inspection-day mappings is published on the city's own Inspections page, though it is presented as 'tentative,' not a guaranteed lead time.
department page checked 2026-08-30 https://web.archive.org/web/20260123072221/https://www.cityofhawthorne.org/departments/building-safety/request-for-inspection-form
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
No fixed AM/PM window is offered; the page states inspection times 'may vary' and instructs applicants to call before 9 a.m. on the inspection date to get the exact time slot.
Why the confidence is not higherStated directly on the city's Inspections page.
department page checked 2026-08-30 https://web.archive.org/web/20260123072221/https://www.cityofhawthorne.org/departments/building-safety/request-for-inspection-form
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Delegated
Why the confidence is not higherCity Building & Safety performs the conventional final building/electrical inspection for base residential PV; LACoFD performs a separate, mandatory field inspection for ESS/BESS, BIPV, and the disconnect-placarding system. Neither inspects the whole system alone.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q53 If delegated, to whom? Core Who inspects
Los Angeles County Fire Department (LACoFD), Fire Prevention Division -- for ESS/BESS, BIPV, and electrical power-source disconnect placarding only.
Why the confidence is not higherStated directly; LACoFD's checklist even instructs the applicant to look up the nearest LACoFD Fire Prevention regional inspection office.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q54 Which inspections are required, and in what order? Core Stages & sequence
Nothing published by this authority.
Where we lookedBuilding & Safety page and Inspections page; both describe scheduling mechanics but neither lists the required inspection stages/sequence for a residential PV project specifically
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Nothing published by this authority.
Where we lookedSame as q54; no statement on whether a rough-in or mid-roof inspection is required for PV was found
Q56 Does the inspector verify labels and listings? Core What is checked
Yes -- for the LACoFD-inspected scope, the checklist explicitly requires confirming UL 9540 (ESS) and UL 1741 (inverter) listings, and confirming the disconnect placarding is in place, as prerequisites the inspector checks.
Why the confidence is not higherDirectly itemized as Y/N/NA checklist items in LACoFD's dated inspection checklist.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q57 Is there a published inspection checklist? Core What is checked
Yes
Why the confidence is not higherLACoFD publishes a dated, 5-page 'Expedited PV/ESS Permitting Process -- Inspection Checklist' as a standalone PDF on its own site, and the City's own Building Forms library hosts LACoFD's related SB-379/GOV 65850.52 statement.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q58 What must be on site at inspection? Core Documents on site
For the LACoFD-inspected scope: digital proof of the construction permit obtained via the expedited permitting process (SolarAPP+ or comparable), any inspection checklist provided with that permit, the disconnect placarding already installed, and confirmation that LACoFD Fire Prevention fees have been paid (unpaid invoices cause cancellation). Equipment cut/spec sheets and the full installation manual must be immediately available upon the inspector's request.
Why the confidence is not higherDirectly itemized in LACoFD's checklist, Section V.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q59 Is there a re-inspection fee? Corrections & re-inspection
Nothing published by this authority.
Where we lookedAll four Building Forms subfolders and Finance department pages checked for a fee schedule (see q15); no re-inspection fee amount was located
Q60 How are corrections issued and cleared? Corrections & re-inspection
Nothing published by this authority.
Where we lookedBuilding & Safety page and Inspections page; neither describes the corrections/re-inspection clearance process
Q61 What is issued on pass? Core Final sign-off & PTO
Letter
Why the confidence is not higherLACoFD's checklist states 'A Passed Inspection Serves as an Operational Permit at a R-3/R-4 Occupancy, on the condition that it passes other necessary requirements from other agencies having jurisdiction (e.g., B&S, Utility, etc.)' -- this describes an operational-permit-by-inspection-result rather than one of the four listed Choice options cleanly; closest fit is a Letter/record of passed inspection rather than a formal CO or 'Final' as those terms are used elsewhere. City-side final sign-off documentation (e.g., a formal 'Final' in EnerGov) was not independently confirmed.
AHJ inspection checklist (LACoFD) checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedBuilding & Safety page, LACoFD documents, and SCE sources; no document reviewed states who (installer vs. AHJ vs. utility-pulls) notifies SCE for Permission to Operate. SCE's own interconnection materials were unreachable during this run (see q23/q42 notes).
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Jurisdiction & key facts
The standing 62-question set, answered for City of Hawthorne against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Hawthorne is the authority having jurisdiction 92% confidence
- Holds
- Building and Electrical (base residential rooftop PV permitting/plan-check/inspection sits with the City's Building & Safety Division). Fire is NOT a city department: fire.lacounty.gov's Division 1 contract-city list names Hawthorne directly, and Hawthorne's own department directory has no Fire Department entry at all (Police Department is listed, Fire is not) and links out externally to fire.lacounty.gov for 'Fire.' LACoFD, in its own published guide, states it 'has historically delegated fire-official authority for plan review and inspection of conventional residential solar-on-roof installations at one- or two-family dwellings...to the jurisdictional building and safety department,' but that delegation explicitly excludes Energy Storage Systems (ESS/BESS) and Building-Integrated PV (BIPV), which LACoFD retains as AHJ for plan review and field inspection.
- Delegated to
- LACoFD (Los Angeles County Fire Department) holds fire-code AHJ authority independently as the contract fire provider; it delegates conventional rooftop-PV fire review back to the City's Building & Safety Division, but keeps ESS/BESS and BIPV plan review + field inspection for itself.
- Overridden by
- LACoFD Guide for ESS, PV, & Disconnects (Rev. 3, 2023-09-01), Section II: LACoFD retains AHJ authority over ESS/BESS and BIPV regardless of city permit issuance, and requires its own separate plan submittal (where not exempt) and field inspection under the 2023 Los Angeles County Fire Code.
- Why not higher
- Confirmed from three independent sources in this run: (1) Hawthorne's own Building & Safety department page, which describes SolarAPP+ residential solar permitting and the Building & Safety plan-check function; (2) Hawthorne's own department directory, which lists Police Department but no Fire Department, and elsewhere splash-links out to fire.lacounty.gov; (3) fire.lacounty.gov/contracting/, which lists Hawthorne under LACoFD Division 1 contract cities by name. The split of fire authority (city handles conventional PV, LACoFD retains ESS/BIPV) is stated directly in LACoFD's own guide, not inferred.
Check the code edition before you build
This authority's published code edition does not match what the state has adopted. That usually means the authority's ordinance has not been updated for the current cycle — but a local amendment can also be lawful. Confirm with the building department before you submit.
- Permit required
- Yes92%
- Portal
- Tyler Technologies EnerGov 'Citizen Self Service' (CSS) portal at hawthorneca-energovweb.tylerhost.net, paired with SolarAPP+ (gosolarapp.org) specifically for residential solar,95%
- Electrical code
- 2023 NEC, adopted statewide as the 2025 California Electrical Code (Title 24, Part 3), effective 1 January 2026.60%
- Own placard wording
- Yes95%
- Booking an inspection
- Portal90%
Labels & placards for this authority
City of Hawthorne writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.
Wording 95%
Yes
Size, colour & material 95%
Exterior placards: minimum 2 in. tall x 3.5 in. wide, weather-resistant plastic, verbiage engraved; red letters engraved into a yellow background; solid all-capitals Arial font minimum size 24 ('F.D.' and '#X of Y' bold, minimum size 28). Panel-interior placards: minimum 7/16 in. tall x 3/4 in. wide, same material/color, solid all-capitals bold Arial minimum size 24. Attachment by permanent, material/weather/surface-compatible epoxy.
Where they go 88%
Exterior placards: on or immediately adjacent to each panel/enclosure or standalone disconnect switch that must be operated (additional placards required where an enclosure houses multiple panels, or more than the 'Main' must be operated). Panel-Interior placards: inside the panel, next to the specific switches/breakers, when multiple switches within one panel must be operated. All placarded devices must be accessible from the exterior of the structure and located within 6 feet of the main service panel on the same wall plane.
What the utility wants on top None%
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.