City of Ione

Amador County

Verified Aug. 5, 2026

City of Ione is a city authority in the State of California, serving 5,141 residents. 1,674 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Where you file — No dedicated online permit portal (no Accela/eTRAKiT/SolarAPP+/OpenGov found). The city's process is email-based: applications and plans are submitted to… Q20

Permit required
Yes95% source
What it costs
Residential roof-mount: 1.25% of project valuation, $165.00 minimum. Residential ground-mount: 1.5% of project valuation, $275.00 minimum.90% source
Key document
published checklist + codified ordinance cited by 8 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 92% · department page
    • What does this authority permit itself, and what does it delegate? Both 88% · department page + permit application form
    • Is a permit required for a residential rooftop PV system? Yes 95% · published checklist
    • Is there a separate electrical permit, or is it combined? Combined 80% · fee schedule + permit application form
    • Is a HOA or architectural approval required first? No city-required HOA/architectural approval found 62% · published checklist (absence)
    • Is there a historic-district review? No, for single-family residential -- and Yes only within a narrow downtown zone for non-residential/mixed-use structures. IMC §17.28.020 establishes a Historic Overlay (H) district limited to the portion of Main Street between Ione Street and Sacramento Street, requiring architectural design review for development within it, BUT §17.28.020(B)(3) explicitly states: 'those buildings used exclusively and solely for residential uses (e.g., single family residential) are hereby exempted from the requirement of architectural design review.' 88% · codified ordinance
    • Is a wind or windstorm certification required? No separate windstorm certification program (California does not run a TDI-style program); instead the city's own PV checklist directly requires the applicant to 'demonstrate that roof mounted systems are designed for wind loads in accordance with CBC 1510.7' as a plan-review item. 78% · published checklist
    • Is a Specific Use Permit or Council approval ever required? Yes, for ground-mounted/free-standing systems only -- the city's own PV Solar Checklist states under 'Ground-Mount System': '(Planning approval required for free standing system.)' Roof-mount systems carry no equivalent trigger in the checklist, and Zoning Code §17.38.030 (Accessory Structures) generally routes only 'certain structures' needing site plan review, variance, or other Ch.17.10 entitlements beyond the base building permit. 80% · published checklist + codified ordinance
    • Is there a system-size cap on residential generation? No residential system-size (kW) cap found anywhere 68% · codified ordinance (absence)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Per the city's own Photovoltaic Solar Checklist (dated 5 Feb 2026): a cover sheet (project address, owner contact, plan preparer name/address/phone/signature with engineer's seal and/or CSL# where applicable, list of applicable codes, scope of work, sheet index, legend); an electrical single-line diagram with total kVA rating; main/subpanel location and amperage with make/model (Zinsco panels must be upgraded); roof-covering type and waterproofing method; conduit routing (above/below roof, labeling <10ft apart per CEC 690.31(G)(4), wire type/size/count, standoff/support details); manufacturer specs/installation instructions for modules, mounts, inverters, disconnects, batteries; grounding-system details; structural roof-framing plan and array-support layout; and (if ground-mount) a plot plan, footing/foundation details, and clear-brush-area plan; (if battery) a floor plan of the housing structure and battery specs. 93% · published checklist
    • How many copies, and in what format? Plans submitted electronically by email to building@ione-ca.com, each file as a SEPARATE PDF attachment (not one combined PDF), unlocked/not password protected; standard paper sizes 8.5x11.5 or 11x17 are acceptable if hard copies are requested by the Senior Building Inspector, Planning Department, or Fire Chief. Paper mail submittal is described as 'discouraged'. 88% · department page + published checklist
    • Is a site plan required, and what must it show? For ground-mount systems: yes -- a plot plan showing property boundaries, all buildings on the parcel, and easements (Planning approval is separately required for a free-standing system). For roof-mount systems, no distinct 'site plan' is itemized beyond the cover sheet's project-address/scope-of-work items; siting is instead conveyed via the roof plan and single-line diagram. 68% · published checklist
    • Is a one-line / three-line diagram required? Yes 92% · published checklist
    • Are string and conductor calculations required? Partially -- the checklist requires conduit/conductor sizing detail (type, size, and number of wires in each conduit) and a total kVA rating on the single-line, but it does not itemize a distinct string-level Isc/Voc/temperature-coefficient/voltage-drop calculation the way some larger CA jurisdictions' checklists do. 65% · published checklist
    • Is a structural PE stamp required, and at what threshold? Yes -- structural calculations by a licensed/registered California design professional are required for the existing roof structure if the total combined weight of all roof-mounted PV equipment exceeds 5 pounds per square foot. 90% · published checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? No dedicated online permit portal (no Accela/eTRAKiT/SolarAPP+/OpenGov found). The city's process is email-based: applications and plans are submitted to building@ione-ca.com; plan-check deposits are paid by phone (credit card preferred) or mailed check. 82% · department page
    • Can the whole application be completed online? No 78% · department page
    • What does a residential solar permit cost? Residential roof-mount: 1.25% of project valuation, $165.00 minimum. Residential ground-mount: 1.5% of project valuation, $275.00 minimum. Plus a separate plan-review fee (see q17): 65% of the permit fee, $220.00 minimum. 90% · published fee schedule
    • How is the fee calculated? Valuation 90% · published fee schedule
    • Is there a separate plan-check fee? Yes 92% · published fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • How long is an issued permit valid before it expires? 2 years from date of issuance, OR sooner if work is not commenced within 180 days of issuance, OR if work is suspended/abandoned (defined as no documented progress inspection for more than 180 days). 92% · codified ordinance
    • Which utility handles interconnection here? Pacific Gas & Electric (PG&E) 92% · department page
    • Where does the utility sit in the sequence? After permit (parallel-with-a-gate, more precisely): PG&E's Electric Rule 21 (Section D.13.b) requires 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction over the Generating Facility' as one of three conditions before PG&E will normally process Permission to Operate within its 30-business-day target. Ione's own Municipal Code has no local utility-connection ordinance of its own (unlike Amador County's §15.04.080) -- this is entirely a PG&E-tariff-level requirement. 85% · utility tariff

28 questions answered against City of Ione’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherThe City of Ione's own Building Department page and its full suite of permit/fee/inspection documents (Photovoltaic Solar Checklist, Master Fee Schedule listing PV permit fee lines, Building Permit Application) confirm the city issues and inspects residential PV permits itself within its incorporated limits.

department page checked 2026-08-31 https://www.ione.ca.gov/building

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherThe Building Department issues Building AND Electrical permits itself for solar (single application form with Bldg/Mech/Plumb/Elect checkboxes, single deposit); no contract building-official firm or delegated electrical authority found anywhere on the site or in the fee schedule. The codified Municipal Code Ch.15.04.110 splits fire/panic-safety enforcement for Group R occupancies to the City's own Fire Chief, but that is intra-city, not a delegation out.

department page + permit application form checked 2026-08-31 https://www.ione.ca.gov/administration/page/business-licenses-related-permits

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherThe city's own Photovoltaic Solar Checklist states plainly: 'Prior to City approval and issuance of PV solar permits, all of the following must be provided...'; the Master Fee Schedule separately lists dedicated PV Roof Mount and PV Ground Mount permit fee lines (residential and commercial).

published checklist checked 2026-08-31 https://www.ione.ca.gov/building/page/photovoltaic-solar-checklist-0

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherThe general Building Permit Application is one form with Bldg/Mech/Plumb/Elect checkboxes rather than separate applications per trade, and the Master Fee Schedule's PV Roof/Ground Mount Solar fee lines under 'Building' are single all-in figures (1.25%-1.5% of valuation) rather than a separate electrical-only line for solar specifically.

fee schedule + permit application form checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either

Why the confidence is not higherThe general Building Permit Application form contains both a 'Licensed Contractor's Declaration' (CSLB license class/number) and an 'Owner-Builder Declaration' (citing B&P Code §7044 self-performed-work exemption) -- not solar-specific, and no separate standalone electrical permit exists for PV to check a narrower rule against.

permit application form checked 2026-08-31 https://www.ione.ca.gov/media/1531

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Likely yes, but not confirmed as a hard gate on permit issuance specifically for solar

Why the confidence is not higherThe City's general Building Permit Application form (submittal_2.pdf) has a 'CITY USE ONLY' checklist of items submitted with the permit application that includes a checkbox for '___Business License Application', and the Master Fee Schedule lists a general 'Business License $60.00/calendar year' fee (City Clerk section) -- suggesting a business license is customarily required of contractors doing city work. I did not locate the Municipal Code's Business License chapter itself (Title 5 was not reachable via the Municode node-ID guesses I tried this session) to confirm it is a hard legal gate before a permit can be issued, versus a courtesy collection step, so confidence is capped below 60.

permit application form + fee schedule (inference) checked 2026-08-31 https://www.ione.ca.gov/media/1531

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherThe general Building Permit Application form includes a full 'Owner-Builder Declaration' section (citing B&P Code §7044/§7031.5) allowing the property owner to self-perform work; nothing in the PV Solar Checklist excludes solar from this general path.

permit application form checked 2026-08-31 https://www.ione.ca.gov/media/1531

Q8 What documents make up a complete submittal? Core Submittal package

Per the city's own Photovoltaic Solar Checklist (dated 5 Feb 2026): a cover sheet (project address, owner contact, plan preparer name/address/phone/signature with engineer's seal and/or CSL# where applicable, list of applicable codes, scope of work, sheet index, legend); an electrical single-line diagram with total kVA rating; main/subpanel location and amperage with make/model (Zinsco panels must be upgraded); roof-covering type and waterproofing method; conduit routing (above/below roof, labeling <10ft apart per CEC 690.31(G)(4), wire type/size/count, standoff/support details); manufacturer specs/installation instructions for modules, mounts, inverters, disconnects, batteries; grounding-system details; structural roof-framing plan and array-support layout; and (if ground-mount) a plot plan, footing/foundation details, and clear-brush-area plan; (if battery) a floor plan of the housing structure and battery specs.

Why the confidence is not higherExtracted myself with pdftotext -layout from the actual PDF (not a WebFetch summary); document is self-dated 5 Feb 2026 and is the current document linked live from the Building Department's page as of this run.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q9 How many copies, and in what format? Submittal package

Plans submitted electronically by email to building@ione-ca.com, each file as a SEPARATE PDF attachment (not one combined PDF), unlocked/not password protected; standard paper sizes 8.5x11.5 or 11x17 are acceptable if hard copies are requested by the Senior Building Inspector, Planning Department, or Fire Chief. Paper mail submittal is described as 'discouraged'.

Why the confidence is not higherDirect quotes from the Building Permit & Submittal Process page and the Photovoltaic Solar Checklist, both current live documents.

department page + published checklist checked 2026-08-31 https://www.ione.ca.gov/building/page/building-permit-submittal-process

Q10 Is a site plan required, and what must it show? Core Submittal package

For ground-mount systems: yes -- a plot plan showing property boundaries, all buildings on the parcel, and easements (Planning approval is separately required for a free-standing system). For roof-mount systems, no distinct 'site plan' is itemized beyond the cover sheet's project-address/scope-of-work items; siting is instead conveyed via the roof plan and single-line diagram.

Why the confidence is not higherDirect read of the PV Solar Checklist's 'Ground-Mount System' section versus its general cover-sheet section, which does not separately list a plot/site plan requirement for roof-mount jobs.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherPV Solar Checklist, 'Addition plan requirements': 'Provide an electrical single-line diagram identifying all devices in the system including the total kVA rating.'

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q12 Are string and conductor calculations required? Drawings & calculations

Partially -- the checklist requires conduit/conductor sizing detail (type, size, and number of wires in each conduit) and a total kVA rating on the single-line, but it does not itemize a distinct string-level Isc/Voc/temperature-coefficient/voltage-drop calculation the way some larger CA jurisdictions' checklists do.

Why the confidence is not higherDirect read of the PV Solar Checklist's Conduit section; no separate 'calculations' subsection comparable to those requiring Isc/Voc/temp-coefficient figures was found.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Yes -- structural calculations by a licensed/registered California design professional are required for the existing roof structure if the total combined weight of all roof-mounted PV equipment exceeds 5 pounds per square foot.

Why the confidence is not higherDirect quote, PV Solar Checklist, 'Structural' subsection: 'Structural calculations by a licensed/registered CA design professional are required for the existing roof structure, if the total combined weight of the PV system exceeds 5 pounds per square foot.'

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedThe PV Solar Checklist (full text extracted via pdftotext), Title 15 chapters 15.04 (CBC), 15.08 (CRC), and 15.12 (CEC) -- none states a valuation, size, or complexity threshold that triggers a separate ELECTRICAL PE-stamp requirement beyond the general cover-sheet line ('Provide an engineer's seal and/or CSL# if by an electrical contractor, and/or if structural calcs/information is submitted with plans'), which is conditional on who prepares the plans rather than a numeric threshold.

https://www.ione.ca.gov/media/5691

Q15 What does a residential solar permit cost? Core Fees

Residential roof-mount: 1.25% of project valuation, $165.00 minimum. Residential ground-mount: 1.5% of project valuation, $275.00 minimum. Plus a separate plan-review fee (see q17): 65% of the permit fee, $220.00 minimum.

Why the confidence is not higherMaster Fee Schedule effective 30 Jul 2018 (Resolution 2018-26), Building section, extracted myself via pdftotext -layout -- read directly, not summarized. This is the only fee schedule linked live from the current Building Department page; it is dated 2018 and I found no newer published fee resolution superseding it, which I flag as a possible staleness caveat even though it is the operative linked document.

published fee schedule checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q16 How is the fee calculated? Core Fees

Valuation

Why the confidence is not higherAll four PV fee lines (residential/commercial x roof/ground) in the Master Fee Schedule are expressed as a percentage of project valuation with a stated dollar minimum -- not a flat fee, per-kW, or per-panel basis.

published fee schedule checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q17 Is there a separate plan-check fee? Fees

Yes

Why the confidence is not higherThe Master Fee Schedule's separate 'PLAN REVIEW' fee table lists 'PV SOLAR / residential -- 65% of permit fee / $220.00 minimum' and 'PV SOLAR / commercial -- 90% of permit fee / $385.00 minimum' as line items distinct from the Building section's PV permit fee lines, and the schedule states generally that 'Plan review fees are in addition to permit fees.'

published fee schedule checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedBuilding Permit & Submittal Process page and the PV Solar Checklist, both checked in full -- neither states a plan-review turnaround time (in business days or otherwise) for solar or for building permits generally.

https://www.ione.ca.gov/building/page/building-permit-submittal-process

Q19 How long is an issued permit valid before it expires? Timeline & validity

2 years from date of issuance, OR sooner if work is not commenced within 180 days of issuance, OR if work is suspended/abandoned (defined as no documented progress inspection for more than 180 days).

Why the confidence is not higherMunicipal Code §15.08.033 (amending CRC §R105.5), current codified text (Ord. No. 508, 12-3-2019), read directly via Municode (rendered with headless Chrome since the site is an Angular SPA that curl/WebFetch cannot render).

codified ordinance checked 2026-08-31 https://library.municode.com/ca/ione/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.08CAREBUCO

Q20 Which permit portal does this authority use? Core Portal & process

No dedicated online permit portal (no Accela/eTRAKiT/SolarAPP+/OpenGov found). The city's process is email-based: applications and plans are submitted to building@ione-ca.com; plan-check deposits are paid by phone (credit card preferred) or mailed check.

Why the confidence is not higherDirect read of the Building Permit & Submittal Process page, the city's only description of how applications are submitted; no portal link exists anywhere on the Building Department page or its sub-pages.

department page checked 2026-08-31 https://www.ione.ca.gov/building/page/building-permit-submittal-process

Q21 Can the whole application be completed online? Core Portal & process

No

Why the confidence is not higherThe process is email/phone based rather than a self-service web portal: applicant emails plans, is then contacted by staff for the deposit (paid by phone), receives correspondence by email, and must print the emailed permit/approved plans/inspection card for the job site -- there is no end-to-end online application-and-payment system.

department page checked 2026-08-31 https://www.ione.ca.gov/building/page/building-permit-submittal-process

Q22 Which utility handles interconnection here? Core Utility interconnection

Pacific Gas & Electric (PG&E)

Why the confidence is not higherThe City's own Administration Department 'Utility Companies' page states directly under 'Gas & Electric Services': 'PG&E, Phone: 1-800-743-5000' -- a city-sourced statement, not a PowerToChoose lookup.

department page checked 2026-08-31 https://www.ione.ca.gov/administration/page/utility-companies

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit (parallel-with-a-gate, more precisely): PG&E's Electric Rule 21 (Section D.13.b) requires 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction over the Generating Facility' as one of three conditions before PG&E will normally process Permission to Operate within its 30-business-day target. Ione's own Municipal Code has no local utility-connection ordinance of its own (unlike Amador County's §15.04.080) -- this is entirely a PG&E-tariff-level requirement.

Why the confidence is not higherExtracted myself this session via pdftotext of the full current PG&E tariff PDF (Advice 7692-E, effective 29 Aug 2025), not inherited from another agent's read; Ione's own Title 15 chapters (CBC, CRC, CEC) were checked in full and contain no comparable utility-connection clause.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No city-required HOA/architectural approval found

Why the confidence is not higherNo document on the Building Department's pages, the PV Solar Checklist, or the general Building Permit Application mentions HOA or private architectural-committee approval as a prerequisite. California's Solar Rights Act (Civil Code §714/§4600) independently limits an HOA's ability to disapprove solar regardless, but that is state law rather than an Ione-specific statement.

published checklist (absence) checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q25 Is there a historic-district review? Overlays & special cases

No, for single-family residential -- and Yes only within a narrow downtown zone for non-residential/mixed-use structures. IMC §17.28.020 establishes a Historic Overlay (H) district limited to the portion of Main Street between Ione Street and Sacramento Street, requiring architectural design review for development within it, BUT §17.28.020(B)(3) explicitly states: 'those buildings used exclusively and solely for residential uses (e.g., single family residential) are hereby exempted from the requirement of architectural design review.'

Why the confidence is not higherDirect read of Municipal Code §17.28.020, current codified text (Ord. No. 528, 2-15-2022), rendered via headless Chrome since the Municode SPA does not return content to curl/WebFetch.

codified ordinance checked 2026-08-31 https://library.municode.com/ca/ione/codes/code_of_ordinances?nodeId=TIT17ZO_ARTIIZODIALUSDEST_CH17.28OVDI

Q26 Is a wind or windstorm certification required? Overlays & special cases

No separate windstorm certification program (California does not run a TDI-style program); instead the city's own PV checklist directly requires the applicant to 'demonstrate that roof mounted systems are designed for wind loads in accordance with CBC 1510.7' as a plan-review item.

Why the confidence is not higherDirect quote from the PV Solar Checklist's Structural subsection, combined with the general California-practice point that wind is handled through ASCE-7-based CBC structural provisions rather than a standalone certificate.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Yes, for ground-mounted/free-standing systems only -- the city's own PV Solar Checklist states under 'Ground-Mount System': '(Planning approval required for free standing system.)' Roof-mount systems carry no equivalent trigger in the checklist, and Zoning Code §17.38.030 (Accessory Structures) generally routes only 'certain structures' needing site plan review, variance, or other Ch.17.10 entitlements beyond the base building permit.

Why the confidence is not higherDirect quote from the PV Solar Checklist plus the general accessory-structure permit-exception clause in the codified Zoning Code.

published checklist + codified ordinance checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No residential system-size (kW) cap found anywhere

Why the confidence is not higherChecked and found no kW/generation-size cap in: the PV Solar Checklist, the Master Fee Schedule (fee scales purely by valuation percentage, not by kW breakpoint), and Zoning Code Chapter 17.38 (Accessory Structures) -- whose own development-standards table (17.38.040-1) lists height/setback limits by structure TYPE (sheds, pools, decks, etc.) with no 'solar'/'PV' row at all. Positive control ('electrical'/'permit') and fabricated control ('zzqqx') both run clean against the extracted PV checklist and fee-schedule text.

codified ordinance (absence) checked 2026-08-31 https://library.municode.com/ca/ione/codes/code_of_ordinances?nodeId=TIT17ZO_ARTIIISIPLST_CH17.38ACST

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 NEC (as incorporated into the 2025 California Electrical Code), per the city's own live PV Solar Checklist, which states design/installation must comply with 'the 2025 California Building Code (CBC), California Residential Code (CRC), California Electrical Code (CEC), and California Fire Code (CFC).' HOWEVER: the codified Municipal Code chapter (§15.12.010, Ord. No. 509, 12-3-2019, current through Municode Supp. 13 / Nov 2023) still literally reads 'The 2019 edition of the California Electrical Code... based on the 2017 National Electrical Code' -- a real, dated lag between the codified adoption ordinance and the department's current live guidance. Under CA Building Standards Law the state's current triennial cycle (2025, effective statewide 1 Jan 2026) generally supersedes a stale local base-cycle citation via the ordinance's own 'and all future amendments thereto' clause, which is why I record 2023 as the operative answer, but the literal codified text has not been updated to say so. 75% · published checklist vs. codified ordinance (conflicting)
    • Which building code edition is in force? 2025 California Building Code, per the city's own live PV Solar Checklist. The codified Municipal Code chapter (§15.04.010, Ord. No. 507, 12-3-2019) still literally reads 'The 2019 edition of the California Building Code... based on the 2018 International Building Code' -- same lag noted at q29. 75% · published checklist vs. codified ordinance (conflicting)
    • Which fire code edition is in force? 2025 California Fire Code, per the city's own live PV Solar Checklist. The codified Municipal Code chapter (§15.22.010, Ord. No. 489, 3-7-2017) is the most stale of all four: it still literally reads 'The 2016 edition of the California Fire Code... based upon the 2015 edition of the International Fire Code.' 72% · published checklist vs. codified ordinance (conflicting)
    • Are there local amendments to any of the above? Yes 92% · codified ordinance
    • What is the installation judged against? The adopted 2025 CBC/CRC/CEC/CFC (per the live checklist) as locally amended, plus UL listing/labeling (UL 1703 for panels/modules), IEEE/accredited-lab standards, and PG&E Electric Rule 21's interconnection design requirements (visible disconnect, markings). 80% · published checklist + utility tariff
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Codified: CRC §R324.6.1 (locally added, Ord. 508) requires a pathway of not less than 36 inches wide, setback from the lowest roof edge, on any roof plane with a PV array. The city's own PV Solar Checklist separately states (citing 'local fire district requirements'): minimum 3 feet (36 inches) setback from roof edges, hip roof layouts, eaves and parapets; and minimum 18 inches setback where panels are placed on both sides of a hip or valley. 90% · codified ordinance + published checklist
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Not stated in the city's own PV Solar Checklist (no mention of 'rapid shutdown' or '690.12' anywhere in the document, control-checked). It applies indirectly through the state-adopted 2025 CEC (based on the 2023 NEC per the live checklist's own code-cycle statement -- see q29), which carries NEC Article 690.12 forward without a local exception found anywhere in Title 15. 68% · published checklist (absence) + code adoption (inference)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Per the PV Solar Checklist: (1) equipment placards identifying all installed equipment ('Placards shall identify all equipment installed with PV Panels identified'); (2) conduit/wiring labels required every <10 feet along the wiring system per CEC 690.31(G)(4); (3) a 'Do Not Relocate This Breaker' sign at the backfed breaker location (per CEC 690.64/705.129(D)(2)(3)(b)); (4) directional placards to inverters and the main service panel when the inverter is not in line of sight of the MSP or is in a non-readily-accessible space. 85% · published checklist
    • Does the authority specify placard wording of its own? Yes, in part 78% · published checklist
    • Is a site plan / facility map placard required, and what must it show? Yes, conditionally -- when an inverter is not in line of sight of the main service panel/PV overcurrent device, or is located in a non-readily-accessible area (lockable garage, room, yard, etc.), the checklist requires 'placards with directional signage to inverters and MSP' -- functioning as a wayfinding/facility placard, though the city does not describe a distinct NEC-705.10-style single consolidated facility map/directory placard beyond this directional-signage requirement. 65% · published checklist
    • Does the UTILITY specify placards beyond the AHJ's? Yes -- PG&E's Electric Rule 21 (Section H.1.d, 'Visible Disconnect Required') independently requires the Producer to furnish and install a ganged, manually-operated isolating switch near the Point of Interconnection, which must allow visible verification of separation, include open/closed markings/signage, and be reachable 24/7 by Distribution Provider personnel without obstacles, keys, or special clearance -- a statewide PG&E requirement layered on top of anything the City requires. 88% · utility tariff
    • Where must the labels be placed? At the service equipment/point of interconnection and on the visible AC disconnect (per PG&E Rule 21's disconnect-marking requirement, q42); conduit/wiring labels every <10 feet along the run per CEC 690.31(G)(4); a 'Do Not Relocate This Breaker' placard adjacent to the backfed breaker; and directional placards toward the inverter/MSP where not in line of sight, per the city's own PV Solar Checklist. 80% · published checklist + utility tariff
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? Yes 88% · published checklist
    • Are batteries permitted, and under what conditions? Yes, permitted, under conditions set out in the city's own PV Solar Checklist's 'Battery Installation' section: provide a floor plan of the structure housing the battery bank; indicate battery type, size, dimensions, ventilation, and physical-damage protection; provide the battery-bank anchoring method and a wiring diagram of the battery set; and the disconnect must be located within 10 feet of the main service panel. 85% · published checklist
    • Is there a separate ESS permit or inspection? No separate ESS-specific permit or fee line found 65% · fee schedule (absence)
    • Is a ground mount treated as a structure? Yes 78% · published checklist
    • Is a specific mounting system or attachment spacing required? No city-mandated proprietary mounting system. The city requires the plans to specify the manufacturer-specific attachment method (bolt/lag style, diameter, embedment) and, for structural load distribution, to 'stagger the placement of (other than ends) supports... to properly distribute loads and avoid concentrated loading. Otherwise, provide engineering to verify the roof structure is capable of supporting in-line supports.' 82% · published checklist

20 questions answered against City of Ione’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 NEC (as incorporated into the 2025 California Electrical Code), per the city's own live PV Solar Checklist, which states design/installation must comply with 'the 2025 California Building Code (CBC), California Residential Code (CRC), California Electrical Code (CEC), and California Fire Code (CFC).' HOWEVER: the codified Municipal Code chapter (§15.12.010, Ord. No. 509, 12-3-2019, current through Municode Supp. 13 / Nov 2023) still literally reads 'The 2019 edition of the California Electrical Code... based on the 2017 National Electrical Code' -- a real, dated lag between the codified adoption ordinance and the department's current live guidance. Under CA Building Standards Law the state's current triennial cycle (2025, effective statewide 1 Jan 2026) generally supersedes a stale local base-cycle citation via the ordinance's own 'and all future amendments thereto' clause, which is why I record 2023 as the operative answer, but the literal codified text has not been updated to say so.

Why the confidence is not higherCombines the city's own dated (5 Feb 2026) checklist with the codified ordinance text (both read directly, not summarized); flagged as an internal inconsistency rather than picking one silently.

published checklist vs. codified ordinance (conflicting) checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Code, per the city's own live PV Solar Checklist. The codified Municipal Code chapter (§15.04.010, Ord. No. 507, 12-3-2019) still literally reads 'The 2019 edition of the California Building Code... based on the 2018 International Building Code' -- same lag noted at q29.

Why the confidence is not higherSame basis as q29: the live checklist is dated 5 Feb 2026 (current), while Municode's codified text (current through Ord. 533, Nov 2023) has not been updated to reflect a newer adoption ordinance.

published checklist vs. codified ordinance (conflicting) checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q31 Which fire code edition is in force? Code editions in force

2025 California Fire Code, per the city's own live PV Solar Checklist. The codified Municipal Code chapter (§15.22.010, Ord. No. 489, 3-7-2017) is the most stale of all four: it still literally reads 'The 2016 edition of the California Fire Code... based upon the 2015 edition of the International Fire Code.'

Why the confidence is not higherSame lag pattern as q29/q30, but larger (2016 CFC vs the checklist's cited 2025 CFC) -- the largest codified-vs-live gap found in this run.

published checklist vs. codified ordinance (conflicting) checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes

Why the confidence is not higherMultiple explicit local amendments read directly from Title 15: a locally-added PV-specific roof-pathway rule (CRC §R324.6.1, added by Ord. 508: 'A pathway, not less than 36" wide setback from lowest roof edge of a roof plane with a photovoltaic array, will be required'); a broadened automatic-sprinkler trigger at 5,000 sq ft fire area (CBC §903.2, Ord. 507); a locally-amended permit-expiration rule (CRC §R105.5, Ord. 508, 2-year/180-day expiration -- see q19); a Class-A roof-covering mandate on all new construction and re-roofs (CBC §1505.1, Ord. 507); and various fee/investigation/reinspection-fee amendments.

codified ordinance checked 2026-08-31 https://library.municode.com/ca/ione/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.08CAREBUCO

Q33 What is the installation judged against? Core Electrical

The adopted 2025 CBC/CRC/CEC/CFC (per the live checklist) as locally amended, plus UL listing/labeling (UL 1703 for panels/modules), IEEE/accredited-lab standards, and PG&E Electric Rule 21's interconnection design requirements (visible disconnect, markings).

Why the confidence is not higherCombines the PV Solar Checklist's explicit code-and-listing language with PG&E's tariff, both read directly.

published checklist + utility tariff checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedMunicipal Code Chapter 15.12 (California Electrical Code, all 4 sections read in full via Municode) contains only adoption/fees/enforcement/penalties clauses -- no local rule on service-panel upgrade sizing or busbar percentage was found. Positive control ('electrical', 8 hits) and fabricated control ('zzqqx', 0 hits) both run clean, confirming a genuine absence.

https://library.municode.com/ca/ione/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.12CAELCO

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No city-mandated proprietary mounting system. The city requires the plans to specify the manufacturer-specific attachment method (bolt/lag style, diameter, embedment) and, for structural load distribution, to 'stagger the placement of (other than ends) supports... to properly distribute loads and avoid concentrated loading. Otherwise, provide engineering to verify the roof structure is capable of supporting in-line supports.'

Why the confidence is not higherDirect quote from the PV Solar Checklist's 'Structural' subsection.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Codified: CRC §R324.6.1 (locally added, Ord. 508) requires a pathway of not less than 36 inches wide, setback from the lowest roof edge, on any roof plane with a PV array. The city's own PV Solar Checklist separately states (citing 'local fire district requirements'): minimum 3 feet (36 inches) setback from roof edges, hip roof layouts, eaves and parapets; and minimum 18 inches setback where panels are placed on both sides of a hip or valley.

Why the confidence is not higherCombines the codified local amendment (read directly via Municode) with the current PV Solar Checklist's own fire-safety-roof-setback section -- both first-party Ione sources, consistent with each other.

codified ordinance + published checklist checked 2026-08-31 https://library.municode.com/ca/ione/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.08CAREBUCO

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Not stated in the city's own PV Solar Checklist (no mention of 'rapid shutdown' or '690.12' anywhere in the document, control-checked). It applies indirectly through the state-adopted 2025 CEC (based on the 2023 NEC per the live checklist's own code-cycle statement -- see q29), which carries NEC Article 690.12 forward without a local exception found anywhere in Title 15.

Why the confidence is not higherFull-text search of the PV Solar Checklist for 'rapid shutdown'/'690.12' returned zero hits; positive control ('electrical') hit multiple times and fabricated control ('zzqqx') returned zero hits, confirming the search itself worked. Code-cycle adoption is high-confidence but the practical-enforcement half is inferred, not directly documented by Ione.

published checklist (absence) + code adoption (inference) checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Per the PV Solar Checklist: (1) equipment placards identifying all installed equipment ('Placards shall identify all equipment installed with PV Panels identified'); (2) conduit/wiring labels required every <10 feet along the wiring system per CEC 690.31(G)(4); (3) a 'Do Not Relocate This Breaker' sign at the backfed breaker location (per CEC 690.64/705.129(D)(2)(3)(b)); (4) directional placards to inverters and the main service panel when the inverter is not in line of sight of the MSP or is in a non-readily-accessible space.

Why the confidence is not higherAll four items are direct quotes/paraphrases from the current PV Solar Checklist, extracted myself.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Yes, in part

Why the confidence is not higherThe checklist specifies exact wording for one placard: 'Do Not Relocate This Breaker' at the backfed-breaker location. It does not specify full custom wording for every placard (most others are described functionally -- e.g. 'identify locations for all labels' -- rather than by exact text), so this is a partial yes.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedPV Solar Checklist (full text) and the codified CRC §R324.6.1 pathway amendment -- neither specifies a placard letter height, colour, or material standard beyond citing the underlying CEC article numbers (690.31(G)(4), 690.64, 705.129) that a national/state code would separately govern; Ione supplies no local table of its own.

https://www.ione.ca.gov/media/5691

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Yes, conditionally -- when an inverter is not in line of sight of the main service panel/PV overcurrent device, or is located in a non-readily-accessible area (lockable garage, room, yard, etc.), the checklist requires 'placards with directional signage to inverters and MSP' -- functioning as a wayfinding/facility placard, though the city does not describe a distinct NEC-705.10-style single consolidated facility map/directory placard beyond this directional-signage requirement.

Why the confidence is not higherDirect quote, PV Solar Checklist, 'Central/string inverters' subsection; no separate consolidated facility-map placard document or code section was found.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes -- PG&E's Electric Rule 21 (Section H.1.d, 'Visible Disconnect Required') independently requires the Producer to furnish and install a ganged, manually-operated isolating switch near the Point of Interconnection, which must allow visible verification of separation, include open/closed markings/signage, and be reachable 24/7 by Distribution Provider personnel without obstacles, keys, or special clearance -- a statewide PG&E requirement layered on top of anything the City requires.

Why the confidence is not higherExtracted myself this session via pdftotext of PG&E's current tariff PDF (Advice 7692-E, effective 29 Aug 2025) -- direct quote of Section H.1.d, re-verified this run rather than inherited.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the service equipment/point of interconnection and on the visible AC disconnect (per PG&E Rule 21's disconnect-marking requirement, q42); conduit/wiring labels every <10 feet along the run per CEC 690.31(G)(4); a 'Do Not Relocate This Breaker' placard adjacent to the backfed breaker; and directional placards toward the inverter/MSP where not in line of sight, per the city's own PV Solar Checklist.

Why the confidence is not higherCombines PG&E's tariff (verified directly this run) with the city's own PV Solar Checklist (verified directly this run).

published checklist + utility tariff checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherPV Solar Checklist, General section: 'Panels and modules shall be listed and labeled in accordance with UL 1703, and shall have a fire classification rating > the roof covering.'

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, permitted, under conditions set out in the city's own PV Solar Checklist's 'Battery Installation' section: provide a floor plan of the structure housing the battery bank; indicate battery type, size, dimensions, ventilation, and physical-damage protection; provide the battery-bank anchoring method and a wiring diagram of the battery set; and the disconnect must be located within 10 feet of the main service panel.

Why the confidence is not higherDirect quote/paraphrase from the current PV Solar Checklist, extracted myself; no separate battery/ESS chapter exists in the codified Municipal Code (Title 15 chapters checked in full, zero 'battery'/'energy storage' hits, control-checked), so this checklist is the sole Ione-authored source on batteries.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separate ESS-specific permit or fee line found

Why the confidence is not higherThe Master Fee Schedule's Building and Plan Review sections list only 'PV ROOF/GROUND MOUNT SOLAR' lines (residential/commercial); no distinct 'battery'/'ESS'/'energy storage' fee line exists anywhere in the 20-page schedule (checked in full). The PV Solar Checklist's own Battery Installation section is folded into the same PV permit rather than described as a separate permit type.

fee schedule (absence) checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes

Why the confidence is not higherThe PV Solar Checklist requires ground-mount submittals to include 'details for footings/foundation and structural frame work' and a plot plan, and separately states 'Planning approval required for free standing system' -- functionally treating a ground-mounted array as a structure requiring both building-structural and planning review, consistent with the general Zoning Code's Accessory Structures chapter (17.38) framework for detached structures generally (no PV-specific row exists in that chapter's table, so this is treatment-by-analogy plus the checklist's explicit language).

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedPV Solar Checklist and PG&E's Electric Rule 21 (full pdftotext extraction of both) -- PG&E's tariff describes the visible disconnect's functional requirements (reachability, locking, markings) but gives no specific dimension relative to the meter, and Ione's own checklist does not address AC-disconnect-to-meter placement at all; a more detailed PG&E Distributed Generation interconnection handbook (if one exists) was not reached this session.

https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone, Email, or Walk-in 85% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 85% · department page
    • If delegated, to whom? N/A -- not delegated; the City performs its own final solar inspection (see q52). 78% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Roof-mount residential PV: a single final inspection. Ground-mount residential PV: footing inspection, then final. (Commercial roof-mount: final only; commercial ground-mount: footing then final.) 88% · published fee schedule
    • Is a rough-in or mid-roof inspection required? No 82% · published fee schedule
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes 82% · published checklist
    • What must be on site at inspection? A sturdy, non-folding, non-telescoping extension ladder secured to and extending at least 2 feet above the roof (and a matching ladder extending into the attic access, if applicable); the contractor present for all inspections; and the attic, all equipment, disconnects, and the main and subpanels open and ready for inspection before the inspector arrives. 88% · published checklist
    • Does the inspector verify labels and listings? Likely yes, inferred rather than explicitly stated -- the PV Solar Checklist requires equipment to be UL-listed and labeled, requires placards identifying all installed equipment, and separately instructs that 'the contractor will be present for all inspections, and have attic, and all equipment, disconnects, and main and subpanels open and ready for inspection prior to arrival of inspector' -- but no city document states in so many words that the inspector specifically checks labels/listings as a discrete step. 60% · published checklist (inference)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final 82% · published fee schedule
    • Who notifies the utility for PTO? Installer/Applicant 82% · utility tariff
    • Is there a re-inspection fee? $110.00 per inspection 92% · published fee schedule + codified ordinance
    • How are corrections issued and cleared? If work does not pass inspection, the inspector issues a correction notice; once corrections are made, the customer must reschedule an inspection (a re-inspection fee and any charges for the new scope apply). 85% · department page

14 questions answered against City of Ione’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone, Email, or Walk-in

Why the confidence is not higherBuilding Inspection page states directly: 'Schedule a building inspection: In-person: visit us at 1 Main St Ione Ca. By phone: 209-274-2412, Ext. 110. By email: building@ione-ca.com.' No online portal booking option exists.

department page checked 2026-08-31 https://www.ione.ca.gov/building/page/building-inspection

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedBuilding Inspection department page (full text) -- states how to book (phone/email/in-person) but never states a minimum advance-notice period.

https://www.ione.ca.gov/building/page/building-inspection

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedSame Building Inspection page checked as q50 -- no mention of same-day booking or AM/PM windows either way.

https://www.ione.ca.gov/building/page/building-inspection

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherThe Building Inspection page describes the City's own Building Department staff performing inspections directly (in-person/phone/email scheduling to City Hall, not a delegated agency); the Master Fee Schedule's PV fee lines each specify who performs which inspection stage ('inspection: final') under the City's own Building section, with no delegation named anywhere.

department page checked 2026-08-31 https://www.ione.ca.gov/building/page/building-inspection

Q53 If delegated, to whom? Core Who inspects

N/A -- not delegated; the City performs its own final solar inspection (see q52).

Why the confidence is not higherSame basis as q52.

department page checked 2026-08-31 https://www.ione.ca.gov/building/page/building-inspection

Q54 Which inspections are required, and in what order? Core Stages & sequence

Roof-mount residential PV: a single final inspection. Ground-mount residential PV: footing inspection, then final. (Commercial roof-mount: final only; commercial ground-mount: footing then final.)

Why the confidence is not higherDirect read of the Master Fee Schedule's own PV fee lines, each of which lists its required inspection stage(s) beneath the fee amount (e.g., 'PV ROOF MOUNT SOLAR/residential ... inspection: final'; 'PV GROUND MOUNT SOLAR/residential ... inspections: footing / final').

published fee schedule checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No

Why the confidence is not higherThe Master Fee Schedule's PV fee lines list only 'final' (roof-mount) or 'footing / final' (ground-mount) as the required inspection stages for residential solar -- no rough-in or mid-roof stage is listed for either configuration.

published fee schedule checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q56 Does the inspector verify labels and listings? Core What is checked

Likely yes, inferred rather than explicitly stated -- the PV Solar Checklist requires equipment to be UL-listed and labeled, requires placards identifying all installed equipment, and separately instructs that 'the contractor will be present for all inspections, and have attic, and all equipment, disconnects, and main and subpanels open and ready for inspection prior to arrival of inspector' -- but no city document states in so many words that the inspector specifically checks labels/listings as a discrete step.

Why the confidence is not higherInference from the equipment-listing and inspection-readiness requirements in the PV Solar Checklist; not an explicit statement.

published checklist (inference) checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q57 Is there a published inspection checklist? Core What is checked

Yes

Why the confidence is not higherThe city publishes a dedicated 'Photovoltaic Solar Checklist' (submittal-and-inspection-readiness combined) and a separate general 'Building Permit Application Checklist' -- both linked live from the Building Department's pages.

published checklist checked 2026-08-31 https://www.ione.ca.gov/building/page/photovoltaic-solar-checklist-0

Q58 What must be on site at inspection? Core Documents on site

A sturdy, non-folding, non-telescoping extension ladder secured to and extending at least 2 feet above the roof (and a matching ladder extending into the attic access, if applicable); the contractor present for all inspections; and the attic, all equipment, disconnects, and the main and subpanels open and ready for inspection before the inspector arrives.

Why the confidence is not higherDirect quotes from the PV Solar Checklist's General section, which lists these as plan-noted commitments that must be honored at time of inspection.

published checklist checked 2026-08-31 https://www.ione.ca.gov/media/5691

Q59 Is there a re-inspection fee? Corrections & re-inspection

$110.00 per inspection

Why the confidence is not higherMaster Fee Schedule: 'REINSPECTION $110.00 per inspection -- Assessed when permitted quantity of inspections is exceeded.' Consistent with the codified local amendment at CRC §R108.2.1 (Ord. 508), which states a reinspection fee is assessed once more than two inspections (1 initial + 1 reinspection) are required for the same work, and that no further inspection occurs until it is paid.

published fee schedule + codified ordinance checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q60 How are corrections issued and cleared? Corrections & re-inspection

If work does not pass inspection, the inspector issues a correction notice; once corrections are made, the customer must reschedule an inspection (a re-inspection fee and any charges for the new scope apply).

Why the confidence is not higherDirect quote from the Building Inspection page's 'Re-inspections and Correction Notices' section.

department page checked 2026-08-31 https://www.ione.ca.gov/building/page/building-inspection

Q61 What is issued on pass? Core Final sign-off & PTO

Final

Why the confidence is not higherThe Master Fee Schedule's own PV fee lines each name the terminal inspection stage as simply 'final' -- no Certificate of Occupancy is implicated for an existing-dwelling PV retrofit (the schedule's only CO-adjacent line, 'TEMPORARY CERTIFICATE OF OCCUPANCY,' is explicitly 'commercial/industrial only'), and no 'green tag' or 'letter' terminology appears anywhere in Ione's own documents.

published fee schedule checked 2026-08-31 https://www.ione.ca.gov/media/1536

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/Applicant

Why the confidence is not higherPG&E's Electric Rule 21 (Section D.13.b) describes the Applicant as the party who must supply 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction' along with the Interconnection Request package -- PG&E does not proactively pull this from the City. Extracted myself directly from the current tariff PDF this session.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Ione against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Ione is the authority having jurisdiction 92% confidence
Holds
Building AND Electrical (both issued in-house by the City's own Building Department); fire/panic-safety code enforcement for Group R occupancies is split out to the City's own Fire Chief per the codified Building Code enforcement clause.
Overridden by
CA Gov. Code §65850.5 (Solar Rights Act, as amended by AB 2188/SB 1414) mandates an expedited/administrative review process and eligibility standards for small residential rooftop solar, and Gov. Code §65850.52 (SB 379) separately mandates automated online permitting for eligible systems, but Ione has NOT codified a matching local expedited-solar chapter (full-text search of Title 15 Buildings/Construction and Title 17 Zoning for 'expedited', '65850', 'SolarAPP', and 'small residential rooftop' returned zero hits) -- so the state statute's default terms govern directly rather than through a local ordinance. AB 130 (Stats. 2025, Ch. 22) also freezes the city from adopting any MORE restrictive residential building-code amendment from 1 Oct 2025 to 1 Jun 2031. Separately, PG&E's Electric Rule 21 (Section D.13.b, Advice 7692-E, effective 29 Aug 2025) requires 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction over the Generating Facility' before PG&E will normally process Permission to Operate -- i.e., PG&E is a downstream gatekeeper on top of the City's own final inspection, not a competing AHJ.
Why not higher
The City of Ione's OWN live website (www.ione.ca.gov, a CivicPlus/Drupal site sitting behind Cloudflare Turnstile -- plain curl and WebFetch both return a 403 challenge page; curl_cffi with impersonate='chrome124' bypasses it and returns the real site) runs a full, current Building Department with its own Photovoltaic Solar Checklist (PDF, self-dated 5 Feb 2026), Master Fee Schedule, Building Permit & Submittal Process page, and Building Inspection page, all naming the City's own Building Department (contact: Jordan Doerksen, Administrative Assistant, 209-274-2412 x110, building@ione-ca.com) as the permitting and inspecting authority -- no delegation to Amador County or to any contract firm was found anywhere. NOTE: cityofione.com (a different, unrelated domain) is a dormant GoDaddy 'Launching Soon' placeholder page with zero content -- confirmed independently this run, matching a prior agent's finding for that specific URL -- but that is NOT the city's real site; www.ione.ca.gov is. This corrects the earlier assumption in this survey's own Amador County file that Ione's site 'could not be confirmed to the same standard' because that agent only checked the dead cityofione.com domain. Amador County's own Building Department page (confirmed separately in this survey) states it serves 'the unincorporated area of Amador County' only, and names Ione as one of five incorporated cities that are separate AHJs -- consistent with Ione self-performing.

https://www.ione.ca.gov/building

Permit required
Yes95%
Permit cost
Residential roof-mount: 1.25% of project valuation, $165.00 minimum. Residential ground-mount: 1.5% of project valuation, $275.00 minimum.90%
Portal
No dedicated online permit portal (no Accela/eTRAKiT/SolarAPP+/OpenGov found). The city's process is email-based: applications and plans are submitted to building@ione-ca.com;82%
Electrical code
2023 NEC (as incorporated into the 2025 California Electrical Code), per the city's own live PV Solar Checklist,75%
Own placard wording
Yes, in part78%
Booking an inspection
Phone, Email, or Walk-in85%
Labels & placards for this authority

City of Ione writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.

Wording 78%

Yes, in part

Size, colour & material None%

Where they go 80%

At the service equipment/point of interconnection and on the visible AC disconnect (per PG&E Rule 21's disconnect-marking requirement, q42); conduit/wiring labels every <10 feet along the run per CEC 690.31(G)(4); a 'Do Not Relocate This Breaker' placard adjacent to the backfed breaker; and directional placards toward the inverter/MSP where not in line of sight, per the city's own PV Solar Checklist.

What the utility wants on top 88%

Yes -- PG&E's Electric Rule 21 (Section H.1.d, 'Visible Disconnect Required') independently requires the Producer to furnish and install a ganged, manually-operated isolating switch near the Point of Interconnection, which must allow visible verification of separation, include open/closed markings/signage, and be reachable 24/7 by Distribution Provider personnel without obstacles, keys, or special clearance -- a statewide PG&E requirement layered on top of anything the City requires.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Amador County
Regions served
1
Regions covered
City of Ione · city
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.ione.ca.gov/building
Authority Contact
Address
1 E Main St, Ione, CA 95640
Main Phone
209-274-2412
Building Department
Department
Building Department
Direct Phone
209-274-2412 ext. 110
Booking & Scheduling
Preferred channel
phone
Request an inspection
Notes
Schedule inspections by phone at 209-274-2412 ext. 110 or by email at building@ione-ca.com. Building Official/Code Enforcement Officer Josh Tirapelli can be reached at ext. 105. Office hours Monday-Friday 9:00 AM - 4:00 PM, closed weekends and holidays. No online inspection portal found. It is the property owner's responsibility to ensure all required inspections are completed; contractors may schedule and be present for inspections. If work does not pass inspection, a correction notice is issued and re-inspection must be rescheduled. (collected Jul 2026)