City of Lompoc

Santa Barbara County

Verified Aug. 5, 2026

City of Lompoc is a city authority in the State of California, serving 44,444 residents. 952 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — Same day for over-the-counter applications, or 1-3 business days for electronic applications, for systems eligible for the expedited review process. Q18 Where you file — EnerGov Citizen Self Service (Tyler Technologies), at energov2.ci.lompoc.ca.us/energov_prod/selfservice Q20

Permit required
Yes97% source
What it costs
No single flat fee. Building Division: valuation-tiered Building Permit fee (e.g. $184 up to $2,000 valuation, then $184 plus $40/$1,000 up to $20,000,75% source
Plan review turnaround
Same day for over-the-counter applications, or 1-3 business days for electronic applications, for systems eligible for the expedited review process.90% source
Key document
ordinance cited by 7 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · adopting ordinance
    • What does this authority permit itself, and what does it delegate? Both 93% · department page
    • Is a permit required for a residential rooftop PV system? Yes 97% · ordinance
    • Is there a separate electrical permit, or is it combined? Combined 65% · ordinance
    • Is a HOA or architectural approval required first? No local HOA/architectural-review requirement was found for rooftop PV; California's Solar Rights Act (Civil Code §714) statutorily preempts HOA disapproval of solar statewide, and no zoning-code Architectural Design and Site Development Review (LMC Ch 17.512) trigger for rooftop PV was found. 60% · ordinance
    • Is there a historic-district review? Conditional — only if the specific property is a City-designated Landmark or a listed historic resource. LMC Ch 17.516 requires a Certificate of Appropriateness for 'exterior alteration... of any individual Landmark or historic resource, or potential historic resource' by the City or a private party; this is not a citywide requirement for ordinary residential properties. 75% · ordinance
    • Is a wind or windstorm certification required? No wind/windstorm certification requirement found (California does not use a TDI-style wind certification regime); the local CBC amendments (LMC §15.04.010) were searched for 'wind' (excluding false-positive matches on 'Wildland' and 'Window') and returned zero hits, with positive control ('building official') and fabricated control ('zzqqx') both behaving as expected. 70% · ordinance
    • Is a Specific Use Permit or Council approval ever required? Not required for systems that qualify as 'small residential rooftop solar' under LMC §15.74.020 (≤10kW AC / 30kW thermal, single/duplex-family, within height limits) — those go through the nondiscretionary Ch 15.74 process. A Conditional/Minor Use Permit (Ch 17.520) or Council action could be triggered only if a system falls outside that definition (e.g., oversized, or a ground-mount treated as an accessory structure exceeding standards), which was not independently confirmed. 55% · ordinance
    • Is there a system-size cap on residential generation? Two separate caps exist: (1) LMC §15.74.020 defines the 'small residential rooftop solar energy system' eligible for the expedited/nondiscretionary review path as no larger than 10 kW AC nameplate (or 30 kW thermal); (2) independently, Lompoc Electric's interconnection rules cap the system's expected annual production at no more than 100% of the customer's trailing 12-month energy use as recorded by their electric meter (Self-Generating Application Requirement #1; G-1 tariff eligibility). 90% · ordinance
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either 75% · department page
    • Must the contractor be registered with this authority before applying? Yes 70% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes 75% · checklist
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Building Permit Application; site plan; electronic construction documents/plans and technical specification sheets; AESC CSI Incentive Calculator (csi-epbb.com) production report per array; shading-analysis report if shading exists; equipment cut sheets showing CEC-listed PV modules/inverters; initialed Schedule G-1 and signed Self-Generating Electric Facility Installation and Interconnection Application submitted to the Electric Division; City Standard Drawing SM-1600 attached to the plan set. 85% · checklist
    • How many copies, and in what format? Digital-only: the current Building & Safety Services page states permits are submitted electronically via the Customer Self-Service (EnerGov) portal ('we have recently converted to digital-only submittals for all permit applications'). An older Building Permit Application form on file (Bulletin No. G-2019-001, dated Feb 18, 2022, under the former 'Community Development Department, Building and Safety Division' letterhead) still specifies '3 sets / 1- or 2-family dwelling' for paper submittals, which appears superseded. 70% · department page
    • Is a site plan required, and what must it show? Yes. Must be drawn to scale from an accurate boundary-line survey, show size/location of new and existing structures, distances from lot lines and established street grades; for Wildland-Urban Interface parcels must also show topography, access-road width/grade and landscape detail. A generic 'Sample Residential Site Plan' template is published. 75% · checklist
    • Is a one-line / three-line diagram required? Yes 75% · checklist
    • Are string and conductor calculations required? Not separately itemized as a distinct submittal item in the city's published plan-review or solar-application documents; the general Plan Review page lists 'Structural Design Computations' as supporting data 'depending on scope' but does not name string/conductor voltage-drop calculations. 55% · checklist
    • Is a structural PE stamp required, and at what threshold? No PV-specific structural PE-stamp threshold is published. The general Plan Review page requires 'Structural Design Computations' only 'depending on scope' (i.e., when the project departs from a prescriptive/pre-engineered path). LMC §15.74.050(D) directs the city's solar checklist to 'substantially conform' to the statewide California Solar Permitting Guidebook, which allows PE stamps to be waived for standard prescriptive residential PV installs. 50% · ordinance
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? EnerGov Citizen Self Service (Tyler Technologies), at energov2.ci.lompoc.ca.us/energov_prod/selfservice 92% · portal landing page
    • Can the whole application be completed online? Yes 88% · department page
    • What does a residential solar permit cost? No single flat fee. Building Division: valuation-tiered Building Permit fee (e.g. $184 up to $2,000 valuation, then $184 plus $40/$1,000 up to $20,000, scaling up) PLUS a separate Building Plan Check fee ($551 permit-issuance-with-plan-check base, or $200 plus $36/$1,000 scaling by valuation) PLUS a separate Fire Department 'Solar photovoltaic power systems' construction-permit fee of $220 flat for Residential (single family) per the Fire Dept's Construction Permits fee list. 75% · fee schedule
    • How is the fee calculated? Valuation (Building Division fee) plus a flat per-system Fire Department fee 78% · fee schedule
    • Is there a separate plan-check fee? Yes 90% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Same day for over-the-counter applications, or 1-3 business days for electronic applications, for systems eligible for the expedited review process. 90% · ordinance
    • How long is an issued permit valid before it expires? No local amendment to the standard CBC permit-expiration provision was found (searched LMC §15.04.010 California Building Code amendments with a positive control ('building official', 4 hits) and fabricated control ('zzqqx', 0 hits) — no override of the code's default permit-validity/expiration rule appears in the local amendments). Separately, a 2022 Building Permit Application bulletin states that an UNISSUED application (not yet a permit) 'shall expire by limitation' if no permit is issued within 365 days of application — a different clock than an issued permit's validity. 55% · ordinance
    • Which utility handles interconnection here? City of Lompoc Electric Division ('Lompoc Electric') — a municipally-owned utility operated by the City itself, NOT PG&E. PG&E's role is limited to upstream transmission into the City's system (relevant to PSPS de-energization events); Lompoc Electric is the interconnecting/retail distribution utility and is not CPUC-jurisdictional. 97% · department page
    • Where does the utility sit in the sequence? Before permit 93% · utility DG manual/application

28 questions answered against City of Lompoc’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherCity of Lompoc is an incorporated city with its own Building & Safety Services Division and its own Fire Department; LMC §15.03.020 designates the City's own Building Official as AHJ for all adopted construction codes except the Fire Code, and §15.03.025 designates the City's own Fire Chief as Fire Code Official. Santa Barbara County has no role for in-city addresses.

adopting ordinance checked 2026-08-30 https://ecode360.com/43247430

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherCity permits and inspects both building and electrical itself through Building & Safety Services; not delegated to the county or a third-party firm. A separate, additional utility-interconnection approval step is held by the City's own municipal Electric Division (see jurisdiction.overridden_by) — that is an added gate, not a delegation of the building/electrical permit function.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherLMC Chapter 15.74 (Expedited Permit Process for Small Residential Rooftop Solar Energy Systems) exists specifically to govern permitting of these systems, confirming a permit is required.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherLMC §15.74.060(B) directs the Building Official to issue 'a building permit or other nondiscretionary permit' covering electrical/mechanical/fire compliance in one action; the fee schedule lists Mechanical/Electrical/Plumbing as fee line items, not separately issued permits. Not stated verbatim as 'combined' by the city.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either

Why the confidence is not higherCity publishes an Owner-Builder Booklet and the Building Permit Application's 'Application Completed By' field includes an Owner checkbox alongside Contractor/Designer, indicating owner-builder self-permitting is allowed alongside a licensed contractor. Not a solar-specific statement.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/online-forms-and-construction-details

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherThe Electric Division's Self-Generating Electric Facility Installation and Interconnection Application instructions state 'Installation companies must have a business certificate to do business in the City' as part of the solar permitting process.

department page checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherCity publishes an Owner-Builder Booklet and the Building Permit Application form has an 'Owner' option under 'Application Completed By', consistent with California owner-builder self-permitting; not solar-specific.

checklist checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/online-forms-and-construction-details

Q8 What documents make up a complete submittal? Core Submittal package

Building Permit Application; site plan; electronic construction documents/plans and technical specification sheets; AESC CSI Incentive Calculator (csi-epbb.com) production report per array; shading-analysis report if shading exists; equipment cut sheets showing CEC-listed PV modules/inverters; initialed Schedule G-1 and signed Self-Generating Electric Facility Installation and Interconnection Application submitted to the Electric Division; City Standard Drawing SM-1600 attached to the plan set.

Why the confidence is not higherCombined from the Electric Division's published interconnection application (instructions, pp.2-3) and the general Plan Review submittal-requirements page; both are current authority documents.

checklist checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Q9 How many copies, and in what format? Submittal package

Digital-only: the current Building & Safety Services page states permits are submitted electronically via the Customer Self-Service (EnerGov) portal ('we have recently converted to digital-only submittals for all permit applications'). An older Building Permit Application form on file (Bulletin No. G-2019-001, dated Feb 18, 2022, under the former 'Community Development Department, Building and Safety Division' letterhead) still specifies '3 sets / 1- or 2-family dwelling' for paper submittals, which appears superseded.

Why the confidence is not higherTwo of the authority's own documents disagree by date: the live department page (current) says digital-only; a 2022 bulletin still linked from Online Forms specifies 3 paper sets. Flagging both rather than resolving; note the older bulletin's letterhead is itself a stale department-name holdover (see jurisdiction.why).

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes. Must be drawn to scale from an accurate boundary-line survey, show size/location of new and existing structures, distances from lot lines and established street grades; for Wildland-Urban Interface parcels must also show topography, access-road width/grade and landscape detail. A generic 'Sample Residential Site Plan' template is published.

Why the confidence is not higherCity's Plan Review page states the general site-plan content requirement (citing 2025 CBC/CRC sections); the Sample Site Plan PDF is a generic room-addition example, not solar-specific, so applicability to a PV site plan is inferred.

checklist checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/plan-review

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherElectric Division interconnection-application instructions require the plan set to include 'proposed solar system wiring and interconnection means' complying with Standard Drawing SM-1600 (a one-line interconnection diagram); functionally required though not phrased 'one-line diagram' verbatim.

checklist checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/32009/638060979141230000

Q12 Are string and conductor calculations required? Drawings & calculations

Not separately itemized as a distinct submittal item in the city's published plan-review or solar-application documents; the general Plan Review page lists 'Structural Design Computations' as supporting data 'depending on scope' but does not name string/conductor voltage-drop calculations.

Why the confidence is not higherChecked the general Plan Review submittal page and the Electric Division solar application instructions; neither lists string/conductor calculations by name.

checklist checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/plan-review

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No PV-specific structural PE-stamp threshold is published. The general Plan Review page requires 'Structural Design Computations' only 'depending on scope' (i.e., when the project departs from a prescriptive/pre-engineered path). LMC §15.74.050(D) directs the city's solar checklist to 'substantially conform' to the statewide California Solar Permitting Guidebook, which allows PE stamps to be waived for standard prescriptive residential PV installs.

Why the confidence is not higherNo city document states a specific valuation, weight, or roof-type threshold triggering a structural stamp for PV; inferred from the general 'depending on scope' language and the statewide guidebook reference in the local ordinance.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedChecked LMC Ch 15.74 (solar ordinance), the general Plan Review page, and the Ch 15.04.030 California Electrical Code local amendments for an electrical PE-stamp valuation/size threshold; none is stated.

https://www.cityoflompoc.com/government/departments/building-safety-services/plan-review

Q15 What does a residential solar permit cost? Core Fees

No single flat fee. Building Division: valuation-tiered Building Permit fee (e.g. $184 up to $2,000 valuation, then $184 plus $40/$1,000 up to $20,000, scaling up) PLUS a separate Building Plan Check fee ($551 permit-issuance-with-plan-check base, or $200 plus $36/$1,000 scaling by valuation) PLUS a separate Fire Department 'Solar photovoltaic power systems' construction-permit fee of $220 flat for Residential (single family) per the Fire Dept's Construction Permits fee list.

Why the confidence is not higherFrom the dated Master Fee Schedule (Effective Feb 5, 2024, amended Mar 8, 2024), the authority's own current linked fee document. Ambiguity flagged: the same schedule also has an 'Administrative Permits/Fees – Fire Department' item 7, 'Fire permit fee of building plans... Residential-SFH(R-3): 5% of Building Fees, includes up to 3 site inspections' — it is unclear from the text whether this 5%-of-building-fees line or the flat $220 solar-specific line (or both) applies to a given residential rooftop PV permit; not resolved, reported as found.

fee schedule checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/718/638454853616670000

Q16 How is the fee calculated? Core Fees

Valuation (Building Division fee) plus a flat per-system Fire Department fee

Why the confidence is not higherBuilding Permit and Building Plan Check fees are explicitly valuation-tiered tables in the Master Fee Schedule; the Fire Department's Solar PV line item is a flat $220 for residential, single family, independent of valuation.

fee schedule checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/718/638454853616670000

Q17 Is there a separate plan-check fee? Fees

Yes

Why the confidence is not higherMaster Fee Schedule has a distinct 'Building Plan Checking' category (Permit Issuance with Plan Check $551, plus a valuation-tiered Building Plan fee schedule) separate from the 'Building Construction Inspection/Permits' category.

fee schedule checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/718/638454853616670000

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Same day for over-the-counter applications, or 1-3 business days for electronic applications, for systems eligible for the expedited review process.

Why the confidence is not higherLMC §15.74.060(B): the Building Official 'shall issue a building permit... on the same day for over-the-counter applications or within one to three business days for electronic applications, upon receipt of a complete application.'

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q19 How long is an issued permit valid before it expires? Timeline & validity

No local amendment to the standard CBC permit-expiration provision was found (searched LMC §15.04.010 California Building Code amendments with a positive control ('building official', 4 hits) and fabricated control ('zzqqx', 0 hits) — no override of the code's default permit-validity/expiration rule appears in the local amendments). Separately, a 2022 Building Permit Application bulletin states that an UNISSUED application (not yet a permit) 'shall expire by limitation' if no permit is issued within 365 days of application — a different clock than an issued permit's validity.

Why the confidence is not higherAbsence of a local amendment proven with positive/fabricated controls in the authority's own Ch 15.04.010 text; the 365-day figure found is for a stale, un-permitted application, not an issued permit, so it does not directly answer the question.

ordinance checked 2026-08-30 https://ecode360.com/48712656

Q20 Which permit portal does this authority use? Core Portal & process

EnerGov Citizen Self Service (Tyler Technologies), at energov2.ci.lompoc.ca.us/energov_prod/selfservice

Why the confidence is not higherLinked directly from the Building & Safety Services page as the portal for permit application, status checking and inspection scheduling.

portal landing page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherBuilding & Safety Services page states the division 'converted to digital-only submittals for all permit applications' and directs applicants to the Customer Self-Service portal; status checks are also portal-based.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services

Q22 Which utility handles interconnection here? Core Utility interconnection

City of Lompoc Electric Division ('Lompoc Electric') — a municipally-owned utility operated by the City itself, NOT PG&E. PG&E's role is limited to upstream transmission into the City's system (relevant to PSPS de-energization events); Lompoc Electric is the interconnecting/retail distribution utility and is not CPUC-jurisdictional.

Why the confidence is not higherCity's own Electric Division page states plainly: 'The City of Lompoc's Electric Division is a publicly-owned utility that manages the generation, transmission, and distribution of electricity to the public within the city,' and separately explains 'Lompoc Electric uses PG&E transmission' only in the context of wildfire/PSPS de-energization risk upstream. This overturns the brief's PG&E assumption.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/utilities/electric

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Before permit

Why the confidence is not higherLMC §15.74.030(C): approval under the solar chapter 'does not authorize an applicant to connect' to the City's electric system — separate Utility Director approval (Interconnection Agreement) is required. The Electric Division's own application instructions place utility pre-approval, Schedule G-1 execution and signing of the Interconnection Agreement as Steps 1-5, explicitly BEFORE Step 7 ('Apply for a Building Permit'); the Building & Safety Services page independently confirms: 'Before signing any contract(s) or using Solar APP+ to obtain a building permit, please contact the City of Lompoc Electric Division for pre-approval instructions... If a system is installed without a permit, it will be turned off and locked until electric utility approval has been given and a permit has been approved.'

utility DG manual/application checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No local HOA/architectural-review requirement was found for rooftop PV; California's Solar Rights Act (Civil Code §714) statutorily preempts HOA disapproval of solar statewide, and no zoning-code Architectural Design and Site Development Review (LMC Ch 17.512) trigger for rooftop PV was found.

Why the confidence is not higherBased on the statewide Solar Rights Act plus absence of a found local trigger; did not exhaustively review all of Ch 17.512's applicability thresholds.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q25 Is there a historic-district review? Overlays & special cases

Conditional — only if the specific property is a City-designated Landmark or a listed historic resource. LMC Ch 17.516 requires a Certificate of Appropriateness for 'exterior alteration... of any individual Landmark or historic resource, or potential historic resource' by the City or a private party; this is not a citywide requirement for ordinary residential properties.

Why the confidence is not higherLMC §17.516.020(A) is explicit about scope (designated landmarks / listed historic resources / properties potentially eligible for a register); no solar-specific carve-out or inclusion was found in that chapter.

ordinance checked 2026-08-30 https://ecode360.com/43250826

Q26 Is a wind or windstorm certification required? Overlays & special cases

No wind/windstorm certification requirement found (California does not use a TDI-style wind certification regime); the local CBC amendments (LMC §15.04.010) were searched for 'wind' (excluding false-positive matches on 'Wildland' and 'Window') and returned zero hits, with positive control ('building official') and fabricated control ('zzqqx') both behaving as expected.

Why the confidence is not higherProven absence via controlled search of the authority's own Ch 15.04 local amendments; standard ASCE 7 wind-load engineering under the adopted CBC applies instead of a separate certification.

ordinance checked 2026-08-30 https://ecode360.com/48712656

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Not required for systems that qualify as 'small residential rooftop solar' under LMC §15.74.020 (≤10kW AC / 30kW thermal, single/duplex-family, within height limits) — those go through the nondiscretionary Ch 15.74 process. A Conditional/Minor Use Permit (Ch 17.520) or Council action could be triggered only if a system falls outside that definition (e.g., oversized, or a ground-mount treated as an accessory structure exceeding standards), which was not independently confirmed.

Why the confidence is not higherInferred from the statutory definition boundary in Ch 15.74 and the existence of Ch 17.520 CUP/MUP procedures generally; no city document explicitly states solar triggers a CUP outside that boundary.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Two separate caps exist: (1) LMC §15.74.020 defines the 'small residential rooftop solar energy system' eligible for the expedited/nondiscretionary review path as no larger than 10 kW AC nameplate (or 30 kW thermal); (2) independently, Lompoc Electric's interconnection rules cap the system's expected annual production at no more than 100% of the customer's trailing 12-month energy use as recorded by their electric meter (Self-Generating Application Requirement #1; G-1 tariff eligibility).

Why the confidence is not higherBoth figures are stated plainly in the authority's own ordinance and the utility's own published application requirements.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 88% · adopting ordinance
    • Which building code edition is in force? 2025 California Building Code and 2025 California Residential Code 97% · adopting ordinance
    • Which fire code edition is in force? 2025 California Fire Code, locally renamed the 'Lompoc Fire Code' 97% · adopting ordinance
    • Are there local amendments to any of the above? Yes 95% · ordinance
    • What is the installation judged against? The 2025 California Electrical Code (NEC 2023-based) as locally amended by LMC §15.04.030 (service-disconnect accessibility amendment to Art. 230.70(A)(1)), plus LMC Ch 15.74's requirement that solar systems meet 'the National Electrical Code with necessary California amendments... California Fire Code, and the International Residential Code with necessary California amendments,' plus the utility's own Schedule G-1, Interconnection Agreement, and Standard Drawing SM-1600. 85% · ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? No local ridge-setback or fire-access-pathway amendment was found. LMC §15.04.090 (California Fire Code local amendments) was searched for 'ridge', 'setback', and 'pathway' with a positive control ('electrical', 6 hits) and fabricated control ('zzqqx', 0 hits); no genuine hits (the only 'ridge' match was inside the word 'cartridges', a false positive). The unamended 2025 California Fire Code's own PV access/pathway provisions therefore apply as adopted, without local modification. 65% · fire code + amendments
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, rapid shutdown is required under the unamended 2025 California Electrical Code (NEC 2023-based), NEC Article 690.12. No local amendment addressing rapid shutdown was found in LMC §15.04.030 (Electrical Code amendments, which contains only a service-disconnect-location amendment). 72% · NEC edition in force
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? (a) Utility-required signage: a sign at the bi-directional net billing meter stating a customer generation system operates in parallel there, and a label at the generation AC disconnect switch (Interconnection Agreement §9.7). (b) No additional AHJ-specific placard beyond the unamended 2025 CEC/CFC baseline (NEC Art. 690/705 disconnect and rapid-shutdown labeling) was found in the local fire-code amendments. 68% · utility DG manual
    • Does the authority specify placard wording of its own? Partially — the UTILITY specifies required content (not exact verbatim wording): Interconnection Agreement §9.7 requires the meter sign to 'clearly indicate that a customer generation system is parallel at the meter point' and the disconnect to be 'clearly labeled as such.' The City itself (Building/Fire) has not published its own verbatim PV placard wording beyond adopting the unamended state code. 68% · ordinance / utility spec
    • Does it specify letter height, colour or material? Material only: utility labels 'must be weatherproof and durable' (Interconnection Agreement §9.7). No letter height or color is specified anywhere found — checked the Interconnection Agreement, Standard Drawing SM-1600, and LMC §15.04.090 (Fire Code amendments, 0 hits for placard-related text beyond the unrelated Ch 15.16 post-disaster placard chapter). 65% · ordinance
    • Does the UTILITY specify placards beyond the AHJ's? Yes 92% · utility DG manual
    • Where must the labels be placed? At the bi-directional net billing (revenue) meter, and at the generation AC disconnect switch. Standard Drawing SM-1600 shows the AC disconnect, the 'Lompoc PV' production meter and the main breaker clustered together and requires this equipment be 'located adjacent to the City of Lompoc Electric meter and outside of any fence unless pre-approved by City of Lompoc.' 85% · utility DG manual
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Adjacent to the City of Lompoc Electric meter, outside any fence 'unless pre-approved by City of Lompoc,' with the AC disconnect lockable in the open position. 88% · utility DG manual
    • Must equipment be on a specific approved list? Yes 90% · ordinance
    • Are batteries permitted, and under what conditions? Yes, batteries/ESS are permitted. The utility's application flags a metering condition: a battery positioned between the generating equipment and the City's production meter must be restricted from charging off the grid, or the customer may be billed extra energy charges for grid-charged storage discharged back to load. Broader fire/life-safety conditions are governed by the unamended 2025 California Fire Code (no ESS-specific local amendment was found in LMC §15.04.090). 75% · fire code + amendments
    • Is there a separate ESS permit or inspection? Yes 82% · fee schedule
    • Is a ground mount treated as a structure? Not explicitly addressed by a Lompoc-specific ordinance; under the adopted (unamended) 2025 CBC's general definitions, a freestanding ground-mounted PV rack meeting the code's definition of 'structure' would be treated as such (subject to setbacks/permit), but no Lompoc-specific ground-mount provision was found in LMC Ch 15.04 (Building Code amendments) or Ch 17.404 (Specific to Use Standards — the only 'solar' hit there was 'solar evaporation of sea water,' a false positive, confirming no ground-mount solar use-standard exists). 55% · ordinance
    • Is there a local rule on service upgrades or busbar sizing? Yes, though not solar-specific: (1) LMC §15.04.030(C) amends NEC Art. 230.70(A)(1) to require the service disconnect be readily accessible to emergency personnel without transiting the building interior; (2) the Electric Division's 'Typical Residential Electric Service' standard drawing caps the Main Electric Service Panel at '200 AMP MAX, RATED FOR RESIDENTIAL USE' and specifies grounding, clearance and work-space requirements, and requires the customer to call the Electric Division 48 hours before any panel replacement so City staff can disconnect/reconnect service. 78% · utility DG manual

20 questions answered against City of Lompoc’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023

Why the confidence is not higherLMC §15.03.010 adopts the '2025 edition of the California Electrical Code.' Per statewide practice, the 2025 CEC (effective 1 Jan 2026 as part of the 2025 Title 24 cycle) is based on the 2023 NEC; the city's own text names the CEC edition, not an NEC year, so the 2023 mapping is a standard/known equivalence rather than the city's own verbatim statement.

adopting ordinance checked 2026-08-30 https://ecode360.com/43247430

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Code and 2025 California Residential Code

Why the confidence is not higherLMC §15.03.010 adopts both by edition and title; the Building & Safety Services page independently confirms 'effective January 1, 2026, all projects must be designed per 2025 California Building Codes.'

adopting ordinance checked 2026-08-30 https://ecode360.com/43247430

Q31 Which fire code edition is in force? Code editions in force

2025 California Fire Code, locally renamed the 'Lompoc Fire Code'

Why the confidence is not higherLMC §15.03.010 adopts the 2025 California Fire Code; §15.04.090(B) renames it 'the Lompoc Fire Code' in local amendments.

adopting ordinance checked 2026-08-30 https://ecode360.com/48712672

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes

Why the confidence is not higherLMC Chapter 15.04 contains local amendments to the California Building, Residential, Electrical, Mechanical, Plumbing, Energy, Historic Building, Fire, Existing Building, Green Building Standards, and Wildland-Urban Interface Codes.

ordinance checked 2026-08-30 https://ecode360.com/48712656

Q33 What is the installation judged against? Core Electrical

The 2025 California Electrical Code (NEC 2023-based) as locally amended by LMC §15.04.030 (service-disconnect accessibility amendment to Art. 230.70(A)(1)), plus LMC Ch 15.74's requirement that solar systems meet 'the National Electrical Code with necessary California amendments... California Fire Code, and the International Residential Code with necessary California amendments,' plus the utility's own Schedule G-1, Interconnection Agreement, and Standard Drawing SM-1600.

Why the confidence is not higherCombination of the authority's own code-adoption section, its Ch 15.74 solar ordinance, and its utility's own interconnection standards.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Yes, though not solar-specific: (1) LMC §15.04.030(C) amends NEC Art. 230.70(A)(1) to require the service disconnect be readily accessible to emergency personnel without transiting the building interior; (2) the Electric Division's 'Typical Residential Electric Service' standard drawing caps the Main Electric Service Panel at '200 AMP MAX, RATED FOR RESIDENTIAL USE' and specifies grounding, clearance and work-space requirements, and requires the customer to call the Electric Division 48 hours before any panel replacement so City staff can disconnect/reconnect service.

Why the confidence is not higherThe panel-upgrade standard drawing is an image-only PDF; extracted via OCR (tesseract) rather than trusting a PDF-summary. It is a generic residential-service standard, not labeled as solar-specific, and carries no visible revision date in the scanned sheet.

utility DG manual checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/47274/638989872581670000

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedChecked LMC Ch 15.04 (CBC/CRC local amendments), LMC Ch 15.74 (solar ordinance), and utility Standard Drawing SM-1600 (an electrical interconnection diagram, not a structural mounting spec); no city-specific rack/attachment-spacing standard was found.

https://ecode360.com/48712656

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

No local ridge-setback or fire-access-pathway amendment was found. LMC §15.04.090 (California Fire Code local amendments) was searched for 'ridge', 'setback', and 'pathway' with a positive control ('electrical', 6 hits) and fabricated control ('zzqqx', 0 hits); no genuine hits (the only 'ridge' match was inside the word 'cartridges', a false positive). The unamended 2025 California Fire Code's own PV access/pathway provisions therefore apply as adopted, without local modification.

Why the confidence is not higherProven absence via controlled search of the authority's own current fire-code amendment chapter; the statewide baseline requirement is a comparable-authority inference, not city-specific text.

fire code + amendments checked 2026-08-30 https://ecode360.com/48712672

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, rapid shutdown is required under the unamended 2025 California Electrical Code (NEC 2023-based), NEC Article 690.12. No local amendment addressing rapid shutdown was found in LMC §15.04.030 (Electrical Code amendments, which contains only a service-disconnect-location amendment).

Why the confidence is not higherConfirmed the CEC 2025/NEC-2023 edition is adopted (Q29/30) and confirmed the local electrical amendments do not touch Art. 690.12; rapid shutdown itself is a state-code baseline requirement rather than a city-specific statement naming '690.12'.

NEC edition in force checked 2026-08-30 https://ecode360.com/48712656

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

(a) Utility-required signage: a sign at the bi-directional net billing meter stating a customer generation system operates in parallel there, and a label at the generation AC disconnect switch (Interconnection Agreement §9.7). (b) No additional AHJ-specific placard beyond the unamended 2025 CEC/CFC baseline (NEC Art. 690/705 disconnect and rapid-shutdown labeling) was found in the local fire-code amendments.

Why the confidence is not higherUtility signage requirement is explicit in the authority's own Interconnection Agreement; absence of a further city-specific placard spec was checked via the same controlled search of LMC §15.04.090 used for Q36/41.

utility DG manual checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45955/638901636189230000

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Partially — the UTILITY specifies required content (not exact verbatim wording): Interconnection Agreement §9.7 requires the meter sign to 'clearly indicate that a customer generation system is parallel at the meter point' and the disconnect to be 'clearly labeled as such.' The City itself (Building/Fire) has not published its own verbatim PV placard wording beyond adopting the unamended state code.

Why the confidence is not higherContent requirement is explicit in the utility's own agreement; absence of city-specific verbatim wording was checked against LMC §15.04.090 with controls (see Q36).

ordinance / utility spec checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45955/638901636189230000

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Material only: utility labels 'must be weatherproof and durable' (Interconnection Agreement §9.7). No letter height or color is specified anywhere found — checked the Interconnection Agreement, Standard Drawing SM-1600, and LMC §15.04.090 (Fire Code amendments, 0 hits for placard-related text beyond the unrelated Ch 15.16 post-disaster placard chapter).

Why the confidence is not higherMaterial spec is explicit in the utility's own document; absence of letter-height/color spec is a controlled, proven negative across three of the authority's own documents.

ordinance checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45955/638901636189230000

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedChecked LMC Ch 15.74 (which directs the checklist to 'substantially conform' to the statewide California Solar Permitting Guidebook but does not itself publish the checklist's content on the city website), LMC §15.04.090 (Fire Code amendments, no placard/facility-map hits), and Standard Drawing SM-1600 (an electrical interconnection diagram only). No published site-plan/facility-map placard spec was found.

https://ecode360.com/43248143

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes

Why the confidence is not higherInterconnection Agreement §9.7: 'Customer shall provide signs at the bi-directional net billing meter and disconnect switch... The labels must be weatherproof and durable' — a utility-specific signage requirement layered on top of, and separate from, whatever the AHJ's own (unamended, state-baseline) code requires. This matches the Lodi/Colton/Azusa pattern of municipal-utility-specific signage.

utility DG manual checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45955/638901636189230000

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the bi-directional net billing (revenue) meter, and at the generation AC disconnect switch. Standard Drawing SM-1600 shows the AC disconnect, the 'Lompoc PV' production meter and the main breaker clustered together and requires this equipment be 'located adjacent to the City of Lompoc Electric meter and outside of any fence unless pre-approved by City of Lompoc.'

Why the confidence is not higherInterconnection Agreement §9.7 plus the utility's own Standard Drawing SM-1600 (extracted via pdftotext -layout from a CAD-exported PDF; text order is scrambled by the drawing's rotated labels but content is legible).

utility DG manual checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/32009/638060979141230000

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherSelf-Generating Electric Facility Installation and Interconnection Application, Requirement #2: 'PV modules and inverters must be listed on the California Energy Commission Solar Equipment List... Inverters shall be covered by a 10-year warranty.'

ordinance checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, batteries/ESS are permitted. The utility's application flags a metering condition: a battery positioned between the generating equipment and the City's production meter must be restricted from charging off the grid, or the customer may be billed extra energy charges for grid-charged storage discharged back to load. Broader fire/life-safety conditions are governed by the unamended 2025 California Fire Code (no ESS-specific local amendment was found in LMC §15.04.090).

Why the confidence is not higherUtility metering condition is explicit in the Electric Division's own application; absence of a local ESS-specific fire-code amendment was checked as part of the same LMC §15.04.090 review used for Q36.

fire code + amendments checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Yes

Why the confidence is not higherMaster Fee Schedule (Fire Department Construction Permits) lists 'Energy Storage Systems' as its own line item, separate from the Solar PV line: 'A. Residential (single family R-3) storage system: $220; B. Commercial/Residential (R-1 & R-2) storage systems: $660.'

fee schedule checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/718/638454853616670000

Q47 Is a ground mount treated as a structure? Core Ground mount

Not explicitly addressed by a Lompoc-specific ordinance; under the adopted (unamended) 2025 CBC's general definitions, a freestanding ground-mounted PV rack meeting the code's definition of 'structure' would be treated as such (subject to setbacks/permit), but no Lompoc-specific ground-mount provision was found in LMC Ch 15.04 (Building Code amendments) or Ch 17.404 (Specific to Use Standards — the only 'solar' hit there was 'solar evaporation of sea water,' a false positive, confirming no ground-mount solar use-standard exists).

Why the confidence is not higherControlled search (positive control 'residential', 18 hits; fabricated 'zzqqx', 0 hits) of Ch 17.404 confirmed the only 'solar' occurrence is unrelated; treatment as a structure is inferred from general CBC definitions rather than a city-specific PV ground-mount rule.

ordinance checked 2026-08-30 https://ecode360.com/43249839

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Adjacent to the City of Lompoc Electric meter, outside any fence 'unless pre-approved by City of Lompoc,' with the AC disconnect lockable in the open position.

Why the confidence is not higherUtility Standard Drawing SM-1600 ('EQUIPMENT WITHIN THIS DASHED LINE SHALL BE LOCATED ADJACENT TO THE CITY OF LOMPOC ELECTRIC METER AND OUTSIDE OF ANY FENCE UNLESS PRE-APPROVED BY CITY OF LOMPOC'; 'AC DISCONNECT LOCKABLE IN OPEN POSITION'), corroborated by Interconnection Agreement §9.3 ('manual lockable disconnect switch... accessible to City employees at all times').

utility DG manual checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/32009/638060979141230000

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone (24-hour Inspection Hotline, (805) 875-8231) or Portal (EnerGov Customer Self-Service, schedule inspection online). 88% · department page
    • How much notice is required? Effectively next business day, or same day if the request is called in before 7:00 a.m. 82% · department page
    • Are same-day or AM/PM windows offered? Same-day is available for requests called in before 7:00 a.m.; no AM/PM window system is described. Inspectors are not available weekends or holidays. 80% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 90% · ordinance
    • If delegated, to whom? N/A — not delegated; performed by the City's own Building and Safety Services Section. 85% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For systems eligible for the Ch 15.74 expedited process: a single final inspection performed by Building and Safety Services. For larger/non-expedited building work generally, the city's published sequence is grading, foundation, concrete-slab/under-floor, frame, lath/wallboard, then final. 78% · ordinance
    • Is a rough-in or mid-roof inspection required? No, not for systems eligible for the expedited Ch 15.74 review — only one (final) inspection is required by §15.74.060(H), implying no separate rough-in/mid-roof inspection for qualifying small residential PV. 78% · ordinance
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No — not published as a distinct downloadable document. 75% · department page
    • What must be on site at inspection? Stamped, approved plans must be available on the job site for the inspector. 90% · department page
    • Does the inspector verify labels and listings? Not explicitly published as a checklist item, but the CEC-listing requirement is imposed at submittal (Self-Generating Application Requirement #2 requires CEC Solar Equipment List compliance and spec sheets), and the city's general final-inspection description is to confirm 'the physical work matches the approved plans and pertinent codes,' which would include verifying installed equipment matches the listed/approved equipment on the plans. 50% · department page / practice
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final 80% · department page
    • Who notifies the utility for PTO? Installer 75% · utility DG manual
    • Is there a re-inspection fee? Hourly rate — no flat dollar figure is published. Master Fee Schedule lists 'Re-Inspection/Other Inspections not Specified: Hourly Rate' under Building & Inspection (no numeric hourly rate stated in this document), and separately, for Fire, 'Additional inspection (hourly rate, minimum 1 hour): $110.' 65% · fee schedule
    • How are corrections issued and cleared? Written correction notices detail all deficiencies and required additional information/documentation for resubmission (LMC §15.74.060(G)); if a system fails inspection, a subsequent (re-)inspection is required (§15.74.060(I)). 82% · ordinance

14 questions answered against City of Lompoc’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone (24-hour Inspection Hotline, (805) 875-8231) or Portal (EnerGov Customer Self-Service, schedule inspection online).

Why the confidence is not higherBuilding & Safety Services and Building Inspection pages both state the hotline number and the option to 'Use the permit portal to schedule your inspection online.'

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/building-inspection

Q50 How much notice is required? Core Booking & scheduling

Effectively next business day, or same day if the request is called in before 7:00 a.m.

Why the confidence is not higherBuilding Inspection page: 'If your request is received prior to 7:00 a.m., the inspector will conduct the inspection that same day. Any inspections received after this time will be conducted the following work day.' Not stated as a fixed 'business days' figure in the schema's units.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/building-inspection

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Same-day is available for requests called in before 7:00 a.m.; no AM/PM window system is described. Inspectors are not available weekends or holidays.

Why the confidence is not higherBuilding Inspection page text.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/building-inspection

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherLMC §15.74.060(H): 'Only one inspection shall be required and performed by the Building and Safety Services Section for small residential rooftop solar energy systems eligible for expedited review under this Chapter.'

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated; performed by the City's own Building and Safety Services Section.

Why the confidence is not higherLMC §15.74.060(H) names the Building and Safety Services Section as the inspecting body.

department page checked 2026-08-30 https://ecode360.com/43248143

Q54 Which inspections are required, and in what order? Core Stages & sequence

For systems eligible for the Ch 15.74 expedited process: a single final inspection performed by Building and Safety Services. For larger/non-expedited building work generally, the city's published sequence is grading, foundation, concrete-slab/under-floor, frame, lath/wallboard, then final.

Why the confidence is not higherLMC §15.74.060(H) states one inspection for eligible small residential PV; Building Inspection page lists the general multi-stage sequence used for building projects generally (not solar-specific).

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No, not for systems eligible for the expedited Ch 15.74 review — only one (final) inspection is required by §15.74.060(H), implying no separate rough-in/mid-roof inspection for qualifying small residential PV.

Why the confidence is not higherDirect reading of LMC §15.74.060(H); the general multi-stage sequence (which does include a frame inspection) applies to non-expedited/larger projects, not confirmed to apply to standard rooftop PV.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q56 Does the inspector verify labels and listings? Core What is checked

Not explicitly published as a checklist item, but the CEC-listing requirement is imposed at submittal (Self-Generating Application Requirement #2 requires CEC Solar Equipment List compliance and spec sheets), and the city's general final-inspection description is to confirm 'the physical work matches the approved plans and pertinent codes,' which would include verifying installed equipment matches the listed/approved equipment on the plans.

Why the confidence is not higherInferred from the combination of the submittal-time listing requirement and the general (non-solar-specific) final-inspection description; no solar-specific inspection checklist was found to confirm field verification of labels/listings directly (see Q57).

department page / practice checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Q57 Is there a published inspection checklist? Core What is checked

No — not published as a distinct downloadable document.

Why the confidence is not higherChecked the Online Forms and Construction Details document list (15 documents, none solar/PV-specific) and the general Building Inspection page (describes generic inspection stages only, no PV checklist attached); LMC §15.74.050(C)-(D) directs the city to adopt one internally but it is not posted publicly as a standalone checklist file.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/online-forms-and-construction-details

Q58 What must be on site at inspection? Core Documents on site

Stamped, approved plans must be available on the job site for the inspector.

Why the confidence is not higherBuilding & Safety Services page, 'The Golden Rule of Inspections': 'You must have your stamped, approved plans available on the job site for the inspector. If they are not available, there will be no inspection.'

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services

Q59 Is there a re-inspection fee? Corrections & re-inspection

Hourly rate — no flat dollar figure is published. Master Fee Schedule lists 'Re-Inspection/Other Inspections not Specified: Hourly Rate' under Building & Inspection (no numeric hourly rate stated in this document), and separately, for Fire, 'Additional inspection (hourly rate, minimum 1 hour): $110.'

Why the confidence is not higherThe authority's own current fee schedule states these fees are hourly-rate-based but does not itself state the dollar-per-hour figure for the general Building Division re-inspection line (only the Fire Department's parallel line has a stated $110/hr).

fee schedule checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/718/638454853616670000

Q60 How are corrections issued and cleared? Corrections & re-inspection

Written correction notices detail all deficiencies and required additional information/documentation for resubmission (LMC §15.74.060(G)); if a system fails inspection, a subsequent (re-)inspection is required (§15.74.060(I)).

Why the confidence is not higherDirect text of LMC §15.74.060, subsections G and I.

ordinance checked 2026-08-30 https://ecode360.com/43248143

Q61 What is issued on pass? Core Final sign-off & PTO

Final

Why the confidence is not higherBuilding & Safety Services general process culminates in a 'Final Inspection... once the building is completed'; separately, the Electric Division's application Step 10 states 'Once all installation activities have been signed off by the Building Division and the Electric Division, the City will then give permission to operate' — i.e., a building Final plus a separate utility PTO, not a single certificate/green-tag/letter product named by the city.

department page checked 2026-08-30 https://www.cityoflompoc.com/government/departments/building-safety-services/building-inspection

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer

Why the confidence is not higherElectric Division application, Step 9: 'Notify Electric Division staff of the installation completion date and final Building Division inspection date' is an action required of the customer/installer; the Electric Division (which, notably, IS the interconnecting utility here, being a City department) then issues PTO after both Building and Electric sign-off.

utility DG manual checked 2026-08-30 https://www.cityoflompoc.com/home/showpublisheddocument/45957/638901636527530000

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Lompoc against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Lompoc is the authority having jurisdiction 92% confidence
Holds
Building and Electrical (City's own Building & Safety Services Division, per LMC §15.03.020); Fire Code enforcement separately by the City's own Fire Department (Fire Chief as Fire Code Official, LMC §15.03.025)
Overridden by
City of Lompoc Electric Division ('Lompoc Electric', a municipally-owned, non-CPUC-jurisdictional utility) imposes its own mandatory pre-approval, Interconnection Agreement, Schedule G-1 tariff, and signage/disconnect-location requirements that gate BEFORE the building permit and BEFORE energization (LMC §15.74.030(C); Electric Division interconnection application). Statewide, Gov. Code §65850.5 (Ch.15.74's basis) and AB 130 (Stats. 2025, Ch. 22, freezing more-restrictive local residential amendments 1 Oct 2025-1 Jun 2031) constrain the city's own amendment authority.
Why not higher
City of Lompoc is an incorporated city (not unincorporated Santa Barbara County territory) with its own Building & Safety Services Division and its own Fire Department, confirmed live on the city's own site navigation and department pages, and codified in LMC §15.03.020/.025. CA-santa-barbara-county.json is scoped to unincorporated county territory and does not apply here — this was independently corroborated, not inherited. The brief's assumption that PG&E is the interconnecting utility is WRONG: the city runs its own municipally-owned Electric Division ('Lompoc Electric'), confirmed on the Electric Division's own department page, which is not CPUC-jurisdictional and applies its own Rule-21-equivalent interconnection process instead of PG&E's Rule 21.

https://ecode360.com/43247430

Permit required
Yes97%
Permit cost
No single flat fee. Building Division: valuation-tiered Building Permit fee (e.g. $184 up to $2,000 valuation, then $184 plus $40/$1,000 up to $20,000,75%
Plan review
Same day for over-the-counter applications, or 1-3 business days for electronic applications, for systems eligible for the expedited review process.90%
Portal
EnerGov Citizen Self Service (Tyler Technologies), at energov2.ci.lompoc.ca.us/energov_prod/selfservice92%
Electrical code
202388%
Own placard wording
Partially — the UTILITY specifies required content (not exact verbatim wording): Interconnection Agreement §9.7 requires the meter sign to 'clearly indicate that a customer generation…68%
Booking an inspection
Phone (24-hour Inspection Hotline, (805) 875-8231) or Portal (EnerGov Customer Self-Service, schedule inspection online).88%
Labels & placards for this authority

Wording 68%

Partially — the UTILITY specifies required content (not exact verbatim wording): Interconnection Agreement §9.7 requires the meter sign to 'clearly indicate that a customer generation system is parallel at the meter point' and the disconnect to be 'clearly labeled as such.' The City itself (Building/Fire) has not published its own verbatim PV placard wording beyond adopting the unamended state code.

Size, colour & material 65%

Material only: utility labels 'must be weatherproof and durable' (Interconnection Agreement §9.7). No letter height or color is specified anywhere found — checked the Interconnection Agreement, Standard Drawing SM-1600, and LMC §15.04.090 (Fire Code amendments, 0 hits for placard-related text beyond the unrelated Ch 15.16 post-disaster placard chapter).

Where they go 85%

At the bi-directional net billing (revenue) meter, and at the generation AC disconnect switch. Standard Drawing SM-1600 shows the AC disconnect, the 'Lompoc PV' production meter and the main breaker clustered together and requires this equipment be 'located adjacent to the City of Lompoc Electric meter and outside of any fence unless pre-approved by City of Lompoc.'

What the utility wants on top 92%

Yes

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Santa Barbara County
Regions served
1
Regions covered
City of Lompoc · city
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityoflompoc.com/government/departments/building-safety-services
Authority Contact
Address
100 Civic Center Plaza, Lompoc, CA 93436
Main Phone
(805) 875-8220
Building Department
Department
Building and Safety Division
Direct Phone
(805) 875-8231
Portal Software
GoSolarApp
Booking & Scheduling
Preferred channel
phone
Book in advance
1
Notes
City of Lompoc uses SolarAPP+ (gosolarapp.org) for residential rooftop solar PV permit applications — automated plan review and permit issuance online. After permit is issued, inspections must be requested by phone via the 24-hour Inspection Hotline at (805) 875-8231 at least one business day prior to the desired inspection date. Requests received before 7:00 a.m. are inspected same day; after 7:00 a.m. scheduled next business day. Counter staff available Mon-Fri 8AM-5PM at (805) 875-8220 or building@ci.lompoc.ca.us. eTRAKiT permit status portal also available at http://www1.cityoflompoc.com/etrakit2/Search.aspx?Group=PERMIT. Contractors must hold a City Business Tax Certificate and valid State Contractors License to use SolarAPP+. City of Lompoc Electric utility approval required before interconnection.