City of Millbrae

San Mateo County

Verified Aug. 4, 2026

City of Millbrae is a city authority in the State of California, serving 23,216 residents. 792 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — For expedited-eligible small residential PV: same day (over-the-counter) or 1-3 business days (electronic applications). Q18 Where you file — eProcess360 (millbrae.ca.eprocess360.com) Q20

Permit required
Yes95% source
What it costs
$500 flat for residential PV systems 15 kW AC or less (includes plan review); +$15 per kW above 15 kW (plus plan review at the hourly rate). Battery Storage: $141.01 each.92% source
Plan review turnaround
For expedited-eligible small residential PV: same day (over-the-counter) or 1-3 business days (electronic applications).85% source
Key document
municipal code cited by 8 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 92% · municipal code
    • What does this authority permit itself, and what does it delegate? Both (in-house) for Building and Electrical; fire is delegated to Central County Fire Department 90% · municipal code
    • Is a permit required for a residential rooftop PV system? Yes 95% · municipal code
    • Is there a separate electrical permit, or is it combined? Combined 65% · permit application form
    • Is a HOA or architectural approval required first? No — the City will not condition approval of an eligible small residential PV application on association (HOA) approval 85% · municipal code
    • Is there a historic-district review? No — Millbrae's code contains no historic-district or landmark ordinance at all 78% · municipal code
    • Is a wind or windstorm certification required? No stand-alone windstorm certification is required; wind exposure (Exposure B or C, with Special Wind Region conditions) is addressed as a prescriptive-eligibility factor inside the Structural Criteria worksheet itself, not as a separate certificate 65% · department handout
    • Is a Specific Use Permit or Council approval ever required? Yes, conditionally — the Building Official may require a Use Permit if the system could have a 'specific, adverse impact' on public health/safety; that decision is appealable to the Planning Commission 90% · municipal code
    • Is there a system-size cap on residential generation? 10 kW AC nameplate / 30 kW thermal — this is an eligibility GATE for the expedited/AB 2188 'small residential rooftop solar energy system' definition, not a hard ceiling on residential generation; larger systems are not barred, they simply do not qualify for the streamlined review path 88% · municipal code
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either (licensed contractor or owner-builder) 65% · department handout
    • Must the contractor be registered with this authority before applying? Yes — a City of Millbrae business license is required for any contractor doing work in the city (not a separate building-department contractor registration) 75% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes 70% · department handout
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Completed permit application; City standard PV plan set; the Eligibility Checklist for Expedited Solar PV Permitting (general/electrical/structural/fire-safety Y/N items); the Structural Criteria for Residential Flush-Mounted Solar Arrays worksheet (or a PE-stamped structural calc package if any item on it fails); a roof diagram showing panel/module layout, access pathways, disconnect locations and roof-access points 85% · department handout
    • How many copies, and in what format? Electronic only — hard-copy applications are not accepted 90% · department page
    • Is a site plan required, and what must it show? Yes — a roof plan/diagram is required showing panel and module array layout, clear access pathways, and the approximate locations of electrical disconnecting means and roof access points 85% · department handout
    • Are string and conductor calculations required? Partially — the eligibility checklist requires confirming PV string counts per MPPT input, fuse ratings and combiner limits (Electrical Requirements A-D), which functions as a simplified string-configuration check for expedited-eligible systems; full engineered conductor/string calculations are implicitly required only for systems that fail the checklist and go to standard plan check 60% · department handout
    • Is a structural PE stamp required, and at what threshold? Yes, conditionally — a PE/structural-engineer stamp is required only if any item on the City's Structural Criteria for Residential Flush-Mounted Solar Arrays worksheet is answered 'No'; if all items are 'Yes,' no additional calculations are required 90% · department handout
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? eProcess360 (millbrae.ca.eprocess360.com) 92% · department page
    • Can the whole application be completed online? Yes 88% · department page
    • What does a residential solar permit cost? $500 flat for residential PV systems 15 kW AC or less (includes plan review); +$15 per kW above 15 kW (plus plan review at the hourly rate). Battery Storage: $141.01 each. Residential Solar Thermal: $450 for 10 kWth or less. 92% · fee schedule
    • How is the fee calculated? Tiered — flat fee up to a kW threshold, then per-kW above it 90% · fee schedule
    • Is there a separate plan-check fee? No separate plan-check fee for residential PV ≤15 kW AC (plan review is included in the $500 flat fee); above 15 kW, plan review is billed separately at the hourly rate ($291.55/hr) 88% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? For expedited-eligible small residential PV: same day (over-the-counter) or 1-3 business days (electronic applications). For systems that fail the eligibility checklist: 5 working days, standard process. General (non-solar) building permits: allow 15 days for all plan-check activities. 85% · municipal code
    • How long is an issued permit valid before it expires? 12 months from issuance (permit expires if work has not commenced within 12 months, or is suspended/abandoned for 12 months); up to one or more 180-day extensions may be granted by the Building Official for cause 88% · municipal code
    • Which utility handles interconnection here? Pacific Gas and Electric Company (PG&E) 92% · municipal code (franchise ordinance)
    • Where does the utility sit in the sequence? Parallel/after permit — PTO is gated on the City's final-inspection clearance 65% · utility tariff

28 questions answered against City of Millbrae’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherMMC 9.05.020.A defines 'Authority having jurisdiction,' 'Administrative authority,' 'Code official,' and 'local enforcing agency' as 'the City of Millbrae and its designated officials, including but not limited to the City's Building Official.' The City's own Building Division self-performs building/electrical/plumbing/mechanical permitting and inspection for residential solar (MMC Chapter 9.15); fire code enforcement and a conditional fire inspection are delegated to Central County Fire Department (see jurisdiction block).

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both (in-house) for Building and Electrical; fire is delegated to Central County Fire Department

Why the confidence is not higherMMC 9.05.020.A and the Building Division's own page show the City self-performs building/electrical/plumbing/mechanical permitting and inspection; MMC 9.10.710 and 9.15.060.H delegate fire code enforcement and a conditional fire inspection to CCFD.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherMMC Chapter 9.15 'Small Residential Rooftop Solar Energy Systems' governs the permitting of all small residential rooftop solar systems; a building permit is required per MMC 9.15.030 applicability and the general permit-required rule in 9.10 for any electrical/structural work.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherThe City's own 'Application for Building, Electrical, Plumbing and Mechanical Permit' (DocumentCenter/View/371) is a single combined form, and the online portal's four-page application (Information/Scope of Work/Application/Submittals) is one unified process with no separate electrical-permit step described for solar. Not verified against an actual solar application's field layout inside the login-gated eProcess360 portal, so confidence is moderate.

permit application form checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/371/Application-for-Building-Electrical-Plumbing-and-Mechanical-Permit-PDF

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either (licensed contractor or owner-builder)

Why the confidence is not higherThe City publishes a 'Caution to Owner-Builders from Contractor State License Board' handout and a 'Property Owner-Builder Disclosure Form' among its standard Building forms, indicating owner-builder permitting is accepted generally; no solar-specific restriction on who may pull the permit was found.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/1472/Caution-to-Owner-Builders-from-Contractor-State-License-Board-PDF

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — a City of Millbrae business license is required for any contractor doing work in the city (not a separate building-department contractor registration)

Why the confidence is not higherBuilding Division page: 'All contractors need to hold a valid and current business license when doing work in the City of Millbrae,' administered via millbrae.hdlgov.com.

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/176/Building-Division

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherThe City publishes an Owner-Builder Disclosure form and the CSLB owner-builder caution handout as standard Building Division forms; no solar-specific bar on owner-builder self-permitting was found in MMC Chapter 9.15.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/404/Property-Owner-Builder-Disclosure-Form-PDF

Q8 What documents make up a complete submittal? Core Submittal package

Completed permit application; City standard PV plan set; the Eligibility Checklist for Expedited Solar PV Permitting (general/electrical/structural/fire-safety Y/N items); the Structural Criteria for Residential Flush-Mounted Solar Arrays worksheet (or a PE-stamped structural calc package if any item on it fails); a roof diagram showing panel/module layout, access pathways, disconnect locations and roof-access points

Why the confidence is not higherDirectly enumerated across the City's two solar-specific PDFs: the Expedited Permitting Eligibility Checklist and the Structural Criteria worksheet, both dated January 2023 and hosted on the City's own Forms & Other Handouts page.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q9 How many copies, and in what format? Submittal package

Electronic only — hard-copy applications are not accepted

Why the confidence is not higherBuilding Permit page: 'The City requires all permits be submitted in the Online Permit Portal. Hard-copy applications are not accepted,' and MMC 9.15.050.B commits to electronic submittal for solar specifically.

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/210/Building-Permit

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — a roof plan/diagram is required showing panel and module array layout, clear access pathways, and the approximate locations of electrical disconnecting means and roof access points

Why the confidence is not higherEligibility Checklist, 'Fire Safety Requirements' item D, and the Structural Criteria worksheet's roof-plan/anchor-layout requirement (item E).

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedThe Eligibility Checklist for Expedited Solar PV Permitting and the Structural Criteria worksheet (both DocumentCenter PDFs) — neither names a one-line or three-line diagram explicitly, and no separate 'Solar PV Standard Plan' document referenced in MMC 9.15.050.D was linked from the Building Permit, Building Division, or Forms & Other Handouts pages (it may exist only inside the login-gated eProcess360 portal).

https://www.ci.millbrae.ca.us/211/Forms-Other-Handouts

Q12 Are string and conductor calculations required? Drawings & calculations

Partially — the eligibility checklist requires confirming PV string counts per MPPT input, fuse ratings and combiner limits (Electrical Requirements A-D), which functions as a simplified string-configuration check for expedited-eligible systems; full engineered conductor/string calculations are implicitly required only for systems that fail the checklist and go to standard plan check

Why the confidence is not higherEligibility Checklist 'Electrical Requirements' section; no separate named 'conductor calculation' submittal item was found, so this is read from the checklist's content rather than an explicit label.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Yes, conditionally — a PE/structural-engineer stamp is required only if any item on the City's Structural Criteria for Residential Flush-Mounted Solar Arrays worksheet is answered 'No'; if all items are 'Yes,' no additional calculations are required

Why the confidence is not higherStructural Criteria worksheet, Section 3 'Summary': 'B. One or more items are checked NO. Attached project-specific drawings and calculations stamped and signed by a California-licensed civil or structural engineer.' This is a localized copy of the statewide PV structural-criteria template, with the City's own header/footer/phone/address filled in, dated January 2023.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/416/Structural-Criteria-for-Residential-Flush-Mounted-Solar-Arrays-PDF

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedThe Eligibility Checklist, the Structural Criteria worksheet, and MMC 9.10's Electrical Code amendment sections (9.10.405-425) — none state an electrical PE-stamp threshold.

https://ecode360.com/print/MI4538?guid=47416219

Q15 What does a residential solar permit cost? Core Fees

$500 flat for residential PV systems 15 kW AC or less (includes plan review); +$15 per kW above 15 kW (plus plan review at the hourly rate). Battery Storage: $141.01 each. Residential Solar Thermal: $450 for 10 kWth or less.

Why the confidence is not higherCity of Millbrae Fee Schedule, 'H: Solar Systems' section, effective July 1, 2026 (pdfinfo CreationDate 1 Jul 2026), which annotates the residential PV figures 'Established by State' (i.e. the state-mandated fee cap under Gov. Code §65850.55/§66015/§66016 and H&SC §17951, as MMC 9.15.050.E cites).

fee schedule checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/1484/City-Fee-Schedule-PDF-

Q16 How is the fee calculated? Core Fees

Tiered — flat fee up to a kW threshold, then per-kW above it

Why the confidence is not higherFee Schedule 'H: Solar Systems': $500 flat ≤15kW, then $15/kW above 15kW for residential PV; same shape for solar thermal.

fee schedule checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/1484/City-Fee-Schedule-PDF-

Q17 Is there a separate plan-check fee? Fees

No separate plan-check fee for residential PV ≤15 kW AC (plan review is included in the $500 flat fee); above 15 kW, plan review is billed separately at the hourly rate ($291.55/hr)

Why the confidence is not higherFee Schedule 'H: Solar Systems' line reads '15KW or less (includes Plan Review) $500'; the >15kW lines read 'plus plan review at hourly rate.'

fee schedule checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/1484/City-Fee-Schedule-PDF-

Q18 What is the stated plan-review turnaround? Core Timeline & validity

For expedited-eligible small residential PV: same day (over-the-counter) or 1-3 business days (electronic applications). For systems that fail the eligibility checklist: 5 working days, standard process. General (non-solar) building permits: allow 15 days for all plan-check activities.

Why the confidence is not higherMMC 9.15.060.A ('same day... or within one to three business days'); Eligibility Checklist notes ('otherwise permit application must go through standard process of 5 working days'); Building Division page ('Permit applicants should allow 15 days for all plan check activities').

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q19 How long is an issued permit valid before it expires? Timeline & validity

12 months from issuance (permit expires if work has not commenced within 12 months, or is suspended/abandoned for 12 months); up to one or more 180-day extensions may be granted by the Building Official for cause

Why the confidence is not higherMMC 9.05.040 'Permit expiration,' a general provision (Ord. 821, 11/25/2025) applicable to all permits issued under Title 9, including solar; no solar-specific validity period was found.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q20 Which permit portal does this authority use? Core Portal & process

eProcess360 (millbrae.ca.eprocess360.com)

Why the confidence is not higherDirectly linked from the Building Permit page as 'Register or Login to Online Building Permitting and Plan Review.'

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/210/Building-Permit

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherBuilding Permit page: the entire four-page application (Information, Scope of Work, Application, Submittals) is completed and submitted electronically through the portal; 'Hard-copy applications are not accepted.'

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/210/Building-Permit

Q22 Which utility handles interconnection here? Core Utility interconnection

Pacific Gas and Electric Company (PG&E)

Why the confidence is not higherMMC Chapter 11.05 'Electrical Transmission Franchise' grants the City's electrical transmission franchise, by name, to Pacific Gas and Electric Company ('The word "grantee" means Pacific Gas and Electric Company... The franchise... is granted to Pacific Gas and Electric Company'). This is the City's own codified confirmation, superior to a PowerToChoose lookup.

municipal code (franchise ordinance) checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47420332

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel/after permit — PTO is gated on the City's final-inspection clearance

Why the confidence is not higherNot stated in any Millbrae-specific document (none was found); inferred from PG&E's own statewide Rule 21 tariff §D.13.b, which processes NEM/NBT interconnection applications and requires 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction' before PTO — a statewide PG&E rule, not authority-specific.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — the City will not condition approval of an eligible small residential PV application on association (HOA) approval

Why the confidence is not higherMMC 9.15.060.F: 'The City will not condition approval of an application on the approval of an association, as defined in Civil Code Section 4080.' No separate general architectural-review gate for solar was found; larger/ineligible systems could still route through the general Design Review chapter (10.05.2500), which contains no solar carve-out.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q25 Is there a historic-district review? Overlays & special cases

No — Millbrae's code contains no historic-district or landmark ordinance at all

Why the confidence is not higherFull-text search of Title 10 (Planning and Zoning)'s complete chapter list (10.05 Zoning through 10.40 Airport Noise Disclosure) shows no Historic Preservation chapter; the only 'historic' hits are generic references to the State Historic Resources Inventory used as an eligibility test inside the ADU and SB9 two-unit exemption criteria, not a city historic-review ordinance. Fabricated control ('zzqqx') returned zero hits confirming the search worked; a Downtown/Station-Area Specific Plan design element was not independently checked for a historic overlay, so this is not rated higher.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47417273

Q26 Is a wind or windstorm certification required? Overlays & special cases

No stand-alone windstorm certification is required; wind exposure (Exposure B or C, with Special Wind Region conditions) is addressed as a prescriptive-eligibility factor inside the Structural Criteria worksheet itself, not as a separate certificate

Why the confidence is not higherStructural Criteria for Residential Flush-Mounted Solar Arrays, Table 1 Notes items on Wind Exposure B/C and Special Wind Region assumptions.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/416/Structural-Criteria-for-Residential-Flush-Mounted-Solar-Arrays-PDF

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Yes, conditionally — the Building Official may require a Use Permit if the system could have a 'specific, adverse impact' on public health/safety; that decision is appealable to the Planning Commission

Why the confidence is not higherMMC 9.15.060.B and .D, verbatim AB 2188/Solar Rights Act language codified in the City's own solar chapter.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q28 Is there a system-size cap on residential generation? Overlays & special cases

10 kW AC nameplate / 30 kW thermal — this is an eligibility GATE for the expedited/AB 2188 'small residential rooftop solar energy system' definition, not a hard ceiling on residential generation; larger systems are not barred, they simply do not qualify for the streamlined review path

Why the confidence is not higherMMC 9.15.020.D.1 defines 'small residential rooftop solar energy system' as 'no larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal'; the fee schedule separately prices residential PV up to 15 kW at a flat rate and above 15 kW per-kW, and commercial PV up to 250+ kW, showing systems above the 9.15 gate are still permitted, just outside the expedited chapter.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 NEC (adopted as part of the 2025 California Electrical Code) 92% · municipal code
    • Which building code edition is in force? 2025 California Building Code and 2025 California Residential Code 92% · municipal code
    • Which fire code edition is in force? 2025 California Fire Code (Title 24, Part 9) together with the International Fire Code, 2024 Edition, as amended by the State of California 92% · municipal code
    • Are there local amendments to any of the above? Yes — extensive local amendments exist to the Fire, Electrical and Mechanical codes (MMC Chapter 9.10), plus a 2020 sustainable 'reach code' ordinance (Ord. 783) amending the Energy Code (9.50) and Green Building Code (9.35). Note: the current Title-24-cycle amendments were codified by Ord. 821 on 11/25/2025 — after AB 130's 1 Oct 2025 freeze on more-restrictive residential amendments began; whether any of these specific amendments affect one- and two-family residential construction in a way subject to AB 130 review, or were filed/accepted by BSC, could not be determined in this run and is left as an open question rather than asserted either way. 75% · municipal code
    • What is the installation judged against? The 2025 California Electrical Code (based on the 2023 NEC), subject to the City's local amendments in MMC 9.10.410-425 (none of which are PV-specific) 85% · municipal code
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? No Millbrae-specific ridge-setback distance or pathway width is codified. The Eligibility Checklist's Fire Safety Requirements only require confirming 'Clear access pathways provided' without stating dimensions, so the unamended 2025 CFC/CRC prescriptive pathway and ridge-setback provisions apply by default. 62% · municipal code
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, under the 2023 NEC §690.12 (via the 2025 CEC), applied unamended — Millbrae has not adopted its own local rapid-shutdown rule 62% · municipal code
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? No AHJ-specific placard content beyond the unamended state code's generic markings/labels requirement — Millbrae's own Eligibility Checklist only requires confirming 'All required markings and labels are provided' without naming any specific placard 70% · municipal code
    • Does the authority specify placard wording of its own? No 78% · municipal code
    • Does it specify letter height, colour or material? No 78% · municipal code
    • Is a site plan / facility map placard required, and what must it show? Yes, functionally — the Eligibility Checklist requires 'a diagram of the roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points' as part of the submittal, serving the same purpose as a 705.10 facility/site plan placard, though it is a submitted drawing rather than a posted physical placard 78% · department handout
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? Yes 85% · municipal code
    • Are batteries permitted, and under what conditions? Batteries are not addressed by a dedicated ordinance; they are excluded from the expedited/streamlined path. The Eligibility Checklist's General Requirements item E requires the system be 'utility interactive and without battery storage' to qualify for expedited review — a system with a battery must go through standard (non-expedited) plan check, for which no separate published battery/ESS conditions were found. 65% · department handout
    • Is there a separate ESS permit or inspection? Likely yes, based on a distinct fee line, but no dedicated ESS ordinance or permit process is published 55% · fee schedule
    • Is a ground mount treated as a structure? Yes, by inference — Millbrae's zoning code defines 'Structure' broadly as 'anything constructed or erected, the use of which requires location on or in the ground, or attachment to something having location on or in the ground,' with no PV-specific ground-mount carve-out or standard anywhere in Title 10 68% · municipal code
    • Is there a local rule on service upgrades or busbar sizing? No Millbrae-specific busbar or service-upgrade ordinance was found. The '225A or less' single-phase busbar figure that appears in the solar Eligibility Checklist is the statewide AB 2188/CALSEIA expedited-permitting template's own eligibility threshold, not a locally codified Millbrae rule (Millbrae's Electrical Code amendments at 9.10.410-425 do not mention busbar sizing). 68% · department handout
    • Is a specific mounting system or attachment spacing required? Yes — the City's own 'Structural Criteria for Residential Flush-Mounted Solar Arrays' worksheet prescribes: modules parallel to the roof plane with a 2"-10" gap to the roof surface, no overhang past roof edges, array covering no more than half the total roof area, and a Table-1 anchor horizontal-spacing standard tied to roof framing type/slope, with 5/16" lag screws at 2.5" rafter embedment (or manufacturer's guidelines) for wind-uplift resistance 90% · department handout

20 questions answered against City of Millbrae’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 NEC (adopted as part of the 2025 California Electrical Code)

Why the confidence is not higherMMC 9.10.405 adopts the 'California Electrical Code, 2025 Edition'; per the 2025 Title 24 cycle statewide, the 2025 CEC is based on the 2023 NEC.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Code and 2025 California Residential Code

Why the confidence is not higherMMC 9.10.005 ('California Building Code, 2025 Edition, Adopted') and the Residential Code section ('California Residential Building Code, 2025 Edition').

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q31 Which fire code edition is in force? Code editions in force

2025 California Fire Code (Title 24, Part 9) together with the International Fire Code, 2024 Edition, as amended by the State of California

Why the confidence is not higherMMC 9.10.705, adopted by the City and enforced through Central County Fire Department per 9.10.710.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — extensive local amendments exist to the Fire, Electrical and Mechanical codes (MMC Chapter 9.10), plus a 2020 sustainable 'reach code' ordinance (Ord. 783) amending the Energy Code (9.50) and Green Building Code (9.35). Note: the current Title-24-cycle amendments were codified by Ord. 821 on 11/25/2025 — after AB 130's 1 Oct 2025 freeze on more-restrictive residential amendments began; whether any of these specific amendments affect one- and two-family residential construction in a way subject to AB 130 review, or were filed/accepted by BSC, could not be determined in this run and is left as an open question rather than asserted either way.

Why the confidence is not higherMMC 9.10 amendment sections throughout Title 9, each stamped '(Ord. 821, 11/25/2025)'; the Sustainable Reach Codes page describing Ord. 783 (10 Nov 2020) and the City's own note that it is 'currently suspending enforcement of all-electric requirements' post-Cal. Rest. Ass'n v. City of Berkeley.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q33 What is the installation judged against? Core Electrical

The 2025 California Electrical Code (based on the 2023 NEC), subject to the City's local amendments in MMC 9.10.410-425 (none of which are PV-specific)

Why the confidence is not higherMMC 9.10.405 and the following amendment sections (Article 100 'Readily Accessible,' 89.108.4.1, 89.108.8, and 230.70(A)(1) service-disconnect accessibility) — none target solar specifically.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No Millbrae-specific busbar or service-upgrade ordinance was found. The '225A or less' single-phase busbar figure that appears in the solar Eligibility Checklist is the statewide AB 2188/CALSEIA expedited-permitting template's own eligibility threshold, not a locally codified Millbrae rule (Millbrae's Electrical Code amendments at 9.10.410-425 do not mention busbar sizing).

Why the confidence is not higherCross-checked the Eligibility Checklist's electrical-requirements item C against the full text of MMC 9.10's Electrical Code amendment sections, which contain no busbar/service-upgrade rule; this mirrors the Lathrop caution in the research corpus about conflating a national program's eligibility gate with a local ordinance.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Yes — the City's own 'Structural Criteria for Residential Flush-Mounted Solar Arrays' worksheet prescribes: modules parallel to the roof plane with a 2"-10" gap to the roof surface, no overhang past roof edges, array covering no more than half the total roof area, and a Table-1 anchor horizontal-spacing standard tied to roof framing type/slope, with 5/16" lag screws at 2.5" rafter embedment (or manufacturer's guidelines) for wind-uplift resistance

Why the confidence is not higherDirect extraction of the Structural Criteria PDF, a localized copy of the statewide 'PV Toolkit' structural template with the City's own header/footer/phone/address filled in, dated January 2023.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/416/Structural-Criteria-for-Residential-Flush-Mounted-Solar-Arrays-PDF

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

No Millbrae-specific ridge-setback distance or pathway width is codified. The Eligibility Checklist's Fire Safety Requirements only require confirming 'Clear access pathways provided' without stating dimensions, so the unamended 2025 CFC/CRC prescriptive pathway and ridge-setback provisions apply by default.

Why the confidence is not higherFull-text search of Millbrae's codified Fire Code amendments (MMC 9.10.705 through the end of Chapter 9.10's fire article) for 'ridge' and 'pathway' returned zero local-amendment hits; the only fire-code PV-specific rule found is an unrelated sprinkler exception for PV-equipped parking canopies (9.10.780).

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, under the 2023 NEC §690.12 (via the 2025 CEC), applied unamended — Millbrae has not adopted its own local rapid-shutdown rule

Why the confidence is not higherNo local rapid-shutdown amendment exists in MMC 9.10's Electrical Code amendments, and neither of the City's own solar PDFs (both dated January 2023) cites '690.12' or the phrase 'rapid shutdown' by name — the same 2015-2023-era documentation gap seen elsewhere in this survey (e.g. Calaveras, Montclair, West Hollywood), so the rule is inferred from the adopted code edition rather than read verbatim in a Millbrae document.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

No AHJ-specific placard content beyond the unamended state code's generic markings/labels requirement — Millbrae's own Eligibility Checklist only requires confirming 'All required markings and labels are provided' without naming any specific placard

Why the confidence is not higherFull-text search of MMC 9.10's Fire Code amendments found no local placard/marking amendment tied to solar or PV (the only placard-type amendments concern address numbering, fire-lane curbing, key boxes, and disaster-assessment placards — none solar-related); the Eligibility Checklist item is generic.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No

Why the confidence is not higherSame absence as Q38 — no wording is specified anywhere in Millbrae's codified fire/electrical amendments or its two solar handouts.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No

Why the confidence is not higherSame absence — no letter-height, colour, or material spec found anywhere in Millbrae's own documents.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Yes, functionally — the Eligibility Checklist requires 'a diagram of the roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points' as part of the submittal, serving the same purpose as a 705.10 facility/site plan placard, though it is a submitted drawing rather than a posted physical placard

Why the confidence is not higherEligibility Checklist, Fire Safety Requirements item D.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedPG&E's public DG/interconnection pages and its Rule 21 tariff; the substantive meter-proximity/placard specification lives in PG&E's Greenbook document TD-2306M, which is access-gated ('See your PG&E Job Owner for access') and was not reachable.

https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame PG&E Greenbook gate as Q42; no Millbrae-specific label-placement rule exists in MMC Title 9.

https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherMMC 9.15.040.B-C: water-heating systems must be certified by an accredited listing agency; electricity-producing systems 'shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories.'

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries are not addressed by a dedicated ordinance; they are excluded from the expedited/streamlined path. The Eligibility Checklist's General Requirements item E requires the system be 'utility interactive and without battery storage' to qualify for expedited review — a system with a battery must go through standard (non-expedited) plan check, for which no separate published battery/ESS conditions were found.

Why the confidence is not higherEligibility Checklist General Requirements item E; full-text search of MMC Title 9 for 'battery' and 'energy storage' returned zero local ordinance hits (control-checked: 'electrical' and 'fire' both hit extensively; the fabricated term 'zzqqx' returned zero), despite the Fee Schedule carrying a 'Battery Storage — Energy Storage Battery System (each) $141.01' line with no corresponding code chapter.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Likely yes, based on a distinct fee line, but no dedicated ESS ordinance or permit process is published

Why the confidence is not higherFee Schedule prices 'Energy Storage Battery System (each) $141.01' as its own line separate from Residential Photovoltaic, implying a distinct permit/inspection event, but Title 9 contains no ESS-specific chapter, submittal checklist, or inspection provision (control-checked absence, as in Q45).

fee schedule checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/1484/City-Fee-Schedule-PDF-

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes, by inference — Millbrae's zoning code defines 'Structure' broadly as 'anything constructed or erected, the use of which requires location on or in the ground, or attachment to something having location on or in the ground,' with no PV-specific ground-mount carve-out or standard anywhere in Title 10

Why the confidence is not higherTitle 10 zoning definitions ('Structure'); full-text search of the entire Zoning title (Chapter 10.05) for 'solar'/'photovoltaic' returned only one hit, a generic design-review reference to protecting neighbors' 'solar access' — there is no dedicated ground-mount solar standard, so this is inference from the general definition, not a direct statement.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47417273

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedMMC 9.10.425 (service-disconnect 'readily accessible' amendment, general to all electrical work, not meter-relative or solar-specific) and PG&E's gated Greenbook TD-2306M, which is where the meter-proximity spec would live.

https://ecode360.com/print/MI4538?guid=47416219

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone 85% · department page
    • How much notice is required? At least 1 business day (current department guidance); for eligible small residential PV specifically, MMC 9.15.060.H commits to scheduling within 2 business days of the request 82% · department page
    • Are same-day or AM/PM windows offered? For eligible small residential PV: a 2-hour inspection window is offered, scheduled within 2 business days of the request. No general AM/PM-window system is described for ordinary building inspections beyond the (stale, 2005) FAQ's route-based afternoon schedule. 78% · municipal code
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 88% · municipal code
    • If delegated, to whom? Fire only, conditionally, to Central County Fire Department; building/electrical are not delegated 88% · municipal code
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For eligible small residential PV: a single consolidated City inspection (with a follow-up only if the installation fails to conform to the approved plans/Title 24), plus a possible separate CCFD fire inspection if required. Millbrae's general (non-solar) building-permit process runs five sequential inspection stages — Concrete/Underground, Below Floor, Above Floor, Coverings, Final — per the department's own (2005-dated) inspection FAQ, though a rooftop PV retrofit would typically only need the Final stage. 72% · municipal code
    • Is a rough-in or mid-roof inspection required? No 85% · municipal code
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes 90% · department handout
    • What must be on site at inspection? The approved plans/permit card and permit number should be available; the inspector verifies the installation against the approved plans and Title 24 requirements 55% · municipal code
    • Does the inspector verify labels and listings? Yes, by inference 65% · department handout
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (a signed-off final inspection / approved permit) — not a new Certificate of Occupancy, which the City reserves for new structures or occupancy changes 65% · department page
    • Who notifies the utility for PTO? Installer (applicant submits evidence of the AHJ's final inspection clearance to PG&E as part of the interconnection application) 55% · utility tariff
    • Is there a re-inspection fee? $291.55 per hour, charged for reinspection without corrections made 88% · fee schedule
    • How are corrections issued and cleared? Corrections are noted on the permit card/a written correction notice; the applicant corrects the work and calls to schedule a reinspection; the process repeats until the work passes. For solar specifically, MMC 9.15.060.H authorizes a follow-up inspection if the installation does not conform to approved plans or Title 24, to be done 'in a timely manner' with 'consolidated inspections.' 70% · municipal code

14 questions answered against City of Millbrae’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone

Why the confidence is not higherBuilding Division page: inspection requests are made 'by calling 650-259-2330, Monday through Friday from 8:30 am to 4:30 pm.' No online inspection-scheduling feature is described (the eProcess360 portal is login-gated and its scheduling capability could not be verified without an account).

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/176/Building-Division

Q50 How much notice is required? Core Booking & scheduling

At least 1 business day (current department guidance); for eligible small residential PV specifically, MMC 9.15.060.H commits to scheduling within 2 business days of the request

Why the confidence is not higherBuilding Division page: 'Inspection requests should be made at least one day in advance.' MMC 9.15.060.H: 'An inspection will be scheduled within two business days of a request.' A much older (12/30/2005) 'Building Inspection FAQ' PDF still linked from the same page describes a same-day-morning-call system with a 1-5pm route — that document is stale and superseded by the current department page and the 2025-cycle solar chapter; flagged, not used as the answer.

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/176/Building-Division

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

For eligible small residential PV: a 2-hour inspection window is offered, scheduled within 2 business days of the request. No general AM/PM-window system is described for ordinary building inspections beyond the (stale, 2005) FAQ's route-based afternoon schedule.

Why the confidence is not higherMMC 9.15.060.H: '...and provide a two-hour inspection window.'

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherMMC 9.15.060.H: 'Only one inspection will be required and performed by the City for small residential rooftop solar energy systems eligible for expedited review.'

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q53 If delegated, to whom? Core Who inspects

Fire only, conditionally, to Central County Fire Department; building/electrical are not delegated

Why the confidence is not higherMMC 9.15.060.H, final sentence: 'A separate fire inspection may be performed by the Central County Fire Department, if required.'

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q54 Which inspections are required, and in what order? Core Stages & sequence

For eligible small residential PV: a single consolidated City inspection (with a follow-up only if the installation fails to conform to the approved plans/Title 24), plus a possible separate CCFD fire inspection if required. Millbrae's general (non-solar) building-permit process runs five sequential inspection stages — Concrete/Underground, Below Floor, Above Floor, Coverings, Final — per the department's own (2005-dated) inspection FAQ, though a rooftop PV retrofit would typically only need the Final stage.

Why the confidence is not higherMMC 9.15.060.H for the solar-specific sequence; the five-stage general framework comes from the City's 'Building Inspection FAQ' PDF, whose content date (12/30/2005) is old — used only for general context, not as the solar-specific answer.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No

Why the confidence is not higherMMC 9.15.060.H states plainly that 'Only one inspection will be required' for expedited-eligible small residential PV.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q56 Does the inspector verify labels and listings? Core What is checked

Yes, by inference

Why the confidence is not higherThe Eligibility Checklist's Fire Safety Requirement item C ('All required markings and labels are provided') is a self-certification item confirmed at the same single field inspection under MMC 9.15.060.H, and MMC 9.15.040.C requires UL/accredited-lab listing for PV equipment generally — but no department document explicitly states the inspector checks labels/listings during the visit.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q57 Is there a published inspection checklist? Core What is checked

Yes

Why the confidence is not higherThe 'Eligibility Checklist for Expedited Solar Photovoltaic Permitting for One- and Two-Family Dwellings' is a published, City-branded checklist covering general, electrical, structural, and fire-safety requirements, hosted on the City's own Forms & Other Handouts page.

department handout checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/388/Expedited-Permitting-Process-for-Small-Residential-Rooftop-Solar-Energy-Systems-PDF

Q58 What must be on site at inspection? Core Documents on site

The approved plans/permit card and permit number should be available; the inspector verifies the installation against the approved plans and Title 24 requirements

Why the confidence is not higherInferred from MMC 9.15.060.H ('if the City determines that the installation does not conform to the approved plans...') and the general (2005-dated) Building Inspection FAQ's instruction to have the permit number and job address ready; no single itemized 'what must be on site' list specific to solar was found.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q59 Is there a re-inspection fee? Corrections & re-inspection

$291.55 per hour, charged for reinspection without corrections made

Why the confidence is not higherCity Fee Schedule, effective July 1, 2026: 'Re-Inspection Fee (per hour) $291.55 — for reinspection without corrections made.' A much older (2005) inspection FAQ cites a flat $60/inspection figure after 2 failed repeat inspections of the same item — clearly superseded by the current fee schedule and not used as the answer.

fee schedule checked 2026-08-31 https://www.ci.millbrae.ca.us/DocumentCenter/View/1484/City-Fee-Schedule-PDF-

Q60 How are corrections issued and cleared? Corrections & re-inspection

Corrections are noted on the permit card/a written correction notice; the applicant corrects the work and calls to schedule a reinspection; the process repeats until the work passes. For solar specifically, MMC 9.15.060.H authorizes a follow-up inspection if the installation does not conform to approved plans or Title 24, to be done 'in a timely manner' with 'consolidated inspections.'

Why the confidence is not higherGeneral mechanism from the City's own (2005-dated) Building Inspection FAQ, corroborated by the current solar-specific follow-up-inspection language in MMC 9.15.060.H.

municipal code checked 2026-08-31 https://ecode360.com/print/MI4538?guid=47416219

Q61 What is issued on pass? Core Final sign-off & PTO

Final (a signed-off final inspection / approved permit) — not a new Certificate of Occupancy, which the City reserves for new structures or occupancy changes

Why the confidence is not higherThe Building Division page describes a Certificate of Occupancy as issued 'after the final inspection and verification that all work under a permit is complete for the new structure or tenant space' — a rooftop PV retrofit on an existing dwelling would not trigger a new CofO; no 'green tag' terminology appears anywhere in Millbrae's documents.

department page checked 2026-08-31 https://www.ci.millbrae.ca.us/176/Building-Division

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer (applicant submits evidence of the AHJ's final inspection clearance to PG&E as part of the interconnection application)

Why the confidence is not higherNot stated in any Millbrae-specific document; inferred from PG&E's statewide Rule 21 tariff §D.13.b pattern, in which the applicant/installer supplies the utility with proof of the AHJ's final inspection clearance to trigger PTO processing.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Millbrae against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Millbrae is the authority having jurisdiction 92% confidence
Holds
Building and Electrical (both issued and inspected in-house by the City's Building Division). Fire code enforcement and a conditional final fire inspection sit with Central County Fire Department (CCFD), a JPA.
Delegated to
Central County Fire Department — fire code enforcement (MMC 9.10.710 defines 'Fire Chief'/'Fire Department' as CCFD's) and a conditional separate final fire inspection under MMC 9.15.060.H, 'if required.' Building, electrical, plumbing and mechanical stay with the City; no contract firm (Willdan/4LEAF/CSG/etc.) found anywhere in the fee schedule, staff contacts, or solar process pages — all named staff (e.g. Permit Technician Tabitha Romero) are on the city domain.
Why not higher
MMC 9.05.020.A defines 'Authority having jurisdiction,' 'Administrative authority,' 'Code official,' and 'local enforcing agency' as 'the City of Millbrae and its designated officials, including but not limited to the City's Building Official.' The City's own Building Division page and fee-schedule staffing show an in-house Building Official/Permit Technician structure with no contractor delegation for building/electrical. Fire is a distinct, genuinely delegated slice: MMC 9.10.710 amends CFC 104.1 so 'Fire Chief' and 'Fire Department' mean the Central County Fire Department, confirmed live and current from CCFD's own About page ('The Central County Fire Department proudly serves the communities of Burlingame, Hillsborough, and Millbrae... Formed in April 2004'). MMC 9.15.060.H is the codified conditional-inspection clause: 'Only one inspection will be required and performed by the City for small residential rooftop solar energy systems eligible for expedited review... A separate fire inspection may be performed by the Central County Fire Department, if required' — nearly verbatim the Claremont/La Verne/Burlingame model-ordinance sentence found elsewhere in this corpus.

https://ecode360.com/print/MI4538?guid=47416219

Permit required
Yes95%
Permit cost
$500 flat for residential PV systems 15 kW AC or less (includes plan review); +$15 per kW above 15 kW (plus plan review at the hourly rate). Battery Storage: $141.01 each.92%
Plan review
For expedited-eligible small residential PV: same day (over-the-counter) or 1-3 business days (electronic applications).85%
Portal
eProcess360 (millbrae.ca.eprocess360.com)92%
Electrical code
2023 NEC (adopted as part of the 2025 California Electrical Code)92%
Own placard wording
No78%
Booking an inspection
Phone85%
Labels & placards for this authority

Wording 78%

No

Size, colour & material 78%

No

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
San Mateo County
Regions served
1
Regions covered
City of Millbrae · city
Solar Requirements
Required placards
Building Division | Millbrae, CA Skip to Main Content Traffic Alert Aviador Bridge Closure Starting 06/01 Read On... Broadway 1300 Block Southbound Road Closure Starting 03/09 Read On... Create a Website Account - Manage notification subscriptions, save form progress and more. Website Sign In Search Home Government Departments Community Development Building Division Building Division Overview For
Separate roof inspection
Register or Login to Online Building Permitting and Plan Review Plan Check Process Typically, plans, specifications, energy calculations, soils reports, and other data are required whenever new construction work is proposed. The documentation is routed for review by all pertinent City departments to
Authority Contact
Address
621 Magnolia Avenue, Millbrae, CA 94030
Main Phone
(650) 259-2334
Building Department
Department
Building Division
Direct Phone
(650) 259-2330
Booking & Scheduling
Preferred channel
phone
Book in advance
1
Request an inspection
Notes
Call (650) 259-2330 or email PTech@ci.millbrae.ca.us to schedule inspections (contact: Permit Technician Tabitha Romero). Inspection requests accepted Mon–Fri 8:30 AM–4:30 PM; minimum one business day advance notice required. Inspections conducted Mon–Fri 9 AM–Noon and 1 PM–4:30 PM. Have permit number and address ready. Solar PV permits are eligible for expedited in-house review. Small residential rooftop solar systems require only one city inspection; a separate Central County Fire inspection may also be required. Permit applications submitted online only via eprocess360 portal. (collected Jul 2026)