City of Pacifica

San Mateo County

Verified Aug. 4, 2026

City of Pacifica is a city authority in the State of California, serving 38,640 residents. 1,588 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — SolarAPP+/expedited solar review of systems 34 kW or less: about 3 days; standard building-permit review: first review 3-4 weeks, resubmittal reviews 2-3 weeks each Q18 Where you file — SolarAPP+ (for eligible systems) and the City's GreenVue online permit portal (operated by CSG Engineering) for standard applications Q20

Permit required
Yes95% source
What it costs
$263 flat fee plus $15 per kW above 15 kW (residential, FY2025-2026); Strong-Motion Instrumentation Program (SMIP) and Building Standards Fee apply on top, based on valuation95% source
Plan review turnaround
SolarAPP+/expedited solar review of systems 34 kW or less: about 3 days; standard building-permit review: first review 3-4 weeks, resubmittal reviews 2-3 weeks each90% source
Key document
fee schedule cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · department page
    • What does this authority permit itself, and what does it delegate? Both 88% · ordinance
    • Is a permit required for a residential rooftop PV system? Yes 95% · ordinance / department page
    • Is there a separate electrical permit, or is it combined? Combined 72% · fee schedule
    • Is a HOA or architectural approval required first? No 95% · ordinance
    • Is there a historic-district review? No dedicated historic-district review article was found in the Zoning Code's 67 zoning articles (Title 9, Chapter 4) after checking article names in full. 55% · ordinance (absence)
    • Is a wind or windstorm certification required? No 68% · ordinance (absence)
    • Is a Specific Use Permit or Council approval ever required? Conditionally yes: if the Building Official (in consultation with the Planning Director) finds a system could have a 'specific, adverse impact' on public health/safety, a Use Permit (PMC Title 9, Ch. 4, Art. 33) can be required, appealable to the Planning Commission. Separately, properties within the Coastal Zone Combining District (CZ District) require at least an Administrative Coastal Development Permit, since rooftop PV on an existing home falls under 'improvements to an existing structure.' 80% · ordinance
    • Is there a system-size cap on residential generation? No absolute cap on residential system size; PMC 8-4.04's ministerial/expedited track applies only to systems <=10 kW AC nameplate or <=30 kW thermal (the 2014 AB 2188 definition of 'small residential rooftop solar energy system'). Larger systems on single-family/duplex homes go through the standard (non-ministerial) Building Permit process rather than being capped or barred. 80% · ordinance
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Any contractor 68% · department page
    • Must the contractor be registered with this authority before applying? Yes 80% · department page
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • How many copies, and in what format? Electronic submittal only; full plan set as a single combined PDF file 85% · submittal procedure document
    • Is a site plan required, and what must it show? A site plan is required as part of the standard building-permit submittal package; for the analogous EV-charging checklist the city requires it to show all existing/proposed equipment locations, parking/roof areas, and the electrical run -- no solar-specific site-plan checklist document was found to confirm identical scope for PV. 55% · comparable checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? SolarAPP+ (for eligible systems) and the City's GreenVue online permit portal (operated by CSG Engineering) for standard applications 92% · department page
    • Can the whole application be completed online? Yes 82% · department procedure document
    • What does a residential solar permit cost? $263 flat fee plus $15 per kW above 15 kW (residential, FY2025-2026); Strong-Motion Instrumentation Program (SMIP) and Building Standards Fee apply on top, based on valuation 95% · fee schedule
    • How is the fee calculated? Tiered 92% · fee schedule
    • Is there a separate plan-check fee? No separate plan-check fee line for the GC 66015 residential solar fee category (the flat+per-kW figure appears all-inclusive); general (non-solar) building permits are separately charged a Building Division Plan Check fee of 65% of the permit fee. 72% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? SolarAPP+/expedited solar review of systems 34 kW or less: about 3 days; standard building-permit review: first review 3-4 weeks, resubmittal reviews 2-3 weeks each 90% · department procedure document
    • How long is an issued permit valid before it expires? No local amendment to permit-expiration was found in the codified Building Code chapter (18 amendment sections reviewed in full), so the unamended CBC Sec. 105.5 default of 180 days applies. 68% · ordinance (absence)
    • Which utility handles interconnection here? PG&E 88% · city courtesy notice
    • Where does the utility sit in the sequence? After permit (parallel application allowed, but Permission to Operate is gated on the AHJ's final electrical inspection clearance) 85% · utility tariff (Rule 21)

28 questions answered against City of Pacifica’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherCity of Pacifica Building Division (Community Development) is the AHJ issuing building and electrical permits for residential rooftop PV; confirmed on its own current permitting page.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherCity's Building Division self-performs building and electrical plan review/inspection for solar; fire-specific inspection may be delegated to North County Fire Authority per PMC 8-4.04(d)(9), conditional on whether a mutual-aid inspection agreement exists.

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherPMC 8-4.04 codifies a mandatory permitting process for small residential rooftop solar; larger systems require a standard building permit per the city's own SolarAPP+ page.

ordinance / department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherThe Citywide Fee Schedule prices 'Solar Photovoltaic System, pursuant to Government Code Section 66015' as a single flat+per-kW fee distinct from the general 'Electrical Permit Fees' table, indicating the solar permit is unified rather than requiring a second stand-alone electrical permit. General (non-solar) electrical work is billed separately in the same schedule.

fee schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/20573/638863818072663193

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Any contractor

Why the confidence is not higherCity's SolarAPP+ page states 'Licensed Contractors Can Now Submit Eligible Solar Permits' and requires upload of a contractor license for verification -- it does not restrict to electricians specifically (C-46 or general B contractors both hold CSLB licenses). Standard (non-SolarAPP+) path is not explicitly documented as to who may pull the permit.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherSolarAPP+ path requires the contractor to upload a copy of their license, which is verified before the application proceeds to the City of Pacifica queue -- functionally a registration/verification step before applying.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Nothing published by this authority.

Where we lookedPMC Title 8 (Building/Electrical Code amendments) and city Building Division handouts ('Do I need a Building Permit?', 'When is a Licensed Professional Required?', 'When is a Building Permit Not Required'); none addresses whether a homeowner may self-install and self-permit a residential solar system specifically (California's general owner-builder statute, B&P Code Sec. 7044, is state law, but no Pacifica-specific confirmation for solar was found).

https://www.cityofpacifica.org/home/showpublisheddocument/790/637828565691330000

Q8 What documents make up a complete submittal? Core Submittal package

Nothing published by this authority.

Where we lookedBuilding Division document list and SolarAPP+ page; no Pacifica-specific 'complete submittal package' checklist PDF for residential solar was found (the linked 'SolarAPP+ Eligibility Checklist' is the national help.gosolarapp.org article, not a city document, per the brief's caution against laundering national boilerplate as local fact).

https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q9 How many copies, and in what format? Submittal package

Electronic submittal only; full plan set as a single combined PDF file

Why the confidence is not higherOnline Permit Portal Submittal Procedures instructs: 'Please submit PDF files only – Submit full set of plans as one file (do not separate architectural, Mech., Plumb., etc).'

submittal procedure document checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/780/638888864564200000

Q10 Is a site plan required, and what must it show? Core Submittal package

A site plan is required as part of the standard building-permit submittal package; for the analogous EV-charging checklist the city requires it to show all existing/proposed equipment locations, parking/roof areas, and the electrical run -- no solar-specific site-plan checklist document was found to confirm identical scope for PV.

Why the confidence is not higherInferred from the city's EV Charging Checklist (a comparable electrical-equipment permitting document) plus general Online Permit Portal Submittal Procedures; no Pacifica-specific solar site-plan checklist PDF was located after checking the Building Division document list.

comparable checklist checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/776/637828565650230000

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedPMC Electrical Code chapter and Online Permit Portal Submittal Procedures; neither explicitly states a one-line/three-line diagram requirement for solar (standard for any CEC-governed electrical permit, but not stated in Pacifica's own materials at a confidence above 40 given no direct textual match).

https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame Electrical Code chapter and submittal-procedure document; no explicit statement on string/conductor calculations.

https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we looked'When is a Licensed Professional Required?' handout lists categories requiring PE/architect stamps (structural alterations, machinery/equipment anchorage, lateral-force systems on embedded poles) but does not name rooftop PV racking specifically, so no clear kW or scope threshold could be extracted for solar.

https://www.cityofpacifica.org/home/showpublisheddocument/790/637828565691330000

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSame handout and Electrical Code chapter; no electrical PE stamp threshold specific to solar found.

https://www.cityofpacifica.org/home/showpublisheddocument/790/637828565691330000

Q15 What does a residential solar permit cost? Core Fees

$263 flat fee plus $15 per kW above 15 kW (residential, FY2025-2026); Strong-Motion Instrumentation Program (SMIP) and Building Standards Fee apply on top, based on valuation

Why the confidence is not higherCitywide Fee Schedule (2025-2026 column), 'Solar Photovoltaic System, pursuant to Government Code Section 66015,' Residential row, text-layer PDF read directly with pdftotext -layout (no OCR needed).

fee schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/20573/638863818072663193

Q16 How is the fee calculated? Core Fees

Tiered

Why the confidence is not higherFlat base fee plus a per-kilowatt charge above a 15 kW threshold, per the same Citywide Fee Schedule line.

fee schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/20573/638863818072663193

Q17 Is there a separate plan-check fee? Fees

No separate plan-check fee line for the GC 66015 residential solar fee category (the flat+per-kW figure appears all-inclusive); general (non-solar) building permits are separately charged a Building Division Plan Check fee of 65% of the permit fee.

Why the confidence is not higherThe Solar Photovoltaic System fee entry in the Citywide Fee Schedule has no adjoining plan-check line, unlike the general valuation-based building-permit table two pages earlier which explicitly states 'Building Division Plan Check fee -- 65% of Permit Fee.'

fee schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/20573/638863818072663193

Q18 What is the stated plan-review turnaround? Core Timeline & validity

SolarAPP+/expedited solar review of systems 34 kW or less: about 3 days; standard building-permit review: first review 3-4 weeks, resubmittal reviews 2-3 weeks each

Why the confidence is not higherStated directly in the city's own 'Online Permit Portal Submittals' procedure document and repeated on the live Building Division landing page.

department procedure document checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/780/638888864564200000

Q19 How long is an issued permit valid before it expires? Timeline & validity

No local amendment to permit-expiration was found in the codified Building Code chapter (18 amendment sections reviewed in full), so the unamended CBC Sec. 105.5 default of 180 days applies.

Why the confidence is not higherPacifica Municipal Code Title 8, Chapter 1 (Building Code) contains 18 numbered local amendment sections; none amends CBC Sec. 105.5 (permit expiration). Absence proven by reading the full amendment list, not by a keyword miss.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH1BUCO

Q20 Which permit portal does this authority use? Core Portal & process

SolarAPP+ (for eligible systems) and the City's GreenVue online permit portal (operated by CSG Engineering) for standard applications

Why the confidence is not higherBoth named and linked directly from the Building Division page: SolarAPP+ for real-time eligible permits, and the GreenVue portal (greenvue.csgengr.com/pacifica2) for the standard online application; permit notifications come from donotreply@csgengr.com.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherSolarAPP+ issues a real-time permit fully online for eligible systems; the standard GreenVue portal also supports full application, file upload and fee viewing online, though in-person/mailed check payment is offered as an alternative.

department procedure document checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/780/638888864564200000

Q22 Which utility handles interconnection here? Core Utility interconnection

PG&E

Why the confidence is not higherCity's own Building Division page links to PG&E rebate/lead-time resources ('Courtesy Notice - PG&E Lead Times') as its interconnection utility reference; no municipal electric utility found for Pacifica. Not sourced from PowerToChoose.

city courtesy notice checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/772/637828565639170000

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit (parallel application allowed, but Permission to Operate is gated on the AHJ's final electrical inspection clearance)

Why the confidence is not higherPG&E Electric Rule 21, Section D.13.b: PTO 'shall normally be processed not later than thirty (30) Business Days' following receipt of, among other things, 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction.'

utility tariff (Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No

Why the confidence is not higherPMC 8-4.04(f)(5): 'The City shall not condition approval of an application for a small residential rooftop solar energy system on the approval of an association.'

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q25 Is there a historic-district review? Overlays & special cases

No dedicated historic-district review article was found in the Zoning Code's 67 zoning articles (Title 9, Chapter 4) after checking article names in full.

Why the confidence is not higherWalked the complete Article list (1 through 67) of the Zoning Code table of contents by name; no 'Historic District' or 'Historic Preservation' article exists (Chapter 8, Title 8's 'Historical Buildings Code' pertains to the CA Historical Building Code for qualified historic structures generally, not a residential PV-specific overlay review).

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT9PLZO_CH4ZO

Q26 Is a wind or windstorm certification required? Overlays & special cases

No

Why the confidence is not higherCalifornia does not use a Texas-style windstorm/TDI certification regime; wind loading is addressed through the adopted CBC/CRC structural provisions (ASCE 7 wind maps incorporated by reference) rather than a separate certification. No Pacifica amendment adds one.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH1BUCO

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Conditionally yes: if the Building Official (in consultation with the Planning Director) finds a system could have a 'specific, adverse impact' on public health/safety, a Use Permit (PMC Title 9, Ch. 4, Art. 33) can be required, appealable to the Planning Commission. Separately, properties within the Coastal Zone Combining District (CZ District) require at least an Administrative Coastal Development Permit, since rooftop PV on an existing home falls under 'improvements to an existing structure.'

Why the confidence is not higherPMC 8-4.04(f)(2) sets out the use-permit escalation path; PMC 9-4.4306(a) explicitly lists 'improvements to an existing structure' and 'a single-family dwelling' as eligible for the Administrative (minor) Coastal Development Permit rather than full CDP review.

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT9PLZO_CH4ZO_ART43COZOCODI_S9-4.4306ADCODEPE

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No absolute cap on residential system size; PMC 8-4.04's ministerial/expedited track applies only to systems <=10 kW AC nameplate or <=30 kW thermal (the 2014 AB 2188 definition of 'small residential rooftop solar energy system'). Larger systems on single-family/duplex homes go through the standard (non-ministerial) Building Permit process rather than being capped or barred.

Why the confidence is not higherPMC 8-4.04(b)(7) definition, cross-checked against the city's own SolarAPP+ page which states 'All other solar and PV installations require a standard Building Permit' (i.e., no rejection, just a different track). NOTE: this local ordinance's 10 kW AC ministerial threshold has not been updated to match Gov. Code Sec. 65850.52 (SB 379)'s newer 38.4 kW AC state-mandated automated-permitting threshold -- a codification gap, flagged rather than resolved.

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 95% · adopting ordinance
    • Which building code edition is in force? 2025 California Building Code (incorporating the 2024 IBC) and 2025 California Residential Code, both effective January 1, 2026 95% · department page + ordinance
    • Which fire code edition is in force? 2025 California Fire Code (CCR Title 24, Part 9); California Wildland-Urban Interface Code (2025) also in effect 92% · adopting ordinance
    • Are there local amendments to any of the above? Yes 95% · ordinance
    • What is the installation judged against? The 2025 California Electrical Code (based on the 2023 NEC), Chapters 1-9 and Article 89, as locally amended by PMC Sec. 8-4.02 (permits/fees/inspections) and Sec. 8-4.03 (raceways in wet locations above grade) 90% · ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Not found as a local amendment -- Pacifica's Fire Code Article 1 amendments (reviewed in full: sprinkler requirements, firefighter air replenishment, fire-apparatus-access-road sections in Appendix D) do not add or modify a PV-specific rooftop ridge setback or access-pathway section. The unamended 2025 CFC Sec. 605.11 (rooftop PV access/pathways/setbacks) therefore governs as adopted by reference. 75% · ordinance (absence)
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Required, per NEC 690.12 (2023 NEC edition, incorporated into the adopted 2025 CEC) -- no local ordinance text separately restates this, but it is mandatory under the adopted code edition. 75% · inference from adopted code edition
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Standard, unamended 2025 California Fire Code placards (service disconnect/PV label per CFC/NEC 690.31, 690.56) -- no Pacifica-specific placard schedule found beyond the adopted-by-reference state code. 60% · ordinance (absence)
    • Does the authority specify placard wording of its own? No 85% · ordinance (absence)
    • Does it specify letter height, colour or material? No 85% · ordinance (absence)
    • Is a site plan / facility map placard required, and what must it show? Not found as a distinct local requirement beyond the state NEC 705.10 marking/plan requirement adopted by reference. 55% · ordinance (absence)
    • Does the UTILITY specify placards beyond the AHJ's? Yes, partially confirmed: PG&E Electric Rule 21 requires a visible, manually-operated isolating disconnect near the Point of Interconnection with markings/signage 'that clearly indicates open and closed positions,' reachable by PG&E personnel 24/7. Finer meter-proximity spec is understood to sit in PG&E's Greenbook document TD-2306M, which is access-gated ('See your PG&E Job Owner for access') and could not be retrieved. 62% · utility tariff (Rule 21)
    • Where must the labels be placed? At/near the service equipment and at the visible utility-required disconnect near the point of interconnection, per PG&E Rule 21 and the adopted (unamended) NEC labeling requirements -- no Pacifica-specific placement rule beyond that. 55% · utility tariff (Rule 21)
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Not fully specified locally; PG&E Rule 21 requires the visible interconnection disconnect to be reachable by PG&E personnel 24/7 and to carry open/closed markings, but the specific meter-proximity dimension is documented in PG&E's gated Greenbook TD-2306M, which was not retrievable. 55% · utility tariff (partial)
    • Must equipment be on a specific approved list? Yes 85% · ordinance
    • Are batteries permitted, and under what conditions? Batteries/energy storage systems are referenced alongside solar PV on the city's own SolarAPP+ page ('installing a solar photovoltaic rooftop system and an energy storage system') as eligible for the same streamlined process, but the codified PMC 8-4.04 ordinance text defines only 'solar energy system' (not ESS) and imposes no ESS-specific conditions of its own; ESS installations are otherwise governed by the unamended, adopted 2025 California Fire Code and Residential Code provisions for energy storage systems. 62% · department page + ordinance
    • Is there a separate ESS permit or inspection? No separately identified ESS permit or fee line was found. 78% · fee schedule (absence)
    • Is a ground mount treated as a structure? Yes (by inference from the general zoning definition) 65% · ordinance (definition)
    • Is there a local rule on service upgrades or busbar sizing? Not found -- Pacifica's Electrical Code chapter (only 4 total sections: adoption, Sec. 89.108.4.1 permits, Sec. 300.9 raceways, and Sec. 8-4.04 solar) contains no local rule on service-upgrade triggers or busbar sizing. 75% · ordinance (absence)
    • Is a specific mounting system or attachment spacing required? Not found -- no PMC amendment specifies a mounting system or attachment spacing beyond deferring to CEC/UL/IEEE standards generally (PMC 8-4.04(d)(2)). 72% · ordinance (absence)

20 questions answered against City of Pacifica’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023

Why the confidence is not higherPMC 8-4.01 adopts the '2025 Edition' California Electrical Code, which the ordinance text itself states 'incorporates and amends the 2023 Edition of the National Electrical Code.' Effective via Ord. 904-C.S., eff. January 1, 2026.

adopting ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.01ADCAELCO

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Code (incorporating the 2024 IBC) and 2025 California Residential Code, both effective January 1, 2026

Why the confidence is not higherConfirmed both on the Building Division's live page ('As of January 1, 2026, the following 2025 California codes are in effect in Pacifica: California Building Code, California Residential Code...') and in the codified CBC adoption section (PMC 8-1.01).

department page + ordinance checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q31 Which fire code edition is in force? Code editions in force

2025 California Fire Code (CCR Title 24, Part 9); California Wildland-Urban Interface Code (2025) also in effect

Why the confidence is not higherPMC Title 4, Ch. 3, Art. 1 adopts 'the California Fire Code, 2025 Edition [CCR Title 24, Part 9]... published by the International Code Council' effective via Ord. 904-C.S., Jan 1, 2026; WUI Code listed on the Building Division's own code-editions list.

adopting ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT4PUSA_CH3FIPR_ART1FICO

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes

Why the confidence is not higherBuilding Code chapter has 18 local amendment sections, Electrical Code chapter has 3 (plus the solar ordinance), Fire Code article has amendments to 903.2, 914.3.9, and Appendix D access-road sections -- all codified in PMC Title 8 and Title 4.

ordinance checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q33 What is the installation judged against? Core Electrical

The 2025 California Electrical Code (based on the 2023 NEC), Chapters 1-9 and Article 89, as locally amended by PMC Sec. 8-4.02 (permits/fees/inspections) and Sec. 8-4.03 (raceways in wet locations above grade)

Why the confidence is not higherFull text of PMC Chapter 4 (Electrical Code) read via Municode API.

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.01ADCAELCO

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Not found -- Pacifica's Electrical Code chapter (only 4 total sections: adoption, Sec. 89.108.4.1 permits, Sec. 300.9 raceways, and Sec. 8-4.04 solar) contains no local rule on service-upgrade triggers or busbar sizing.

Why the confidence is not higherRead the complete, short Electrical Code chapter (4 sections) in full via the Municode API; no busbar or service-upgrade amendment exists, unlike e.g. Palm Springs' PSMC 8.04.055.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Not found -- no PMC amendment specifies a mounting system or attachment spacing beyond deferring to CEC/UL/IEEE standards generally (PMC 8-4.04(d)(2)).

Why the confidence is not higherRead the full Electrical and Building Code local-amendment sections; none addresses racking/attachment spacing. The solar ordinance only requires compliance with 'applicable safety and performance standards established by the California Electrical Code, IEEE... and accredited testing laboratories.'

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Not found as a local amendment -- Pacifica's Fire Code Article 1 amendments (reviewed in full: sprinkler requirements, firefighter air replenishment, fire-apparatus-access-road sections in Appendix D) do not add or modify a PV-specific rooftop ridge setback or access-pathway section. The unamended 2025 CFC Sec. 605.11 (rooftop PV access/pathways/setbacks) therefore governs as adopted by reference.

Why the confidence is not higherFull text of PMC Title 4, Ch. 3, Art. 1 read via Municode API; positive control ('sprinkler') and fabricated control ('zzqqx', 0 hits) both ran clean in the same extraction.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT4PUSA_CH3FIPR_ART1FICO

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Required, per NEC 690.12 (2023 NEC edition, incorporated into the adopted 2025 CEC) -- no local ordinance text separately restates this, but it is mandatory under the adopted code edition.

Why the confidence is not higherInferred from the adopted NEC edition (Q29); no Pacifica-specific rapid-shutdown callout was found in PMC Title 8 Ch. 4 or the solar ordinance text itself.

inference from adopted code edition checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.01ADCAELCO

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Standard, unamended 2025 California Fire Code placards (service disconnect/PV label per CFC/NEC 690.31, 690.56) -- no Pacifica-specific placard schedule found beyond the adopted-by-reference state code.

Why the confidence is not higherFull Fire Code Article 1 amendment text contains no PV placard section (only an unrelated Sec. 509.1.2 multi-family utility-ID marking amendment).

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT4PUSA_CH3FIPR_ART1FICO

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No

Why the confidence is not higherFire Code Article 1's local amendments (read in full) do not add any solar/PV/ESS placard wording; the only marking amendment added is Sec. 509.1.2, about multi-family gas/electric unit ID, unrelated to solar.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT4PUSA_CH3FIPR_ART1FICO

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No

Why the confidence is not higherSame absence as Q39 -- no letter-height, colour, or material specification for solar placards anywhere in the codified local fire or building amendments.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT4PUSA_CH3FIPR_ART1FICO

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Not found as a distinct local requirement beyond the state NEC 705.10 marking/plan requirement adopted by reference.

Why the confidence is not higherNo PMC section requiring a separate facility/site map placard was located in the Building, Electrical, or Fire Code amendment chapters.

ordinance (absence) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, partially confirmed: PG&E Electric Rule 21 requires a visible, manually-operated isolating disconnect near the Point of Interconnection with markings/signage 'that clearly indicates open and closed positions,' reachable by PG&E personnel 24/7. Finer meter-proximity spec is understood to sit in PG&E's Greenbook document TD-2306M, which is access-gated ('See your PG&E Job Owner for access') and could not be retrieved.

Why the confidence is not higherRule 21 Section D (Visible Disconnect Required) read directly from PG&E's public tariff PDF; TD-2306M's content is not publicly retrievable, so that portion is left as a gap rather than guessed.

utility tariff (Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

At/near the service equipment and at the visible utility-required disconnect near the point of interconnection, per PG&E Rule 21 and the adopted (unamended) NEC labeling requirements -- no Pacifica-specific placement rule beyond that.

Why the confidence is not higherCombines the PG&E Rule 21 disconnect-location language with the absence of any Pacifica-specific labeling-location amendment.

utility tariff (Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherPMC 8-4.04(d)(2): systems for producing electricity 'shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories.'

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries/energy storage systems are referenced alongside solar PV on the city's own SolarAPP+ page ('installing a solar photovoltaic rooftop system and an energy storage system') as eligible for the same streamlined process, but the codified PMC 8-4.04 ordinance text defines only 'solar energy system' (not ESS) and imposes no ESS-specific conditions of its own; ESS installations are otherwise governed by the unamended, adopted 2025 California Fire Code and Residential Code provisions for energy storage systems.

Why the confidence is not higherCross-checked the live SolarAPP+ page text against the codified ordinance text and the Fire Code Article 1 amendments (no ESS-specific local amendment found in either).

department page + ordinance checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separately identified ESS permit or fee line was found.

Why the confidence is not higherNeither the Citywide Fee Schedule (pdftotext-extracted, text layer present) nor the North County Fire Authority's Pacifica fee schedule (OCR'd via pdftoppm+tesseract after confirming no text layer) contains a 'battery,' 'ESS,' or 'energy storage' fee line; positive control ('sprinkler'/'electrical') and fabricated control ('zzqqx', 0 hits) both passed on the same extractions.

fee schedule (absence) checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/20573/638863818072663193

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes (by inference from the general zoning definition)

Why the confidence is not higherZoning Code Sec. 9-4.278 defines 'Structure' as 'anything constructed or erected the use of which requires location on the ground or attachment to something having location on the ground' -- a ground-mounted PV array meets this definition, and no PV-specific carve-out (unlike some other CA cities) was found in the Zoning Code's Definitions article.

ordinance (definition) checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT9PLZO_CH4ZO_ART2DE_S9-4.278ST

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Not fully specified locally; PG&E Rule 21 requires the visible interconnection disconnect to be reachable by PG&E personnel 24/7 and to carry open/closed markings, but the specific meter-proximity dimension is documented in PG&E's gated Greenbook TD-2306M, which was not retrievable.

Why the confidence is not higherRule 21's public tariff text does not give a specific distance from the meter; that level of detail is understood to sit in the access-gated Greenbook DG document.

utility tariff (partial) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone 92% · department page
    • How much notice is required? Not explicitly stated as a minimum; the city states inspections 'cannot be requested more than one week in advance,' which bounds the maximum lead time rather than specifying a minimum notice period. 70% · department page
    • Are same-day or AM/PM windows offered? Yes, AM/PM windows 88% · live department schedule
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 80% · live department schedule
    • If delegated, to whom? North County Fire Authority (for fire-specific inspection only, conditional on the absence of a city-NCFA inspection agreement) 78% · ordinance
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For SolarAPP+/expedited systems: a single combined inspection covering the full installation. For standard-track systems, sequence includes at least a rough electrical inspection followed by a final/'Electrical Meter Release' inspection (as observed on the live schedule for an active PV project). 75% · ordinance + live schedule
    • Is a rough-in or mid-roof inspection required? No, for expedited-track systems (only one inspection is authorized); not clearly documented either way for standard-track larger systems. 65% · ordinance
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, for the SolarAPP+ path 80% · department page
    • What must be on site at inspection? Approved/stamped plan set, the job card, and (for SolarAPP+ permits) the SolarAPP+ ID and generated Inspection Checklist 68% · department page
    • Does the inspector verify labels and listings? Presumed yes, as standard field-inspection practice under the adopted CEC/CBC, but not separately documented in city materials reviewed. 50% · inference
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final 80% · live department schedule
    • Who notifies the utility for PTO? Installer 72% · utility tariff (Rule 21)
    • Is there a re-inspection fee? Not found in the reviewed fee schedule sections (Building Division and Community Development fee pages checked); no flat re-inspection fee line was located distinct from the general 'Inspection Fee. Hourly rate with a minimum 30 minutes' entry. 50% · fee schedule
    • How are corrections issued and cleared? Through the online permit portal account: 'If there are comments from any of the departments, they will be released to the applicant when all reviewers have completed the review,' and applicants are notified of next steps through their permit account. 72% · department page

14 questions answered against City of Pacifica’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone

Why the confidence is not higherBuilding Division page: 'To schedule an inspection, call the Building Inspection Hotline at (650) 737-1000.'

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q50 How much notice is required? Core Booking & scheduling

Not explicitly stated as a minimum; the city states inspections 'cannot be requested more than one week in advance,' which bounds the maximum lead time rather than specifying a minimum notice period.

Why the confidence is not higherDirect quote from the Building Division page; no separate minimum-notice figure (e.g., '24 hours') was published alongside it.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Yes, AM/PM windows

Why the confidence is not higherThe city's own live, dated (8/3/2026) daily inspection schedule document lists each inspection with an 'AM' or 'PM' time slot, including an 'Electrical Meter Release' inspection for an 89.88 kWdc PV project at 308 Gateway Dr.

live department schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/23438/639213731982870000

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherThe Building Division performs building/electrical inspections in-house (confirmed by the live inspection schedule showing City inspectors handling PV-related 'Electrical Meter Release' inspections); a separate fire-safety inspection may additionally be performed by North County Fire Authority when required.

live department schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/23438/639213731982870000

Q53 If delegated, to whom? Core Who inspects

North County Fire Authority (for fire-specific inspection only, conditional on the absence of a city-NCFA inspection agreement)

Why the confidence is not higherPMC 8-4.04(d)(9): 'A separate fire inspection may be performed by the North County Fire Authority, if required, in the event the City does not have an agreement with the Fire Authority to conduct fire safety inspections on its behalf.'

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q54 Which inspections are required, and in what order? Core Stages & sequence

For SolarAPP+/expedited systems: a single combined inspection covering the full installation. For standard-track systems, sequence includes at least a rough electrical inspection followed by a final/'Electrical Meter Release' inspection (as observed on the live schedule for an active PV project).

Why the confidence is not higherPMC 8-4.04(f)(8): 'Only one inspection shall be required and performed by the Building Division for small residential rooftop solar energy systems eligible for expedited review.' Standard-track sequence inferred from the live inspection schedule's mix of Rough Electrical and Electrical Meter Release entries.

ordinance + live schedule checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No, for expedited-track systems (only one inspection is authorized); not clearly documented either way for standard-track larger systems.

Why the confidence is not higherPMC 8-4.04(f)(8) limits the expedited track to one inspection; no separate documentation found addressing rough-in requirements for standard-track solar permits.

ordinance checked 2026-08-30 https://library.municode.com/ca/pacifica/codes/code_of_ordinances?nodeId=TIT8BURE_CH4ELCO_S8-4.04STPEPRSMREROSOENSY

Q56 Does the inspector verify labels and listings? Core What is checked

Presumed yes, as standard field-inspection practice under the adopted CEC/CBC, but not separately documented in city materials reviewed.

Why the confidence is not higherNo city document explicitly states that inspectors check labels/listings; this is inferred from standard code-compliance inspection practice under the adopted 2025 CEC.

inference checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q57 Is there a published inspection checklist? Core What is checked

Yes, for the SolarAPP+ path

Why the confidence is not higherSolarAPP+ page: 'An Inspection Checklist, a SolarAPP+ ID, and job card will be generated when approved.' No separate published checklist confirmed for the standard (non-SolarAPP+) track.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q58 What must be on site at inspection? Core Documents on site

Approved/stamped plan set, the job card, and (for SolarAPP+ permits) the SolarAPP+ ID and generated Inspection Checklist

Why the confidence is not higherInferred from the SolarAPP+ page's description of what is generated upon approval; standard practice for on-site documentation was not separately confirmed for non-SolarAPP+ permits.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division/solarapp

Q59 Is there a re-inspection fee? Corrections & re-inspection

Not found in the reviewed fee schedule sections (Building Division and Community Development fee pages checked); no flat re-inspection fee line was located distinct from the general 'Inspection Fee. Hourly rate with a minimum 30 minutes' entry.

Why the confidence is not higherCitywide Fee Schedule (36 pages, read via pdftotext -layout) contains an hourly re-inspection-adjacent charge for changes to permits but no fee explicitly labeled 're-inspection' for solar.

fee schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/20573/638863818072663193

Q60 How are corrections issued and cleared? Corrections & re-inspection

Through the online permit portal account: 'If there are comments from any of the departments, they will be released to the applicant when all reviewers have completed the review,' and applicants are notified of next steps through their permit account.

Why the confidence is not higherDirect quote from the Building Division's live process description.

department page checked 2026-08-30 https://www.cityofpacifica.org/departments/community-development/building-division

Q61 What is issued on pass? Core Final sign-off & PTO

Final

Why the confidence is not higherThe city's live, dated inspection schedule shows a 'Building Final' inspection type used at project completion, and an 'Electrical Meter Release' inspection specifically for an active PV project.

live department schedule checked 2026-08-30 https://www.cityofpacifica.org/home/showpublisheddocument/23438/639213731982870000

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer

Why the confidence is not higherPG&E Rule 21 places the burden on the 'Applicant' (the installer/interconnection customer) to provide 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction' to PG&E as part of the Permission to Operate process -- the AHJ does not push clearance to PG&E itself.

utility tariff (Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Pacifica against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Pacifica is the authority having jurisdiction 90% confidence
Holds
Both
Delegated to
North County Fire Authority (fire-only, conditional)
Overridden by
California Solar Rights Act (Civil Code Sec. 714) and Gov. Code Sec. 65850.5/65850.52 (SB 379); Pacifica's own codified streamlined-permitting ordinance (PMC Sec. 8-4.04) caps its ministerial track at the AB 2188-era 10 kW AC / 30 kW thermal threshold, while SB 379 (Gov. Code Sec. 65850.52) requires automated software (SolarAPP+) for systems up to 38.4 kW AC statewide -- the codified local ordinance has not been updated to match the newer state cap
Why not higher
City of Pacifica's own Building Division (within Community Development) issues both building and electrical permits for residential PV, with a named in-house Building Official (Jerry Schnell) -- confirmed on the Building Division page. Fire is NOT a standalone Pacifica department: the city's own 'Fire' page IS a redirect/informational page pointing to North County Fire Authority ('Operating a business in Pacifica? Contact the North County Fire Authority...'), NCFA's own 'Who We Serve' page names Pacifica explicitly alongside Daly City and Brisbane, and northcountyfire.org is a live, resolving domain (301-redirecting to northcountyfire.gov) -- triangulated three ways per the brief's instruction. Pacifica's own streamlined-solar ordinance (PMC 8-4.04(d)(9)) states a separate NCFA fire inspection 'may be performed... if required, in the event the City does not have an agreement with the Fire Authority to conduct fire safety inspections on its behalf,' meaning fire sign-off is conditional/delegated, not always separate.

https://www.cityofpacifica.org/departments/community-development/building-division

Permit required
Yes95%
Permit cost
$263 flat fee plus $15 per kW above 15 kW (residential, FY2025-2026); Strong-Motion Instrumentation Program (SMIP) and Building Standards Fee apply on top, based on valuation95%
Plan review
SolarAPP+/expedited solar review of systems 34 kW or less: about 3 days; standard building-permit review: first review 3-4 weeks, resubmittal reviews 2-3 weeks each90%
Portal
SolarAPP+ (for eligible systems) and the City's GreenVue online permit portal (operated by CSG Engineering) for standard applications92%
Electrical code
202395%
Own placard wording
No85%
Booking an inspection
Phone92%
Labels & placards for this authority

Wording 85%

No

Size, colour & material 85%

No

Where they go 55%

At/near the service equipment and at the visible utility-required disconnect near the point of interconnection, per PG&E Rule 21 and the adopted (unamended) NEC labeling requirements -- no Pacifica-specific placement rule beyond that.

What the utility wants on top 62%

Yes, partially confirmed: PG&E Electric Rule 21 requires a visible, manually-operated isolating disconnect near the Point of Interconnection with markings/signage 'that clearly indicates open and closed positions,' reachable by PG&E personnel 24/7. Finer meter-proximity spec is understood to sit in PG&E's Greenbook document TD-2306M, which is access-gated ('See your PG&E Job Owner for access') and could not be retrieved.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
San Mateo County
Regions served
1
Regions covered
City of Pacifica · city
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.cityofpacifica.org/departments/community-development/building-division
Authority Contact
Address
1800 Francisco Blvd, Pacifica, CA 94044
Main Phone
(650) 738-7300
Building Department
Department
Building Division
Direct Phone
(650) 738-7341
Booking & Scheduling
Preferred channel
phone
Book in advance
up to 1 week
Notes
Call the Building Inspection Hotline at (650) 737-1000 to schedule inspections. Inspections cannot be requested more than one week in advance. The Building Division is operated by CSG Consultants under contract. Online permit management is available through the GreenVue/Digital Permit Suite portal at greenvue.csgengr.com/pacifica2 — requires account login; full inspection scheduling capability through portal not confirmed. Qualifying residential rooftop solar PV installations on single-family or duplex homes may use SolarAPP+ for streamlined/instant permitting (see https://www.cityofpacifica.org/departments/community-development/building-division/solarapp). Portal login assistance: (650) 738-7344. Permit notifications sent from donotreply@csgengr.com. (collected Jul 2026)