City of Richmond

Contra Costa County

Verified Aug. 4, 2026

City of Richmond is a city authority in the State of California, serving 116,448 residents. 5,190 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined — one 'Building Regulations Permit Application' form covers Building, Electrical, Plumbing and Mechanical scopes under a single permit number (checkboxes, Q4 Plan review — Instant/same-day approval for SolarAPP+-eligible systems via the automated code-compliance engine. Q18 Where you file — iMS — the City's permitting/inspection portal (replaced eTRAKiT); SolarAPP+ is used specifically for automated review and instant permitting of eligible residential… Q20

Permit required
Yes95% source
What it costs
$450 flat ("Solar Structure - Residential System"), approved fee effective 1-Jul-2025.90% source
Plan review turnaround
Instant/same-day approval for SolarAPP+-eligible systems via the automated code-compliance engine. No published business-day turnaround figure was found for the standard (non-SolarApp) residential…55% source
Key document
fee schedule cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · adopting ordinance
    • What does this authority permit itself, and what does it delegate? Both (Building & Electrical) — no delegation to the county; the Building Division's single permit application covers building and electrical trades on one form, and Richmond's own Fire Prevention Services Division (not Contra Costa County Fire Protection District) separately reviews/signs off fire-related items. 85% · permit application form
    • Is a permit required for a residential rooftop PV system? Yes 95% · fee schedule
    • Is there a separate electrical permit, or is it combined? Combined — one 'Building Regulations Permit Application' form covers Building, Electrical, Plumbing and Mechanical scopes under a single permit number (checkboxes, not separate applications). 70% · permit application form
    • Is a HOA or architectural approval required first? No — none of the City's solar submittal checklists, Standard Plans, or SolarAPP+ eligibility criteria list HOA or architectural review as a submittal item. 60% · checklist
    • Is there a historic-district review? Yes, for historic-register properties — SolarAPP+ page: applicants must obtain a Certificate of Appropriateness from the Planning Division before submitting through SolarAPP+ if the site is on the Richmond Historic Register, and the installation must meet the Secretary of the Interior's Standards for Rehabilitation. 90% · department page
    • Is a wind or windstorm certification required? No — no third-party wind/windstorm certification program was found; the Building Division's own Jurisdictional Datasheet treats wind only as a design-load input (per current CBC and the ASCE Hazard Tool), not a separate certification. 55% · department handout
    • Is a Specific Use Permit or Council approval ever required? Not for standard residential rooftop PV — the only elevated-review trigger found is the historic-register Certificate of Appropriateness (Planning Division sign-off, q25); no Specific Use Permit or City Council approval requirement was found in any of the reviewed solar materials. 55% · department page
    • Is there a system-size cap on residential generation? No hard cap — 10 kW AC is the threshold that qualifies a system for the expedited/SolarAPP+ and 'Simplified' Standard Plan tracks; systems above that size are not capped or prohibited, they are simply routed to the 'Comprehensive Standard Plan' full-engineering review track instead. 75% · checklist
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either — a licensed contractor (state Contractors License Law, BPC Ch.9 Div.3) or the property owner acting as owner-builder (BPC §7044) may sign the 'Who's Doing the Work' section and pull the permit. 75% · permit application form
    • Must the contractor be registered with this authority before applying? Yes — a current City of Richmond Business Tax Certificate (Business License) is a listed precondition (alongside a valid CSLB license) before SolarAPP+ will generate an instant permit. 80% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes — the generic Building Regulations Permit Application includes an owner-builder declaration (BPC §7044) as an alternative to a licensed contractor, and 'Obtaining Permits' confirms permits may issue to 'property owners or their authorized agents and licensed contractors.' 70% · department page
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? SolarAPP+ track: SolarAPP+ approval documents (named 'SolarAPP+ Approval Documents') + a signed 'PAF Permit Application', uploaded to iMS, referencing the SolarAPP+ Approval ID. Standard track: a completed Solar PV Standard Plan (or full engineered plans for larger/non-conforming systems) plus the items on the Residential Solar PV Plan Submittal Checklist (site/roof plan, electrical plan with single-line diagram, structural plan, equipment cut sheets) and the Eligibility Checklist. 85% · department page
    • How many copies, and in what format? Historically 'three complete sets of plans on 11” x17” paper' per the still-linked 2015 Residential Solar PV Plan Submittal Checklist; current practice is electronic-only submittal through the iMS Digital Plan Room (the City states eTRAKiT 'is no longer in service' and permitting moved to iMS), so the paper-copy count appears superseded by practice even though the checklist itself has not been updated. 55% · checklist (dated 2015, still linked)
    • Is a site plan required, and what must it show? Yes — a site diagram/roof plan is required showing panel/module arrangement, string counts, conduit runs, existing/new equipment, skylights/vents, north arrow, lot dimensions, distance to adjacent structures, dimensioned access pathways, and disconnect locations; the Standard Plan additionally requires a standalone 'Roof Layout Diagram' showing pathways, disconnect locations and roof-access points. 85% · standard plan / checklist
    • Is a one-line / three-line diagram required? Yes — the Solar PV Standard Plan supplies four numbered single-line diagram templates (no-combiner, combined-strings, and two-inverter variants) that must be completed and attached. 90% · standard plan
    • Are string and conductor calculations required? Yes — the Standard Plan's Steps 1-15 require Voc/Isc string calculations, max system DC voltage, source-circuit/PV-output conductor sizing tables, and inverter-output OCPD/conductor sizing. 90% · standard plan
    • Is a structural PE stamp required, and at what threshold? Not required for a conventionally-framed wood-frame 1- or 2-story single-family dwelling (state BPC §5537 exemption); a licensed engineer's or architect's stamp IS required for any portion of the racking/roof-attachment design that deviates from conventional framing under Title 24 (BPC §5537(b)/§6737.1(b)). 85% · department handout
    • Is an electrical PE stamp required, and at what threshold? Not required if a licensed electrical (or C-46 solar) specialty contractor designs and installs their own work (BPC §5536.1(a)/§6737.3 exemption); otherwise electrical plans must be signed/stamped by a licensed electrical engineer (BPC §6735.3/§6735.4). 85% · department handout
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? iMS — the City's permitting/inspection portal (replaced eTRAKiT); SolarAPP+ is used specifically for automated review and instant permitting of eligible residential rooftop PV, with the resulting approval then referenced into an iMS permit application. 90% · department page
    • Can the whole application be completed online? Yes — SolarAPP+ eligible systems can be designed, reviewed and instantly permitted entirely online, then filed into iMS; non-eligible systems can also apply and pay through iMS, though an in-person appointment option remains available. 80% · department page
    • What does a residential solar permit cost? $450 flat ("Solar Structure - Residential System"), approved fee effective 1-Jul-2025. 90% · fee schedule
    • How is the fee calculated? Flat 90% · fee schedule
    • Is there a separate plan-check fee? Possibly yes — the same Master Fee Schedule separately lists a Fire Department plan-review fee 'PR-3.5 Solar Photovoltaic Power Systems (CFC 105.7.21)' at $683, in addition to the $450 Building permit fee; it is not stated on the schedule whether Fire Prevention applies this to ordinary small rooftop residential systems or reserves it for larger/commercial-scale reviews. 60% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Instant/same-day approval for SolarAPP+-eligible systems via the automated code-compliance engine. No published business-day turnaround figure was found for the standard (non-SolarApp) residential solar plan-review track. 55% · department page
    • How long is an issued permit valid before it expires? 180 days to commence work after issuance (state CBC/CRC §105.5, adopted by reference and not amended on this point); Richmond's local addition (Ord. 01-26 N.S., new §105.5.2) allows re-activation of an expired permit at half the original fee if the lapse has not exceeded one year. 60% · adopting ordinance
    • Which utility handles interconnection here? PG&E (Pacific Gas & Electric) — confirmed from a City page: Richmond joined MCE (Marin Clean Energy), a Community Choice Aggregation electricity supplier, in 2012, but MCE's own project documentation on the City's site states MCE 'has submitted interconnection applications with PG&E' — i.e., PG&E remains the interconnecting distribution utility even for CCA-supplied accounts; MCE sets no interconnection rules. 90% · department page (city-hosted)
    • Where does the utility sit in the sequence? After permit (with the underlying interconnection application filed in parallel) — PG&E's Greenbook states local ordinances require the applicant to obtain the AHJ's permit AND final inspection approval before PG&E will connect/energize service (Electric/Gas Rule 11 & 16); the Rule 21 interconnection application itself can be submitted in parallel with the city permit process, but PG&E's actual connection/PTO step follows the AHJ's final. 75% · utility interconnection manual

28 questions answered against City of Richmond’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherRMC 6.02.030 (Ord. 01-26 N.S.) §103.1 creates the Building Division of the Community Development Department as the code-enforcement agency for the City; Richmond is an incorporated city that issues its own building/electrical permits, not delegated to Contra Costa County.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both (Building & Electrical) — no delegation to the county; the Building Division's single permit application covers building and electrical trades on one form, and Richmond's own Fire Prevention Services Division (not Contra Costa County Fire Protection District) separately reviews/signs off fire-related items.

Why the confidence is not higherConfirmed the Building Regulations Permit Application has Building/Electrical/Plumbing/Mechanical checkboxes on one form, and that Richmond runs its own Fire Department (Chief Aaron Osorio, 440 Civic Center Plaza) rather than being served by CCCFPD — the Concord-style CCCFPD delegation-to-city arrangement does not apply here because Richmond already has its own department.

permit application form checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/7241

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherMaster Fee Schedule lists a dedicated 'Solar Structure - Residential System' building permit fee, and the Residential Solar Systems page publishes checklists/standard plans that presuppose a permit.

fee schedule checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/76881/Adopted-Master-Fee-Schedule-Approved-June-2025-PDF

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined — one 'Building Regulations Permit Application' form covers Building, Electrical, Plumbing and Mechanical scopes under a single permit number (checkboxes, not separate applications).

Why the confidence is not higherForm is the City's generic building-permit application (not solar-specific); did not find a solar-specific statement that electrical is always combined, but the form itself provides no separate electrical-only application path for this type of work.

permit application form checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/7241

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either — a licensed contractor (state Contractors License Law, BPC Ch.9 Div.3) or the property owner acting as owner-builder (BPC §7044) may sign the 'Who's Doing the Work' section and pull the permit.

Why the confidence is not higherRead directly off the City's Building Regulations Permit Application form; note the SolarAPP+ instant-permit track separately requires a valid CSLB license (see q7).

permit application form checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/7241

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — a current City of Richmond Business Tax Certificate (Business License) is a listed precondition (alongside a valid CSLB license) before SolarAPP+ will generate an instant permit.

Why the confidence is not higherSolarAPP+ page's 'instant permit' conditions list the City Business Tax Certificate explicitly; not confirmed whether this business-license requirement is waived for the non-instant/standard review track.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4174/SolarAPP-For-Solar-Installers

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes — the generic Building Regulations Permit Application includes an owner-builder declaration (BPC §7044) as an alternative to a licensed contractor, and 'Obtaining Permits' confirms permits may issue to 'property owners or their authorized agents and licensed contractors.'

Why the confidence is not higherGeneral permit-application evidence, not solar-specific; the SolarAPP+ automated/instant track itself requires a valid CSLB license, so a self-installing homeowner would likely have to use the standard (non-instant) review path rather than SolarAPP+.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/135/Obtaining-Permits

Q8 What documents make up a complete submittal? Core Submittal package

SolarAPP+ track: SolarAPP+ approval documents (named 'SolarAPP+ Approval Documents') + a signed 'PAF Permit Application', uploaded to iMS, referencing the SolarAPP+ Approval ID. Standard track: a completed Solar PV Standard Plan (or full engineered plans for larger/non-conforming systems) plus the items on the Residential Solar PV Plan Submittal Checklist (site/roof plan, electrical plan with single-line diagram, structural plan, equipment cut sheets) and the Eligibility Checklist.

Why the confidence is not higherCombined from the current SolarAPP+ page and the linked Standard Plans/checklists, all live on the Residential Solar Systems page.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/2771/Residential-Solar-Systems

Q9 How many copies, and in what format? Submittal package

Historically 'three complete sets of plans on 11” x17” paper' per the still-linked 2015 Residential Solar PV Plan Submittal Checklist; current practice is electronic-only submittal through the iMS Digital Plan Room (the City states eTRAKiT 'is no longer in service' and permitting moved to iMS), so the paper-copy count appears superseded by practice even though the checklist itself has not been updated.

Why the confidence is not higherThe only document stating a copy count is dated 10-01-15 and is inconsistent with the City's current 'electronic permit submittals' process; no updated copy-count figure was found.

checklist (dated 2015, still linked) checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/36027/Residential-Solar-PV-Checklist-10-01-15

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — a site diagram/roof plan is required showing panel/module arrangement, string counts, conduit runs, existing/new equipment, skylights/vents, north arrow, lot dimensions, distance to adjacent structures, dimensioned access pathways, and disconnect locations; the Standard Plan additionally requires a standalone 'Roof Layout Diagram' showing pathways, disconnect locations and roof-access points.

Why the confidence is not higherDirectly from the City's own submittal checklist and Standard Plan exhibit.

standard plan / checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — the Solar PV Standard Plan supplies four numbered single-line diagram templates (no-combiner, combined-strings, and two-inverter variants) that must be completed and attached.

Why the confidence is not higherDirectly from the Standard Plan document itself.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q12 Are string and conductor calculations required? Drawings & calculations

Yes — the Standard Plan's Steps 1-15 require Voc/Isc string calculations, max system DC voltage, source-circuit/PV-output conductor sizing tables, and inverter-output OCPD/conductor sizing.

Why the confidence is not higherDirectly from the Standard Plan calculation worksheet.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Not required for a conventionally-framed wood-frame 1- or 2-story single-family dwelling (state BPC §5537 exemption); a licensed engineer's or architect's stamp IS required for any portion of the racking/roof-attachment design that deviates from conventional framing under Title 24 (BPC §5537(b)/§6737.1(b)).

Why the confidence is not higherCity's own 'Design Licensing Requirements' handout, published by the Building Division, restates the state BPC thresholds that the Building Official applies.

department handout checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/30714/Design-Licensing-Requirements

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Not required if a licensed electrical (or C-46 solar) specialty contractor designs and installs their own work (BPC §5536.1(a)/§6737.3 exemption); otherwise electrical plans must be signed/stamped by a licensed electrical engineer (BPC §6735.3/§6735.4).

Why the confidence is not higherSame City handout as q13.

department handout checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/30714/Design-Licensing-Requirements

Q15 What does a residential solar permit cost? Core Fees

$450 flat ("Solar Structure - Residential System"), approved fee effective 1-Jul-2025.

Why the confidence is not higherLine item in the Adopted Master Fee Schedule (approved June 2025); the schedule also lists a separate tiered fee for 'Commercial Solar Energy System' ($1,000 base + per-kW) that does not apply to residential.

fee schedule checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/76881/Adopted-Master-Fee-Schedule-Approved-June-2025-PDF

Q16 How is the fee calculated? Core Fees

Flat

Why the confidence is not higherSame Master Fee Schedule line item; no valuation, per-kW, or per-panel variable is applied to the residential fee (the per-kW tiers only appear under the separate commercial category).

fee schedule checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/76881/Adopted-Master-Fee-Schedule-Approved-June-2025-PDF

Q17 Is there a separate plan-check fee? Fees

Possibly yes — the same Master Fee Schedule separately lists a Fire Department plan-review fee 'PR-3.5 Solar Photovoltaic Power Systems (CFC 105.7.21)' at $683, in addition to the $450 Building permit fee; it is not stated on the schedule whether Fire Prevention applies this to ordinary small rooftop residential systems or reserves it for larger/commercial-scale reviews.

Why the confidence is not higherFee schedule shows the two line items in different department sections (CD-Bldng Reg's vs. Fire) with no residential/commercial size qualifier on the fire fee, so applicability to a typical single-family rooftop system is inferred, not stated outright.

fee schedule checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/76881/Adopted-Master-Fee-Schedule-Approved-June-2025-PDF

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Instant/same-day approval for SolarAPP+-eligible systems via the automated code-compliance engine. No published business-day turnaround figure was found for the standard (non-SolarApp) residential solar plan-review track.

Why the confidence is not higherSolarAPP+ page states instant permitting for eligible systems; checked Building Division, Obtaining Permits, and Residential Solar Systems pages for a stated day-count on the standard track and found none.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4174/SolarAPP-For-Solar-Installers

Q19 How long is an issued permit valid before it expires? Timeline & validity

180 days to commence work after issuance (state CBC/CRC §105.5, adopted by reference and not amended on this point); Richmond's local addition (Ord. 01-26 N.S., new §105.5.2) allows re-activation of an expired permit at half the original fee if the lapse has not exceeded one year.

Why the confidence is not higherRead the amendment (§105.5.2) verbatim in Ordinance 01-26; the base §105.5 180-day language it refers to is the unamended, standard CBC provision adopted by reference — its exact text was not separately located on the City's site.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q20 Which permit portal does this authority use? Core Portal & process

iMS — the City's permitting/inspection portal (replaced eTRAKiT); SolarAPP+ is used specifically for automated review and instant permitting of eligible residential rooftop PV, with the resulting approval then referenced into an iMS permit application.

Why the confidence is not higherBuilding Division and SolarAPP+ pages both point to iMS as the permit system of record.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/2099/Building-Division

Q21 Can the whole application be completed online? Core Portal & process

Yes — SolarAPP+ eligible systems can be designed, reviewed and instantly permitted entirely online, then filed into iMS; non-eligible systems can also apply and pay through iMS, though an in-person appointment option remains available.

Why the confidence is not higherCombination of solarapp.html and buildingdiv.html.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4174/SolarAPP-For-Solar-Installers

Q22 Which utility handles interconnection here? Core Utility interconnection

PG&E (Pacific Gas & Electric) — confirmed from a City page: Richmond joined MCE (Marin Clean Energy), a Community Choice Aggregation electricity supplier, in 2012, but MCE's own project documentation on the City's site states MCE 'has submitted interconnection applications with PG&E' — i.e., PG&E remains the interconnecting distribution utility even for CCA-supplied accounts; MCE sets no interconnection rules.

Why the confidence is not higherCity-hosted MCE Solar Farm page names PG&E as the interconnecting utility; cross-checked against PG&E's own Greenbook (TD-7001M-06) which governs Rule 21 interconnection in this territory.

department page (city-hosted) checked 2026-08-30 https://www.ci.richmond.ca.us/2940/MCE-Solar-Farm

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit (with the underlying interconnection application filed in parallel) — PG&E's Greenbook states local ordinances require the applicant to obtain the AHJ's permit AND final inspection approval before PG&E will connect/energize service (Electric/Gas Rule 11 & 16); the Rule 21 interconnection application itself can be submitted in parallel with the city permit process, but PG&E's actual connection/PTO step follows the AHJ's final.

Why the confidence is not higherPG&E TD-7001M-01 §1.11(11)-(12), extracted directly from the current Greenbook PDF.

utility interconnection manual checked 2026-08-30 https://www.pge.com/assets/pge/docs/account/service-requests/greenbook-manual-full.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — none of the City's solar submittal checklists, Standard Plans, or SolarAPP+ eligibility criteria list HOA or architectural review as a submittal item.

Why the confidence is not higherChecked the Eligibility Checklist, both Standard Plans, and the SolarAPP+ page — none mention HOA/architectural approval as a precondition (CA Civil Code §714 also limits HOA authority to unreasonably restrict solar, though that statute itself was not re-verified in this run).

checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48763/Residential-Solar-PV-Eligibility-Checklist

Q25 Is there a historic-district review? Overlays & special cases

Yes, for historic-register properties — SolarAPP+ page: applicants must obtain a Certificate of Appropriateness from the Planning Division before submitting through SolarAPP+ if the site is on the Richmond Historic Register, and the installation must meet the Secretary of the Interior's Standards for Rehabilitation.

Why the confidence is not higherDirectly stated on the current SolarAPP+ page.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4174/SolarAPP-For-Solar-Installers

Q26 Is a wind or windstorm certification required? Overlays & special cases

No — no third-party wind/windstorm certification program was found; the Building Division's own Jurisdictional Datasheet treats wind only as a design-load input (per current CBC and the ASCE Hazard Tool), not a separate certification.

Why the confidence is not higherChecked the Building Division Datasheet, Ordinance 01-26's full local-amendments text, and both Standard Plans/checklists — none reference a wind-certification program (a concept used in TDI states like Texas but not found here).

department handout checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/58142/City-of-Richmond---Building-Department-Datasheet-32221

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Not for standard residential rooftop PV — the only elevated-review trigger found is the historic-register Certificate of Appropriateness (Planning Division sign-off, q25); no Specific Use Permit or City Council approval requirement was found in any of the reviewed solar materials.

Why the confidence is not higherChecked Eligibility Checklist, both Standard Plans, SolarAPP+ page, and Residential Solar Systems page.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/2771/Residential-Solar-Systems

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No hard cap — 10 kW AC is the threshold that qualifies a system for the expedited/SolarAPP+ and 'Simplified' Standard Plan tracks; systems above that size are not capped or prohibited, they are simply routed to the 'Comprehensive Standard Plan' full-engineering review track instead.

Why the confidence is not higherEligibility Checklist item A and the Standard Plan's own SCOPE note both state the 10kW figure as a track-eligibility threshold, not a maximum allowed system size.

checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48763/Residential-Solar-PV-Eligibility-Checklist

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 NEC, incorporated as the California Electrical Code (Title 24, Part 3) as part of the 2025 California Building Standards Code cycle adopted by Richmond via Ordinance 01-26 N.S. (effective no sooner than Jan 1, 2026). 70% · adopting ordinance
    • Which building code edition is in force? 2025 California Building Standards Code (Title 24), adopted by City Council Ordinance No. 01-26 N.S. on March 3, 2026, effective no sooner than January 1, 2026 as mandated by the state. 95% · adopting ordinance
    • Which fire code edition is in force? 2025 California Fire Code (Title 24, Part 9) and 2025 California Wildland-Urban Interface Code (Part 7); the local-amendment ordinance had its first reading March 24, 2026 and second reading April 7, 2026. 85% · department page
    • Are there local amendments to any of the above? Yes — Building: RMC 6.02.030 amends CBC Chapter 1 admin provisions (enforcement-agency designation, plan-review/permit expiration timing, investigation and reinspection fees, an ADU/residential legalization amnesty program, Board of Appeals composition, and several Appendix Q emergency-housing fire/life-safety additions). Fire: local amendments to the 2025 CFC/WUI code (e.g., RMC 8.16.040 fire-sprinkler trigger for Group R-3 substantial additions, RMC 8.16.080 Very High Fire Hazard Severity Zone provisions) referenced on the Fire Prevention page and Building Datasheet. 90% · adopting ordinance
    • What is the installation judged against? The adopted 2025 CEC (NEC-based, Title 24 Part 3), CRC §R331, and CFC, plus manufacturer listing/installation instructions (CEC 110.3, 690.4(D)); for permitting purposes, systems are checked against either the City's Solar PV Standard Plan (≤10kW, simple central/string or microinverter, no storage) or a fully engineered 'Comprehensive Standard Plan' for larger/non-conforming systems. 80% · standard plan
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Clear roof access pathways are required and must be diagrammed on the roof-layout plan (per CRC R331.2 and CFC 605.11.1, both cited directly in the City's own Standard Plan markings page); the specific pathway-width/ridge-setback dimensional tables are set out in CFC §605.11 itself, which is ICC-copyrighted text not reproduced on any Richmond city page and could not be extracted. 55% · standard plan
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes — rapid shutdown (CEC Article 690.12) is required as part of the fully-adopted 2025 CEC (Title 24 Part 3, based on the 2023 NEC), which Richmond adopted by reference without exception; the City's Standard Plans do not separately restate 690.12 language because they assume listed/labeled inverters already provide it. 65% · adopting ordinance
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Per the City's own Standard Plan: WARNING – Photovoltaic Power Source (at junction/combiner boxes and every 10 ft of conduit), WARNING – Inverter Output Connection/do-not-relocate OCPD, WARNING – Dual Power Sources (AC disconnect rating plaque), PV System AC Disconnect and PV System DC Disconnect rating placards, electric-shock-hazard placards for ungrounded conductors/ground-fault/do-not-touch-terminals, and a CEC 705.12 permanent power-source directory/plaque. Separately, PG&E's Greenbook requires an engraved placard on the metering equipment for any supply-side/line-side-tap AC disconnect (utility-level, not AHJ). 90% · standard plan
    • Does the authority specify placard wording of its own? Yes — the Standard Plan reproduces the exact CEC-mandated placard wording (e.g., 'WARNING PHOTOVOLTAIC POWER SOURCE', 'WARNING DUAL POWER SOURCES...') as the template the City expects to be installed verbatim. 85% · standard plan
    • Does it specify letter height, colour or material? Guidance, not a hard local mandate: the Standard Plan cites ANSI Z535.4 for label design and states 'a phenolic plaque with contrasting colors between text and background would meet the intent of the code,' with '20 point (3/8") should be considered the minimum' letter height; no type size is strictly mandated. 85% · standard plan
    • Is a site plan / facility map placard required, and what must it show? Yes — a Roof Layout Diagram is required showing the arrangement of all panels/modules, clear access pathways, and the approximate locations of electrical disconnecting means and roof access points. 85% · standard plan
    • Does the UTILITY specify placards beyond the AHJ's? Yes — PG&E's Greenbook (TD-7001M-06, §6.3) requires an engraved placard/signage on the metering equipment indicating a line/supply-side connection whenever a fusible AC disconnect is installed ahead of the customer's main breaker. 85% · utility interconnection manual
    • Where must the labels be placed? At the inverter, at each junction/combiner box and along conduit runs (every 10 ft), and at the PV AC and DC disconnects per the City's Standard Plan; additionally, per PG&E, on the metering equipment itself whenever a supply-side/line-side-tap AC disconnect is used. 85% · standard plan
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? No AC disconnect required where the PV system connects on the load side of a self-contained, socket-based meter panel rated ≤320A single-phase; an AC disconnect (fusible, with an engraved supply-side placard) IS required where the interconnection is on the supply/line side ahead of the main breaker and after the meter, or for any transformer-rated/non-self-contained meter panel. 85% · utility interconnection manual
    • Must equipment be on a specific approved list? No City-specific approved-equipment list — equipment need only be listed/labeled for its PV application under the state CEC (110.3, 690.4(D)), which the Standard Plan cites; no separate Richmond-maintained approved-products list was found. 70% · standard plan
    • Are batteries permitted, and under what conditions? The expedited SolarAPP+ / 'Simplified' Standard Plan tracks explicitly require the system be 'utility interactive and without battery storage' (Eligibility Checklist item D); systems with batteries/ESS are excluded from those tracks and must go through the standard (non-expedited) permitting process. The Fire Master Fee Schedule separately lists a distinct 'Battery Systems' operational-permit fee and plan-review fee, indicating Fire Prevention treats battery storage as its own reviewed hazard class. 70% · checklist
    • Is there a separate ESS permit or inspection? Yes, apparently — the Master Fee Schedule lists a separate Fire 'Battery System Storage' operational permit ($192, OP19-55) and a distinct 'Battery Systems' plan-review fee ($749, PR-9), both apart from the $450 residential solar building fee, implying a separate ESS-specific permit/review step. 70% · fee schedule
    • Is there a local rule on service upgrades or busbar sizing? No local amendment found beyond the unamended state rule — Ordinance 01-26's local-amendments section (RMC 6.02.030) addresses only Chapter 1 administrative provisions; busbar/feeder sizing for PV interconnection follows the standard (unamended) CEC 705.12(D)(2) 120%/100% rule, which the City's own Standard Plan reproduces verbatim in its Table 4. 70% · adopting ordinance
    • Is a specific mounting system or attachment spacing required? No single mandated spacing figure — the City's checklist/Standard Plan require submission of the racking manufacturer's product-evaluation/structural design, embedment-bolt style/diameter/length/spacing, and bonding/grounding instructions for Building Official review, rather than prescribing one fixed spacing; any attachment method that deviates from conventional framing triggers the PE/architect stamp described in q13. 70% · checklist

20 questions answered against City of Richmond’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 NEC, incorporated as the California Electrical Code (Title 24, Part 3) as part of the 2025 California Building Standards Code cycle adopted by Richmond via Ordinance 01-26 N.S. (effective no sooner than Jan 1, 2026).

Why the confidence is not higherOrdinance 01-26 confirms Richmond adopted the full 2025 CBSC including Part 3 (CEC) by reference; the specific 2023-NEC-to-2025-cycle mapping is the well-established statewide CBSC code-cycle correlation (Title 24 → dgs.ca.gov/BSC/Codes, linked from the City's own Building Codes page) rather than a sentence appearing verbatim in the City's ordinance.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Standards Code (Title 24), adopted by City Council Ordinance No. 01-26 N.S. on March 3, 2026, effective no sooner than January 1, 2026 as mandated by the state.

Why the confidence is not higherOrdinance text itself, extracted directly.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q31 Which fire code edition is in force? Code editions in force

2025 California Fire Code (Title 24, Part 9) and 2025 California Wildland-Urban Interface Code (Part 7); the local-amendment ordinance had its first reading March 24, 2026 and second reading April 7, 2026.

Why the confidence is not higherFire Prevention Services Division's own Codes/Ordinance/Resources page, current as of this check.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4963/CodesOrdinanceResources

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — Building: RMC 6.02.030 amends CBC Chapter 1 admin provisions (enforcement-agency designation, plan-review/permit expiration timing, investigation and reinspection fees, an ADU/residential legalization amnesty program, Board of Appeals composition, and several Appendix Q emergency-housing fire/life-safety additions). Fire: local amendments to the 2025 CFC/WUI code (e.g., RMC 8.16.040 fire-sprinkler trigger for Group R-3 substantial additions, RMC 8.16.080 Very High Fire Hazard Severity Zone provisions) referenced on the Fire Prevention page and Building Datasheet.

Why the confidence is not higherRead the full text of Ordinance 01-26 N.S. and cross-checked against the Fire Prevention Codes page and Building Division Datasheet.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q33 What is the installation judged against? Core Electrical

The adopted 2025 CEC (NEC-based, Title 24 Part 3), CRC §R331, and CFC, plus manufacturer listing/installation instructions (CEC 110.3, 690.4(D)); for permitting purposes, systems are checked against either the City's Solar PV Standard Plan (≤10kW, simple central/string or microinverter, no storage) or a fully engineered 'Comprehensive Standard Plan' for larger/non-conforming systems.

Why the confidence is not higherSynthesized from the Standard Plan's own SCOPE paragraph and the adopting ordinance.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local amendment found beyond the unamended state rule — Ordinance 01-26's local-amendments section (RMC 6.02.030) addresses only Chapter 1 administrative provisions; busbar/feeder sizing for PV interconnection follows the standard (unamended) CEC 705.12(D)(2) 120%/100% rule, which the City's own Standard Plan reproduces verbatim in its Table 4.

Why the confidence is not higherRead the full local-amendments text in Ordinance 01-26 (no CEC/busbar section appears) and cross-checked against the Standard Plan's Table 4.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No single mandated spacing figure — the City's checklist/Standard Plan require submission of the racking manufacturer's product-evaluation/structural design, embedment-bolt style/diameter/length/spacing, and bonding/grounding instructions for Building Official review, rather than prescribing one fixed spacing; any attachment method that deviates from conventional framing triggers the PE/architect stamp described in q13.

Why the confidence is not higherResidential Solar PV Plan Submittal Checklist (structural-plan section) and Design Licensing Requirements handout.

checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/36027/Residential-Solar-PV-Checklist-10-01-15

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Clear roof access pathways are required and must be diagrammed on the roof-layout plan (per CRC R331.2 and CFC 605.11.1, both cited directly in the City's own Standard Plan markings page); the specific pathway-width/ridge-setback dimensional tables are set out in CFC §605.11 itself, which is ICC-copyrighted text not reproduced on any Richmond city page and could not be extracted.

Why the confidence is not higherConfirmed the qualitative pathway requirement and code citations from the Standard Plan; the dimensional tables in CFC 605.11 are behind ICC's paywall (codes.iccsafe.org/content/CAFC2025P1 requires a subscription/premium access) and were not retrievable.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — rapid shutdown (CEC Article 690.12) is required as part of the fully-adopted 2025 CEC (Title 24 Part 3, based on the 2023 NEC), which Richmond adopted by reference without exception; the City's Standard Plans do not separately restate 690.12 language because they assume listed/labeled inverters already provide it.

Why the confidence is not higherInferred from full-code adoption (no CEC exception in Ordinance 01-26) rather than a page that names '690.12' directly on a Richmond site.

adopting ordinance checked 2026-08-30 https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Per the City's own Standard Plan: WARNING – Photovoltaic Power Source (at junction/combiner boxes and every 10 ft of conduit), WARNING – Inverter Output Connection/do-not-relocate OCPD, WARNING – Dual Power Sources (AC disconnect rating plaque), PV System AC Disconnect and PV System DC Disconnect rating placards, electric-shock-hazard placards for ungrounded conductors/ground-fault/do-not-touch-terminals, and a CEC 705.12 permanent power-source directory/plaque. Separately, PG&E's Greenbook requires an engraved placard on the metering equipment for any supply-side/line-side-tap AC disconnect (utility-level, not AHJ).

Why the confidence is not higherStandard Plan 'Markings' page, extracted verbatim.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Yes — the Standard Plan reproduces the exact CEC-mandated placard wording (e.g., 'WARNING PHOTOVOLTAIC POWER SOURCE', 'WARNING DUAL POWER SOURCES...') as the template the City expects to be installed verbatim.

Why the confidence is not higherStandard Plan markings page.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Guidance, not a hard local mandate: the Standard Plan cites ANSI Z535.4 for label design and states 'a phenolic plaque with contrasting colors between text and background would meet the intent of the code,' with '20 point (3/8") should be considered the minimum' letter height; no type size is strictly mandated.

Why the confidence is not higherStandard Plan 'Markings' page, extracted verbatim.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Yes — a Roof Layout Diagram is required showing the arrangement of all panels/modules, clear access pathways, and the approximate locations of electrical disconnecting means and roof access points.

Why the confidence is not higherStandard Plan's dedicated 'Roof Layout Diagram for One- and Two-Family Dwellings' exhibit page.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes — PG&E's Greenbook (TD-7001M-06, §6.3) requires an engraved placard/signage on the metering equipment indicating a line/supply-side connection whenever a fusible AC disconnect is installed ahead of the customer's main breaker.

Why the confidence is not higherPG&E Greenbook Table 6-3 and accompanying text, extracted directly from the current (effective 6/22/2026) PDF.

utility interconnection manual checked 2026-08-30 https://www.pge.com/assets/pge/docs/account/service-requests/greenbook-manual-full.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the inverter, at each junction/combiner box and along conduit runs (every 10 ft), and at the PV AC and DC disconnects per the City's Standard Plan; additionally, per PG&E, on the metering equipment itself whenever a supply-side/line-side-tap AC disconnect is used.

Why the confidence is not higherStandard Plan markings page plus PG&E Greenbook §6.3.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q44 Must equipment be on a specific approved list? Equipment listing

No City-specific approved-equipment list — equipment need only be listed/labeled for its PV application under the state CEC (110.3, 690.4(D)), which the Standard Plan cites; no separate Richmond-maintained approved-products list was found.

Why the confidence is not higherStandard Plan SCOPE language references only the state listing requirement; searched Building Division and Residential Solar Systems pages for a City equipment list and found none.

standard plan checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48760/Residential-Solar-PV-Standard-Plan-Simplified-Central-String-Inverter

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

The expedited SolarAPP+ / 'Simplified' Standard Plan tracks explicitly require the system be 'utility interactive and without battery storage' (Eligibility Checklist item D); systems with batteries/ESS are excluded from those tracks and must go through the standard (non-expedited) permitting process. The Fire Master Fee Schedule separately lists a distinct 'Battery Systems' operational-permit fee and plan-review fee, indicating Fire Prevention treats battery storage as its own reviewed hazard class.

Why the confidence is not higherEligibility Checklist item D plus Master Fee Schedule battery-fee line items (OP19-55, PR-9); did not find a dedicated residential-ESS installation standard (e.g., a 'Solar+Storage Standard Plan') on the City's site.

checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48763/Residential-Solar-PV-Eligibility-Checklist

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Yes, apparently — the Master Fee Schedule lists a separate Fire 'Battery System Storage' operational permit ($192, OP19-55) and a distinct 'Battery Systems' plan-review fee ($749, PR-9), both apart from the $450 residential solar building fee, implying a separate ESS-specific permit/review step.

Why the confidence is not higherMaster Fee Schedule line items; the schedule does not explicitly say 'residential' vs. 'commercial' for these two lines, so applicability to a small residential ESS attached to rooftop PV is inferred rather than stated outright.

fee schedule checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/76881/Adopted-Master-Fee-Schedule-Approved-June-2025-PDF

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedSearched Ordinance 01-26 N.S. full text (local amendments to CBC Ch.1), the Building Division's Jurisdictional Datasheet, and all documents on the Forms & Handouts and Residential Solar Systems pages for a ground-mount-specific provision; the City's Standard Plans and Eligibility Checklist are explicitly limited to roof-mounted systems ('roof-mounted on one- or two-family dwelling or accessory structure' — Eligibility Checklist item B), so ground-mount PV falls outside every published template and no City statement that a ground-mount array is/isn't treated as an accessory structure was found.

https://www.ci.richmond.ca.us/2774/Building-Codes

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

No AC disconnect required where the PV system connects on the load side of a self-contained, socket-based meter panel rated ≤320A single-phase; an AC disconnect (fusible, with an engraved supply-side placard) IS required where the interconnection is on the supply/line side ahead of the main breaker and after the meter, or for any transformer-rated/non-self-contained meter panel.

Why the confidence is not higherPG&E Greenbook Table 6-3, 'Requirements for AC Disconnect Switches,' extracted directly.

utility interconnection manual checked 2026-08-30 https://www.pge.com/assets/pge/docs/account/service-requests/greenbook-manual-full.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (iMS) or Phone (510-447-1156, touch-tone automated menu) or Text (866-535-4016, keyword commands SCHEDULE/RESCHEDULE/CANCEL/RESULTS). 90% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — Richmond's own Building Division (Community Development Department) performs the building/electrical final inspection; Richmond's own Fire Department (Fire Prevention Services Division, Chief Aaron Osorio, 440 Civic Center Plaza) separately signs off where its stamp appears on the approved plans. No delegation to the Contra Costa County Fire Protection District was found — unlike Concord, Richmond operates its own full-service fire department covering its own city limits, so the CCCFPD-to-city delegation arrangement established for Concord does not apply here. 90% · department page
    • If delegated, to whom? N/A — not delegated; the City's own Building Division and its own Fire Department both retain their respective inspection roles. 90% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Building/electrical rough and final inspections are scheduled via iMS/phone/text; if the approved plan set carries an approval stamp from another agency (Fire, Planning, Health, Engineering, or a Sanitary District), that agency's sign-off must appear on the permit card BEFORE the Building Division will conduct its final inspection. 75% · department page
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, functionally — the Eligibility Checklist and the Standard Plan's Markings page serve as the published pre-inspection compliance criteria that must be attached to the submittal; no separate, standalone document titled 'final inspection checklist' was found. 60% · checklist
    • Does the inspector verify labels and listings? Yes (inferred from published materials, not a direct department statement) — the Standard Plan's entire 'Markings' page and the Eligibility Checklist's requirement that 'all required markings and labels are provided' exist specifically as the criteria a field inspector checks against at final. 60% · checklist
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (Building Division final inspection approval on the permit); no standalone 'green tag' or separate 'Certificate of Occupancy' terminology was found for solar-only permits (a CofO is a separately-fee'd item in the Master Fee Schedule, listed as 'requested separate from orig. permit,' suggesting it is not automatically issued for a solar retrofit). 55% · department page
    • Who notifies the utility for PTO? Installer/applicant — PG&E's Greenbook describes the interconnection/NEM process in terms of the 'applicant' submitting the Rule 21 application and needing to show AHJ permit/final-inspection compliance before PG&E will connect service; no Richmond page states that the City itself notifies PG&E on the customer's behalf. 55% · utility interconnection manual
    • Is there a re-inspection fee? $203 (Re-Inspection Fee Per Address, approved fee effective 1-Jul-2025) under the Building/Community Development section of the Master Fee Schedule. 75% · fee schedule

14 questions answered against City of Richmond’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (iMS) or Phone (510-447-1156, touch-tone automated menu) or Text (866-535-4016, keyword commands SCHEDULE/RESCHEDULE/CANCEL/RESULTS).

Why the confidence is not higheriMS Permit Inspections and Automated Phone Inspection Scheduling System pages, both current.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4804/iMS-Permit-Inspections

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedChecked the iMS Permit Inspections page and the Automated Phone Inspection Scheduling System page for a stated minimum advance-notice window (e.g., '24 hours before'); both describe only the scheduling mechanics (phone/text keywords), not a required lead time.

https://www.ci.richmond.ca.us/4804/iMS-Permit-Inspections

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedChecked iMS Permit Inspections, Automated Phone Inspection Scheduling System, and Building Division pages for mention of same-day or AM/PM inspection windows; none state whether time windows are offered.

https://www.ci.richmond.ca.us/3610/Automated-Phone-Inspection-Scheduling-Sy

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — Richmond's own Building Division (Community Development Department) performs the building/electrical final inspection; Richmond's own Fire Department (Fire Prevention Services Division, Chief Aaron Osorio, 440 Civic Center Plaza) separately signs off where its stamp appears on the approved plans. No delegation to the Contra Costa County Fire Protection District was found — unlike Concord, Richmond operates its own full-service fire department covering its own city limits, so the CCCFPD-to-city delegation arrangement established for Concord does not apply here.

Why the confidence is not higherFire Department and Fire Prevention Services Division pages both describe Richmond's own staff/leadership, with no mention of CCCFPD in any capacity.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/79/Fire-Department

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated; the City's own Building Division and its own Fire Department both retain their respective inspection roles.

Why the confidence is not higherSame evidence as q52.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/79/Fire-Department

Q54 Which inspections are required, and in what order? Core Stages & sequence

Building/electrical rough and final inspections are scheduled via iMS/phone/text; if the approved plan set carries an approval stamp from another agency (Fire, Planning, Health, Engineering, or a Sanitary District), that agency's sign-off must appear on the permit card BEFORE the Building Division will conduct its final inspection.

Why the confidence is not higheriMS Permit Inspections page, 'Additional Information for Final Inspections' section.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4804/iMS-Permit-Inspections

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedChecked both Standard Plans, the Eligibility Checklist, and the SolarAPP+ page for a stated mid-roof/rough inspection stage distinct from final; none describe a solar-specific inspection sequence beyond 'schedule an inspection' after permit issuance.

https://www.ci.richmond.ca.us/4174/SolarAPP-For-Solar-Installers

Q56 Does the inspector verify labels and listings? Core What is checked

Yes (inferred from published materials, not a direct department statement) — the Standard Plan's entire 'Markings' page and the Eligibility Checklist's requirement that 'all required markings and labels are provided' exist specifically as the criteria a field inspector checks against at final.

Why the confidence is not higherNo City page explicitly states inspector practice at time of inspection; this is inferred from the existence and content of the published compliance documents.

checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48763/Residential-Solar-PV-Eligibility-Checklist

Q57 Is there a published inspection checklist? Core What is checked

Yes, functionally — the Eligibility Checklist and the Standard Plan's Markings page serve as the published pre-inspection compliance criteria that must be attached to the submittal; no separate, standalone document titled 'final inspection checklist' was found.

Why the confidence is not higherSame two documents as q56; no distinct inspection-only checklist located.

checklist checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/48763/Residential-Solar-PV-Eligibility-Checklist

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedChecked iMS Permit Inspections, Automated Phone Inspection Scheduling System, Building Division, and Residential Solar Systems pages for a stated list of documents required to be physically on site at the time of inspection (e.g., approved plan set, permit card, SolarAPP+ approval printout); only the cross-agency sign-off requirement on the permit card was found, not a full on-site-documents list.

https://www.ci.richmond.ca.us/4804/iMS-Permit-Inspections

Q59 Is there a re-inspection fee? Corrections & re-inspection

$203 (Re-Inspection Fee Per Address, approved fee effective 1-Jul-2025) under the Building/Community Development section of the Master Fee Schedule.

Why the confidence is not higherMaster Fee Schedule line item under the 'CD - Bldng Reg's, Permits' section, alongside other Building Division admin fees; Ordinance 01-26 §109.7 separately authorizes the Building Official to assess a reinspection fee 'in accordance with the fee schedule adopted by the City' — confirms this is the applicable line, though the fee schedule does not label it 'solar-specific.'

fee schedule checked 2026-08-30 https://www.ci.richmond.ca.us/DocumentCenter/View/76881/Adopted-Master-Fee-Schedule-Approved-June-2025-PDF

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedOrdinance 01-26 §109.7 states a reinspection fee applies when work is not complete or corrections are not made, and that no further inspection occurs until fees are paid, but no City page was found describing the actual correction-notice workflow (e.g., a red-tag/correction-list format or how corrections are formally communicated and cleared).

https://mcclibraryfunctions.azurewebsites.us/api/ordinanceDownload/16579/1412681/pdf

Q61 What is issued on pass? Core Final sign-off & PTO

Final (Building Division final inspection approval on the permit); no standalone 'green tag' or separate 'Certificate of Occupancy' terminology was found for solar-only permits (a CofO is a separately-fee'd item in the Master Fee Schedule, listed as 'requested separate from orig. permit,' suggesting it is not automatically issued for a solar retrofit).

Why the confidence is not higherInferred from the iMS 'final inspection' sign-off language and the CofO fee line in the Master Fee Schedule; no explicit 'what is issued for solar permits specifically' statement was found.

department page checked 2026-08-30 https://www.ci.richmond.ca.us/4804/iMS-Permit-Inspections

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/applicant — PG&E's Greenbook describes the interconnection/NEM process in terms of the 'applicant' submitting the Rule 21 application and needing to show AHJ permit/final-inspection compliance before PG&E will connect service; no Richmond page states that the City itself notifies PG&E on the customer's behalf.

Why the confidence is not higherInferred from PG&E Greenbook §1.11 and §6.1-6.3 applicant-centric language; not a single sentence stating 'the installer notifies PG&E for PTO.'

utility interconnection manual checked 2026-08-30 https://www.pge.com/assets/pge/docs/account/service-requests/greenbook-manual-full.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Richmond against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Richmond is the authority having jurisdiction 90% confidence
Holds
building and electrical
Why not higher
Richmond is an incorporated California city inside Contra Costa County. RMC 6.02.030 (Ord. 01-26 N.S., §103.1) creates the Building Division of the Community Development Department as the enforcement agency for building and electrical permits; the City's own Building Regulations Permit Application covers both trades on one form. Fire prevention plan review/inspection is handled by Richmond's OWN Fire Department (Fire Prevention Services Division, Chief Aaron Osorio, 440 Civic Center Plaza) — confirmed this is NOT delegated to the Contra Costa County Fire Protection District; Richmond is not one of CCCFPD's member jurisdictions and runs a full-service municipal fire department, so the Concord-style CCCFPD-to-city delegation arrangement (checked for this run per brief) does not apply — Richmond needs no such delegation because it already holds fire authority itself. Contra Costa County's own building department has no jurisdiction inside incorporated Richmond.

https://www.ci.richmond.ca.us/2099/Building-Division

Permit required
Yes95%
Permit cost
$450 flat ("Solar Structure - Residential System"), approved fee effective 1-Jul-2025.90%
Plan review
Instant/same-day approval for SolarAPP+-eligible systems via the automated code-compliance engine.55%
Portal
iMS — the City's permitting/inspection portal (replaced eTRAKiT); SolarAPP+ is used specifically for automated review and instant permitting of eligible residential rooftop PV,90%
Electrical code
2023 NEC, incorporated as the California Electrical Code (Title 24, Part 3) as part of the 2025 California Building Standards Code cycle adopted by Richmond via Ordinance 01-26 N.S.70%
Own placard wording
Yes — the Standard Plan reproduces the exact CEC-mandated placard wording (e.g., 'WARNING PHOTOVOLTAIC POWER SOURCE',85%
Booking an inspection
Portal (iMS) or Phone (510-447-1156, touch-tone automated menu) or Text (866-535-4016, keyword commands SCHEDULE/RESCHEDULE/CANCEL/RESULTS).90%
Labels & placards for this authority

City of Richmond writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.

Wording 85%

Yes — the Standard Plan reproduces the exact CEC-mandated placard wording (e.g., 'WARNING PHOTOVOLTAIC POWER SOURCE', 'WARNING DUAL POWER SOURCES...') as the template the City expects to be installed verbatim.

Size, colour & material 85%

Guidance, not a hard local mandate: the Standard Plan cites ANSI Z535.4 for label design and states 'a phenolic plaque with contrasting colors between text and background would meet the intent of the code,' with '20 point (3/8") should be considered the minimum' letter height; no type size is strictly mandated.

Where they go 85%

At the inverter, at each junction/combiner box and along conduit runs (every 10 ft), and at the PV AC and DC disconnects per the City's Standard Plan; additionally, per PG&E, on the metering equipment itself whenever a supply-side/line-side-tap AC disconnect is used.

What the utility wants on top 85%

Yes — PG&E's Greenbook (TD-7001M-06, §6.3) requires an engraved placard/signage on the metering equipment indicating a line/supply-side connection whenever a fusible AC disconnect is installed ahead of the customer's main breaker.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Contra Costa County
Regions served
1
Regions covered
City of Richmond · city
Solar Requirements
Authority Contact
Address
450 Civic Center Plaza, 2nd Floor, Richmond, CA 94804
Main Phone
510-620-6868
Building Department
Department
Building Division
Direct Phone
510-620-6868
Booking & Scheduling
Preferred channel
online
Notes
Solar installers use SolarAPP+ (https://solarapp.nrel.gov/) for residential roof-mounted PV; an instant permit is issued when contractor CSLB license and city business tax certificate are current and correct docs uploaded to iMS. After permit issuance, schedule the final inspection via: (1) iMS online portal at https://ims.ci.richmond.ca.us/ims — requires valid permit number; (2) automated phone system at 510-447-1156 (touch-tone prompts); or (3) text 866-535-4016 (send "SCHEDULE"). For final inspection, other agency sign-offs (Fire, Planning, Health, Engineering, Sanitary Districts) must be on the permit card before the Building Division final can be scheduled. Permit counter hours: Mon–Thu 8:30 am–4:00 pm, Fri 9:00 am–12:30 pm. Spanish-language support: 510-620-6705. (collected Jul 2026)