City of San Dimas

Los Angeles County

Verified Aug. 4, 2026

City of San Dimas is a city authority in the State of California, serving 34,924 residents. 1,602 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — 3 business days Q18 Where you file — SolarAPP+ (gosolarapp.org) for eligible ≤10kW residential rooftop PV, feeding into the city's own Accela Citizen Access-based 'San Dimas Permit Center'… Q20

Permit required
Yes98% source
What it costs
Approximately $410 flat ($460 if the project includes a service/panel upgrade); confirmed by two actual issued permits: $418.90 total (Solar Permit Fee $406.00 + $12.90 Plan Maintenance Fee, SFR,88% source
Plan review turnaround
3 business days95% source
Key document
municipal code cited by 7 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · authority's own page
    • What does this authority permit itself, and what does it delegate? Both 90% · published bulletin
    • Is a permit required for a residential rooftop PV system? Yes 98% · municipal code
    • Is there a separate electrical permit, or is it combined? Combined 88% · published bulletin
    • Is a HOA or architectural approval required first? No (not HOA-conditioned for solar specifically) — but a Planning Division check IS required for solar, and is limited to a non-discretionary administrative review unless the Director finds a specific, adverse health/safety impact. 80% · municipal code
    • Is there a historic-district review? Yes, but only for properties on the City's Historic Inventory List 70% · municipal code
    • Is a wind or windstorm certification required? No 70% · municipal code
    • Is a Specific Use Permit or Council approval ever required? Only exceptionally: the Community Development Director may require discretionary 'director's review' under SDMC Ch. 18.12 (Development Plan Review) if the Director finds, based on substantial evidence, that the solar system 'could have a specific, adverse impact upon the public health and safety.' No Conditional/Specific Use Permit or City Council hearing is required for a qualifying expedited-path system. 85% · municipal code
    • Is there a system-size cap on residential generation? 10 kW AC nameplate (or 30 kW thermal) is the codified cap for the expedited/standard-plan path, on a single- or duplex-family dwelling not exceeding the maximum legal building height. Both the Central/String and Microinverter/ACM Standard Plans additionally cap the AC service panel busbar at 225A (120/240V single-phase). No separate zoning-code kW ceiling was found. 92% · municipal code
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? (1) Completed PV Permit Application; (2) completed Eligibility Checklist for Expedited Roof Top Solar PV Permitting; (3) a completed Standard Electrical Plan (Central/String or Microinverter/ACM version) OR a custom one-line electrical plan with disconnect locations, module/string/inverter counts, make/model, grounding/bonding, conductor/conduit sizing, battery info if any, equipment cut sheets, and CEC 690/705 labeling; (4) a roof plan showing layout, fire-safety access pathways, fire classification and label locations; (5) a completed Structural Criteria checklist (or PE/SE-stamped structural calcs if it fails). 95% · published bulletin
    • How many copies, and in what format? Electronic PDF upload via SolarAPP+ then the City's Accela-based 'Permit Center' (sandimasca.gov/PermitCenter) for the standard ≤10kW rooftop path; no page-count/paper-copy requirement is published for solar specifically (contrast: the generic Plan Checking page calls for 'three sets of plans' for ordinary building permits, but the Solar Permit Center page describes an all-electronic SolarAPP+→Permit Center workflow instead). 65% · authority's own page
    • Is a site plan required, and what must it show? Yes — a site diagram showing panel arrangement (roof or ground), north arrow, lot dimensions, and distances from property lines to adjacent buildings/structures (existing and proposed); plus a separate roof plan showing roof layout, PV panels, approximate roof-access point, code-compliant access pathways, PV fire classification, and locations of all required labels/markings. 95% · published bulletin
    • Is a one-line / three-line diagram required? Yes 95% · published standard plan
    • Are string and conductor calculations required? Yes 92% · published standard plan
    • Is a structural PE stamp required, and at what threshold? Not required if a completed 'Structural Criteria' pre-installation checklist passes (flush-mounted array, panel+support weight ≤4 psf, ≤half of total roof area, rafter spans within the published table); a project-specific structural calculation stamped and signed by a CA-licensed Civil or Structural Engineer IS required if any checklist item fails. 82% · published checklist
    • Is an electrical PE stamp required, and at what threshold? No electrical PE stamp threshold is published anywhere in the city's solar documents; the only professional-stamp requirement found is the structural (Civil/Structural PE) stamp for non-qualifying roof structures. 70% · published bulletin
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? SolarAPP+ (gosolarapp.org) for eligible ≤10kW residential rooftop PV, feeding into the city's own Accela Citizen Access-based 'San Dimas Permit Center' (sandimasca.gov/PermitCenter) for city-side application, upload and payment; ground-mount and commercial PV are NOT eligible for SolarAPP+ and must call Building Division directly. 93% · authority's own page
    • Can the whole application be completed online? Yes 88% · authority's own page
    • What does a residential solar permit cost? Approximately $410 flat ($460 if the project includes a service/panel upgrade); confirmed by two actual issued permits: $418.90 total (Solar Permit Fee $406.00 + $12.90 Plan Maintenance Fee, SFR, 2022) and $477.40 total (Solar Permit Fee $409.84 + fees, ADU, 2024). 88% · published fee bulletin + sample permits
    • How is the fee calculated? Flat 75% · sample issued permit
    • Is there a separate plan-check fee? Yes 85% · sample issued permit
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 3 business days 95% · municipal code
    • How long is an issued permit valid before it expires? 1 year to commence work from date of issuance (locally amended from the CBC-standard 180 days), extendable once by up to 180 additional days for good cause; if no inspection passes at least every 6 months the permit lapses and a new permit/fee is required. 85% · municipal code
    • Which utility handles interconnection here? Southern California Edison (SCE) 90% · authority's own page

28 questions answered against City of San Dimas’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherCity of San Dimas Building and Safety Division (245 E Bonita Ave) is the local building/electrical permitting authority for residential rooftop PV; codified at SDMC Ch. 15.06 (Expedited Permitting Process for Small Residential Rooftop Solar Energy Systems) and confirmed on the city's own Codes and Solar Permit Center pages.

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/codes.php

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherCity permits and inspects building+electrical for rooftop PV itself (issues a single 'Combination Solar Permit'); it delegates only the narrow fire-code slice (ESS >3kWh, disconnect/rapid-shutdown placarding, a narrow BIPV subcategory) to LA County Fire Dept (LACoFD), its contract fire agency. Confirmed from San Dimas's own bulletin plus LACoFD's own current SB-379/PV-ESS page.

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherSDMC §15.06.030: 'This chapter applies to the permitting of all small residential rooftop solar energy systems in the city.' Routine O&M with no structural change is the only exemption.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherCity's own Submittal Requirements Bulletin: 'The following permits are required to install a roof top solar PV system... a) A Combination Solar Permit' — one permit covers building+electrical for qualifying (≤10kW) systems.

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either

Why the confidence is not higherCity's own PV Permit Application form lets the 'Applicant Relationship' be Owner, Contractor, Architect or Other, and collects a separate contractor license#/class field only when a contractor is used — indicating either a licensed contractor or the owner may be the applicant/permittee. No SDMC section restricts the electrical permit to a licensed electrician specifically.

permit application form checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Assembly%20Bill%202234/PV%20PERMIT%20APPLICATION%2005-2025.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherCity's own PV Permit Application form has a dedicated 'SAN DIMAS BUSINESS LICENSE #' field for the contractor, indicating the contractor must hold/provide a city business license at time of application. No separate 'contractor registration' program beyond the business license was found.

permit application form checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Assembly%20Bill%202234/PV%20PERMIT%20APPLICATION%2005-2025.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherThe city's own PV Permit Application form offers 'Owner' as an Applicant Relationship option (alongside Contractor/Architect/Other), implying owner-builder self-permitting is accepted as it is for other CA owner-builder permits; no SDMC section explicitly discusses homeowner self-installation of the electrical work, so this is an inference from the form rather than an explicit statement.

permit application form checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Assembly%20Bill%202234/PV%20PERMIT%20APPLICATION%2005-2025.pdf

Q8 What documents make up a complete submittal? Core Submittal package

(1) Completed PV Permit Application; (2) completed Eligibility Checklist for Expedited Roof Top Solar PV Permitting; (3) a completed Standard Electrical Plan (Central/String or Microinverter/ACM version) OR a custom one-line electrical plan with disconnect locations, module/string/inverter counts, make/model, grounding/bonding, conductor/conduit sizing, battery info if any, equipment cut sheets, and CEC 690/705 labeling; (4) a roof plan showing layout, fire-safety access pathways, fire classification and label locations; (5) a completed Structural Criteria checklist (or PE/SE-stamped structural calcs if it fails).

Why the confidence is not higherCity's own 'Submittal Requirements Bulletin – Solar Photovoltaic Roof Top Installations 10 kW or Less' (dated 2023-08-21, still hosted live) itemizes the full package under 'Submittal Requirements.'

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q9 How many copies, and in what format? Submittal package

Electronic PDF upload via SolarAPP+ then the City's Accela-based 'Permit Center' (sandimasca.gov/PermitCenter) for the standard ≤10kW rooftop path; no page-count/paper-copy requirement is published for solar specifically (contrast: the generic Plan Checking page calls for 'three sets of plans' for ordinary building permits, but the Solar Permit Center page describes an all-electronic SolarAPP+→Permit Center workflow instead).

Why the confidence is not higherCity's own Solar Permit Center page describes the SolarAPP+ + Permit Center upload workflow; the 'three sets' language is from the generic (non-solar) Plan Checking page, so it is unclear whether it still applies to solar.

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/online_permit_center.php

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — a site diagram showing panel arrangement (roof or ground), north arrow, lot dimensions, and distances from property lines to adjacent buildings/structures (existing and proposed); plus a separate roof plan showing roof layout, PV panels, approximate roof-access point, code-compliant access pathways, PV fire classification, and locations of all required labels/markings.

Why the confidence is not higherCity's own Submittal Requirements Bulletin, items 2(c) and 2(d).

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherBoth the Central/String and Microinverter/ACM 'Solar PV Standard Plan — Simplified' documents are themselves fillable single-line diagrams (Single-Line Diagram #1/#2 for central/string; branch-circuit diagram for microinverter/ACM), and the Submittal Requirements Bulletin requires a 'one-line diagram of system' for non-standard-plan submittals.

published standard plan checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/checklist.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Yes

Why the confidence is not higherStandard Plan (Simplified) requires source-circuit/string counts, conductor size/type/conduit fill tables (CEC Table 310.15), max system DC voltage, and OCPD sizing calculations (CEC 690.7, 690.8, 705.12(D)(2)); the Bulletin also requires conductor/conduit type and size for custom (non-standard-plan) electrical plans.

published standard plan checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/checklist.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Not required if a completed 'Structural Criteria' pre-installation checklist passes (flush-mounted array, panel+support weight ≤4 psf, ≤half of total roof area, rafter spans within the published table); a project-specific structural calculation stamped and signed by a CA-licensed Civil or Structural Engineer IS required if any checklist item fails.

Why the confidence is not higherCity's own Structural Criteria form and Submittal Requirements Bulletin item 2(e); the Structural Criteria PDF is San Dimas's own branded document but is dated 2015 and cites the 2013 CBC/CRC cycle, so the specific psf/table values may be stale relative to the now-adopted 2025 CBC/CRC — flagged as a code-cycle lag.

published checklist checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/structural-criteria.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

No electrical PE stamp threshold is published anywhere in the city's solar documents; the only professional-stamp requirement found is the structural (Civil/Structural PE) stamp for non-qualifying roof structures.

Why the confidence is not higherSearched the Submittal Requirements Bulletin and both Standard Plan documents for 'P.E.', 'professional engineer' and 'electrical engineer' — the only 'stamped and signed' requirement found is structural, not electrical.

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q15 What does a residential solar permit cost? Core Fees

Approximately $410 flat ($460 if the project includes a service/panel upgrade); confirmed by two actual issued permits: $418.90 total (Solar Permit Fee $406.00 + $12.90 Plan Maintenance Fee, SFR, 2022) and $477.40 total (Solar Permit Fee $409.84 + fees, ADU, 2024).

Why the confidence is not higherCity's own 2023-08-21 Submittal Requirements Bulletin states the approximate cost; cross-checked against two of the city's own sample issued solar permits (SFR 2022, ADU 2024) published on its AB 2234 page, both landing at ~$406–410 for the 'Solar Permit Fee' line. The bulletin is not the newest possible fee document (no separate 'solar' line item was found in the FY26-27 Master Fee Schedule, which prices Building fees by valuation instead), so this is treated as the best-published, cross-corroborated figure rather than a current line-item lookup.

published fee bulletin + sample permits checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q16 How is the fee calculated? Core Fees

Flat

Why the confidence is not higherThe bulletin and both sample issued permits show a single 'Solar Permit Fee' line (~$406-410) rather than a per-kW/per-panel/valuation calculation for the qualifying (≤10kW) expedited path; the city's general (non-solar) Building fee schedule is otherwise valuation-tiered (SDMC 15.020.020), so this may only hold for the expedited solar path.

sample issued permit checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Assembly%20Bill%202234/SFRSolarPermit.pdf

Q17 Is there a separate plan-check fee? Fees

Yes

Why the confidence is not higherBoth sample issued permits list a separate 'Plan Maintenance Fee' ($12.90 / $14.28) and the ADU permit adds a 'General Plan Maintenance Fee' ($40.98) and 'Technology Fee' ($12.30) on top of the Solar Permit Fee line — i.e., plan-check/maintenance fees are itemized separately from the permit fee itself.

sample issued permit checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Assembly%20Bill%202234/Solar%20Permit%20Redacted.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

3 business days

Why the confidence is not higherBoth the codified ordinance (SDMC §15.06.060(B)(2): 'shall issue a non-discretionary permit within three business days of the filing of the application') and the city's Submittal Requirements Bulletin ('Permits should be reviewed in THREE days') agree.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q19 How long is an issued permit valid before it expires? Timeline & validity

1 year to commence work from date of issuance (locally amended from the CBC-standard 180 days), extendable once by up to 180 additional days for good cause; if no inspection passes at least every 6 months the permit lapses and a new permit/fee is required.

Why the confidence is not higherSDMC §15.02 (Uniform Administrative Code amendments, amending CBC §105.5) sets 1-year commencement + one 180-day extension; the city's Inspections FAQ page states the same 1-year/6-month rule. Note: the generic boilerplate printed on the city's own sample issued permits instead reads '180 days,' which appears to be stale template language that predates or was not updated for this amendment — flagging the conflict rather than resolving it.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q20 Which permit portal does this authority use? Core Portal & process

SolarAPP+ (gosolarapp.org) for eligible ≤10kW residential rooftop PV, feeding into the city's own Accela Citizen Access-based 'San Dimas Permit Center' (sandimasca.gov/PermitCenter) for city-side application, upload and payment; ground-mount and commercial PV are NOT eligible for SolarAPP+ and must call Building Division directly.

Why the confidence is not higherCity's own Solar Permit Center page describes the two-step SolarAPP+ → Permit Center process; the Permit Center's underlying booking/inspection portal is Accela (aca-prod.accela.com/SANDIMAS) per the Inspections page link.

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/online_permit_center.php

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherFor eligible ≤10kW residential rooftop PV: design/plans and fee payment happen in SolarAPP+, then upload of approved SolarAPP+ documents plus payment of the City's solar permit fee happens in the City's own online Permit Center account — the whole process is described as online end-to-end, with the approved permit emailed back. Ground-mount/commercial PV is explicitly excluded from this online path.

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/online_permit_center.php

Q22 Which utility handles interconnection here? Core Utility interconnection

Southern California Edison (SCE)

Why the confidence is not higherCity's own AB 2234 'Other Agency Reviews' list for building permits names 'Southern California Edison (SCE)' (alongside Golden State Water District and SoCalGas) as the relevant utility for San Dimas. Not sourced from PowerToChoose.

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/assembly_bill_2234.php

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Nothing published by this authority.

Where we lookedSCE's own DG/interconnection pages (sce.com/business/generating-your-own-power/newly-approved-generation and /interconnections both 404; the live 'Grid Interconnections' page at sce.com/clean-energy-efficiency/solar-generating-your-own-power/solar-power-basics/grid-interconnections returned 200 but rendered no procedural sequence text in the fetched HTML). Also checked San Dimas's own Solar Permit Center and Submittal Requirements Bulletin, neither of which states where SCE sits relative to permit issuance.

https://www.sce.com/clean-energy-efficiency/solar-generating-your-own-power/solar-power-basics/grid-interconnections

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No (not HOA-conditioned for solar specifically) — but a Planning Division check IS required for solar, and is limited to a non-discretionary administrative review unless the Director finds a specific, adverse health/safety impact.

Why the confidence is not higherSDMC §15.06.060(F): 'Approval of an application shall not be conditioned upon the approval of an association' — directly overriding the city's generic (non-solar) Plan Checking guidance that 'If your neighborhood has a Homeowner's Association (HOA), then you'll need to get their approval stamp on plans before submittal.' The city's own Submittal Requirements Bulletin separately confirms 'Planning review IS required for solar PV installations of this size,' and §15.06.060(C) limits that review to a discretionary 'director's review' only where a specific adverse impact is found.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q25 Is there a historic-district review? Overlays & special cases

Yes, but only for properties on the City's Historic Inventory List

Why the confidence is not higherSDMC Title 18 (Development Plan Review, §18.12) lists 'Additions and structural modifications to residential and nonresidential structures on the City's historic inventory list' and 'designated historic structures' as requiring review; nothing PV-specific was found for historic properties, so this is the generic historic-alteration review rather than a solar-specific rule.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=43697022

Q26 Is a wind or windstorm certification required? Overlays & special cases

No

Why the confidence is not higherNo wind/windstorm certification requirement was found anywhere in the Submittal Requirements Bulletin, the Standard Plan documents, or SDMC Title 15/18; SDMC §15.06.060(A)(1) requires only a general engineering evaluation for wind/seismic/dead/live loads as part of the structural check, not a separate windstorm certificate (this is a CA jurisdiction; TDI-style wind certification is a Texas coastal concept).

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Only exceptionally: the Community Development Director may require discretionary 'director's review' under SDMC Ch. 18.12 (Development Plan Review) if the Director finds, based on substantial evidence, that the solar system 'could have a specific, adverse impact upon the public health and safety.' No Conditional/Specific Use Permit or City Council hearing is required for a qualifying expedited-path system.

Why the confidence is not higherSDMC §15.06.060(C)-(D).

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q28 Is there a system-size cap on residential generation? Overlays & special cases

10 kW AC nameplate (or 30 kW thermal) is the codified cap for the expedited/standard-plan path, on a single- or duplex-family dwelling not exceeding the maximum legal building height. Both the Central/String and Microinverter/ACM Standard Plans additionally cap the AC service panel busbar at 225A (120/240V single-phase). No separate zoning-code kW ceiling was found.

Why the confidence is not higherSDMC §15.06.020 definition of 'Small residential rooftop solar energy system' (≤10kW AC / 30kW thermal); the two Standard Plan documents corroborate the 225A busbar limit. Checked SDMC Title 18 (Zoning) for a separate zoning-based kW cap and found none (control: 'building' appears 1,087 times, fabricated 'zzqqx' 0 times in the same extracted text) — this is the only cap found, not a second, conflicting one.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 92% · municipal code
    • Which building code edition is in force? 2025 California Building Code (based on the 2024 International Building Code), adopted by Ordinance 1275/1331; mandatory for all project plans from 1 Jan 2026. 95% · authority's own page
    • Which fire code edition is in force? City's own Municipal Code: 2025 California Fire Code, based on the 2024 International Fire Code (SDMC §15.51.010). NOTE — this lags/differs from LA County Fire Department's own current operative PV/ESS guidance, which as of this check still cites 'the 2023 edition of the Los Angeles County Fire Code (LACFC), a locally amended version of the 2022 California Fire Code' (LACoFD documents dated 2023-09-01, still the live version on LACoFD's own site). 88% · municipal code + LACoFD's own operative guide
    • Are there local amendments to any of the above? Yes 90% · municipal code
    • What is the installation judged against? The 2025 CEC (based on the 2023 NEC), 2025 CBC/CRC (based on the 2024 IBC/IRC) and the 2025 CFC (based on the 2024 IFC), all as locally amended by SDMC Title 15, plus SDMC Ch. 15.06's own PV-specific requirements and LACoFD's retained fire-code scope over disconnects/placarding and ESS >3kWh. 90% · municipal code
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Modules must be set back a minimum of 12 inches from all roof edges (eave and rake/ridge); clear, code-compliant access pathways and the approximate roof-access point must be diagrammed on the roof plan per the CA State Fire Marshal's Solar PV Installation Guide; LACoFD (fire) additionally requires the roof plan show PV fire classification and label locations. No additional San Dimas-specific ridge setback beyond the 12" figure was found. 88% · published checklist
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, to the 2025 CEC (based on the 2023 NEC), i.e., NEC 2023 Article 690.12 rapid-shutdown requirements apply. Note: this specific citation ('690.12') was NOT found anywhere in San Dimas's own PV documents — its Standard Plans and Submittal Requirements Bulletin instead cite the older 705.12(D)(4)/690.53/690.54/690.35/690.5(C)/690.17 label sections (2016-cycle CEC numbering) without ever mentioning 690.12 rapid shutdown by section number. 70% · published standard plan (absence proven by corpus grep)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? At the service equipment (AHJ/fire scope): LACoFD's placard system for ALL power-source disconnects — 'F.D. – ELECTRICAL / BLDG DISCONNECT / #X of Y'. At the PV/inverter equipment itself (CEC 690/705, per the city's own Standard Plan labeling page): DC disconnect warning label, AC disconnect (PV System AC Disconnect) label, inverter-output-OCPD 'do not relocate' warning, dual-power-source warning, ground-fault warning, shock-hazard/terminal warnings, and a CEC 705.12 permanent power-source directory/plaque. 90% · AHJ's own current guide
    • Does the authority specify placard wording of its own? Yes 92% · AHJ's own current guide
    • Does it specify letter height, colour or material? LACoFD disconnect placards: exterior placard minimum 2" tall x 3.5" wide, weather-resistant plastic, verbiage engraved; panel-interior placard minimum 7/16" tall x 3/4" wide; red letters engraved into a yellow background; Arial font, all-capitals, solid, minimum size 24 (28 bold for 'F.D.' and '#X of Y'); attached with permanent, weather/surface-compatible epoxy. The city's own CEC-690/705 warning labels do not specify letter height/color/material beyond an informational note suggesting a phenolic plaque with contrasting colors and a minimum ~20-point (3/8") type size. 93% · AHJ's own current guide
    • Is a site plan / facility map placard required, and what must it show? Yes — the roof plan required with every solar submittal functions as the facility/site map: it must show roof layout, all panel/module locations, the approximate roof-access point, code-compliant clear access pathways, PV fire classification, and the location of every required label/marking (per CEC 705.10 and the State Fire Marshal's Solar PV Installation Guide). 90% · published bulletin
    • Where must the labels be placed? At the main/utility service panel and at every power-source disconnect: LACoFD requires its placards on the exterior wall (within 6 ft of the main service panel, same wall plane) and inside the panel identifying specific switches/breakers; the city's Standard Plan requires CEC 690/705 labels at the inverter, at the AC and DC disconnects, and at junction/combiner boxes and conduit (marked every 10 feet per CRC R331.2/CFC 605.11.1). 88% · AHJ's own current guide
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Per LACoFD's retained fire-code scope (which the city's own solar process defers to for disconnect placement): the electrical disconnection means and rapid-shutdown activation device for every power source (including PV) must be on the exterior, within 6 feet of the main service panel, on the same wall plane, and not separated from the main panel by walls, gates, fences, vegetation or architectural features (2023 LACFC §509.3). Only case-by-case exceptions require case-specific signage per the fire code official. 82% · AHJ's own current checklist
    • Must equipment be on a specific approved list? Yes 85% · published standard plan
    • Are batteries permitted, and under what conditions? Not permitted on the city's expedited/Standard-Plan solar path — the Eligibility Checklist requires the system be 'utility interactive and without battery storage' to qualify for expedited review. Batteries/ESS ARE permitted under the full (non-expedited) permit process subject to the 2025 CRC/CEC and LACoFD's ESS rules: UL 9540 listing, 20 kWh max per unit, 80 kWh aggregate cap per site/location, 3 ft unit-to-unit spacing, 3–10 ft setbacks from openings/lot lines/vegetation, impact protection where subject to vehicle impact, and detection/notification if installed in an attached garage. 85% · published checklist + AHJ's own current guide
    • Is there a separate ESS permit or inspection? Yes 85% · permit application form + AHJ's own fee ordinance
    • Is a ground mount treated as a structure? Yes 90% · municipal code
    • Is there a local rule on service upgrades or busbar sizing? Yes — the Standard Plan (Simplified) caps eligible service panels at a 225A bus bar (single-phase 120/240V) and gives the CEC 705.12(D)(2) 120%/100% rule table for combined PV+main OCPD sizing; no separate San Dimas-specific main-breaker-derating or service-upgrade ordinance beyond the CEC itself was found. 85% · published standard plan
    • Is a specific mounting system or attachment spacing required? Yes, for the flush-mount expedited path: modules must be parallel to and within 2"–10" of the roof surface, weigh ≤4 psf (PV) / ≤5 psf (thermal) including support, cover ≤half the total roof area, with rafter spacing/span checked against a published table; anchor spacing per the manufacturer's/racking evaluation report. The city's separate Solar Permit Center page also states a City preference for flush-mount, ≤6" standoff height. Non-qualifying arrays need PE/SE-stamped project-specific structural calcs. 85% · published checklist

20 questions answered against City of San Dimas’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023

Why the confidence is not higherSDMC §15.44.010: 'the California Electrical Code, 2025 Edition, based on the 2023 National Electrical Code... shall be and become the Electrical Code of the city of San Dimas.' Effective for plans submitted from 1 Jan 2026 per the Codes page banner.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Code (based on the 2024 International Building Code), adopted by Ordinance 1275/1331; mandatory for all project plans from 1 Jan 2026.

Why the confidence is not higherSDMC §15.04.010 and the city's own Codes page banner: 'STARTING JANUARY 1, 2026 THE CITY OF SAN DIMAS WILL ONLY ACCEPT PROJECT PLANS THAT ARE DESIGNED BASED ON THE 2025 CALIFORNIA CODES.'

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/codes.php

Q31 Which fire code edition is in force? Code editions in force

City's own Municipal Code: 2025 California Fire Code, based on the 2024 International Fire Code (SDMC §15.51.010). NOTE — this lags/differs from LA County Fire Department's own current operative PV/ESS guidance, which as of this check still cites 'the 2023 edition of the Los Angeles County Fire Code (LACFC), a locally amended version of the 2022 California Fire Code' (LACoFD documents dated 2023-09-01, still the live version on LACoFD's own site).

Why the confidence is not higherCity of San Dimas Municipal Code §15.51.010 vs. LACoFD's own Expedited PV/ESS Permitting checklist and Guide (both dated 2023-09-01) — flagging the code-cycle lag between the city's nominal Fire Code adoption and the fire code edition LACoFD's own field documents still cite, rather than resolving it.

municipal code + LACoFD's own operative guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes

Why the confidence is not higherSDMC Title 15 carries the city's own local amendments to the Building Code (Appendix J grading, NPDES stormwater, reroofing in the 'Severely High Fire Zone'), the Residential Code (workmanship, reinspection fee, Swimming Pool Safety Act appendix), and its own free-standing solar-specific chapter (15.06); by contrast, its Fire Code chapter (15.51) has an adoption section only with NO local amendments (checked directly — no §15.51.020 exists).

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q33 What is the installation judged against? Core Electrical

The 2025 CEC (based on the 2023 NEC), 2025 CBC/CRC (based on the 2024 IBC/IRC) and the 2025 CFC (based on the 2024 IFC), all as locally amended by SDMC Title 15, plus SDMC Ch. 15.06's own PV-specific requirements and LACoFD's retained fire-code scope over disconnects/placarding and ESS >3kWh.

Why the confidence is not higherSDMC §§15.04.010, 15.44.010, 15.50.010, 15.51.010; SDMC §15.06.040(C): PV systems 'shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories.'

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Yes — the Standard Plan (Simplified) caps eligible service panels at a 225A bus bar (single-phase 120/240V) and gives the CEC 705.12(D)(2) 120%/100% rule table for combined PV+main OCPD sizing; no separate San Dimas-specific main-breaker-derating or service-upgrade ordinance beyond the CEC itself was found.

Why the confidence is not higherCity's own Solar PV Standard Plan — Simplified (both Central/String and Microinverter/ACM versions).

published standard plan checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/checklist.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Yes, for the flush-mount expedited path: modules must be parallel to and within 2"–10" of the roof surface, weigh ≤4 psf (PV) / ≤5 psf (thermal) including support, cover ≤half the total roof area, with rafter spacing/span checked against a published table; anchor spacing per the manufacturer's/racking evaluation report. The city's separate Solar Permit Center page also states a City preference for flush-mount, ≤6" standoff height. Non-qualifying arrays need PE/SE-stamped project-specific structural calcs.

Why the confidence is not higherCity's own Structural Criteria form (2015, cites 2013 CBC/CRC — flagged as a stale code-cycle reference) and the Solar Permit Center page's 'Planning Division Requirements.'

published checklist checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/structural-criteria.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Modules must be set back a minimum of 12 inches from all roof edges (eave and rake/ridge); clear, code-compliant access pathways and the approximate roof-access point must be diagrammed on the roof plan per the CA State Fire Marshal's Solar PV Installation Guide; LACoFD (fire) additionally requires the roof plan show PV fire classification and label locations. No additional San Dimas-specific ridge setback beyond the 12" figure was found.

Why the confidence is not higherCity's own Submittal Requirements Bulletin item 2(d) and Solar Permit Center 'Planning Division Requirements' (both give the 12-inch figure); Photovoltaic-Submittals.pdf project-info sheet repeats the 12-inch eave/rake setback and adds a ≤6-inch module-height-above-roof-deck rule.

published checklist checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/Photovoltaic-Submittals.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, to the 2025 CEC (based on the 2023 NEC), i.e., NEC 2023 Article 690.12 rapid-shutdown requirements apply. Note: this specific citation ('690.12') was NOT found anywhere in San Dimas's own PV documents — its Standard Plans and Submittal Requirements Bulletin instead cite the older 705.12(D)(4)/690.53/690.54/690.35/690.5(C)/690.17 label sections (2016-cycle CEC numbering) without ever mentioning 690.12 rapid shutdown by section number.

Why the confidence is not higherCorpus-wide grep of every downloaded San Dimas PV PDF (checklist.pdf, SolarMicroinverter.pdf, submittal-req.pdf, SolarRequirements Final.pdf, structural-criteria.pdf, Photovoltaic-Submittals.pdf) for '690.12' and 'rapid shutdown' returned zero hits for either term — rapid shutdown is required by the adopted 2023 NEC itself, but the city's own published PV materials never cite the specific section, which is worth flagging rather than assuming full alignment.

published standard plan (absence proven by corpus grep) checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/checklist.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

At the service equipment (AHJ/fire scope): LACoFD's placard system for ALL power-source disconnects — 'F.D. – ELECTRICAL / BLDG DISCONNECT / #X of Y'. At the PV/inverter equipment itself (CEC 690/705, per the city's own Standard Plan labeling page): DC disconnect warning label, AC disconnect (PV System AC Disconnect) label, inverter-output-OCPD 'do not relocate' warning, dual-power-source warning, ground-fault warning, shock-hazard/terminal warnings, and a CEC 705.12 permanent power-source directory/plaque.

Why the confidence is not higherLACoFD's own Guide for ESS, PV & Disconnects (Appendix B, 2023-09-01) for the exterior/panel-interior disconnect placards; City of San Dimas's own Solar PV Standard Plan — Simplified 'Markings' page for the CEC 690/705 equipment labels.

AHJ's own current guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Yes

Why the confidence is not higherLACoFD specifies exact verbiage for its disconnect placard ('F.D. – ELECTRICAL / BLDG DISCONNECT / #X of Y'); the city's own Standard Plan specifies the exact wording for each CEC 690/705 warning label (e.g., 'WARNING — ELECTRIC SHOCK HAZARD...', 'PV SYSTEM AC DISCONNECT — RATED AC OUTPUT CURRENT...').

AHJ's own current guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

LACoFD disconnect placards: exterior placard minimum 2" tall x 3.5" wide, weather-resistant plastic, verbiage engraved; panel-interior placard minimum 7/16" tall x 3/4" wide; red letters engraved into a yellow background; Arial font, all-capitals, solid, minimum size 24 (28 bold for 'F.D.' and '#X of Y'); attached with permanent, weather/surface-compatible epoxy. The city's own CEC-690/705 warning labels do not specify letter height/color/material beyond an informational note suggesting a phenolic plaque with contrasting colors and a minimum ~20-point (3/8") type size.

Why the confidence is not higherLACoFD Guide for ESS, PV & Disconnects, Appendix B (2023-09-01); City of San Dimas Solar PV Standard Plan — Simplified, Markings page.

AHJ's own current guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Yes — the roof plan required with every solar submittal functions as the facility/site map: it must show roof layout, all panel/module locations, the approximate roof-access point, code-compliant clear access pathways, PV fire classification, and the location of every required label/marking (per CEC 705.10 and the State Fire Marshal's Solar PV Installation Guide).

Why the confidence is not higherCity's own Submittal Requirements Bulletin item 2(d).

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSCE's own DG/interconnection and Rule 21 pages (see Q23 note — sce.com pages either 404 or rendered no placard-specific text); also checked San Dimas's own PV documents, which do not mention an SCE-specific placard requirement beyond the general CEC 705.12 power-source directory already captured under Q38.

https://www.sce.com/clean-energy-efficiency/solar-generating-your-own-power/solar-power-basics/grid-interconnections

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the main/utility service panel and at every power-source disconnect: LACoFD requires its placards on the exterior wall (within 6 ft of the main service panel, same wall plane) and inside the panel identifying specific switches/breakers; the city's Standard Plan requires CEC 690/705 labels at the inverter, at the AC and DC disconnects, and at junction/combiner boxes and conduit (marked every 10 feet per CRC R331.2/CFC 605.11.1).

Why the confidence is not higherLACoFD Guide for ESS, PV & Disconnects, Appendix B; City of San Dimas Solar PV Standard Plan — Simplified, Markings page.

AHJ's own current guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherCity's own Standard Plan: 'Listed and labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling (CEC 110.3). Equipment intended for use with PV system shall be identified and listed for the application (CEC 690.4[D]).' LACoFD's checklist separately requires UL 9540 (ESS) and UL 1741 (inverter) listing.

published standard plan checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/checklist.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Not permitted on the city's expedited/Standard-Plan solar path — the Eligibility Checklist requires the system be 'utility interactive and without battery storage' to qualify for expedited review. Batteries/ESS ARE permitted under the full (non-expedited) permit process subject to the 2025 CRC/CEC and LACoFD's ESS rules: UL 9540 listing, 20 kWh max per unit, 80 kWh aggregate cap per site/location, 3 ft unit-to-unit spacing, 3–10 ft setbacks from openings/lot lines/vegetation, impact protection where subject to vehicle impact, and detection/notification if installed in an attached garage.

Why the confidence is not higherCity of San Dimas Eligibility Checklist for Expedited Roof Top Solar PV Permitting (item D); LACoFD's Expedited PV/ESS Permitting Inspection Checklist and Guide for ESS, PV & Disconnects (2023-09-01).

published checklist + AHJ's own current guide checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/submittal-req.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Yes

Why the confidence is not higherThe city's own PV Permit Application form lists 'Energy Storage Systems' as its own line item under Electrical Items (tracked separately from the PV panels themselves); LACoFD's Appendix QQ fee ordinance prices a distinct 'Energy storage system, Group R-3 and R-4' field inspection fee ($195) separate from the 'Photovoltaic residential' inspection fee ($293), confirming ESS gets its own dedicated fire-department inspection.

permit application form + AHJ's own fee ordinance checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Assembly%20Bill%202234/PV%20PERMIT%20APPLICATION%2005-2025.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes

Why the confidence is not higherSDMC §18.168.070(D): 'Ground-mounted solar energy systems shall comply with building and setback regulations and shall be set back not less than five feet from the property line and no less than ten feet above the ground. A collector may be less than ten feet in height only if, in addition to the five-foot setback, the collector is set back three times the amount lowered.' The city's Solar Permit Center page separately confirms ground-mount systems are excluded from the SolarAPP+/expedited path and must be reviewed by the Building Division directly.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=43697022

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Per LACoFD's retained fire-code scope (which the city's own solar process defers to for disconnect placement): the electrical disconnection means and rapid-shutdown activation device for every power source (including PV) must be on the exterior, within 6 feet of the main service panel, on the same wall plane, and not separated from the main panel by walls, gates, fences, vegetation or architectural features (2023 LACFC §509.3). Only case-by-case exceptions require case-specific signage per the fire code official.

Why the confidence is not higherLACoFD Expedited PV/ESS Permitting Inspection Checklist, Section IV.1 (2023-09-01). This is sourced from the fire-code AHJ rather than an SCE DG manual, since SCE's own interconnection pages did not yield a location rule (see Q23/42 not_found notes).

AHJ's own current checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal 90% · published step-by-step guide
    • How much notice is required? For the codified expedited solar path: within 2 business days of request (SDMC §15.06.060(G)(1): 'An inspection will be scheduled within two business days of a request.'). The city's Submittal Requirements Bulletin describes day-to-day practice as: requests received during business hours are typically scheduled for the next business day, or within a 5-day window if next-day is unavailable. 85% · municipal code
    • Are same-day or AM/PM windows offered? AM/PM preference only, not a guaranteed specific time — per the Inspections FAQ: 'No, but you can request a preference for a morning or afternoon inspection and we will make every effort to accommodate your request.' Inspection timeframe/window is typically viewable in the Permit Center after 8:30 AM the day of the inspection. 90% · authority's own page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Delegated 85% · AHJ's own current checklist
    • If delegated, to whom? Los Angeles County Fire Department (LACoFD) — for ESS >3kWh, electrical-disconnect/rapid-shutdown placarding, and a narrow BIPV subcategory only; San Dimas's own Building & Safety Division retains and performs the general PV/electrical/building inspection itself. 90% · AHJ's own current page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For the expedited path, only ONE building-department inspection is required and performed (SDMC §15.06.060(G)); it follows issuance of the Combination Solar Permit. Separately and in parallel, LACoFD performs its own ESS/disconnect-placarding inspection where its retained scope applies (ESS >3kWh, all disconnect/rapid-shutdown placards) — LACoFD's checklist requires proof of the city's construction permit and paid placarding/fees before that inspection is booked. 85% · municipal code + AHJ's own checklist
    • Is a rough-in or mid-roof inspection required? No 78% · municipal code
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes 90% · published bulletin
    • What must be on site at inspection? Digital/printed proof of the issued construction permit (including any SolarAPP+ approval documents), the approved plans, and (for the LACoFD-retained scope) invoicing information for the contractor/billing party and proof the disconnect placarding is already in place and any LACoFD fees are paid before that inspection is booked. 82% · AHJ's own current checklist
    • Does the inspector verify labels and listings? Yes 90% · published bulletin
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final 78% · authority's own page
    • Is there a re-inspection fee? $98.00 for LACoFD's retained (ESS/disconnect) scope — 'Additional inspections after initial inspection and one reinspection.' For the city's own building/electrical inspection, SDMC §15.02 (CBC/CRC §R108.4.1 amendment) authorizes a reinspection fee 'in accordance with a fee schedule adopted by this jurisdiction,' but no specific city dollar figure for a solar reinspection was found in the FY26-27 Master Fee Schedule (which is valuation/percentage-based for Building fees generally, with no line item found by name for solar reinspection). 78% · AHJ's own current fee ordinance
    • How are corrections issued and cleared? Via a written correction notice detailing all deficiencies, sent to the applicant for resubmission (for the codified expedited path); cleared by requesting and passing a subsequent inspection, which per SDMC §15.06.060(G)(2) 'need not conform to the [single-inspection] requirements' of the expedited process — i.e., re-inspections are unlimited until the work passes. 78% · municipal code

14 questions answered against City of San Dimas’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal

Why the confidence is not higherThe city's own 'Scheduling an Inspection' step-by-step guide: log into the San Dimas Permit Center (Accela), locate the permit record, then click 'Schedule Inspection' to open the 'San Dimas Easy Scheduler.' Phone (909-394-6260) is also offered as an alternative per the Submittal Requirements Bulletin.

published step-by-step guide checked 2026-08-30 https://files.sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Inspections/StepByStep.pdf

Q50 How much notice is required? Core Booking & scheduling

For the codified expedited solar path: within 2 business days of request (SDMC §15.06.060(G)(1): 'An inspection will be scheduled within two business days of a request.'). The city's Submittal Requirements Bulletin describes day-to-day practice as: requests received during business hours are typically scheduled for the next business day, or within a 5-day window if next-day is unavailable.

Why the confidence is not higherSDMC §15.06.060(G)(1) (codified requirement) and the city's own Submittal Requirements Bulletin (operational description) — both cited since they give slightly different numbers for the same process.

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

AM/PM preference only, not a guaranteed specific time — per the Inspections FAQ: 'No, but you can request a preference for a morning or afternoon inspection and we will make every effort to accommodate your request.' Inspection timeframe/window is typically viewable in the Permit Center after 8:30 AM the day of the inspection.

Why the confidence is not higherCity of San Dimas Inspections page FAQ; StepByStep.pdf 'Important Note.'

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/inspections.php

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Delegated

Why the confidence is not higherCity of San Dimas Building Department performs the general building/electrical/PV inspection itself (only one inspection required per SDMC §15.06.060(G) for the expedited path). LA County Fire Dept (LACoFD) performs its own separate, dedicated inspection for ESS >3kWh and for all electrical-disconnect/rapid-shutdown placarding — a passed LACoFD inspection independently 'serves as an operational permit' for that fire-code scope. So the answer is 'Yes' for the building/electrical scope and 'Delegated' (to LACoFD) for the retained fire-code scope.

AHJ's own current checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q53 If delegated, to whom? Core Who inspects

Los Angeles County Fire Department (LACoFD) — for ESS >3kWh, electrical-disconnect/rapid-shutdown placarding, and a narrow BIPV subcategory only; San Dimas's own Building & Safety Division retains and performs the general PV/electrical/building inspection itself.

Why the confidence is not higherLACoFD's own Expedited PV/ESS Permitting Inspection Checklist and current Contract Cities page (confirms San Dimas as an incorporated contract city served via the Glendora fire station).

AHJ's own current page checked 2026-08-30 https://fire.lacounty.gov/contract-cities/

Q54 Which inspections are required, and in what order? Core Stages & sequence

For the expedited path, only ONE building-department inspection is required and performed (SDMC §15.06.060(G)); it follows issuance of the Combination Solar Permit. Separately and in parallel, LACoFD performs its own ESS/disconnect-placarding inspection where its retained scope applies (ESS >3kWh, all disconnect/rapid-shutdown placards) — LACoFD's checklist requires proof of the city's construction permit and paid placarding/fees before that inspection is booked.

Why the confidence is not higherSDMC §15.06.060(G); LACoFD's Expedited PV/ESS Permitting Inspection Checklist, Section V.

municipal code + AHJ's own checklist checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No

Why the confidence is not higherSDMC §15.06.060(G) states 'Only one inspection shall be required and performed by the building department for small residential rooftop solar energy systems eligible for expedited review' — i.e., no separate rough-in/mid-roof inspection stage for the qualifying expedited path (a subsequent re-inspection is authorized only if the single inspection fails).

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q56 Does the inspector verify labels and listings? Core What is checked

Yes

Why the confidence is not higherCity's own Submittal Requirements Bulletin, Inspections section, lists as a common inspection point: 'Appropriate signs are property [sic] constructed, installed and displayed' (DC disconnect sign, AC point-of-connection sign, alternative-power-system switch sign) and 'Equipment ratings are consistent with application and installed signs on the installation' — i.e., the inspector explicitly checks labels/listings against the plans and equipment listing labels.

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q57 Is there a published inspection checklist? Core What is checked

Yes

Why the confidence is not higherCity's own Submittal Requirements Bulletin includes a detailed 'Inspections' section functioning as the inspection checklist (module/model match, grounding, workmanlike installation, conductor sizing, signage, OCPD/bus-bar ratings, ambient-temperature derating); LACoFD separately publishes its own 5-page 'Inspection Checklist for Group R-3/-4 ESS, PV, and Electrical-Disconnect Placarding.'

published bulletin checked 2026-08-30 https://sandimasca.gov/Documents/Departments/Community%20Development/Building%20and%20Safety/Forms%20and%20Handouts/SolarRequirements%20Final.pdf

Q58 What must be on site at inspection? Core Documents on site

Digital/printed proof of the issued construction permit (including any SolarAPP+ approval documents), the approved plans, and (for the LACoFD-retained scope) invoicing information for the contractor/billing party and proof the disconnect placarding is already in place and any LACoFD fees are paid before that inspection is booked.

Why the confidence is not higherCity's Submittal Requirements Bulletin ('Permit holders must be prepared to show conformance with all technical requirements in the field'); LACoFD's Expedited PV/ESS Permitting Inspection Checklist, Sections I.1 and V.1.

AHJ's own current checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

$98.00 for LACoFD's retained (ESS/disconnect) scope — 'Additional inspections after initial inspection and one reinspection.' For the city's own building/electrical inspection, SDMC §15.02 (CBC/CRC §R108.4.1 amendment) authorizes a reinspection fee 'in accordance with a fee schedule adopted by this jurisdiction,' but no specific city dollar figure for a solar reinspection was found in the FY26-27 Master Fee Schedule (which is valuation/percentage-based for Building fees generally, with no line item found by name for solar reinspection).

Why the confidence is not higherLACoFD Appendix QQ fee ordinance, Table QQ104.4(6), effective 2024-01-11 (re-confirmed live via a 2025-10 upload); SDMC §15.02 amendment to CBC §R108.4.1 for the city-side authorization language.

AHJ's own current fee ordinance checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2025/10/2023-LACFC-Appendix-QQ-Certified-Ord-Eff.-2024-01-11-Secured.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Via a written correction notice detailing all deficiencies, sent to the applicant for resubmission (for the codified expedited path); cleared by requesting and passing a subsequent inspection, which per SDMC §15.06.060(G)(2) 'need not conform to the [single-inspection] requirements' of the expedited process — i.e., re-inspections are unlimited until the work passes.

Why the confidence is not higherSDMC §15.06.060(B)(3) and (G)(2).

municipal code checked 2026-08-30 https://ecode360.com/print/SA5002?guid=48094291

Q61 What is issued on pass? Core Final sign-off & PTO

Final

Why the confidence is not higherThe city's Inspections page lists 'Building Final' among the required inspections for a project to close out; LACoFD's own checklist states a passed fire inspection 'serves as an Operational Permit' for its retained R-3/R-4 scope, conditioned on passing other AHJs' (B&S, Utility) requirements too — i.e., there is no separate 'Certificate of Occupancy' issued for an existing single-family home solar retrofit, just a Final/passed-inspection sign-off.

authority's own page checked 2026-08-30 https://sandimasca.gov/departments/community_development/building_and_safety/inspections.php

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedSan Dimas's own Solar Permit Center, Submittal Requirements Bulletin and Standard Plan documents (none state who submits the Permission-to-Operate paperwork to SCE); SCE's own DG/interconnection pages (see Q23 — 404s / no rendered procedural text).

https://sandimasca.gov/departments/community_development/building_and_safety/online_permit_center.php

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of San Dimas against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of San Dimas is the authority having jurisdiction 92% confidence
Holds
Building, electrical, mechanical, plumbing and the city's own solar plan-check/permit process (Combination Solar Permit) — Building & Safety Division, Community Development Department, 245 E Bonita Ave
Delegated to
Los Angeles County Fire Department (LACoFD), for ESS >3kWh, all electrical power-source disconnect/rapid-shutdown placarding, and a narrow Building-Integrated PV subcategory only — LACoFD is San Dimas's contract fire department (an incorporated 'contract city' served via LACoFD's Glendora station, per LACoFD's own current Contract Cities page)
Overridden by
California Gov. Code §65850.5 (expedited/nondiscretionary solar permitting, codified locally at SDMC Ch. 15.06) constrains how the city may review a qualifying system; LACoFD's own 2023-09-01 SB-379-derived guidance defines and retains the narrow fire-code slice described above notwithstanding the city's Building Official generally holding fire-code enforcement under SDMC Ch. 15.51
Why not higher
City of San Dimas Building and Safety Division's own Codes, Solar Permit Center, and AB 2234 pages, plus SDMC Title 15 (Ch. 15.02-15.51, 15.06), confirm the city issues and inspects its own combination building/electrical solar permits. LACoFD's own current SB-379 page and its Expedited PV/ESS Permitting Checklist/Guide (2023-09-01) confirm San Dimas is an incorporated LACoFD contract city and confirm LACoFD's narrow retained fire-code scope (ESS>3kWh, all disconnect/rapid-shutdown placarding, narrow BIPV) — matching the pattern established across eleven prior LA-basin AHJ runs and re-derived here from LACoFD's own live documents rather than assumed.

https://sandimasca.gov/departments/community_development/building_and_safety/codes.php

Permit required
Yes98%
Permit cost
Approximately $410 flat ($460 if the project includes a service/panel upgrade); confirmed by two actual issued permits: $418.90 total (Solar Permit Fee $406.00 + $12.90 Plan Maintenance…88%
Plan review
3 business days95%
Portal
SolarAPP+ (gosolarapp.org) for eligible ≤10kW residential rooftop PV, feeding into the city's own Accela Citizen Access-based 'San Dimas Permit Center' (sandimasca.gov/PermitCenter) for…93%
Electrical code
202392%
Own placard wording
Yes92%
Booking an inspection
Portal90%
Labels & placards for this authority

City of San Dimas writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.

Wording 92%

Yes

Size, colour & material 93%

LACoFD disconnect placards: exterior placard minimum 2" tall x 3.5" wide, weather-resistant plastic, verbiage engraved; panel-interior placard minimum 7/16" tall x 3/4" wide; red letters engraved into a yellow background; Arial font, all-capitals, solid, minimum size 24 (28 bold for 'F.D.' and '#X of Y'); attached with permanent, weather/surface-compatible epoxy. The city's own CEC-690/705 warning labels do not specify letter height/color/material beyond an informational note suggesting a phenolic plaque with contrasting colors and a minimum ~20-point (3/8") type size.

Where they go 88%

At the main/utility service panel and at every power-source disconnect: LACoFD requires its placards on the exterior wall (within 6 ft of the main service panel, same wall plane) and inside the panel identifying specific switches/breakers; the city's Standard Plan requires CEC 690/705 labels at the inverter, at the AC and DC disconnects, and at junction/combiner boxes and conduit (marked every 10 feet per CRC R331.2/CFC 605.11.1).

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Los Angeles County
Regions served
1
Regions covered
City of San Dimas · city
Solar Requirements
Authority Contact
Address
245 E Bonita Ave, San Dimas, CA 91773
Main Phone
Office Hours
7:30 a.m. – 5:30 p.m.
Building Department
Department
Building and Safety Division
Direct Phone
909-394-6260
Portal Software
GrayQuarter
Booking & Scheduling
Preferred channel
online
Book in advance
1
Booking phone
Notes
Schedule final solar inspection online via GrayQuarter portal (https://apps.grayquarter.com/inspection/inspector/index?appId=1422). 24-hour advance notice required. Provide permit number, name, and phone. Morning or afternoon time preference can be requested but is not guaranteed. Contractor, homeowner, or authorized representative (must be 18+) must be present at inspection. Cancel or reschedule by calling 909-394-6260. Solar permits for residential rooftop PV (R3 occupancies) use SolarAPP+ (https://gosolarapp.org/) followed by city Accela portal for final permit issuance. Solar-specific questions: solar@sandimasca.gov. Ground-mounted and commercial PV cannot use online portals — call 909-394-6260. Accela portal also available for permit records: https://aca-prod.accela.com/SANDIMAS/. Building hours: Mon-Thu 7:30am-5:30pm, Fri 7:30am-4:30pm. (collected Jul 2026)