City of Selma

Fresno County

Verified Aug. 4, 2026

City of Selma is a city authority in the State of California, serving 24,674 residents. 2,409 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — For SolarAPP+-eligible projects: instantaneous issuance ('instantaneous permit issuance once permit application is completed'). Q18 Where you file — OpenGov (branded the 'Selma Permit Center') -- the same platform selmaca.viewpointcloud.com also resolves into, Q20

Permit required
Yes90% source
What it costs
Valuation-tiered building permit fee per the city's 2021 User Fee Study 'Suggested Building Permit Fees' table, e.g.65% source
Plan review turnaround
For SolarAPP+-eligible projects: instantaneous issuance ('instantaneous permit issuance once permit application is completed').75% source
Key document
inference (comparable authority + statewide default) cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 90% · department page
    • What does this authority permit itself, and what does it delegate? Both 90% · department page
    • Is a permit required for a residential rooftop PV system? Yes 90% · department page
    • Is there a separate electrical permit, or is it combined? Combined 60% · department page
    • Is a HOA or architectural approval required first? No -- no HOA/architectural-approval prerequisite found; a residential rooftop PV system would be governed by the state Solar Rights Act (Civil Code §714), which bars an HOA from unreasonably restricting solar. 65% · zoning code (full-text review)
    • Is there a historic-district review? No historic-district review found 65% · zoning code (full-text review)
    • Is a wind or windstorm certification required? No dedicated windstorm-certification requirement found; the Plan Check page's own 'Technical Information' lists a general Minimum Basic Wind Speed of 85 MPH, Wind Design Exposure C, applicable to all building work city-wide via the unamended 2022 CBC/ASCE 7-22 -- not a solar-specific certification. 70% · department page
    • Is a Specific Use Permit or Council approval ever required? No -- rooftop PV is not shown as requiring a CUP or Council approval; the Zoning Code's general residential-use table lists 'Accessory Structures' as permitted by right ('P') rather than conditional, and no CUP trigger specific to solar/PV was found anywhere in the 242-page code (0 'photovoltaic' hits). 65% · zoning code (full-text review)
    • Is there a system-size cap on residential generation? No codified local system-size cap found. The city relies on the SolarAPP+ program's own (national default) eligibility categories -- 'Solar (Photovoltaic)', 'Solar (Photovoltaic) with Storage', 'Building-Integrated Solar (Photovoltaic)', and 'Building-Integrated Solar (Photovoltaic) with Storage' -- without stating a specific kW figure on the city's own page. 60% · department page + zoning/building code review
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Per the city's Plan Check page, a 'SOLAR PLAN CHECK REQUIREMENTS' submittal must include: a site plan, solar building plans, Title 24 (energy) documentation, and a signed Owner Authorization Form (if the applicant represents the homeowner). 80% · department page
    • Is a site plan required, and what must it show? Yes -- a site plan is required; the Plan Check page lists 'site plan' as the first item under Solar Plan Check Requirements, alongside solar building plans and Title 24 documentation, but does not itemize what the site plan itself must show. 70% · department page
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? OpenGov (branded the 'Selma Permit Center') -- the same platform selmaca.viewpointcloud.com also resolves into, since OpenGov's Permitting & Licensing product absorbed ViewPoint Cloud. 90% · department page
    • Can the whole application be completed online? Yes 85% · department page
    • What does a residential solar permit cost? Valuation-tiered building permit fee per the city's 2021 User Fee Study 'Suggested Building Permit Fees' table, e.g. $554.00 for the first $25,000 of valuation plus $15.00 per additional $1,000 up to $50,000 (a typical residential PV valuation band). 65% · fee schedule
    • How is the fee calculated? Valuation 85% · fee schedule
    • Is there a separate plan-check fee? Yes, but bundled -- 'CD-001 BUILDING PLAN CHECK/INSPECTION' is a distinct cost-recovery fee category in the User Fee Study's fee comparison report, but plan-check and inspection are priced together under one reference number rather than as two separate dollar figures. 55% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? For SolarAPP+-eligible projects: instantaneous issuance ('instantaneous permit issuance once permit application is completed'). No turnaround time is stated for the standard (non-SolarAPP+) plan-check track. 75% · department page
    • How long is an issued permit valid before it expires? Likely 180 days without commencement/continuous work, per the unamended 2022 CBC/CRC §105.5 -- Selma's own local amendments to the Building Code (SMC 4-3-2) delete only the CBC's Appendix Chapter 1 permit/fee/appeals sections and Appendices A-J, not §105.5 itself. 60% · municipal code (local amendment section, fetched before a site outage)
    • Which utility handles interconnection here? Pacific Gas and Electric Company (PG&E) 85% · department page (phone directory)
    • Where does the utility sit in the sequence? After permit (PTO), but construction/installation may begin once the AHJ permit issues -- per PG&E's own Rule 21 tariff (§D.13.b), PTO for NEM is processed upon receipt of 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction.' 60% · utility tariff

28 questions answered against City of Selma’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherCity's own Building Division page states it issues building, electrical, mechanical and plumbing permits and performs inspections in-house; see jurisdiction block for full evidence.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/buildingdepartments/community_development/building/index.php

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherBuilding Division page: the Division 'reviews and approves all building plans, issues building, electrical, mechanical, plumbing, and other permits, and inspects buildings and projects under construction.' No delegation to a firm or the county found.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/buildingdepartments/community_development/building/index.php

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherBuilding Division page states verbatim: 'A Building Permit is required anytime a building or structure, or any electrical, plumbing, or mechanical system is to be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished.'

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/buildingdepartments/community_development/building/index.php

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherThe Building Division's own description covers 'building, electrical, mechanical, plumbing, and other permits' issued from one division/portal, and the Solar Plan Check page does not reference a separate electrical-permit submittal; inferred as combined rather than stated in so many words for solar specifically.

department page checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either

Why the confidence is not higherNo Selma-specific statement restricting the electrical permit to a licensed electrician was found (the administrative-code chapter that would normally state this, SMC 4-2-2, could not be retrieved -- amlegal.com returned Cloudflare 522 'origin timeout' errors site-wide for the second half of this run). Inferred from the statewide-standard CBC/CSLB owner-builder-or-licensed-contractor default and the comparable pattern in nearby Fresno County cities.

inference (comparable authority + statewide default) checked 2026-08-31 https://www.cityofselma.com/departments/departments/buildingdepartments/community_development/building/index.php

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherCity's Business Licenses page: 'A City Business License must be obtained prior to doing any business inside the city limits,' and directs 'a Contractor' to the Community Development Department for zoning/building requirements before submitting a license application. Not stated as an explicit building-permit prerequisite in so many words.

department page checked 2026-08-31 https://www.cityofselma.com/business/business_licenses.php

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherNo Selma-specific owner-builder text could be retrieved (the likely-relevant administrative-code section, SMC 4-2-2, was unreachable due to the amlegal.com outage). Inferred from the general California owner-builder statute and from the fact the Business License page treats 'a Contractor' as a distinct category implying homeowners may also apply directly.

inference checked 2026-08-31 https://www.cityofselma.com/business/business_licenses.php

Q8 What documents make up a complete submittal? Core Submittal package

Per the city's Plan Check page, a 'SOLAR PLAN CHECK REQUIREMENTS' submittal must include: a site plan, solar building plans, Title 24 (energy) documentation, and a signed Owner Authorization Form (if the applicant represents the homeowner).

Why the confidence is not higherStated directly on the city's current Plan Check page under 'SOLAR PLAN CHECK REQUIREMENTS'; Selma does not publish a separate itemized PV construction-plan checklist the way some peer cities do (e.g. Sanger's), so this is thinner than average -- flagged accordingly rather than treated as exhaustive.

department page checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q9 How many copies, and in what format? Submittal package

Nothing published by this authority.

Where we lookedPlan Check page, Building Division page, Automated Solar Permitting page -- none states a required number of copies or format beyond the general OpenGov upload process

https://www.cityofselma.com/departments/community_development/plan_check.php

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes -- a site plan is required; the Plan Check page lists 'site plan' as the first item under Solar Plan Check Requirements, alongside solar building plans and Title 24 documentation, but does not itemize what the site plan itself must show.

Why the confidence is not higherDirect citation of the requirement; no further detail on required site-plan content (e.g. setbacks, access pathways) was found on this or any linked page.

department page checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedPlan Check page (only says 'solar building plans' generically), SolarAPP+ page -- no explicit one-line/three-line diagram requirement stated; Selma does not publish an itemized PV construction checklist like some peer cities

https://www.cityofselma.com/departments/community_development/plan_check.php

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame pages as Q11 -- no explicit string/conductor calculation requirement stated

https://www.cityofselma.com/departments/community_development/plan_check.php

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedPlan Check page, Building Code local amendments (SMC 4-3-2, fetched before the amlegal outage) -- no structural PE-stamp threshold stated for solar specifically

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-12240

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedPlan Check page, Electrical Code local amendments (SMC 4-4-2, fetched before the amlegal outage) -- no electrical PE-stamp threshold stated

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-12253

Q15 What does a residential solar permit cost? Core Fees

Valuation-tiered building permit fee per the city's 2021 User Fee Study 'Suggested Building Permit Fees' table, e.g. $554.00 for the first $25,000 of valuation plus $15.00 per additional $1,000 up to $50,000 (a typical residential PV valuation band).

Why the confidence is not higherThe 'City of Selma User Fee Study Schedule' (dated 21 Jul 2021, adopted by City Council 11/2/21 via Resolution No. 2021-66R) is the only comprehensive fee document linked from the city's current Taxes and Fees page, with no newer comprehensive fee schedule found; it predates the 2022 code cycle the city has since adopted (Ord. 2023-2), so some staleness risk exists, though the city's own current webpage still points to it as the operative fee document.

fee schedule checked 2026-08-31 https://www.cityofselma.com/Document_Center/Department/Finance/Tax%20and%20fees/RCS-Selma%20Fee%20Study%20%282021-07-21%29.pdf

Q16 How is the fee calculated? Core Fees

Valuation

Why the confidence is not higherThe User Fee Study's 'SUGGESTED BUILDING PERMIT FEES' table is explicitly a valuation-tiered schedule (8 bands from $1-500 up to $1,000,001+), matching the 'CURRENT BUILDING PERMIT FEES' table it is meant to supersede.

fee schedule checked 2026-08-31 https://www.cityofselma.com/Document_Center/Department/Finance/Tax%20and%20fees/RCS-Selma%20Fee%20Study%20%282021-07-21%29.pdf

Q17 Is there a separate plan-check fee? Fees

Yes, but bundled -- 'CD-001 BUILDING PLAN CHECK/INSPECTION' is a distinct cost-recovery fee category in the User Fee Study's fee comparison report, but plan-check and inspection are priced together under one reference number rather than as two separate dollar figures.

Why the confidence is not higherThe fee-comparison table (REF #: CD-001) recommends a 45% increase to 'Building Plan Check/Inspection' fees to reach full cost recovery but does not split plan-check from inspection into two line items the way some peer cities' schedules do.

fee schedule checked 2026-08-31 https://www.cityofselma.com/Document_Center/Department/Finance/Tax%20and%20fees/RCS-Selma%20Fee%20Study%20%282021-07-21%29.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

For SolarAPP+-eligible projects: instantaneous issuance ('instantaneous permit issuance once permit application is completed'). No turnaround time is stated for the standard (non-SolarAPP+) plan-check track.

Why the confidence is not higherDirectly quoted from the city's Automated Solar Permitting (SolarAPP+) page; this only answers the expedited pathway, not the general plan-review track, which was not found stated anywhere on the city's site.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/automated_solar_permitting.php

Q19 How long is an issued permit valid before it expires? Timeline & validity

Likely 180 days without commencement/continuous work, per the unamended 2022 CBC/CRC §105.5 -- Selma's own local amendments to the Building Code (SMC 4-3-2) delete only the CBC's Appendix Chapter 1 permit/fee/appeals sections and Appendices A-J, not §105.5 itself.

Why the confidence is not higherInferred from having read the full local amendment section (SMC 4-3-2) and finding no amendment touching permit validity; no Selma-specific permit-expiration document was found to confirm this directly.

municipal code (local amendment section, fetched before a site outage) checked 2026-08-31 https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-12240

Q20 Which permit portal does this authority use? Core Portal & process

OpenGov (branded the 'Selma Permit Center') -- the same platform selmaca.viewpointcloud.com also resolves into, since OpenGov's Permitting & Licensing product absorbed ViewPoint Cloud.

Why the confidence is not higherThe city's Automated Solar Permitting page instructs applicants to 'Go to the Selma Permit Center and select "SolarAPP+ Solar Permit"' and to 'download the approved documents for submittal in OpenGov'; the homepage separately links both selmaca.portal.opengov.com and selmaca.viewpointcloud.com, both of which render as the same OpenGov JS shell to a plain fetch.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/automated_solar_permitting.php

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherSolarAPP+ page: 'Log in and submit plans. After the project is approved, download the approved documents for submittal in OpenGov... Once all fees have been paid, a permit and inspection card will be issued electronically.' No indication a paper original must also be filed.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/automated_solar_permitting.php

Q22 Which utility handles interconnection here? Core Utility interconnection

Pacific Gas and Electric Company (PG&E)

Why the confidence is not higherConfirmed from a city-side source: the Building Inspections page's own reference phone list names 'PG&E (Pacific Gas and Electric) (877) 660-6789' among the utility/agency contacts inspectors and applicants coordinate with, alongside California Water Service (water) and Mid Valley Disposal (trash) -- consistent with PG&E, not a municipal utility, serving electricity in Selma. The brief's PG&E field is confirmed, not overturned.

department page (phone directory) checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit (PTO), but construction/installation may begin once the AHJ permit issues -- per PG&E's own Rule 21 tariff (§D.13.b), PTO for NEM is processed upon receipt of 'evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction.'

Why the confidence is not higherThis is PG&E's statewide Rule 21 tariff provision, not a Selma-specific document; no Selma-side statement of the utility sequence was found on the city's own pages.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No -- no HOA/architectural-approval prerequisite found; a residential rooftop PV system would be governed by the state Solar Rights Act (Civil Code §714), which bars an HOA from unreasonably restricting solar.

Why the confidence is not higherThe city's 242-page 2024 Zoning Code Update was searched for 'homeowners association' and 'HOA' with zero hits (positive control 'electrical' returned 31 hits, fabricated control 'zzqqx' returned 0, confirming the search worked), and no HOA-approval step is described on the Plan Check or SolarAPP+ pages. Combined with the general statewide preemption.

zoning code (full-text review) checked 2026-08-31 https://www.cityofselma.com/2024-6%20Ordinance_Zoning%20Code%20Update.pdf

Q25 Is there a historic-district review? Overlays & special cases

No historic-district review found

Why the confidence is not higherWalked the full 2024 Zoning Code Update (242 pages, 8 chapters) by table of contents and searched for 'historic'/'landmark'; the only hits are a 'PV Zone' (Public/Village zone) historic-display use classification and CEQA-context references to the California Register of Historical Resources -- no historic-preservation permit-review chapter or overlay district exists in the current code.

zoning code (full-text review) checked 2026-08-31 https://www.cityofselma.com/2024-6%20Ordinance_Zoning%20Code%20Update.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

No dedicated windstorm-certification requirement found; the Plan Check page's own 'Technical Information' lists a general Minimum Basic Wind Speed of 85 MPH, Wind Design Exposure C, applicable to all building work city-wide via the unamended 2022 CBC/ASCE 7-22 -- not a solar-specific certification.

Why the confidence is not higherDirectly quoted from the city's Plan Check page ('Technical Information' section); no separate solar wind-certification document or code amendment was found.

department page checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No -- rooftop PV is not shown as requiring a CUP or Council approval; the Zoning Code's general residential-use table lists 'Accessory Structures' as permitted by right ('P') rather than conditional, and no CUP trigger specific to solar/PV was found anywhere in the 242-page code (0 'photovoltaic' hits).

Why the confidence is not higherInferred from the Permitted Uses tables (e.g. Table 3-6) showing Accessory Structures as 'P' and from the absence of any solar-specific standard among the code's 12 'Standards for Specific Land Uses and Activities' subsections (11-4.1 through 11-4.12) -- none of which address solar/PV.

zoning code (full-text review) checked 2026-08-31 https://www.cityofselma.com/2024-6%20Ordinance_Zoning%20Code%20Update.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No codified local system-size cap found. The city relies on the SolarAPP+ program's own (national default) eligibility categories -- 'Solar (Photovoltaic)', 'Solar (Photovoltaic) with Storage', 'Building-Integrated Solar (Photovoltaic)', and 'Building-Integrated Solar (Photovoltaic) with Storage' -- without stating a specific kW figure on the city's own page.

Why the confidence is not higherSelma's Title IV (Building Regulations, 17 chapters) and its 2024 Zoning Code Update (242 pages) were both searched for 'photovoltaic' with zero hits, and no AB 2188-style 'small residential rooftop solar' ordinance section exists (unlike e.g. neighboring Sanger's SMC §14-93). This is a genuine no-codified-cap finding, but the SolarAPP+ page's own eligibility categories (which nationally default to 10 kW AC / 30 kW thermal unless locally customized) were not confirmed as customized for Selma -- flagged per the caution against conflating SolarAPP+'s national default with a local ordinance.

department page + zoning/building code review checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/automated_solar_permitting.php

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2020 80% · adopting ordinance (fetched before a site outage)
    • Which building code edition is in force? 2022 California Building Code / 2022 California Residential Code (based on the 2021 IBC/IRC) 90% · department page + adopting ordinance
    • Which fire code edition is in force? Likely 2022 California Fire Code (same cycle as building/electrical, under the general SMC 4-1-1 adoption of the '2022 Edition' California Building Standards Code, of which the CFC is one part) -- but the city's own Plan Check page lists '2022 NFPA' rather than naming the CFC directly, and Title VII (Fire Regulations), which would carry the fire code's own adoption section and any local amendments, could not be verified. 55% · department page (Title VII fire-code adoption section itself unreachable due to site outage)
    • Are there local amendments to any of the above? Yes 85% · municipal code (fetched before a site outage)
    • What is the installation judged against? The 2022 California Building Standards Code as a whole -- 2022 CBC/CRC (structural/building), 2022 CEC (electrical, based on the 2020 NEC), 2022 CMC and 2022 CPC -- plus Title 24 Part 6 (Energy) and the fire/life-safety code referenced on the Plan Check page as '2022 NFPA', per the city's own 'Technical Information' list. 80% · department page
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Selma on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Presumptively yes, per the 2020 NEC §690.12 (module/system-level rapid shutdown) as incorporated by the adopted 2022 CEC -- but no Selma-specific document was found that cites §690.12 or rapid shutdown by name. 55% · inference from adopted code edition
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Does the UTILITY specify placards beyond the AHJ's? PG&E's own Rule 21 tariff requires a visible interconnection disconnect with open/closed position markings, lockable and accessible, and shown on the single-line diagram (§H.1.d-equivalent general Rule 21 tariff text). 55% · utility tariff
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? No city-maintained approved-equipment list found; California statewide practice requires CEC/UL-listed equipment generally, but no Selma-specific list or statement was found either way. 55% · department page (partial check)
    • Are batteries permitted, and under what conditions? Yes -- the city's SolarAPP+ eligibility list explicitly includes 'Solar (Photovoltaic) with Storage' and 'Building-Integrated Solar (Photovoltaic) with Storage' as eligible system types for the same automated permitting pathway as standard PV. 80% · department page
    • Is there a separate ESS permit or inspection? No separate ESS-specific fire permit or fee appears to exist -- storage is folded into the same 'Solar (Photovoltaic) with Storage' SolarAPP+ category as standard PV, and the Fire Prevention Bureau's own stated scope ('reviews and approves all fire sprinkler, alarm and hood systems') does not mention batteries or energy storage. 70% · department page + fee schedule (control-checked)
    • Is a ground mount treated as a structure? Yes, by inference -- the Zoning Code's generic 'Accessory Structure' provisions (Section 11-3-3) define an accessory building/structure as including 'any other structures with a fixed location that is detached from the main building,' with no PV-specific carve-out; a ground-mounted array would meet this generic definition and be subject to a 16-foot detached-structure height limit and the standard front/side-yard setback rules. 65% · zoning code (full-text review)
    • Is there a local rule on service upgrades or busbar sizing? No local rule found on service-upgrade review or busbar sizing 70% · municipal code (fetched before a site outage)

20 questions answered against City of Selma’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2020

Why the confidence is not higherSMC §4-1-1 adopts 'the California building standards code, 2022 Edition' as a whole (Ord. 2016-7, 12-5-2016; amd. Ord. 2023-2, 4-17-2023); the 2022 CBSC's electrical component (2022 CEC) is based on the 2020 NEC, per the statewide standard code-cycle mapping -- not independently re-stated by Selma's own electrical chapter (SMC 4-4-1/4-4-2), which adopts by reference only.

adopting ordinance (fetched before a site outage) checked 2026-08-31 https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-12213

Q30 Which building code edition is in force? Core Code editions in force

2022 California Building Code / 2022 California Residential Code (based on the 2021 IBC/IRC)

Why the confidence is not higherDirectly confirmed on two independent city-side sources: SMC §4-1-1 ('the California building standards code, 2022 Edition... as amended by Ord. 2023-2') and the Plan Check page's own 'Codes Enforced' list: '2022 California Building Code, 2022 California Mechanical Code, 2022 California Plumbing Code, 2022 California Electrical Code.'

department page + adopting ordinance checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q31 Which fire code edition is in force? Code editions in force

Likely 2022 California Fire Code (same cycle as building/electrical, under the general SMC 4-1-1 adoption of the '2022 Edition' California Building Standards Code, of which the CFC is one part) -- but the city's own Plan Check page lists '2022 NFPA' rather than naming the CFC directly, and Title VII (Fire Regulations), which would carry the fire code's own adoption section and any local amendments, could not be verified.

Why the confidence is not highercodelibrary.amlegal.com (the host of the Selma Municipal Code, including Title VII Fire Regulations) returned Cloudflare '522: Connection timed out' errors on every attempt for roughly the last 45 minutes of this run (both via plain curl, which got the expected Cloudflare challenge, and via headless Chrome, which cleared the challenge but then hit a real origin timeout) -- a genuine site-wide outage, not a technique failure, confirmed by the same 522 recurring on unrelated already-successfully-fetched Title IV pages re-tried during the outage. The Plan Check page's citation of '2022 NFPA' rather than '2022 CFC' leaves some genuine ambiguity about whether Fire uses a different edition or vocabulary than Building.

department page (Title VII fire-code adoption section itself unreachable due to site outage) checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes

Why the confidence is not higherSMC §4-3-2 (Building Code amendments) deletes and adds administrative provisions (permit-fee cross-reference to the fee resolution, tract-home plan-review carve-out, Building Official/Board of Appeals redefinition, violation/penalty section) and SMC §4-4-2 (Electrical Code amendments) similarly adds permit-fee and violation/penalty provisions -- both confirmed local amendments to the adopted 2022 CBSC.

municipal code (fetched before a site outage) checked 2026-08-31 https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-12240

Q33 What is the installation judged against? Core Electrical

The 2022 California Building Standards Code as a whole -- 2022 CBC/CRC (structural/building), 2022 CEC (electrical, based on the 2020 NEC), 2022 CMC and 2022 CPC -- plus Title 24 Part 6 (Energy) and the fire/life-safety code referenced on the Plan Check page as '2022 NFPA', per the city's own 'Technical Information' list.

Why the confidence is not higherSynthesized directly from the Plan Check page's 'Codes Enforced' list and SMC 4-1-1's blanket adoption of the 2022 CBSC; no single document states this as one sentence for solar specifically.

department page checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local rule found on service-upgrade review or busbar sizing

Why the confidence is not higherRead the full Electrical Code local-amendment section (SMC 4-4-2 'Amendments, Additions, Deletions, And Fee Exceptions') in its entirety: it adds only a permit-fee cross-reference and a violation/penalty clause. No busbar-size or service-upgrade-specific provision (unlike e.g. Palm Springs' 225A rule) exists in this section.

municipal code (fetched before a site outage) checked 2026-08-31 https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-12253

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedPlan Check page, SolarAPP+ page, Building/Electrical Code local amendments -- no prescriptive mounting-system or attachment-spacing standard found; Selma has no PV-specific structural handout comparable to peer cities

https://www.cityofselma.com/departments/community_development/plan_check.php

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedTitle VII (Fire Regulations) could not be retrieved -- codelibrary.amlegal.com returned Cloudflare '522: Connection timed out' on every attempt (curl and headless Chrome alike) for the latter half of this run, a genuine site-wide outage confirmed by re-testing an already-successfully-fetched Title IV URL, which also began returning 522. No ridge-setback/pathway figure was found on any city-hosted page either.

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-15229

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Presumptively yes, per the 2020 NEC §690.12 (module/system-level rapid shutdown) as incorporated by the adopted 2022 CEC -- but no Selma-specific document was found that cites §690.12 or rapid shutdown by name.

Why the confidence is not higherThis is an inference from the adopted code edition alone (Q29), not a local citation -- the city's Plan Check and SolarAPP+ pages do not mention rapid shutdown, and the Title VII fire chapter (where a local rapid-shutdown placard rule might otherwise live) could not be checked due to the amlegal.com site outage described at Q31. Flagged per the caution against assuming 690.12 compliance without a document actually citing it.

inference from adopted code edition checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame Title VII outage as Q36; Plan Check and SolarAPP+ pages do not mention placards

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-15229

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame Title VII outage as Q36

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-15229

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame Title VII outage as Q36

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-15229

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedPlan Check page, SolarAPP+ page, and the general 'site plan' submittal item at Q10 -- no facility-map/placard requirement distinct from the general site-plan submittal was found; Title VII unreachable (see Q36)

https://www.cityofselma.com/departments/community_development/plan_check.php

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

PG&E's own Rule 21 tariff requires a visible interconnection disconnect with open/closed position markings, lockable and accessible, and shown on the single-line diagram (§H.1.d-equivalent general Rule 21 tariff text).

Why the confidence is not higherThis is PG&E's statewide tariff provision, not confirmed to be re-stated on any Selma-specific document; no Selma-side utility handout was found.

utility tariff checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame Title VII outage as Q36; no city-side placard-location document found

https://codelibrary.amlegal.com/codes/selmaca/latest/selma_ca/0-0-0-15229

Q44 Must equipment be on a specific approved list? Equipment listing

No city-maintained approved-equipment list found; California statewide practice requires CEC/UL-listed equipment generally, but no Selma-specific list or statement was found either way.

Why the confidence is not higherNeither the Plan Check page nor the SolarAPP+ page references an approved-products list; absence checked only against these two pages, not a full code search (Title IV local amendments do not mention equipment listing either).

department page (partial check) checked 2026-08-31 https://www.cityofselma.com/departments/community_development/plan_check.php

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes -- the city's SolarAPP+ eligibility list explicitly includes 'Solar (Photovoltaic) with Storage' and 'Building-Integrated Solar (Photovoltaic) with Storage' as eligible system types for the same automated permitting pathway as standard PV.

Why the confidence is not higherDirectly quoted from the Automated Solar Permitting (SolarAPP+) page's 'System Eligibility' list; no separate conditions (e.g. kWh cap, location restrictions) are stated on this page for the storage-inclusive categories.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/automated_solar_permitting.php

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separate ESS-specific fire permit or fee appears to exist -- storage is folded into the same 'Solar (Photovoltaic) with Storage' SolarAPP+ category as standard PV, and the Fire Prevention Bureau's own stated scope ('reviews and approves all fire sprinkler, alarm and hood systems') does not mention batteries or energy storage.

Why the confidence is not higherTwo independent, control-proven city sources agree: (1) the SolarAPP+ page bundles storage into the PV category rather than listing it as a separate permit type, and (2) the city's comprehensive 2021 User Fee Study lists 32 numbered 'FI-0xx' fire fee line items (fire alarm response, annual fire-code inspection, sprinkler/hood/alarm plan check, fireworks, hazmat, etc.) with zero PV, solar, battery, or energy-storage line among them (positive control 'electrical' returned 11 hits elsewhere in the same document, fabricated control 'zzqqx' returned 0). Title VII (the fire code chapter itself) could not be checked for a possible ESS-specific technical requirement due to the site outage noted at Q31.

department page + fee schedule (control-checked) checked 2026-08-31 https://www.cityofselma.com/departments/fire/permits___plans.php

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes, by inference -- the Zoning Code's generic 'Accessory Structure' provisions (Section 11-3-3) define an accessory building/structure as including 'any other structures with a fixed location that is detached from the main building,' with no PV-specific carve-out; a ground-mounted array would meet this generic definition and be subject to a 16-foot detached-structure height limit and the standard front/side-yard setback rules.

Why the confidence is not higherNo PV-specific ground-mount ordinance exists anywhere in the 242-page 2024 Zoning Code Update (0 'photovoltaic' hits, control-checked); this is a general zoning definition applied by inference, in the same shape the playbook records for Pacifica and (independently) for Sanger.

zoning code (full-text review) checked 2026-08-31 https://www.cityofselma.com/2024-6%20Ordinance_Zoning%20Code%20Update.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedBuilding Inspections page, PG&E Rule 21 tariff (general -- no meter-proximity spec found, consistent with the playbook's PG&E Greenbook-gated finding) -- no Selma-specific or PG&E-specific AC-disconnect-to-meter distance/location rule found

https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal or Phone 90% · department page
    • How much notice is required? Effectively next business day -- 'Your request must be made before 3:30 PM through OpenGov Portal or by calling the inspection line for an inspection to be done on the following day.' 85% · department page
    • Are same-day or AM/PM windows offered? No distinct AM/PM windows offered -- inspections are 'generally between the hours of 8:30 AM and 3:30 PM,' a single daily window rather than a split morning/afternoon slot system. 80% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 90% · department page
    • If delegated, to whom? N/A -- not delegated; the city's own in-house Building Division performs final solar inspection (see Q52). 90% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Not itemized for solar specifically -- the Building Inspections page states generically: 'Inspections are required after obtaining a building, electrical, plumbing, or mechanical permit. When the permit is issued, you will be informed of the required inspections for your project.' No published stage-by-stage sequence for a PV install was found. 50% · department page
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • What must be on site at inspection? City-approved plans must be on site, and a ladder must be provided if the inspector needs to access the roof or attic. 85% · department page
    • Does the inspector verify labels and listings? Likely yes, by inference -- general building-code compliance verification would include checking installed equipment against submitted plans and product listings, but no Selma document explicitly states that the inspector checks PV labels/listings. 50% · inference
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • Who notifies the utility for PTO? Installer (applicant), by general NEM-interconnection practice -- no Selma-specific document states this. 50% · inference from utility tariff practice
    • Is there a re-inspection fee? $89.00/hour (2-hour minimum for after-hours re-inspections; half-hour minimum otherwise), per the 2021 User Fee Study's 'SUGGESTED' schedule. 70% · fee schedule

14 questions answered against City of Selma’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal or Phone

Why the confidence is not higherBuilding Inspections page: 'When the work is ready for inspection, you may schedule through OpenGov portal or call the 24 HOUR Inspection Request Line (559) 891-2220.' Unlike some peer cities, Selma has not eliminated phone-in scheduling.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q50 How much notice is required? Core Booking & scheduling

Effectively next business day -- 'Your request must be made before 3:30 PM through OpenGov Portal or by calling the inspection line for an inspection to be done on the following day.'

Why the confidence is not higherQuoted verbatim from the Building Inspections page.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No distinct AM/PM windows offered -- inspections are 'generally between the hours of 8:30 AM and 3:30 PM,' a single daily window rather than a split morning/afternoon slot system.

Why the confidence is not higherDirectly stated on the Building Inspections page; contrasts with peer cities (e.g. Sanger) that publish an explicit AM/PM split.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherThe Building Inspections page describes the in-house division performing all building/electrical/plumbing/mechanical inspections; no delegation to a firm or the county was found anywhere on the city's site.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q53 If delegated, to whom? Core Who inspects

N/A -- not delegated; the city's own in-house Building Division performs final solar inspection (see Q52).

Why the confidence is not higherSame evidence as Q52.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q54 Which inspections are required, and in what order? Core Stages & sequence

Not itemized for solar specifically -- the Building Inspections page states generically: 'Inspections are required after obtaining a building, electrical, plumbing, or mechanical permit. When the permit is issued, you will be informed of the required inspections for your project.' No published stage-by-stage sequence for a PV install was found.

Why the confidence is not higherThis is a generic, non-solar-specific statement; the actual per-project inspection list is delivered at permit issuance rather than published, so it could not be independently verified.

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedBuilding Inspections page -- only a generic statement that required inspections are communicated at permit issuance; no published rough-in/mid-roof requirement for solar was found

https://www.cityofselma.com/departments/departments/building/inspections.php

Q56 Does the inspector verify labels and listings? Core What is checked

Likely yes, by inference -- general building-code compliance verification would include checking installed equipment against submitted plans and product listings, but no Selma document explicitly states that the inspector checks PV labels/listings.

Why the confidence is not higherNo explicit statement was found on the Building Inspections page or the Plan Check page; inferred from standard building-inspection practice rather than a direct citation.

inference checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedBuilding Division page, Plan Check page, Automated Solar Permitting page, Fire Permits & Plans page -- no published PV/solar inspection checklist (distinct from the plan-submittal requirements) was found anywhere on the city's site

https://www.cityofselma.com/departments/departments/building/inspections.php

Q58 What must be on site at inspection? Core Documents on site

City-approved plans must be on site, and a ladder must be provided if the inspector needs to access the roof or attic.

Why the confidence is not higherQuoted verbatim from the Building Inspections page: 'Have the city-approved plans on the site. Provide a ladder if the inspector needs to get on the roof or in the attic.'

department page checked 2026-08-31 https://www.cityofselma.com/departments/departments/building/inspections.php

Q59 Is there a re-inspection fee? Corrections & re-inspection

$89.00/hour (2-hour minimum for after-hours re-inspections; half-hour minimum otherwise), per the 2021 User Fee Study's 'SUGGESTED' schedule.

Why the confidence is not higherThe Fee Study's Appendix D states: 'Reinspection fees assessed under provisions of Section 305.8 ... $89/hour*' under the suggested schedule (current/2021 schedule was $47/hour). This is the 2021-adopted figure; no newer comprehensive fee schedule was located.

fee schedule checked 2026-08-31 https://www.cityofselma.com/Document_Center/Department/Finance/Tax%20and%20fees/RCS-Selma%20Fee%20Study%20%282021-07-21%29.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedBuilding Inspections page, Plan Check page -- no description of how field-inspection corrections are issued or cleared was found (only the general submittal process)

https://www.cityofselma.com/departments/departments/building/inspections.php

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedBuilding Division page, Building Inspections page, Building Code local amendments (SMC 4-3-2) -- none states what document/tag is issued on passing a residential PV final inspection specifically (Certificate of Occupancy language, where present, is scoped to new construction/occupancy changes)

https://www.cityofselma.com/departments/departments/buildingdepartments/community_development/building/index.php

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer (applicant), by general NEM-interconnection practice -- no Selma-specific document states this.

Why the confidence is not higherStandard practice statewide under PG&E's Rule 21 NEM process is applicant/installer-driven interconnection paperwork; no Selma ordinance or department page was found stating who is responsible for utility notification, so this is an inference rather than a local citation.

inference from utility tariff practice checked 2026-08-31 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Selma against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Selma is the authority having jurisdiction 88% confidence
Holds
Building and Electrical (in-house Community Development Department, Building Division/'Building Inspection' cost center); a separate self-performed municipal Fire Department (Selma Fire Dept., est. 1889, Fire Chief Jordan Webster) whose own fee schedule carries zero PV/ESS lines and whose Fire Prevention Bureau's stated scope is limited to sprinkler/alarm/hood systems
Overridden by
State Solar Rights Act (Civil Code §714) and Gov. Code §65850.5/.52 (SolarAPP+ mandate) govern the ministerial/expedited review pathway; no codified local rooftop-solar ordinance exists in Selma's own Title IV (checked all 17 Building-Regulations chapters, 0 'photovoltaic' hits) or its 2024 Zoning Code Update (242 pages, 0 'photovoltaic' hits), so the SolarAPP+ program's own national default eligibility criteria fill that gap rather than a local ordinance. Fresno County Building/Planning is listed only as an informational neighbor-agency phone contact on the city's own Building Inspections page, not evidence of delegation -- Selma is fully incorporated and the County is not a co-AHJ here.
Why not higher
City's own Building Division page states the Division 'reviews and approves all building plans, issues building, electrical, mechanical, plumbing, and other permits, and inspects buildings and projects under construction.' SMC §4-1-2 (fetched from amlegal before a site outage) vests the codified 'Building Official' title in the Community Development Director or designee -- an in-house city title, not a named contract firm. The FY2026-27 Adopted Budget's Department 5300 ('Building Inspection') staffing table shows only 1.0 FTE Building Inspector plus a 0.34 FTE share of a newly-created (FY26-27) in-house Community Development Director position, with no Willdan/4LEAF/Transtech/EsGil-style contract title anywhere on the city's staff pages, department pages, or budget; an $80,000/yr 'Professional Services' line in that department's budget is unexplained and could fund contracted plan-check backup, so full in-house performance of every function (vs. supplemented) is flagged at slightly reduced confidence. Fire is confirmed self-performed via the Fire Department's own administration page (named Fire Chief and Battalion Chiefs, all @cityofselma.com) and its own Fire Prevention/Permits & Plans pages.

https://www.cityofselma.com/departments/departments/buildingdepartments/community_development/building/index.php

Check the code edition before you build

This authority's published code edition does not match what the state has adopted. That usually means the authority's ordinance has not been updated for the current cycle — but a local amendment can also be lawful. Confirm with the building department before you submit.

Building code
This authority publishes 2022 2022 California Building Code / 2022 California Residential Code (based on the 2021 IBC/IRC) 90% · source
The state has adopted 2024/2025 2025 California Building Code (Title 24, Part 2, Volumes 1 & 2), based on the 2024 International Building Code, and 2025 California Residential Code (Title 24, Part 2.5), 92% · source
Fire code
This authority publishes 2022 Likely 2022 California Fire Code (same cycle as building/electrical, under the general SMC 4-1-1 adoption of the '2022 Edition' California Building Standards Code, of which the CFC is one part) -- but the city's own Plan Check page lists '2022 NFPA' rather than naming the CFC directly, and Title VII (Fire Regulations), which would carry the fire code's own adoption section and any local amendments, could not be verified. 55% · source
The state has adopted 2024/2025 2025 California Fire Code (Title 24, Part 9), based on the 2024 International Fire Code, adopted by the Office of the State Fire Marshal with BSC approval. 90% · source
Permit required
Yes90%
Permit cost
Valuation-tiered building permit fee per the city's 2021 User Fee Study 'Suggested Building Permit Fees' table, e.g.65%
Plan review
For SolarAPP+-eligible projects: instantaneous issuance ('instantaneous permit issuance once permit application is completed').75%
Portal
OpenGov (branded the 'Selma Permit Center') -- the same platform selmaca.viewpointcloud.com also resolves into, since OpenGov's Permitting & Licensing product absorbed ViewPoint Cloud.90%
Electrical code
202080%
Booking an inspection
Portal or Phone90%
Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top 55%

PG&E's own Rule 21 tariff requires a visible interconnection disconnect with open/closed position markings, lockable and accessible, and shown on the single-line diagram (§H.1.d-equivalent general Rule 21 tariff text).

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Fresno County
Regions served
1
Regions covered
City of Selma · city
Solar Requirements
Separate roof inspection
City of Selma, CA Employment Opportunities learn more Apply for Permits OpenGov learn more Council Meetings & Agendas learn more Selma Municipal Code learn more Report a Pothole learn more Solar Building Permits learn more Roof Permit learn more learn more Building The Building Division reviews and
Authority Contact
Address
1710 Tucker St., Selma, CA 93662
Main Phone
(559) 891-2200
Building Department
Department
Building Division, Community Development Department
Direct Phone
(559) 891-2208
Portal Software
Accela
Booking & Scheduling
Preferred channel
online
Book in advance
next business day
Notes
Schedule final solar inspection via the OpenGov portal at https://selmaca.portal.opengov.com/ or by calling the 24-hour inspection request line (559) 891-2220. Request must be submitted before 3:30 PM for a next-day inspection. Inspections are conducted between 8:30 AM and 3:30 PM. When requesting, provide: jobsite address, permit number, desired inspection date, inspection type, your name, and preferred contact method. Have city-approved plans on-site and a ladder available if roof/attic access is needed. For pre-inspection questions, call (559) 891-2208 between 8 AM–5 PM (or specifically 8–9 AM or 4–5 PM for direct inspector contact). The city uses SolarAPP+ for automated plan check review of residential solar PV projects. Note: selmaca.viewpointcloud.com redirects to selmaca.portal.opengov.com. (collected Jul 2026)