City of Tehama
Tehama County
City of Tehama is a city authority in the State of California, serving 435 residents. 49 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Where you file — OpenGov Permitting & Licensing, at tehamacountyca.portal.opengov.com (reached via the County's published legacy link https://tehamacountyca.viewpointcloud.com, Q20
- Permit required
- Yes92% source
- What it costs
- $400.95 flat, per inverter (Electrical Permit Fee Table E, item 566 'Solar Photovoltaic System'), limited to two site visits.78% source
- Key document
- code of ordinances (statutory cross-reference) cited by 6 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes 90% · city department page
- What does this authority permit itself, and what does it delegate? Delegated 95% · code of ordinances
- Is a permit required for a residential rooftop PV system? Yes 92% · code of ordinances
- Is there a separate electrical permit, or is it combined? Combined 78% · code of ordinances
- Is a HOA or architectural approval required first? No 65% · code of ordinances (statutory cross-reference)
- Is there a historic-district review? No 78% · city department page / code TOC absence
- Is a wind or windstorm certification required? No dedicated 'windstorm certification' document is required; standard wind design load (county-published local design standard: 90 MPH, Exposure C) under the adopted CBC/ASCE 7 applies generally, with no PV-specific certification called out. 60% · department page
- Is a Specific Use Permit or Council approval ever required? Yes, for two of the three zoning classifications — a Use Permit is required for a 'Dual Purpose Solar Energy System' (net exporter) and a 'Solar Power Facility' is not allowed at all in Residential zones (Open Space-1 only, by Use Permit); an ordinary 'Small Solar Energy System' (sized to reduce on-site consumption, the typical residential rooftop case) is Permitted outright with no Use Permit. 75% · code of ordinances
- Is there a system-size cap on residential generation? No hard cap on residential system size. The county's 10 kW AC / 30 kW thermal figure is only the eligibility threshold for the streamlined/expedited AB 2188-style review process; larger residential systems remain permittable through the standard (non-expedited) review pathway. 85% · code of ordinances
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? No dedicated solar submittal checklist is published. The general Building Permit Application requires: owner/contractor/architect info, parcel #, project valuation, and a checklist of 'Approved Plot Plan, Complete Set of Building Plans, Energy Calculations, Truss Calculations, SFR Modified Soils Test, Structural Calculations (if applicable), Solar Plans and Manual J Report, Flood Elevation Certificate (if applicable).' TCC 15.60.030(c)(2) additionally requires conformance with adopted fire/structural/electrical codes and UL/IEEE listing standards. 55% · form
- How many copies, and in what format? Electronic, via the County's online permit portal (applicants are directed to apply online); no specific copy-count or paper-format requirement stated. 68% · department page
- Is a site plan required, and what must it show? Yes — an 'Approved Plot Plan' is a required item on the general Building Permit Application checklist; the County's general Plan Requirements historically call for owner/address/APN, dimensions, and setbacks (per standard county plot-plan practice), but no PV-specific site-plan content list (panel layout, access pathways, label locations) was found. 60% · form
- Is a one-line / three-line diagram required? Yes (implied) 58% · code of ordinances
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? OpenGov Permitting & Licensing, at tehamacountyca.portal.opengov.com (reached via the County's published legacy link https://tehamacountyca.viewpointcloud.com, which 301-redirects to the OpenGov portal). 85% · department page
- Can the whole application be completed online? Yes (apply online is presented as the primary route: 'Apply Now') 55% · department page
- What does a residential solar permit cost? $400.95 flat, per inverter (Electrical Permit Fee Table E, item 566 'Solar Photovoltaic System'), limited to two site visits. A distinct item 314 'Solar Panels, per system' exists under the Plumbing fee table for solar THERMAL/water-heating panels — not applicable to PV. 78% · fee schedule
- How is the fee calculated? Flat (a fixed per-inverter dollar amount; not valuation-, per-kW-, or per-panel-based) 75% · fee schedule
- Is there a separate plan-check fee? No — not billed separately for this item; the $400.95 solar PV fee already bundles a 30-minute plan-check-rate component into the single total. 78% · fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- How long is an issued permit valid before it expires? Plan-review applications expire in 6 months (180 days) if no permit is issued (extendable once, max 6 more months); an issued permit is valid 2 years from issuance, extendable by 1-year increments, capped at 3 years total. 90% · form/code excerpt
- Which utility handles interconnection here? Pacific Gas & Electric (PG&E) 95% · city department page
- Where does the utility sit in the sequence? After permit 85% · code of ordinances
28 questions answered against City of Tehama’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes
Why the confidence is not higherCity's own Building Permits & Inspections page states the City checks plans for site layout/setbacks/flood elevation while the County 'is responsible for permitting all construction and conducting inspections of all construction-related permits'; TCMC 15.04.020 codifies the County as the acting building department for the city. The city remains the nominal AHJ (permits are issued for work within city limits under a contract), but performance is fully delegated.
city department page checked 2026-08-31 https://cityoftehama.us/building-permits-and-inspections
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Delegated
Why the confidence is not higherTCMC 15.04.020 (Ord. 116 §4, 1982): 'The Tehama County building department is authorized to act as the building department for the city of Tehama in the issuing, inspection, and enforcement of building permits under the adopted codes.' Both Building and Electrical are delegated; City retains only Planning/zoning site-plan review (setbacks, flood elevation) per its own building-permits page.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.04COCOAD
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherTehama County Code Ch.15.04/15.20 (adopted by the city via TCMC 15.04.020) require building and electrical permits for construction; County's streamlined-solar chapter TCC 15.60 confirms a permit process exists specifically for small residential rooftop PV under Gov. Code §65850.5.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined
Why the confidence is not higherTCC 15.60.040(f): upon approval the building official 'shall administratively approve the application and issue all required permits or authorizations' as a single expedited action for qualifying small residential rooftop PV, i.e. combined rather than sequential separate permits.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Either
Why the confidence is not higherCounty's standard 'Owner/Builders Take Note' CSLB disclosure form is used when a homeowner signs a building permit application as owner/builder, confirming self-permitting is an accepted route alongside a licensed contractor; the general Building Permit Application form records either a contractor's state license number/class or is signed by an owner/builder.
form checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2025/09/Owner-Builder-Take-Note-Form-Fillable.pdf
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
No
Why the confidence is not higherThe general Building Permit Application only records the contractor's existing CSLB state license number and class; no separate county contractor-registration step or portal was found on the Building & Safety department pages or forms library.
form checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2025/04/Building-Permit-Application-2024-Fill-in.pdf
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes
Why the confidence is not higherCounty requires the standard CSLB 'Owner/Builders Take Note' acknowledgment to be signed when a homeowner applies as their own general contractor, confirming homeowner self-permitting is an accepted practice.
form checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2025/09/Owner-Builder-Take-Note-Form-Fillable.pdf
Q8 What documents make up a complete submittal? Core Submittal package
No dedicated solar submittal checklist is published. The general Building Permit Application requires: owner/contractor/architect info, parcel #, project valuation, and a checklist of 'Approved Plot Plan, Complete Set of Building Plans, Energy Calculations, Truss Calculations, SFR Modified Soils Test, Structural Calculations (if applicable), Solar Plans and Manual J Report, Flood Elevation Certificate (if applicable).' TCC 15.60.030(c)(2) additionally requires conformance with adopted fire/structural/electrical codes and UL/IEEE listing standards.
Why the confidence is not higherThis is the County's generic new-construction application form (which lists 'Solar Plans' as one checklist item among many); no PV-specific standalone checklist could be located despite TCC 15.60.040(a)-(b) directing the building official to adopt and publish one (confirmed via site search of tehama.gov for 'solar' — 2 results, neither a checklist — with positive control 'electrical' returning 1 result and fabricated control 'zzqqx' returning 0).
form checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2025/04/Building-Permit-Application-2024-Fill-in.pdf
Q9 How many copies, and in what format? Submittal package
Electronic, via the County's online permit portal (applicants are directed to apply online); no specific copy-count or paper-format requirement stated.
Why the confidence is not higherCounty's Permit Information page: 'To apply for a permit online please go to: [portal link]. Apply Now.' No paper-copy count specified anywhere in the forms library.
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/permit-information/
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes — an 'Approved Plot Plan' is a required item on the general Building Permit Application checklist; the County's general Plan Requirements historically call for owner/address/APN, dimensions, and setbacks (per standard county plot-plan practice), but no PV-specific site-plan content list (panel layout, access pathways, label locations) was found.
Why the confidence is not higherBuilding Permit Application form lists 'Approved Plot Plan' as a required document; no dedicated solar site-plan specification was located in the forms library or TCC 15.60.
form checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2025/04/Building-Permit-Application-2024-Fill-in.pdf
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes (implied)
Why the confidence is not higherTCC 15.60.030(c)(2) requires conformance with 'all applicable safety and performance standards established by the California Electrical Code' which requires one-line diagrams for PV interconnection as a matter of course; no county document names a one-line diagram as a standalone checklist item since no dedicated solar checklist is published.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedCounty Building & Safety Permit Information page, Building Forms page (full PDF listing checked), Fee Ordinance No. 1918, and TCC 15.60 streamlined-solar chapter — none specify a string-sizing or conductor-ampacity calculation submittal requirement.
https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Nothing published by this authority.
Where we lookedCounty Building Permit Application ('Structural Calculations (if applicable)' checklist item, no threshold given), TCC 15.02 (Uniform Administrative Code) and TCC 15.60 — none state a specific valuation, span, or weight threshold that triggers a required PE structural stamp for solar.
https://www.tehama.gov/wp-content/uploads/2025/04/Building-Permit-Application-2024-Fill-in.pdf
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Nothing published by this authority.
Where we lookedTCC Ch.15.20 (Electrical Code) and TCC 15.60 streamlined-solar chapter — neither states a threshold (e.g. service size, system kW) requiring an electrical PE stamp for residential PV.
https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.20ELCO
Q15 What does a residential solar permit cost? Core Fees
$400.95 flat, per inverter (Electrical Permit Fee Table E, item 566 'Solar Photovoltaic System'), limited to two site visits. A distinct item 314 'Solar Panels, per system' exists under the Plumbing fee table for solar THERMAL/water-heating panels — not applicable to PV.
Why the confidence is not higherOrdinance No. 1918 (Fee Ordinance), Attachment A, is the current fee schedule linked from the County's live 2026 Codes & Ordinances page; item 566 formula: (11 min support + 42 min travel + 60 min inspection) x 1.24 failure-rate factor x $141.05/hr inspection rate, plus 30 min x $143.10/hr plan-check rate = $400.95. Adopted 12 May 2009, effective 12 Jul 2009 — dated but still the currently-linked, in-force schedule (no newer fee ordinance found on the County's Codes & Ordinances page). PDF was image-only; extracted via pdftoppm + tesseract OCR.
fee schedule checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2024/12/ord1918-Fee-Ordinance.pdf
Q16 How is the fee calculated? Core Fees
Flat (a fixed per-inverter dollar amount; not valuation-, per-kW-, or per-panel-based)
Why the confidence is not higherSame item 566 fee line — stated as a flat $400.95 'per each inverter,' derived from a time-and-hourly-rate formula but presented to the applicant as a single flat figure.
fee schedule checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2024/12/ord1918-Fee-Ordinance.pdf
Q17 Is there a separate plan-check fee? Fees
No — not billed separately for this item; the $400.95 solar PV fee already bundles a 30-minute plan-check-rate component into the single total.
Why the confidence is not higherItem 566's own formula explicitly adds '30 minutes x $143.10/Hr. (plan check rate)' into the $400.95 total, distinguishing it from the general Table B note (line ~403) that plan-check is added on top for other, non-PV-specific fee categories.
fee schedule checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2024/12/ord1918-Fee-Ordinance.pdf
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedCounty Building & Safety Permit Information page, Inspection Requests/Inspection Policy page, and Codes & Ordinances page — none publish a stated business-day plan-review turnaround target.
https://www.tehama.gov/government/departments/building-and-safety/permit-information/
Q19 How long is an issued permit valid before it expires? Timeline & validity
Plan-review applications expire in 6 months (180 days) if no permit is issued (extendable once, max 6 more months); an issued permit is valid 2 years from issuance, extendable by 1-year increments, capped at 3 years total.
Why the confidence is not higherCounty's own 'Acknowledgement of Expiration of Permit Application' form quotes TCC §15.02.350(A) and (B)(1)-(2) verbatim; corroborated by the County's Permit Information page reminder that 'All permit applications expire after 180 days.'
form/code excerpt checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2025/09/Ack-of-Expiration-of-Permit-Application-Form-fillable.pdf
Q20 Which permit portal does this authority use? Core Portal & process
OpenGov Permitting & Licensing, at tehamacountyca.portal.opengov.com (reached via the County's published legacy link https://tehamacountyca.viewpointcloud.com, which 301-redirects to the OpenGov portal).
Why the confidence is not higherCounty's Permit Information page: 'To apply for a permit online please go to: https://tehamacountyca.viewpointcloud.com'; confirmed by HTTP 301 redirect to the OpenGov portal domain.
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/permit-information/
Q21 Can the whole application be completed online? Core Portal & process
Yes (apply online is presented as the primary route: 'Apply Now')
Why the confidence is not higherCounty's Permit Information page directs applicants to apply online; the OpenGov portal itself is a JavaScript single-page application that returned an empty shell to both a plain fetch and a headless-Chrome dump attempt (timed out), so full walkthrough of document-upload/fee-payment steps could not be independently verified in this run.
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/permit-information/
Q22 Which utility handles interconnection here? Core Utility interconnection
Pacific Gas & Electric (PG&E)
Why the confidence is not higherCity of Tehama's own 'Gas & Electric Utilities' page: 'Pacific, Gas and Electric Company (PG&E) provides service to the City of Tehama community.' First-party city source, not a third-party lookup tool.
city department page checked 2026-08-31 https://cityoftehama.us/gas-and-electric-utilities
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit
Why the confidence is not higherTCC 15.60.040(f): county approval/permit issuance 'does not authorize an applicant to connect the small residential rooftop energy system to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider' — i.e. utility interconnection/PTO is sought after permit issuance, not before or in parallel as a gating step.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q24 Is a HOA or architectural approval required first? Overlays & special cases
No
Why the confidence is not higherNo city or county ordinance conditions a solar permit on HOA/architectural-committee approval; California's Solar Rights Act (Civil Code §714, cross-referenced in TCC 15.60.030(b)) preempts CC&R restrictions on solar installations statewide.
code of ordinances (statutory cross-reference) checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q25 Is there a historic-district review? Overlays & special cases
No
Why the confidence is not higherThe City of Tehama's codified Municipal Code (Municode full table of contents) contains no Historic Preservation title or chapter at all; the city's own 'Historic Preservation' web page is a single aspirational sentence ('The City of Tehama encourages the preservation of our older homes and buildings') with no review process, board, or ordinance described.
city department page / code TOC absence checked 2026-08-31 https://cityoftehama.us/historic-preservation
Q26 Is a wind or windstorm certification required? Overlays & special cases
No dedicated 'windstorm certification' document is required; standard wind design load (county-published local design standard: 90 MPH, Exposure C) under the adopted CBC/ASCE 7 applies generally, with no PV-specific certification called out.
Why the confidence is not higherCounty's live Codes & Ordinances page lists 'Wind Speed 90 MPH' and 'Exposure C' among its Local Conditions & Requirements design standards; no solar-specific wind-certification requirement found in TCC 15.60 or the fee ordinance.
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/codes-and-ordinances/
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Yes, for two of the three zoning classifications — a Use Permit is required for a 'Dual Purpose Solar Energy System' (net exporter) and a 'Solar Power Facility' is not allowed at all in Residential zones (Open Space-1 only, by Use Permit); an ordinary 'Small Solar Energy System' (sized to reduce on-site consumption, the typical residential rooftop case) is Permitted outright with no Use Permit.
Why the confidence is not higherCity's own zoning code, TCMC Ch.17.84 (Ord. No. 198, 6-13-23), §17.84.030 use table: Small Solar Energy System = P (permitted) in Residential and Open Space-1; Solar Power Facility = X (not allowed) in Residential / C (conditional) in Open Space-1; Dual Purpose Solar System = C (conditional) in both. Definitions in §17.04.050 classify a system 'intended solely to reduce on-premises consumption' as 'small' (no CUP) versus a system built to also sell excess generation as 'dual purpose' (CUP required).
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama/codes/code_of_ordinances?nodeId=TIT17ZO_CH17.84SOENSY
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No hard cap on residential system size. The county's 10 kW AC / 30 kW thermal figure is only the eligibility threshold for the streamlined/expedited AB 2188-style review process; larger residential systems remain permittable through the standard (non-expedited) review pathway.
Why the confidence is not higherTCC 15.60.030(c)(1) defines a 'small residential rooftop solar energy system' (eligible for the streamlined process) as capped at '10 kilowatts alternating current nameplate rating or thirty kilowatts thermal' — this is an eligibility gate for expedited review, not a ban on larger systems, consistent with Gov. Code §65850.5's own structure.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? Ambiguous/in transition. The County's live 2026 Codes & Ordinances page and its pending Title-15 readoption (Ord. No. 2150, 'current governing codes (2025)') move the Electrical Code's adoption clause from a fixed '2022... National Electrical Code, 2022 Edition' text to 'the most current edition' of the CEC — i.e. the 2025 California Electrical Code cycle (effective statewide 1 Jan 2026), which incorporates the 2023 NEC. However, the still-live Municode codification of TCC §15.20.030 has not been updated and continues to read '2022 California Electrical Code... incorporating the National Electrical Code, 2022 Edition' (itself an apparent drafting mismatch, since no NEC edition is dated '2022' — the correct pairing for the 2022 CBSC cycle is the 2020 NEC). 55% · department page vs. codified ordinance (conflict noted)
- Which building code edition is in force? 2025 California Building Code (per the County's live 2026 department page and its Ord. No. 2150 readoption of Title 15 to 'current governing codes (2025)'); Municode's codified TCC §15.04.030 has not yet been updated and still shows the 2022 CBC. 70% · department page / ordinance (Legistar)
- Which fire code edition is in force? 2025 California Fire Code (incorporating the 2024 IFC per Ord. 2150's tracked-change text, which strikes '2018' and inserts '2024' for the IFC edition); Municode's codified TCC §15.34.030 still shows the prior 2022 CFC / 2018 IFC. 60% · ordinance (Legistar packet, tracked-changes)
- Are there local amendments to any of the above? Yes — the County has repeatedly amended Title 15 by ordinance at each code cycle (e.g. Ord. 2086 in 2020, Ord. 2127 in 2022, Ord. 2150 in 2025), including at least one substantive local amendment (Residential Code §15.06.040, swimming-pool drowning-prevention feature requirements). No PV- or ESS-specific local amendment was found anywhere in Title 15 (confirmed by keyword search of the full Ord. 2150 readoption text for 'battery', 'energy storage', 'rapid shutdown', '690.' — zero hits; positive control 'electrical' 31 hits and 'fire' 38 hits, fabricated control 'zzqqx' 0 hits). 78% · ordinance (Legistar packet)
- What is the installation judged against? The adopted California Electrical Code (2025 cycle per the County's current department page; codified text still shows the 2022 CEC), plus TCC 15.60.030(c)(2)'s explicit cross-reference requiring conformance with 'all applicable state fire, structural, electrical, and other building codes,' state/county health and safety standards, and 'all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories' and, where applicable, CPUC safety/reliability rules. 78% · code of ordinances
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for City of Tehama on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, rapid shutdown applies — NEC Article 690.12 has been part of every NEC edition adopted in California since the 2017 cycle, and is carried forward automatically through the County's Electrical Code adoption-by-reference clause (TCC 15.20.030), whichever specific edition (2020 NEC under the still-codified 2022 CEC, or 2023 NEC under the 2025 CEC cycle now shown on the County's live page) currently applies. No county ordinance names 690.12 by section number, however — the requirement is inherited from the state code, not locally elaborated. 60% · code of ordinances (inferred from adoption clause)
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? No placards beyond the standard NEC/CEC-required markings (e.g. 690.13 service disconnect marking, 690.56 rapid-shutdown label, 705.10/706.15 point-of-interconnection/disconnect marking) — neither the City nor the County has published any local placard specification of its own for PV service equipment. 55% · forms library (absence) / code text (absence)
- Does the authority specify placard wording of its own? No 70% · forms library (absence)
- Does it specify letter height, colour or material? No 70% · forms library (absence)
- Is a site plan / facility map placard required, and what must it show? No local elaboration found; only the NEC/CEC default (Art. 705.10, one-line/site diagram for systems with multiple power sources) would apply via the adopted electrical code, with no county-specific 'facility map' placard requirement. 50% · forms library (absence)
- Where must the labels be placed? No local elaboration found; default placement would follow the adopted NEC/CEC (at each disconnecting means and the point of interconnection, per Art. 690/705) with no county-specific placement instruction published. 50% · forms library (absence)
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Must equipment be on a specific approved list? Yes 80% · code of ordinances
- Are batteries permitted, and under what conditions? Governed by whatever battery/ESS provisions exist in the adopted CRC/CFC (2025 cycle per the County's current department page) as a matter of general state code; no city or county ordinance adds a local ESS-specific rule, and Fee Ordinance No. 1918 (2009) predates common residential battery adoption and carries no ESS fee line at all. 55% · code text (absence) / fee schedule (absence)
- Is there a separate ESS permit or inspection? No dedicated ESS-specific permit or inspection process was found; a battery/ESS installation would be folded into the same building/electrical permit and the single combined inspection under TCC 15.60.040(e), absent any evidence of a separate track. 55% · fee schedule (absence)
- Is a ground mount treated as a structure? Likely yes (inferred) — the zoning chapter applies height (§17.84.040) and setback (§17.84.060) standards to solar installations generally ('Solar panels shall comply with the maximum permitted height of the zoning district'; 'must meet the required setbacks established by the zone district'), which functions the same way the code treats an accessory structure, though a ground-mount array is not explicitly named or defined apart from a roof/building-attached system. 60% · code of ordinances (inferred)
20 questions answered against City of Tehama’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
Ambiguous/in transition. The County's live 2026 Codes & Ordinances page and its pending Title-15 readoption (Ord. No. 2150, 'current governing codes (2025)') move the Electrical Code's adoption clause from a fixed '2022... National Electrical Code, 2022 Edition' text to 'the most current edition' of the CEC — i.e. the 2025 California Electrical Code cycle (effective statewide 1 Jan 2026), which incorporates the 2023 NEC. However, the still-live Municode codification of TCC §15.20.030 has not been updated and continues to read '2022 California Electrical Code... incorporating the National Electrical Code, 2022 Edition' (itself an apparent drafting mismatch, since no NEC edition is dated '2022' — the correct pairing for the 2022 CBSC cycle is the 2020 NEC).
Why the confidence is not higherTwo County first-party sources disagree on vintage: Municode's codified TCC 15.20.030 (still 2022-cycle text) vs. the County's own current department page listing 'Tehama County Ordinance #2150 Adopting Code Cycle 2025' and '2025 California Building Code' as a live design standard, plus the Legistar-hosted readoption ordinance text itself (tracked-changes PDF) which strikes the fixed-year references. Recording lower confidence given the conflict between codified text and live department page.
department page vs. codified ordinance (conflict noted) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/codes-and-ordinances/
Q30 Which building code edition is in force? Core Code editions in force
2025 California Building Code (per the County's live 2026 department page and its Ord. No. 2150 readoption of Title 15 to 'current governing codes (2025)'); Municode's codified TCC §15.04.030 has not yet been updated and still shows the 2022 CBC.
Why the confidence is not higherCounty's Codes & Ordinances page lists '2025 California Building Code' under 'Design Standards' alongside Ordinance #2150; the Legistar PDF of Ord. 2150 explicitly retitles Title 15 as readopting 'current governing codes (2025)'.
department page / ordinance (Legistar) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/codes-and-ordinances/
Q31 Which fire code edition is in force? Code editions in force
2025 California Fire Code (incorporating the 2024 IFC per Ord. 2150's tracked-change text, which strikes '2018' and inserts '2024' for the IFC edition); Municode's codified TCC §15.34.030 still shows the prior 2022 CFC / 2018 IFC.
Why the confidence is not higherLegistar PDF of Ord. 2150, TCC §15.34.030 adoption clause tracked-change text reads '...incorporating the International Fire Code, 2018 2024 Edition...' (old value immediately followed by new value, a Legistar redline artifact); County's live department page corroborates a 2025-cycle adoption generally but does not separately name the fire-code edition.
ordinance (Legistar packet, tracked-changes) checked 2026-08-31 https://tehamacounty.legistar.com/View.ashx?M=F&ID=15003879&GUID=C5732D70-975B-43D7-9E52-8272B52F5A24
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes — the County has repeatedly amended Title 15 by ordinance at each code cycle (e.g. Ord. 2086 in 2020, Ord. 2127 in 2022, Ord. 2150 in 2025), including at least one substantive local amendment (Residential Code §15.06.040, swimming-pool drowning-prevention feature requirements). No PV- or ESS-specific local amendment was found anywhere in Title 15 (confirmed by keyword search of the full Ord. 2150 readoption text for 'battery', 'energy storage', 'rapid shutdown', '690.' — zero hits; positive control 'electrical' 31 hits and 'fire' 38 hits, fabricated control 'zzqqx' 0 hits).
Why the confidence is not higherDirect text review of the Legistar-hosted Ord. 2150 packet (71 pages, full Title 15 text) plus TCC §15.06.040.
ordinance (Legistar packet) checked 2026-08-31 https://tehamacounty.legistar.com/View.ashx?M=F&ID=15003879&GUID=C5732D70-975B-43D7-9E52-8272B52F5A24
Q33 What is the installation judged against? Core Electrical
The adopted California Electrical Code (2025 cycle per the County's current department page; codified text still shows the 2022 CEC), plus TCC 15.60.030(c)(2)'s explicit cross-reference requiring conformance with 'all applicable state fire, structural, electrical, and other building codes,' state/county health and safety standards, and 'all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories' and, where applicable, CPUC safety/reliability rules.
Why the confidence is not higherTCC 15.60.030(c)(2), the streamlined-solar chapter's own definition section.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedFull text of TCC Title 15 (Ord. 2150 readoption packet) and Ch.15.20 Electrical Code — searched for 'busbar', 'service upgrade', 'panel upgrade', '120%'; none found. No local rule beyond the base adopted CEC exists.
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedTCC Title 15 (building/electrical chapters) and Title 17.84 (Solar Energy Systems zoning chapter) — neither specifies a mounting-system type or attachment/spacing standard beyond generic 'setbacks established by the zone district' (§17.84.060); no racking/attachment-spacing rule found.
https://library.municode.com/ca/tehama/codes/code_of_ordinances?nodeId=TIT17ZO_CH17.84SOENSY
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedTCC Ch.15.34 Fire Code adoption clause and the full Ord. 2150 readoption text — searched for 'pathway', 'ridge', 'setback' in a fire-code/PV context; no locally-added PV access-pathway or ridge-setback rule exists on top of whatever the adopted CFC/CRC prescriptive tables provide by default.
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, rapid shutdown applies — NEC Article 690.12 has been part of every NEC edition adopted in California since the 2017 cycle, and is carried forward automatically through the County's Electrical Code adoption-by-reference clause (TCC 15.20.030), whichever specific edition (2020 NEC under the still-codified 2022 CEC, or 2023 NEC under the 2025 CEC cycle now shown on the County's live page) currently applies. No county ordinance names 690.12 by section number, however — the requirement is inherited from the state code, not locally elaborated.
Why the confidence is not higherInference from TCC 15.20.030's adoption-by-reference of the CEC/NEC; no Tehama city or county document names NEC 690.12 or 'rapid shutdown' directly (confirmed absent from the full Ord. 2150 text and the City's Title 17.84 solar chapter).
code of ordinances (inferred from adoption clause) checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.20ELCO
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
No placards beyond the standard NEC/CEC-required markings (e.g. 690.13 service disconnect marking, 690.56 rapid-shutdown label, 705.10/706.15 point-of-interconnection/disconnect marking) — neither the City nor the County has published any local placard specification of its own for PV service equipment.
Why the confidence is not higherConfirmed absence: full-text search of the City's Title 17.84 solar zoning chapter, the County's full Ord. 2150 Title 15 text, and the County's Building & Safety forms library/site search ('solar' — 2 results, neither a signage handout) found no locally-specified placard content.
forms library (absence) / code text (absence) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No
Why the confidence is not higherSame absence as Q38 — no city or county document specifies its own placard wording for PV systems; the state NEC/CEC default marking language applies without local elaboration.
forms library (absence) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
No
Why the confidence is not higherSame absence — no letter-height, colour, or material specification for PV placards found in either the City's Title 17.84 or the County's Title 15/fee ordinance/forms library.
forms library (absence) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
No local elaboration found; only the NEC/CEC default (Art. 705.10, one-line/site diagram for systems with multiple power sources) would apply via the adopted electrical code, with no county-specific 'facility map' placard requirement.
Why the confidence is not higherConfirmed absence in the same document search as Q38/39/40.
forms library (absence) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedCity's utility page (confirms PG&E serves Tehama) and County Building & Safety pages were checked, but PG&E's own Rule 21 tariff / 'Greenbook' DG interconnection requirements were not independently retrieved or reviewed in this run, so any utility-specific placard requirements beyond the AHJ's are unconfirmed.
Q43 Where must the labels be placed? Core Labels Signage & labelling
No local elaboration found; default placement would follow the adopted NEC/CEC (at each disconnecting means and the point of interconnection, per Art. 690/705) with no county-specific placement instruction published.
Why the confidence is not higherSame absence confirmed as Q38-41.
forms library (absence) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q44 Must equipment be on a specific approved list? Equipment listing
Yes
Why the confidence is not higherTCC 15.60.030(c)(2) requires conformance with 'all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories' — i.e. listed/labeled equipment is required as a matter of the adopted code, though not framed as a separate 'approved list' maintained by the county itself.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Governed by whatever battery/ESS provisions exist in the adopted CRC/CFC (2025 cycle per the County's current department page) as a matter of general state code; no city or county ordinance adds a local ESS-specific rule, and Fee Ordinance No. 1918 (2009) predates common residential battery adoption and carries no ESS fee line at all.
Why the confidence is not higherConfirmed absence of any ESS-specific text in the full Ord. 2150 Title 15 readoption packet (searched for 'battery', 'energy storage', 'ESS' — zero hits) and in Fee Ordinance 1918's full OCR'd fee tables.
code text (absence) / fee schedule (absence) checked 2026-08-31 https://tehamacounty.legistar.com/View.ashx?M=F&ID=15003879&GUID=C5732D70-975B-43D7-9E52-8272B52F5A24
Q46 Is there a separate ESS permit or inspection? Battery / ESS
No dedicated ESS-specific permit or inspection process was found; a battery/ESS installation would be folded into the same building/electrical permit and the single combined inspection under TCC 15.60.040(e), absent any evidence of a separate track.
Why the confidence is not higherSame absence as Q45 — no ESS line in the Fee Ordinance, no ESS section in Title 15.
fee schedule (absence) checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2024/12/ord1918-Fee-Ordinance.pdf
Q47 Is a ground mount treated as a structure? Core Ground mount
Likely yes (inferred) — the zoning chapter applies height (§17.84.040) and setback (§17.84.060) standards to solar installations generally ('Solar panels shall comply with the maximum permitted height of the zoning district'; 'must meet the required setbacks established by the zone district'), which functions the same way the code treats an accessory structure, though a ground-mount array is not explicitly named or defined apart from a roof/building-attached system.
Why the confidence is not higherCity's Title 17.84 (§§17.84.040, 17.84.060) — general height/setback rules that would apply to any ground-mounted array by default since it is not building-attached.
code of ordinances (inferred) checked 2026-08-31 https://library.municode.com/ca/tehama/codes/code_of_ordinances?nodeId=TIT17ZO_CH17.84SOENSY
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Nothing published by this authority.
Where we lookedCity's utility page (confirms PG&E) and County Building & Safety materials were checked; PG&E's own interconnection/Greenbook specification for AC-disconnect placement relative to the meter was not independently retrieved in this run.
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Portal or Phone — inspections may be requested online through the permit portal or by calling the Building & Safety office's 24-hour inspection line, (530) 527-7002. 88% · department page
- How much notice is required? Effectively about one business day: online requests must be in by 4:00 p.m. and phone requests by 4:30 p.m. to be scheduled for the next business day; requests after those deadlines are not scheduled for the next day. 85% · department page
- Are same-day or AM/PM windows offered? No AM/PM window choice is offered; inspections are scheduled for a specific day only, with the instruction to 'Be on-site by 8:00 a.m.' and to call after 7:30 a.m. that morning to check the specific time slot. 75% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Delegated 90% · department page / code of ordinances
- If delegated, to whom? Tehama County Department of Building & Safety, 444 Oak Street, Room H / Courthouse Annex 2nd Floor, Red Bluff, CA 96080, (530) 527-7002. 92% · city department page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? A single combined final inspection covers building and electrical for a qualifying small residential rooftop PV system, with a separate fire inspection only if the fire code official determines one is necessary; no rough-in stage is required for the PV work itself. 85% · code of ordinances
- Is a rough-in or mid-roof inspection required? No 85% · code of ordinances
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? No — despite TCC 15.60.040(a)-(b) directing the director of the building department to adopt an expedited-review checklist/standard plan(s) 'substantially conform[ing]' to the state Solar Permitting Guidebook and to publish it on the county website, no such checklist could be located. 78% · forms library (absence, control-checked)
- What must be on site at inspection? A complete set of County-approved plans, the pink permit, calculations, and the yellow inspection card must be on site between 8:00 a.m. and 5:00 p.m. on the day of the scheduled inspection; the orange County 'JOB SITE' card must also be posted visibly near the road. 90% · department policy document
- Does the inspector verify labels and listings? Not documented as an explicit checklist item, but implicitly covered — TCC 15.60.030(c)(2) requires conformance with UL/IEEE listing standards as a condition of eligibility, which the single combined inspection under 15.60.040(e) would be verifying as part of general code compliance. 50% · code of ordinances (inferred)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? Final inspection approval/sign-off on the permit card. The City's own page states the County issues 'Certificates of Occupancy' for construction generally, but for a PV retrofit on an existing dwelling (not new construction) the operative sign-off is passage of the single final inspection under TCC 15.60.040(e) rather than a new Certificate of Occupancy. 55% · city department page (inferred)
- Who notifies the utility for PTO? Installer / Applicant 85% · code of ordinances
- Is there a re-inspection fee? $166.15 88% · department policy document / fee schedule
- How are corrections issued and cleared? A written correction notice detailing all deficiencies is issued; items must be corrected and a re-inspection called in before proceeding, with the correction notice kept available on site for the inspector to review at the re-inspection. 85% · department policy document
14 questions answered against City of Tehama’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Portal or Phone — inspections may be requested online through the permit portal or by calling the Building & Safety office's 24-hour inspection line, (530) 527-7002.
Why the confidence is not higherCounty's Building & Safety page: 'Our inspection line is available 24 hours. ☎ (530) 527-7002'; the department page also links a 'Schedule Inspection' function alongside 'Apply for a Permit Online'.
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/
Q50 How much notice is required? Core Booking & scheduling
Effectively about one business day: online requests must be in by 4:00 p.m. and phone requests by 4:30 p.m. to be scheduled for the next business day; requests after those deadlines are not scheduled for the next day.
Why the confidence is not higherCounty's Building & Safety page, 'Inspection Deadlines' box: 'Online 4:00 p.m. for the next business day. Phone 4:30 p.m. for the next business day. Calls or online requests after the deadline will not be scheduled the next day.'
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
No AM/PM window choice is offered; inspections are scheduled for a specific day only, with the instruction to 'Be on-site by 8:00 a.m.' and to call after 7:30 a.m. that morning to check the specific time slot.
Why the confidence is not higherCounty's Building & Safety page: '✓ Be on-site by 8:00 a.m. ✓ Someone must be present... Call after 7:30 a.m. to check your inspection time for the day.'
department page checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Delegated
Why the confidence is not higherFinal building/electrical inspection is performed by the Tehama County Building & Safety Department under the TCMC 15.04.020 contract arrangement, not by City staff directly.
department page / code of ordinances checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/
Q53 If delegated, to whom? Core Who inspects
Tehama County Department of Building & Safety, 444 Oak Street, Room H / Courthouse Annex 2nd Floor, Red Bluff, CA 96080, (530) 527-7002.
Why the confidence is not higherCity's own building-permits page names the County Building Department as the delegate; County's own department page and forms confirm the address/phone (Building Official: Patrick Ewald, CBO).
city department page checked 2026-08-31 https://cityoftehama.us/building-permits-and-inspections
Q54 Which inspections are required, and in what order? Core Stages & sequence
A single combined final inspection covers building and electrical for a qualifying small residential rooftop PV system, with a separate fire inspection only if the fire code official determines one is necessary; no rough-in stage is required for the PV work itself.
Why the confidence is not higherTCC 15.60.040(e): 'Only one, timely, inspection shall be required and performed by staff for small residential rooftop solar energy systems eligible for expedited review, excepting a separate fire inspection if necessary.'
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
No
Why the confidence is not higherSame TCC 15.60.040(e) language — explicitly 'only one' inspection is required for qualifying systems, precluding a separate rough-in/mid-roof stage.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q56 Does the inspector verify labels and listings? Core What is checked
Not documented as an explicit checklist item, but implicitly covered — TCC 15.60.030(c)(2) requires conformance with UL/IEEE listing standards as a condition of eligibility, which the single combined inspection under 15.60.040(e) would be verifying as part of general code compliance.
Why the confidence is not higherInference from TCC 15.60.030(c)(2) and 15.60.040(e); no published inspection checklist exists to confirm this as a discrete, named inspection step (see Q57).
code of ordinances (inferred) checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Q57 Is there a published inspection checklist? Core What is checked
No — despite TCC 15.60.040(a)-(b) directing the director of the building department to adopt an expedited-review checklist/standard plan(s) 'substantially conform[ing]' to the state Solar Permitting Guidebook and to publish it on the county website, no such checklist could be located.
Why the confidence is not higherConfirmed by site search of tehama.gov for 'solar' (2 results, neither a checklist), the full PDF listing on the Building Forms page (no solar-specific checklist among 60+ named forms), and the Codes & Ordinances page (no linked checklist). Positive control 'electrical' returned 1 result and fabricated control 'zzqqx' returned 0 results, confirming the site search itself functions.
forms library (absence, control-checked) checked 2026-08-31 https://www.tehama.gov/government/departments/building-and-safety/building-forms/
Q58 What must be on site at inspection? Core Documents on site
A complete set of County-approved plans, the pink permit, calculations, and the yellow inspection card must be on site between 8:00 a.m. and 5:00 p.m. on the day of the scheduled inspection; the orange County 'JOB SITE' card must also be posted visibly near the road.
Why the confidence is not higherCounty's own 'Inspection Policy' document, items 1-2, verbatim.
department policy document checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2026/02/Inspection-Policy.pdf
Q59 Is there a re-inspection fee? Corrections & re-inspection
$166.15
Why the confidence is not higherCounty's Inspection Policy document states verbatim: 'Failure to comply with any item above shall require the permit holder to pay a re-inspection of $166.15.' This matches the Fee Ordinance's 'Minimum Permit / Minimum Inspection Fee (one inspection unit)' base rate (Table B item 200 / Table E item 500), corroborating the figure across two County documents.
department policy document / fee schedule checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2026/02/Inspection-Policy.pdf
Q60 How are corrections issued and cleared? Corrections & re-inspection
A written correction notice detailing all deficiencies is issued; items must be corrected and a re-inspection called in before proceeding, with the correction notice kept available on site for the inspector to review at the re-inspection.
Why the confidence is not higherCounty's Inspection Policy document, item 4; corroborated by TCC 15.60.040(d) for the plan-review stage ('a written correction notice detailing all deficiencies... shall be sent to the applicant for resubmission').
department policy document checked 2026-08-31 https://www.tehama.gov/wp-content/uploads/2026/02/Inspection-Policy.pdf
Q61 What is issued on pass? Core Final sign-off & PTO
Final inspection approval/sign-off on the permit card. The City's own page states the County issues 'Certificates of Occupancy' for construction generally, but for a PV retrofit on an existing dwelling (not new construction) the operative sign-off is passage of the single final inspection under TCC 15.60.040(e) rather than a new Certificate of Occupancy.
Why the confidence is not higherCity of Tehama's Building Permits & Inspections page (County 'responsible for... issuance of Certificates of Occupancy') read together with TCC 15.60.040(e)'s single-final-inspection process for qualifying solar systems; no document explicitly names what document/tag is issued specifically for a passed solar inspection.
city department page (inferred) checked 2026-08-31 https://cityoftehama.us/building-permits-and-inspections
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Installer / Applicant
Why the confidence is not higherTCC 15.60.040(f): county approval 'does not authorize an applicant to connect... to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider' — i.e. the applicant/installer, not the AHJ, deals with the utility for PTO.
code of ordinances checked 2026-08-31 https://library.municode.com/ca/tehama_county/codes/code_of_ordinances?nodeId=TIT15BUCO_CH15.60STPEPRSMREROSOENSY
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Jurisdiction & key facts
The standing 62-question set, answered for City of Tehama against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Tehama is the authority having jurisdiction 93% confidence
- Holds
- Nominal/legal AHJ for work within city limits, but Building and Electrical permitting, plan review and inspection are both fully delegated by contract to the Tehama County Department of Building & Safety; the City itself retains only Planning/zoning review (site layout, setbacks, flood elevation).
- Delegated to
- Tehama County Department of Building & Safety, 444 Oak St. Room H, Red Bluff, CA 96080 (Building Official: Patrick Ewald, CBO)
- Overridden by
- CA Gov. Code §65850.5 (streamlined residential solar permitting, codified by the County as TCC Ch.15.60 since the County performs the building function city-wide by contract); TCC 15.04.020 is the specific delegation clause.
- Why not higher
- Two independent first-party sources agree: the City's own 'Building Permits & Inspections' page states plainly that 'The City of Tehama contracts with the Tehama County Building Department to issue Building Permits and conduct Inspections... The County is responsible for permitting all construction and conducting inspections of all construction-related permits'; and the City's own codified ordinance, TCMC §15.04.020 (Ord. 116 §4, 1982), states 'The Tehama County building department is authorized to act as the building department for the city of Tehama in the issuing, inspection, and enforcement of building permits under the adopted codes.' The brief's caution to verify delegation via a copied form could not be tested directly — the city's own site hosts no downloadable Building Permit Application PDF at all (confirmed via its XML sitemap, which lists only HTML pages, zero PDFs) — but the plain-language delegation statement and the codified ordinance clause together are stronger, first-party proof of the same fact.
- Permit required
- Yes92%
- Permit cost
- $400.95 flat, per inverter (Electrical Permit Fee Table E, item 566 'Solar Photovoltaic System'), limited to two site visits.78%
- Portal
- OpenGov Permitting & Licensing, at tehamacountyca.portal.opengov.com (reached via the County's published legacy link https://tehamacountyca.viewpointcloud.com,85%
- Electrical code
- Ambiguous/in transition. The County's live 2026 Codes & Ordinances page and its pending Title-15 readoption (Ord. No.55%
- Own placard wording
- No70%
- Booking an inspection
- Portal or Phone — inspections may be requested online through the permit portal or by calling the Building & Safety office's 24-hour inspection line, (530) 527-7002.88%
Labels & placards for this authority
Wording 70%
No
Size, colour & material 70%
No
Where they go 50%
No local elaboration found; default placement would follow the adopted NEC/CEC (at each disconnecting means and the point of interconnection, per Art. 690/705) with no county-specific placement instruction published.
What the utility wants on top None%
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.