City of West Hollywood

Los Angeles County

Verified Aug. 5, 2026

City of West Hollywood is a city authority in the State of California, serving 35,757 residents. 161 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — 3 business days Q18 Where you file — Tyler Technologies EnerGov Self-Service Portal (cityofwesthollywoodca-energovweb.tylerhost.net) Q20

Permit required
Yes95% source
What it costs
$0 for building, electrical and plumbing plan-check and permit fees on qualifying residential rooftop solar (waived by the City);90% source
Plan review turnaround
3 business days85% source
Key document
absence across reviewed department documents cited by 11 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · department page
    • What does this authority permit itself, and what does it delegate? Both (Building and Electrical, self-performed in-house by the Building & Safety Division); Planning issues a Zone Clearance; Fire (LACoFD) is delegated for conventional rooftop PV but retains ESS>3kWh, a BIPV subset, and disconnect/placard review 90% · department page
    • Is a permit required for a residential rooftop PV system? Yes 95% · published checklist
    • Is there a separate electrical permit, or is it combined? Combined 95% · department page
    • Is a HOA or architectural approval required first? No 90% · department page
    • Is there a historic-district review? No 95% · municipal code
    • Is a wind or windstorm certification required? No - not applicable/not found in any WeHo or LACoFD document reviewed 50% · absence across reviewed department documents
    • Is a Specific Use Permit or Council approval ever required? Not for qualifying systems (handled by ministerial Zone Clearance only, per the city's own page: 'Projects with an output no greater than 10kW will be issued under a zone clearance,' processed 'similar to nondiscretionary permits'). Larger/non-qualifying systems could fall under the general Development Permit (WHMC Ch.19.48) or CUP (Ch.19.52) process depending on zoning district, but no solar-specific CUP/Council-approval trigger was found. 65% · department page + municipal code TOC
    • Is there a system-size cap on residential generation? 10 kW (AC) for simple PV systems; 30 kWth for solar water heating; 30 kWth for solar pool heating - all scoped to single- or duplex-family dwellings under the city's AB 2188 streamlined ordinance. This is the ONLY cap I could find: the codified zoning solar chapter (WHMC 19.20.170) sets siting/screening standards but no kW number; the city's permit portal is Tyler EnerGov, not SolarAPP+ or Symbium, so no separate live-portal cap exists to conflict with it. 90% · department page
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Zoning clearance application; building permit application; electrical permit application; completed Expedited Solar Photovoltaic Permitting Checklist (all 'YES' answers required for streamlined eligibility); Solar PV Standard Electrical Plan (or a custom electrical plan with disconnect locations, module/string counts, inverter/combiner make-model, one-line diagram, grounding/bonding and conductor sizing, equipment cut sheets, CEC 690/705 labeling); roof plan showing layout, fire-access pathways, PV fire classification and required label locations; and a completed Structural Criteria for Rooftop Solar Energy Installations form (or PE/SE-stamped structural drawings/calcs for non-qualifying systems) 95% · published checklist
    • How many copies, and in what format? Electronic/digital submittal (PDF); the Division has accepted electronic-only submittals since March 2020 for residential plan check generally, submitted via the online permitting portal 60% · department page
    • Is a site plan required, and what must it show? Yes - a site diagram showing arrangement of panels on the roof or ground, north arrow, lot dimensions, and distance from property lines to adjacent buildings/structures (existing and proposed) 95% · published checklist
    • Is a one-line / three-line diagram required? Yes 95% · published checklist
    • Are string and conductor calculations required? Yes 90% · published checklist
    • Is a structural PE stamp required, and at what threshold? Structural PE/SE stamp is NOT required for systems that pass the city's own 'Structural Criteria for Rooftop Solar Energy Installations' self-certification form (qualifying systems). For non-qualifying systems, stamped structural drawings and calculations by a California-licensed civil or structural engineer are required. 75% · published checklist
    • Is an electrical PE stamp required, and at what threshold? No solar-specific electrical PE stamp threshold found; the general Electrical Code amendment (WHMC 13.08.030) requires electrical plans to be prepared by a CA-registered electrical engineer 'or a person who is qualified...and exempt from registration' under the Professional Engineer's Act - this is boilerplate applicable to all electrical permits, not a solar-specific stamp trigger, and qualifying PV systems use the standard plan instead. 60% · municipal code
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Tyler Technologies EnerGov Self-Service Portal (cityofwesthollywoodca-energovweb.tylerhost.net) 95% · portal landing page
    • Can the whole application be completed online? Yes 88% · department page
    • What does a residential solar permit cost? $0 for building, electrical and plumbing plan-check and permit fees on qualifying residential rooftop solar (waived by the City); a Zone Clearance fee from Planning and any State/outside-agency fees still apply (amount not published in any source I could reach); permit fees for required structural upgrades are NOT waived and follow the standard valuation-based fee schedule 90% · department page
    • How is the fee calculated? Flat ($0) for qualifying systems' building/electrical/plumbing plan check and permit; the separate Zone Clearance fee and any non-waived structural-upgrade fees are calculated per the Planning and Building fee schedules respectively (schedules not retrievable this session) 70% · department page
    • Is there a separate plan-check fee? Building/electrical plan-check fee is $0 (waived) for qualifying systems; a separate Planning Zone Clearance fee still applies 80% · department page
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 3 business days 85% · department page
    • Which utility handles interconnection here? Southern California Edison (SCE) 98% · department page
    • Where does the utility sit in the sequence? Parallel / no hard permit dependency 65% · department page

28 questions answered against City of West Hollywood’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherCity's own Solar West Hollywood page: 'Building and Safety review and approval is required. A building and electrical permit shall be issued.'

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both (Building and Electrical, self-performed in-house by the Building & Safety Division); Planning issues a Zone Clearance; Fire (LACoFD) is delegated for conventional rooftop PV but retains ESS>3kWh, a BIPV subset, and disconnect/placard review

Why the confidence is not higherCombination of the Solar West Hollywood page and LACoFD's own checklist/guide (2023-09-01) describing the deferral and the retained scope.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherBoth the live Solar West Hollywood page and the city's own 'Solar Photovoltaic (PV) System Installations: 10kW or Less' handout state a building and electrical permit shall be issued, even though fees for qualifying systems are waived.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherCity's Building & Safety Permitting Services page states: 'We do not issue combination building permits. Each trade is required to obtain individual permits for their specific work, with the exception of solar installations, signs, and pools and spas.' Solar is an explicit, named exception to the city's general separate-permit rule.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-division-permitting-services

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either (licensed contractor or, per the city's general Owner-Builder Permit process, the homeowner)

Why the confidence is not higherNo solar-specific restriction on who pulls the electrical permit was found. The city's own Building and Safety Guides and Handouts list includes an 'Owner-Builder Permit Requirements' handout confirming an owner-builder pathway exists generally, but its content PDF could not be retrieved (persistent Akamai block on the /home/showpublisheddocument/ path during this session) so this is inference from the title plus general CA practice (Bus. & Prof. Code 7044), not a read solar-specific clause.

department page (title only; PDF blocked) checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-guides-and-handouts

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherPermitting Services page requires 'A Business Tax Certificate...for all contractors' before/at application, which functions as a registration-before-permitting requirement, though it is a business tax certificate rather than a dedicated contractor-registration database.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-division-permitting-services

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherInferred from the existence of a city-published 'Owner-Builder Permit Requirements' handout (title confirmed on the Guides and Handouts page) plus general CA law; the handout's content PDF could not be retrieved this session due to a persistent host-level block on the document-serving path, so this is not a directly read solar-specific confirmation.

department page (title only; PDF blocked) checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-guides-and-handouts

Q8 What documents make up a complete submittal? Core Submittal package

Zoning clearance application; building permit application; electrical permit application; completed Expedited Solar Photovoltaic Permitting Checklist (all 'YES' answers required for streamlined eligibility); Solar PV Standard Electrical Plan (or a custom electrical plan with disconnect locations, module/string counts, inverter/combiner make-model, one-line diagram, grounding/bonding and conductor sizing, equipment cut sheets, CEC 690/705 labeling); roof plan showing layout, fire-access pathways, PV fire classification and required label locations; and a completed Structural Criteria for Rooftop Solar Energy Installations form (or PE/SE-stamped structural drawings/calcs for non-qualifying systems)

Why the confidence is not higherDirectly extracted (pdftotext) from the city's own current handout, letterhead-branded 'WEST HOLLYWOOD, Building & Safety Division,' not a generic template.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q9 How many copies, and in what format? Submittal package

Electronic/digital submittal (PDF); the Division has accepted electronic-only submittals since March 2020 for residential plan check generally, submitted via the online permitting portal

Why the confidence is not higherGeneral residential post-entitlement submittal page states electronic-only since March 2020. The 2015-dated solar handout separately describes an in-person or email (bgalan@weho.org) route during 8AM-12PM counter hours; that instruction predates the now-live EnerGov online portal and may be superseded, so I flag the discrepancy rather than pick one silently.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/residential-post-entitlement-submittals/how-to-submit-residential-post-entitlement-phase-projects

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes - a site diagram showing arrangement of panels on the roof or ground, north arrow, lot dimensions, and distance from property lines to adjacent buildings/structures (existing and proposed)

Why the confidence is not higherDirectly quoted from the city's own PV installation handout, item (c).

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherHandout requires 'One-line diagram of system' as part of the electrical plan submittal if the standard plan is not used.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q12 Are string and conductor calculations required? Drawings & calculations

Yes

Why the confidence is not higherHandout requires 'Total number of modules, number of modules per string and the total number of strings' and conductor/conduit type-and-size specification when the standard plan is not used.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Structural PE/SE stamp is NOT required for systems that pass the city's own 'Structural Criteria for Rooftop Solar Energy Installations' self-certification form (qualifying systems). For non-qualifying systems, stamped structural drawings and calculations by a California-licensed civil or structural engineer are required.

Why the confidence is not higherThreshold logic is stated plainly in the city's own handout; however the Structural Criteria PDF itself (which would give the specific weight/psf/spacing numbers defining 'qualifying') could not be retrieved this session - the /home/showpublisheddocument/ path returned a persistent Akamai 'Access Denied' for every document ID after the first successful fetch, across multiple fresh browser profiles and over 8+ minutes of retries.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

No solar-specific electrical PE stamp threshold found; the general Electrical Code amendment (WHMC 13.08.030) requires electrical plans to be prepared by a CA-registered electrical engineer 'or a person who is qualified...and exempt from registration' under the Professional Engineer's Act - this is boilerplate applicable to all electrical permits, not a solar-specific stamp trigger, and qualifying PV systems use the standard plan instead.

Why the confidence is not higherRead the full text of WHMC 13.08.030 (Amendments to Electrical Code); found only the generic PE Act reference, no solar-specific threshold.

municipal code checked 2026-08-30 https://ecode360.com/43910196

Q15 What does a residential solar permit cost? Core Fees

$0 for building, electrical and plumbing plan-check and permit fees on qualifying residential rooftop solar (waived by the City); a Zone Clearance fee from Planning and any State/outside-agency fees still apply (amount not published in any source I could reach); permit fees for required structural upgrades are NOT waived and follow the standard valuation-based fee schedule

Why the confidence is not higherStated identically and specifically on both the live 'Solar West Hollywood' page and the (2015) PV installation handout: 'Building, electrical and plumbing plan check fees and associated permit fees for qualifying residential rooftop solar energy systems have been waived by the City of West Hollywood.'

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q16 How is the fee calculated? Core Fees

Flat ($0) for qualifying systems' building/electrical/plumbing plan check and permit; the separate Zone Clearance fee and any non-waived structural-upgrade fees are calculated per the Planning and Building fee schedules respectively (schedules not retrievable this session)

Why the confidence is not higherThe $0 waiver for qualifying systems is explicit and repeated across two of the city's own documents; the calculation basis for the non-waived Zone Clearance/structural fees was not found because the consolidated fee schedule PDF sits behind the same blocked document path.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q17 Is there a separate plan-check fee? Fees

Building/electrical plan-check fee is $0 (waived) for qualifying systems; a separate Planning Zone Clearance fee still applies

Why the confidence is not higherSame source as Q15/Q16 - explicitly names plan-check fees as part of the waiver while carving the Zone Clearance fee out as still applicable.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q18 What is the stated plan-review turnaround? Core Timeline & validity

3 business days

Why the confidence is not higherCity's general Permitting Services page ('Applications will be processed within 3 business days') and the solar handout ('The applicant will be notified within 3 business days regarding review status' for permits not approved under the streamlined process) agree on this figure.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-division-permitting-services

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedWHMC Title 13 Chapter 13.04 (Building Code) section list, including 13.04.035 'Expiration of Applications' (which covers application expiration, not issued-permit validity) and 13.04.060/070 (Building Code Section 113 amendments); no issued-permit expiration/validity period section was located; the city's solar handout and live Solar West Hollywood page are silent on this

https://ecode360.com/43910120

Q20 Which permit portal does this authority use? Core Portal & process

Tyler Technologies EnerGov Self-Service Portal (cityofwesthollywoodca-energovweb.tylerhost.net)

Why the confidence is not higherLive link target from the city's own 'Permits & Licenses' online-services page.

portal landing page checked 2026-08-30 https://www.weho.org/services/online-services/permits

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherPermitting Services page: 'All applications shall be submitted online via our permitting and licensing portal.' Inspections are also scheduled and results retrieved through the same account-based portal per the Inspection Services page.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-division-permitting-services

Q22 Which utility handles interconnection here? Core Utility interconnection

Southern California Edison (SCE)

Why the confidence is not higherCity's own Solar West Hollywood page states plainly: 'West Hollywood is serviced by Southern California Edison (SCE).' The Clean Power Alliance (joined 2019, per the city's Electrify WeHo page) supplies generation/electricity commodity to most WeHo customers but is not the interconnecting utility - SCE owns the wires and handles NEM/interconnection. PowerToChoose was not used for this determination.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel / no hard permit dependency

Why the confidence is not higherCity's own page: 'Edison's interconnection approval is separate from West Hollywood's and customers are encouraged to contact them early in the planning process. Edison's approval process may take up to 30 days.' This describes a parallel track rather than an explicit before/after-permit gate; SCE's own DG-manual/interconnection pages returned a soft-404 in this session so the sequence could not be independently confirmed from SCE's side.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No

Why the confidence is not higherCity's own page states the Zone Clearance permit for a qualifying system 'shall not be conditioned on approval of an association' - an explicit HOA-preemption consistent with the CA Solar Rights Act (Civil Code 714/4600), which is unusually relevant given West Hollywood's large condominium stock.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q25 Is there a historic-district review? Overlays & special cases

No

Why the confidence is not higherWHMC 19.58.090(G), 'Solar Panel Exemption': 'a certificate of appropriateness is not required for the installation of a solar energy system, solar panels, or the appurtenant equipment and accessory features associated with solar energy systems, provided that the collectors are located in compliance with Section 19.20.170.' Read directly from the codified Cultural Heritage Preservation chapter - historic review does not reach a compliant PV installation.

municipal code checked 2026-08-30 https://ecode360.com/43916616

Q26 Is a wind or windstorm certification required? Overlays & special cases

No - not applicable/not found in any WeHo or LACoFD document reviewed

Why the confidence is not higherCalifornia does not operate a TDI-style windstorm-certification regime; no wind/windstorm certification requirement was mentioned in the city's solar handouts, the zoning solar-equipment section, or LACoFD's PV/ESS guide.

absence across reviewed department documents checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Not for qualifying systems (handled by ministerial Zone Clearance only, per the city's own page: 'Projects with an output no greater than 10kW will be issued under a zone clearance,' processed 'similar to nondiscretionary permits'). Larger/non-qualifying systems could fall under the general Development Permit (WHMC Ch.19.48) or CUP (Ch.19.52) process depending on zoning district, but no solar-specific CUP/Council-approval trigger was found.

Why the confidence is not higherDirect city-page language for the qualifying path; the non-qualifying-path inference is drawn from the general zoning chapter list, not a solar-specific carve-out.

department page + municipal code TOC checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q28 Is there a system-size cap on residential generation? Overlays & special cases

10 kW (AC) for simple PV systems; 30 kWth for solar water heating; 30 kWth for solar pool heating - all scoped to single- or duplex-family dwellings under the city's AB 2188 streamlined ordinance. This is the ONLY cap I could find: the codified zoning solar chapter (WHMC 19.20.170) sets siting/screening standards but no kW number; the city's permit portal is Tyler EnerGov, not SolarAPP+ or Symbium, so no separate live-portal cap exists to conflict with it.

Why the confidence is not higherCap figure is stated on the live, current 'Solar West Hollywood' page and repeated in the 2015 handout; I separately read the full codified zoning solar section (19.20.170) and confirmed it carries no numeric size cap, and confirmed the city does not use SolarAPP+.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 (NEC edition underlying the California Electrical Code, 2025 Edition, which West Hollywood adopts by reference) 88% · adopting ordinance
    • Which building code edition is in force? California Building Code, 2025 Edition (via LA County Code Title 26, as amended and in effect 1/1/2026) 92% · adopting ordinance
    • Which fire code edition is in force? California Fire Code, 2022 Edition, via LA County Code Title 32 as amended and in effect March 2, 2023 (WHMC 14.04.010, last amended by Ord. 23-12 in 2023). NOTE: this is one cycle BEHIND LACoFD's own current 2023 LACFC (Ordinances #23-0008 & 2023-0058, codified effective 2024-01-11) that its Fire Prevention Division's PV/ESS guide and Appendix QQ fee schedule now operate under. 85% · adopting ordinance
    • Are there local amendments to any of the above? Yes for Building, Electrical, Green Building, and Fire codes generally (local amendment chapters exist for each), but NO solar/PV/ESS-specific local amendment was found in any of them - checked WHMC 13.08.030 (Electrical amendments: Building Official/permit-application content only), 13.24.015 (Green Building amendments: water-use only), and 14.04.020 (Fire Code amendments: sprinkler threshold only). Ran positive control (found 'electrical'/'fire code' text throughout) and fabricated control ('zzqqx', 0 hits) in the same pass. 85% · municipal code
    • What is the installation judged against? CA Building Code 2025, CA Electrical Code 2025 (CEC Sections 690 and 705 specifically cited for PV equipment labeling), CA Residential Code (R324.7 cited for roof access pathways), and LA County Fire Code/LACoFD's current PV-ESS-Disconnects guide for fire/disconnect/placard matters; the State Fire Marshal's Solar PV Installation Guide is cited by the city for pathway examples. 85% · published checklist + municipal code
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Roof access and pathways per LA County Fire Code Section 605.11 and California Residential Code Section R324.7 (no WeHo-specific numeric setback beyond incorporating these codes) 88% · department page
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Required as a matter of the currently-adopted CEC 2025 (based on NEC 2023, i.e., CEC/NEC Section 690.12), but NEITHER the city's own PV handout nor its live Solar West Hollywood page, nor LACoFD's current PV/ESS guide and inspection checklist, mention 'rapid shutdown' by that CEC section number anywhere - I grepped all of them for '690.12' and 'rapid shutdown' with zero hits in the city's documents (LACoFD's guide/checklist do use the term 'Rapid Shutdown' generically 6 times but never cite 690.12 specifically). 60% · published checklist (absence) + adopting ordinance (requirement)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? At the building/electrical level: signs identifying the PV power-source system attributes at the DC disconnect, the AC point of connection, and the switch for the alternative power system (standard CEC 690/705-style placards, per the city's own inspection checklist). At the fire level (LACoFD-retained scope): the LACoFD Electrical Power Source Disconnect Placarding System - an Exterior Placard ('F.D. - ELECTRICAL / BLDG DISCONNECT / #X of Y') and a Panel-Interior Placard for specific breakers. 90% · fire authority guide
    • Does the authority specify placard wording of its own? Yes, but only by the fire AHJ (LACoFD), not the building AHJ (city). LACoFD specifies exact wording: 'F.D. - ELECTRICAL / BLDG DISCONNECT / #X of Y.' The city's own PV handout describes sign FUNCTIONS (DC disconnect sign, AC point-of-connection sign, alternative-power-switch sign) but does not itself dictate wording beyond referencing CEC 690/705. 90% · fire authority guide
    • Does it specify letter height, colour or material? Yes, by LACoFD (fire-retained scope): red letters engraved into a yellow background; Arial, all-capitals, solid, minimum 24pt (28pt bold for 'F.D.' and '#X of Y'); minimum 2in x 3.5in weather-resistant plastic for exterior placards, 7/16in x 3/4in for panel-interior placards; permanent epoxy mount. The city's own building-side documents do not separately specify letter height/color/material for the CEC 690/705 signs. 92% · fire authority guide
    • Is a site plan / facility map placard required, and what must it show? No dedicated separate 705.10 facility-map placard requirement was found distinct from the roof-plan submittal itself, which must show 'PV system fire classification and the locations of all required labels and markings.' 65% · published checklist
    • Where must the labels be placed? At the DC disconnect, at the AC point of connection, and at the switch for the alternative power system (city side); LACoFD Exterior Placards go on/immediately adjacent to each panel/enclosure or standalone disconnect switch to be operated, with Panel-Interior Placards inside the panel identifying specific breakers where multiple switches require operation. 85% · fire authority guide + published checklist
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? Yes, implicitly - the city's own Solar Web Resources page links CALSEIA's UL 1703 Approved Roof-Mounted PV Systems database as a resource, and LACoFD requires UL 9540 listing for ESS units (whole-unit or component) and UL 1741 for inverters. 78% · fire authority checklist
    • Are batteries permitted, and under what conditions? Batteries/ESS are permitted subject to LACoFD's retained conditions: max 20 kWh per individual ESS unit, 80 kWh aggregate per site and per location category (attached garage / detached garage / exterior wall / ground), UL 9540 listing, and the setback/impact-protection/ventilation rules of LACFC 1207.11. Whether West Hollywood's OWN streamlined-PV Eligibility Checklist excludes battery storage from the expedited path entirely (as seen in several other CA cities in this corpus) could NOT be confirmed - that specific PDF was blocked all session. 68% · fire authority guide
    • Is there a separate ESS permit or inspection? Yes 85% · fee schedule
    • Is a ground mount treated as a structure? Qualified yes - WHMC 19.20.170(B)(1)(b) explicitly addresses 'wall-mounted and ground-mounted collectors,' requiring they be screened from public view, and WHMC 19.20.150(B)(2) exempts only 'free-standing solar devices...that do not exceed a height of 12 inches above finished grade' from setback measurement - implying taller ground-mounted solar installations ARE otherwise subject to standard structure setback rules. 80% · municipal code
    • Is there a local rule on service upgrades or busbar sizing? No local rule on service upgrades or busbar sizing found 80% · municipal code
    • Is a specific mounting system or attachment spacing required? No prescriptive city spacing table; the city requires either its own 'Structural Criteria for Rooftop Solar Energy Installations' self-certification form (qualifying systems) or, where an approved racking system is used, manufacturer documentation of maximum allowable weight, attachment method, and product evaluation/structural design for the rack system. 75% · published checklist

20 questions answered against City of West Hollywood’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 (NEC edition underlying the California Electrical Code, 2025 Edition, which West Hollywood adopts by reference)

Why the confidence is not higherWHMC 13.08.010: 'Title 27, Electrical Code, of the Los Angeles County Code...as amended and in effect on January 1, 2026, adopting the California Electrical Code, 2025 Edition.' The 2025 CEC is based on the 2023 NEC.

adopting ordinance checked 2026-08-30 https://ecode360.com/43910196

Q30 Which building code edition is in force? Core Code editions in force

California Building Code, 2025 Edition (via LA County Code Title 26, as amended and in effect 1/1/2026)

Why the confidence is not higherWHMC 13.04.010, read directly: 'Title 26, Building Code, of the Los Angeles County Code...as amended and in effect on January 1, 2026, adopting the California Building Code, 2025 Edition.'

adopting ordinance checked 2026-08-30 https://ecode360.com/43910120

Q31 Which fire code edition is in force? Code editions in force

California Fire Code, 2022 Edition, via LA County Code Title 32 as amended and in effect March 2, 2023 (WHMC 14.04.010, last amended by Ord. 23-12 in 2023). NOTE: this is one cycle BEHIND LACoFD's own current 2023 LACFC (Ordinances #23-0008 & 2023-0058, codified effective 2024-01-11) that its Fire Prevention Division's PV/ESS guide and Appendix QQ fee schedule now operate under.

Why the confidence is not higherRead WHMC 14.04.010 directly (last amendment 2023, muni code overall is current through Ord. 26-08/May 2026 so the fire chapter is genuinely stale relative to the rest of the code) and cross-checked the date against LACoFD's own current Appendix QQ, which is explicitly the 2023 LACFC effective 2024-01-11 - a real code-cycle lag, not a guess.

adopting ordinance checked 2026-08-30 https://ecode360.com/43910590

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes for Building, Electrical, Green Building, and Fire codes generally (local amendment chapters exist for each), but NO solar/PV/ESS-specific local amendment was found in any of them - checked WHMC 13.08.030 (Electrical amendments: Building Official/permit-application content only), 13.24.015 (Green Building amendments: water-use only), and 14.04.020 (Fire Code amendments: sprinkler threshold only). Ran positive control (found 'electrical'/'fire code' text throughout) and fabricated control ('zzqqx', 0 hits) in the same pass.

Why the confidence is not higherRead full text of each amendment section; none mention solar, PV, or ESS.

municipal code checked 2026-08-30 https://ecode360.com/43910196

Q33 What is the installation judged against? Core Electrical

CA Building Code 2025, CA Electrical Code 2025 (CEC Sections 690 and 705 specifically cited for PV equipment labeling), CA Residential Code (R324.7 cited for roof access pathways), and LA County Fire Code/LACoFD's current PV-ESS-Disconnects guide for fire/disconnect/placard matters; the State Fire Marshal's Solar PV Installation Guide is cited by the city for pathway examples.

Why the confidence is not higherCombination of WHMC code-adoption sections and direct quotes from the city's own PV handout ('Labeling of equipment as required by CEC, Sections 690 and 705'; 'Roof access and pathways shall be provided per the Los Angeles County Fire Code, Section 605.11 and the California Residential Building Code, Section R324.7').

published checklist + municipal code checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local rule on service upgrades or busbar sizing found

Why the confidence is not higherRead the full text of WHMC 13.08.030 (Amendments to Electrical Code) - it covers Building Official designation, permit-application expiration/extension, and electrical-plan authorship requirements only; no busbar or service-upgrade provision. Positive control (found substantive electrical-code amendment text) and fabricated control ('zzqqx', 0 hits) both checked in the same pass.

municipal code checked 2026-08-30 https://ecode360.com/43910196

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No prescriptive city spacing table; the city requires either its own 'Structural Criteria for Rooftop Solar Energy Installations' self-certification form (qualifying systems) or, where an approved racking system is used, manufacturer documentation of maximum allowable weight, attachment method, and product evaluation/structural design for the rack system.

Why the confidence is not higherDirectly quoted from the city's own PV handout; the Structural Criteria form itself (which likely contains the actual spacing/attachment table, per the corpus-wide 'PV Toolkit Document #5' pattern) could not be retrieved this session due to the Akamai block on the document path.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Roof access and pathways per LA County Fire Code Section 605.11 and California Residential Code Section R324.7 (no WeHo-specific numeric setback beyond incorporating these codes)

Why the confidence is not higherDirect quote from the live Solar West Hollywood page.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Required as a matter of the currently-adopted CEC 2025 (based on NEC 2023, i.e., CEC/NEC Section 690.12), but NEITHER the city's own PV handout nor its live Solar West Hollywood page, nor LACoFD's current PV/ESS guide and inspection checklist, mention 'rapid shutdown' by that CEC section number anywhere - I grepped all of them for '690.12' and 'rapid shutdown' with zero hits in the city's documents (LACoFD's guide/checklist do use the term 'Rapid Shutdown' generically 6 times but never cite 690.12 specifically).

Why the confidence is not higherThe requirement flows from the adopted CEC edition itself (self-executing statewide code), not from an explicit local citation; the city's primary solar handout is dated 2015, predating the NEC 690.12 rapid-shutdown mandate, and was never updated to reference it. This is a genuine, corpus-consistent absence, not a search failure - checked with a positive control ('CEC, Sections 690 and 705' does appear in the handout).

published checklist (absence) + adopting ordinance (requirement) checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

At the building/electrical level: signs identifying the PV power-source system attributes at the DC disconnect, the AC point of connection, and the switch for the alternative power system (standard CEC 690/705-style placards, per the city's own inspection checklist). At the fire level (LACoFD-retained scope): the LACoFD Electrical Power Source Disconnect Placarding System - an Exterior Placard ('F.D. - ELECTRICAL / BLDG DISCONNECT / #X of Y') and a Panel-Interior Placard for specific breakers.

Why the confidence is not higherCity side from the city's own PV handout inspection-checklist section; fire side directly extracted (pdftotext) from LACoFD's current (2023-09-01) Guide Appendix B.

fire authority guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Yes, but only by the fire AHJ (LACoFD), not the building AHJ (city). LACoFD specifies exact wording: 'F.D. - ELECTRICAL / BLDG DISCONNECT / #X of Y.' The city's own PV handout describes sign FUNCTIONS (DC disconnect sign, AC point-of-connection sign, alternative-power-switch sign) but does not itself dictate wording beyond referencing CEC 690/705.

Why the confidence is not higherDirect comparison of the city's PV handout text against LACoFD's Appendix B verbatim wording requirement.

fire authority guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Yes, by LACoFD (fire-retained scope): red letters engraved into a yellow background; Arial, all-capitals, solid, minimum 24pt (28pt bold for 'F.D.' and '#X of Y'); minimum 2in x 3.5in weather-resistant plastic for exterior placards, 7/16in x 3/4in for panel-interior placards; permanent epoxy mount. The city's own building-side documents do not separately specify letter height/color/material for the CEC 690/705 signs.

Why the confidence is not higherExtracted verbatim from LACoFD's current Appendix B.

fire authority guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

No dedicated separate 705.10 facility-map placard requirement was found distinct from the roof-plan submittal itself, which must show 'PV system fire classification and the locations of all required labels and markings.'

Why the confidence is not higherRead the full text of the city's own PV handout; found the roof-plan requirement but no separately-named site-plan/facility-map placard clause.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSCE's own generating-your-own-power/interconnections and Rule 21/DG-manual pages, which returned a soft-404 (custom 404 page, not the real content) in this session; the city's own PV handouts and live Solar West Hollywood page do not describe any SCE-specific placard beyond the general CEC 690/705 signs already captured in Q38-Q40

https://www.sce.com/business/generating-your-own-power/interconnections

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the DC disconnect, at the AC point of connection, and at the switch for the alternative power system (city side); LACoFD Exterior Placards go on/immediately adjacent to each panel/enclosure or standalone disconnect switch to be operated, with Panel-Interior Placards inside the panel identifying specific breakers where multiple switches require operation.

Why the confidence is not higherCity side from the PV handout's inspection checklist; fire side from LACoFD's Appendix B placement rules.

fire authority guide + published checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes, implicitly - the city's own Solar Web Resources page links CALSEIA's UL 1703 Approved Roof-Mounted PV Systems database as a resource, and LACoFD requires UL 9540 listing for ESS units (whole-unit or component) and UL 1741 for inverters.

Why the confidence is not higherCity-side link plus LACoFD's own checklist requirement for UL9540/UL1741 listing.

fire authority checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries/ESS are permitted subject to LACoFD's retained conditions: max 20 kWh per individual ESS unit, 80 kWh aggregate per site and per location category (attached garage / detached garage / exterior wall / ground), UL 9540 listing, and the setback/impact-protection/ventilation rules of LACFC 1207.11. Whether West Hollywood's OWN streamlined-PV Eligibility Checklist excludes battery storage from the expedited path entirely (as seen in several other CA cities in this corpus) could NOT be confirmed - that specific PDF was blocked all session.

Why the confidence is not higherLACoFD conditions extracted directly from its current guide; the city-side eligibility-checklist battery-exclusion question is an open gap flagged honestly rather than guessed.

fire authority guide checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/LACoFD-Guide-for-ESS-PV-and-Disconnects-Rev-3-2023-09-01-w-Appendices-SECURED.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Yes

Why the confidence is not higherLACoFD's own Appendix QQ fee schedule prices ESS plan review ($195, Group R-3/R-4) and ESS field inspection ($390) as separate line items from PV; LACoFD's checklist describes a distinct FD ESS inspection request/scheduling process.

fee schedule checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2025/10/2023-LACFC-Appendix-QQ-Certified-Ord-Eff.-2024-01-11-Secured.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Qualified yes - WHMC 19.20.170(B)(1)(b) explicitly addresses 'wall-mounted and ground-mounted collectors,' requiring they be screened from public view, and WHMC 19.20.150(B)(2) exempts only 'free-standing solar devices...that do not exceed a height of 12 inches above finished grade' from setback measurement - implying taller ground-mounted solar installations ARE otherwise subject to standard structure setback rules.

Why the confidence is not higherRead both code sections directly; this is a genuinely ground-mount-aware zoning code (an unusual, well-documented shape compared to many cities in this corpus that are silent on ground mounts entirely).

municipal code checked 2026-08-30 https://ecode360.com/43913747

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedSame SCE soft-404 as Q42; LACoFD's guide gives a generic fire-code disconnect-location rule (within 6 feet of the main service panel, on the same wall plane, LACFC 509.3) but that is not phrased relative to the utility meter specifically, and no city-side or SCE-side meter-relative AC-disconnect placement rule could be located

https://www.sce.com/business/generating-your-own-power/interconnections

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (City of West Hollywood Permit & License Portal, Tyler EnerGov) 85% · department page
    • How much notice is required? Effectively 1 business day - inspections must be scheduled 'before 4PM' the business day prior; the 2015 solar handout separately describes requests received by 6PM being scheduled for the next business day. 82% · department page
    • Are same-day or AM/PM windows offered? A roughly 3-hour arrival window rather than a simple AM/PM split - 'The jobsite MUST be available within 3 hours of the time identified on your inspection record.' 80% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes for standard rooftop PV (self-performed by City Building & Safety inspectors); Delegated to LACoFD for ESS>3kWh, the narrow BIPV subcategory, and disconnect/rapid-shutdown placard verification 88% · staff directory
    • If delegated, to whom? Los Angeles County Fire Department, Fire Prevention Division (regional inspection office nearest the project site) 88% · fire authority checklist
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? City building permit issuance -> City Building & Safety final inspection (single final-type inspection covering modules, mounting, grounding, wiring, and signage per the city's own checklist) -> where applicable, a separately-scheduled LACoFD Fire Prevention inspection for ESS/BIPV-subset/disconnect-placard items (LACoFD requires digital proof of the issued construction permit before it will book its own inspection) 78% · fire authority checklist + published checklist
    • Is a rough-in or mid-roof inspection required? Not called out - the city's own inspection checklist describes what appears to be a single final-type inspection for qualifying rooftop PV, with no separate rough-in/mid-roof stage mentioned 65% · published checklist
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes 95% · fire authority checklist
    • What must be on site at inspection? Approved plans printed at 24in x 36in (per general Inspection Services page for construction plans on any project) and equipment cut/specification sheets matching the plans (per the PV handout's checklist language); LACoFD separately requires ESS cut/specification sheets 'immediately available upon request of the fire code official.' 80% · department page
    • Does the inspector verify labels and listings? Yes 95% · published checklist
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (the city does not issue physical inspection cards; the current Inspection Services page states 'Inspection results can be accessed by logging onto your online account,' implying a portal-recorded final/passed status rather than a printed Certificate of Occupancy, which generally does not apply to a PV addition on an existing single-family/duplex dwelling) 62% · department page
    • Who notifies the utility for PTO? Installer 58% · department page (inference)
    • Is there a re-inspection fee? $98 (LACoFD-side, for ESS/disconnect-placard re-inspections after the first re-inspection: 'Additional inspections after initial inspection and one reinspection'). No city-side (Building & Safety) re-inspection fee schedule could be retrieved this session. 80% · fee schedule

14 questions answered against City of West Hollywood’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (City of West Hollywood Permit & License Portal, Tyler EnerGov)

Why the confidence is not higherCurrent Inspection Services page: 'Applicants with valid permits can schedule an inspection using the City of West Hollywood Permit & License Portal.' NOTE: the 2015 solar-specific handout separately cites an older automated phone line ((323) 848-6335); I use the current general page as authoritative since it is dated to today's live site and describes the present-day process for all permit types including solar.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/inspection-services

Q50 How much notice is required? Core Booking & scheduling

Effectively 1 business day - inspections must be scheduled 'before 4PM' the business day prior; the 2015 solar handout separately describes requests received by 6PM being scheduled for the next business day.

Why the confidence is not higherCurrent Inspection Services page language plus the solar handout's consistent same-figure description.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/inspection-services

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

A roughly 3-hour arrival window rather than a simple AM/PM split - 'The jobsite MUST be available within 3 hours of the time identified on your inspection record.'

Why the confidence is not higherDirect quote from the current Inspection Services page.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/inspection-services

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes for standard rooftop PV (self-performed by City Building & Safety inspectors); Delegated to LACoFD for ESS>3kWh, the narrow BIPV subcategory, and disconnect/rapid-shutdown placard verification

Why the confidence is not higherStaff directory lists in-house Senior Combination Building Inspectors (Murray Armstrong, Phillip Brandenburg) under the Community Development Department with a @weho.org-domain contact chain (the PV handout directs plan-review email to bgalan@weho.org, the Building Official); LACoFD's checklist independently describes its own separate FD inspection-scheduling process for its retained scope.

staff directory checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/staff-directory

Q53 If delegated, to whom? Core Who inspects

Los Angeles County Fire Department, Fire Prevention Division (regional inspection office nearest the project site)

Why the confidence is not higherLACoFD's own checklist directs applicants to 'Obtain jurisdictional FD Office Contact Information...Refer to the LACoFD Fire Prevention Regional Inspection Office Phone List. Select the nearest office to the project site.'

fire authority checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q54 Which inspections are required, and in what order? Core Stages & sequence

City building permit issuance -> City Building & Safety final inspection (single final-type inspection covering modules, mounting, grounding, wiring, and signage per the city's own checklist) -> where applicable, a separately-scheduled LACoFD Fire Prevention inspection for ESS/BIPV-subset/disconnect-placard items (LACoFD requires digital proof of the issued construction permit before it will book its own inspection)

Why the confidence is not higherSequence reconstructed from the city's PV handout inspection-checklist section plus LACoFD's own checklist Section 1(a)(ii), which requires proof of the already-issued permit as a prerequisite to booking the FD inspection.

fire authority checklist + published checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Not called out - the city's own inspection checklist describes what appears to be a single final-type inspection for qualifying rooftop PV, with no separate rough-in/mid-roof stage mentioned

Why the confidence is not higherRead the full inspection-checklist section of the city's PV handout; no rough-in language appears. The city's separate, more detailed 'Field Inspection Guide for Rooftop PV Systems' PDF (which might describe multi-stage inspection) could not be retrieved this session due to the persistent document-path block, so this is based on the summary handout only, not the dedicated field-inspection guide.

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q56 Does the inspector verify labels and listings? Core What is checked

Yes

Why the confidence is not higherCity's own inspection checklist explicitly lists: 'Number of PV modules and model number match plans and specification sheets,' and multiple equipment-rating/label cross-checks against installed signs (inverter rating vs. sign, OCPD rating vs. sign, etc.), plus 'Appropriate signs are properly constructed, installed and displayed.'

published checklist checked 2026-08-30 https://www.weho.org/home/showpublisheddocument/21392/635785168432900000

Q57 Is there a published inspection checklist? Core What is checked

Yes

Why the confidence is not higherThe city's own PV handout contains a published inspection checklist (Section 5/6), and LACoFD separately publishes a detailed, dated (2023-09-01) 'Inspection Checklist for Group R-3/-4 ESS, PV, and Electrical-Disconnect Placarding' covering its retained scope.

fire authority checklist checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2023/09/Expedited-Permitting-Checklist-LACoFD-ESS-PV-Disconnects-2023-09-01-SECURED.pdf

Q58 What must be on site at inspection? Core Documents on site

Approved plans printed at 24in x 36in (per general Inspection Services page for construction plans on any project) and equipment cut/specification sheets matching the plans (per the PV handout's checklist language); LACoFD separately requires ESS cut/specification sheets 'immediately available upon request of the fire code official.'

Why the confidence is not higherCombination of the general Inspection Services page (plan-size requirement) and the PV handout/LACoFD checklist (documentation-on-hand requirements).

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/inspection-services

Q59 Is there a re-inspection fee? Corrections & re-inspection

$98 (LACoFD-side, for ESS/disconnect-placard re-inspections after the first re-inspection: 'Additional inspections after initial inspection and one reinspection'). No city-side (Building & Safety) re-inspection fee schedule could be retrieved this session.

Why the confidence is not higherExtracted directly from LACoFD's current Appendix QQ, Table QQ104.4(6). The city-side consolidated fee schedule PDF sits behind the same persistently-blocked document path as the other unretrieved handouts.

fee schedule checked 2026-08-30 https://fire.lacounty.gov/wp-content/uploads/2025/10/2023-LACFC-Appendix-QQ-Certified-Ord-Eff.-2024-01-11-Secured.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedCity's general residential post-entitlement submittal page describes how PLAN CHECK correction comments are issued and cleared ('written notification from the City with a list of incomplete items...and how to resubmit'), but that is a paper/plan-check process, not a field-inspection correction/re-inspection process; no solar- or field-inspection-specific correction-clearing procedure was found on the Inspection Services page or in the PV handout

https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/inspection-services

Q61 What is issued on pass? Core Final sign-off & PTO

Final (the city does not issue physical inspection cards; the current Inspection Services page states 'Inspection results can be accessed by logging onto your online account,' implying a portal-recorded final/passed status rather than a printed Certificate of Occupancy, which generally does not apply to a PV addition on an existing single-family/duplex dwelling)

Why the confidence is not higherInferred from the Inspection Services page's description of the record-keeping system; no explicit 'what is issued on final pass for solar specifically' statement was found.

department page checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/inspection-services

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer

Why the confidence is not higherNot explicitly stated by the city; inferred from the city's own description that 'Edison's interconnection approval is separate from West Hollywood's and customers are encouraged to contact them early in the planning process' - implying the applicant/installer deals with SCE directly for PTO rather than the city notifying SCE. SCE's own DG-manual/PTO pages soft-404'd in this session so this could not be independently confirmed from the utility side.

department page (inference) checked 2026-08-30 https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of West Hollywood against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of West Hollywood is the authority having jurisdiction 95% confidence
Holds
Building and Electrical (Community Development Department, Building & Safety Division; combined permit for solar specifically); Planning issues a Zone Clearance for qualifying systems
Delegated to
Los Angeles County Fire Department (contract city, confirmed on LACoFD's own current /contracting/ page, 200 status, listing 'West Hollywood *' among battalion-served cities; the /contract-cities/ path 404s). LACoFD defers conventional rooftop-PV fire review to City Building & Safety but explicitly retains ESS installations >3 kWh, a narrow BIPV subcategory, and ALL electrical-disconnect/rapid-shutdown placarding review and inspection
Overridden by
CA Solar Rights Act follow-up AB 2188 (2014) required the city's streamlined ordinance; the city's own Zone Clearance provision states 'shall not be conditioned on approval of an association,' preempting HOA review under Civil Code Solar Rights Act. LACoFD's retained ESS/disconnect scope is set by LA County Fire Code Title 32, independent of the city's own permit process
Why not higher
City's own 'Solar West Hollywood' page states Building and Safety review/approval and a building+electrical permit are required, and that 'Los Angeles County Fire department review and approval for these small residential rooftop installations has been deferred to Building and Safety.' LACoFD's own current Inspection Checklist (2023-09-01) independently confirms it retains ESS>3kWh, BIPV subset, and disconnect/placard scope. Fire-department page on weho.org separately confirms LACoFD serves the city (Stations 7 and 8).

https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety/building-and-safety-plan-check-services/solar-west-hollywood

Permit required
Yes95%
Permit cost
$0 for building, electrical and plumbing plan-check and permit fees on qualifying residential rooftop solar (waived by the City);90%
Plan review
3 business days85%
Portal
Tyler Technologies EnerGov Self-Service Portal (cityofwesthollywoodca-energovweb.tylerhost.net)95%
Electrical code
2023 (NEC edition underlying the California Electrical Code, 2025 Edition, which West Hollywood adopts by reference)88%
Own placard wording
Yes, but only by the fire AHJ (LACoFD), not the building AHJ (city). LACoFD specifies exact wording: 'F.D.90%
Booking an inspection
Portal (City of West Hollywood Permit & License Portal, Tyler EnerGov)85%
Labels & placards for this authority

City of West Hollywood writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.

Wording 90%

Yes, but only by the fire AHJ (LACoFD), not the building AHJ (city). LACoFD specifies exact wording: 'F.D. - ELECTRICAL / BLDG DISCONNECT / #X of Y.' The city's own PV handout describes sign FUNCTIONS (DC disconnect sign, AC point-of-connection sign, alternative-power-switch sign) but does not itself dictate wording beyond referencing CEC 690/705.

Size, colour & material 92%

Yes, by LACoFD (fire-retained scope): red letters engraved into a yellow background; Arial, all-capitals, solid, minimum 24pt (28pt bold for 'F.D.' and '#X of Y'); minimum 2in x 3.5in weather-resistant plastic for exterior placards, 7/16in x 3/4in for panel-interior placards; permanent epoxy mount. The city's own building-side documents do not separately specify letter height/color/material for the CEC 690/705 signs.

Where they go 85%

At the DC disconnect, at the AC point of connection, and at the switch for the alternative power system (city side); LACoFD Exterior Placards go on/immediately adjacent to each panel/enclosure or standalone disconnect switch to be operated, with Panel-Interior Placards inside the panel identifying specific breakers where multiple switches require operation.

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Los Angeles County
Regions served
1
Regions covered
City of West Hollywood · city
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.weho.org/city-government/city-departments/community-development-department/building-and-safety
Authority Contact
Address
8300 Santa Monica Blvd, 2nd Floor, West Hollywood, CA 90069
Main Phone
(323) 848-6320
Building Department
Department
Building and Safety Division
Direct Phone
(323) 848-6320
Portal Software
EnerGov (Tyler)
Booking & Scheduling
Preferred channel
online
Book in advance
next business day
Notes
Schedule final solar inspection through the City of West Hollywood Permit & License Portal (Tyler EnerGov, launched August 2024). Log in to your account, select the permit from the Dashboard or My Work tab, then navigate to the Inspections tab to select and schedule inspection items. Inspections must be scheduled before 4:00 PM for the next business day. Provide name and phone number of the person onsite. Jobsite must be available within 3 hours of the scheduled time on the inspection record. Inspectors can also be reached by phone at (323) 848-6335 or by email at inspector@weho.org. (collected Jul 2026)