Daly City
San Mateo County
Daly City is a city authority in the State of California, serving 104,901 residents. 1,596 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Either Q4 Plan review — 1-3 business days for submittals using the City's Solar PV Standard Plan (≤10kW simplified path); Q18 Where you file — Daly City Online Permits, a Tyler Technologies EnerGov self-service portal (dalycityca-energovpub.tylerhost.net), Q20
- Permit required
- Yes96% source
- What it costs
- No solar-specific flat fee is published; using the City's own valuation-based Building Permit fee table plus its 79% Plan Review surcharge and 9% Technology Fee,55% source
- Plan review turnaround
- 1-3 business days for submittals using the City's Solar PV Standard Plan (≤10kW simplified path); 15 working days from routing for projects requiring full custom plan review (general…82% source
- Key document
- checklist cited by 7 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes 97% · department page
- What does this authority permit itself, and what does it delegate? Both 90% · department page
- Is a permit required for a residential rooftop PV system? Yes 96% · department page
- Is there a separate electrical permit, or is it combined? Either 82% · checklist
- Is a wind or windstorm certification required? No 65% · checklist
- Is a Specific Use Permit or Council approval ever required? No dedicated Council/SUP process found for by-right residential rooftop PV; the City markets the program as low-fee/timely administrative review, consistent with the state's ministerial-approval mandate for residential solar (Gov. Code §65850.5). 60% · department page
- Is there a system-size cap on residential generation? Two Daly City pages give conflicting caps: the dedicated SolarAPP+ page states the City accepts SolarAPP+ submittals up to '38.4 kilowatts alternating current nameplate rating' including a paired ESS up to the same 38.4kW AC cap (with battery spacing ≥3ft). The separate Solar Energy Systems page states Daly City is 'currently only utilizing this program for PV installs under 10kW and for which no ESS/battery is proposed,' routing larger or battery systems to standard plan review by email. Both pages are live and undated; this is a genuine, unresolved discrepancy in the City's own publications, not a single settled cap. 55% · department page
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? Either 75% · department page
- Must the contractor be registered with this authority before applying? Yes 90% · department page
- Is a homeowner permitted to self-install and self-permit? Yes 78% · department page
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Building Permit Application; eligibility/expedited checklist demonstrating compliance; a completed Standard Electrical Plan (or custom one-line diagram, string/conductor sizing, equipment cut sheets, labeling per CEC 690/705) with plot plan; a roof plan showing panel layout, fire-pathways, roof-access point and label locations; and completed Structural Criteria with engineer-stamped calcs if the prescriptive checklist is not met. 92% · checklist
- How many copies, and in what format? Digital PDF submittal by email to the Building Division (or upload through the SolarAPP+/permit portal for eligible projects); no physical copy count specified. 65% · department page
- Is a site plan required, and what must it show? Yes -- a site/plot plan showing front, side and rear setbacks (min 1/8in=1ft scale) plus a roof plan showing panel/module layout, clear fire-access pathways, roof-access point, fire classification, and locations of all required labels/markings and disconnects. 92% · checklist
- Is a one-line / three-line diagram required? Yes 95% · checklist
- Are string and conductor calculations required? Yes 92% · checklist
- Is a structural PE stamp required, and at what threshold? PE stamp not required if the array passes the City's prescriptive 'Structural Criteria for Residential Rooftop Flush-Mounted Solar Arrays' checklist (flush-mount, 2-10in standoff, ≤4psf array weight, covers ≤half the roof, rafter span within Table 2, no deterioration/overlay roof); if the project fails any checklist item it must go to standard review with 'structural drawings and calculations stamped and signed by a California-licensed Civil or Structural Engineer.' 75% · checklist
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Daly City Online Permits, a Tyler Technologies EnerGov self-service portal (dalycityca-energovpub.tylerhost.net), integrated with SolarAPP+ for eligible residential PV/ESS projects. 92% · portal landing page
- Can the whole application be completed online? Yes, for projects that qualify for SolarAPP+ (automated code-compliance check, then upload approval documents and pay fees in the City's EnerGov portal); No for larger/battery projects, which route through email plan review and in-person/mail fee payment. 85% · portal
- What does a residential solar permit cost? No solar-specific flat fee is published; using the City's own valuation-based Building Permit fee table plus its 79% Plan Review surcharge and 9% Technology Fee, a typical ~$18,000 residential PV system computes to roughly $740-$800 in City permit fees. A separate processing fee is paid directly to SolarAPP+ (not the City) for projects using that track. 55% · fee schedule
- How is the fee calculated? Valuation 85% · fee schedule
- Is there a separate plan-check fee? Yes 88% · fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? 1-3 business days for submittals using the City's Solar PV Standard Plan (≤10kW simplified path); 15 working days from routing for projects requiring full custom plan review (general Permits-Involving-Plans timeline, not solar-specific). SolarAPP+ submittals for eligible projects (see q28 conflict) get an automated, near-instant code-compliance check. 82% · checklist
- Which utility handles interconnection here? Pacific Gas & Electric (PG&E) 85% · department page
- Where does the utility sit in the sequence? Parallel 58% · utility DG manual
28 questions answered against Daly City’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes
Why the confidence is not higherDaly City Building Division administers and enforces Title 24 (CBC/CEC/CRC/CFC) and issues residential building and electrical permits directly, including PV via SolarAPP+ and standard plan review; confirmed on its own Building, Adopted Codes and Solar Energy Systems pages.
department page checked 2026-08-30 https://www.dalycity.org/164/Building
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both
Why the confidence is not higherBuilding Division holds building AND electrical permitting/inspection in-house (Chief Building Official Mario Sigala). Fire-code review/inspection is delegated to the North County Fire Authority (NCFA), a JPA of Daly City, Brisbane and Pacifica formed 2003 -- confirmed on Daly City's own Fire & Rescue page, which sends fire permit/inspection inquiries to NCFA's Brisbane office. Planning Division also reviews solar submittals per the City's own Solar PV submittal-requirements document.
department page checked 2026-08-30 https://www.dalycity.org/461/Fire-Rescue
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higher'Is a Permit Required?' page states a permit is required to alter/construct/enlarge any structure per the CBC as adopted; the dedicated Solar Energy Systems page and SolarAPP+ page both describe the residential PV permitting process, confirming a permit is required.
department page checked 2026-08-30 https://www.dalycity.org/202/Is-a-Permit-Required
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Either
Why the confidence is not higherThe City's own 'Submittal Requirements for Rooftop Solar PV Installations (10kW or Less)' states: 'Building and Electrical Permit' (combined) is required, PLUS 'Separate Electrical Permit required for new or upgraded electrical panels' -- i.e. combined for the base PV system, separate when a panel/service upgrade is involved.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Either
Why the confidence is not higherDaly City has a published Owner-Builder Permits pathway (homeowner may pull permits/perform work) alongside standard licensed-contractor permitting; the Solar PV Standard Plan form has a signature line for 'Contractor/Engineer,' not exclusively an electrician, though grid-interconnected work in practice is performed by a C-10/C-46 licensed electrician per CEC/CSLB rules referenced on the same page.
department page checked 2026-08-30 https://www.dalycity.org/1176/Owner-Builder-Permits
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes
Why the confidence is not higherSolarAPP+ page states plainly: 'Contractor must have an active Daly City business license when at the time of application.'
department page checked 2026-08-30 https://www.dalycity.org/1157/SolarApp
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes
Why the confidence is not higherOwner-Builder Permits page confirms Daly City issues Owner-Builder permits to homeowners performing their own work (general building-permit pathway, not solar-specific); applicant must sign the Owner-Builder Disclosure Form. Not solar-specific, so confidence is capped.
department page checked 2026-08-30 https://www.dalycity.org/1176/Owner-Builder-Permits
Q8 What documents make up a complete submittal? Core Submittal package
Building Permit Application; eligibility/expedited checklist demonstrating compliance; a completed Standard Electrical Plan (or custom one-line diagram, string/conductor sizing, equipment cut sheets, labeling per CEC 690/705) with plot plan; a roof plan showing panel layout, fire-pathways, roof-access point and label locations; and completed Structural Criteria with engineer-stamped calcs if the prescriptive checklist is not met.
Why the confidence is not higherEnumerated verbatim in the City's own 'Submittal Requirements for Rooftop Solar Photovoltaic Installations 10 kW or Less' document, sections 1-2.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q9 How many copies, and in what format? Submittal package
Digital PDF submittal by email to the Building Division (or upload through the SolarAPP+/permit portal for eligible projects); no physical copy count specified.
Why the confidence is not higher'Permits Involving Plans' page instructs applicants to email the Building Division 'electronic PDF files of your drawings/plans' or a cloud-storage link; this is the general plan-review submission instruction (not solar-specific) and no page states a physical-copy count for any project type.
department page checked 2026-08-30 https://www.dalycity.org/266/Permits-Involving-Plans
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes -- a site/plot plan showing front, side and rear setbacks (min 1/8in=1ft scale) plus a roof plan showing panel/module layout, clear fire-access pathways, roof-access point, fire classification, and locations of all required labels/markings and disconnects.
Why the confidence is not higherCity's own submittal-requirements document, items 2(c) and 2(d).
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes
Why the confidence is not higherStandard Plan requires a 'One-line diagram of system to include a readily accessible rapid disconnecting means for inverter'; the roof-layout diagram exhibit is also explicitly titled 'SOLAR PV RAPID SHUTDOWN' single-line diagram.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q12 Are string and conductor calculations required? Drawings & calculations
Yes
Why the confidence is not higherStandard Plan (Simplified Central/String Inverter) walks the applicant through source-circuit/string counts per MPPT, max system DC voltage (Table 1), source/output conductor sizing (Tables 3-4), and OCPD sizing against bus-bar rating -- all required calculations on the City's own form.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
PE stamp not required if the array passes the City's prescriptive 'Structural Criteria for Residential Rooftop Flush-Mounted Solar Arrays' checklist (flush-mount, 2-10in standoff, ≤4psf array weight, covers ≤half the roof, rafter span within Table 2, no deterioration/overlay roof); if the project fails any checklist item it must go to standard review with 'structural drawings and calculations stamped and signed by a California-licensed Civil or Structural Engineer.'
Why the confidence is not higherBoth paths spelled out in the City's own submittal-requirements/Structural Criteria document; the trigger condition (checklist failure) is inferred from the document's structure rather than stated as a single bright-line threshold.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Nothing published by this authority.
Where we lookedSolar Energy Systems page, SolarAPP+ page, the Solar PV Standard Plan and Microinverter Standard Plan forms, and the Building Permit/Forms pages -- none states an electrical PE-stamp threshold; the Standard Plan is designed to be completed and signed by the installing contractor, not a PE
Q15 What does a residential solar permit cost? Core Fees
No solar-specific flat fee is published; using the City's own valuation-based Building Permit fee table plus its 79% Plan Review surcharge and 9% Technology Fee, a typical ~$18,000 residential PV system computes to roughly $740-$800 in City permit fees. A separate processing fee is paid directly to SolarAPP+ (not the City) for projects using that track.
Why the confidence is not higherComputed from the FY2027 Master Fee Schedule's Building Permit Valuation table (fee 3.10-3.26), Plan Review Fee (3.27, 79% of Building Permit fee) and Technology Fee (3.44, 9%); the schedule has no line item naming 'solar' or 'photovoltaic', confirmed by a text search of the extracted PDF (also searched 'electrical' as a positive control -- hits at line 178 -- and 'zzqqx' as a fabricated control -- zero hits -- so the extraction/search is sound).
fee schedule checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/13336/FY-2027-Master-Fee-Schedule-Final-with-Police-Fines-PDF
Q16 How is the fee calculated? Core Fees
Valuation
Why the confidence is not higherFY2027 Master Fee Schedule prices Building Permits off a Project Valuation table (3.10-3.26: base + per-$1,000 increment) with Plan Review at 79% of the Building Permit fee and a 9% Technology Fee on top; no per-kW or per-panel line exists for solar.
fee schedule checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/13336/FY-2027-Master-Fee-Schedule-Final-with-Police-Fines-PDF
Q17 Is there a separate plan-check fee? Fees
Yes
Why the confidence is not higherFee 3.27 'Plan Review Fee' is charged as 79% of the Building Permit fee as a distinct line item, and 3.93 'Plan Review Fees (if submitted separately)' is billed at $181/hour when plan check is requested apart from the permit.
fee schedule checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/13336/FY-2027-Master-Fee-Schedule-Final-with-Police-Fines-PDF
Q18 What is the stated plan-review turnaround? Core Timeline & validity
1-3 business days for submittals using the City's Solar PV Standard Plan (≤10kW simplified path); 15 working days from routing for projects requiring full custom plan review (general Permits-Involving-Plans timeline, not solar-specific). SolarAPP+ submittals for eligible projects (see q28 conflict) get an automated, near-instant code-compliance check.
Why the confidence is not higherSolar-specific 1-3 day figure and 15-working-day general figure are each stated verbatim on the City's own pages; the Building Division's Building page separately warns plan review 'is currently longer than normal' due to volume, undated.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q19 How long is an issued permit valid before it expires? Timeline & validity
Nothing published by this authority.
Where we lookedAdopted Codes page, Building/Permits/Fee Schedule pages, and the solar submittal PDFs -- none states a permit-validity day count. The Fee Schedule does confirm permits DO expire (fees 3.101 'Extension of Permit About to Expire' and 3.102 'Reactivation of Expired Permit', and Code Enforcement fees 4.04-4.06 'Expired Plan Check/Building Permit Application'), implying the unamended CBC/CRC default of 180 days applies, but no Daly City document states this figure directly
Q20 Which permit portal does this authority use? Core Portal & process
Daly City Online Permits, a Tyler Technologies EnerGov self-service portal (dalycityca-energovpub.tylerhost.net), integrated with SolarAPP+ for eligible residential PV/ESS projects.
Why the confidence is not higherLinked directly from the Permits page ('Apply or Schedule Online at www.dalycity.org/apply') and from the SolarAPP+ page's application steps.
portal landing page checked 2026-08-30 https://www.dalycity.org/263/Permits
Q21 Can the whole application be completed online? Core Portal & process
Yes, for projects that qualify for SolarAPP+ (automated code-compliance check, then upload approval documents and pay fees in the City's EnerGov portal); No for larger/battery projects, which route through email plan review and in-person/mail fee payment.
Why the confidence is not higherSolarAPP+ page's 'Steps for Obtaining a Permit' walks through account creation, submission, City-portal application and fee payment entirely online; the same page and the Solar Energy Systems page both direct commercial, >threshold, or battery projects to 'email the project to the Building Division' instead.
portal checked 2026-08-30 https://www.dalycity.org/1157/SolarApp
Q22 Which utility handles interconnection here? Core Utility interconnection
Pacific Gas & Electric (PG&E)
Why the confidence is not higherDaly City's own 'Electrical Installation of Residential Services' handout cites PG&E-specific meter-height and service-mast requirements ('66 inches (PG&E)', 'PG&E requires a minimum of 1-1/4 inch diameter service mast'), confirming PG&E as the interconnecting utility from a city-side source. San Mateo County/Daly City sits within Peninsula Clean Energy's CCA territory for generation billing, but PCE is a Community Choice Aggregator, not the wires utility, and has no interconnection authority -- PG&E owns the distribution grid and is the Rule 21 interconnecting utility.
department page checked 2026-08-30 https://www.dalycity.org/204/Electrical-Installation-of-Residential-S
Q23 Where does the utility sit in the sequence? Core Utility interconnection
Parallel
Why the confidence is not higherPG&E's Rule 21 interconnection application can be submitted in parallel with the City permit process (PG&E's EGI page describes applying anytime via the 'Your Projects' portal, independent of permit status); Permission to Operate is issued by PG&E only after it receives proof of the City's final inspection sign-off, so the utility step both starts in parallel with and finishes after permitting. No single Daly City or PG&E document states the full sequence for small residential NEM in one place, so this is inferred from PG&E's EGI process page plus the Greenbook's AC-disconnect chapter.
utility DG manual checked 2026-08-30 https://www.pge.com/en/about/doing-business-with-pge/interconnections/electric-generation-interconnection.html
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedDaly City Planning Division page, Solar Energy Systems page, and the solar submittal-requirements PDF -- the latter states 'Planning review is required for solar PV installations' (an administrative zoning check) but no page names HOA or architectural-review board approval as a prerequisite; California's Solar Rights Act (Civ. Code §714, not a Daly City document) generally bars HOAs from unreasonably restricting residential solar
Q25 Is there a historic-district review? Overlays & special cases
Nothing published by this authority.
Where we lookedPlanning Division page and Adopted Codes/2025 CBSC ordinance page -- no historic-district or historic-preservation overlay is mentioned in connection with solar or building permitting generally
Q26 Is a wind or windstorm certification required? Overlays & special cases
No
Why the confidence is not higherNo Daly City document (Adopted Codes, Solar Energy Systems, Standard Plan, Structural Criteria checklist) references a wind or windstorm certification; California's wind design is folded into standard CBC structural review (ASCE 7 wind maps), unlike TDI-style windstorm certification used in some other states. Absence confirmed by direct reading of the Structural Criteria checklist, which addresses roof/attachment loading only.
checklist checked 2026-08-30 https://www.dalycity.org/278/Solar-Energy-Systems
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
No dedicated Council/SUP process found for by-right residential rooftop PV; the City markets the program as low-fee/timely administrative review, consistent with the state's ministerial-approval mandate for residential solar (Gov. Code §65850.5).
Why the confidence is not higherSolar Energy Systems page frames the process as encouragement via 'low permit fees and timely permit review and inspection services' with no mention of a Specific Use Permit or Council hearing step; inferred partly from the absence and partly from state law context, so capped below 'own document says it plainly.'
department page checked 2026-08-30 https://www.dalycity.org/278/Solar-Energy-Systems
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Two Daly City pages give conflicting caps: the dedicated SolarAPP+ page states the City accepts SolarAPP+ submittals up to '38.4 kilowatts alternating current nameplate rating' including a paired ESS up to the same 38.4kW AC cap (with battery spacing ≥3ft). The separate Solar Energy Systems page states Daly City is 'currently only utilizing this program for PV installs under 10kW and for which no ESS/battery is proposed,' routing larger or battery systems to standard plan review by email. Both pages are live and undated; this is a genuine, unresolved discrepancy in the City's own publications, not a single settled cap.
Why the confidence is not higherDirect quotes from both https://www.dalycity.org/1157/SolarApp and https://www.dalycity.org/278/Solar-Energy-Systems, fetched the same day; neither page carries a revision date, so the tension could not be resolved by dating them.
department page checked 2026-08-30 https://www.dalycity.org/1157/SolarApp
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2023 92% · adopting ordinance
- Which building code edition is in force? 2025 California Building Code (and 2025 California Residential Code for one/two-family dwellings), effective 1 Jan 2026, with local amendments in Daly City Municipal Code Title 15. 95% · adopting ordinance
- Which fire code edition is in force? 2025 California Fire Code, effective 1 Jan 2026, enforced in coordination with the North County Fire Authority. 88% · adopting ordinance
- Are there local amendments to any of the above? Yes 92% · ordinance
- What is the installation judged against? The current adopted 2025 CBC/CRC/CEC/CFC as locally amended under DCMC Title 15, plus the City's own Solar PV Standard Plan/Structural Criteria/Microinverter forms and Photovoltaic Inspection Checklist, which operationalize CEC Articles 690/705 and CRC R331 for residential rooftop PV. 88% · ordinance
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for Daly City on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, to the 2023 NEC (as adopted in the 2025 CEC) -- a readily accessible rapid shutdown is required on both the AC and DC side of the inverter (or the DC side for microinverter-type modules). 92% · checklist
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? Warning placards at the inverter output OCPD, DC disconnect, AC disconnect, and (for ungrounded systems) DC-conductor shock-hazard warning; PV Power Source marking on junction/combiner boxes and conduit every 10ft; ground-fault shock-hazard warning; and a permanent plaque/directory at the main service denoting all power sources (CEC 705.12). 92% · ordinance / utility spec
- Does the authority specify placard wording of its own? Yes 92% · ordinance
- Does it specify letter height, colour or material? The Standard Plan's informational note recommends ANSI Z535.4-compliant safety signs: a phenolic plaque with contrasting text/background colors for permanency, and states 'No type size is specified, but 20 point (3/8in) should be considered the minimum.' 90% · ordinance
- Is a site plan / facility map placard required, and what must it show? Yes -- a roof/site diagram showing the layout of all panels/modules, clear access pathways, approximate locations of electrical disconnecting means and roof access points, plus a wiring diagram showing a readily accessible rapid shutdown of the PV system. 92% · checklist
- Does the UTILITY specify placards beyond the AHJ's? Yes -- PG&E requires an engraved placard/signage on the metering equipment indicating a line/supply-side connection where a fusible AC disconnect is used ahead of the main breaker, per PG&E Electric Design Standard 060559 ('Disconnect Switch Requirements for Distributed Generation Customers'), referenced in the Greenbook's Electric Generation Interconnection chapter. 85% · utility DG manual
- Where must the labels be placed? AHJ-level PV/system labels go at the PV modules, junction/combiner boxes, conduit (every 10ft), DC and AC disconnects, and the main service equipment (per the Standard Plan). Utility-level: PG&E requires its line/supply-side-connection placard mounted on the metering equipment itself (Greenbook Ch. 6.3). 85% · ordinance / utility spec
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? An AC disconnect is required at all self-contained meter panels over 320A (single-phase, continuous rating) and at all transformer-rated meter panels of any size, and at all panels for non-inverter-based generators regardless of size; it is NOT required for a self-contained, socket-based single-phase meter panel ≤320A using an inverter-based generator (e.g. typical residential string/micro-inverter PV), unless a K-base meter is used. Where a fusible AC disconnect is installed ahead of the main breaker (line-side/supply-side tap), it goes on the metering equipment itself. 88% · utility DG manual
- Must equipment be on a specific approved list? Yes 82% · ordinance
- Are batteries permitted, and under what conditions? Yes, batteries/ESS are permitted, but the City's two solar pages give conflicting routes: the SolarAPP+ page allows a paired residential ESS up to 38.4kW AC combined with the PV system via SolarAPP+ (provided batteries are spaced ≥3ft apart; closer spacing requires standard plan review), while the Solar Energy Systems page says the ≤10kW streamlined/SolarAPP+ path is only for systems 'for which no ESS/battery is proposed' and routes any battery project to the Building Division by email for standard plan review. Either way, a battery-paired system is permittable in Daly City -- only the review pathway is in dispute between the City's own pages. 62% · fire code + amendments
- Is there a separate ESS permit or inspection? No separate ESS-specific permit or fee line found; a paired battery system is folded into the same building/electrical PV permit application (routed to standard plan review rather than SolarAPP+, per q45). 58% · fee schedule
- Is there a local rule on service upgrades or busbar sizing? Yes -- the Solar PV Standard Plan restricts eligible systems to a single-phase 120/240V service with a bus-bar rating of 225A or less, and applies CEC 705.12(D)(2)'s 120%/100% busbar rule with City-specified maximum combined OCPD values, expressly reduced (e.g. to 60A) 'to reflect 10kW AC size maximum.' The general Electrical Installation of Residential Services handout also gives Daly City-specific grounding-electrode and service-conductor rules (DCMC 15.24.x). 85% · amendments
- Is a specific mounting system or attachment spacing required? For flush-mounted arrays, the City's prescriptive Structural Criteria requires: modules parallel to and within a 2-10in gap of the roof plane, no overhang past roof edges, ≤4psf combined weight for PV (5psf for solar thermal), array covering no more than half the total roof area, and rafter horizontal span within the City's Table 2 span limits (or a licensed engineer's site-specific calculations if not). 88% · amendments
20 questions answered against Daly City’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2023
Why the confidence is not higherDaly City's 2025 California Electrical Code (part of the 2025 CBSC cycle, effective 1 Jan 2026) is California's amended adoption of the 2023 NEC.
adopting ordinance checked 2026-08-30 https://www.dalycity.org/260/Adopted-Codes
Q30 Which building code edition is in force? Core Code editions in force
2025 California Building Code (and 2025 California Residential Code for one/two-family dwellings), effective 1 Jan 2026, with local amendments in Daly City Municipal Code Title 15.
Why the confidence is not higherAdopted Codes page states this plainly and lists the full 2025 code suite (CBC, CRC, CEC, CMC, CPC, Energy Code, CFC, Existing Building Code, CALGreen, Reference Standards Code) plus the 2024 International Property Maintenance Code.
adopting ordinance checked 2026-08-30 https://www.dalycity.org/260/Adopted-Codes
Q31 Which fire code edition is in force? Code editions in force
2025 California Fire Code, effective 1 Jan 2026, enforced in coordination with the North County Fire Authority.
Why the confidence is not higherListed on the Adopted Codes page among the 2025 CBSC suite; NCFA's role as the operating fire agency is confirmed on Daly City's Fire & Rescue page, though NCFA's own fire-prevention/plan-review page could not be reached directly (see jurisdiction notes).
adopting ordinance checked 2026-08-30 https://www.dalycity.org/260/Adopted-Codes
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes
Why the confidence is not higherAdopted Codes page states Daly City 'has adopted local amendments that address administrative requirements and conditions specific to the community,' codified in DCMC Title 15; the separate 2025 CBSC Adoption Ordinance page confirms this cycle specifically pared back some prior amendments (e.g. removed the old EERO exemption) while retaining others (stormwater, seismic, hillside access).
ordinance checked 2026-08-30 https://www.dalycity.org/260/Adopted-Codes
Q33 What is the installation judged against? Core Electrical
The current adopted 2025 CBC/CRC/CEC/CFC as locally amended under DCMC Title 15, plus the City's own Solar PV Standard Plan/Structural Criteria/Microinverter forms and Photovoltaic Inspection Checklist, which operationalize CEC Articles 690/705 and CRC R331 for residential rooftop PV.
Why the confidence is not higherSynthesized from the Adopted Codes page and the City's own solar-specific forms, all of which cross-reference current CEC/CRC/CFC sections by number.
ordinance checked 2026-08-30 https://www.dalycity.org/260/Adopted-Codes
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Yes -- the Solar PV Standard Plan restricts eligible systems to a single-phase 120/240V service with a bus-bar rating of 225A or less, and applies CEC 705.12(D)(2)'s 120%/100% busbar rule with City-specified maximum combined OCPD values, expressly reduced (e.g. to 60A) 'to reflect 10kW AC size maximum.' The general Electrical Installation of Residential Services handout also gives Daly City-specific grounding-electrode and service-conductor rules (DCMC 15.24.x).
Why the confidence is not higherBoth documents are the City's own; the Standard Plan's Table 4 footnote is an explicit local application of the code rule tailored to the City's 10kW simplified-plan cap.
amendments checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
For flush-mounted arrays, the City's prescriptive Structural Criteria requires: modules parallel to and within a 2-10in gap of the roof plane, no overhang past roof edges, ≤4psf combined weight for PV (5psf for solar thermal), array covering no more than half the total roof area, and rafter horizontal span within the City's Table 2 span limits (or a licensed engineer's site-specific calculations if not).
Why the confidence is not higherEnumerated in the City's own 'Structural Criteria for Residential Rooftop Flush-Mounted Solar Arrays' worksheet.
amendments checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedSolar submittal PDFs, Adopted Codes page, and the Photovoltaic Inspection Checklist -- fire-access pathway compliance is required ('code-compliant access pathways,' referencing the State Fire Marshal's Solar PV Installation Guide) but no Daly City document reproduces the specific ridge-setback dimensions from CFC §605.11, which are ICC-copyrighted table content not published on any Daly City or NCFA page reached
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, to the 2023 NEC (as adopted in the 2025 CEC) -- a readily accessible rapid shutdown is required on both the AC and DC side of the inverter (or the DC side for microinverter-type modules).
Why the confidence is not higherBoth the City's Photovoltaic Inspection Checklist (items 21-22) and the Solar PV Standard Plan's markings/diagram pages require rapid shutdown per CEC 690.12, citing the 2025 CEC (2023 NEC base).
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
Warning placards at the inverter output OCPD, DC disconnect, AC disconnect, and (for ungrounded systems) DC-conductor shock-hazard warning; PV Power Source marking on junction/combiner boxes and conduit every 10ft; ground-fault shock-hazard warning; and a permanent plaque/directory at the main service denoting all power sources (CEC 705.12).
Why the confidence is not higherFull wording and code citations (CEC 690.5(C), 690.17, 690.35(F), 690.53, 690.54, 705.12(D)(4)/(D)(7), CRC R331.2, CFC 605.11.1) reproduced verbatim in the City's own Solar PV Standard Plan.
ordinance / utility spec checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Yes
Why the confidence is not higherThe Standard Plan's 'Markings' page reproduces the exact required wording for each placard (e.g. 'WARNING INVERTER OUTPUT CONNECTION; DO NOT RELOCATE THIS OVERCURRENT DEVICE') alongside its CEC citation.
ordinance checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
The Standard Plan's informational note recommends ANSI Z535.4-compliant safety signs: a phenolic plaque with contrasting text/background colors for permanency, and states 'No type size is specified, but 20 point (3/8in) should be considered the minimum.'
Why the confidence is not higherDirect quote from the Standard Plan's Markings page.
ordinance checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Yes -- a roof/site diagram showing the layout of all panels/modules, clear access pathways, approximate locations of electrical disconnecting means and roof access points, plus a wiring diagram showing a readily accessible rapid shutdown of the PV system.
Why the confidence is not higherRequired verbatim in the eligibility checklist (item D under Fire Safety Requirements) and illustrated as a standalone 'Roof Layout Diagram' exhibit in the Standard Plan.
checklist checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Yes -- PG&E requires an engraved placard/signage on the metering equipment indicating a line/supply-side connection where a fusible AC disconnect is used ahead of the main breaker, per PG&E Electric Design Standard 060559 ('Disconnect Switch Requirements for Distributed Generation Customers'), referenced in the Greenbook's Electric Generation Interconnection chapter.
Why the confidence is not higherPG&E Greenbook (TD-7001M-06, Electric & Gas Service Requirements, publication date 22 Apr 2026 / effective 22 Jun 2026), Chapter 6.3, Table 6-3 and item (a). This is a utility-level requirement, not a Daly City ordinance requirement.
utility DG manual checked 2026-08-30 https://www.pge.com/assets/pge/docs/account/service-requests/greenbook-manual-full.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
AHJ-level PV/system labels go at the PV modules, junction/combiner boxes, conduit (every 10ft), DC and AC disconnects, and the main service equipment (per the Standard Plan). Utility-level: PG&E requires its line/supply-side-connection placard mounted on the metering equipment itself (Greenbook Ch. 6.3).
Why the confidence is not higherCombines the City's own Standard Plan marking locations with PG&E Greenbook Table 6-3/item (a) for the utility-required placard location.
ordinance / utility spec checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q44 Must equipment be on a specific approved list? Equipment listing
Yes
Why the confidence is not higherBoth the Photovoltaic Inspection Checklist ('Equipment installed, listed and labeled according to the approved plan') and the Standard Plan ('Equipment intended for use with PV system shall be identified and listed for the application, CEC 690.4(D)') require listed/labeled equipment; this is a code-listing requirement (UL/NRTL) rather than a City-maintained approved-products list.
ordinance checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, batteries/ESS are permitted, but the City's two solar pages give conflicting routes: the SolarAPP+ page allows a paired residential ESS up to 38.4kW AC combined with the PV system via SolarAPP+ (provided batteries are spaced ≥3ft apart; closer spacing requires standard plan review), while the Solar Energy Systems page says the ≤10kW streamlined/SolarAPP+ path is only for systems 'for which no ESS/battery is proposed' and routes any battery project to the Building Division by email for standard plan review. Either way, a battery-paired system is permittable in Daly City -- only the review pathway is in dispute between the City's own pages.
Why the confidence is not higherBoth statements are quoted directly from https://www.dalycity.org/1157/SolarApp and https://www.dalycity.org/278/Solar-Energy-Systems; no Daly City or NCFA page was found stating CFC energy-storage-system conditions (e.g. spacing, ventilation, fire clearances) beyond the 3ft SolarAPP+ eligibility line.
fire code + amendments checked 2026-08-30 https://www.dalycity.org/1157/SolarApp
Q46 Is there a separate ESS permit or inspection? Battery / ESS
No separate ESS-specific permit or fee line found; a paired battery system is folded into the same building/electrical PV permit application (routed to standard plan review rather than SolarAPP+, per q45).
Why the confidence is not higherThe FY2027 Master Fee Schedule was searched for 'battery' and 'energy storage' and returned no residential ESS-specific fee line (the only storage-adjacent fees are for hazardous-material storage tanks, an unrelated commercial fire-code category); the Solar Energy Systems and SolarAPP+ pages describe battery projects as being emailed to the Building Division for standard review, not a distinct permit type.
fee schedule checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/13336/FY-2027-Master-Fee-Schedule-Final-with-Police-Fines-PDF
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedSolar Energy Systems page, SolarAPP+ page, Solar PV Standard Plan, Microinverter Standard Plan and Structural Criteria checklist -- all of Daly City's published solar forms and guidance address roof-mounted arrays only; none mentions ground-mounted PV or whether it is treated as an accessory structure
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
An AC disconnect is required at all self-contained meter panels over 320A (single-phase, continuous rating) and at all transformer-rated meter panels of any size, and at all panels for non-inverter-based generators regardless of size; it is NOT required for a self-contained, socket-based single-phase meter panel ≤320A using an inverter-based generator (e.g. typical residential string/micro-inverter PV), unless a K-base meter is used. Where a fusible AC disconnect is installed ahead of the main breaker (line-side/supply-side tap), it goes on the metering equipment itself.
Why the confidence is not higherPG&E Greenbook (TD-7001M-06, eff. 22 Jun 2026), Chapter 6.3, Table 6-3 'Requirements for AC Disconnect Switches' and item (a); this is utility-level policy, not a Daly City ordinance.
utility DG manual checked 2026-08-30 https://www.pge.com/assets/pge/docs/account/service-requests/greenbook-manual-full.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Phone or email 82% · department page
- How much notice is required? At least 2 business days for standard-route requests (general Inspections page); for the ≤10kW Standard Plan solar path, requests received during business hours are 'typically scheduled for the next business day,' with a fallback 'within a five-day window' if next-day is unavailable. 80% · department page
- Are same-day or AM/PM windows offered? Approximate arrival-time windows are posted the morning of the scheduled inspection (finalized by 8:00am) via the online portal's 'Today's Inspections' page, rather than a customer-selected AM/PM slot at booking time. 70% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes 85% · department page
- If delegated, to whom? Not delegated for the routine building/electrical/structural PV final -- performed by Daly City's own Building Division. Fire-code plan review/inspection generally is delegated to the North County Fire Authority (JPA of Daly City, Brisbane, Pacifica), reachable at (650) 800-6580, though its role specifically in residential rooftop PV sign-off could not be confirmed (NCFA's website blocked automated fetches -- see jurisdiction notes). 68% · department page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? A single field/final inspection covering structural mounting, fire classification, grounding/bonding, conduit/conductor installation, equipment listing/labeling, disconnects and rapid shutdown -- Daly City's residential PV process does not describe separate rough-in/mechanical/electrical-only stages the way a home addition would; the Photovoltaic Inspection Checklist is organized as one consolidated field inspection with 22 verification items. 80% · department page
- Is a rough-in or mid-roof inspection required? No separate rough-in/mid-roof inspection is described for the streamlined residential PV path; attic conduit clearance is verified at the same final inspection (installer must 'provide attic access for inspection' at that time) rather than at a distinct mid-construction visit. 65% · department page
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Yes 98% · department page
- What must be on site at inspection? Means to safely access and inspect the roof; knowledgeable personnel on-site familiar with the installed system; interior access to verify required smoke/CO alarms; and photographic/video evidence of at least 10% (minimum two) of the roof attachment points, all keyed to the approved plans. 92% · department page
- Does the inspector verify labels and listings? Yes 95% · department page
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? Final 82% · department page
- Who notifies the utility for PTO? Installer 55% · utility DG manual
- Is there a re-inspection fee? No solar/PV-specific re-inspection fee found; the FY2027 Master Fee Schedule's only line explicitly labeled 'Construction Re-inspections' ($416.00 flat) sits inside the schedule's Fire (Section 5) fee group, alongside Fire plan-check items -- it is not clearly a general Building Division re-inspection fee. Building Division's closest general-purpose line is 'Inspection for which no fee is specifically indicated' at $168.00/hour (fee 3.95). 50% · fee schedule
- How are corrections issued and cleared? Plan-review comments are compiled and emailed to the permit's listed contacts; resubmittals go back through the Building Division email. At inspection, failed items are corrected on-site or the inspection is failed and must be rescheduled by calling the Building Division; there is no online corrections portal described for solar specifically. 68% · department page
14 questions answered against Daly City’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Phone or email
Why the confidence is not higherResidential PV/solar inspections are not on the City's 'Online Inspection Pilot Program' eligible list (which covers items like EV charger replacement, bathroom/kitchen remodels, etc., but not solar/PV); the SolarAPP+ page and the general Inspections page both direct applicants to 'Call the Building Division at 650-991-8061' or email required details to schedule.
department page checked 2026-08-30 https://www.dalycity.org/259/Inspections
Q50 How much notice is required? Core Booking & scheduling
At least 2 business days for standard-route requests (general Inspections page); for the ≤10kW Standard Plan solar path, requests received during business hours are 'typically scheduled for the next business day,' with a fallback 'within a five-day window' if next-day is unavailable.
Why the confidence is not higherBoth figures stated verbatim -- the 2-day figure on the general Inspections page (non-solar-specific standard route) and the next-business-day/5-day figure specifically in the solar submittal-requirements document.
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/572/Solar-System-Checklist-for-Small-Residential-Rooftop-System-PDF
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Approximate arrival-time windows are posted the morning of the scheduled inspection (finalized by 8:00am) via the online portal's 'Today's Inspections' page, rather than a customer-selected AM/PM slot at booking time.
Why the confidence is not higherInspections page: 'Inspection arrival times are estimated and will be finalized and posted by 8:00 AM on the scheduled inspection date.'
department page checked 2026-08-30 https://www.dalycity.org/259/Inspections
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes
Why the confidence is not higherBuilding Division performs final building/electrical/structural PV inspection itself (Photovoltaic Inspection Checklist is a Building Division document, and its own Inspections page routes solar inspection scheduling to Building Division at 650-991-8061); fire-safety aspects of the installation may fall under North County Fire Authority's separate fire-code enforcement role, but no evidence was found of NCFA performing a routine PV final sign-off separate from Building's.
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q53 If delegated, to whom? Core Who inspects
Not delegated for the routine building/electrical/structural PV final -- performed by Daly City's own Building Division. Fire-code plan review/inspection generally is delegated to the North County Fire Authority (JPA of Daly City, Brisbane, Pacifica), reachable at (650) 800-6580, though its role specifically in residential rooftop PV sign-off could not be confirmed (NCFA's website blocked automated fetches -- see jurisdiction notes).
Why the confidence is not higherDaly City's own Inspections page lists 'Fire Department (NCFA): (650) 800-6580' as a separate inspection-scheduling line from Building Division, and the Fire & Rescue page confirms NCFA is a JPA, not an in-house Daly City fire department.
department page checked 2026-08-30 https://www.dalycity.org/259/Inspections
Q54 Which inspections are required, and in what order? Core Stages & sequence
A single field/final inspection covering structural mounting, fire classification, grounding/bonding, conduit/conductor installation, equipment listing/labeling, disconnects and rapid shutdown -- Daly City's residential PV process does not describe separate rough-in/mechanical/electrical-only stages the way a home addition would; the Photovoltaic Inspection Checklist is organized as one consolidated field inspection with 22 verification items.
Why the confidence is not higherStructure and content of the City's own Photovoltaic Inspection Checklist, which is titled a single 'Field Inspection Guide' rather than a sequence of separate-stage checklists.
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
No separate rough-in/mid-roof inspection is described for the streamlined residential PV path; attic conduit clearance is verified at the same final inspection (installer must 'provide attic access for inspection' at that time) rather than at a distinct mid-construction visit.
Why the confidence is not higherInferred from the Photovoltaic Inspection Checklist item 4, which folds attic-conduit-clearance verification into the single field inspection rather than listing it as a separate rough-in stage.
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q56 Does the inspector verify labels and listings? Core What is checked
Yes
Why the confidence is not higherChecklist items 12 and 18 explicitly require the inspector to verify 'Equipment installed, listed and labeled according to the approved plan' and 'PV system markings, labels and signs according to the approved plan.'
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q57 Is there a published inspection checklist? Core What is checked
Yes
Why the confidence is not higherThe 'Photovoltaic Inspection Checklist' / 'Inspection Guide for PV Systems for One- and Two-Family Dwellings' is a published, standalone 10-page PDF listed on both the Solar Energy Systems and Forms pages.
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q58 What must be on site at inspection? Core Documents on site
Means to safely access and inspect the roof; knowledgeable personnel on-site familiar with the installed system; interior access to verify required smoke/CO alarms; and photographic/video evidence of at least 10% (minimum two) of the roof attachment points, all keyed to the approved plans.
Why the confidence is not higherEnumerated verbatim at the top of the City's Photovoltaic Inspection Checklist.
department page checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/570/Photovoltaic-Inspection-Checklist-PDF
Q59 Is there a re-inspection fee? Corrections & re-inspection
No solar/PV-specific re-inspection fee found; the FY2027 Master Fee Schedule's only line explicitly labeled 'Construction Re-inspections' ($416.00 flat) sits inside the schedule's Fire (Section 5) fee group, alongside Fire plan-check items -- it is not clearly a general Building Division re-inspection fee. Building Division's closest general-purpose line is 'Inspection for which no fee is specifically indicated' at $168.00/hour (fee 3.95).
Why the confidence is not higherFee-schedule section headers place 'Construction Re-inspections' (5.24) under '5. FIRE' rather than under '3. BUILDING', which is ambiguous as to whether it also covers Building/electrical re-inspections or is Fire-specific (NCFA-collected); flagged rather than guessed at.
fee schedule checked 2026-08-30 https://www.dalycity.org/DocumentCenter/View/13336/FY-2027-Master-Fee-Schedule-Final-with-Police-Fines-PDF
Q60 How are corrections issued and cleared? Corrections & re-inspection
Plan-review comments are compiled and emailed to the permit's listed contacts; resubmittals go back through the Building Division email. At inspection, failed items are corrected on-site or the inspection is failed and must be rescheduled by calling the Building Division; there is no online corrections portal described for solar specifically.
Why the confidence is not higherGeneral plan-review correction process from the Permits Involving Plans page ('Any comments from the review will be compiled and sent to the contacts on the permit... Resubmittal documents should be emailed to the Building Division'), not solar-specific.
department page checked 2026-08-30 https://www.dalycity.org/266/Permits-Involving-Plans
Q61 What is issued on pass? Core Final sign-off & PTO
Final
Why the confidence is not higherInspections page states 'The signed job cards will serve as the CO for all other projects' (i.e. everything except new construction/occupancy-change projects, which get an actual Certificate of Occupancy) -- a residential rooftop PV retrofit would receive a signed final job card rather than a CO.
department page checked 2026-08-30 https://www.dalycity.org/259/Inspections
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Installer
Why the confidence is not higherNot stated on any Daly City page; inferred from PG&E's standard NEM interconnection practice, in which the installer/applicant submits proof of the AHJ's final permit sign-off to PG&E (via the interconnection application/portal) to trigger Permission to Operate. No single PG&E or Daly City document was found stating this step-by-step for small residential NEM.
utility DG manual checked 2026-08-30 https://www.pge.com/en/about/doing-business-with-pge/interconnections/electric-generation-interconnection.html
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Jurisdiction & key facts
The standing 62-question set, answered for Daly City against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
Daly City is the authority having jurisdiction 88% confidence
- Holds
- Building and Electrical (Daly City Building Division, in-house); Planning Division also reviews solar submittals for zoning compliance
- Delegated to
- Fire-code review/inspection is delegated to the North County Fire Authority (NCFA), a Joint Powers Authority formed in 2003 by Daly City, Brisbane and Pacifica -- confirmed on Daly City's own Fire & Rescue page. NCFA's own website (northcountyfire.org) returned HTTP 403 to automated fetch; its role in routine residential PV sign-off specifically (vs. Building Division's own PV inspection checklist) could not be independently confirmed beyond the JPA structure and the separate NCFA inspection-scheduling phone line listed on Daly City's Inspections page.
- Overridden by
- California state law shapes but does not remove local authority: Gov. Code §65850.5 mandates ministerial/streamlined review for residential solar (reflected in Daly City's own 'low fees, timely review' framing and its SolarAPP+/AB 2188 10kW-streamlined program), and AB 130 (Stats. 2025, Ch. 22) froze more-restrictive local residential code amendments from 1 Oct 2025 to 1 Jun 2031 -- relevant to interpreting Daly City's 2025 CBSC local-amendment cycle, which the City itself describes as 'housekeeping and simplification' removing rather than adding local amendments.
- Why not higher
- Daly City's Building Division page states it 'is responsible for the administration and enforcement of adopted Code of Regulations Title 24'; its Adopted Codes page confirms the City enforces the full 2025 CBSC suite with local Title 15 amendments. Fire is NOT an in-house Daly City department -- it is delegated to NCFA, a three-city JPA, which changes who to contact for CFC-driven questions (battery/ESS clearances, ridge setbacks) even though Building Division performs the routine PV final inspection itself.
- Permit required
- Yes96%
- Permit cost
- No solar-specific flat fee is published; using the City's own valuation-based Building Permit fee table plus its 79% Plan Review surcharge and 9% Technology Fee,55%
- Plan review
- 1-3 business days for submittals using the City's Solar PV Standard Plan (≤10kW simplified path);82%
- Portal
- Daly City Online Permits, a Tyler Technologies EnerGov self-service portal (dalycityca-energovpub.tylerhost.net), integrated with SolarAPP+ for eligible residential PV/ESS projects.92%
- Electrical code
- 202392%
- Own placard wording
- Yes92%
- Booking an inspection
- Phone or email82%
Labels & placards for this authority
Daly City writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.
Wording 92%
Yes
Size, colour & material 90%
The Standard Plan's informational note recommends ANSI Z535.4-compliant safety signs: a phenolic plaque with contrasting text/background colors for permanency, and states 'No type size is specified, but 20 point (3/8in) should be considered the minimum.'
Where they go 85%
AHJ-level PV/system labels go at the PV modules, junction/combiner boxes, conduit (every 10ft), DC and AC disconnects, and the main service equipment (per the Standard Plan). Utility-level: PG&E requires its line/supply-side-connection placard mounted on the metering equipment itself (Greenbook Ch. 6.3).
What the utility wants on top 85%
Yes -- PG&E requires an engraved placard/signage on the metering equipment indicating a line/supply-side connection where a fusible AC disconnect is used ahead of the main breaker, per PG&E Electric Design Standard 060559 ('Disconnect Switch Requirements for Distributed Generation Customers'), referenced in the Greenbook's Electric Generation Interconnection chapter.
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.