Town of Los Gatos

Santa Clara County

Verified Aug. 4, 2026

Town of Los Gatos is a city authority in the State of California, serving 33,529 residents. 3,300 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined (one Building Permit Application form includes an integrated 'Application for Electrical Permit' section; Q4 Plan review — Same day for over-the-counter applications, or 1–3 business days for electronic applications (for small residential rooftop solar systems eligible for the… Q18 Where you file — Accela Citizen Access (ACA), branded as the Town's 'Online Permits System' at permits.losgatosca.gov Q20

Permit required
Yes98% source
What it costs
No flat residential fee. Building-side: Plan Review $190.00/hr (1/4-hr minimum) + Field Inspection $199.00/hr (1-hr minimum) for 'Photovoltaic – Roof & Ground Mounted – Residential' (Item 72).92% source
Plan review turnaround
Same day for over-the-counter applications, or 1–3 business days for electronic applications (for small residential rooftop solar systems eligible for the expedited/nondiscretionary review process).90% source
Key document
published checklist (inference) cited by 8 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · department page
    • What does this authority permit itself, and what does it delegate? Both (building and electrical are issued by the Town's own Building Division); fire-code aspects sit with Santa Clara County Fire Department (a separate special district providing Los Gatos' fire services, not a delegation from the Town) 88% · department page + fee schedule
    • Is a permit required for a residential rooftop PV system? Yes 98% · ordinance
    • Is there a separate electrical permit, or is it combined? Combined (one Building Permit Application form includes an integrated 'Application for Electrical Permit' section; the SolarApp+ path issues a single 'Residential Solar Permit with SolarApp+') 65% · permit application form
    • Is a HOA or architectural approval required first? No — not required by the Town for a solar permit itself. 65% · published checklist (absence)
    • Is there a historic-district review? Yes, for designated landmarks, properties in a historic district, or pre-1941 structures — planning approval is required before any exterior alteration, and Town Code contains no PV/solar exemption from this review (unlike some cities' explicit solar carve-outs). 85% · town code
    • Is a wind or windstorm certification required? No — no wind/windstorm certification (TDI-style) requirement exists; not applicable in this jurisdiction. 80% · ordinance (absence)
    • Is a Specific Use Permit or Council approval ever required? Conditionally yes — the Building Official may require a 'minor residential permit' (with Planning Commission appeal rights) if the solar system is found, on substantial evidence, to have a 'specific, adverse impact upon the public health and safety'; otherwise no Special/Conditional Use Permit or Council approval is required for a routine small residential rooftop system. 90% · ordinance
    • Is there a system-size cap on residential generation? Two different caps found for two different pathways: (1) codified 'small residential rooftop solar energy system' definition = 10 kW AC nameplate / 30 kW thermal, on a single- or duplex-family dwelling only (AB 2188-era cap, unchanged in the Dec 2025 recodification); (2) the live SolarApp+ automated-instant-permit page caps PV at 38.4 kW AC and ESS at 38.4 kW, with 400A service/225A disconnect/225A busbar limits — a different (larger) national SolarApp+ eligibility threshold, not a Town-set ceiling. No separate zoning-code kW ceiling was found. 90% · ordinance + portal page
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Licensed contractor — specifically a C-10 (electrical) or C-46 (solar) classification per the Town's own submittal checklist ('a C-10 or C-46 classification contractor's license may pull permits for solar installation') 95% · published checklist
    • Must the contractor be registered with this authority before applying? Yes 90% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes, via the conventional (non-SolarApp+) permit path 60% · department page (inference)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Completed permit application; ONE bookmarked, wet/digitally-signed plan-set PDF; separate supporting-document PDFs (structural calcs, specs, etc.); proof of a signed written contract between contractor and owner; for roof mount — roof plan to scale, single-line diagram, rooftop setback per CRC-R324.6, equipment listing/testing-agency data; for ground mount — Planning approval, site plan showing utilities and trees, tree-protection plan, construction-management plan, footing/attachment engineering calcs. 95% · published checklist
    • How many copies, and in what format? Electronic upload only: ONE (1) combined, bookmarked PDF for the signed plan set, with the permit application and any supporting documents (structural calcs, specs) each as separate PDF uploads to the Accela portal — no paper/physical copies specified. 90% · published checklist
    • Is a site plan required, and what must it show? Yes — a roof plan (for roof mount) or site plan (for ground mount) is required, drawn to scale, showing: north arrow, direction to street frontage, main electric meter/panel, DC disconnect, inverter, AC disconnect location, roof slope/material/dimensions, array location(s), rafter spans/bracing (or attic photo), and CRC-R324.6 rooftop setbacks; ground-mount site plans must additionally show all existing/proposed utilities, existing trees (species, diameter, dripline), and a 10-ft brush-clear area per CRC-R324.7.2. 95% · published checklist
    • Is a one-line / three-line diagram required? Yes 95% · published checklist
    • Are string and conductor calculations required? Effectively yes — the single-line diagram must show conductor/wire size and type plus equipment make/model/size, and 'equipment manufacturer's specifications showing listing and testing agencies' are separately required, though the Town does not use the phrase 'string calculations' or ask for a distinct voltage-drop/string-sizing worksheet. 65% · published checklist (inference)
    • Is a structural PE stamp required, and at what threshold? No numeric threshold published; the checklist requires a 'wet/digital signature... by design professional(s)' on all submittal documents generally, and for GROUND-mount systems specifically requires 'footing and attachment details with engineering calculations.' No roof-mount PE-stamp trigger (e.g., panel weight, roof type, or valuation) is stated. 55% · published checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Accela Citizen Access (ACA), branded as the Town's 'Online Permits System' at permits.losgatosca.gov 98% · portal landing page
    • Can the whole application be completed online? Yes 95% · portal / department page
    • What does a residential solar permit cost? No flat residential fee. Building-side: Plan Review $190.00/hr (1/4-hr minimum) + Field Inspection $199.00/hr (1-hr minimum) for 'Photovoltaic – Roof & Ground Mounted – Residential' (Item 72). Electrical-side: $68.00 permit issuance fee (Item 74) + $92.00 'Photovoltaic system (residential)' unit fee (Item 89, same rate for 'Solar systems (including controls)', Item 90) + electrical plan review at 25% of the electrical permit fee (Item 78). SolarApp+ path adds a separate $25 NREL platform administration fee. 92% · fee schedule
    • How is the fee calculated? Tiered/hourly — priced by hourly plan-review and field-inspection rates with stated minimums (not flat, not valuation-based, not per-kW or per-panel), plus a flat electrical unit fee and a percentage-of-fee plan-review charge on the electrical side. 80% · fee schedule
    • Is there a separate plan-check fee? Yes 95% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Same day for over-the-counter applications, or 1–3 business days for electronic applications (for small residential rooftop solar systems eligible for the expedited/nondiscretionary review process). 90% · ordinance
    • How long is an issued permit valid before it expires? No local override found; the Town's own submittal/fee documents do not restate a permit-validity period, and Ordinance 2380 contains no amendment to CBC Section 105.5 (permit expiration), so the state-standard default (180 days without required inspection progress under the 2025 CBC) is inferred to apply. 60% · ordinance (absence of amendment)
    • Which utility handles interconnection here? Pacific Gas & Electric (PG&E) is the wires/interconnection utility; Silicon Valley Clean Energy (SVCE) is the Community Choice Aggregation electricity provider (generation only — PG&E still owns the wires, handles interconnection and issues Permission to Operate). 80% · utility/CCA member list + city pages
    • Where does the utility sit in the sequence? After permit / after the AHJ's final inspection — PG&E will not normally issue Permission to Operate (PTO) until it has evidence of the applicant's final electrical inspection clearance from the AHJ. 90% · utility tariff (Greenbook/Rule 21)

28 questions answered against Town of Los Gatos’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherTown's own Building Division page and Fire Services page directly describe the Town issuing residential building/electrical permits for PV; Community Development/Building Division is the AHJ for building & electrical.

department page checked 2026-08-30 https://www.losgatosca.gov/220/Building

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both (building and electrical are issued by the Town's own Building Division); fire-code aspects sit with Santa Clara County Fire Department (a separate special district providing Los Gatos' fire services, not a delegation from the Town)

Why the confidence is not higherBuilding Division page shows Town issues building permits and a distinct Electrical Permit Fees section exists in the Town's own fee schedule; Town's Fire Services page states residents 'receive fire services from the Santa Clara County Fire Department' — SCCFD is not a Town department.

department page + fee schedule checked 2026-08-30 https://www.losgatosca.gov/220/Building

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherOrdinance 2380 Sec. 6.150.030 (Applicability) states the expedited-permit provisions 'apply to the permitting of all small residential rooftop solar energy systems in the Town,' and the SolarApp+ page confirms a building permit is required (instant or conventional).

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined (one Building Permit Application form includes an integrated 'Application for Electrical Permit' section; the SolarApp+ path issues a single 'Residential Solar Permit with SolarApp+')

Why the confidence is not higherTown's Building Permit Application PDF has an inline 'Application for Electrical Permit E-___' section on the same form as the building application; however the FY2026-27 fee schedule prices Building (Item 72) and Electrical (Items 74-80, 89) fees on separate line items, so the two trades are billed separately even though processed under one application.

permit application form checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/833/Building-Division-Permit-Applications

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Licensed contractor — specifically a C-10 (electrical) or C-46 (solar) classification per the Town's own submittal checklist ('a C-10 or C-46 classification contractor's license may pull permits for solar installation')

Why the confidence is not higherStated verbatim in the Town's Photovoltaic Solar System Submittal Requirements checklist.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherBuilding Division page states 'Contractors must have a current Business License for the Town to obtain permits,' and the SolarApp+ instructions require verifying a Town business license (calling 408-502-5687) before the instant building permit step.

department page checked 2026-08-30 https://www.losgatosca.gov/220/Building

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes, via the conventional (non-SolarApp+) permit path

Why the confidence is not higherSolarApp+'s own eligibility page states 'Applicants without a CSLB license must apply through the traditional building permit process' (implying self-installers are not barred, just routed off SolarApp+), and the Town's general Building Permit Application form lists 'OWNER' as a valid applicant/contact type. No Town document explicitly affirms or bars homeowner self-permitting for electrical work; this is inferred from those two Town sources plus California's general owner-builder allowance (Bus. & Prof. Code §7044), which no local rule was found to override.

department page (inference) checked 2026-08-30 https://permits.losgatosca.gov/Building/Apply-Directly-for-a-Residential-SolarAPP-Permit

Q8 What documents make up a complete submittal? Core Submittal package

Completed permit application; ONE bookmarked, wet/digitally-signed plan-set PDF; separate supporting-document PDFs (structural calcs, specs, etc.); proof of a signed written contract between contractor and owner; for roof mount — roof plan to scale, single-line diagram, rooftop setback per CRC-R324.6, equipment listing/testing-agency data; for ground mount — Planning approval, site plan showing utilities and trees, tree-protection plan, construction-management plan, footing/attachment engineering calcs.

Why the confidence is not higherFull itemised list in the Town's own 'Photovoltaic Solar System Submittal Requirements' checklist, last modified 29 Jun 2026 per its PDF metadata.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q9 How many copies, and in what format? Submittal package

Electronic upload only: ONE (1) combined, bookmarked PDF for the signed plan set, with the permit application and any supporting documents (structural calcs, specs) each as separate PDF uploads to the Accela portal — no paper/physical copies specified.

Why the confidence is not higher'You will need to upload to the pre-application in separate PDFs... Plan set (PDF pages bookmarked and signed... Note: This must be ONE (1) PDF.)' — Town's PV submittal checklist.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — a roof plan (for roof mount) or site plan (for ground mount) is required, drawn to scale, showing: north arrow, direction to street frontage, main electric meter/panel, DC disconnect, inverter, AC disconnect location, roof slope/material/dimensions, array location(s), rafter spans/bracing (or attic photo), and CRC-R324.6 rooftop setbacks; ground-mount site plans must additionally show all existing/proposed utilities, existing trees (species, diameter, dripline), and a 10-ft brush-clear area per CRC-R324.7.2.

Why the confidence is not higherVerbatim requirements in the Town's PV submittal checklist, Sections 2 (Roof Top) and 3 (Ground Installation).

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higher'Single line diagram of electrical equipment clearly showing: the size of main panel, sub panels, PV system equipment including make, model and size of units, disconnects and wire size and type' — required item in the Town's PV submittal checklist and in its final CHECKLIST section.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q12 Are string and conductor calculations required? Drawings & calculations

Effectively yes — the single-line diagram must show conductor/wire size and type plus equipment make/model/size, and 'equipment manufacturer's specifications showing listing and testing agencies' are separately required, though the Town does not use the phrase 'string calculations' or ask for a distinct voltage-drop/string-sizing worksheet.

Why the confidence is not higherInferred from the submittal checklist's single-line-diagram and equipment-listing requirements; no separate calculation form is named.

published checklist (inference) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No numeric threshold published; the checklist requires a 'wet/digital signature... by design professional(s)' on all submittal documents generally, and for GROUND-mount systems specifically requires 'footing and attachment details with engineering calculations.' No roof-mount PE-stamp trigger (e.g., panel weight, roof type, or valuation) is stated.

Why the confidence is not higherTown's PV submittal checklist, General and Ground Installation sections; no threshold language found elsewhere in Ordinance 2380's Building Code articles.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedOrdinance 2380 Article IV (California Electrical Code, Sec. 6.40.010 'Adopted' is its only section — full 4,429-line ordinance text grepped for 'stamp'/'PE'/electrical-engineer threshold language) and the PV submittal checklist — neither states an electrical PE-stamp threshold.

https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q15 What does a residential solar permit cost? Core Fees

No flat residential fee. Building-side: Plan Review $190.00/hr (1/4-hr minimum) + Field Inspection $199.00/hr (1-hr minimum) for 'Photovoltaic – Roof & Ground Mounted – Residential' (Item 72). Electrical-side: $68.00 permit issuance fee (Item 74) + $92.00 'Photovoltaic system (residential)' unit fee (Item 89, same rate for 'Solar systems (including controls)', Item 90) + electrical plan review at 25% of the electrical permit fee (Item 78). SolarApp+ path adds a separate $25 NREL platform administration fee.

Why the confidence is not higherTown's FY2026-2027 Comprehensive Fee Schedule, pp.9-10, plus the SolarApp+ permit page's mention of the $25 administration fee.

fee schedule checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/636/Permit-Fees

Q16 How is the fee calculated? Core Fees

Tiered/hourly — priced by hourly plan-review and field-inspection rates with stated minimums (not flat, not valuation-based, not per-kW or per-panel), plus a flat electrical unit fee and a percentage-of-fee plan-review charge on the electrical side.

Why the confidence is not higherDerived directly from the FY2026-27 fee schedule's Special Systems Fees (Item 72) and Electrical Permit/Unit Fee Schedule (Items 74, 78, 89) — none of the standard Flat/Valuation/Per-kW/Per-panel options describes it precisely, so 'Tiered' is the closest fit for an hourly-rate-with-minimums + flat-unit-fee structure.

fee schedule checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/636/Permit-Fees

Q17 Is there a separate plan-check fee? Fees

Yes

Why the confidence is not higherFee schedule lists 'Plan Review (1/4 hr. minimum) $190.00/hr' as a distinct line from 'Field Inspection' for PV (Item 72), and a separate electrical 'Plan review fee — 25% of Electrical Permit Fee' (Item 78).

fee schedule checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/636/Permit-Fees

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Same day for over-the-counter applications, or 1–3 business days for electronic applications (for small residential rooftop solar systems eligible for the expedited/nondiscretionary review process).

Why the confidence is not higherOrdinance 2380 Sec. 6.150.060(a): 'The Building Division shall issue a building permit... on the same day for over-the-counter applications or within one (1) to three (3) business days for electronic applications upon receipt of a complete application.'

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q19 How long is an issued permit valid before it expires? Timeline & validity

No local override found; the Town's own submittal/fee documents do not restate a permit-validity period, and Ordinance 2380 contains no amendment to CBC Section 105.5 (permit expiration), so the state-standard default (180 days without required inspection progress under the 2025 CBC) is inferred to apply.

Why the confidence is not higherFull-text search of Ordinance 2380 (4,429 lines) for '105.5'/'expir' found only bond-related expiration language (Building Relocation Code) and refund-request deadlines — no residential PV permit-validity amendment.

ordinance (absence of amendment) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q20 Which permit portal does this authority use? Core Portal & process

Accela Citizen Access (ACA), branded as the Town's 'Online Permits System' at permits.losgatosca.gov

Why the confidence is not higherBuilding Division page: 'you will need to register for an account on the Town's portal: https://permits.losgatosca.gov'; SolarApp+ page: 'Log in to our User Portal, Accela Citizen Access (ACA).'

portal landing page checked 2026-08-30 https://permits.losgatosca.gov/Building/Apply-Directly-for-a-Residential-SolarAPP-Permit

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higher'We are only accepting applications online at this time' — SolarApp+ permit page; Building Division page describes online registration, application upload, and permit issuance entirely through the portal.

portal / department page checked 2026-08-30 https://permits.losgatosca.gov/Building/Apply-Directly-for-a-Residential-SolarAPP-Permit

Q22 Which utility handles interconnection here? Core Utility interconnection

Pacific Gas & Electric (PG&E) is the wires/interconnection utility; Silicon Valley Clean Energy (SVCE) is the Community Choice Aggregation electricity provider (generation only — PG&E still owns the wires, handles interconnection and issues Permission to Operate).

Why the confidence is not higherTown's Building page lists 'Silicon Valley Clean Energy eHub' among its associated links (confirming SVCE as the CCA) and multiple Town pages/documents (e.g. PG&E Public Safety Power Shutoff pages) refer to PG&E as the electric utility; SVCE's own member-agency list includes Los Gatos. No single Town sentence states 'PG&E is our utility' outright, so this is a moderate-confidence composite of Town-side and SVCE-side sources, not a PowerToChoose guess.

utility/CCA member list + city pages checked 2026-08-30 https://www.svcleanenergy.org/who-we-are/

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit / after the AHJ's final inspection — PG&E will not normally issue Permission to Operate (PTO) until it has evidence of the applicant's final electrical inspection clearance from the AHJ.

Why the confidence is not higherPG&E Electric Rule 21, Section D.13.b: PTO 'shall normally be processed not later than thirty (30) Business Days following Distribution Provider's receipt of... evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction.'

utility tariff (Greenbook/Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — not required by the Town for a solar permit itself.

Why the confidence is not higherThe Town's PV submittal checklist and Ordinance 2380's expedited-solar chapter list no HOA/ARB approval step (only a Building pre-application); California's Solar Rights Act (Civil Code §714) independently bars HOA approval from being a permit precondition. No Los Gatos document was found requiring it.

published checklist (absence) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q25 Is there a historic-district review? Overlays & special cases

Yes, for designated landmarks, properties in a historic district, or pre-1941 structures — planning approval is required before any exterior alteration, and Town Code contains no PV/solar exemption from this review (unlike some cities' explicit solar carve-outs).

Why the confidence is not higherMunicode Sec. 29.80.260 ('Permit required'): 'No person shall do any work listed below without first obtaining the required planning approval: (1) Exterior alteration to a designated landmark, property in an historic district or pre-1941 structure...' Checked Sec. 29.80.295 (Exemptions for reconstruction) — its only exemption is for as-built reconstruction, not solar. Grepped the whole Article VIII (Overlay Zones & Historic Preservation) chunk (53 docs) for 'solar'/'photovoltaic' — zero hits.

town code checked 2026-08-30 https://library.municode.com/ca/los_gatos/codes/code_of_ordinances?nodeId=CO_CH29ZORE_ARTVIIIOVZOHIPR_DIV3HIPRLHLAHIPROVZO_S29.80.260PERE

Q26 Is a wind or windstorm certification required? Overlays & special cases

No — no wind/windstorm certification (TDI-style) requirement exists; not applicable in this jurisdiction.

Why the confidence is not higherCalifornia does not use Texas Department of Insurance-style windstorm certification; searched Ordinance 2380 and the PV submittal checklist for wind-related PV language and found none beyond standard structural engineering calculations (which are handled under Q13, not a separate 'certification').

ordinance (absence) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Conditionally yes — the Building Official may require a 'minor residential permit' (with Planning Commission appeal rights) if the solar system is found, on substantial evidence, to have a 'specific, adverse impact upon the public health and safety'; otherwise no Special/Conditional Use Permit or Council approval is required for a routine small residential rooftop system.

Why the confidence is not higherOrdinance 2380 Sec. 6.150.060(a)-(c): Building Official 'may require an applicant to apply for a minor residential permit if the official finds... a specific, adverse impact'; decisions 'may be appealed to the Town Planning Commission.'

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Two different caps found for two different pathways: (1) codified 'small residential rooftop solar energy system' definition = 10 kW AC nameplate / 30 kW thermal, on a single- or duplex-family dwelling only (AB 2188-era cap, unchanged in the Dec 2025 recodification); (2) the live SolarApp+ automated-instant-permit page caps PV at 38.4 kW AC and ESS at 38.4 kW, with 400A service/225A disconnect/225A busbar limits — a different (larger) national SolarApp+ eligibility threshold, not a Town-set ceiling. No separate zoning-code kW ceiling was found.

Why the confidence is not higherOrdinance 2380 Sec. 6.150.020 (Definitions) for the 10kW/30kW figure; Town's own 'Apply Directly for a Residential SolarAPP+ Permit' page for the 38.4kW SolarApp+ eligibility figures.

ordinance + portal page checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 NEC, adopted (as amended by CBSC) as the 2025 California Electrical Code (CEC), Title 24 Part 3 — effective 1 Jan 2026. 98% · adopting ordinance
    • Which building code edition is in force? 2024 IBC, adopted as the 2025 California Building Code (CBC), Title 24 Part 2; residential work falls under the corresponding 2025 California Residential Code (CRC), Article III of the same chapter. 98% · adopting ordinance
    • Which fire code edition is in force? 2024 IFC, adopted (as amended) as the 2025 California Fire Code (CFC). 98% · adopting ordinance
    • Are there local amendments to any of the above? Yes — extensive local amendments, including: a WUI scope clarification; Reach Codes (AC-to-heat-pump replacement on existing single-family AC replacement, electric-readiness pre-wiring on remodels/additions); residential ESS location/spacing/fire-detection/suppression amendments (CRC R330, CFC 1207 series); a Schedule-of-Permit-Fees amendment (CBC 109.2.1, plan review = 65% of permit fee); and the Town's own 'Expedited Permit Process for Small Residential Rooftop Solar Systems' chapter (Article XV, mirrored in Zoning Ch. 29 Div. 3B). 98% · adopting ordinance
    • What is the installation judged against? The 2025 CBC/CRC/CEC/CFC/CGBSC as locally amended by Ordinance 2380, plus the Town's Article XV/Zoning Div. 3B 'Expedited Permit Process for Small Residential Rooftop Solar Systems' (which itself requires conformance to the state Solar Permitting Guidebook and Civil Code §714 cost/efficiency restrictions). 90% · ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? Rooftop setbacks per CRC-R324.6 must be shown on the roof plan; for ground-mounted/WUI-area systems, a 10-foot brush-free clear area is required per CRC-R324.7.2. No local amendment to these state pathway/setback provisions was found in Ordinance 2380 (they are inherited from the 2025 CRC as adopted). 92% · published checklist
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, rapid shutdown is required under the currently-adopted 2023 NEC (§690.12), effective 1 Jan 2026 as the 2025 CEC. Caution: the Town's own PV submittal checklist — whose PDF metadata shows it was last modified 29 Jun 2026, i.e. after the new code took effect — still instructs applicants to put '2022 Building Code, 2022 Electrical Code and 2022 Fire Code' on their cover sheet and describes the disconnect mechanism 'per the 2022 California Electrical Code,' rather than the 2025 CEC actually in force. This is a real lag between the currently-adopted ordinance and the still-unrevised checklist. 75% · ordinance vs. checklist discrepancy
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? No Town-specific placard list is published. The submittal checklist only requires applicants to 'show actual proposed labels as required by code and policy' and note their location/dimension on the plan set — it does not enumerate which placards (e.g. AC/DC disconnect, rapid-shutdown, dual-power-source, ESS) are required; those are inherited from the state-adopted 2025 CEC (Art. 690/705) and 2025 CFC (§605.11/706) without local elaboration. 70% · published checklist (partial absence)
    • Does the authority specify placard wording of its own? No 80% · ordinance (proven absence)
    • Does it specify letter height, colour or material? No — no Town-specified letter height, colour, or material for PV placards was found anywhere in the reviewed documents. 75% · ordinance (proven absence)
    • Is a site plan / facility map placard required, and what must it show? The required roof plan/site plan (showing array location, meter/panel, disconnects, inverter, and — for ground mount — utilities and trees) functions as the facility map for plan-check purposes; the Town does not separately name or require a distinct '705.10 facility placard' document beyond that plan-set drawing. 65% · published checklist (inference)
    • Does the UTILITY specify placards beyond the AHJ's? Yes — PG&E's Electric Rule 21 requires the visible interconnection/isolating disconnect device to 'include markings or signage that clearly indicates open and closed positions,' in addition to whatever the AHJ requires. 85% · utility tariff (Greenbook/Rule 21)
    • Where must the labels be placed? Town documents do not specify exact placement beyond requiring labels to be shown, located and dimensioned on the plan set. PG&E's Rule 21 requires its visible disconnect to be located 'near the Point of Interconnection' and reachable by Distribution Provider personnel 24 hours a day for emergency purposes; standard NEC/CEC Art. 690/705 labeling-location rules (at service equipment, disconnects, and point of interconnection) apply by virtue of code adoption without further local elaboration. 65% · checklist + utility tariff
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? Yes 90% · ordinance
    • Are batteries permitted, and under what conditions? Yes, subject to detailed CRC R330 / CFC §1207 location, spacing, fire-detection and fire-suppression amendments as locally modified by Ordinance 2380: ESS may only be installed in detached garages/accessory structures, separated attached garages, specified outdoor locations ≥3 ft from doors/windows, or enclosed/fire-rated utility spaces (never in sleeping rooms); units must be spaced ≥3 ft apart unless large-scale fire testing shows otherwise; smoke/heat alarm interconnection is required; and fire-area quantity limits and automatic suppression requirements apply above certain kWh thresholds (with lead-acid/UPS exceptions). 95% · ordinance
    • Is there a separate ESS permit or inspection? No distinct 'ESS permit' line exists in the Town's fee schedule — ESS is billed under the same hourly Special-Systems Building fee structure as other electrical/PV work (no 'Energy Storage System' fee item was found, unlike some neighbouring cities). Under SolarApp+, a combined PV/ESS project can be issued as a single instant permit, but standalone ESS is explicitly excluded from SolarApp+ and must go through the conventional building-permit process (which still uses the same general fee schedule, not a distinct ESS permit type). 70% · fee schedule (absence) + portal page
    • Is a ground mount treated as a structure? Effectively treated as requiring the same site-development review as a structure — the Town's PV submittal checklist requires 'Planning approval, location on site plan' for any ground installation, plus a full site plan (existing/proposed utilities, tree inventory and protection plan, construction-management plan) and 'footing and attachment details with engineering calculations,' though no zoning-code section was found that formally labels ground-mount PV an 'accessory structure.' 70% · published checklist (inference)

20 questions answered against Town of Los Gatos’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 NEC, adopted (as amended by CBSC) as the 2025 California Electrical Code (CEC), Title 24 Part 3 — effective 1 Jan 2026.

Why the confidence is not higherOrdinance 2380, Article IV, Sec. 6.40.010: 'The 2023 National Electrical Code (NEC), as amended by the State of California Building Standards Commission, and known as the 2025 California Electric Code (CEC)... is adopted by reference.'

adopting ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q30 Which building code edition is in force? Core Code editions in force

2024 IBC, adopted as the 2025 California Building Code (CBC), Title 24 Part 2; residential work falls under the corresponding 2025 California Residential Code (CRC), Article III of the same chapter.

Why the confidence is not higherOrdinance 2380, Article II, Sec. 6.20.010, and the Town's 'Current Adopted Codes' page confirming the 2025 cycle became effective 1 Jan 2026 per Ordinance 2380 (enacted 2 Dec 2025).

adopting ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q31 Which fire code edition is in force? Code editions in force

2024 IFC, adopted (as amended) as the 2025 California Fire Code (CFC).

Why the confidence is not higherOrdinance 2380, Article X: 'The 2024 International Fire Code (IFC), as amended by the State of California Building Standards Commission and known as the 2025 California Fire Code (CFC)...'

adopting ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — extensive local amendments, including: a WUI scope clarification; Reach Codes (AC-to-heat-pump replacement on existing single-family AC replacement, electric-readiness pre-wiring on remodels/additions); residential ESS location/spacing/fire-detection/suppression amendments (CRC R330, CFC 1207 series); a Schedule-of-Permit-Fees amendment (CBC 109.2.1, plan review = 65% of permit fee); and the Town's own 'Expedited Permit Process for Small Residential Rooftop Solar Systems' chapter (Article XV, mirrored in Zoning Ch. 29 Div. 3B).

Why the confidence is not higherOrdinance 2380 in full — dozens of 'Section X is amended to read as follows' clauses across Articles II, IV, VII, X, XII, XV.

adopting ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q33 What is the installation judged against? Core Electrical

The 2025 CBC/CRC/CEC/CFC/CGBSC as locally amended by Ordinance 2380, plus the Town's Article XV/Zoning Div. 3B 'Expedited Permit Process for Small Residential Rooftop Solar Systems' (which itself requires conformance to the state Solar Permitting Guidebook and Civil Code §714 cost/efficiency restrictions).

Why the confidence is not higherOrdinance 2380 Secs. 6.150.010/.040/.050(e): systems 'shall meet applicable health and safety standards... imposed by the state and the Town' and standard plans 'shall substantially conform to... the California Solar Permitting Guidebook.'

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedOrdinance 2380 Article IV (California Electrical Code) contains only Sec. 6.40.010 'Adopted' — no further local sections. Full-text grep of the 4,429-line ordinance for 'busbar'/'service upgrade'/'panel upgrade' returned zero hits (positive control 'electrical' returned 49 hits, fabricated control 'zzqqx' returned 0, confirming the search itself was working).

https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedPV submittal checklist and Ordinance 2380's Building/Residential Code articles were checked for a mounting-system or attachment-spacing table; only a rooftop-setback cross-reference to CRC-R324.6 and a general 'footing and attachment details with engineering calculations' requirement (ground mount only) were found — no Town-specific spacing table.

https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Rooftop setbacks per CRC-R324.6 must be shown on the roof plan; for ground-mounted/WUI-area systems, a 10-foot brush-free clear area is required per CRC-R324.7.2. No local amendment to these state pathway/setback provisions was found in Ordinance 2380 (they are inherited from the 2025 CRC as adopted).

Why the confidence is not higherTown's PV submittal checklist, Section 2 (Roof Top) and Section 3 (Ground Installation), citing CRC-R324.6 and R324.7.2 by section number.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, rapid shutdown is required under the currently-adopted 2023 NEC (§690.12), effective 1 Jan 2026 as the 2025 CEC. Caution: the Town's own PV submittal checklist — whose PDF metadata shows it was last modified 29 Jun 2026, i.e. after the new code took effect — still instructs applicants to put '2022 Building Code, 2022 Electrical Code and 2022 Fire Code' on their cover sheet and describes the disconnect mechanism 'per the 2022 California Electrical Code,' rather than the 2025 CEC actually in force. This is a real lag between the currently-adopted ordinance and the still-unrevised checklist.

Why the confidence is not higherOrdinance 2380 Sec. 6.40.010 (2025 CEC in force) versus the PV submittal checklist's cover-sheet instruction citing the superseded 2022 codes — both Town documents, in direct tension.

ordinance vs. checklist discrepancy checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

No Town-specific placard list is published. The submittal checklist only requires applicants to 'show actual proposed labels as required by code and policy' and note their location/dimension on the plan set — it does not enumerate which placards (e.g. AC/DC disconnect, rapid-shutdown, dual-power-source, ESS) are required; those are inherited from the state-adopted 2025 CEC (Art. 690/705) and 2025 CFC (§605.11/706) without local elaboration.

Why the confidence is not higherTown's PV submittal checklist, General Roof Top Installation bullet on labels; full-text search of Ordinance 2380 for 'placard' returned zero hits.

published checklist (partial absence) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No

Why the confidence is not higherGrepped the full 4,429-line Ordinance 2380 for 'placard' (0 hits) and reviewed the PV submittal checklist, which asks applicants to propose their own label wording/location rather than specifying Town-mandated wording. Positive control 'electrical' returned 49 hits in the same document, confirming the search method works.

ordinance (proven absence) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No — no Town-specified letter height, colour, or material for PV placards was found anywhere in the reviewed documents.

Why the confidence is not higherFull-text search of Ordinance 2380 and the PV submittal checklist for letter-height/colour/material language found only an unrelated fire-apparatus-access-road sign spec (12in x 18in, red letters on white reflective background) — confirming the extraction method surfaces such specs when they exist, and that none exists for PV placards.

ordinance (proven absence) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

The required roof plan/site plan (showing array location, meter/panel, disconnects, inverter, and — for ground mount — utilities and trees) functions as the facility map for plan-check purposes; the Town does not separately name or require a distinct '705.10 facility placard' document beyond that plan-set drawing.

Why the confidence is not higherTown's PV submittal checklist, roof-plan and site-plan requirements.

published checklist (inference) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes — PG&E's Electric Rule 21 requires the visible interconnection/isolating disconnect device to 'include markings or signage that clearly indicates open and closed positions,' in addition to whatever the AHJ requires.

Why the confidence is not higherPG&E Electric Rule 21, Sheet 45, Section D.13.d(ii).

utility tariff (Greenbook/Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Town documents do not specify exact placement beyond requiring labels to be shown, located and dimensioned on the plan set. PG&E's Rule 21 requires its visible disconnect to be located 'near the Point of Interconnection' and reachable by Distribution Provider personnel 24 hours a day for emergency purposes; standard NEC/CEC Art. 690/705 labeling-location rules (at service equipment, disconnects, and point of interconnection) apply by virtue of code adoption without further local elaboration.

Why the confidence is not higherTown PV submittal checklist (label location/dimension note) plus PG&E Electric Rule 21 D.13.d.

checklist + utility tariff checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherOrdinance 2380 Sec. 6.150.040(c): systems 'shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories.' The PV submittal checklist also requires 'equipment manufacturer's specifications showing listing and testing agencies.'

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, subject to detailed CRC R330 / CFC §1207 location, spacing, fire-detection and fire-suppression amendments as locally modified by Ordinance 2380: ESS may only be installed in detached garages/accessory structures, separated attached garages, specified outdoor locations ≥3 ft from doors/windows, or enclosed/fire-rated utility spaces (never in sleeping rooms); units must be spaced ≥3 ft apart unless large-scale fire testing shows otherwise; smoke/heat alarm interconnection is required; and fire-area quantity limits and automatic suppression requirements apply above certain kWh thresholds (with lead-acid/UPS exceptions).

Why the confidence is not higherOrdinance 2380, Sec. 6.30.030 (amending CRC R330.3.1/R330.4/R330.7) and Sec. 6.100.160 (amending CFC 1207.1.7 / 1207.2.2.1 / 1207.5.2 / 1207.5.5 / 1207.11.3), citing NFPA 855 (2023 Ed.) and UL 9540A.

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No distinct 'ESS permit' line exists in the Town's fee schedule — ESS is billed under the same hourly Special-Systems Building fee structure as other electrical/PV work (no 'Energy Storage System' fee item was found, unlike some neighbouring cities). Under SolarApp+, a combined PV/ESS project can be issued as a single instant permit, but standalone ESS is explicitly excluded from SolarApp+ and must go through the conventional building-permit process (which still uses the same general fee schedule, not a distinct ESS permit type).

Why the confidence is not higherGrepped the Town's FY2026-27 fee schedule (which does list 'Photovoltaic system (residential) $92.00' and 'Solar systems... $92.00' as unit fees) for 'battery'/'energy storage'/'ESS' — zero hits; SolarApp+ page states 'SolarAPP+ is currently unable to accommodate... Standalone energy storage.'

fee schedule (absence) + portal page checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/636/Permit-Fees

Q47 Is a ground mount treated as a structure? Core Ground mount

Effectively treated as requiring the same site-development review as a structure — the Town's PV submittal checklist requires 'Planning approval, location on site plan' for any ground installation, plus a full site plan (existing/proposed utilities, tree inventory and protection plan, construction-management plan) and 'footing and attachment details with engineering calculations,' though no zoning-code section was found that formally labels ground-mount PV an 'accessory structure.'

Why the confidence is not higherTown's PV submittal checklist, Section 3 (Ground Installation).

published checklist (inference) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedLos Gatos' own PV submittal checklist only requires the roof/site plan to show the meter/panel and AC disconnect locations without specifying a distance/proximity rule; PG&E's public Electric Rule 21 gives general visible-disconnect requirements but the specific meter-proximity spec for service/disconnect placement sits in PG&E's Greenbook document TD-2306M, which is gated (not publicly downloadable) — could not be verified.

https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (Online Permits System / Accela), Phone (24-hr Inspection Request voicemail line), or Fax (Fax Inspection Request form) — no walk-in inspection booking option is offered. 95% · department page
    • How much notice is required? Must be scheduled by 12:00 p.m. (noon) the business day before, to get a next-business-day inspection; requests received after noon roll to the following business day. Effectively ~1 business day's notice. 90% · department page
    • Are same-day or AM/PM windows offered? AM/PM preference is accepted and 'every effort' is made to accommodate it, but it is not guaranteed; morning window is roughly 8am–12pm and afternoon roughly 12–3pm (described as estimates only). No same-day inspection option is offered — earliest is next business day. 90% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes for building/electrical — the Town's own Building Division field inspectors (Bobby DeHerrera, Noal Grover, Kyle Moore, Roy Alba) perform the final inspection. Delegated only for CFC-governed fire/ESS elements (e.g., large-scale ESS fire testing under the locally-amended CFC §1207), which fall to the Santa Clara County Fire Department as 'fire code official' — though no evidence was found that SCCFD publishes a distinct residential PV/ESS inspection process or fee (see jurisdiction note). 75% · staff directory + ordinance
    • If delegated, to whom? Santa Clara County Fire Department — but only for the CFC-governed portions (e.g., ESS fire-suppression/testing thresholds under locally-amended §1207); routine residential rooftop PV without a qualifying ESS is inspected entirely by the Town's own Building Division. 70% · department page (inference)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For small residential rooftop systems eligible for expedited review: only ONE consolidated inspection is required, scheduled within 2 business days of request with a 2-hour window. For conventional (non-expedited) permits — e.g., ground mount, service-panel upgrade, or systems failing the specific-adverse-impact test — no PV-specific inspection sequence is separately published; standard Town practice (rough electrical, then final) is inferred to apply but not documented for solar specifically. 80% · ordinance
    • Is a rough-in or mid-roof inspection required? No — for expedited/small-residential-rooftop systems, Ordinance 2380 explicitly limits the process to a single inspection (no separate rough-in/mid-roof step). For conventional (non-expedited) systems this is not separately documented by the Town. 80% · ordinance
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, in the form of a SUBMITTAL checklist that doubles as a field checklist — the Town's PV document ends with an explicit 'CHECKLIST' section (roof plan to scale, north arrow, roof slope/rafter size, roof cross-section, electrical-service location, single-line diagram, equipment specs) that an applicant signs as having submitted; it is framed as a submittal/plan-check checklist rather than a separately labeled 'inspection checklist.' 75% · published checklist
    • Does the inspector verify labels and listings? Inferred yes — the approved plan set the inspector checks against must include 'equipment manufacturer's specifications showing listing and testing agencies' per the submittal checklist, and Ordinance 2380 requires equipment to meet UL/IEEE/PUC standards, so verifying listings against the approved plans is implicit in standard field-inspection practice. No Town document states this in as many words for the inspection step itself. 65% · published checklist (inference)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? A signed-off Building Final (a 'Final' inspection approval on the permit record/card). No use of 'green tag' or similar terminology was found in any Town document reviewed. 55% · portal page (inference)
    • Who notifies the utility for PTO? Installer/applicant — PG&E's own tariff places the burden on the 'Applicant' to submit evidence of the AHJ's final electrical inspection clearance as part of the interconnection request that triggers Permission to Operate; the Town does not notify PG&E on the applicant's behalf. 75% · utility tariff (Greenbook/Rule 21)
    • Is there a re-inspection fee? $199.00/hr (billed under the Electrical Permit Fees / 'Plan Review & Re-inspection Fees' heading, which functions as the Town's general re-inspection rate; an additional 4-hour-minimum after-hours inspection rate of $240.00/hr also appears elsewhere in the same schedule for inspections outside normal business hours). 80% · fee schedule
    • How are corrections issued and cleared? For expedited/small-residential-rooftop solar: a written correction notice detailing all deficiencies is sent to the applicant for resubmission (Ordinance 2380 Sec. 6.150.060(f)). Generally, corrections/comments and marked-up plans are exchanged through the Accela citizen portal, and applicants may resubmit or collaborate with staff by email per the SolarApp+ instructions. 85% · ordinance + portal page

14 questions answered against Town of Los Gatos’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (Online Permits System / Accela), Phone (24-hr Inspection Request voicemail line), or Fax (Fax Inspection Request form) — no walk-in inspection booking option is offered.

Why the confidence is not higherTown's 'Inspection Request Information' page lists exactly these three methods.

department page checked 2026-08-30 https://www.losgatosca.gov/207/Inspection-Request-Information

Q50 How much notice is required? Core Booking & scheduling

Must be scheduled by 12:00 p.m. (noon) the business day before, to get a next-business-day inspection; requests received after noon roll to the following business day. Effectively ~1 business day's notice.

Why the confidence is not higher'*Must Schedule by 12 p.m. (Noon) for a Next Business Day Inspection*' — Town's Inspection Request Information page.

department page checked 2026-08-30 https://www.losgatosca.gov/207/Inspection-Request-Information

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

AM/PM preference is accepted and 'every effort' is made to accommodate it, but it is not guaranteed; morning window is roughly 8am–12pm and afternoon roughly 12–3pm (described as estimates only). No same-day inspection option is offered — earliest is next business day.

Why the confidence is not higherTown's Inspection Request Information page.

department page checked 2026-08-30 https://www.losgatosca.gov/207/Inspection-Request-Information

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes for building/electrical — the Town's own Building Division field inspectors (Bobby DeHerrera, Noal Grover, Kyle Moore, Roy Alba) perform the final inspection. Delegated only for CFC-governed fire/ESS elements (e.g., large-scale ESS fire testing under the locally-amended CFC §1207), which fall to the Santa Clara County Fire Department as 'fire code official' — though no evidence was found that SCCFD publishes a distinct residential PV/ESS inspection process or fee (see jurisdiction note).

Why the confidence is not higherTown's Building staff directory (in-house field inspectors) and Fire Services page (SCCFD provides all fire services) plus Ordinance 2380's CFC 1207 amendments naming the 'fire code official.'

staff directory + ordinance checked 2026-08-30 https://www.losgatosca.gov/Directory.asp?did=95

Q53 If delegated, to whom? Core Who inspects

Santa Clara County Fire Department — but only for the CFC-governed portions (e.g., ESS fire-suppression/testing thresholds under locally-amended §1207); routine residential rooftop PV without a qualifying ESS is inspected entirely by the Town's own Building Division.

Why the confidence is not higherOrdinance 2380 Sec. 6.100.160 references the 'Fire Code Official,' and the Town's Fire Services page confirms SCCFD is the Town's fire-service provider; SCCFD itself publishes no distinct residential PV/ESS standard, form or fee (checked and control-verified on its Standards & Specifications, Applications & Forms, and Municipal Codes & Fees pages).

department page (inference) checked 2026-08-30 https://www.losgatosca.gov/3053/Fire-Services

Q54 Which inspections are required, and in what order? Core Stages & sequence

For small residential rooftop systems eligible for expedited review: only ONE consolidated inspection is required, scheduled within 2 business days of request with a 2-hour window. For conventional (non-expedited) permits — e.g., ground mount, service-panel upgrade, or systems failing the specific-adverse-impact test — no PV-specific inspection sequence is separately published; standard Town practice (rough electrical, then final) is inferred to apply but not documented for solar specifically.

Why the confidence is not higherOrdinance 2380 Sec. 6.150.060(g)-(h): 'Only one (1) inspection shall be required... An inspection will be scheduled within two (2) business days of a request and provide a two-hour inspection window.'

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No — for expedited/small-residential-rooftop systems, Ordinance 2380 explicitly limits the process to a single inspection (no separate rough-in/mid-roof step). For conventional (non-expedited) systems this is not separately documented by the Town.

Why the confidence is not higherOrdinance 2380 Sec. 6.150.060(g): 'Only one (1) inspection shall be required and performed by the Town for small residential rooftop solar energy systems eligible for expedited review.'

ordinance checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q56 Does the inspector verify labels and listings? Core What is checked

Inferred yes — the approved plan set the inspector checks against must include 'equipment manufacturer's specifications showing listing and testing agencies' per the submittal checklist, and Ordinance 2380 requires equipment to meet UL/IEEE/PUC standards, so verifying listings against the approved plans is implicit in standard field-inspection practice. No Town document states this in as many words for the inspection step itself.

Why the confidence is not higherTown's PV submittal checklist (equipment listing requirement) and Ordinance 2380 Sec. 6.150.040(c) (UL/IEEE standards).

published checklist (inference) checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q57 Is there a published inspection checklist? Core What is checked

Yes, in the form of a SUBMITTAL checklist that doubles as a field checklist — the Town's PV document ends with an explicit 'CHECKLIST' section (roof plan to scale, north arrow, roof slope/rafter size, roof cross-section, electrical-service location, single-line diagram, equipment specs) that an applicant signs as having submitted; it is framed as a submittal/plan-check checklist rather than a separately labeled 'inspection checklist.'

Why the confidence is not higherTown's PV submittal checklist's final 'CHECKLIST' section and signature block.

published checklist checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/23919/Photovoltaic-Solar-System-Submittal-Requirements

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedThe Town's Inspection Request Information page describes how/when to schedule inspections but does not state what documents (permit card, approved plans, SolarApp+ approval letter, etc.) must be physically on site at the time of inspection.

https://www.losgatosca.gov/207/Inspection-Request-Information

Q59 Is there a re-inspection fee? Corrections & re-inspection

$199.00/hr (billed under the Electrical Permit Fees / 'Plan Review & Re-inspection Fees' heading, which functions as the Town's general re-inspection rate; an additional 4-hour-minimum after-hours inspection rate of $240.00/hr also appears elsewhere in the same schedule for inspections outside normal business hours).

Why the confidence is not higherTown's FY2026-2027 Comprehensive Fee Schedule, Item 80 ('Re-inspection fee — $199.00/hr') and Item 50 ('Inspection outside normal business hours (4 hr.) — $240.00/hr').

fee schedule checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/636/Permit-Fees

Q60 How are corrections issued and cleared? Corrections & re-inspection

For expedited/small-residential-rooftop solar: a written correction notice detailing all deficiencies is sent to the applicant for resubmission (Ordinance 2380 Sec. 6.150.060(f)). Generally, corrections/comments and marked-up plans are exchanged through the Accela citizen portal, and applicants may resubmit or collaborate with staff by email per the SolarApp+ instructions.

Why the confidence is not higherOrdinance 2380 Sec. 6.150.060(f); SolarApp+ permit page Step 7 ('you may receive comments, marked-up plans, or provide resubmissions... We encourage you to collaborate with staff via email').

ordinance + portal page checked 2026-08-30 https://www.losgatosca.gov/DocumentCenter/View/44068/Ord-2380---REPEALING-CHAPTER-6-AND-CHAPTER-9-BUILDING-CODES-

Q61 What is issued on pass? Core Final sign-off & PTO

A signed-off Building Final (a 'Final' inspection approval on the permit record/card). No use of 'green tag' or similar terminology was found in any Town document reviewed.

Why the confidence is not higherInferred from standard California building-permit final-inspection practice and the SolarApp+ page's instruction to 'review the issued permit card / packet before completing any work'; no Town document uses explicit CO/Final/Green-tag/Letter terminology for solar sign-off.

portal page (inference) checked 2026-08-30 https://permits.losgatosca.gov/Building/Apply-Directly-for-a-Residential-SolarAPP-Permit

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/applicant — PG&E's own tariff places the burden on the 'Applicant' to submit evidence of the AHJ's final electrical inspection clearance as part of the interconnection request that triggers Permission to Operate; the Town does not notify PG&E on the applicant's behalf.

Why the confidence is not higherPG&E Electric Rule 21, Section D.13.b, which conditions PTO processing on 'Distribution Provider's receipt of... evidence of Applicant's final electric inspection clearance from the Governmental Authority having jurisdiction.'

utility tariff (Greenbook/Rule 21) checked 2026-08-30 https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Los Gatos against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Los Gatos is the authority having jurisdiction 92% confidence
Holds
Building and Electrical (Town of Los Gatos Community Development / Building Division issues and inspects both); Fire-code authority over PV/ESS-adjacent provisions (CFC amendments, WUI) sits with the Santa Clara County Fire Department, a separate special district that provides ALL fire services to Los Gatos rather than a Town department, and which publishes no distinct residential PV/ESS standard, form or fee of its own (checked and control-verified against its Standards & Specifications, Applications & Forms, and Municipal Codes & Fees pages: fabricated-style probe for 'solar'/'photovoltaic'/'battery'/'energy storage' = 0 hits on each page against 'fire' positive-control hits of 195/175/162 respectively).
Overridden by
Pacific Gas & Electric's Electric Rule 21 gates Permission to Operate on the Town's own final-inspection clearance (not a subordination of the Town's authority, but a sequencing dependency); Santa Clara County Fire Department independently holds fire-code enforcement (not delegated BY the Town — SCCFD is Los Gatos' fire service provider, confirmed on the Town's own Fire Services page and by name on SCCFD's own 'About' page listing 'Campbell, Cupertino, Los Altos, Los Altos Hills, Los Gatos, Monte Sereno, San Martin, Saratoga').
Why not higher
Town's own Building Division page, PV submittal checklist, SolarApp+ permit page, and FY2026-27 fee schedule all show the Town issuing and inspecting residential building and electrical permits directly (in-house Chief Building Official Robert Gray and named field inspectors, all on the losgatosca.gov staff directory with no third-party/contract-firm marker found). Cross-checked the brief's Municode link on the Town's own Town Code page and found it points to the WRONG Municode client (clientId=11760, which resolves to Trenton, Georgia's Code of Ordinances) — the correct Los Gatos ClientID is 8991 (productId 11760 is coincidentally the correct Code-of-Ordinances product number once queried via the Clients/stateId/5 endpoint). The Santa Clara County Fire Department's own 'Municipal Codes & Fees' page contains the identical stale/incorrect library.municode.com link for Los Gatos, confirming this is a genuinely broken link on both sites rather than a one-off fetch error.

https://www.losgatosca.gov/220/Building

Permit required
Yes98%
Permit cost
No flat residential fee. Building-side: Plan Review $190.00/hr (1/4-hr minimum) + Field Inspection $199.00/hr (1-hr minimum) for 'Photovoltaic – Roof & Ground Mounted – Residential' (Item…92%
Plan review
Same day for over-the-counter applications, or 1–3 business days for electronic applications (for small residential rooftop solar systems eligible for the expedited/nondiscretionary review…90%
Portal
Accela Citizen Access (ACA), branded as the Town's 'Online Permits System' at permits.losgatosca.gov98%
Electrical code
2023 NEC, adopted (as amended by CBSC) as the 2025 California Electrical Code (CEC), Title 24 Part 3 — effective 1 Jan 2026.98%
Own placard wording
No80%
Booking an inspection
Portal (Online Permits System / Accela), Phone (24-hr Inspection Request voicemail line), or Fax (Fax Inspection Request form) — no walk-in inspection booking option is offered.95%
Labels & placards for this authority

Wording 80%

No

Size, colour & material 75%

No — no Town-specified letter height, colour, or material for PV placards was found anywhere in the reviewed documents.

Where they go 65%

Town documents do not specify exact placement beyond requiring labels to be shown, located and dimensioned on the plan set. PG&E's Rule 21 requires its visible disconnect to be located 'near the Point of Interconnection' and reachable by Distribution Provider personnel 24 hours a day for emergency purposes; standard NEC/CEC Art. 690/705 labeling-location rules (at service equipment, disconnects, and point of interconnection) apply by virtue of code adoption without further local elaboration.

What the utility wants on top 85%

Yes — PG&E's Electric Rule 21 requires the visible interconnection/isolating disconnect device to 'include markings or signage that clearly indicates open and closed positions,' in addition to whatever the AHJ requires.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Santa Clara County
Regions served
1
Regions covered
Town of Los Gatos · city
Solar Requirements
Separate fire inspection
From there, you will follow the steps provided. Once you have completed your work with SolarApp+, and you receive your SolarApp+ Approval Number, you will be redirected to the Town's Residential SolarApp+ Permit page to complete your permitting process. If you have any questions, please contact Buil
Authority Contact
Address
110 E. Main St., Los Gatos, CA 95030
Main Phone
408-354-6876
Building Department
Department
Building Division
Direct Phone
408-354-6877
Booking & Scheduling
Preferred channel
online
Book in advance
next business day
Notes
Schedule inspections online at permits.losgatosca.gov/Schedule-Inspection (login required) or by calling the 24-hour voicemail line (408) 354-6877. Must schedule by noon (12 p.m.) for next business day inspection; requests after noon are pushed to the following business day. Inspection hours Monday–Friday, 8 a.m.–3 p.m. (morning window 8 a.m.–noon; afternoon window noon–3 p.m. — estimates only). Inspector will call the afternoon before to confirm. When leaving voicemail: provide permit number (format B16-1111), site address, inspection type, preferred date and A.M./P.M. preference — speak slowly and clearly. Also accepts fax at (408) 354-7593 with completed Fax Inspection Request form. Residential solar permits use SolarApp+ platform for plan check; after approval, applicant completes permitting on the Town's SolarApp+ permit page. Permit technicians reachable at 408-354-6876, counter hours 8 a.m.–1 p.m. Mon–Fri. (collected Jul 22 2026)