Town of Yountville

Napa County

Verified Aug. 4, 2026

Town of Yountville is a city authority in the State of California, serving 3,436 residents. 138 residential solar installs are on record here. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Combined Q4 Plan review — 5 business days (solar-specific, from a complete application); general (non-solar) building permits are quoted at approximately 4-6 weeks for first plan-check… Q18 Where you file — OpenGov / ViewPointCloud portal at yountvilleca.viewpointcloud.com (referred to by the Town as the 'OpenGov Building Permit Portal'); Q20

Permit required
Yes95% source
What it costs
$450 flat ('Solar Permit' line item)65% source
Plan review turnaround
5 business days (solar-specific, from a complete application); general (non-solar) building permits are quoted at approximately 4-6 weeks for first plan-check comments90% source
Key document
published checklist (PDF), dated 12 Aug 2015 per PDF metadata cited by 5 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes 95% · department page / ordinance
    • What does this authority permit itself, and what does it delegate? Both 90% · ordinance
    • Is a permit required for a residential rooftop PV system? Yes 95% · ordinance
    • Is there a separate electrical permit, or is it combined? Combined 75% · fee schedule + ordinance
    • Is a HOA or architectural approval required first? No — the Building Official may not condition approval on HOA/association approval, though see the jurisdiction note on a possible conflict with the Town's separate Design Review chapter 75% · ordinance
    • Is there a historic-district review? Possibly — no solar-specific historic carve-out found; a property in the 'H, Old Town Historic' zoning district would still be subject to the Town's general Design Review chapter (major for 5+ units, minor for 1-4 unit residential) for any exterior alteration, which is not explicitly exempted for solar 55% · ordinance (inference)
    • Is a wind or windstorm certification required? No 55% · ordinance (absence checked at chapter-title level)
    • Is a Specific Use Permit or Council approval ever required? No solar-specific SUP/Council approval requirement found; a general (non-solar) Town Council override exists only for building-height exceptions granted via Master Development Plan approval 60% · ordinance
    • Is there a system-size cap on residential generation? 10 kW AC nameplate (or 30 kW thermal) is the ceiling for eligibility under the Town's streamlined 'small residential rooftop solar energy system' process; no absolute cap was found on a standard (non-streamlined) building permit 90% · ordinance
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Any contractor 55% · department page
    • Must the contractor be registered with this authority before applying? Yes 70% · department page
    • Is a homeowner permitted to self-install and self-permit? Ambiguous — not clearly addressed either way 50% · department page (absence checked)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? General Building Permit Application Form; Cover/Title page with code-version note; Site Plan; Solar PV Standard Electrical Plan (DC/AC one-line wiring worksheet) or equivalent stamped one-line diagram; Solar PV Roof Plan showing equipment/disconnect locations and clearances; structural engineer's plan if the roof does not have a single roof covering; energy documentation/CALGreen items as applicable to the trade scope 80% · published checklist (PDF)
    • How many copies, and in what format? Electronic submission (email or fax) is expressly authorized for solar permits, with electronic signatures accepted in lieu of wet signatures; standard building permits otherwise go through the Town's online OpenGov/ViewPointCloud portal 85% · ordinance
    • Is a site plan required, and what must it show? Yes — a Site Plan (scale 1/8"=1'-0" or 1"=20') showing property lines, buildings, easements and dimensions is required for general submittals, and the solar-specific 'Solar PV Roof Plan' must show the location of all equipment, disconnecting means, and required clearances 85% · published checklist (PDF)
    • Is a one-line / three-line diagram required? Yes 85% · published checklist (PDF)
    • Are string and conductor calculations required? Yes 90% · published checklist (PDF)
    • Is a structural PE stamp required, and at what threshold? Required when the roof does NOT have a single roof covering (the Town's solar electrical plan item 15 directs: 'Does the roof have a single roof covering? ... If No, submit plan from structural engineer'); more generally, YMC submittal rules require a licensed engineer/architect's structural calculations for any construction not meeting the conventional-construction provisions of CBC Ch. 23 / CRC 80% · published checklist (PDF)
    • Is an electrical PE stamp required, and at what threshold? Not set at a specific numeric threshold; the Town's own prescriptive Solar PV Standard Electrical Plan (≤10kW AC, ≤225A 120/240V 3-wire service, central inverter, single roof covering, no batteries/power optimizers) substitutes for an engineer-stamped one-line for systems within those bounds — systems outside them (larger service, batteries, optimizers, non-central inverter) would by implication need a licensed-engineer-stamped electrical plan 55% · published checklist (PDF), dated 12 Aug 2015 per PDF metadata
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? OpenGov / ViewPointCloud portal at yountvilleca.viewpointcloud.com (referred to by the Town as the 'OpenGov Building Permit Portal'); licensed contractors additionally use the separate NREL SolarAPP+ platform (gosolarapp.org) for automated plan review before applying for the permit itself in the OpenGov portal 90% · department page + published handout
    • Can the whole application be completed online? Yes 85% · department page
    • What does a residential solar permit cost? $450 flat ('Solar Permit' line item) 65% · fee schedule (PDF)
    • How is the fee calculated? Flat 65% · fee schedule (PDF)
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 5 business days (solar-specific, from a complete application); general (non-solar) building permits are quoted at approximately 4-6 weeks for first plan-check comments 90% · ordinance
    • How long is an issued permit valid before it expires? 180 days — expires if work is not commenced within 180 days of issuance, or if no inspection has occurred on-site for at least 180 days 90% · department page
    • Which utility handles interconnection here? Pacific Gas & Electric (PG&E) 80% · town news post (dated, town's own source)

28 questions answered against Town of Yountville’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherYMC Title 15 applies Town building regulations within Yountville; Planning & Building Department issues building permits including a dedicated SolarAPP+ residential solar track.

department page / ordinance checked 2026-08-31 https://townofyountville.com/284/Building-Permits-Inspections

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherYMC Ch. 15.08 (CBC) and Ch. 15.12 (CEC) are both adopted and enforced by the Town's own Building Director/Building Official — no delegation found for building or electrical. Fire code enforcement/inspection is separately contracted to Napa County/CAL FIRE (see Public Safety & Fire Services page), so fire is delegated even though building+electrical are not.

ordinance checked 2026-08-31 https://ecode360.com/42568405

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherYMC §15.45.020(A): 'This chapter applies to the permitting of small residential rooftop solar energy systems in the Town of Yountville.' Routine O&M/like-kind replacement is the only carve-out (§15.45.020(C)).

ordinance checked 2026-08-31 https://ecode360.com/42568474

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined

Why the confidence is not higherYMC Ch. 15.45 refers throughout only to a single 'building permit' for solar (never a separate electrical permit), and the FY2025/26 Master Fee Schedule carries one flat 'Solar Permit' line ($450) with no separate electrical-permit fee line found nearby.

fee schedule + ordinance checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/3318

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Any contractor

Why the confidence is not higherNeither Ch. 15.45 nor the SolarAPP+ page restricts the trade class; SolarAPP+ eligibility requires 'a licensed contractor that has previously registered with SolarAPP+' and 'Permit Runners are not allowed,' but does not require an electrician specifically (could be C-46, C-10, or a properly licensed GC per CSLB rules).

department page checked 2026-08-31 https://townofyountville.com/571/SolarAPP-Application-Information

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherFor the SolarAPP+ track specifically, the Town's own eligibility list requires the contractor to 'have a current Business License with the Town of Yountville.' The standard (non-SolarAPP+) permit process does not separately state a Town contractor-registration requirement.

department page checked 2026-08-31 https://townofyountville.com/571/SolarAPP-Application-Information

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Ambiguous — not clearly addressed either way

Why the confidence is not higherSolarAPP+ is licensed-contractor-only by its own eligibility rules ('Permit Runners are not allowed', contractor login required), so a homeowner cannot use that track. Neither Ch. 15.45 nor the general Building Permit Submittal Requirements handout states whether an owner-builder may self-permit a standard (non-SolarAPP+) solar permit; general California owner-builder rules (B&P Code §7044) are not referenced locally.

department page (absence checked) checked 2026-08-31 https://townofyountville.com/571/SolarAPP-Application-Information

Q8 What documents make up a complete submittal? Core Submittal package

General Building Permit Application Form; Cover/Title page with code-version note; Site Plan; Solar PV Standard Electrical Plan (DC/AC one-line wiring worksheet) or equivalent stamped one-line diagram; Solar PV Roof Plan showing equipment/disconnect locations and clearances; structural engineer's plan if the roof does not have a single roof covering; energy documentation/CALGreen items as applicable to the trade scope

Why the confidence is not higherCombines the Town's general 'Building Permit Submittal Requirements' handout (rev. 07/23/2025) with its solar-specific 'Permit Application for Residential Solar PV Installation' worksheet (DocumentCenter/View/683), which is the Town's only dedicated solar submittal document found.

published checklist (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/3381/Building-Permit-Submittal-Requirements-PDF

Q9 How many copies, and in what format? Submittal package

Electronic submission (email or fax) is expressly authorized for solar permits, with electronic signatures accepted in lieu of wet signatures; standard building permits otherwise go through the Town's online OpenGov/ViewPointCloud portal

Why the confidence is not higherYMC §15.45.060(A): 'The required building permit application and other documents may be electronically submitted by email or facsimile' and 'An applicant's electronic signature shall be accepted ... in lieu of a wet signature.'

ordinance checked 2026-08-31 https://ecode360.com/42568496

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — a Site Plan (scale 1/8"=1'-0" or 1"=20') showing property lines, buildings, easements and dimensions is required for general submittals, and the solar-specific 'Solar PV Roof Plan' must show the location of all equipment, disconnecting means, and required clearances

Why the confidence is not higherCombines the general Building Permit Submittal Requirements handout's Site Plan requirement with the Town's own Solar PV Standard Electrical Plan form, page 2, 'SOLAR PV ROOF PLAN — Show location of all equipment, disconnecting means and required clearances.'

published checklist (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherThe Town's own 'Solar PV Standard Electrical Plan' is itself a fill-in-the-blank one-line diagram covering DC wiring (module count/string, Voc, Isc, max DC voltage/current, conductor AWG) and AC wiring (inverter rating, max AC output) for standard central-inverter systems; non-standard systems would need an equivalent stamped one-line.

published checklist (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q12 Are string and conductor calculations required? Drawings & calculations

Yes

Why the confidence is not higherThe Town's Solar PV Standard Electrical Plan explicitly requires string/conductor sizing math: module Voc/Isc, 'Maximum DC system voltage,' 'Maximum DC current per string ... x 1.56,' source-circuit conductor AWG size, and combiner-to-inverter output conductor sizing.

published checklist (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Required when the roof does NOT have a single roof covering (the Town's solar electrical plan item 15 directs: 'Does the roof have a single roof covering? ... If No, submit plan from structural engineer'); more generally, YMC submittal rules require a licensed engineer/architect's structural calculations for any construction not meeting the conventional-construction provisions of CBC Ch. 23 / CRC

Why the confidence is not higherCombines the solar-specific trigger on the Town's own Solar PV Standard Electrical Plan with the general Building Permit Submittal Requirements handout's structural-calculations rule.

published checklist (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Not set at a specific numeric threshold; the Town's own prescriptive Solar PV Standard Electrical Plan (≤10kW AC, ≤225A 120/240V 3-wire service, central inverter, single roof covering, no batteries/power optimizers) substitutes for an engineer-stamped one-line for systems within those bounds — systems outside them (larger service, batteries, optimizers, non-central inverter) would by implication need a licensed-engineer-stamped electrical plan

Why the confidence is not higherInferred from the scope note on the Town's own Solar PV Standard Electrical Plan form ('This plan addresses only the requirements of the 2010 CEC ... not intended for systems containing batteries or power optimizer'); no separate ordinance text sets an electrical PE-stamp threshold.

published checklist (PDF), dated 12 Aug 2015 per PDF metadata checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q15 What does a residential solar permit cost? Core Fees

$450 flat ('Solar Permit' line item)

Why the confidence is not higherFY2025/26 Master Fee Schedule (current, adopted; PDF modified 2 Jul 2025) lists 'Solar Permit⁴ ... $450.00 ... Each' under Planning fees, footnoted to Gov. Code §66015. It is ambiguous from the document whether this $450 is the entire fee for a residential solar permit or an administrative charge layered on top of the standard valuation-based Building Permit Fee table that appears a few pages later in the same schedule — no solar-specific carve-out from the valuation table was found.

fee schedule (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/3318

Q16 How is the fee calculated? Core Fees

Flat

Why the confidence is not higherThe Master Fee Schedule's 'Solar Permit' line is a flat $450 'Each,' distinct from the valuation-based 'Building Permit Fees (New Construction and Additions)' table used for general construction.

fee schedule (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/3318

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedMaster Fee Schedule (DocumentCenter/View/3318): the general 'Plan Review Fees — Plan Check' line sets plan check at 65% of the Building Permit Fee, but the separate flat 'Solar Permit $450' line does not state whether plan check is included in or additional to that $450, and no solar-specific plan-check line was found

https://townofyountville.com/DocumentCenter/View/3318

Q18 What is the stated plan-review turnaround? Core Timeline & validity

5 business days (solar-specific, from a complete application); general (non-solar) building permits are quoted at approximately 4-6 weeks for first plan-check comments

Why the confidence is not higherYMC §15.45.060(C): 'The Planning and Building Department shall issue a building permit within five business days of determining that an application ... is complete.' Contrast with the Building Permits & Inspections page's general estimate of 4-6 weeks for standard (non-expedited) building permits.

ordinance checked 2026-08-31 https://ecode360.com/42568496

Q19 How long is an issued permit valid before it expires? Timeline & validity

180 days — expires if work is not commenced within 180 days of issuance, or if no inspection has occurred on-site for at least 180 days

Why the confidence is not higherTown of Yountville Building Permits & Inspections page, current text: 'Building Permits Expire if: (1) work is not commenced within 180 days from the date of permit issuance or (2) after permit issuance when an inspection has not occurred on the site for at least 180 days.'

department page checked 2026-08-31 https://townofyountville.com/284/Building-Permits-Inspections

Q20 Which permit portal does this authority use? Core Portal & process

OpenGov / ViewPointCloud portal at yountvilleca.viewpointcloud.com (referred to by the Town as the 'OpenGov Building Permit Portal'); licensed contractors additionally use the separate NREL SolarAPP+ platform (gosolarapp.org) for automated plan review before applying for the permit itself in the OpenGov portal

Why the confidence is not higherBuilding Permit Inspection Requirements handout gives the portal URL directly; the SolarAPP+ page's Step 3 says 'Apply for a permit online via the OpenGov Building Permit Portal.'

department page + published handout checked 2026-08-31 https://ca-yountville.civicplus.com/DocumentCenter/View/694

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higherSolarAPP+ eligible contractors submit design review, apply for the permit, pay, and print permit documents entirely online via gosolarapp.org and the OpenGov portal; inspections are also scheduled online through the same portal.

department page checked 2026-08-31 https://townofyountville.com/571/SolarAPP-Application-Information

Q22 Which utility handles interconnection here? Core Utility interconnection

Pacific Gas & Electric (PG&E)

Why the confidence is not higherThe Town's own current news post (posted 21 Aug 2026, Public Works) describes 'PG&E and its contractor ... beginning utility work today ... to replace a non-functioning underground power line ... for residents' in Yountville — confirming PG&E as the electric utility serving Town addresses; Yountville is not one of California's municipal-utility cities.

town news post (dated, town's own source) checked 2026-08-31 https://townofyountville.com/CivicAlerts.aspx?AID=304

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Nothing published by this authority.

Where we lookedTown's own Building/Planning and SolarAPP+ pages (no interconnection-sequencing language found); PG&E's own NEM/interconnection pages, which are treated as unreachable to automated reading per standing project guidance

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — the Building Official may not condition approval on HOA/association approval, though see the jurisdiction note on a possible conflict with the Town's separate Design Review chapter

Why the confidence is not higherYMC §15.45.060(B)(2): 'The Building Official may not condition approval of a building permit application on the approval of an association, as defined by Civil Code Section 4080.' However, YMC §17.188.020(A) (Design Review) separately states broadly that 'No structure shall be built, expanded, or have its exterior altered, and no building permit shall be issued, unless the design is approved in advance,' and its exemption list at §17.188.020(D) does not name solar — a real, unresolved tension between the two chapters that this run is reporting rather than picking a side on.

ordinance checked 2026-08-31 https://ecode360.com/42568496

Q25 Is there a historic-district review? Overlays & special cases

Possibly — no solar-specific historic carve-out found; a property in the 'H, Old Town Historic' zoning district would still be subject to the Town's general Design Review chapter (major for 5+ units, minor for 1-4 unit residential) for any exterior alteration, which is not explicitly exempted for solar

Why the confidence is not higherYMC Ch. 17.28 establishes the H, Old Town Historic district; Ch. 17.188 (Design Review) governs exterior alterations town-wide with no solar carve-out in its exemption list (§17.188.020(D)). No separate historic-commission review process distinct from Design Review was found.

ordinance (inference) checked 2026-08-31 https://ecode360.com/42571245

Q26 Is a wind or windstorm certification required? Overlays & special cases

No

Why the confidence is not higherNo wind/windstorm certification requirement was found in the Town's adopted Building, Residential, or Electrical Code chapters (YMC Ch. 15.08, 15.10, 15.12) or in the Town's solar-specific documents; this is consistent with standard California (non-coastal, non-Texas-TDI-style) practice, though only chapter/section titles rather than full body text were reviewed for the non-solar chapters.

ordinance (absence checked at chapter-title level) checked 2026-08-31 https://ecode360.com/42568355

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No solar-specific SUP/Council approval requirement found; a general (non-solar) Town Council override exists only for building-height exceptions granted via Master Development Plan approval

Why the confidence is not higherYMC §15.45.060(B)(1) limits building-permit review to health/safety compliance (no discretionary SUP/Council step for solar). Separately, §17.104.010 allows the Town Council to authorize height in excess of the normal limit 'through the Master Development Plan approval' — a general clause, not a solar-specific requirement.

ordinance checked 2026-08-31 https://ecode360.com/42570004

Q28 Is there a system-size cap on residential generation? Overlays & special cases

10 kW AC nameplate (or 30 kW thermal) is the ceiling for eligibility under the Town's streamlined 'small residential rooftop solar energy system' process; no absolute cap was found on a standard (non-streamlined) building permit

Why the confidence is not higherYMC §15.45.030 defines a 'small residential rooftop solar energy system' as, among other conditions, 'no larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal' and installed on a single-family or duplex dwelling not exceeding the zoning district's max height.

ordinance checked 2026-08-31 https://ecode360.com/42568478

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 85% · adopting ordinance
    • Which building code edition is in force? 2025 California Building Code (Title 24, Part 2), with the 2025 California Residential Code (Ch. 15.10) for one- and two-family dwellings 95% · adopting ordinance
    • Which fire code edition is in force? 2025 California Fire Code (Title 24, Part 9), enforced under contract by Napa County/CAL FIRE 90% · adopting ordinance
    • Are there local amendments to any of the above? Yes 90% · ordinance
    • What is the installation judged against? The Town-adopted 2025 CBC/CRC/CEC/CFC (Title 24), plus the solar-specific health/safety, listing and safety-standard requirements of YMC Ch. 15.45.040 (UL/IEEE/accredited-lab listing for electricity-producing systems; accredited-listing-agency certification under the CA Plumbing/Mechanical Code for solar water heating) 85% · ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? A 3-foot clear space at the array perimeter is called out on the Town's own solar wiring worksheet as a fire-access requirement; this document predates (and does not reflect) the more detailed pathway/setback matrix in the currently-adopted 2025 CFC (based on the current CRC/CFC roof-access rules) 65% · published checklist (PDF), stale — dated 12 Aug 2015, cites 2010 CEC
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, required by default under NEC 690.12 as incorporated into the currently-adopted 2023 NEC / 2025 CEC; the Town's own published solar wiring worksheet (created 2015, citing the 2010 CEC) predates NEC 690.12 and does not mention rapid shutdown at all — a real gap between the currently-adopted code and the Town's own handout 65% · adopting ordinance + stale published checklist (conflict noted)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Per the Town's own (stale, 2015) wiring worksheet: 'WARNING — Inverter Output Connection / Do Not Relocate This Overcurrent Device'; 'WARNING — Dual Power Sources / Second Source is Photo-Voltaic System'; PV System AC Disconnect and DC Disconnect rating placards; 'CAUTION SOLAR CIRCUIT'; 'WARNING ELECTRIC SHOCK HAZARD' at ground-fault-capable equipment and at points where line/load terminals may be energized in the open position 65% · published checklist (PDF), stale — dated 12 Aug 2015
    • Does the authority specify placard wording of its own? Yes 65% · published checklist (PDF), stale — dated 12 Aug 2015
    • Does it specify letter height, colour or material? No — the document gives placard wording only; no letter height, colour, or material specification was found 70% · published checklist (PDF), absence checked
    • Is a site plan / facility map placard required, and what must it show? Yes — a 'Solar PV Roof Plan' is required, showing the location of all equipment, disconnecting means, and required clearances 65% · published checklist (PDF), stale — dated 12 Aug 2015
    • Where must the labels be placed? At the main service panel/meter, the PV AC and DC disconnects, the inverter, and along exposed DC conduit runs (the Town's worksheet calls for a placard/tag every 10 feet of exposed DC conduit) 65% · published checklist (PDF), stale — dated 12 Aug 2015
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? Yes 80% · ordinance
    • Is there a separate ESS permit or inspection? No separate ESS permit fee line found in the current Master Fee Schedule (searched for 'battery' and 'energy storage,' zero hits, against a working positive control of 'Solar Permit' at $450 turning up correctly); no dedicated ESS ordinance chapter exists in Title 15 (15.00–15.56 reviewed by chapter title) 70% · fee schedule (PDF), absence checked with controls
    • Is a ground mount treated as a structure? Likely yes — Ch. 15.45's streamlined process is expressly scoped to ROOFTOP systems only, so a ground-mounted array would fall outside it and be treated under the Town's general 'Auxiliary Structures' zoning chapter (setbacks, Building Code compliance, height, maximum count) 60% · ordinance (inference)
    • Is there a local rule on service upgrades or busbar sizing? No local ordinance-level rule found; the Town's adopted SolarAPP+ program carries the platform's built-in technical ceilings (up to 400A main service, 225A service disconnect switches, 225A busbars), and the Town's own prescriptive Solar PV Standard Electrical Plan is limited to 225A, 120/240V, 3-wire residential services 75% · department FAQ page + published checklist
    • Is a specific mounting system or attachment spacing required? No Town-specific mounting-system or attachment-spacing standard found beyond a 3-foot perimeter clearance called out on the Town's solar wiring worksheet; mounting is otherwise judged against the adopted CBC/CRC structural provisions and manufacturer engineering 60% · published checklist (PDF), dated 12 Aug 2015 per PDF metadata

20 questions answered against Town of Yountville’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023

Why the confidence is not higherYMC §15.12.010 adopts 'the California Electrical Code, 2025 Edition ... as set forth in California Code of Regulations Title 24, Part 3' by Ord. 25-538 (11/4/2025). The 2025 CEC (effective statewide 1 Jan 2026) is based on the 2023 National Electrical Code.

adopting ordinance checked 2026-08-31 https://ecode360.com/42568405

Q30 Which building code edition is in force? Core Code editions in force

2025 California Building Code (Title 24, Part 2), with the 2025 California Residential Code (Ch. 15.10) for one- and two-family dwellings

Why the confidence is not higherYMC §15.08.010: 'the California Building Code, 2025 Edition ... is hereby adopted by reference in its entirety by the Town of Yountville,' adopted by Ord. 25-538 (11/4/2025).

adopting ordinance checked 2026-08-31 https://ecode360.com/42568395

Q31 Which fire code edition is in force? Code editions in force

2025 California Fire Code (Title 24, Part 9), enforced under contract by Napa County/CAL FIRE

Why the confidence is not higherYMC §15.32.010: 'the California Fire Code, 2025 Edition, with the following additions, including Appendix Chapter 4, Appendix B and Appendix C ... is hereby adopted by reference,' Ord. 25-538 (11/4/2025). Fire services (including inspection) are provided under the Town's written agreement with Napa County/CAL FIRE per its Public Safety & Fire Services page.

adopting ordinance checked 2026-08-31 https://ecode360.com/42568416

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes

Why the confidence is not higherLocal CBC amendments include §1505.6 (wood shingles/shakes prohibited on any roof assembly) and CFC amendments at §903.2 (automatic sprinkler triggers) and §105.6.25 (temporary membrane structures/tents/canopies). None of the local amendments found are solar-specific.

ordinance checked 2026-08-31 https://ecode360.com/42568396

Q33 What is the installation judged against? Core Electrical

The Town-adopted 2025 CBC/CRC/CEC/CFC (Title 24), plus the solar-specific health/safety, listing and safety-standard requirements of YMC Ch. 15.45.040 (UL/IEEE/accredited-lab listing for electricity-producing systems; accredited-listing-agency certification under the CA Plumbing/Mechanical Code for solar water heating)

Why the confidence is not higherYMC §15.45.040: 'Solar energy systems for producing electricity shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories.'

ordinance checked 2026-08-31 https://ecode360.com/42568487

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local ordinance-level rule found; the Town's adopted SolarAPP+ program carries the platform's built-in technical ceilings (up to 400A main service, 225A service disconnect switches, 225A busbars), and the Town's own prescriptive Solar PV Standard Electrical Plan is limited to 225A, 120/240V, 3-wire residential services

Why the confidence is not higherTown FAQ (QID 135, 'Is there a limit on system size SolarAPP+ can review?'): 'Projects may be permitted to install up to 400A main service, 225A service disconnect switches and 225A busbars.' The Town's Solar PV Standard Electrical Plan is scoped to '...not larger than 225 amps at a voltage of 120/240.'

department FAQ page + published checklist checked 2026-08-31 https://townofyountville.com/FAQ.aspx

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No Town-specific mounting-system or attachment-spacing standard found beyond a 3-foot perimeter clearance called out on the Town's solar wiring worksheet; mounting is otherwise judged against the adopted CBC/CRC structural provisions and manufacturer engineering

Why the confidence is not higherThe Town's 'Solar PV Standard Electrical Plan' states only 'Roof Top Mounting Requires a 3-foot space @ the array perimeter to meet fire requirements' — no attachment-spacing/pull-out spec found in Town documents.

published checklist (PDF), dated 12 Aug 2015 per PDF metadata checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

A 3-foot clear space at the array perimeter is called out on the Town's own solar wiring worksheet as a fire-access requirement; this document predates (and does not reflect) the more detailed pathway/setback matrix in the currently-adopted 2025 CFC (based on the current CRC/CFC roof-access rules)

Why the confidence is not higherTown's 'Solar PV Standard Electrical Plan,' page 1: 'Roof Top Mounting Requires a 3-foot space @ the array perimeter to meet fire requirements.' PDF metadata shows this document was created 12 Aug 2015 and its own text cites the 2010 CEC — flagged here as stale relative to the 2025 CFC now in force.

published checklist (PDF), stale — dated 12 Aug 2015, cites 2010 CEC checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, required by default under NEC 690.12 as incorporated into the currently-adopted 2023 NEC / 2025 CEC; the Town's own published solar wiring worksheet (created 2015, citing the 2010 CEC) predates NEC 690.12 and does not mention rapid shutdown at all — a real gap between the currently-adopted code and the Town's own handout

Why the confidence is not higherYMC §15.12.010 adopts the 2025 CEC (which incorporates NEC 690.12) statewide with no local amendment disapplying it; but the Town's own 'Solar PV Standard Electrical Plan' worksheet, still linked live from the Applications & Forms page, was created 12 Aug 2015 ('This plan addresses only the requirements of the 2010 California Electrical Code') and contains no rapid-shutdown field or label at all.

adopting ordinance + stale published checklist (conflict noted) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Per the Town's own (stale, 2015) wiring worksheet: 'WARNING — Inverter Output Connection / Do Not Relocate This Overcurrent Device'; 'WARNING — Dual Power Sources / Second Source is Photo-Voltaic System'; PV System AC Disconnect and DC Disconnect rating placards; 'CAUTION SOLAR CIRCUIT'; 'WARNING ELECTRIC SHOCK HAZARD' at ground-fault-capable equipment and at points where line/load terminals may be energized in the open position

Why the confidence is not higherDirectly extracted (pdftotext) from the Town's 'Solar PV Standard Electrical Plan / Required Signage' page. Confidence reduced because the document is dated 12 Aug 2015 by its own PDF metadata and cites 2010 CEC §690 section numbers that have since been renumbered/expanded (e.g. no 690.12 rapid-shutdown placard is included).

published checklist (PDF), stale — dated 12 Aug 2015 checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Yes

Why the confidence is not higherThe Town's 'Required Signage' page gives verbatim placard wording (e.g. 'WARNING LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION') — but the document is 2015-vintage and keyed to 2010 CEC §690 section numbers, so current-code placards (e.g. rapid shutdown per 690.12) are not covered.

published checklist (PDF), stale — dated 12 Aug 2015 checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No — the document gives placard wording only; no letter height, colour, or material specification was found

Why the confidence is not higherSearched the full text of the Town's 'Solar PV Standard Electrical Plan / Required Signage' page for lettering/colour/material terms (inch, point, font, color, reflective, etc.) and found none; only wording templates are given.

published checklist (PDF), absence checked checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Yes — a 'Solar PV Roof Plan' is required, showing the location of all equipment, disconnecting means, and required clearances

Why the confidence is not higherPage 2 of the Town's Solar PV Standard Electrical Plan is titled 'SOLAR PV ROOF PLAN — SHOW LOCATION OF ALL EQUIPMENT, DISCONNECTING MEANS AND REQUIRED CLEARANCES.' This functions as the facility-map placard/plan required alongside NEC 705.10 signage.

published checklist (PDF), stale — dated 12 Aug 2015 checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedTown of Yountville's own building/solar pages (no reference to a PG&E-specific placard spec found); PG&E's own interconnection/DG manual pages, which are treated as unreachable to automated reading per standing project guidance

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Q43 Where must the labels be placed? Core Labels Signage & labelling

At the main service panel/meter, the PV AC and DC disconnects, the inverter, and along exposed DC conduit runs (the Town's worksheet calls for a placard/tag every 10 feet of exposed DC conduit)

Why the confidence is not higherDerived from the placard-location callouts on the Town's 'Solar PV Standard Electrical Plan / Required Signage' diagram (labels at the inverter output connection, AC/DC disconnects, and 'DC CONDUIT (EVERY 10′)').

published checklist (PDF), stale — dated 12 Aug 2015 checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/683/Permit-Application-for-Residential-Solar-PV-Installation-PDF

Q44 Must equipment be on a specific approved list? Equipment listing

Yes

Why the confidence is not higherYMC §15.45.040(B)-(C): solar water-heating systems must be 'certified by an accredited listing agency,' and electricity-producing systems must meet standards set by 'the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories.'

ordinance checked 2026-08-31 https://ecode360.com/42568487

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedYMC Ch. 15.45 (scoped explicitly to 'solar energy system,' silent on batteries/ESS); the Town's own Solar PV Standard Electrical Plan states outright it is 'not intended for systems containing batteries or power optimizer'; searched the full Title 15 chapter list (15.00–15.56) for a battery/ESS-titled chapter and found none

https://ecode360.com/42568355

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separate ESS permit fee line found in the current Master Fee Schedule (searched for 'battery' and 'energy storage,' zero hits, against a working positive control of 'Solar Permit' at $450 turning up correctly); no dedicated ESS ordinance chapter exists in Title 15 (15.00–15.56 reviewed by chapter title)

Why the confidence is not higherFull-text search of the FY2025/26 Master Fee Schedule PDF for 'battery'/'energy storage' returned zero matches while the known 'Solar Permit' line was found correctly (positive control), and the Title 15 TOC (which the code publishes down to 15.56) contains no battery/ESS-titled chapter. The current 2025 CFC's own (unamended) ESS provisions would still apply by default even without a local fee line.

fee schedule (PDF), absence checked with controls checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/3318

Q47 Is a ground mount treated as a structure? Core Ground mount

Likely yes — Ch. 15.45's streamlined process is expressly scoped to ROOFTOP systems only, so a ground-mounted array would fall outside it and be treated under the Town's general 'Auxiliary Structures' zoning chapter (setbacks, Building Code compliance, height, maximum count)

Why the confidence is not higherYMC §15.45.030(4) defines the streamlined system as installed on the dwelling roof; §17.112.030 ('Building Code compliance') and §17.112.040 (setbacks: 20' front/10' street side/5' side & rear) govern 'auxiliary structures' generally, the most likely local classification for a ground-mounted array, though no ordinance names solar ground-mounts specifically.

ordinance (inference) checked 2026-08-31 https://ecode360.com/42570029

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedTown's Solar PV Standard Electrical Plan and general Building Permit Submittal Requirements handout (neither states an AC-disconnect-to-meter placement rule); this is typically a PG&E Greenbook/Electric Rule requirement rather than a Town ordinance requirement, and PG&E's own DG/interconnection pages are treated as unreachable to automated reading per standing project guidance

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (OpenGov/ViewPointCloud) or phone 90% · department page
    • How much notice is required? 24 hours 90% · department page
    • Are same-day or AM/PM windows offered? AM/PM windows only (no same-day); inspections limited to Tuesdays and Thursdays. The two Town documents give slightly different afternoon end-times — 1pm-4pm per the Building Permits & Inspections webpage vs. 1pm-3pm per the printed inspection handout — reported here rather than silently picking one 80% · department page (conflicting with printed handout, both cited)
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 85% · ordinance
    • If delegated, to whom? Napa County Fire Department / CAL FIRE, under the Town's fire-services contract, when a separate fire inspection is performed 80% · ordinance + department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For expedited/SolarAPP+-eligible residential rooftop solar: a single, consolidated final inspection by the Building Department (with an optional separate fire inspection). For standard (non-expedited) construction generally, the Town's sequence runs Foundation → Underfloor → Slab → Shear Walls → Roof Nails → Framing → Insulation → Sheetrock → Final 80% · ordinance + department handout
    • Is a rough-in or mid-roof inspection required? No 85% · ordinance
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, but not Town-authored — for SolarAPP+ permits the Town's own FAQ points applicants to the national SolarAPP+ inspection checklist (via help.solar-app.org); no separate Yountville-specific solar inspection checklist was found, only the general 'Building Permit Inspection Requirements' handout for standard construction 60% · department FAQ page
    • What must be on site at inspection? Printed permit documents from the SolarAPP+/portal system, the approved plans/permit, and (implicitly) the posted permit card at the job site 80% · department page
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (inspection sign-off) 60% · department page
    • Is there a re-inspection fee? $301.00 per re-inspection (charged when the inspector arrives but the contractor is not ready); a related $151.00 fee applies for cancelling an inspection with less than 48 hours' notice 85% · fee schedule (PDF)
    • How are corrections issued and cleared? For solar plan review: a written correction notice detailing all deficiencies is sent to the applicant for resubmission. For general building permits: plan-check comments are posted and tracked within the OpenGov portal itself 80% · ordinance + department page

14 questions answered against Town of Yountville’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (OpenGov/ViewPointCloud) or phone

Why the confidence is not higherBuilding Permit Inspection Requirements handout: 'To schedule an inspection: Contact us 24 hours prior ... Call (707) 948-2606 or Login to the online Portal yountvilleca.viewpointcloud.com.'

department page checked 2026-08-31 https://ca-yountville.civicplus.com/DocumentCenter/View/694

Q50 How much notice is required? Core Booking & scheduling

24 hours

Why the confidence is not higherBuilding Permit Inspection Requirements handout: 'Contact us 24 hours prior to the requested inspection.'

department page checked 2026-08-31 https://ca-yountville.civicplus.com/DocumentCenter/View/694

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

AM/PM windows only (no same-day); inspections limited to Tuesdays and Thursdays. The two Town documents give slightly different afternoon end-times — 1pm-4pm per the Building Permits & Inspections webpage vs. 1pm-3pm per the printed inspection handout — reported here rather than silently picking one

Why the confidence is not higherBuilding Permits & Inspections page: 'Morning Appointment Window: 9 am to 12 pm or Afternoon Appointment Window: 1 pm to 4 pm... Inspections are available Tuesdays and Thursdays.' The separate printed 'Building Permit Inspection Requirements' handout instead prints '9am-12 noon' and '1pm-3pm.'

department page (conflicting with printed handout, both cited) checked 2026-08-31 https://townofyountville.com/284/Building-Permits-Inspections

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherYMC §15.45.060(E)(1): 'Only one inspection shall be required and performed by the Building Department for small residential rooftop solar energy systems eligible for expedited review.' A separate fire inspection may additionally be performed (see Q53).

ordinance checked 2026-08-31 https://ecode360.com/42568496

Q53 If delegated, to whom? Core Who inspects

Napa County Fire Department / CAL FIRE, under the Town's fire-services contract, when a separate fire inspection is performed

Why the confidence is not higherYMC §15.45.060(E)(1): 'A separate fire inspection may be performed by the Fire Department.' The Town's Public Safety & Fire Services page states fire protection is provided 'through a contract for services with the Napa County/CALFIRE Department.'

ordinance + department page checked 2026-08-31 https://townofyountville.com/300/Public-Safety-Fire-Services

Q54 Which inspections are required, and in what order? Core Stages & sequence

For expedited/SolarAPP+-eligible residential rooftop solar: a single, consolidated final inspection by the Building Department (with an optional separate fire inspection). For standard (non-expedited) construction generally, the Town's sequence runs Foundation → Underfloor → Slab → Shear Walls → Roof Nails → Framing → Insulation → Sheetrock → Final

Why the confidence is not higherYMC §15.45.060(E)(1) sets the one-inspection rule for eligible solar; the general stage list comes from the Town's 'Building Permit Inspection Requirements' handout, most of which (foundation, slab, framing, etc.) would not apply to a simple rooftop PV retrofit.

ordinance + department handout checked 2026-08-31 https://ecode360.com/42568496

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No

Why the confidence is not higherYMC §15.45.060(E)(1) requires 'Only one inspection ... for small residential rooftop solar energy systems eligible for expedited review' — i.e., no separate rough-in/mid-roof inspection stage for eligible systems.

ordinance checked 2026-08-31 https://ecode360.com/42568496

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedCh. 15.45 (inspection provisions, §15.45.060(E)) and the Town's general Building Permit Inspection Requirements handout — neither states explicitly that the inspector verifies labels/equipment listings as a checklist item, although §15.45.040(C) requires UL/accredited-lab listing as a condition of the system itself

https://ecode360.com/42568496

Q57 Is there a published inspection checklist? Core What is checked

Yes, but not Town-authored — for SolarAPP+ permits the Town's own FAQ points applicants to the national SolarAPP+ inspection checklist (via help.solar-app.org); no separate Yountville-specific solar inspection checklist was found, only the general 'Building Permit Inspection Requirements' handout for standard construction

Why the confidence is not higherTown FAQ, QID 133 ('What's on the SolarAPP+ inspection checklist?') links to https://help.solar-app.org/article/89-whats-on-the-solarapp-inspection-checklist — an NREL/SolarAPP+ document adopted by reference rather than a Town-drafted checklist.

department FAQ page checked 2026-08-31 https://townofyountville.com/FAQ.aspx

Q58 What must be on site at inspection? Core Documents on site

Printed permit documents from the SolarAPP+/portal system, the approved plans/permit, and (implicitly) the posted permit card at the job site

Why the confidence is not higherSolarAPP+ page, Step 3: '...print the provided permit documents and have available at the site for inspections.'

department page checked 2026-08-31 https://townofyountville.com/571/SolarAPP-Application-Information

Q59 Is there a re-inspection fee? Corrections & re-inspection

$301.00 per re-inspection (charged when the inspector arrives but the contractor is not ready); a related $151.00 fee applies for cancelling an inspection with less than 48 hours' notice

Why the confidence is not higherFY2025/26 Master Fee Schedule: 'Re-Inspection: Charge for when Inspector Arrives at Site, but Contractor is Not Ready for the Called Inspection ... $301.00 Each Inspection' and 'Cancellation Inspection with Less than 48 Hours Notice ... $151.00 Each.'

fee schedule (PDF) checked 2026-08-31 https://townofyountville.com/DocumentCenter/View/3318

Q60 How are corrections issued and cleared? Corrections & re-inspection

For solar plan review: a written correction notice detailing all deficiencies is sent to the applicant for resubmission. For general building permits: plan-check comments are posted and tracked within the OpenGov portal itself

Why the confidence is not higherYMC §15.45.060(B)(3): 'If an application is deemed incomplete, a written correction notice detailing all deficiencies ... shall be sent to the applicant for resubmission.' Building Permits & Inspections page: 'All permit related communication including plan check comments will be provided within the portal.'

ordinance + department page checked 2026-08-31 https://ecode360.com/42568496

Q61 What is issued on pass? Core Final sign-off & PTO

Final (inspection sign-off)

Why the confidence is not higherThe Town's general Building Permit Inspection Requirements handout states 'All permits require a final inspection' and describes a 'Final' inspection stage; no separate Certificate of Occupancy or 'green tag' terminology was found for a residential solar retrofit specifically.

department page checked 2026-08-31 https://ca-yountville.civicplus.com/DocumentCenter/View/694

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedCh. 15.45 (no PTO/utility-notification clause found), the Town's Building Permits & Inspections and SolarAPP+ pages (silent on who notifies the utility), and PG&E's own interconnection pages, which are treated as unreachable to automated reading per standing project guidance

https://www.pge.com/en/about/doing-business-with-pge/interconnections/net-energy-metering-program.html

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Yountville against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Yountville is the authority having jurisdiction 90% confidence
Holds
Building and Electrical (in-house, Planning & Building Department, under the 'Building Director' per YMC 15.08.020); Fire code enforcement and fire inspection are contracted out to the Napa County Fire Department / CAL FIRE
Overridden by
State Solar Rights Act / AB 2188 (codified locally as YMC Ch. 15.45) limits the Building Official's review to local/state/federal health-and-safety compliance and bars conditioning approval on HOA (association) approval; fees are capped per Gov. Code §§65850.55, 66015, 66016 and H&S Code §17951. Separately, YMC 17.188.020(A) (Design Review chapter) states broadly that no building permit may issue for an exterior alteration to a 1-4 unit residential structure without prior minor Design Review approval, with no explicit solar carve-out in the exemption list at 17.188.020(D) — a real tension with Ch. 15.45's nondiscretionary process that the Town does not appear to have resolved in the code text itself.
Why not higher
Town of Yountville Municipal Code Title 15 (Buildings and Construction) adopts the CBC/CRC/CEC/CFC by reference and YMC 15.08.020 assigns enforcement to 'The Building Director and assignee'; the Town's own website names Jim Campo as 'Building Official' for the Planning & Building Department and operates its own permit portal (OpenGov/ViewPointCloud) and SolarAPP+ program. Fire protection is provided under a separate written agreement with Napa County/CAL FIRE per the Town's own Public Safety & Fire Services page.

https://ecode360.com/42568395

Permit required
Yes95%
Permit cost
$450 flat ('Solar Permit' line item)65%
Plan review
5 business days (solar-specific, from a complete application); general (non-solar) building permits are quoted at approximately 4-6 weeks for first plan-check comments90%
Portal
OpenGov / ViewPointCloud portal at yountvilleca.viewpointcloud.com (referred to by the Town as the 'OpenGov Building Permit Portal');90%
Electrical code
202385%
Own placard wording
Yes65%
Booking an inspection
Portal (OpenGov/ViewPointCloud) or phone90%
Labels & placards for this authority

Town of Yountville writes its own placard wording. A standard NEC label set will not satisfy it — the exact text, and in most cases the size, colour and font, are specified below.

Wording 65%

Yes

Size, colour & material 70%

No — the document gives placard wording only; no letter height, colour, or material specification was found

Where they go 65%

At the main service panel/meter, the PV AC and DC disconnects, the inverter, and along exposed DC conduit runs (the Town's worksheet calls for a placard/tag every 10 feet of exposed DC conduit)

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Napa County
Regions served
1
Regions covered
Town of Yountville · city
Solar Requirements
Required placards
Planning & Building | Yountville, CA Skip to Main Content Recruitment Town Manager Recruitment Engagement Opportunities Read on... Create a Website Account - Manage notification subscriptions, save form progress and more. Website Sign In Search Home Departments Planning & Building Planning & Building Welcome to the Town of Yountville Planning and Building Department! The Town of Yountville Plannin
Authority Contact
Address
6550 Yount Street, Yountville, CA 94599
Main Phone
707-944-8851
Building Department
Department
Planning and Building Department
Direct Phone
707-944-8851
Portal Software
OpenGov
Booking & Scheduling
Preferred channel
online
Book in advance
1
Notes
Schedule inspections through the online portal at https://yountvilleca.portal.opengov.com/ (formerly yountvilleca.viewpointcloud.com). When submitting a request include: morning or afternoon preference, inspection type, contact name, and contact number. Inspections are available Tuesdays and Thursdays only; morning window 9 AM–noon, afternoon window 1–4 PM. All permits require a final inspection. Building Official (Jim Campo) available Tuesday and Thursday 9 AM–3 PM. Permits expire if no inspection occurs within 180 days of issuance. Building inspector email: Binspector@yville.com. (collected Jul 22 2026)