City of Fort Worth


City of Fort Worth is a city authority in the State of Texas, serving 918,915 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Permitting 5 steps · 28 questions

Whether a permit is needed — Yes — a building permit and a separate electrical permit Q3 Electrical and building permits — Separate Q4 Plan review — 7 business days (residential building permits) to first review comments Q18 Where you file — Accela Citizen Access — https://aca-prod.accela.com/CFW/Default.aspx (city calls it 'Online Permitting' / 'ACA') Q20

Permit required
Yes — a building permit and a separate electrical permit80% source
What it costs
$225.00 minimum permit fee (2 trades: building + electrical) plus a $16.87 Technology Fee. $112.50 if only one trade permit is pulled.60% source
Plan review turnaround
7 business days (residential building permits) to first review comments90% source
Key document
fee ordinance Ord. No. 27191-09-2024, Table 1A-1 (extracted with pdftotext -layout) cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Licensed electrician — a registered Electrical Contractor (state TDLR licence). A homeowner may pull it for their own homestead. 80% · department page
    • Must the contractor be registered with this authority before applying? Yes 90% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes — on their own homestead (owner-occupied single-family) 80% · department page
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar-specific checklist exists. The general residential submittal matrix for an accessory structure requires: online application, checklist/requirements, complete set of plans, plat (certified copy), site plan, and Urban Forestry permit if common ownership is 1 acre or more. 55% · department page (submittal matrix)
    • How many copies, and in what format? Electronic only, via the online portal. All documents must be PDF, Adobe Acrobat 22-compatible, first-generation vector PDFs (direct conversion from CAD/Word) — scanned plans are NOT accepted, though scanned plats, correspondence, energy-code documents and forms are. Files must not be write-protected or read-only (staff must be able to mark up and add/remove sheets). Plans must be at a defined scale (1/4"=1', 1/2"=1' etc.) with correct proportions. All drawings combined into one file. 90% · submittal guide PDF (extracted with pdftotext -layout)
    • Is a site plan required, and what must it show? Yes for accessory structures, per the residential submittal matrix. The city publishes no content specification for what the site plan must show for solar. 55% · department page (submittal matrix)
    • Is a one-line / three-line diagram required? Yes — but by the UTILITY, not the city. Oncor requires a one-line diagram (single page, flattened, non-editable PDF, under 2MB) showing service address, ESI ID, all panels/inverters/batteries/VLLD/meter with manufacturer, model, quantity and voltage, and the VLLD-to-meter distance in feet. The City of Fort Worth publishes no checklist requiring a one-line. 90% · utility DG requirements (extracted with pdftotext -layout)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 7 business days (residential building permits) to first review comments 90% · department page
    • Which utility handles interconnection here? Oncor Electric Delivery Company LLC (TDU). Retail billing is through the customer's chosen REP; Fort Worth is in the ERCOT competitive market. 85% · utility electric service guidelines, Feb 2025 (extracted with pdftotext -layout)
    • Where does the utility sit in the sequence? Parallel — but the Interconnection Agreement must be executed before the system is energized. Oncor ESG 700.02: 'All Distributed Generation connected for Parallel Operation with the Company grid must work through the interconnection process with the Company to obtain an Interconnection Agreement before the system is energized.' 85% · utility DG manual, ESG Sec. 700.02, Feb 2025

28 questions answered against City of Fort Worth’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higher95 because the city's own Building & Energy Codes page names the codes it has adopted and names its Building Official; the fee ordinance sets its building/electrical/mechanical/plumbing permit fees. Not 100 only because state third-party pre-emption (see jurisdiction.overridden_by) can move review and inspection off the city for this exact class of work.

department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/building-energy-codes

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both — the city permits and inspects building, electrical, mechanical and plumbing itself. Third-party plan review and/or field inspection is optional (applicant's choice), and reduces the permit fee.

Why the confidence is not higher90 because the fee ordinance's own footnotes to Tables 1-A and 1A-1 spell out the four combinations (city/city, third-party/third-party, third-party review + city inspection, city review + third-party inspection) with explicit multipliers, which only makes sense if the city holds all four trades and third party is elective. Not higher because the ordinance never states in one sentence 'the city is the AHJ for X'.

fee ordinance (Ord. No. 27191-09-2024), Tables 1-A and 1A-1 checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/9/development-services/documents/resources-applications-forms-videos/f/development-fees-schedule.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes — a building permit and a separate electrical permit

Why the confidence is not higher80, not higher, because the only city document that names solar panels is the undated 'Nuts & Bolts of Residential Building Permits' brochure, which lists solar panels among accessory structures requiring a building permit and says electrical work requires an electrical permit. That brochure is stale: it still calls the department 'Planning and Development' (now Development Services) and gives the old City Hall address at 1000 Throckmorton (the city moved to 100 Fort Worth Trail). No current, dated city page says 'solar requires a permit'.

department brochure (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/nuts-and-bolts-eng.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate

Why the confidence is not higher90 because the Inspections FAQ answers this head-on: 'Does my building permit mean that I have all of my trade permits also...? No. Aside from your building permit, you still must obtain all trade permits that are needed separately and schedule inspections as required for each permit type.' Not 95+ because the FAQ is undated.

department page (Stay informed – FAQS accordion) checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/inspections

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Licensed electrician — a registered Electrical Contractor (state TDLR licence). A homeowner may pull it for their own homestead.

Why the confidence is not higher80 because it is assembled from two city sources rather than one statement: the Contractor Registration page requires a valid registration on file for anyone obtaining a building/mechanical/plumbing/electrical permit, lists 'Electrical Contractor' as a registration type, and excepts 'property owners of single-family residences when performing the work on their homestead property'. The fee ordinance separately exempts state-licensed electricians from registration fees (not from registration).

department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/contractor-registration

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higher90 because the page is unambiguous: 'Any firm, business, individual or organization obtaining a permit related to the building, mechanical, plumbing or electrical provisions of the City of Fort Worth's Codes shall have on file in the Development Services Department a valid Contractor Registration'. Registration expires one year from issuance. Not higher because the page is undated and the electrical registration fee is not listed on it (the fee ordinance exempts state-licensed electricians from the fee).

department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/contractor-registration

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes — on their own homestead (owner-occupied single-family)

Why the confidence is not higher80 because the Contractor Registration page states the exception explicitly ('The property owners of single-family residences when performing the work on their homestead property, meaning you own and live in the property'), but that page only excuses registration; it does not separately confirm the homeowner may perform and self-certify the electrical work itself.

department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/contractor-registration

Q8 What documents make up a complete submittal? Core Submittal package

No solar-specific checklist exists. The general residential submittal matrix for an accessory structure requires: online application, checklist/requirements, complete set of plans, plat (certified copy), site plan, and Urban Forestry permit if common ownership is 1 acre or more.

Why the confidence is not higher55 because the matrix is the city's own current Residential Building Permit page, but its columns are New Construction / Additions / Remodels / Accessory Structures / Pools — none of which names solar, so applying the 'Accessory Structures' column to a rooftop PV retrofit is my inference from the Nuts & Bolts brochure's classification of solar panels as accessory structures. A rooftop retrofit plausibly falls under 'Remodels' instead, which drops the plat and site plan requirements. I walked the city's whole A–Z Applications & Forms index and there is no solar entry (see not_found q8).

department page (submittal matrix) checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/residential-building-permit

Q9 How many copies, and in what format? Submittal package

Electronic only, via the online portal. All documents must be PDF, Adobe Acrobat 22-compatible, first-generation vector PDFs (direct conversion from CAD/Word) — scanned plans are NOT accepted, though scanned plats, correspondence, energy-code documents and forms are. Files must not be write-protected or read-only (staff must be able to mark up and add/remove sheets). Plans must be at a defined scale (1/4"=1', 1/2"=1' etc.) with correct proportions. All drawings combined into one file.

Why the confidence is not higher90 because this is the city's own Online Submittal Guide, Version 1.4 dated 8/9/2024 on its cover. Deducted for one real hazard: the internal page footers still read 'Version 1.1 4/15/2015', so parts of the body have not been revised since 2015 even though the cover is 2024 — the Acrobat 22 reference suggests the file-format section at least is current.

submittal guide PDF (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/edr-submittal-guide.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes for accessory structures, per the residential submittal matrix. The city publishes no content specification for what the site plan must show for solar.

Why the confidence is not higher55 for the same reason as q8: the matrix ticks 'Site Plan' under Accessory Structures and Pools, and solar is classed as an accessory structure only by the undated Nuts & Bolts brochure. Nothing in any city document says what a solar site plan must contain. Note the separate, definitely-required site drawing: Oncor requires a Layout Sketch (bird's-eye, north arrow, street name, driveway, all equipment labelled, VLLD-to-meter distance in feet, ESI ID) — that one is well sourced, see q11.

department page (submittal matrix) checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/residential-building-permit

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — but by the UTILITY, not the city. Oncor requires a one-line diagram (single page, flattened, non-editable PDF, under 2MB) showing service address, ESI ID, all panels/inverters/batteries/VLLD/meter with manufacturer, model, quantity and voltage, and the VLLD-to-meter distance in feet. The City of Fort Worth publishes no checklist requiring a one-line.

Why the confidence is not higher90 because Oncor's 'Residential/Small Commercial Project Requirements', revised 1 May 2025, sets this out item by item with a checklist. The reason this is not 95+ is the split: the answer belongs at utility level, and I proved the city-side absence by walking the A–Z forms index rather than finding a city document that says 'no one-line required'.

utility DG requirements (extracted with pdftotext -layout) checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/for-installers/New-Residential-Requirements-2025.pdf.coredownload.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedNo string or conductor calculation requirement anywhere. Looked in: the city's A–Z Applications & Forms index (walked to the 'E' and 'S' panels — 'E' holds only the 2023 NEC amendments under 'Electrical Code'; 'S' runs Sexually Oriented Businesses → Signs → Subdivision with no Solar entry, so the slot where a solar checklist would sit alphabetically is empty), the Residential Building Permit submittal matrix, and the 2023 NEC local amendments (Article 690 unamended). Oncor's residential requirements ask for equipment nameplate data and voltages on the one-line, not calculations.

https://www.fortworthtexas.gov/departments/development-services/development-resources

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedNo structural PE stamp threshold published for solar. Looked in: the 2021 IRC local amendments (Ord. 25383-03-2022) — the only Texas-registered-engineer requirement there is IRC R401.2, foundations and footings, not roof loading; the 2021 IBC local amendments (Ord. 25382-03-2022) — RPE is defined at IBC 4557 and required only at the Building Official's discretion for boathouses (IBC 3610); and the city's A–Z forms index, which has no solar or structural affidavit form. Both PDFs extracted with pdftotext -layout and controls passed.

https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/irc-amendments-2021-ordinance-25383-03-2022.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSame documents as q13, plus the 2023 NEC local amendments (Ord. 26721-02-2024), whose full article-by-article amendment list I read: no electrical PE stamp requirement or threshold appears.

https://www.fortworthtexas.gov/files/assets/public/v/3/development-services/documents/resources-applications-forms-videos/e/2023-nec-amendments.pdf

Q15 What does a residential solar permit cost? Core Fees

$225.00 minimum permit fee (2 trades: building + electrical) plus a $16.87 Technology Fee. $112.50 if only one trade permit is pulled.

Why the confidence is not higher60 — this is inference, and there is a trap in this document worth naming. Table 1A-1 RESIDENTIAL REMODEL FEES sets a minimum permit fee by number of trades: 1 trade $112.50, 2 trades $225.00, 3 trades $337.50. A rooftop PV retrofit needs a building permit and an electrical permit = 2 trades. But no line item in the ordinance says 'solar'. THE TRAP: the ordinance does contain a line reading 'Solar energy system: 59.18' — it sits in the MECHANICAL fee table (Chapter 7, Art. 1, Sec. 7-1, Part 2, Sec. 119), between 'Automatic shutoff - products of combustion' and 'Heat recovery devices per 1,000 BTU'. That is a solar THERMAL/water-heating fee, not photovoltaic, and should not be recorded as the PV permit fee. Also note SB 1202 (89R): if a third party reviews and inspects, Local Government Code Sec. 247.003 bars the city from charging a fee for that review/inspection.

fee ordinance Ord. No. 27191-09-2024, Table 1A-1 (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/9/development-services/documents/resources-applications-forms-videos/f/development-fees-schedule.pdf

Q16 How is the fee calculated? Core Fees

Tiered — by number of trade permits required (residential); non-residential remodel/accessory work is valuation-based

Why the confidence is not higher70 because Table 1A-1 is explicitly headed 'Based upon the number of trades required for the project' and is the residential table, which is a clean tier structure. Deducted because 'Tiered' is my mapping of 'number of trades' onto the survey's option list, and because it is unconfirmed that Development Services applies Table 1A-1 rather than the valuation table (Table 1-A) to a solar retrofit.

fee ordinance Ord. No. 27191-09-2024, Tables 1-A and 1A-1 checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/9/development-services/documents/resources-applications-forms-videos/f/development-fees-schedule.pdf

Q17 Is there a separate plan-check fee? Fees

No separate plan-check fee for a residential permit. Charges arise only for re-review: additional plan review required by changes/additions/revisions is $63.00 per revision per hour (half-hour minimum) for the first revision, $112.50 second, $225.00 third and fourth, $337.50 fifth and up. Expedited plan review is separately priced.

Why the confidence is not higher75 because the ordinance's block 'Inspection and Plan Review Fees Applicable to All Permit Types' lists only these re-review and expedited charges — there is no first-review plan-check line for residential. That is an absence proved by reading the relevant block, not a positive statement that plan review is included, hence not higher. Controls on this PDF passed (positive 'electrical' 7 hits, fabricated 'zzqqx' 0 hits).

fee ordinance Ord. No. 27191-09-2024 checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/9/development-services/documents/resources-applications-forms-videos/f/development-fees-schedule.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

7 business days (residential building permits) to first review comments

Why the confidence is not higher90 because the city's Review Timeframes page states, under 'Building Permits', 'Commercial: 7 business days' and 'Residential: 7 business days'. I expanded the accordion and read it on screen. Deducted because the page's own preamble limits this to 'first review comments' upon submittal of a complete application — it is not a time-to-issue, and a correction cycle restarts it. Page is undated.

department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/review-timeframes

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedPermit validity/expiration period not established. Looked in: the 2021 IRC and 2021 IBC local amendment ordinances (no amendment to the Section 105 administrative provisions — grep for 'Expiration' and '105.5' returned only swimming-pool barrier section AQ105.5), and the fee ordinance (which amends Ch. 7, Art. 1, Sec. 7-1, Part 2, Secs. 118 and 119 — fees only). The base 2021 IBC/IRC 180-day rule presumably applies, but I did not read the city code's own Chapter 7 Part 2 administrative text to confirm it is unamended, so I am not recording a value.

https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/irc-amendments-2021-ordinance-25383-03-2022.pdf

Q20 Which permit portal does this authority use? Core Portal & process

Accela Citizen Access — https://aca-prod.accela.com/CFW/Default.aspx (city calls it 'Online Permitting' / 'ACA')

Why the confidence is not higher95 because the 'Enter Online Permitting' button on the Residential Building Permit page links straight to aca-prod.accela.com/CFW, and the Inspections page refers to 'the online ACA profile' by name.

portal landing link on department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/residential-building-permit

Q21 Can the whole application be completed online? Core Portal & process

Yes

Why the confidence is not higher85 because the residential submittal matrix marks every project type 'Online' in its first row, and the Online Submittal Guide says the system lets customers 'apply for permits, pay most fees, upload documents for review, and receive/answer comments online' and 'Most applications can be completed without ever coming to City Hall'. Deducted for the guide's own hedges — 'most fees', 'most common building permits', 'most applications'.

submittal guide PDF v1.4 dated 8/9/2024 checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/edr-submittal-guide.pdf

Q22 Which utility handles interconnection here? Core Utility interconnection

Oncor Electric Delivery Company LLC (TDU). Retail billing is through the customer's chosen REP; Fort Worth is in the ERCOT competitive market.

Why the confidence is not higher85 and not higher because I could not get a clean city-side statement or a machine-readable territory list. The evidence is Oncor's own current Electric Service Guidelines (February 2025), Sec. 100.05.04, which refers to 'Company Network Distribution systems in downtown Dallas and downtown Fort Worth' — i.e. Oncor's own document describing its distribution system in Fort Worth. Oncor's service-territory lookup is an interactive map with no city list, and Oncor's Area Managers page 404s. I did NOT use PowerToChoose. Caveat: Fort Worth's city limits sprawl into several counties; a small number of outlying addresses could sit in a co-op territory, so confirm per address.

utility electric service guidelines, Feb 2025 (extracted with pdftotext -layout) checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel — but the Interconnection Agreement must be executed before the system is energized. Oncor ESG 700.02: 'All Distributed Generation connected for Parallel Operation with the Company grid must work through the interconnection process with the Company to obtain an Interconnection Agreement before the system is energized.'

Why the confidence is not higher85 because ESG Sec. 700.02 is explicit on the energisation gate, and Oncor's published residential process (installer submits tariff application → submits via eTRACK → Oncor reviews and studies → IA signed → PTO) never mentions the municipal permit at all, which is why I record Parallel rather than After permit. Deducted because 'never mentions' is an absence: Oncor does not publish a statement that a city final is not a prerequisite, and its eTRACK flow does require installer-supplied inspection photos at the 'Agreement Available' step.

utility DG manual, ESG Sec. 700.02, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedNo city source makes HOA or architectural approval a permit prerequisite. Looked in: the Residential Building Permit page and its submittal matrix, the Nuts & Bolts brochure (which covers historic/design district review and zoning setbacks but never mentions HOAs), and the Contractor Registration page. The governing rule is state law — Texas Property Code Sec. 202.010 limits what a property owners' association may prohibit for solar devices — but I could not verify its text: statutes.capitol.texas.gov now serves a JavaScript shell (HTTP 200, 250KB, zero occurrences of 'solar' or '202.010' in the payload), which is a soft-200 rather than the document. Rather than cite a statute I did not read, I am recording this as not found.

https://statutes.capitol.texas.gov/Docs/PR/htm/PR.202.htm

Q25 Is there a historic-district review? Overlays & special cases

Yes, where the property is in a historic or design-review district — additional approvals are required before a permit can be issued. Design review staff contact 817-392-8037.

Why the confidence is not higher75 because the source is the undated Nuts & Bolts brochure ('Historic and design districts require additional approvals before a permit can be issued for construction'), and the same brochure is demonstrably stale (old department name, old City Hall address). The city does maintain a live Historic Preservation & Urban Design section, which corroborates that such districts exist, but I did not find a current page stating the pre-permit approval requirement.

department brochure (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/nuts-and-bolts-eng.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

No windstorm certification. Fort Worth's locally filled IRC Table R301.2(1) gives an ultimate design wind speed of 105 mph (3-second gust), Exposure B unless site conditions say otherwise.

Why the confidence is not higher70. The 105 mph figure is solid — I read it out of the city's own 2021 IRC amendments ordinance (Ord. 25383-03-2022), which fills in Table R301.2(1). The 'No' on windstorm certification is inference: TDI windstorm certification (WPI-8) applies only to designated coastal catastrophe areas, and Tarrant County is not one; no Fort Worth document mentions windstorm certification. The table's OCR is partially garbled around the exposure category, so treat the exposure value as unread.

adopting ordinance, local amendments (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/irc-amendments-2021-ordinance-25383-03-2022.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No — solar is allowed by right. 'The Development Services Department has clarified that solar energy is allowed by right in residential and commercial zones.'

Why the confidence is not higher75 because this is the city's own published statement (12 Dec 2024 news release announcing its SolSmart Silver designation), which is a city source and recent — but it is a news release, not the zoning ordinance. I corroborated negatively: I read the full Chapter 5 (Supplemental Use Standards) table of contents in the current code (2026 S-20) and there is no solar entry anywhere in §§ 5.100–5.158 or 5.300–5.308, so no supplemental use standard or special-exception trigger attaches to solar.

city news release checked 2026-08-28 https://www.fortworthtexas.gov/news/2024/12/solsmart

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedNo system-size cap on residential generation. Looked in: the full Chapter 5 (Supplemental Use Standards) table of contents of the current zoning code (version 2026 S-20) — §§ 5.100–5.158 and 5.300–5.308, no solar entry; the full text of §§ 5.300 and 5.301; and the 2023 NEC local amendments. Caveat worth carrying forward: §5.301(b)(1)a caps total non-habitable accessory building area at 120–400 sq ft by lot size, which would constrain a GROUND MOUNT if solar is classed there (see q47) — but that is a footprint cap, not a kW cap, and it does not touch rooftop systems.

https://codelibrary.amlegal.com/codes/ftworth/latest/ftworth_tx/0-0-0-36802

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2023 NEC, adopted as the Fort Worth Electrical Code by Ordinance No. 26721-02-2024 (adopted 13 Feb 2024, effective 1 March 2024), with local amendments 95% · adopting ordinance (extracted with pdftotext -layout)
    • Which building code edition is in force? 2021 International Building Code (Ord. 25382-03-2022) and 2021 International Residential Code (Ord. 25383-03-2022); also 2021 IMC, IPC, IFGC and IEBC; 2015 International Energy Conservation Code; 2018 International Swimming Pool and Spa Code 95% · department page plus adopting ordinances
    • Which fire code edition is in force? 2021 International Fire Code, amended by Ordinance No. 25388-03-2022 (the Fort Worth Fire Code) 95% · adopting ordinance (extracted with pdftotext -layout)
    • Are there local amendments to any of the above? Yes — every adopted code carries local amendments; the city's own page says 'Each code has locally adopted amendments'. None of them amends solar PV. 95% · department page plus four extracted amendment ordinances
    • What is the installation judged against? The 2023 NEC as locally amended (the Fort Worth Electrical Code, City Code Ch. 11, Secs. 11-1 to 11-4). Article 690 and Article 705 are unamended, so a PV installation is judged against unmodified 2023 NEC. 95% · adopting ordinance (extracted with pdftotext -layout)
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? No local amendment. Rooftop access, pathways and ridge setback are governed by the unamended 2021 International Fire Code, Chapter 12 (Energy Systems). Separately, the city DELETED IFC Section 105.6.20 'Solar photovoltaic power systems', so no Fire Department construction permit is required for a solar PV system. 70% · adopting ordinance (extracted with pdftotext -layout)
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? The AHJ requires none of its own beyond the 2023 NEC. The UTILITY (Oncor) requires a caution/warning placard on the Visible Lockable Labeled AC Disconnect (VLLD) on every DG project — Class 1, 2 or 3 depending on the VLLD-to-meter distance. 90% · utility DG manual, ESG Sec. 700.04, Feb 2025
    • Does the authority specify placard wording of its own? No — the city specifies no placard wording of its own. Oncor supplies sample (not mandatory) wording, e.g. 'CAUTION / POWER TO THIS SERVICE IS ALSO SUPPLIED FROM ON-SITE SOLAR/WIND GENERATION / AC SYSTEM DISCONNECT' and 'CAUTION / Solar Generation Utility AC Disconnect'. 85% · utility placard guideline (extracted with pdftotext -layout)
    • Does it specify letter height, colour or material? No letter height and no colour specified by anyone. Material IS specified, by Oncor: colour-cast acrylic placards, or sticker-type material only if outdoor-rated and of similar specification to NEC requirements; both must carry a UV inhibitor rated for exterior use. If colour-cast acrylic is used the customer must also supply adhesive tape — Oncor's preferred brand is 3M Scotch VHB (4956, 4941, 4936 or 4926), minimum 1 inch wide, double-sided, exterior grade. 85% · utility DG manual, ESG Sec. 700.04.01, Feb 2025
    • Is a site plan / facility map placard required, and what must it show? Yes, in Class 3 cases (facilities fed from an Oncor pad-mounted transformer, or VLLD installed remotely). The site map must show: location of the Oncor meter and Oncor delivery equipment; location of the customer's main AC disconnect (VLLD); the service address; a north indicator and basic street and building layout; and a map title, e.g. 'Location of Distributed Generation System Disconnect' (older wording: 'Solar System Disconnecting Means'). 90% · utility DG manual, ESG Sec. 700.04.02–700.04.06, Feb 2025
    • Does the UTILITY specify placards beyond the AHJ's? Yes, substantially. Oncor requires placards on ALL distributed generation projects, in three classes by VLLD-to-meter distance. Class 1 (VLLD within 10 ft of the meter): caution placard on the VLLD. Class 2 (VLLD more than 10 ft from the meter): additionally a directory placard posted within line of sight and viewable distance of the Oncor meter, stating where the disconnect is (e.g. 'AC DISCONNECT IS LOCATED ON WEST WALL OF THIS STRUCTURE'). Class 3 (pad-mount transformer feed or remote VLLD): caution placard plus a site map; three sets are requested — one for existing Oncor equipment, one held for future replacement of that equipment, one for the customer's main equipment; the contractor furnishes the placards and adhesive tape, and Oncor's own operations group mounts those on Oncor equipment after a site visit. For pad-mounted transformers, an additional caution placard with two pre-drilled holes is attached to the secondary cables inside the transformer. Placard proofs must be submitted for review, uploaded to the Placards section of the eTRACK Installer Portal. 95% · utility DG manual, ESG Sec. 700.04, Feb 2025
    • Where must the labels be placed? On the Visible Lockable Labeled AC Disconnect — explicitly NOT on the Oncor meter. Oncor: 'Placards are required to be located on the visible AC disconnect and not on the Company Meter.' For Class 2, an additional directory placard goes within line of sight and viewable distance of the Oncor meter. For Class 3, identical placards go on both the Oncor equipment and the customer's main equipment. 95% · utility DG manual, ESG Sec. 700.04, Feb 2025
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? A Visible Lockable Labeled AC Disconnect (VLLD) must be located between the Oncor meter and ALL sources of distributed generation, on an ACCESSIBLE EXTERIOR wall WITHIN 10 FEET of the Oncor meter, accessible at all times. It must have an external handle and be lockable; molded-case breakers are NOT acceptable as a VLLD. Mounting height per ESG Figure 1 is 4 ft minimum, 6 ft maximum. Non-utility meter collars or other devices may not be installed between the utility meter and meter socket or inside the meter socket — that space is reserved for utility use only, and the meter socket must not be used as a raceway. If the VLLD is farther than 10 ft from the meter, Class 2 or Class 3 placarding is required. 95% · utility DG manual, ESG Sec. 700.03, Feb 2025
    • Are batteries permitted, and under what conditions? Yes, permitted. Technical conditions are the unamended 2021 IFC Chapter 12 (Energy Systems) — Fort Worth adopted no local amendment to it. The city does charge separately: a Fire construction permit fee 'Energy Systems (Installation)' at $150.00 per battery system installation, plus $110.00 per hour for any additional inspections after the first; and an IFC 105.5.14 'Energy Storage Systems' operational permit at $75.00. 75% · fire code adopting ordinance, Table H104.2 and construction permit fee table (extracted with pdftotext -layout)
    • Is there a separate ESS permit or inspection? Yes — a Fire construction permit priced at $150.00 per battery system installation, with $110.00 per hour for any additional inspections after one inspection; and a separate IFC 105.5.14 Energy Storage Systems operational permit at $75.00. Note the contrast: the city DELETED IFC 105.6.20, so there is no equivalent fire permit for solar PV alone. 75% · fire code adopting ordinance (extracted with pdftotext -layout)
    • Is a ground mount treated as a structure? Yes — as a residential accessory structure, and the constraints are severe. Zoning §§ 5.300–5.301 cap total non-habitable accessory building area by lot size (120 sq ft for lots under 5,000 sq ft; 200 sq ft for 5,000–9,999; 400 sq ft for 10,000–43,559; 2% of lot area for 1 acre and above), limit height to 10 ft (12 ft with an extra 2 ft of setback per extra foot of height), and require the structure to sit behind the rear wall of the house furthest from the street, or at least 75 ft back from the front property line, whichever is less restrictive. Accessory structures are prohibited in front, established front and projected front yards. 55% · zoning ordinance, Appendix A Ch. 5 Art. 3 (American Legal, code version 2026 S-20)
    • Is there a local rule on service upgrades or busbar sizing? One relevant local rule: amended NEC 230.70(A) adds a 'Special Condition 4' — where more than one electrical service is installed, all service disconnecting means shall be grouped in the same location, either all inside the building or all outside and attached to the building. No local rule on busbar sizing or the 120% rule. 70% · adopting ordinance (extracted with pdftotext -layout)

20 questions answered against City of Fort Worth’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 NEC, adopted as the Fort Worth Electrical Code by Ordinance No. 26721-02-2024 (adopted 13 Feb 2024, effective 1 March 2024), with local amendments

Why the confidence is not higher95 because I read the adopting ordinance itself, including its 'ADOPTED: February 13, 2024 / EFFECTIVE: March 1, 2024' block and the attached M&C 24-0105. The city's Building & Energy Codes page independently says 'The adopted electrical code is the 2023 National Electrical Code.' Not 100 because I did not verify no later amending ordinance exists.

adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/3/development-services/documents/resources-applications-forms-videos/e/2023-nec-amendments.pdf

Q30 Which building code edition is in force? Core Code editions in force

2021 International Building Code (Ord. 25382-03-2022) and 2021 International Residential Code (Ord. 25383-03-2022); also 2021 IMC, IPC, IFGC and IEBC; 2015 International Energy Conservation Code; 2018 International Swimming Pool and Spa Code

Why the confidence is not higher95 because the city's Building & Energy Codes page lists the editions in prose, and I downloaded and extracted the underlying amendment ordinances, whose cover pages carry the ordinance numbers and dates. Not 100 because the page itself is undated; the ordinances are 03-2022.

department page plus adopting ordinances checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/building-energy-codes

Q31 Which fire code edition is in force? Code editions in force

2021 International Fire Code, amended by Ordinance No. 25388-03-2022 (the Fort Worth Fire Code)

Why the confidence is not higher95 because I downloaded and extracted the 102-page fire code amendment ordinance itself; its page footers read 'Ordinance No. 25388-03-2022'. The Building & Energy Codes page lists the 2021 IFC among adopted codes.

adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/2021-construction-fire-codes-ordinance-no-25388-03-2022.pdf

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — every adopted code carries local amendments; the city's own page says 'Each code has locally adopted amendments'. None of them amends solar PV.

Why the confidence is not higher95 because I did not take that on trust: I downloaded and text-extracted the NEC, IRC, IBC and Fire Code amendment ordinances and ran controls on each (positive control 'code' hit 87/159/218/301 times respectively; fabricated control 'zzqqx' hit 0 times in all four). The NEC amendments touch Articles 90.10, 100, 230.2, 230.42, 230.70, 250.50, 250.52, 310.14, 334.10, 408.4, 410.118, 422.31, 440.6, 500.8, 505.7, 550, 551 and 696 — and NOT Article 690 (PV) or 705 (interconnection). The Fire Code amendments touch nothing in Chapter 12 (Energy Systems).

department page plus four extracted amendment ordinances checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/permits/building-energy-codes

Q33 What is the installation judged against? Core Electrical

The 2023 NEC as locally amended (the Fort Worth Electrical Code, City Code Ch. 11, Secs. 11-1 to 11-4). Article 690 and Article 705 are unamended, so a PV installation is judged against unmodified 2023 NEC.

Why the confidence is not higher95 on the strength of reading the adopting ordinance's full amendment list article by article and confirming 690 and 705 do not appear (grep for '690' and '705.' returned zero hits in a file where the positive control 'code' returned 87). Not 100 because the ordinance also adds Article 90.10 requiring that primary building power come from an electric utility, with an exception permitting solar panels 'when approved by the code official' — that gives the Building Official a discretionary hook that is not in the base NEC.

adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/3/development-services/documents/resources-applications-forms-videos/e/2023-nec-amendments.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

One relevant local rule: amended NEC 230.70(A) adds a 'Special Condition 4' — where more than one electrical service is installed, all service disconnecting means shall be grouped in the same location, either all inside the building or all outside and attached to the building. No local rule on busbar sizing or the 120% rule.

Why the confidence is not higher70. The 230.70(A)(4) text is verbatim from the ordinance, so that part is solid. The 'no busbar rule' half is a proved absence — NEC 705 is not amended and no service-upgrade or busbar provision appears anywhere in the amendment list — but absences of this kind are worth less than positive statements, and OCR quality in this PDF is poor in places (e.g. 'permit ed' for 'permitted'), so a short amendment could in principle have been mangled.

adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/3/development-services/documents/resources-applications-forms-videos/e/2023-nec-amendments.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedNo mounting system or attachment spacing requirement. Looked in: the 2021 IRC local amendments and the 2021 IBC local amendments, both extracted with pdftotext -layout and both passing controls; greps for photovoltaic, solar, dead load, roof covering and mph found only the foundation, wind-criteria and roof-covering-classification amendments, none of which addresses PV attachment.

https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/ibc-amendments-2021-ordinance-25382-03-2022.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

No local amendment. Rooftop access, pathways and ridge setback are governed by the unamended 2021 International Fire Code, Chapter 12 (Energy Systems). Separately, the city DELETED IFC Section 105.6.20 'Solar photovoltaic power systems', so no Fire Department construction permit is required for a solar PV system.

Why the confidence is not higher70. The deletion of 105.6.20 is verbatim from the ordinance and is a genuinely useful finding — Fort Worth Fire has taken itself out of the PV permit loop. The 'no local pathway amendment' half is a proved absence: greps for solar/photovoltaic/PV/pathway/ridge/setback across the extracted 5,815-line fire ordinance found no Chapter 12 amendments (controls passed: 'code' 301 hits, 'zzqqx' 0). I have deliberately NOT quoted 2021 IFC pathway dimensions, because I did not read the IFC itself — only the city's amendments to it.

adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/2021-construction-fire-codes-ordinance-no-25388-03-2022.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — to the 2023 NEC (Article 690.12), unamended locally

Why the confidence is not higher85 because the edition in force is firmly established (Ord. 26721-02-2024, effective 1 Mar 2024) and I confirmed Article 690 is not among the amended articles. Deducted because no Fort Worth document mentions rapid shutdown at all — the answer is 'whatever the 2023 NEC says', which is correct but is inference from the adopted edition rather than a city statement.

adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/3/development-services/documents/resources-applications-forms-videos/e/2023-nec-amendments.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

The AHJ requires none of its own beyond the 2023 NEC. The UTILITY (Oncor) requires a caution/warning placard on the Visible Lockable Labeled AC Disconnect (VLLD) on every DG project — Class 1, 2 or 3 depending on the VLLD-to-meter distance.

Why the confidence is not higher90. The Oncor half is from ESG Sec. 700.04 (Feb 2025) and the Oncor Placard Guideline, both read in full. The city half is a proved absence: NEC Articles 690/705 unamended, no placard or signage provision anywhere in the fire, IRC or IBC amendments, and no solar entry in the city's A–Z Applications & Forms index. Deducted because a proved absence is still an absence.

utility DG manual, ESG Sec. 700.04, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No — the city specifies no placard wording of its own. Oncor supplies sample (not mandatory) wording, e.g. 'CAUTION / POWER TO THIS SERVICE IS ALSO SUPPLIED FROM ON-SITE SOLAR/WIND GENERATION / AC SYSTEM DISCONNECT' and 'CAUTION / Solar Generation Utility AC Disconnect'.

Why the confidence is not higher85. The city 'No' rests on the absences described at q38, each of which I proved by extracting and grepping the actual ordinances with controls. The Oncor wording is verbatim but its own document frames it as 'Examples' and asks the installer to 'indicate the placard warning language that will be utilized' — so Oncor prescribes the message, not the exact string.

utility placard guideline (extracted with pdftotext -layout) checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/for-installers/Placard%20Guideline.pdf.coredownload.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No letter height and no colour specified by anyone. Material IS specified, by Oncor: colour-cast acrylic placards, or sticker-type material only if outdoor-rated and of similar specification to NEC requirements; both must carry a UV inhibitor rated for exterior use. If colour-cast acrylic is used the customer must also supply adhesive tape — Oncor's preferred brand is 3M Scotch VHB (4956, 4941, 4936 or 4926), minimum 1 inch wide, double-sided, exterior grade.

Why the confidence is not higher85. The material spec is verbatim and appears identically in two Oncor documents (ESG 700.04.01, Feb 2025, and the Placard Guideline). Deducted for a dating hazard worth flagging: the standalone Placard Guideline PDF is stamped '(rev 01/03/2012)' on its first page — a 2012 document still being served from Oncor's current installer page. I did not date it from its URL; the reason I am willing to rely on it is that its text is reproduced inside the May 2025 residential requirements pack and the Feb 2025 ESG.

utility DG manual, ESG Sec. 700.04.01, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Yes, in Class 3 cases (facilities fed from an Oncor pad-mounted transformer, or VLLD installed remotely). The site map must show: location of the Oncor meter and Oncor delivery equipment; location of the customer's main AC disconnect (VLLD); the service address; a north indicator and basic street and building layout; and a map title, e.g. 'Location of Distributed Generation System Disconnect' (older wording: 'Solar System Disconnecting Means').

Why the confidence is not higher90 because ESG Sec. 700.04.06 lists the five required elements as a numbered list and I read it verbatim. Deducted because 'Class 3' is triggered by conditions (pad-mount feed, remote disconnect) that are the exception for a typical Fort Worth rooftop retrofit — for the common Class 1 case no site-map placard is required. The map title differs between the ESG (2025) and the older Placard Guideline (2012).

utility DG manual, ESG Sec. 700.04.02–700.04.06, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, substantially. Oncor requires placards on ALL distributed generation projects, in three classes by VLLD-to-meter distance. Class 1 (VLLD within 10 ft of the meter): caution placard on the VLLD. Class 2 (VLLD more than 10 ft from the meter): additionally a directory placard posted within line of sight and viewable distance of the Oncor meter, stating where the disconnect is (e.g. 'AC DISCONNECT IS LOCATED ON WEST WALL OF THIS STRUCTURE'). Class 3 (pad-mount transformer feed or remote VLLD): caution placard plus a site map; three sets are requested — one for existing Oncor equipment, one held for future replacement of that equipment, one for the customer's main equipment; the contractor furnishes the placards and adhesive tape, and Oncor's own operations group mounts those on Oncor equipment after a site visit. For pad-mounted transformers, an additional caution placard with two pre-drilled holes is attached to the secondary cables inside the transformer. Placard proofs must be submitted for review, uploaded to the Placards section of the eTRACK Installer Portal.

Why the confidence is not higher95 because this is set out at length in Oncor's current Electric Service Guidelines (Feb 2025, Sec. 700.04) and independently in the May 2025 residential requirements pack, and the two agree. Not 100 because much of the Class 3 language is phrased as 'Oncor requests' rather than 'requires', and the class figures (Figures 2–5) are images I could not read as text.

utility DG manual, ESG Sec. 700.04, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

On the Visible Lockable Labeled AC Disconnect — explicitly NOT on the Oncor meter. Oncor: 'Placards are required to be located on the visible AC disconnect and not on the Company Meter.' For Class 2, an additional directory placard goes within line of sight and viewable distance of the Oncor meter. For Class 3, identical placards go on both the Oncor equipment and the customer's main equipment.

Why the confidence is not higher95 — verbatim from ESG Sec. 700.04 (Feb 2025) and repeated in the Placard Guideline. This is worth calling out because it is the opposite of the habit of labelling the meter. Not 100 because NEC 690/705 labelling at the service equipment applies independently and is not displaced by Oncor's placement rule ('Company placard specifications are not intended to take precedence over any applicable electrical codes').

utility DG manual, ESG Sec. 700.04, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedNo approved-equipment list. Looked in: the 2023 NEC local amendments, which go the opposite way — the amended Article 100 adds Informational Notes pointing to NEC 90.7 and 110.3 and warning that 'Manufacturer's self-certification of equipment may not necessarily comply with US product safety standards as certified by a Nationally Recognized Testing Lab', i.e. NRTL listing rather than a city list. Also checked the A–Z forms index. Related but not the same question: the city publishes 'House Bill 2439 Guidance', the Texas statute restricting municipal regulation of building products approved by national model codes — I did not extract it.

https://www.fortworthtexas.gov/files/assets/public/v/3/development-services/documents/resources-applications-forms-videos/e/2023-nec-amendments.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, permitted. Technical conditions are the unamended 2021 IFC Chapter 12 (Energy Systems) — Fort Worth adopted no local amendment to it. The city does charge separately: a Fire construction permit fee 'Energy Systems (Installation)' at $150.00 per battery system installation, plus $110.00 per hour for any additional inspections after the first; and an IFC 105.5.14 'Energy Storage Systems' operational permit at $75.00.

Why the confidence is not higher75. The fee lines are verbatim from the fire code ordinance's fee tables and the ESS operational permit is a real IFC 105.5.14 line the city retained (contrast the solar PV construction permit at 105.6.20, which the city deleted). Deducted because: the ordinance is Ord. 25388-03-2022 and fire fees may have been superseded by the later 2024 city fee ordinance, which I did not cross-check for ESS; and IFC operational permits often carry occupancy or size thresholds that may not catch a single residential battery.

fire code adopting ordinance, Table H104.2 and construction permit fee table (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/2021-construction-fire-codes-ordinance-no-25388-03-2022.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Yes — a Fire construction permit priced at $150.00 per battery system installation, with $110.00 per hour for any additional inspections after one inspection; and a separate IFC 105.5.14 Energy Storage Systems operational permit at $75.00. Note the contrast: the city DELETED IFC 105.6.20, so there is no equivalent fire permit for solar PV alone.

Why the confidence is not higher75 for the same reasons as q45 — the fee lines are verbatim, but they sit in a March 2022 ordinance that a later fee ordinance may have superseded, and I found no Development Services page describing an ESS permit process. The PV/ESS asymmetry (PV permit deleted, ESS permit retained and priced) is the practically important finding here and rests on two verbatim passages in the same document.

fire code adopting ordinance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/building-code-local-amendments/2021-approved-local-amendments/2021-construction-fire-codes-ordinance-no-25388-03-2022.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes — as a residential accessory structure, and the constraints are severe. Zoning §§ 5.300–5.301 cap total non-habitable accessory building area by lot size (120 sq ft for lots under 5,000 sq ft; 200 sq ft for 5,000–9,999; 400 sq ft for 10,000–43,559; 2% of lot area for 1 acre and above), limit height to 10 ft (12 ft with an extra 2 ft of setback per extra foot of height), and require the structure to sit behind the rear wall of the house furthest from the street, or at least 75 ft back from the front property line, whichever is less restrictive. Accessory structures are prohibited in front, established front and projected front yards.

Why the confidence is not higher55 — this is inference and should be verified with the Zoning counter before anyone relies on it. The zoning ordinance does NOT name solar: I read the full Chapter 5 table of contents (current code 2026 S-20) and the complete text of §§ 5.300 and 5.301, and there is no solar entry. The chain is: the city's Nuts & Bolts brochure lists 'solar panels' among accessory structures requiring a building permit and points at Article 5.301; § 5.300(a) closes its list with 'or similar uses'. If that chain holds, a 400 sq ft cap is roughly a 6 kW ground array on a typical lot, which would matter a great deal commercially. Against it: the city's SolSmart release says solar is 'allowed by right', and the brochure is stale.

zoning ordinance, Appendix A Ch. 5 Art. 3 (American Legal, code version 2026 S-20) checked 2026-08-28 https://codelibrary.amlegal.com/codes/ftworth/latest/ftworth_tx/0-0-0-37799

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

A Visible Lockable Labeled AC Disconnect (VLLD) must be located between the Oncor meter and ALL sources of distributed generation, on an ACCESSIBLE EXTERIOR wall WITHIN 10 FEET of the Oncor meter, accessible at all times. It must have an external handle and be lockable; molded-case breakers are NOT acceptable as a VLLD. Mounting height per ESG Figure 1 is 4 ft minimum, 6 ft maximum. Non-utility meter collars or other devices may not be installed between the utility meter and meter socket or inside the meter socket — that space is reserved for utility use only, and the meter socket must not be used as a raceway. If the VLLD is farther than 10 ft from the meter, Class 2 or Class 3 placarding is required.

Why the confidence is not higher95 — verbatim from Oncor ESG Sec. 700.03 (February 2025), corroborated word for word by the May 2025 residential requirements pack. The 4 ft / 6 ft dimensions come from the annotated Figure 1, which pdftotext rendered as text, so those two numbers are slightly less certain than the prose. The meter-collar prohibition is worth flagging separately: it rules out a whole class of retrofit hardware.

utility DG manual, ESG Sec. 700.03, Feb 2025 checked 2026-08-28 https://www.oncor.com/content/dam/oncorwww/documents/new-construction/construction-guidelines/Electric%20Service%20Guidelines%20Book.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (Accela ACA) or Phone (IVR line 817-392-6370) 95% · department page (Stay informed – FAQS accordion)
    • How much notice is required? None — 0 business days. Inspections received before 6:30 a.m. are scheduled for that same day; requests received at or after 6:30 a.m. are scheduled for the next business day. An inspection may be scheduled the same day the permit is obtained. 95% · department page (Stay informed – FAQS accordion)
    • Are same-day or AM/PM windows offered? Same-day is offered (request before 6:30 a.m.). No AM/PM window is published; instead the city requires an 'inspection contact' to be filled in on the online ACA profile, and warns that without it 'the inspector will not have the correct contact to notify on the day of the inspection'. 85% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes by default, but genuinely optional. City inspectors perform the inspections; a third party may perform field inspections instead, at the applicant's election, with the permit fee reduced 35% (third-party review and inspection), 55% (city review, third-party inspection) or 70% (third-party review, city inspection). Separately, under TX Local Government Code Sec. 247.0025 (SB 1202, 89R, effective 1 Sep 2025), for a home backup power installation a licensed master electrician or a state electrical inspector may conduct the inspection without requesting it from the city at all, and the city may not charge a fee for it. 85% · fee ordinance Ord. No. 27191-09-2024, footnotes to Tables 1-A / 1A-1, plus TX SB 1202 (89R)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Trade inspections are scheduled individually but made together on the same day. For electrical: 205 Electrical Underground / 240 Electrical slab (below-grade only) → 210 Electrical Rough (before concealment) → 200/285 Electrical Final (inspection of all components installed after approval of the electrical rough, for permanent power). Building Final (100) comes last and requires that all related permits are approved and final and that Mechanical, Electric and Plumbing are final. Temporary electrical release is 250/285. 70% · department inspection guidance (extracted with pdftotext -layout)
    • Is a rough-in or mid-roof inspection required? Yes, where work will be concealed — Electrical Rough (210). The governing rule is general: 'work must remain accessible and exposed for inspection purposes until approved ... an inspection is probably required for any construction that will be covered or concealed when construction is complete.' No roof-mount or mid-roof inspection is published. 70% · department inspection guidance (extracted with pdftotext -layout)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes — the city publishes an inspection guidance set: 'What Inspections are Required' (general narrative by stage), a Residential typical permits-and-inspections chart, a Commercial general inspections list, and individual per-inspection PDFs (100 Building Final, 105 Stakeout, 108 Wall Sheathing, 110 Framing, 300 Mechanical Final, 305 Mechanical Rough, and others). 90% · department page (Guidance Documents section)
    • What must be on site at inspection? 'All permit documents including the permit card, inspection card, approved plans and other information related to the issuance of the permit must be available for review on site at the time of an inspection.' The owner/contractor is responsible for requesting inspections and keeping the work accessible and exposed until approved. 95% · department inspection guidance (extracted with pdftotext -layout)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final — Electrical Final (200/285) for permanent power, and Building Final (100). A Certificate of Occupancy is not part of this path for a rooftop retrofit; the CO/LCO route in the guidance is for occupancy of a building. 70% · department inspection guidance (extracted with pdftotext -layout)
    • Who notifies the utility for PTO? Installer. The installer registers and submits the project through Oncor's eTRACK / DERTRACK web portal (https://oncor.anbetrack.com/dgportal), sends the customer a tariff application for signature, and uploads a minimum of five inspection photos at the 'Agreement Available' step. Oncor reviews, performs a study, prepares the Interconnection Agreement, and once it is signed by all parties issues the Permission To Operate (PTO) letter to BOTH the customer and the installer, then has the meter reprogrammed. Surplus generation reaches the customer's REP within 30–60 days of PTO. 90% · utility DG process page plus ESG Sec. 700.02 and the May 2025 residential requirements pack
    • Is there a re-inspection fee? $63.00 90% · fee ordinance Ord. No. 27191-09-2024 (extracted with pdftotext -layout)
    • How are corrections issued and cleared? Plan-review corrections: revisions cannot be submitted until all departments have finished reviewing; the portal then emails the plans-exam contact and moves the permit to 'Awaiting Client Reply' status, at which point revisions may be uploaded via the Resubmit link in the Attachments section. All drawings must be combined into one PDF under the 'plans' category; they may NOT be emailed to the plans examiner. Field corrections: the city's guidance does not describe a field-correction clearance process. 75% · submittal guide PDF (extracted with pdftotext -layout)

14 questions answered against City of Fort Worth’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (Accela ACA) or Phone (IVR line 817-392-6370)

Why the confidence is not higher95 because the Inspections FAQ states it directly: 'You can schedule it online or through the IVR system with a phone call. (IVR line at 817-392-6370)'. Not 100 because the FAQ page is undated. The permit must be in 'issued' status to schedule.

department page (Stay informed – FAQS accordion) checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/inspections

Q50 How much notice is required? Core Booking & scheduling

None — 0 business days. Inspections received before 6:30 a.m. are scheduled for that same day; requests received at or after 6:30 a.m. are scheduled for the next business day. An inspection may be scheduled the same day the permit is obtained.

Why the confidence is not higher95 — verbatim from the Inspections FAQ, which is unusually specific ('Inspections received before 6:30 a.m. each day will be scheduled for inspection on that day. Requests received at or after 6:30 a.m. will be scheduled for the next business day.'). Deducted only because the page carries no date.

department page (Stay informed – FAQS accordion) checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/inspections

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Same-day is offered (request before 6:30 a.m.). No AM/PM window is published; instead the city requires an 'inspection contact' to be filled in on the online ACA profile, and warns that without it 'the inspector will not have the correct contact to notify on the day of the inspection'.

Why the confidence is not higher85. The same-day half is verbatim and solid. The 'no AM/PM window' half is a proved absence — I read the Inspections page and its FAQ accordion in full and there is no time-window offer; the notify-the-contact mechanism appears to be what stands in for one. Deducted because absence of a published window does not prove no window is given at the counter or by the inspector.

department page checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/inspections

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes by default, but genuinely optional. City inspectors perform the inspections; a third party may perform field inspections instead, at the applicant's election, with the permit fee reduced 35% (third-party review and inspection), 55% (city review, third-party inspection) or 70% (third-party review, city inspection). Separately, under TX Local Government Code Sec. 247.0025 (SB 1202, 89R, effective 1 Sep 2025), for a home backup power installation a licensed master electrician or a state electrical inspector may conduct the inspection without requesting it from the city at all, and the city may not charge a fee for it.

Why the confidence is not higher85. The three-way fee-reduction structure is verbatim from the city's own current fee ordinance, which is strong evidence that third-party inspection is an established, priced route here rather than a theoretical one. The statutory overlay is verbatim from the enrolled bill. Deducted for the same definitional doubt recorded in jurisdiction.why: whether grid-tied rooftop PV counts as a 'home backup power installation'.

fee ordinance Ord. No. 27191-09-2024, footnotes to Tables 1-A / 1A-1, plus TX SB 1202 (89R) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/9/development-services/documents/resources-applications-forms-videos/f/development-fees-schedule.pdf

Q53 If delegated, to whom? Core Who inspects

Nothing published by this authority.

Where we lookedNot applicable as a fixed delegation — the city does not delegate to a named body. Third-party review/inspection is at the applicant's election, and SB 1202 (89R) names the eligible persons generically (a person authorised under Local Government Code Sec. 247.002, an electrical inspector as defined in Occupations Code Sec. 1305.002, or a master electrician licensed under Occupations Code Ch. 1305 Subch. D). Looked in the fee ordinance footnotes and the Inspections page for a named third-party provider list; none is published.

https://capitol.texas.gov/tlodocs/89R/billtext/html/SB01202F.htm

Q54 Which inspections are required, and in what order? Core Stages & sequence

Trade inspections are scheduled individually but made together on the same day. For electrical: 205 Electrical Underground / 240 Electrical slab (below-grade only) → 210 Electrical Rough (before concealment) → 200/285 Electrical Final (inspection of all components installed after approval of the electrical rough, for permanent power). Building Final (100) comes last and requires that all related permits are approved and final and that Mechanical, Electric and Plumbing are final. Temporary electrical release is 250/285.

Why the confidence is not higher70. The stage codes and sequence are verbatim from the city's 'What Inspections are Required' guidance PDF, extracted with pdftotext -layout. Deducted for two things. First, there is no solar-specific sequence published, so which of these apply to a rooftop retrofit is my mapping. Second, the city's two documents disagree: the residential permits/inspections spreadsheet renders 'Final (200) + Electric Final (400)', while the prose guidance gives 200/285 for Electrical Final and 400 for Plumbing Final. I have followed the prose guidance, since the spreadsheet's columns are visibly mis-aligned in extraction.

department inspection guidance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/resources-applications-forms-videos/i/inspections/what-inspections-are-required.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Yes, where work will be concealed — Electrical Rough (210). The governing rule is general: 'work must remain accessible and exposed for inspection purposes until approved ... an inspection is probably required for any construction that will be covered or concealed when construction is complete.' No roof-mount or mid-roof inspection is published.

Why the confidence is not higher70. The concealment rule and the 210 stage code are verbatim. Deducted because a typical rooftop PV retrofit conceals little, so whether a 210 is actually called for solar is a practice question the published documents do not answer; and I proved the absence of a mid-roof inspection by grep rather than finding a statement that none is required.

department inspection guidance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/resources-applications-forms-videos/i/inspections/what-inspections-are-required.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNo city document says the inspector verifies labels or equipment listings. Looked in the full text of 'What Inspections are Required' (extracted with pdftotext -layout; positive control 'electrical' 18 hits, fabricated control 'zzqqx' 0 hits) — greps for placard, label, listed and marking returned nothing relevant; the Electrical Final section describes only 'inspection of all components of the electrical system installed after approval of the electrical rough'. Also checked the Inspections page and its FAQ accordion. NOTE the contrast: Oncor DOES require photographic evidence of placarding, uploaded to eTRACK, so labels are verified — by the utility, not the city.

https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/resources-applications-forms-videos/i/inspections/what-inspections-are-required.pdf

Q57 Is there a published inspection checklist? Core What is checked

Yes — the city publishes an inspection guidance set: 'What Inspections are Required' (general narrative by stage), a Residential typical permits-and-inspections chart, a Commercial general inspections list, and individual per-inspection PDFs (100 Building Final, 105 Stakeout, 108 Wall Sheathing, 110 Framing, 300 Mechanical Final, 305 Mechanical Rough, and others).

Why the confidence is not higher90 because I downloaded and text-extracted two of these and listed the rest from the Inspections page's Guidance Documents section with their live hrefs. Deducted because none of them is solar-specific and I did not find an electrical-specific per-inspection PDF in the visible list, so the set may be incomplete for this trade.

department page (Guidance Documents section) checked 2026-08-28 https://www.fortworthtexas.gov/departments/development-services/inspections

Q58 What must be on site at inspection? Core Documents on site

'All permit documents including the permit card, inspection card, approved plans and other information related to the issuance of the permit must be available for review on site at the time of an inspection.' The owner/contractor is responsible for requesting inspections and keeping the work accessible and exposed until approved.

Why the confidence is not higher95 — verbatim from the city's own inspection guidance PDF under the heading 'What do I need to have on-site for the inspector?', extracted with pdftotext -layout (controls on this file passed: positive 'electrical' 18 hits, fabricated 'zzqqx' 0). Not 100 because the PDF is undated.

department inspection guidance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/resources-applications-forms-videos/i/inspections/what-inspections-are-required.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

$63.00

Why the confidence is not higher90 because it is a verbatim line item — 'Reinspection fee: 63.00' — in the block headed 'Inspection and Plan Review Fees Applicable to All Permit Types' in the current fee ordinance (Ord. 27191-09-2024). Deducted because the ordinance also carries $28.12 reinspection fees for Parkway and Street Use permits, so the $63.00 figure must be read as the building/trade one, and because inspections outside normal business hours are $112.50 (minimum hours) and outside city limits $94.50/hr, 4 hr minimum.

fee ordinance Ord. No. 27191-09-2024 (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/9/development-services/documents/resources-applications-forms-videos/f/development-fees-schedule.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Plan-review corrections: revisions cannot be submitted until all departments have finished reviewing; the portal then emails the plans-exam contact and moves the permit to 'Awaiting Client Reply' status, at which point revisions may be uploaded via the Resubmit link in the Attachments section. All drawings must be combined into one PDF under the 'plans' category; they may NOT be emailed to the plans examiner. Field corrections: the city's guidance does not describe a field-correction clearance process.

Why the confidence is not higher75. The plan-correction workflow is verbatim from the Online Submittal Guide (cover version 1.4, 8/9/2024). Deducted because (a) the internal page footers of that section still read 'Version 1.1 4/15/2015', so the workflow text may predate the current portal, and (b) the question also asks about field corrections at inspection, which no city document I found addresses — that half is a documented absence, not an answer.

submittal guide PDF (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/edr-submittal-guide.pdf

Q61 What is issued on pass? Core Final sign-off & PTO

Final — Electrical Final (200/285) for permanent power, and Building Final (100). A Certificate of Occupancy is not part of this path for a rooftop retrofit; the CO/LCO route in the guidance is for occupancy of a building.

Why the confidence is not higher70 because the guidance names the stages and describes Electrical Final as the 'inspection of electrical system for purposes of providing permanent power to the building', which is the operative approval for a PV retrofit. Deducted because no city document says what artefact is issued on pass (no mention of a green tag, letter or certificate for a solar job), so 'Final' is my mapping of the stage name onto the survey's option list rather than a stated output.

department inspection guidance (extracted with pdftotext -layout) checked 2026-08-28 https://www.fortworthtexas.gov/files/assets/public/v/1/development-services/documents/resources-applications-forms-videos/i/inspections/what-inspections-are-required.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer. The installer registers and submits the project through Oncor's eTRACK / DERTRACK web portal (https://oncor.anbetrack.com/dgportal), sends the customer a tariff application for signature, and uploads a minimum of five inspection photos at the 'Agreement Available' step. Oncor reviews, performs a study, prepares the Interconnection Agreement, and once it is signed by all parties issues the Permission To Operate (PTO) letter to BOTH the customer and the installer, then has the meter reprogrammed. Surplus generation reaches the customer's REP within 30–60 days of PTO.

Why the confidence is not higher90 because the seven-step interconnection process is published on Oncor's own residential solar page and the portal URL and photo requirements are in the Feb 2025 ESG and the May 2025 residential requirements pack. Deducted because none of these documents says whether or how a city final inspection is reported to Oncor — the AHJ appears nowhere in Oncor's published PTO chain, which is a notable gap rather than a confirmed 'no dependency'. The five required photos are: street view showing the house number (no licence plates visible), equipment nameplates showing model numbers (site-specific, no stock photos), the installed system and exterior wall showing connection to meter and main panel, and all VLLDs with their placarding.

utility DG process page plus ESG Sec. 700.02 and the May 2025 residential requirements pack checked 2026-08-28 https://www.oncor.com/content/oncorwww/us/en/home/smart-energy/renewables-solar-and-more/residential-small-commercial-thinking-about-solar.html

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Jurisdiction & key facts

The standing 62-question set, answered for City of Fort Worth against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Fort Worth is the authority having jurisdiction 85% confidence
Holds
building, electrical, mechanical and plumbing permitting and inspection, plus fire code; all in the Development Services Department (Building Official: Evan Roberts, 817-392-7843)
Delegated to
Optional third-party plan review and/or field inspection, at the applicant's election, under the city's own fee ordinance (Tables 1-A / 1A-1 reduce the permit fee by 35%/55%/70% depending on which parts a third party performs)
Overridden by
Texas SB 1202, 89th Leg. R.S. (2025), effective 1 Sep 2025, adding Local Government Code Sec. 247.0025 — for a 'home backup power installation' (an electric generating facility, energy storage facility or standby system serving a one- or two-family dwelling at 600V or less) a licensed master electrician or a state electrical inspector may do the plan review AND the inspection without submitting to the city; the city must issue the approval/permit within 3 business days of the notice, construction may begin on submission of that notice, and Sec. 247.003 forbids the city charging a fee for that review or inspection. Chapter 247 itself came from HB 14 (88R, 2023).
Why not higher
85 not higher for two reasons. (1) CORRECTION TO THE BRIEF: the brief cites 'TX SB 1202' as limiting municipal inspection of listed equipment. 87(R) SB 1202 — the bill most searches return — is about EV charging service and utility definitions and has nothing to do with inspections; I read the enrolled text. The provision that actually matters is 89(R) SB 1202 (2025), and it is a third-party-review pre-emption, not a listed-equipment inspection ban. Anyone relying on the 87R citation is relying on the wrong bill. (2) Whether a grid-tied rooftop PV array is a 'home backup power installation' is arguable: the statutory definition ('an electric generating facility ... intended to provide electrical power to a one- or two-family dwelling ... connected at 600 volts or less') plainly covers it, but the section heading says 'backup power'. I have not found a Fort Worth document stating how the city applies it. Fort Worth is a home-rule city; Tarrant County does not permit or inspect inside city limits.

https://capitol.texas.gov/tlodocs/89R/billtext/html/SB01202F.htm

Permit required
Yes — a building permit and a separate electrical permit80%
Permit cost
$225.00 minimum permit fee (2 trades: building + electrical) plus a $16.87 Technology Fee. $112.50 if only one trade permit is pulled.60%
Plan review
7 business days (residential building permits) to first review comments90%
Portal
Accela Citizen Access — https://aca-prod.accela.com/CFW/Default.aspx (city calls it 'Online Permitting' / 'ACA')95%
Electrical code
2023 NEC, adopted as the Fort Worth Electrical Code by Ordinance No. 26721-02-2024 (adopted 13 Feb 2024, effective 1 March 2024), with local amendments95%
Own placard wording
No — the city specifies no placard wording of its own. Oncor supplies sample (not mandatory) wording, e.g.85%
Booking an inspection
Portal (Accela ACA) or Phone (IVR line 817-392-6370)95%
Labels & placards for this authority

Wording 85%

No — the city specifies no placard wording of its own. Oncor supplies sample (not mandatory) wording, e.g. 'CAUTION / POWER TO THIS SERVICE IS ALSO SUPPLIED FROM ON-SITE SOLAR/WIND GENERATION / AC SYSTEM DISCONNECT' and 'CAUTION / Solar Generation Utility AC Disconnect'.

Size, colour & material 85%

No letter height and no colour specified by anyone. Material IS specified, by Oncor: colour-cast acrylic placards, or sticker-type material only if outdoor-rated and of similar specification to NEC requirements; both must carry a UV inhibitor rated for exterior use. If colour-cast acrylic is used the customer must also supply adhesive tape — Oncor's preferred brand is 3M Scotch VHB (4956, 4941, 4936 or 4926), minimum 1 inch wide, double-sided, exterior grade.

Where they go 95%

On the Visible Lockable Labeled AC Disconnect — explicitly NOT on the Oncor meter. Oncor: 'Placards are required to be located on the visible AC disconnect and not on the Company Meter.' For Class 2, an additional directory placard goes within line of sight and viewable distance of the Oncor meter. For Class 3, identical placards go on both the Oncor equipment and the customer's main equipment.

What the utility wants on top 95%

Yes, substantially. Oncor requires placards on ALL distributed generation projects, in three classes by VLLD-to-meter distance. Class 1 (VLLD within 10 ft of the meter): caution placard on the VLLD. Class 2 (VLLD more than 10 ft from the meter): additionally a directory placard posted within line of sight and viewable distance of the Oncor meter, stating where the disconnect is (e.g. 'AC DISCONNECT IS LOCATED ON WEST WALL OF THIS STRUCTURE'). Class 3 (pad-mount transformer feed or remote VLLD): caution placard plus a site map; three sets are requested — one for existing Oncor equipment, one held for future replacement of that equipment, one for the customer's main equipment; the contractor furnishes the placards and adhesive tape, and Oncor's own operations group mounts those on Oncor equipment after a site visit. For pad-mounted transformers, an additional caution placard with two pre-drilled holes is attached to the secondary cables inside the transformer. Placard proofs must be submitted for review, uploaded to the Placards section of the eTRACK Installer Portal.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.