City of Boca Raton
City of Boca Raton
Palm Beach County
City of Boca Raton is a city authority in the State of Florida, serving 97,422 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for City of Boca Raton against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Boca Raton is the authority having jurisdiction 85% confidence
- Holds
- Building and electrical. The City of Boca Raton's own Development Services Building Division issues the permit that covers residential PV (an Electrical permit under Ch. 19, Code of Ordinances) and performs its own inspections (STS/ELE sequence) with no delegation to Palm Beach County found on any City document reviewed. Zoning treats solar PV as mechanical equipment allowed by right in all zoning districts (no rezoning/SUP), though Historic Preservation Board and/or Community Appearance Board design review can apply depending on location.
- Overridden by
- Florida F.S. 163.04 bars HOAs/deed restrictions from prohibiting solar (HOA may only steer roof orientation). CS/CS/HB 803 (2026, enrolled, eff. 1 Jul 2026) sets a statutory floor of 1-year permit validity (amending F.S. 553.79(1)(c) for local-government-issued single-family permits) and mandatory review timeframes (F.S. 553.792: 5 business days for an existing single-family electrical permit under $15,000, 30 business days for a new single-family dwelling under 7,500 sq ft) that bind the City regardless of its own stated 'three days or less' solar turnaround. FPL, under Florida PSC Rule 25-6.065 and its own PSC-filed tariff, independently controls interconnection/PTO and requires its own disconnect-switch and placard rules on top of the City's permit. Boca Raton has NOT adopted SolarAPP+ (confirmed via the City's own site search: 'solar' = 69 hits, 'zzqqx' = 0 hits, 'SolarAPP' = 0 hits) even though Palm Beach County adopted it for the unincorporated county in May 2025 — that county-level automated-permitting route does not apply inside Boca Raton's city limits.
- Why not higher
- Building Permits and Inspections page + Code in Effect page show the City running its own Building Division and enforcing FBC 8th Ed. (2023) itself; the City's own SolSmart Advisory Determination of Use (26 Feb 2021) states solar PV permits are issued 'pursuant to Chapter 19, Code of Ordinances' by the City; the City's own Solar Laws page quotes F.S. 163.04 on HOA limits; CS/CS/HB 803 enrolled text verified directly at flsenate.gov rather than taken from a summary; FPL's role verified from its own PSC-filed tariff and live guidelines page. Deduction from 95: I could not reach a Palm Beach County document naming which municipalities it serves under contract (to rule out any residual County role), and Municode's robots.txt blocks confirmation of Boca Raton's own adopting-ordinance number for its FBC/NEC amendments.
- Permit required
- Yes — a permit is required88%
- Permit cost
- Valuation-based: 1.60% of total contract value (after the first $500, which is a $100 minimum), with a 1% (min $100) deposit due at application and the balance due at permit issuance.82%
- Plan review
- The City states on its own dedicated solar page: 'The turnaround time for solar permit approval is three days or less!' The general (non-solar) Plan Review FAQ separately states the City…78%
- Portal
- Two-part system: Boca eHub (Tyler Technologies EnerGov Self-Service, at bocaratonfl-energovpub.tylerhost.net) for permit applications, fee payment, permit status and inspection scheduling;85%
- Electrical code
- Other — most likely the 2020 NEC (NFPA 70), incorporated via Florida Building Code, 8th Edition (2023) Ch.45%
- Own placard wording
- No — the City specifies no placard wording of its own; its only signage-related text is the generic 'required sign[age]' reference in the PV electrical-diagram checklist item,65%
- Booking an inspection
- Portal (Boca eHub) or Phone (561-393-7914, IVR: press 1 to schedule) or Text ('Schedule' to 833-821-0601)88%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes — a permit is required Q3 Electrical and building permits — Separate — PV is permitted as a standalone Electrical permit, not folded into a general building permit, Q4 Plan review — The City states on its own dedicated solar page: 'The turnaround time for solar permit approval is three days or less!' The general (non-solar) Plan Review FAQ… Q18 Where you file — Two-part system: Boca eHub (Tyler Technologies EnerGov Self-Service, at bocaratonfl-energovpub.tylerhost.net) for permit applications, fee payment, Q20
- Permit required
- Yes — a permit is required88% source
- What it costs
- Valuation-based: 1.60% of total contract value (after the first $500, which is a $100 minimum), with a 1% (min $100) deposit due at application and the balance due at permit issuance.82% source
- Plan review turnaround
- The City states on its own dedicated solar page: 'The turnaround time for solar permit approval is three days or less!' The general (non-solar) Plan Review FAQ separately states the City 'does not…78% source
- Key document
- department checklist (signed 13 Apr 2022) cited by 9 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes — City of Boca Raton Development Services Building Division is the AHJ for residential solar 92% · department page
- What does this authority permit itself, and what does it delegate? Both — the City's Building Division issues and inspects both the electrical permit that covers PV and (where triggered) the building permit for structural work; zoning treats solar PV as mechanical equipment allowed in all zoning districts, not requiring a separate zoning approval 88% · City advisory determination of use (26 Feb 2021)
- Is a permit required for a residential rooftop PV system? Yes — a permit is required 88% · City advisory determination of use + department checklist
- Is there a separate electrical permit, or is it combined? Separate — PV is permitted as a standalone Electrical permit, not folded into a general building permit, unless roof/structural work independently triggers a building permit 75% · department checklist (signed 13 Apr 2022)
- Is a HOA or architectural approval required first? No mandatory HOA/architectural pre-approval — Florida law bars an HOA from prohibiting solar outright. The City's own Solar Laws page quotes F.S. 163.04: an HOA 'may not prohibit or have the effect of prohibiting solar collectors,' and 'a property owner may not be denied permission to install solar collectors' by any deed-restriction-empowered entity, though that entity may dictate roof orientation (south, or within 45° east/west of south) if doing so doesn't impair performance. Separately, F.S. 720.3035(1)(c) (added by HB 803, eff. 1 Jul 2026) bars an association from requiring a City permit to already be issued as a precondition of its own review 85% · City page quoting Florida Statutes + enacted bill text
- Is there a historic-district review? Conditionally yes — Historic Preservation Board (and/or Community Appearance Board) design review MAY apply, 'depending upon location, zoning district and other factors,' though PV itself is allowed by right in every zoning district as mechanical equipment 80% · City advisory determination of use (26 Feb 2021)
- Is a wind or windstorm certification required? No dedicated wind/windstorm certification instrument — wind loading is folded into the required sealed structural attachment/frame details rather than being a separate certificate 60% · department checklist (absence)
- Is a Specific Use Permit or Council approval ever required? No — no Specific Use Permit or City Council approval is ever required for residential rooftop/ground PV; it is allowed by right in all zoning districts as mechanical equipment, subject only to the Ch. 19 building/electrical permit (and, where triggered, Historic Preservation/CAB design review) 80% · City advisory determination of use (26 Feb 2021)
- Is there a system-size cap on residential generation? No published cap on residential PV system size — PV is classified with unrestricted-size mechanical equipment like A/C units and generators, and none of the City's checklists, fee schedule, or SolSmart determination states a kW/kVA ceiling 55% · City advisory determination + checklists + fee schedule (absence)
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? Licensed electrician (or a licensed 'Solar Contractor (PV)') may pull the electrical permit for a PV installation 85% · department checklist (signed 13 Apr 2022)
- Must the contractor be registered with this authority before applying? Yes — all contractors must be registered with the City (via the Business Tax/Contractor Registration section) and current on license/insurance before a permit can be pulled 90% · department checklist
- Is a homeowner permitted to self-install and self-permit? Yes — an owner-builder route exists (Owner Builder Affidavit + Estimate of Costs), as an alternative to using a registered contractor 70% · department checklist
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Full PV submittal: Palm Beach County Universal Permit Application (Electrical box checked) + Roof Warranty Notice; construction documents = Roof Plan (scaled, showing panel locations), electrical one-line diagram (array config, wiring, OCPD, inverter disconnect, grounding, AC connection), spec/installation sheets for all components (modules, inverter(s), combiner box, disconnect, mounting), sealed attachment/flashing/frame details for wind zone and loading, electrical (ampacity/conduit-fill/derating) calculations, and — for any battery backup — a standby-load summary. Then EITHER a Florida Solar Energy Center (FSEC) System Approval Report OR signed-and-sealed engineered drawings. Separately required: Submittal Form, Electrical Application, Authorized Agent Form, Contract, Product Approvals and/or NOAs, and a Notice of Commencement if contract value exceeds $5,000 90% · department checklists
- How many copies, and in what format? Electronic only, through Boca ePlans (ProjectDox): PDF files only, and 'Each plan sheet needs to be its own separate file' rather than one combined multi-page PDF. For post-issuance revisions, submit only 1 copy of the revised sheet(s) plus a Revision Contract Cost Statement, with revisions clouded 85% · department FAQ + checklist
- Is a site plan required, and what must it show? Yes — a Roof Plan is required: a 'scale drawing indicating the location of the solar panel's being installed on the roof' 85% · department checklist
- Is a one-line / three-line diagram required? Yes — an electrical diagram is required showing 'PV array configuration, wiring system, overcurrent protection, inverter disconnect, grounding, required sign[age] and AC connection to building' 88% · department checklist
- Are string and conductor calculations required? Yes — 'Electrical calculations showing that all wire sizing has been determined with proper ampacity, conduit fill and ambient derating factors' are required 88% · department checklist
- Is a structural PE stamp required, and at what threshold? A structural seal is effectively always required for the roof attachment: the checklist requires attachment/flashing/frame construction details 'sealed by the appropriate design professional' for wind zone, loading and site conditions, and separately requires the applicant to choose EITHER a Florida Solar Energy Center (FSEC) System Approval Report OR signed-and-sealed engineered drawings for the whole system. No dollar or weight threshold below which the seal is waived is published 80% · department checklist
- Is an electrical PE stamp required, and at what threshold? Not stated as required for a standard residential installation — the checklist requires an electrical one-line diagram and load calculations but does not call for an engineer's seal on the electrical design (only the structural attachment details must be sealed) 55% · department checklist (absence)
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Two-part system: Boca eHub (Tyler Technologies EnerGov Self-Service, at bocaratonfl-energovpub.tylerhost.net) for permit applications, fee payment, permit status and inspection scheduling; Boca ePlans (ProjectDox/Avolve, at bocaraton-fl-us.avolvecloud.com) for uploading and reviewing plan documents. Boca Raton has NOT adopted SolarAPP+ — see confidence note 85% · department page + City site-search controls
- Can the whole application be completed online? Largely yes — application, initial-deposit payment, plan upload (Boca ePlans), correction responses, fee payment and inspection scheduling are all done online through Boca eHub/ePlans. The only in-person step is optional (picking up a USB of files, or applying in person at the counter) 82% · department FAQ
- What does a residential solar permit cost? Valuation-based: 1.60% of total contract value (after the first $500, which is a $100 minimum), with a 1% (min $100) deposit due at application and the balance due at permit issuance. A $2,500-mm Notice of Commencement threshold and $5,000/$15,000 NOC thresholds appear on the checklists (city fee schedule uses $5,000 NOC threshold; solar checklist references FS 713.13's own $2,500 general NOC threshold) 82% · published fee schedule (eff. 1 Oct 2025)
- How is the fee calculated? Valuation — percentage of total contract/construction cost (1.60% over the first $500, $100 minimum), not a flat, per-kW or per-panel rate 85% · published fee schedule (eff. 1 Oct 2025)
- Is there a separate plan-check fee? No separate plan-check fee — the 1.60% permit fee expressly 'includes all plan check fees and sub permit fees, except fire' 82% · published fee schedule (eff. 1 Oct 2025)
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? The City states on its own dedicated solar page: 'The turnaround time for solar permit approval is three days or less!' The general (non-solar) Plan Review FAQ separately states the City 'does not offer expedited plan review service' and gives no numeric turnaround for ordinary multi-department review 78% · department page (dedicated solar page)
- How long is an issued permit valid before it expires? One year from issuance (statewide floor), renewable once. City fee schedule: 'Renewal (one time only by Building Official) equal to the original permit fee or a maximum of $182.00'; 'Reapplication - equal to the original permit fee or a maximum of $182.00' 78% · enacted statute (CS/CS/HB 803, enrolled, 2026) + City fee schedule
- Which utility handles interconnection here? Florida Power & Light Company (FPL) 78% · PSC-filed tariff (Sheet No. 9.050) + City fee schedule (by omission)
- Where does the utility sit in the sequence? After permit / effectively parallel-then-after: FPL requires the customer to apply for interconnection separately from the City permit, but before FPL will allow the system to begin parallel operation the customer must certify that 'the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications' — i.e., FPL's approval-to-operate follows the City's permit closeout 80% · PSC-filed tariff sheet 9.050 + FPL Net Metering Guidelines (live page)
28 questions answered against City of Boca Raton’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes — City of Boca Raton Development Services Building Division is the AHJ for residential solar
Why the confidence is not higherThe City's own Building Permits and Inspections page and Code in Effect page show the City issuing and enforcing the Florida Building Code, 8th Ed. (2023) itself, with its own inspectors (Building Inspector Contact Information directory); the City's SolSmart zoning determination confirms solar PV permits are issued 'pursuant to Chapter 19, Code of Ordinances' by the City
department page checked 2026-09-12 https://www.myboca.us/157/Building-Permits-and-Inspections
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both — the City's Building Division issues and inspects both the electrical permit that covers PV and (where triggered) the building permit for structural work; zoning treats solar PV as mechanical equipment allowed in all zoning districts, not requiring a separate zoning approval
Why the confidence is not higherCity of Boca Raton SolSmart Advisory Determination of Use (26 Feb 2021, signed by the Development Services Director): 'solar PV systems are considered mechanical equipment...allowable subject to the same requirements as other mechanical equipment...Solar PV systems are allowed in all zoning districts'; the Solar (Thermal/Photovoltaic) Checklist shows PV is permitted as an Electrical permit
City advisory determination of use (26 Feb 2021) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/26552
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes — a permit is required
Why the confidence is not higherSolSmart determination: PV is allowed 'contingent upon issuance of the proper permit pursuant to Chapter 19, Code of Ordinances'; the Solar (Thermal/Photovoltaic) Checklist requires a Palm Beach County Universal Permit Application (Electrical box checked) for every PV installation
City advisory determination of use + department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/26552
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Separate — PV is permitted as a standalone Electrical permit, not folded into a general building permit, unless roof/structural work independently triggers a building permit
Why the confidence is not higherSolar (Thermal/Photovoltaic) Checklist: 'Electrical Contractors may obtain the Electrical permit for the installation of the Photovoltaic system' and lists 'Photovoltaic — Electrical Permit Inspections' as its own inspection track; the Photovoltaic Permit Submittal Checklist likewise lists only an 'Electrical Application' as the required form
department checklist (signed 13 Apr 2022) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Licensed electrician (or a licensed 'Solar Contractor (PV)') may pull the electrical permit for a PV installation
Why the confidence is not higherVerbatim from the Solar (Thermal/Photovoltaic) Checklist: 'Solar Contractors (PV) may obtain the Plumbing or Electrical permit for the installation of either Solar Thermal or Photovoltaic systems...Electrical Contractors may obtain the Electrical permit for the installation of the Photovoltaic system'
department checklist (signed 13 Apr 2022) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes — all contractors must be registered with the City (via the Business Tax/Contractor Registration section) and current on license/insurance before a permit can be pulled
Why the confidence is not higherPhotovoltaic Permit Submittal Checklist, verbatim: 'All Contractors must be registered and up-to-date to pull permits'; the Solar Checklist adds that licenses/insurance are submitted to BusinessLicenses@MyBoca.us and 'must be current and up to date at time of permit issuance'
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/252/Photovoltaic-PDF-
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes — an owner-builder route exists (Owner Builder Affidavit + Estimate of Costs), as an alternative to using a registered contractor
Why the confidence is not higherThe Photovoltaic Permit Submittal Checklist lists 'OWNER BUILDER REQUIREMENTS: Owner Builder Affidavit, Estimate of Costs' as a track parallel to the Contractor Registration box. Deduction: this is the City's general permit-checklist template (same fields as electrical/other trades), not solar-specific wording, so it is not certain the City in practice allows an owner to self-install PV rather than merely self-apply for other trades' work on the home
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/252/Photovoltaic-PDF-
Q8 What documents make up a complete submittal? Core Submittal package
Full PV submittal: Palm Beach County Universal Permit Application (Electrical box checked) + Roof Warranty Notice; construction documents = Roof Plan (scaled, showing panel locations), electrical one-line diagram (array config, wiring, OCPD, inverter disconnect, grounding, AC connection), spec/installation sheets for all components (modules, inverter(s), combiner box, disconnect, mounting), sealed attachment/flashing/frame details for wind zone and loading, electrical (ampacity/conduit-fill/derating) calculations, and — for any battery backup — a standby-load summary. Then EITHER a Florida Solar Energy Center (FSEC) System Approval Report OR signed-and-sealed engineered drawings. Separately required: Submittal Form, Electrical Application, Authorized Agent Form, Contract, Product Approvals and/or NOAs, and a Notice of Commencement if contract value exceeds $5,000
Why the confidence is not higherCombines two current City documents: the Solar (Thermal/Photovoltaic) Checklist (digitally signed 13 Apr 2022) and the Photovoltaic Permit Submittal Checklist (undated companion form on the same One & Two Family checklist page)
department checklists checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q9 How many copies, and in what format? Submittal package
Electronic only, through Boca ePlans (ProjectDox): PDF files only, and 'Each plan sheet needs to be its own separate file' rather than one combined multi-page PDF. For post-issuance revisions, submit only 1 copy of the revised sheet(s) plus a Revision Contract Cost Statement, with revisions clouded
Why the confidence is not higherCity FAQ (Application Submittal/Prescreening, TID 15): 'We only accept PDF files' and 'Each plan sheet needs to be its own separate file'; Solar Checklist: 'Submit only 1 copy of the sheets being revised...Include a Revision Contract Cost Statement...All revisions shall be identified and clouded'
department FAQ + checklist checked 2026-09-12 https://www.myboca.us/FAQ.aspx?TID=15
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes — a Roof Plan is required: a 'scale drawing indicating the location of the solar panel's being installed on the roof'
Why the confidence is not higherVerbatim from the Solar (Thermal/Photovoltaic) Checklist, Construction Documents/Details section
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes — an electrical diagram is required showing 'PV array configuration, wiring system, overcurrent protection, inverter disconnect, grounding, required sign[age] and AC connection to building'
Why the confidence is not higherVerbatim from the Solar (Thermal/Photovoltaic) Checklist, 'For Photovoltaic Systems' sub-list
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q12 Are string and conductor calculations required? Drawings & calculations
Yes — 'Electrical calculations showing that all wire sizing has been determined with proper ampacity, conduit fill and ambient derating factors' are required
Why the confidence is not higherVerbatim from the Solar (Thermal/Photovoltaic) Checklist
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
A structural seal is effectively always required for the roof attachment: the checklist requires attachment/flashing/frame construction details 'sealed by the appropriate design professional' for wind zone, loading and site conditions, and separately requires the applicant to choose EITHER a Florida Solar Energy Center (FSEC) System Approval Report OR signed-and-sealed engineered drawings for the whole system. No dollar or weight threshold below which the seal is waived is published
Why the confidence is not higherBoth requirements verbatim from the City's Solar (Thermal/Photovoltaic) Checklist. Unlike some jurisdictions, Boca Raton publishes no small-system/lightweight exemption from the sealed-drawing requirement
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Not stated as required for a standard residential installation — the checklist requires an electrical one-line diagram and load calculations but does not call for an engineer's seal on the electrical design (only the structural attachment details must be sealed)
Why the confidence is not higherInference from absence: the Solar (Thermal/Photovoltaic) Checklist's electrical items (diagram, calculations) carry no 'sealed'/'stamped' language, unlike the structural items which explicitly do
department checklist (absence) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q15 What does a residential solar permit cost? Core Fees
Valuation-based: 1.60% of total contract value (after the first $500, which is a $100 minimum), with a 1% (min $100) deposit due at application and the balance due at permit issuance. A $2,500-mm Notice of Commencement threshold and $5,000/$15,000 NOC thresholds appear on the checklists (city fee schedule uses $5,000 NOC threshold; solar checklist references FS 713.13's own $2,500 general NOC threshold)
Why the confidence is not higherCity of Boca Raton Municipal Facilities and Services User Fee Schedule (effective 10/1/2025), Building Permits §C(4) 'Additions, alterations and repairs...electrical...' 1.60% valuation-based fee, corroborated by the Photovoltaic and Electrical Service Work checklists' 'Initial Deposit: 1% of the contract value...minimum of $100.00'. Deduction: the fee schedule does not carry a PV-specific line — it is read from the general electrical/alteration fee category, which the checklists confirm applies to PV
published fee schedule (eff. 1 Oct 2025) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/6645
Q16 How is the fee calculated? Core Fees
Valuation — percentage of total contract/construction cost (1.60% over the first $500, $100 minimum), not a flat, per-kW or per-panel rate
Why the confidence is not higherUser Fee Schedule §C(4), verbatim: 'First $500.00 valuation...MINIMUM FEE $100.00' then '$501.00 and up (1.60% of the remaining total estimated valuation of construction costs)'
published fee schedule (eff. 1 Oct 2025) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/6645
Q17 Is there a separate plan-check fee? Fees
No separate plan-check fee — the 1.60% permit fee expressly 'includes all plan check fees and sub permit fees, except fire'
Why the confidence is not higherVerbatim from User Fee Schedule §C(4)(b)
published fee schedule (eff. 1 Oct 2025) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/6645
Q18 What is the stated plan-review turnaround? Core Timeline & validity
The City states on its own dedicated solar page: 'The turnaround time for solar permit approval is three days or less!' The general (non-solar) Plan Review FAQ separately states the City 'does not offer expedited plan review service' and gives no numeric turnaround for ordinary multi-department review
Why the confidence is not higherQuote verbatim from 'How to Go Solar in Boca Raton'. Deduction: the page does not say whether the 3-day figure is business or calendar days, or whether it assumes a straightforward FSEC-approved system rather than one requiring full engineering review; the general Plan Review FAQ (a different page) describes a slower multi-department cycle for permits generally
department page (dedicated solar page) checked 2026-09-12 https://www.myboca.us/1998/How-to-Go-Solar-in-Boca-Raton
Q19 How long is an issued permit valid before it expires? Timeline & validity
One year from issuance (statewide floor), renewable once. City fee schedule: 'Renewal (one time only by Building Official) equal to the original permit fee or a maximum of $182.00'; 'Reapplication - equal to the original permit fee or a maximum of $182.00'
Why the confidence is not higherThe 1-year figure is the statutory floor under Florida CS/CS/HB 803 (2026), enrolled text amending F.S. 553.79(1)(c): 'A building permit issued by a local government for a single-family dwelling expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later' — effective 1 July 2026 (already in force). The City's own fee schedule corroborates a renewal/reapplication structure but does not itself restate the numeric validity period on any City page I could reach
enacted statute (CS/CS/HB 803, enrolled, 2026) + City fee schedule checked 2026-09-12 https://www.flsenate.gov/Session/Bill/2026/803/BillText/er/PDF
Q20 Which permit portal does this authority use? Core Portal & process
Two-part system: Boca eHub (Tyler Technologies EnerGov Self-Service, at bocaratonfl-energovpub.tylerhost.net) for permit applications, fee payment, permit status and inspection scheduling; Boca ePlans (ProjectDox/Avolve, at bocaraton-fl-us.avolvecloud.com) for uploading and reviewing plan documents. Boca Raton has NOT adopted SolarAPP+ — see confidence note
Why the confidence is not higherNamed on the City's own Permit Process Information page. On SolarAPP+: I ran the City's own site search — 'solar' returns 69 real hits (Solar Checklist, Go Solar page, Solar Laws page, etc. — positive control passes), 'zzqqx' returns 0 hits (fabricated control passes, confirming search works), and 'SolarAPP' returns 0 hits. Palm Beach County itself adopted SolarAPP+ (8 May 2025) but per County practice this does not flow across municipal boundaries, and Boca Raton's own eHub/ePlans process (plan upload, multi-department review, correction comments) is a standard plan-review workflow, not SolarAPP+'s instant self-certification model
department page + City site-search controls checked 2026-09-12 https://www.myboca.us/1417/Permit-Process-Information
Q21 Can the whole application be completed online? Core Portal & process
Largely yes — application, initial-deposit payment, plan upload (Boca ePlans), correction responses, fee payment and inspection scheduling are all done online through Boca eHub/ePlans. The only in-person step is optional (picking up a USB of files, or applying in person at the counter)
Why the confidence is not higherCity FAQ (TID 15) describes the online-first flow: submit online, 1–2 business days to set up the permit, deposit-payment email, upload to eplans; FAQ (TID 17) confirms 'All fees must be paid in full prior to downloading' plans electronically, with in-person USB pickup as an alternative
department FAQ checked 2026-09-12 https://www.myboca.us/FAQ.aspx?TID=15
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Power & Light Company (FPL)
Why the confidence is not higherBoca Raton's own City-run Utility Services Department (per its Fee Schedule §IX) bills only water, sewer and reclaimed water — there is no City electric utility — so by elimination the electric utility is the area's investor-owned utility. FPL's own PSC-filed Tier 1 Interconnection Agreement for Customer-Owned Renewable Generation (Sheet No. 9.050, effective 1 Jan 2022) governs interconnection at 'the Customer's presently metered location' for systems like residential rooftop PV. Deduction: I could not reach FPL's tariff 'Communities Served' section (Section 7) directly to see Boca Raton named outright — this is inferred from the City's own utility fee schedule having no electric section plus FPL's tariff being the one that applies to Palm Beach County rooftop solar generally
PSC-filed tariff (Sheet No. 9.050) + City fee schedule (by omission) checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit / effectively parallel-then-after: FPL requires the customer to apply for interconnection separately from the City permit, but before FPL will allow the system to begin parallel operation the customer must certify that 'the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications' — i.e., FPL's approval-to-operate follows the City's permit closeout
Why the confidence is not higherVerbatim from FPL's PSC-filed Interconnection Agreement for Customer-Owned Renewable Generation, Tier 1 (Sheet No. 9.050, §3.4) and its 10-calendar-day pre-service notice requirement (§3.5); FPL's own live Net Metering Guidelines page states applications must be 'approved prior to installation and operation' and that after construction the customer must provide 'a copy of the approved permit' with local inspector sign-off
PSC-filed tariff sheet 9.050 + FPL Net Metering Guidelines (live page) checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf
Q24 Is a HOA or architectural approval required first? Overlays & special cases
No mandatory HOA/architectural pre-approval — Florida law bars an HOA from prohibiting solar outright. The City's own Solar Laws page quotes F.S. 163.04: an HOA 'may not prohibit or have the effect of prohibiting solar collectors,' and 'a property owner may not be denied permission to install solar collectors' by any deed-restriction-empowered entity, though that entity may dictate roof orientation (south, or within 45° east/west of south) if doing so doesn't impair performance. Separately, F.S. 720.3035(1)(c) (added by HB 803, eff. 1 Jul 2026) bars an association from requiring a City permit to already be issued as a precondition of its own review
Why the confidence is not higherBoth statutes are quoted/cited verbatim on the City's own 'Solar Laws and Consumer Protections' page, and the 720.3035 addition is verified directly from the HB 803 enrolled bill text, Section 11
City page quoting Florida Statutes + enacted bill text checked 2026-09-12 https://www.myboca.us/1997/Solar-Laws-and-Consumer-Protections
Q25 Is there a historic-district review? Overlays & special cases
Conditionally yes — Historic Preservation Board (and/or Community Appearance Board) design review MAY apply, 'depending upon location, zoning district and other factors,' though PV itself is allowed by right in every zoning district as mechanical equipment
Why the confidence is not higherVerbatim from the City's SolSmart Advisory Determination of Use (26 Feb 2021): '...such mechanical equipment (including solar PV) may be subject to additional design review by the Historic Preservation Board and/or the Community Appearance Board.' The City's Fee Schedule separately lists a 'Historic Preservation Board – Certificate of Appropriateness' fee ($ figure not solar-specific), confirming the Board is an active review body
City advisory determination of use (26 Feb 2021) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/26552
Q26 Is a wind or windstorm certification required? Overlays & special cases
No dedicated wind/windstorm certification instrument — wind loading is folded into the required sealed structural attachment/frame details rather than being a separate certificate
Why the confidence is not higherThe Solar (Thermal/Photovoltaic) Checklist requires attachment/flashing/frame details 'sealed by the appropriate design professional...for the Wind Zone, additional loading, and any site conditions' but names no separate wind-certification document (unlike Texas's TDI windstorm certificate scheme); I found no such certificate elsewhere on the City's permit-resources pages
department checklist (absence) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
No — no Specific Use Permit or City Council approval is ever required for residential rooftop/ground PV; it is allowed by right in all zoning districts as mechanical equipment, subject only to the Ch. 19 building/electrical permit (and, where triggered, Historic Preservation/CAB design review)
Why the confidence is not higherCity's SolSmart Advisory Determination of Use: 'solar PV systems are considered mechanical equipment and are therefore allowable...Solar PV systems are allowed in all zoning districts.' No SUP or Council-hearing step appears anywhere in the City's Building Permits, Checklist, or FAQ pages
City advisory determination of use (26 Feb 2021) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/26552
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No published cap on residential PV system size — PV is classified with unrestricted-size mechanical equipment like A/C units and generators, and none of the City's checklists, fee schedule, or SolSmart determination states a kW/kVA ceiling
Why the confidence is not higherRead from absence across the City's full published solar/electrical document set (SolSmart determination, Solar and Photovoltaic checklists, Fee Schedule) — none imposes a size cap; this is a negative proven only by the City's own documents, not a positive 'no cap' statement
City advisory determination + checklists + fee schedule (absence) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/26552
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? Other — most likely the 2020 NEC (NFPA 70), incorporated via Florida Building Code, 8th Edition (2023) Ch. 27, following the pattern of every prior FBC cycle (each of which paired one NEC edition to its FBC edition in Palm Beach County's own Building Division Ordinance Index). However, that County index — the only county/city document I found that has ever stated an NEC edition explicitly — lists NEC lines for the 2015, 2017 and 2020 FBC cycles but has NO corresponding NEC line for the current FBC 8th Ed. (2023) cycle. Neither the City's own Code in Effect page nor Palm Beach County's Building Code page states a 2020/2023 NEC edition outright 45% · Palm Beach County Building Division Ordinance Index (rev. 18 Mar 2025)
- Which building code edition is in force? Florida Building Code, 8th Edition (2023), in force in the City since 31 Dec 2023 90% · department page
- Which fire code edition is in force? Florida Fire Prevention Code, Eighth Edition (2023) — incorporating the 2021 edition of NFPA 101 Life Safety Code 65% · Palm Beach County Building Division Ordinance Index (rev. 18 Mar 2025)
- Are there local amendments to any of the above? Likely yes — Palm Beach County's countywide model amendments to the FBC 8th Edition (2023) (Ord. 2024-012) amend Ch. 1 Administration, the wind-load figures (1609.3), Appendix Q (tiny houses) and Appendix F (irrigation); Palm Beach County municipalities typically adopt these same countywide amendments by their own separate city ordinance 55% · Palm Beach County Building Division Ordinance Index + Municode robots.txt (blocked)
- What is the installation judged against? The Florida Building Code, 8th Edition (2023) and its incorporated Electrical Code chapter (Ch. 27), applied by the City's Building Division at plan review and inspection against the submitted plans, spec sheets and either an FSEC System Approval Report or signed/sealed engineering drawings 75% · department page + department checklist
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for City of Boca Raton on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, rapid shutdown is required under whichever NEC edition applies (NEC 690.12) — the City adds no shutdown rule of its own; none of the City's solar-related documents (checklist, SolSmart determination, fee schedule) mentions rapid shutdown at all, so the requirement flows entirely from the adopted electrical code 55% · department checklist (absence) + NEC 690.12 by inference
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? The City requires marking consistent with the applicable electrical code but publishes no placard list of its own; what is required flows from NEC/FBC labeling requirements at the PV/AC disconnects, inverter, combiner/junction boxes and rapid-shutdown device, plus FPL's own required placards: a warning sign at any Tier 2/3 manual disconnect ('both sides of the switch may be energized'), and, for any battery storage, a placard reading 'Battery storage utilized in this facility' permanently affixed to the meter enclosure 75% · FPL live guidelines page + City checklist
- Does the authority specify placard wording of its own? No — the City specifies no placard wording of its own; its only signage-related text is the generic 'required sign[age]' reference in the PV electrical-diagram checklist item, which defers to the applicable electrical code and to FPL's own requirements 65% · department checklist (absence)
- Does it specify letter height, colour or material? No City-specific letter height, colour or material spec found; the only concrete spec available is FPL's own Tier 2/3 disconnect warning sign requirement and general Greenbook-style engraved-phenolic/ANSI Z535.4 practice referenced for its switches, which is a utility standard rather than a City one 55% · FPL live guidelines page (utility, not AHJ)
- Is a site plan / facility map placard required, and what must it show? Not required by the City specifically, but effectively yes via FPL: 'a sign noting the location of the disconnect switch should be installed at the meter' whenever the manual disconnect is not co-located with the meter — functioning as the facility/location placard 65% · FPL live guidelines page
- Does the UTILITY specify placards beyond the AHJ's? Yes — FPL requires signage beyond anything the City's checklist asks for: a warning that 'both sides of the switch may be energized' at any Tier 2/3 manual disconnect, a location sign at the meter when the disconnect isn't co-located with it, and — for any battery storage — a placard reading 'Battery storage utilized in this facility' permanently affixed to the meter enclosure 85% · FPL live guidelines page + PSC-filed tariff
- Where must the labels be placed? At each PV/AC/DC disconnect and the meter (per FPL: 'the front of the AC disconnect switch enclosure' and 'at the meter' for the location sign); on the inverter and any battery enclosure; and per the City's checklist, wherever the electrical one-line diagram calls for 'required sign[age]' — i.e., disconnects, inverter, and points of interconnection 70% · FPL live guidelines page + City checklist
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? FPL's rule, not the City's: for Tier 1 (≤10 kW, UL 1741-listed inverter) systems, no manual disconnect is required at all. For Tier 2/3 (or non-UL-1741 Tier 1) systems, a manual disconnect of the visible load-break type must be 'mounted separate from, but adjacent to, the FPL meter socket,' remain readily accessible to FPL, and be lockable with a single FPL padlock 88% · PSC-filed tariff sheet 9.050
- Must equipment be on a specific approved list? Yes — equipment must carry Florida Product Approval and/or a Notice of Acceptance (NOA): the Photovoltaic Permit Submittal Checklist lists 'Product Approvals &/or NOAs' as a required contractor/owner-builder document, and the Solar Checklist requires either an FSEC (Florida Solar Energy Center) System Approval Report or signed-and-sealed engineering in lieu of it 80% · department checklist
- Are batteries permitted, and under what conditions? Yes, batteries are permitted, with documentation: 'For battery backup systems, include a summary of all standby loads, including power ratings and estimated daily energy consumption for each load to show that inverter and battery selection will meet the standby needs,' plus a required FPL battery-storage placard ('Battery storage utilized in this facility') on the meter enclosure 80% · department checklist + FPL live guidelines page
- Is there a separate ESS permit or inspection? No clear separate ESS permit — battery backup is submitted and inspected as part of the same PV electrical permit and inspection sequence (STS/ELE Rough/ELE Final) rather than as its own permit type in the City's fee schedule or checklists. Consistent with this, Florida's own 2026 HB 803 groups 'solar energy and energy storage installations or alterations' together as one single-trade inspection/plans-review category rather than treating ESS as a distinct trade 65% · fee schedule (absence) + enacted statute definitions (HB 803, 2026)
- Is a specific mounting system or attachment spacing required? No prescriptive mounting system or attachment-spacing standard is published; instead every installation must submit project-specific 'attachment details, flashing details, construction design for the unit and any supporting frame members (sealed by the appropriate design professional) for the Wind Zone, additional loading, and any site conditions' — i.e., engineered per project rather than governed by a City standard detail 70% · department checklist
20 questions answered against City of Boca Raton’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
Other — most likely the 2020 NEC (NFPA 70), incorporated via Florida Building Code, 8th Edition (2023) Ch. 27, following the pattern of every prior FBC cycle (each of which paired one NEC edition to its FBC edition in Palm Beach County's own Building Division Ordinance Index). However, that County index — the only county/city document I found that has ever stated an NEC edition explicitly — lists NEC lines for the 2015, 2017 and 2020 FBC cycles but has NO corresponding NEC line for the current FBC 8th Ed. (2023) cycle. Neither the City's own Code in Effect page nor Palm Beach County's Building Code page states a 2020/2023 NEC edition outright
Why the confidence is not higherPalm Beach County Building Division Ordinance Index (revised 3/18/2025) shows, for every prior cycle, an explicit 'National Electric Code' line (e.g. '12/31/2020 2017 National Electric Code' under the FBC 7th Ed. (2020) row) but the 2023/8th-Edition row (Ord. 2024-012, eff. 12/31/2023) lists only the Building Code, Fire Prevention Code and 2021 NFPA 101 — no NEC line. I could not find a Boca Raton-specific statement of the current NEC edition; confidence lowered accordingly rather than assuming the 2020/FBC-Ch.27 pattern holds without documentation
Palm Beach County Building Division Ordinance Index (rev. 18 Mar 2025) checked 2026-09-12 https://discover.pbcgov.org/pzb/building/BuildingCodes/Building%20Code%20Chronologies.pdf
Q30 Which building code edition is in force? Core Code editions in force
Florida Building Code, 8th Edition (2023), in force in the City since 31 Dec 2023
Why the confidence is not higherCity of Boca Raton 'Code in Effect' page states outright: 'Florida Building Code, 8th Edition (2023)'; corroborated by Palm Beach County's Building Division Ordinance Index (Ord. 2024-012, effective 12/31/2023)
department page checked 2026-09-12 https://www.myboca.us/234/Code-in-Effect
Q31 Which fire code edition is in force? Code editions in force
Florida Fire Prevention Code, Eighth Edition (2023) — incorporating the 2021 edition of NFPA 101 Life Safety Code
Why the confidence is not higherSourced from Palm Beach County's Building Division Ordinance Index (Ord. 2024-012, eff. 12/31/2023): 'Florida Fire Prevention Code, Eighth Edition (2023)' and '2021 NFPA 101 Life Safety Code.' Boca Raton has its own Fire-Rescue Services Department rather than using County Fire Rescue, and I could not reach a Boca Raton-specific page stating the fire code edition directly (its own 'Code in Effect' page names only the building code) — this is a county-level record applied to the City by inference, not a City statement
Palm Beach County Building Division Ordinance Index (rev. 18 Mar 2025) checked 2026-09-12 https://discover.pbcgov.org/pzb/building/BuildingCodes/Building%20Code%20Chronologies.pdf
Q32 Are there local amendments to any of the above? Core Code editions in force
Likely yes — Palm Beach County's countywide model amendments to the FBC 8th Edition (2023) (Ord. 2024-012) amend Ch. 1 Administration, the wind-load figures (1609.3), Appendix Q (tiny houses) and Appendix F (irrigation); Palm Beach County municipalities typically adopt these same countywide amendments by their own separate city ordinance
Why the confidence is not higherThe County's own Ordinance Index documents these amendments countywide; however, Boca Raton runs its own Building Division rather than using the County's, so it would need its own adopting ordinance number, which I could not retrieve — Boca Raton's Municipal Code is hosted on library.municode.com, whose robots.txt disallows automated fetching by ClaudeBot ('User-agent: ClaudeBot / Disallow: /'), so I could not confirm the City's own ordinance number or verify it mirrors the County text exactly
Palm Beach County Building Division Ordinance Index + Municode robots.txt (blocked) checked 2026-09-12 https://discover.pbcgov.org/pzb/building/BuildingCodes/Building%20Code%20Chronologies.pdf
Q33 What is the installation judged against? Core Electrical
The Florida Building Code, 8th Edition (2023) and its incorporated Electrical Code chapter (Ch. 27), applied by the City's Building Division at plan review and inspection against the submitted plans, spec sheets and either an FSEC System Approval Report or signed/sealed engineering drawings
Why the confidence is not higherComposite of the City's Code in Effect page (FBC 8th Ed. 2023) and the Solar (Thermal/Photovoltaic) Checklist's submittal requirements, which is what the plan reviewer/inspector checks the installation against
department page + department checklist checked 2026-09-12 https://www.myboca.us/234/Code-in-Effect
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedthe Solar (Thermal/Photovoltaic) Checklist, the Electrical Service Work checklist, and the User Fee Schedule — none states a numeric local rule on service-panel upgrades or busbar sizing beyond requiring a separate Electrical Service Work permit for any service-panel work not covered by the PV permit
https://www.myboca.us/DocumentCenter/View/264/Electrical-Service-Work-PDF-
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
No prescriptive mounting system or attachment-spacing standard is published; instead every installation must submit project-specific 'attachment details, flashing details, construction design for the unit and any supporting frame members (sealed by the appropriate design professional) for the Wind Zone, additional loading, and any site conditions' — i.e., engineered per project rather than governed by a City standard detail
Why the confidence is not higherVerbatim requirement from the Solar (Thermal/Photovoltaic) Checklist; absence of any City standard-detail drawing confirmed by reviewing the full One & Two Family checklist page
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedBoca Raton Fire Rescue Services department page, its Fire & Life Safety Policies index, and the Solar (Thermal/Photovoltaic) Checklist — none publishes a ridge-setback distance or roof access pathway width; this sits by default in the Florida Fire Prevention Code (8th Ed., 2023)/NFPA 1 (2021) rather than a Boca Raton-specific bulletin I could locate
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, rapid shutdown is required under whichever NEC edition applies (NEC 690.12) — the City adds no shutdown rule of its own; none of the City's solar-related documents (checklist, SolSmart determination, fee schedule) mentions rapid shutdown at all, so the requirement flows entirely from the adopted electrical code
Why the confidence is not higherConfidence is capped by the same uncertainty as Q29 (which NEC edition/whether 2020 or an earlier edition governs) — the requirement itself (NEC 690.12 rapid shutdown) has existed since NEC 2014 so is very likely in force regardless of the exact edition, but I found no City document stating it explicitly
department checklist (absence) + NEC 690.12 by inference checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
The City requires marking consistent with the applicable electrical code but publishes no placard list of its own; what is required flows from NEC/FBC labeling requirements at the PV/AC disconnects, inverter, combiner/junction boxes and rapid-shutdown device, plus FPL's own required placards: a warning sign at any Tier 2/3 manual disconnect ('both sides of the switch may be energized'), and, for any battery storage, a placard reading 'Battery storage utilized in this facility' permanently affixed to the meter enclosure
Why the confidence is not higherFPL half verbatim from FPL's own live Net Metering Guidelines page; the electrical-diagram submittal item in the City's Solar Checklist itself references 'required sign[age]' without spelling out wording, confirming the City defers to code/utility rather than prescribing its own list
FPL live guidelines page + City checklist checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No — the City specifies no placard wording of its own; its only signage-related text is the generic 'required sign[age]' reference in the PV electrical-diagram checklist item, which defers to the applicable electrical code and to FPL's own requirements
Why the confidence is not higherChecked the Solar (Thermal/Photovoltaic) Checklist, the Photovoltaic Permit Submittal Checklist, the SolSmart determination, and the Fee Schedule — none contains placard text; absence proven across the City's full published solar document set
department checklist (absence) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
No City-specific letter height, colour or material spec found; the only concrete spec available is FPL's own Tier 2/3 disconnect warning sign requirement and general Greenbook-style engraved-phenolic/ANSI Z535.4 practice referenced for its switches, which is a utility standard rather than a City one
Why the confidence is not higherAbsence across all City solar documents (as in Q39); the affirmative detail comes only from FPL's tariff/guidelines, one step removed from the AHJ
FPL live guidelines page (utility, not AHJ) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Not required by the City specifically, but effectively yes via FPL: 'a sign noting the location of the disconnect switch should be installed at the meter' whenever the manual disconnect is not co-located with the meter — functioning as the facility/location placard
Why the confidence is not higherVerbatim from FPL's live Net Metering Guidelines page; the City's own documents do not separately require a site/facility map placard
FPL live guidelines page checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Yes — FPL requires signage beyond anything the City's checklist asks for: a warning that 'both sides of the switch may be energized' at any Tier 2/3 manual disconnect, a location sign at the meter when the disconnect isn't co-located with it, and — for any battery storage — a placard reading 'Battery storage utilized in this facility' permanently affixed to the meter enclosure
Why the confidence is not higherAll quoted verbatim from FPL's own live Net Metering Guidelines page (fpl.com/clean-energy/net-metering/guidelines.html), cross-checked against FPL's PSC-filed Tier 1 tariff (Sheet No. 9.050-9.052) which independently corroborates the manual-disconnect and signage requirements for non-UL-1741 or Tier 2/3 systems
FPL live guidelines page + PSC-filed tariff checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q43 Where must the labels be placed? Core Labels Signage & labelling
At each PV/AC/DC disconnect and the meter (per FPL: 'the front of the AC disconnect switch enclosure' and 'at the meter' for the location sign); on the inverter and any battery enclosure; and per the City's checklist, wherever the electrical one-line diagram calls for 'required sign[age]' — i.e., disconnects, inverter, and points of interconnection
Why the confidence is not higherComposite of FPL's live guidelines page and the City's Solar (Thermal/Photovoltaic) Checklist electrical-diagram item
FPL live guidelines page + City checklist checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q44 Must equipment be on a specific approved list? Equipment listing
Yes — equipment must carry Florida Product Approval and/or a Notice of Acceptance (NOA): the Photovoltaic Permit Submittal Checklist lists 'Product Approvals &/or NOAs' as a required contractor/owner-builder document, and the Solar Checklist requires either an FSEC (Florida Solar Energy Center) System Approval Report or signed-and-sealed engineering in lieu of it
Why the confidence is not higherBoth requirements verbatim from the City's own two checklists (Photovoltaic Permit Submittal Checklist; Solar (Thermal/Photovoltaic) Checklist)
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/252/Photovoltaic-PDF-
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, batteries are permitted, with documentation: 'For battery backup systems, include a summary of all standby loads, including power ratings and estimated daily energy consumption for each load to show that inverter and battery selection will meet the standby needs,' plus a required FPL battery-storage placard ('Battery storage utilized in this facility') on the meter enclosure
Why the confidence is not higherFirst quote verbatim from the City's Solar (Thermal/Photovoltaic) Checklist; second from FPL's live Net Metering Guidelines page
department checklist + FPL live guidelines page checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q46 Is there a separate ESS permit or inspection? Battery / ESS
No clear separate ESS permit — battery backup is submitted and inspected as part of the same PV electrical permit and inspection sequence (STS/ELE Rough/ELE Final) rather than as its own permit type in the City's fee schedule or checklists. Consistent with this, Florida's own 2026 HB 803 groups 'solar energy and energy storage installations or alterations' together as one single-trade inspection/plans-review category rather than treating ESS as a distinct trade
Why the confidence is not higherNo separate battery/ESS line appears anywhere in the City's User Fee Schedule, and the Solar Checklist folds battery documentation into the same PV submittal rather than describing a second permit. The HB 803 (enrolled, 2026) definitions section explicitly lists 'solar energy and energy storage installations or alterations' together under a single 'single-trade inspection' definition
fee schedule (absence) + enacted statute definitions (HB 803, 2026) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/6645
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedthe City's SolSmart Advisory Determination of Use and both PV checklists — neither states whether a ground-mounted system is classified as a 'structure' for zoning/setback purposes; the determination treats 'ground-mounted and building mounted solar PV systems' together as mechanical equipment without further distinction
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
FPL's rule, not the City's: for Tier 1 (≤10 kW, UL 1741-listed inverter) systems, no manual disconnect is required at all. For Tier 2/3 (or non-UL-1741 Tier 1) systems, a manual disconnect of the visible load-break type must be 'mounted separate from, but adjacent to, the FPL meter socket,' remain readily accessible to FPL, and be lockable with a single FPL padlock
Why the confidence is not higherVerbatim from FPL's PSC-filed Interconnection Agreement for Customer-Owned Renewable Generation, Tier 1 (Sheet No. 9.050, §5.1-5.2), cross-checked against FPL's own live Net Metering Guidelines page which restates the same rule
PSC-filed tariff sheet 9.050 checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Portal (Boca eHub) or Phone (561-393-7914, IVR: press 1 to schedule) or Text ('Schedule' to 833-821-0601) 88% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes — the City of Boca Raton Building Division performs its own final PV/electrical inspections; the City publishes a Building Inspector Contact Information directory and describes its own multi-stage inspection sequence, with no mention of delegation to Palm Beach County or a third party 78% · department page (own inspector directory)
- If delegated, to whom? N/A — not delegated; see Q52 75% · department page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? For a Photovoltaic (electrical permit) installation: STS (Solar Attachment in Progress) → ELE Underground (if applicable) → ELE Rough → ELE Final. For a Solar Thermal (plumbing permit) installation: STS (Solar Attachment in Progress) → Plumbing Rough → Plumbing Final 88% · department checklist
- Is a rough-in or mid-roof inspection required? Yes — 'STS – Solar Attachment in Progress' functions as a rough/mid-installation inspection ahead of the ELE Rough and ELE Final (or Plumbing Rough/Final) inspections 80% · department checklist
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Yes — the City publishes a dedicated Solar (Thermal/Photovoltaic) Checklist and a separate Photovoltaic Permit Submittal Checklist, both on its One & Two Family Application Checklists page, plus an Interactive Permit Checklist tool 90% · department checklist (existence)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? For a typical PV retrofit on an existing single-family home (an alteration, not new construction), no Certificate of Occupancy is issued. Once all required inspections including the Building Final are approved, the permit undergoes an internal 'Admin Permit Closeout' with no field visit; if a CO or Certificate of Completion happens to be required it is initiated at that point, otherwise the permit simply closes 75% · department FAQ
- Who notifies the utility for PTO? The customer/installer — FPL's own Interconnection Agreement puts the notice obligation on the Customer: 'The Customer shall notify FPL at least ten (10) calendar days prior to initially placing Customer's equipment...in service,' and the Customer must provide FPL the local code official's inspection certification before FPL will authorize parallel operation/PTO. The City itself does not notify FPL 75% · PSC-filed tariff sheet 9.050
- Is there a re-inspection fee? $79.00 flat re-inspection fee 92% · published fee schedule (eff. 1 Oct 2025)
- How are corrections issued and cleared? Corrections are issued as review comments inside the Boca ePlans/ProjectDox portal. The applicant navigates to the permit record, clicks 'Accept,' then 'Review Comments' to read each reviewer comment, must click through to respond in writing to each one (a response is required to proceed), uploads any replacement files (named identically to the original so the system versions over the old file rather than creating a duplicate), and clicks 'Submit' to send the response back for re-review 82% · department how-to guide
14 questions answered against City of Boca Raton’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Portal (Boca eHub) or Phone (561-393-7914, IVR: press 1 to schedule) or Text ('Schedule' to 833-821-0601)
Why the confidence is not higherVerbatim from the City's Inspections page: three named methods, all currently live
department page checked 2026-09-12 https://www.myboca.us/1416/Inspections
Q50 How much notice is required? Core Booking & scheduling
Nothing published by this authority.
Where we lookedthe City's Inspections page and its 'How to Schedule Inspections' how-to guide — neither states a minimum advance-notice period (e.g., a cutoff time the night before) the way some other Florida cities publish
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Nothing published by this authority.
Where we lookedthe City's Inspections page and its scheduling how-to guide — neither mentions AM/PM windows or same-day inspection availability
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes — the City of Boca Raton Building Division performs its own final PV/electrical inspections; the City publishes a Building Inspector Contact Information directory and describes its own multi-stage inspection sequence, with no mention of delegation to Palm Beach County or a third party
Why the confidence is not higherInferred from the Building Permits and Inspections page (own inspector directory) and the Solar Checklist's inspection list, which names City inspection-code labels (STS, ELE) rather than a delegated agency; no Boca Raton document I found describes inspection delegation
department page (own inspector directory) checked 2026-09-12 https://www.myboca.us/157/Building-Permits-and-Inspections
Q53 If delegated, to whom? Core Who inspects
N/A — not delegated; see Q52
Why the confidence is not higherSame evidence as Q52: no delegation to Palm Beach County or a private provider is described on any City page reviewed
department page checked 2026-09-12 https://www.myboca.us/157/Building-Permits-and-Inspections
Q54 Which inspections are required, and in what order? Core Stages & sequence
For a Photovoltaic (electrical permit) installation: STS (Solar Attachment in Progress) → ELE Underground (if applicable) → ELE Rough → ELE Final. For a Solar Thermal (plumbing permit) installation: STS (Solar Attachment in Progress) → Plumbing Rough → Plumbing Final
Why the confidence is not higherVerbatim inspection list from the City's Solar (Thermal/Photovoltaic) Checklist
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Yes — 'STS – Solar Attachment in Progress' functions as a rough/mid-installation inspection ahead of the ELE Rough and ELE Final (or Plumbing Rough/Final) inspections
Why the confidence is not higherRead directly from the inspection sequence in the Solar (Thermal/Photovoltaic) Checklist
department checklist checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedthe Solar (Thermal/Photovoltaic) Checklist and the Inspections/Permit Closeout FAQ (TID 16) — neither explicitly states that the inspector verifies equipment labels/listings at inspection, though the submittal package does require 'Specification sheets with listings of all components'
Q57 Is there a published inspection checklist? Core What is checked
Yes — the City publishes a dedicated Solar (Thermal/Photovoltaic) Checklist and a separate Photovoltaic Permit Submittal Checklist, both on its One & Two Family Application Checklists page, plus an Interactive Permit Checklist tool
Why the confidence is not higherBoth checklist documents were retrieved directly from myboca.us/DocumentCenter and read in full
department checklist (existence) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/22473/Solar-Thermal---Photovoltaic-Checklist
Q58 What must be on site at inspection? Core Documents on site
Nothing published by this authority.
Where we lookedthe Solar (Thermal/Photovoltaic) Checklist, the Inspections page, and the Inspections/Permit Closeout FAQ (TID 16) — none states what must be physically on site (e.g., approved plans, permit card) at the time of inspection
Q59 Is there a re-inspection fee? Corrections & re-inspection
$79.00 flat re-inspection fee
Why the confidence is not higherCity of Boca Raton User Fee Schedule (eff. 1 Oct 2025), Building Permits §C(5)(b): 'Each re-inspection due to wrong address, faulty construction, work not ready for inspection at time requested, code violations, corrections not made when inspection is scheduled, verification inspection of withdrawal requests or premises not accessible to the inspector...$79.00'
published fee schedule (eff. 1 Oct 2025) checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/6645
Q60 How are corrections issued and cleared? Corrections & re-inspection
Corrections are issued as review comments inside the Boca ePlans/ProjectDox portal. The applicant navigates to the permit record, clicks 'Accept,' then 'Review Comments' to read each reviewer comment, must click through to respond in writing to each one (a response is required to proceed), uploads any replacement files (named identically to the original so the system versions over the old file rather than creating a duplicate), and clicks 'Submit' to send the response back for re-review
Why the confidence is not higherStep-by-step from the City's own 'How to View and Upload Permit Corrections' how-to guide (Scribe-generated walkthrough hosted on myboca.us/DocumentCenter, pointing to the live bocaedox.ci.boca-raton.fl.us ProjectDox instance)
department how-to guide checked 2026-09-12 https://www.myboca.us/DocumentCenter/View/32037/How-to-View-and-Upload-Permit-Corrections
Q61 What is issued on pass? Core Final sign-off & PTO
For a typical PV retrofit on an existing single-family home (an alteration, not new construction), no Certificate of Occupancy is issued. Once all required inspections including the Building Final are approved, the permit undergoes an internal 'Admin Permit Closeout' with no field visit; if a CO or Certificate of Completion happens to be required it is initiated at that point, otherwise the permit simply closes
Why the confidence is not higherCity FAQ (Inspections/Permit Closeout, TID 16), verbatim: 'The administrative closeout occurs after all inspections and the building final are completed and approved...If a Certificate of Occupancy or Certification is needed, the admin closeout initiates that process; otherwise the permit closes automatically.' This FAQ answers for permits generally, not solar specifically, so confidence is capped short of a solar-specific City statement
department FAQ checked 2026-09-12 https://www.myboca.us/FAQ.aspx?TID=16
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
The customer/installer — FPL's own Interconnection Agreement puts the notice obligation on the Customer: 'The Customer shall notify FPL at least ten (10) calendar days prior to initially placing Customer's equipment...in service,' and the Customer must provide FPL the local code official's inspection certification before FPL will authorize parallel operation/PTO. The City itself does not notify FPL
Why the confidence is not higherVerbatim from FPL's PSC-filed Interconnection Agreement for Customer-Owned Renewable Generation, Tier 1 (Sheet No. 9.050, §3.4-3.5)
PSC-filed tariff sheet 9.050 checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording 65%
No — the City specifies no placard wording of its own; its only signage-related text is the generic 'required sign[age]' reference in the PV electrical-diagram checklist item, which defers to the applicable electrical code and to FPL's own requirements
Size, colour & material 55%
No City-specific letter height, colour or material spec found; the only concrete spec available is FPL's own Tier 2/3 disconnect warning sign requirement and general Greenbook-style engraved-phenolic/ANSI Z535.4 practice referenced for its switches, which is a utility standard rather than a City one
Where they go 70%
At each PV/AC/DC disconnect and the meter (per FPL: 'the front of the AC disconnect switch enclosure' and 'at the meter' for the location sign); on the inverter and any battery enclosure; and per the City's checklist, wherever the electrical one-line diagram calls for 'required sign[age]' — i.e., disconnects, inverter, and points of interconnection
What the utility wants on top 85%
Yes — FPL requires signage beyond anything the City's checklist asks for: a warning that 'both sides of the switch may be energized' at any Tier 2/3 manual disconnect, a location sign at the meter when the disconnect isn't co-located with it, and — for any battery storage — a placard reading 'Battery storage utilized in this facility' permanently affixed to the meter enclosure
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.