City of Bushnell

Sumter County · Florida ← All authorities

City of Bushnell

Sumter County

Verified Aug. 5, 2026

City of Bushnell is a city authority in the State of Florida, serving 3,047 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Bushnell against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Bushnell is the authority having jurisdiction 90% confidence
Holds
Land development and zoning (City Planner, City of Bushnell Land Development Regulations); the municipal ELECTRIC utility, and therefore interconnection, net metering and the electric service connection for most parcels inside the city; water, wastewater and sanitation; code compliance. The City does NOT hold building or electrical permitting or inspection, and no longer holds floodplain administration.
Delegated to
Sumter County Building Services (Development Services Department, Sumter County BOCC), Building Official Jeanette Keller, 7375 Powell Road Suite 115, Wildwood FL 34785 — building permits, plan review and inspections inside the City of Bushnell since 1 April 2025. Separately, the Sumter County Floodplain Administrator became the City's Floodplain Administrator by Ord. 2026-16 (adopted 4 May 2026), and floodplain management is described by the City as 'a consolidated service handled by Sumter County with all five cities'. Applicants may delegate again to a private provider under FS 553.791, which the county accepts for plan review and inspections or for inspections alone.
Overridden by
FS 553.79(1)(c) — a building permit for a single-family dwelling expires one year after issuance or on the effective date of the next FBC edition, whichever is later; Sumter County publishes 180 days, which is shorter. FS 553.791 — private provider rights, with (1)(r) expressly naming 'solar energy and energy storage installations or alterations' as single-trade work, and (2)(b) barring plan-review and inspection fees where a private provider is used. FS 163.04 — deed restrictions may not prohibit solar; no local instrument repeats it. The Florida Building Code 8th Edition (2023) and NEC 2020 apply statewide and neither government amends the electrical provisions. PSC Rule 25-6.065 does NOT apply here at all: both sellers inside the city are non-IOU (one municipal, one cooperative).
Why not higher
IS_AHJ IS RECORDED TRUE ON THE SURVEY'S OWN CONVENTION FOR THIS SHAPE (it matches the Wildwood record in the same county), BUT READ IT AS A SPLIT, NOT A YES: the City is the AHJ for zoning and land development and is itself the electric utility for most parcels, while the building and electrical permit and every inspection belong to Sumter County. The City's own Building Permitting and Zoning page states the 1 April 2025 handover in terms, and the FY2025-26 adopted budget confirms it from both directions — building permit revenue (322.0001) budgeted at $0 after $83,276, and contractual building inspector services (524.3400) budgeted at $0 after $83,540 — with both figures read visually off the scanned page rather than trusted to OCR. Two further corrections to the codified record were caught: Ord. 2026-16 struck 'The Building and Zoning Department' and substituted 'The Sumter County Floodplain Administrator' as Floodplain Administrator, and moved the adopted Flood Insurance Study date from 27 September 2013 to 5 June 2020 — Municode still shows the old text for both. Held at 90 because no interlocal agreement document was located, so the exact scope and any city-side zoning-clearance step ahead of the county permit remain unproved. COMMERCIALLY IMPORTANT AND NOT A QUESTION IN THE SET: the City levies a 10% MUNICIPAL PUBLIC SERVICE TAX ON ELECTRICITY under Code Sec. 25-33(a) (Ord. 92-20, 2 Nov 1992) — 'ten percent of each payment received by the seller' — with NO residential kWh exemption; the only exemptions (Sec. 25-36) are federal, state, county and municipal governments, other public bodies under FS 1.01, and churches for church purposes. Because the tax falls on the payment made to the seller, net metering cuts it pound for pound: at the City's current residential rate of $0.09065/kWh plus a $10.00 monthly customer charge (Sec. 27-600, effective 7 April 2025), a 1,000 kWh/month household pays about $10.07 a month in public service tax, and offsetting 800 kWh saves roughly $72.52 of energy plus a further $7.25 of tax. The city also levies 10% on gas and water and 7% on telecommunications.

https://www.cityofbushnellfl.com/departments/building_permitting_and_zoning.php

Permit required
Yes. Sumter County's fee schedule carries an explicit line 'Solar Panel System $82' (section VI Residential/Commercial Single Permit Fees, item 1.j),92%
Permit cost
About $110 all-in for a straightforward rooftop retrofit: $82 'Solar Panel System' (Sumter County fee schedule VI.1.j) + $24 'Processing Fee for All Permits' (I.1.a) + $2 FS ch.88%
Portal
Citizenserve, installation id 445 — https://www.citizenserve.com/Portal/?installationid=445 — for applications submitted after 23 September 2024.92%
Electrical code
NEC 2020. Sumter County Building Services lists its codes in force and ends the list 'National Electric Code 2020'. Bushnell adopts the NEC by floating reference — Code Sec.92%
Own placard wording
No. Neither the City of Bushnell nor Sumter County specifies placard wording of its own. The wording that applies comes from the NEC and, on SECO parcels, from SECO.85%
Booking an inspection
Phone or portal. Call the Sumter County inspection request line on (352) 569-1529, or request online through Citizenserve for applications submitted after 23 September 2024.92%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. Sumter County's fee schedule carries an explicit line 'Solar Panel System $82' (section VI Residential/Commercial Single Permit Fees, item 1.j), Q3 Electrical and building permits — Combined, in practice. Sumter County classifies 'Solar Panel System' as a BUILDING single permit ($82, section VI.1.j), Q4 Where you file — Citizenserve, installation id 445 — https://www.citizenserve.com/Portal/?installationid=445 — for applications submitted after 23 September 2024. Q20

Permit required
Yes. Sumter County's fee schedule carries an explicit line 'Solar Panel System $82' (section VI Residential/Commercial Single Permit Fees, item 1.j),92% source
What it costs
About $110 all-in for a straightforward rooftop retrofit: $82 'Solar Panel System' (Sumter County fee schedule VI.1.j) + $24 'Processing Fee for All Permits' (I.1.a) + $2 FS ch.88% source
Key document
fee schedule + published exemption list cited by 5 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Split, and the split moved recently. The City of Bushnell is NOT the building/electrical permit and inspection AHJ inside its own limits: its own page states 'As of April 1, 2025, Sumter County serves as the primary point of contact for building permits and inspections within the City of Bushnell.' The City remains the AHJ for (a) land development / zoning (City Planner Shari Holt, Land Development Regulations), and (b) electric interconnection and net metering, because the City owns and operates its own municipal electric utility. Floodplain administration was handed to the Sumter County Floodplain Administrator by Ord. 2026-16 (4 May 2026). 93% · department page + adopted budget
    • What does this authority permit itself, and what does it delegate? Delegated. Building and electrical permitting AND inspection are performed by Sumter County Building Services (Building Official Jeanette Keller, Villages Sumter County Service Center, 7375 Powell Road Suite 115, Wildwood FL 34785, 352-689-4400, building@sumtercountyfl.gov). The City keeps planning/zoning and land development, its electric/water/wastewater utilities, and code compliance. The City's own department list on its website contains no building department at all — the Building Permitting and Zoning page is not linked from the main navigation and is reachable only from Residents > Online Forms & Resources > 'Building Inspection Forms'. 92% · department page
    • Is a permit required for a residential rooftop PV system? Yes. Sumter County's fee schedule carries an explicit line 'Solar Panel System $82' (section VI Residential/Commercial Single Permit Fees, item 1.j), and residential rooftop PV does not appear on the county's 'Items Not Requiring a Permit (Residential Only)' list dated 07/01/2026. The only solar-adjacent exemption on that list is 'Solar tubes without electric', i.e. tubular daylighting devices, which is not PV. 92% · fee schedule + published exemption list
    • Is there a separate electrical permit, or is it combined? Combined, in practice. Sumter County classifies 'Solar Panel System' as a BUILDING single permit ($82, section VI.1.j), not under section VI.2 Electric — where it puts 'Generator installation' and 'Electric upgrade' at $82 each. The county permit application requires subcontractors (including Electrical) to be listed on combination permits, so the electrical scope is carried on the one permit rather than a second one. 62% · fee schedule + permit application
    • Is a HOA or architectural approval required first? Not a governmental requirement. Nothing in the City's Code of Ordinances conditions a permit on HOA or architectural approval, and the City's code contains zero references to FS 163.04 (the statute that bars deed restrictions from prohibiting solar). Private deed restrictions may still exist on a given parcel and are outside the published record. 62% · codified code, controlled search
    • Is there a historic-district review? No historic-district review is established in the City's Code of Ordinances. There is no historic preservation chapter, no historic district, and no certificate of appropriateness. The 14 'historic' hits in the whole code are Florida Building Code, Existing Building Chapter 11 boilerplate inside the floodplain article, plus the codifier's own front matter. 62% · codified code, controlled search
    • Is a wind or windstorm certification required? No separate windstorm certification. Bushnell is inland Sumter County and is NOT in the High Velocity Hurricane Zone, which is Miami-Dade and Broward only, so Miami-Dade NOA product approval is not required. What applies is ordinary Florida Product Approval against the county's published design criterion: Sumter County Building Services states 'What is the wind speed design criteria in Sumter County? 135 MPH'. The county's forms page lists a 'Product Approval Specification Sheet' available on request. 80% · department FAQ
    • Is there a system-size cap on residential generation? Yes, and it is the City's, not the county's. Code Sec. 27-37(a)(2) caps a customer-owned renewable generating facility on the City system at TWO MEGAWATTS, in three tiers: Tier 1 up to 10 kW, Tier 2 over 10 kW to 100 kW, Tier 3 over 100 kW to 2 MW; and the facility must be 'primarily intended to offset part or all of customer's own electric requirements'. There is also a system-wide brake: once AC rated capacity from eligible customer generators (at a 40% capacity contribution factor) exceeds 5% of the City's FMPA all-requirements project summer coincident peak demand, staff must bring enrolment back to Council, which reserves the right to adjust the schedule. Enrolment is first-offered, first-accepted. 93% · codified rate schedule Sec. 27-37
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either. Sumter County: 'Contractors who wish to obtain building permits in Sumter County may do so if they hold a State of Florida Certificate of Competency, are registered with the State through Sumter County, or hold a Sumter County Certificate of Competency.' The county's Construction Industry Licensing Board recognises 'Solar contractor' as a Building-category classification (Code Sec. 6-25(a)(7), definition taken from FS ch. 489 Pt. I), alongside Electrical Contractor. The property owner may also pull it as an owner-builder. 88% · department page + county code Sec. 6-25
    • Must the contractor be registered with this authority before applying? Yes. Registration is with SUMTER COUNTY, not the City. 'State licensed contractors may register online at https://www.citizenserve.com/Portal/?installationid=445'. The City's own Code Sec. 8-2 still requires proof of competency to the city building department plus a one-time municipal registration fee, but that section predates the 1 April 2025 move and the City no longer runs a building department, so the operative registration is the county's. 85% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes. Sumter County FAQ: 'Owners may act as a contractor on their own property.' The county's Building Permit Application has an explicit 'Is this permit for a Contractor OR Owner/Builder?' tick-box and carries the condition 'Owners must personally appear for Owner/Builder permits prior to the permit being issued.' An Owner Builder Disclosure Statement is available on request. 88% · permit application form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar-specific submittal package is published. The nearest published requirement is the county's Electrical submittal list: existing building permit number if applicable; a copy of the recorded deed if there is no existing building permit number; an electric plan; and 'specific applications may require additional documentation'. Add the Building Permit Application itself, subcontractor licence numbers on a combination permit, and a recorded Notice of Commencement, which must be recorded and posted on the job site before the first inspection. 60% · department submittal page
    • How many copies, and in what format? Electronic, through the county's Citizenserve portal, which is the stated preference; in-person submittal at 7375 Powell Road, Wildwood is the alternative. No copy count or sheet size is published for residential work. 55% · portal page + department page
    • Is a structural PE stamp required, and at what threshold? No threshold is published by either the City or Sumter County for a structural PE stamp on residential rooftop PV. The county's three published checklists (Commercial, Mobile Homes, Residential New Construction) and its Electrical submittal list do not mention sealed plans, and the county's design wind speed of 135 mph is published as a design criterion rather than as a trigger for a seal. 45% · department FAQ + submittal pages
    • Is an electrical PE stamp required, and at what threshold? No local threshold is published. The governing threshold is statewide: FS 471.003(2)(h) exempts electrical work from the engineer-seal requirement below $125,000 and 600 amps, so a normal residential PV retrofit in Bushnell falls under the exemption. Neither the City code (its electrical article was repealed by Ord. 2012-06) nor Sumter County Ch. 6 sets a local figure. 55% · Florida Statutes
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Citizenserve, installation id 445 — https://www.citizenserve.com/Portal/?installationid=445 — for applications submitted after 23 September 2024. Beware the stale links: live county pages still name two superseded systems, an eTRAKiT link (etrakit.sumtercountyfl.gov) on the Building Services FAQ and 'Cityworks online permitting portal' in the 2025 storm-recovery guide. Check the href, not the label: the 'here' link on the Building Services FAQ resolves to citizenserve.com/sumtercounty, not to the eTRAKiT anchor that precedes it. 92% · portal page
    • Can the whole application be completed online? Yes. Sumter County takes the whole application online through Citizenserve — apply, upload, pay (Visa, MasterCard, American Express, Discover), schedule inspections and view results — 'Service Available 24 hours a day, 7 days a week'. In-person and cash/check/money order remain available at 7375 Powell Road. Contractors must register on the same portal first. 82% · portal page
    • What does a residential solar permit cost? About $110 all-in for a straightforward rooftop retrofit: $82 'Solar Panel System' (Sumter County fee schedule VI.1.j) + $24 'Processing Fee for All Permits' (I.1.a) + $2 FS ch. 553 surcharge (1% of permit fee, $2 minimum) + $2 FS ch. 468 surcharge (1.5% of permit fee, $2 minimum) = $110.00. Both surcharges hit their $2 floors at this permit size. A concurrent service upgrade adds $82 ('Electric upgrade'). Re-inspections are $82 each. The CITY charges no building permit fee at all any more; its own codified Sec. 8-1 fee schedule (last amended Ord. 2011-13, 2011) has no solar line and is superseded in practice. 88% · fee schedule
    • How is the fee calculated? Flat. $82 flat for the Solar Panel System line, irrespective of kW, panel count or valuation. The add-ons are a flat $24 processing fee plus two percentage-of-permit-fee state surcharges that both bottom out at their $2 minimums at this permit size. 90% · fee schedule
    • Is there a separate plan-check fee? No, not for a residential single permit. The county's only plan-review line is 'Plan Review (Commercial & Private Provider) — minimum fee up to 30 minutes $59, each additional 30 minutes $59/half hour'. Residential single permits such as Solar Panel System carry no separate plan-check line. NOTE A LIVE STATUTORY PROBLEM: that line's own label bills plan review where a PRIVATE PROVIDER is used, and FS 553.791(2)(b) says 'The local jurisdiction may not charge fees for plans review or building inspections if the fee owner or the fee owner's contractor hires a private provider to perform such services.' The county's Private Provider Requirements page item 7 qualifies it — '$59/half hour (county performing review)' — so the two county documents do not read the same way on their face. 70% · fee schedule + private provider policy
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • How long is an issued permit valid before it expires? Sumter County publishes 180 days: 'It is valid until 180 days past the issue date or the last approved inspection' (Building Services FAQ) and 'Note: Permits expire 180 days after issuance' (fee schedule). THAT IS SHORTER THAN THE STATE FLOOR FOR A HOUSE. FS 553.79(1)(c), read live today: 'A building permit issued by a local government for a single-family dwelling expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' The City's own codified Sec. 8-1(c) also says one year. Extensions: the county takes them by online form while the permit is live; the City's codified schedule gives a free first 180-day extension and $30 for a second. 85% · Florida Statutes + department FAQ + fee schedule
    • Which utility handles interconnection here? TWO SELLERS INSIDE ONE SMALL CITY, AND NEITHER IS INVESTOR-OWNED. (1) The CITY OF BUSHNELL ELECTRIC DIVISION is a municipal electric utility — established 1919, 1,605 customers, 12.3 MW peak, a member of the FMPA ALL-REQUIREMENTS PROJECT; it bought SECO's distribution system inside the city limits under Resolution 2017-03 and took the customers over around 7 October 2019. (2) SECO ENERGY (Sumter Electric Cooperative) still sells retail electricity inside the city limits: the FY2025-26 adopted budget carries BOTH a 'FRANCHISE TAX - ELECTRICITY' line ($83,377) and a separate 'UTILITY SERVICE TAX - ELECTRICITY' line ($100,568) alongside the city's own 'CITY UTILITIES - SERVICE TAX' line ($514,914), and the city pays 'STREET LIGHTS (SECO)' ($2,250) and 'LEGAL SERVICES (SECO)'. At the codified 10% public service tax rate, $100,568 implies roughly $1.0m a year of non-city retail electricity sales inside the city. NO INVESTOR-OWNED UTILITY IS EVIDENCED: Duke Energy returns zero hits across the entire adopted budget, and Appendix A of the code contains exactly one electrical franchise — the 1981 grant to Sumter Electric Cooperative. Consequence: PSC Rule 25-6.065 binds nobody here, because it reaches only investor-owned utilities. 88% · utility membership roster + city charter + adopted budget + codified rate schedule
    • Where does the utility sit in the sequence? Parallel, with a documented pre-condition. For a City of Bushnell customer, Code Sec. 27-37(a)(4) makes net metering service conditional on the customer providing the City with an executed standard interconnection agreement for customer-owned renewable generation AND an executed Tri-Party Net Metering Power Purchase Agreement between FMPA, the customer and the City. The county building permit is a separate track. For a SECO-served parcel, SECO requires the application, interconnection agreement and interconnection checklist to be completed on SECO's Solar Dashboard. 78% · codified rate schedule Sec. 27-37 + utility standard

28 questions answered against City of Bushnell’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Split, and the split moved recently. The City of Bushnell is NOT the building/electrical permit and inspection AHJ inside its own limits: its own page states 'As of April 1, 2025, Sumter County serves as the primary point of contact for building permits and inspections within the City of Bushnell.' The City remains the AHJ for (a) land development / zoning (City Planner Shari Holt, Land Development Regulations), and (b) electric interconnection and net metering, because the City owns and operates its own municipal electric utility. Floodplain administration was handed to the Sumter County Floodplain Administrator by Ord. 2026-16 (4 May 2026).

Why the confidence is not higherThe city's own Building Permitting and Zoning page says it plainly and gives the county's phone number and URL. Corroborated on both sides of the FY2025-26 adopted budget: revenue line 322.0001 LAND DEVELOPMENT FEES - BUILDING PERMITS falls $83,276 -> $63,162 estimated -> $0 budgeted, and expenditure line 524.3400 CONTRACTUAL SERVICES - BUILDING INSPECTOR SERVICES falls $83,540 -> $66,045 -> $0. Both figures read visually off the scanned page, not only OCR. Held at 93 rather than higher because the page is undated apart from the April 2025 sentence and no interlocal agreement text was located.

department page + adopted budget checked 2026-09-13 https://www.cityofbushnellfl.com/departments/building_permitting_and_zoning.php

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Delegated. Building and electrical permitting AND inspection are performed by Sumter County Building Services (Building Official Jeanette Keller, Villages Sumter County Service Center, 7375 Powell Road Suite 115, Wildwood FL 34785, 352-689-4400, building@sumtercountyfl.gov). The City keeps planning/zoning and land development, its electric/water/wastewater utilities, and code compliance. The City's own department list on its website contains no building department at all — the Building Permitting and Zoning page is not linked from the main navigation and is reachable only from Residents > Online Forms & Resources > 'Building Inspection Forms'.

Why the confidence is not higherCity page names the county; county Building Services page names the Building Official and confirms a Joint Planning Agreement with the City of Bushnell. Held below 95 because no interlocal agreement document was found, so the precise scope of the delegation is inferred from the two departments' own pages plus the budget.

department page checked 2026-09-13 https://www.cityofbushnellfl.com/departments/building_permitting_and_zoning.php

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. Sumter County's fee schedule carries an explicit line 'Solar Panel System $82' (section VI Residential/Commercial Single Permit Fees, item 1.j), and residential rooftop PV does not appear on the county's 'Items Not Requiring a Permit (Residential Only)' list dated 07/01/2026. The only solar-adjacent exemption on that list is 'Solar tubes without electric', i.e. tubular daylighting devices, which is not PV.

Why the confidence is not higherTwo county instruments agree: a priced line for the work, and an exemption list that omits it. The exemption list is current (1 Jul 2026) and cites FS 489.103, HB 803 and the FBC.

fee schedule + published exemption list checked 2026-09-13 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined, in practice. Sumter County classifies 'Solar Panel System' as a BUILDING single permit ($82, section VI.1.j), not under section VI.2 Electric — where it puts 'Generator installation' and 'Electric upgrade' at $82 each. The county permit application requires subcontractors (including Electrical) to be listed on combination permits, so the electrical scope is carried on the one permit rather than a second one.

Why the confidence is not higherThis is read off where the line sits in the fee schedule plus the application's subcontractor table; no county document states in terms whether a separate electrical permit is pulled for PV. Note the contrast is itself evidence: the same schedule put generators under Electric and solar under Building. A service upgrade done with the array would attract the separate 'Electric upgrade $82' line.

fee schedule + permit application checked 2026-09-13 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either. Sumter County: 'Contractors who wish to obtain building permits in Sumter County may do so if they hold a State of Florida Certificate of Competency, are registered with the State through Sumter County, or hold a Sumter County Certificate of Competency.' The county's Construction Industry Licensing Board recognises 'Solar contractor' as a Building-category classification (Code Sec. 6-25(a)(7), definition taken from FS ch. 489 Pt. I), alongside Electrical Contractor. The property owner may also pull it as an owner-builder.

Why the confidence is not higherCounty licensing page states the three routes; the county code lists the classification. Held below 95 because neither document addresses the specific question of which trade class may pull a PV permit, so the answer is assembled from the licensing rule plus the classification list.

department page + county code Sec. 6-25 checked 2026-09-13 https://www.sumtercountyfl.gov/81/Contractor-Licensing

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes. Registration is with SUMTER COUNTY, not the City. 'State licensed contractors may register online at https://www.citizenserve.com/Portal/?installationid=445'. The City's own Code Sec. 8-2 still requires proof of competency to the city building department plus a one-time municipal registration fee, but that section predates the 1 April 2025 move and the City no longer runs a building department, so the operative registration is the county's.

Why the confidence is not higherCounty page states the registration route plainly. The confidence is discounted because the City's codified Sec. 8-2 was not repealed and still describes a city-side registration that appears to be dead letter — that contradiction is unresolved in the published record.

department page checked 2026-09-13 https://www.sumtercountyfl.gov/81/Contractor-Licensing

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. Sumter County FAQ: 'Owners may act as a contractor on their own property.' The county's Building Permit Application has an explicit 'Is this permit for a Contractor OR Owner/Builder?' tick-box and carries the condition 'Owners must personally appear for Owner/Builder permits prior to the permit being issued.' An Owner Builder Disclosure Statement is available on request.

Why the confidence is not higherThree county documents agree (licensing FAQ, application form, forms page). Held below 95 because none of them addresses solar specifically, and FS 489.103(7)'s owner-builder limits apply independently.

permit application form checked 2026-09-13 https://www.sumtercountyfl.gov/DocumentCenter/View/42229

Q8 What documents make up a complete submittal? Core Submittal package

No solar-specific submittal package is published. The nearest published requirement is the county's Electrical submittal list: existing building permit number if applicable; a copy of the recorded deed if there is no existing building permit number; an electric plan; and 'specific applications may require additional documentation'. Add the Building Permit Application itself, subcontractor licence numbers on a combination permit, and a recorded Notice of Commencement, which must be recorded and posted on the job site before the first inspection.

Why the confidence is not higherAssembled from the county's Electrical page and permit application, both of which are generic. The county's Forms page publishes only three checklists — Commercial, Mobile Homes and Residential New Construction — and none for solar, and a controlled site search returned no solar submittal document. So this is the generic path, not a PV checklist.

department submittal page checked 2026-09-13 https://www.sumtercountyfl.gov/125/Electrical

Q9 How many copies, and in what format? Submittal package

Electronic, through the county's Citizenserve portal, which is the stated preference; in-person submittal at 7375 Powell Road, Wildwood is the alternative. No copy count or sheet size is published for residential work.

Why the confidence is not higherThe format is stated ('Online portal (preferred) or in-person', county storm-recovery guide; 'Online here or come into one of our office at 7375 Powell Rd' on the Building Services page). The copy-count half of the question is genuinely unpublished, which is why this sits at 55.

portal page + department page checked 2026-09-13 https://www.sumtercountyfl.gov/139/Online-Permitting

Q10 Is a site plan required, and what must it show? Core Submittal package

Nothing published by this authority.

Where we lookedSumter County's Electrical submittal page (which lists only an existing permit number or recorded deed, and an electric plan), the three published county checklists (Commercial, Mobile Homes, Residential New Construction), the county Forms page in full, the county Building Permit Application (one page, no site-plan field), and a controlled county site search for 'solar' which returned 8 hits of which none is a solar submittal document (positive control 'electrical' 61, fabricated 'zzqqxvv' 0). On the city side, all 75 linked pages and all 192 linked documents were enumerated. No site-plan requirement or content list for residential PV is published by either. Note the county's 'Site Plan Request' link is a records request for existing plans, not a submittal requirement — check the href, not the label.

https://www.sumtercountyfl.gov/125/Electrical

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedSame county submittal sources as q10 — the Electrical page's four-item list does not name a one-line or three-line diagram, and no solar checklist exists. SECO publishes a 'sample one-line diagram' PDF on its solar page for its own interconnection application, but that is a utility document and does not establish an AHJ requirement. The City of Bushnell's own standard interconnection agreement, which would be the place a city-served customer's diagram requirement lives, is referenced in Code Sec. 27-37(a)(4) but is published nowhere on the city website.

https://www.secoenergy.com/solar-power

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSumter County Electrical submittal page, all three county checklists, the county Forms page, the county fee schedule's plan-review section, and controlled searches of both codified codes for 'conductor', 'string' and 'calculation'. Nothing on string or conductor calculations for PV. Bushnell has no electrical chapter to carry such a rule — Chapter 8 Article III was repealed by Ord. 2012-06.

https://www.sumtercountyfl.gov/125/Electrical

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No threshold is published by either the City or Sumter County for a structural PE stamp on residential rooftop PV. The county's three published checklists (Commercial, Mobile Homes, Residential New Construction) and its Electrical submittal list do not mention sealed plans, and the county's design wind speed of 135 mph is published as a design criterion rather than as a trigger for a seal.

Why the confidence is not higherThis is a proved absence rather than a positive 'no seal required' — the county reserves 'specific applications may require additional documentation' to the Building Official, so a plans examiner can ask for one. Recorded at 45 because absence of a published threshold is not the same as absence of a requirement in practice.

department FAQ + submittal pages checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

No local threshold is published. The governing threshold is statewide: FS 471.003(2)(h) exempts electrical work from the engineer-seal requirement below $125,000 and 600 amps, so a normal residential PV retrofit in Bushnell falls under the exemption. Neither the City code (its electrical article was repealed by Ord. 2012-06) nor Sumter County Ch. 6 sets a local figure.

Why the confidence is not higherThe statute is primary and current; the local half is a proved absence — the City's Chapter 8 Article III (electrical code) is marked Reserved and repealed, and Sumter County Ch. 6 Article I (adoption of technical codes) was repealed in 1996. Held at 55 because this is a state answer standing in for a local one.

Florida Statutes checked 2026-09-13 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

About $110 all-in for a straightforward rooftop retrofit: $82 'Solar Panel System' (Sumter County fee schedule VI.1.j) + $24 'Processing Fee for All Permits' (I.1.a) + $2 FS ch. 553 surcharge (1% of permit fee, $2 minimum) + $2 FS ch. 468 surcharge (1.5% of permit fee, $2 minimum) = $110.00. Both surcharges hit their $2 floors at this permit size. A concurrent service upgrade adds $82 ('Electric upgrade'). Re-inspections are $82 each. The CITY charges no building permit fee at all any more; its own codified Sec. 8-1 fee schedule (last amended Ord. 2011-13, 2011) has no solar line and is superseded in practice.

Why the confidence is not higherFee schedule is the county's own, expressly 'EFFECTIVE 10/1/2024', and the solar line is explicit rather than inferred. Held at 88 because the county reserves 'any permit fees not specifically listed ... will be determined by the Building Official', and because whether a city-side land-development fee also applies could not be established.

fee schedule checked 2026-09-13 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q16 How is the fee calculated? Core Fees

Flat. $82 flat for the Solar Panel System line, irrespective of kW, panel count or valuation. The add-ons are a flat $24 processing fee plus two percentage-of-permit-fee state surcharges that both bottom out at their $2 minimums at this permit size.

Why the confidence is not higherRead directly off the fee schedule's structure — the line sits in 'Residential/Commercial Single Permit Fees', which is the flat-rate section, not in the per-square-foot or valuation sections.

fee schedule checked 2026-09-13 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q17 Is there a separate plan-check fee? Fees

No, not for a residential single permit. The county's only plan-review line is 'Plan Review (Commercial & Private Provider) — minimum fee up to 30 minutes $59, each additional 30 minutes $59/half hour'. Residential single permits such as Solar Panel System carry no separate plan-check line. NOTE A LIVE STATUTORY PROBLEM: that line's own label bills plan review where a PRIVATE PROVIDER is used, and FS 553.791(2)(b) says 'The local jurisdiction may not charge fees for plans review or building inspections if the fee owner or the fee owner's contractor hires a private provider to perform such services.' The county's Private Provider Requirements page item 7 qualifies it — '$59/half hour (county performing review)' — so the two county documents do not read the same way on their face.

Why the confidence is not higherThe residential answer is clear from the schedule's structure. The confidence is held at 70 because of the private-provider discrepancy, which I am recording as a flagged conflict between two county documents rather than asserting non-compliance: the policy page's parenthetical may be the operative reading and the fee-schedule label merely loose.

fee schedule + private provider policy checked 2026-09-13 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedSumter County Building Services page and its full FAQ set, the Online Permitting page, the Inspections page, the Permitting Fees page (which prices plan review by the half hour but states no turnaround), the Private Provider Requirements page (which gives a two-business-day closeout figure but no review clock), and the storm-recovery guide (whose 'Permit Timeline (Steps needed)' heading is followed by no content). No stated plan-review turnaround for any permit type. On the city side, the Land Development Regulations that would carry a city-side clock are adopted by reference only and their text is unpublished.

https://www.sumtercountyfl.gov/77/Building-Services

Q19 How long is an issued permit valid before it expires? Timeline & validity

Sumter County publishes 180 days: 'It is valid until 180 days past the issue date or the last approved inspection' (Building Services FAQ) and 'Note: Permits expire 180 days after issuance' (fee schedule). THAT IS SHORTER THAN THE STATE FLOOR FOR A HOUSE. FS 553.79(1)(c), read live today: 'A building permit issued by a local government for a single-family dwelling expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' The City's own codified Sec. 8-1(c) also says one year. Extensions: the county takes them by online form while the permit is live; the City's codified schedule gives a free first 180-day extension and $30 for a second.

Why the confidence is not higherAll four instruments read first-hand. Held at 85 rather than higher on one genuine ambiguity: whether a rooftop-PV retrofit permit counts as 'a building permit ... for a single-family dwelling' within FS 553.79(1)(c). It is the natural reading, but no Florida source found says so in terms. Treat 180 days as the practical planning number and the one-year floor as the argument.

Florida Statutes + department FAQ + fee schedule checked 2026-09-13 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0500-0599/0553/Sections/0553.79.html

Q20 Which permit portal does this authority use? Core Portal & process

Citizenserve, installation id 445 — https://www.citizenserve.com/Portal/?installationid=445 — for applications submitted after 23 September 2024. Beware the stale links: live county pages still name two superseded systems, an eTRAKiT link (etrakit.sumtercountyfl.gov) on the Building Services FAQ and 'Cityworks online permitting portal' in the 2025 storm-recovery guide. Check the href, not the label: the 'here' link on the Building Services FAQ resolves to citizenserve.com/sumtercounty, not to the eTRAKiT anchor that precedes it.

Why the confidence is not higherThe Online Permitting page states the system and the cut-over date explicitly. Held at 92 because three different portal names appear across live county pages, so the record is internally untidy even though the current system is unambiguous.

portal page checked 2026-09-13 https://www.sumtercountyfl.gov/139/Online-Permitting

Q21 Can the whole application be completed online? Core Portal & process

Yes. Sumter County takes the whole application online through Citizenserve — apply, upload, pay (Visa, MasterCard, American Express, Discover), schedule inspections and view results — 'Service Available 24 hours a day, 7 days a week'. In-person and cash/check/money order remain available at 7375 Powell Road. Contractors must register on the same portal first.

Why the confidence is not higherStated across the county's Online Permitting, Inspections and Building Services pages. Held at 82 because the Citizenserve portal itself was not exercised in this run — prior GovBot runs record Citizenserve returning permission-denied to automated tooling — so this is the county's claim about its own portal rather than a tested one.

portal page checked 2026-09-13 https://www.sumtercountyfl.gov/139/Online-Permitting

Q22 Which utility handles interconnection here? Core Utility interconnection

TWO SELLERS INSIDE ONE SMALL CITY, AND NEITHER IS INVESTOR-OWNED. (1) The CITY OF BUSHNELL ELECTRIC DIVISION is a municipal electric utility — established 1919, 1,605 customers, 12.3 MW peak, a member of the FMPA ALL-REQUIREMENTS PROJECT; it bought SECO's distribution system inside the city limits under Resolution 2017-03 and took the customers over around 7 October 2019. (2) SECO ENERGY (Sumter Electric Cooperative) still sells retail electricity inside the city limits: the FY2025-26 adopted budget carries BOTH a 'FRANCHISE TAX - ELECTRICITY' line ($83,377) and a separate 'UTILITY SERVICE TAX - ELECTRICITY' line ($100,568) alongside the city's own 'CITY UTILITIES - SERVICE TAX' line ($514,914), and the city pays 'STREET LIGHTS (SECO)' ($2,250) and 'LEGAL SERVICES (SECO)'. At the codified 10% public service tax rate, $100,568 implies roughly $1.0m a year of non-city retail electricity sales inside the city. NO INVESTOR-OWNED UTILITY IS EVIDENCED: Duke Energy returns zero hits across the entire adopted budget, and Appendix A of the code contains exactly one electrical franchise — the 1981 grant to Sumter Electric Cooperative. Consequence: PSC Rule 25-6.065 binds nobody here, because it reaches only investor-owned utilities.

Why the confidence is not higherFour independent instruments: the FMPA members list (an external, machine-readable roster giving Bushnell's customer count and project membership), the City Charter Sec. 7.05 which names the 'City's electric distribution system' among properties that cannot be sold without a referendum, Chapter 27 Article II of the code (residential electric rates, street lighting, net metering), and the adopted budget's revenue and expenditure lines. Held at 88, not higher, because no public map or address lookup distinguishes which parcels inside the city are city-served and which are still SECO — that boundary is a real, unresolved gap and it decides the disconnect and placard answers.

utility membership roster + city charter + adopted budget + codified rate schedule checked 2026-09-13 https://www.fmpa.com/members/

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel, with a documented pre-condition. For a City of Bushnell customer, Code Sec. 27-37(a)(4) makes net metering service conditional on the customer providing the City with an executed standard interconnection agreement for customer-owned renewable generation AND an executed Tri-Party Net Metering Power Purchase Agreement between FMPA, the customer and the City. The county building permit is a separate track. For a SECO-served parcel, SECO requires the application, interconnection agreement and interconnection checklist to be completed on SECO's Solar Dashboard.

Why the confidence is not higherBoth utilities state what must be executed, and both state it as a condition of service rather than of permitting — hence 'parallel'. Held at 78 because neither document fixes the ordering against the permit, and the City's interconnection agreement form itself is not published.

codified rate schedule Sec. 27-37 + utility standard checked 2026-09-13 https://library.municode.com/fl/bushnell/codes/code_of_ordinances

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Not a governmental requirement. Nothing in the City's Code of Ordinances conditions a permit on HOA or architectural approval, and the City's code contains zero references to FS 163.04 (the statute that bars deed restrictions from prohibiting solar). Private deed restrictions may still exist on a given parcel and are outside the published record.

Why the confidence is not higherA controlled search of the full 1.85 MB codified text returned 0 hits for '163.04' with positives passing (building 542, permit 446, electrical 19) and fabricated controls at 0 (zzqqxvv, qwertyuiop). But the City's Land Development Regulations are adopted by reference only and their text is not published anywhere, so a requirement sitting in the LDR cannot be excluded — that is why this is 62 and not 85.

codified code, controlled search checked 2026-09-13 https://api.municode.com/CodesContent?jobId=474380&productId=10496

Q25 Is there a historic-district review? Overlays & special cases

No historic-district review is established in the City's Code of Ordinances. There is no historic preservation chapter, no historic district, and no certificate of appropriateness. The 14 'historic' hits in the whole code are Florida Building Code, Existing Building Chapter 11 boilerplate inside the floodplain article, plus the codifier's own front matter.

Why the confidence is not higherProved by controlled search of the full codified text with positive and fabricated controls passing, and by reading every hit rather than counting them. Discounted to 62 for the same reason as Q24: the unpublished Land Development Regulations could carry an overlay.

codified code, controlled search checked 2026-09-13 https://api.municode.com/CodesContent?jobId=474380&productId=10496

Q26 Is a wind or windstorm certification required? Overlays & special cases

No separate windstorm certification. Bushnell is inland Sumter County and is NOT in the High Velocity Hurricane Zone, which is Miami-Dade and Broward only, so Miami-Dade NOA product approval is not required. What applies is ordinary Florida Product Approval against the county's published design criterion: Sumter County Building Services states 'What is the wind speed design criteria in Sumter County? 135 MPH'. The county's forms page lists a 'Product Approval Specification Sheet' available on request.

Why the confidence is not higherThe 135 mph figure is the county's own current statement. Held at 80 because the county does not say which ASCE 7 risk category or exposure that 135 mph is stated for, and the answer combines that figure with the statewide HVHZ geography rather than resting on one document.

department FAQ checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedThe City's Land Development Regulations are the instrument that would answer this and THEY ARE NOT PUBLISHED. Code Sec. 19-43 adopts them as 'the text attached hereto as Exhibit A', with the codifier's note 'Exhibit A is not incorporated herein, but is on file and available for inspection by the public' (Ord. 92-22, 7 Dec 1992). A crawl of all 75 linked city pages and an enumeration of all 192 linked documents found no LDR text; the city's own current fee schedule (Ord. 2026-15) prices a printed copy of the Land Development Regulations at $75, which confirms it exists only on paper. The LDR is under active rewrite — Community Workshop #1 was held 18 July 2026. The codified Code of Ordinances carries no conditional-use or special-exception machinery for solar, but the fee schedule prices a Conditional Use Permit at $6,000 and a Special Exception or Variance at $575, so the machinery exists in the unpublished LDR.

https://www.cityofbushnellfl.com/departments/planning_and_land_development/land_development_regulation_updates.php

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Yes, and it is the City's, not the county's. Code Sec. 27-37(a)(2) caps a customer-owned renewable generating facility on the City system at TWO MEGAWATTS, in three tiers: Tier 1 up to 10 kW, Tier 2 over 10 kW to 100 kW, Tier 3 over 100 kW to 2 MW; and the facility must be 'primarily intended to offset part or all of customer's own electric requirements'. There is also a system-wide brake: once AC rated capacity from eligible customer generators (at a 40% capacity contribution factor) exceeds 5% of the City's FMPA all-requirements project summer coincident peak demand, staff must bring enrolment back to Council, which reserves the right to adjust the schedule. Enrolment is first-offered, first-accepted.

Why the confidence is not higherStraight from the codified rate schedule, amended as recently as Ord. 2025-12 (7 Jul 2025), so it is inside the codification window. Held at 93 only because the 5% brake's current headroom is not published anywhere.

codified rate schedule Sec. 27-37 checked 2026-09-13 https://library.municode.com/fl/bushnell/codes/code_of_ordinances

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020. Sumter County Building Services lists its codes in force and ends the list 'National Electric Code 2020'. Bushnell adopts the NEC by floating reference — Code Sec. 8-16(1)(g) adopts 'The National Electrical Code, and all appendices thereto ... as presently constituted or hereinafter amended' with no year stated — so the year is not a local fact and moves with the state adoption. 92% · department FAQ + adopting ordinance
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) — Building, Residential, Energy Conservation, Plumbing, Existing Building, Accessibility, Mechanical and Fuel Gas, all listed by Sumter County Building Services. Bushnell's Sec. 8-16 adopts the same volumes by floating reference with no edition stated, and also adopts the International Property Maintenance Code. 92% · department FAQ + adopting ordinance
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition, per Sumter County Building Services. Both governments adopt it floating: Bushnell Sec. 10-1 adopts the FFPC 'as presently constituted or hereafter amended'; Sumter County Sec. 6-155 (Ord. 2024-29, 17 Sep 2024) adopts NFPA 1 and NFPA 101 Florida editions as adopted in FAC 69A-60.003/.004 plus the uniform rule chapters, 'along with all subsequent changes, revisions and/or modifications'. 88% · department FAQ + both adopting ordinances
    • Are there local amendments to any of the above? Yes, but none of them is electrical. Bushnell Sec. 8-17 amends the FBC Building administratively (new 107.6.1 barring affidavit-based permitting for flood provisions; new Section 117 flood variances) and Sec. 8-18 amends FBC Residential R322.2.1 technically to base flood elevation plus 1 foot. Sumter County Sec. 6-71 and Sec. 6-72 carry word-for-word the same two amendments (both Ord. 2013-13, 27 Aug 2013), so city and county agree. There are NO local electrical amendments at all: Bushnell's Chapter 8 Article III (electrical code) was repealed by Ord. 2012-06 and is marked Reserved, and Sumter County's Chapter 6 Article I (adoption of technical codes, including an old aluminium-wiring restriction) was repealed in 1996. 92% · adopting ordinances, both jurisdictions
    • What is the installation judged against? The Florida Building Code 8th Edition (2023) and NEC 2020 as adopted, enforced by Sumter County Building Services; plus the two flood amendments above where the parcel is in a flood hazard area; plus the serving utility's own interconnection standard, which is the document that actually decides the hardware. There is no local electrical code and no local solar standard on either side. 85% · department FAQ + adopting ordinances
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? No local ridge-setback or access-pathway rule exists on either side. Neither Bushnell's Chapter 10 (four sections: adoption, school fire drills, permit fee, fireworks) nor Sumter County's Chapter 6 Article VI adds anything to the Florida Fire Prevention Code on solar. What governs is therefore the FFPC as adopted floating by both. Residential one- and two-family PV also falls OUTSIDE the county's fire review scope entirely: Sec. 6-156(b) reserves fire plan review and fire inspection to 'all commercial and multifamily residential new construction, change of occupancy ... remodels, renovations and expansions'. 60% · fire chapters, both jurisdictions
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes — NEC 2020 Article 690.12 rapid shutdown, by virtue of the NEC 2020 being the edition Sumter County states it enforces and Bushnell adopting the NEC floating. No local amendment softens or extends it, and no local document restates it. 88% · department FAQ + adopting ordinance
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? It depends entirely on which of the two sellers serves the parcel, and the two answers are different. SECO-SERVED PARCELS: two placards, both specified in SECO's own current standard — Detail 'A' on the front cover of the utility AC disconnect switch, identifying the on-site power generation source; and Detail 'B' on the front cover of the meter enclosure, indicating DUAL POWER SOURCE. CITY-SERVED PARCELS: the City of Bushnell specifies no placard anywhere — its codified net metering schedules (Sec. 27-37, Sec. 27-38) contain no signage clause at all, and its 'standard interconnection agreement for customer-owned renewable generation' is referenced but not published. In both cases the NEC 2020 Article 690/705 labels apply through the building code. 80% · utility standard + codified rate schedules
    • Does the authority specify placard wording of its own? No. Neither the City of Bushnell nor Sumter County specifies placard wording of its own. The wording that applies comes from the NEC and, on SECO parcels, from SECO. 85% · codified codes, controlled search
    • Does it specify letter height, colour or material? The AHJ specifies nothing. SECO does, in full, and it is the most prescriptive placard specification found in Florida: the placard shall be permanent and durable NON-FERROUS METAL OR POLY-PLASTIC PLATES, UV RESISTANT, EPOXY GLUED OR RIVETED to the front cover of the disconnect switch, with ENGRAVED OR STAMPED lettering a MINIMUM OF 1/4 INCH HIGH, WHITE LETTERS ON A RED BACKGROUND. 'The use of peel-and-stick labels, paint, or marking pens to label the plates is not acceptable.' The same note is repeated on all four pages of the standard, including the energy storage and retrofit drawings. 92% · utility standard
    • Is a site plan / facility map placard required, and what must it show? No local requirement. Neither government requires a site plan or facility-map placard, and neither restates NEC 705.10. On a SECO parcel, SECO does not require a facility map either — its two placards are the disconnect identifier and the dual-power-source label. NEC 2020 705.10 applies on its own terms through the adopted code. 70% · utility standard + codified codes
    • Does the UTILITY specify placards beyond the AHJ's? Yes, where SECO is the seller — and this is the single most job-relevant fact in the record. SECO requires TWO placards that the AHJ does not: (1) Detail 'A', 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH', on the front cover of the utility AC disconnect switch; and (2) Detail 'B', 'DUAL POWER SOURCE', on the front cover of the meter enclosure. The identical requirement is repeated for a system with energy storage (Detail 'D') and for a new array retrofitted to an existing one (Detail 'E'). Where the CITY is the seller, no utility placard is published. 90% · utility standard
    • Where must the labels be placed? SECO parcels: on the FRONT COVER of the utility AC disconnect switch (Detail A) and on the FRONT COVER of the meter enclosure (Detail B). The disconnect itself must be adjacent to the meter enclosure, so both labels end up in one place at the service. Attachment method is prescribed — epoxy glued or riveted — not adhesive. City-served parcels: no published placement requirement beyond the NEC's own locations. 92% · utility standard
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? SECO PARCELS — the most specific mounting rule in this survey: a MANUAL LOAD-BREAK AC DISCONNECT SWITCH providing a LOCKABLE VISIBLE BREAK. A circuit breaker or moulded-case switch does not provide an acceptable visible break and is not acceptable. It shall be mounted ADJACENT TO THE UTILITY METER ENCLOSURE WITHIN A 5 FEET 0 INCHES MAXIMUM DISTANCE, WITHIN LINE OF SIGHT, and shall be ACCESSIBLE AT ALL TIMES to SECO Energy. Mounting height is dimensioned on the drawing as 48 INCHES MINIMUM to 72 INCHES MAXIMUM. There is no size or tier exemption. On a retrofit the existing manual AC disconnect must be REMOVED and a single new utility AC disconnect installed. CITY OF BUSHNELL PARCELS — no disconnect location is published; the City's codified net metering schedule is silent and its standard interconnection agreement form is not published. Do not carry SECO's 5-foot rule onto a city-served parcel without asking. 93% · utility standard
    • Must equipment be on a specific approved list? Yes, on SECO parcels: 'The RGS shall be certified as UL 1741 and IEEE 1547 compliant', and the point of interconnection may not be at any SECO equipment — not metering enclosures, CT metering cabinets, switching cabinets, transformers or transformer secondary cabinets — it must be made within customer wiring and equipment. On City-served parcels the City's codified schedule requires an executed standard interconnection agreement but publishes no equipment list; neither the City nor Sumter County maintains an approved-equipment list of its own. 80% · utility standard
    • Are batteries permitted, and under what conditions? Yes, and the utility side is specified while the AHJ side is silent. SECO's standard carries a dedicated 'ENERGY STORAGE SYSTEM WITH RENEWABLE GENERATION SYSTEM UTILITY AC DISCONNECT REQUIREMENTS' drawing (page 2 of 4, Detail 'D') imposing exactly the same single lockable visible-break AC disconnect within 5 feet of the meter and the same two engraved placards. Neither Bushnell nor Sumter County has any ESS or battery provision: zero hits for 'energy storage' in either code, and the one 'battery' hit in Bushnell's code is a criminal-offence cross-reference to FS ch. 794 sexual battery. The Florida Fire Prevention Code applies as adopted. 68% · utility standard + codified codes
    • Is there a local rule on service upgrades or busbar sizing? No local code rule on busbar sizing or service-entrance sizing exists — the question is answered instead by the CITY AS UTILITY OWNER. Code Sec. 27-26(a) imposes a $50 standard administrative charge for a new or modified service installation plus a customised invoice for field charges, and sub-paragraph (2) states that ALL construction costs to modify a residential service are charged back to the customer; chargeable costs include labour, equipment use, permits, materials and overhead up to 10% of the other costs combined. Sec. 27-39 sets the line-extension regime with a $1,500 maximum city contribution for permanent electric service, and expressly grants no allowance for upgrades or repair of substandard conditions. 75% · codified electric service article

20 questions answered against City of Bushnell’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020. Sumter County Building Services lists its codes in force and ends the list 'National Electric Code 2020'. Bushnell adopts the NEC by floating reference — Code Sec. 8-16(1)(g) adopts 'The National Electrical Code, and all appendices thereto ... as presently constituted or hereinafter amended' with no year stated — so the year is not a local fact and moves with the state adoption.

Why the confidence is not higherThe county is the enforcing authority and states 2020 on its own current page; the city's floating adoption cannot contradict it. This matches the standing Florida position (NEC 2020, effective 31 Dec 2023, inside FBC 8th Edition (2023)) — note that the FBC edition is labelled 2023 and is not the NEC year.

department FAQ + adopting ordinance checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023) — Building, Residential, Energy Conservation, Plumbing, Existing Building, Accessibility, Mechanical and Fuel Gas, all listed by Sumter County Building Services. Bushnell's Sec. 8-16 adopts the same volumes by floating reference with no edition stated, and also adopts the International Property Maintenance Code.

Why the confidence is not higherThe county lists all eight volumes with the edition; the city's floating adoption follows the state. Held at 92 because the county page is undated and a code cycle change would make it stale without the page changing.

department FAQ + adopting ordinance checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition, per Sumter County Building Services. Both governments adopt it floating: Bushnell Sec. 10-1 adopts the FFPC 'as presently constituted or hereafter amended'; Sumter County Sec. 6-155 (Ord. 2024-29, 17 Sep 2024) adopts NFPA 1 and NFPA 101 Florida editions as adopted in FAC 69A-60.003/.004 plus the uniform rule chapters, 'along with all subsequent changes, revisions and/or modifications'.

Why the confidence is not higherThree sources agree and the county's adopting ordinance is recent. Held at 88 because the '8th Edition' label comes from the county's undated FAQ rather than from either adopting ordinance, both of which are deliberately year-free.

department FAQ + both adopting ordinances checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, but none of them is electrical. Bushnell Sec. 8-17 amends the FBC Building administratively (new 107.6.1 barring affidavit-based permitting for flood provisions; new Section 117 flood variances) and Sec. 8-18 amends FBC Residential R322.2.1 technically to base flood elevation plus 1 foot. Sumter County Sec. 6-71 and Sec. 6-72 carry word-for-word the same two amendments (both Ord. 2013-13, 27 Aug 2013), so city and county agree. There are NO local electrical amendments at all: Bushnell's Chapter 8 Article III (electrical code) was repealed by Ord. 2012-06 and is marked Reserved, and Sumter County's Chapter 6 Article I (adoption of technical codes, including an old aluminium-wiring restriction) was repealed in 1996.

Why the confidence is not higherAll four sections read first-hand from the Municode content API on both clients. The repeals are stated in the codifier's editor's notes, which is the strongest form of a proved absence.

adopting ordinances, both jurisdictions checked 2026-09-13 https://library.municode.com/fl/bushnell/codes/code_of_ordinances

Q33 What is the installation judged against? Core Electrical

The Florida Building Code 8th Edition (2023) and NEC 2020 as adopted, enforced by Sumter County Building Services; plus the two flood amendments above where the parcel is in a flood hazard area; plus the serving utility's own interconnection standard, which is the document that actually decides the hardware. There is no local electrical code and no local solar standard on either side.

Why the confidence is not higherAssembled from the county's code list, both adopting ordinances and the repealed electrical articles. Held at 85 because 'judged against' in practice includes the plans examiner's discretion under 'specific applications may require additional documentation', which is unpublished.

department FAQ + adopting ordinances checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local code rule on busbar sizing or service-entrance sizing exists — the question is answered instead by the CITY AS UTILITY OWNER. Code Sec. 27-26(a) imposes a $50 standard administrative charge for a new or modified service installation plus a customised invoice for field charges, and sub-paragraph (2) states that ALL construction costs to modify a residential service are charged back to the customer; chargeable costs include labour, equipment use, permits, materials and overhead up to 10% of the other costs combined. Sec. 27-39 sets the line-extension regime with a $1,500 maximum city contribution for permanent electric service, and expressly grants no allowance for upgrades or repair of substandard conditions.

Why the confidence is not higherRead first-hand from the codified electric service article, which is current (Ord. 2025-02, 7 Apr 2025). Held at 75 because these are utility service-connection rules rather than a code rule on busbar sizing, so they answer the commercial half of the question and not the NEC 705.12 half, for which there is a proved local zero.

codified electric service article checked 2026-09-13 https://library.municode.com/fl/bushnell/codes/code_of_ordinances

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedBoth codified codes (controlled searches for 'mounting', 'attachment', 'rack', 'spacing' against passing positive and fabricated controls), both sets of FBC local amendments (Bushnell Sec. 8-17/8-18 and Sumter County Sec. 6-71/6-72, which are flood amendments only), the county's Electrical and Re-Roof submittal pages, and the county Forms page. No local mounting or attachment-spacing rule on either side; Florida Product Approval against the county's 135 mph design wind speed is what governs, and that is a statewide mechanism rather than a local rule.

https://library.municode.com/fl/bushnell/codes/code_of_ordinances

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

No local ridge-setback or access-pathway rule exists on either side. Neither Bushnell's Chapter 10 (four sections: adoption, school fire drills, permit fee, fireworks) nor Sumter County's Chapter 6 Article VI adds anything to the Florida Fire Prevention Code on solar. What governs is therefore the FFPC as adopted floating by both. Residential one- and two-family PV also falls OUTSIDE the county's fire review scope entirely: Sec. 6-156(b) reserves fire plan review and fire inspection to 'all commercial and multifamily residential new construction, change of occupancy ... remodels, renovations and expansions'.

Why the confidence is not higherThe local absence is proved — zero hits for solar, photovoltaic, placard, rapid shutdown or setback-of-roof language across 1.85 MB of city code and 136 KB of county Chapter 6, with controls passing. Held at 60 rather than higher because the positive half of the answer (which FFPC provision applies, and how an inspector reads it on a house that is exempt from fire review) is not stated by either government.

fire chapters, both jurisdictions checked 2026-09-13 https://library.municode.com/fl/bushnell/codes/code_of_ordinances

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — NEC 2020 Article 690.12 rapid shutdown, by virtue of the NEC 2020 being the edition Sumter County states it enforces and Bushnell adopting the NEC floating. No local amendment softens or extends it, and no local document restates it.

Why the confidence is not higherFollows directly from Q29 with no local amendment found (zero hits for 'rapid shutdown' in either code, controls passing). Held at 88 because it is an inference from the adopted edition rather than a statement either authority makes about solar.

department FAQ + adopting ordinance checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

It depends entirely on which of the two sellers serves the parcel, and the two answers are different. SECO-SERVED PARCELS: two placards, both specified in SECO's own current standard — Detail 'A' on the front cover of the utility AC disconnect switch, identifying the on-site power generation source; and Detail 'B' on the front cover of the meter enclosure, indicating DUAL POWER SOURCE. CITY-SERVED PARCELS: the City of Bushnell specifies no placard anywhere — its codified net metering schedules (Sec. 27-37, Sec. 27-38) contain no signage clause at all, and its 'standard interconnection agreement for customer-owned renewable generation' is referenced but not published. In both cases the NEC 2020 Article 690/705 labels apply through the building code.

Why the confidence is not higherSECO's half is first-hand from the utility's own 2026 standard drawings and is close to certain. The City's half is a proved absence in the published record (zero solar-related 'placard' hits across the whole codified code, and a complete 192-document enumeration of the city website found no interconnection agreement), but the unpublished agreement form could contain a clause — which is why the combined answer sits at 80.

utility standard + codified rate schedules checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. Neither the City of Bushnell nor Sumter County specifies placard wording of its own. The wording that applies comes from the NEC and, on SECO parcels, from SECO.

Why the confidence is not higherControlled searches on both codes: the single 'placard' hit in Bushnell's 1.85 MB of code is a park-vandalism clause, and the only 'placard' in Sumter County's fee schedule is 'Replacement Inspection Placard $10', an administrative item. Positive controls passed on both. Held at 85 because Bushnell's Land Development Regulations are unpublished and Municode is about twelve months behind.

codified codes, controlled search checked 2026-09-13 https://api.municode.com/CodesContent?jobId=474380&productId=10496

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

The AHJ specifies nothing. SECO does, in full, and it is the most prescriptive placard specification found in Florida: the placard shall be permanent and durable NON-FERROUS METAL OR POLY-PLASTIC PLATES, UV RESISTANT, EPOXY GLUED OR RIVETED to the front cover of the disconnect switch, with ENGRAVED OR STAMPED lettering a MINIMUM OF 1/4 INCH HIGH, WHITE LETTERS ON A RED BACKGROUND. 'The use of peel-and-stick labels, paint, or marking pens to label the plates is not acceptable.' The same note is repeated on all four pages of the standard, including the energy storage and retrofit drawings.

Why the confidence is not higherRead first-hand from SECO's current standard, published at /sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf with a PDF modification date of 27 Feb 2026. Held at 92 not 96 on one honest wrinkle: the file is named and filed as the 2026 edition, but the revision stamp inside the drawing block still reads 'JERRY JEAN-LOUIS 8-01-2023'. The content is unchanged from the 2023 revision — so this is a re-issue, not a new spec, and the numbers below have now been read identically in five independent runs.

utility standard checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

No local requirement. Neither government requires a site plan or facility-map placard, and neither restates NEC 705.10. On a SECO parcel, SECO does not require a facility map either — its two placards are the disconnect identifier and the dual-power-source label. NEC 2020 705.10 applies on its own terms through the adopted code.

Why the confidence is not higherProved absence on all three published sources with controls passing. Held at 70 because the answer is 'nothing above the NEC', which is a statement about what is missing, and because the City's unpublished interconnection agreement is a live gap.

utility standard + codified codes checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, where SECO is the seller — and this is the single most job-relevant fact in the record. SECO requires TWO placards that the AHJ does not: (1) Detail 'A', 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH', on the front cover of the utility AC disconnect switch; and (2) Detail 'B', 'DUAL POWER SOURCE', on the front cover of the meter enclosure. The identical requirement is repeated for a system with energy storage (Detail 'D') and for a new array retrofitted to an existing one (Detail 'E'). Where the CITY is the seller, no utility placard is published.

Why the confidence is not higherFirst-hand from SECO's current standard, notes 2, 3 and 5 on each drawing page. Held at 90 because the exact engraved legend is carried in the drawing artwork rather than as extractable text; the captions quoted above are the drawing's own labels for those details.

utility standard checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

SECO parcels: on the FRONT COVER of the utility AC disconnect switch (Detail A) and on the FRONT COVER of the meter enclosure (Detail B). The disconnect itself must be adjacent to the meter enclosure, so both labels end up in one place at the service. Attachment method is prescribed — epoxy glued or riveted — not adhesive. City-served parcels: no published placement requirement beyond the NEC's own locations.

Why the confidence is not higherFirst-hand from the same standard. Held at 92 for the city half being an absence rather than a rule.

utility standard checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes, on SECO parcels: 'The RGS shall be certified as UL 1741 and IEEE 1547 compliant', and the point of interconnection may not be at any SECO equipment — not metering enclosures, CT metering cabinets, switching cabinets, transformers or transformer secondary cabinets — it must be made within customer wiring and equipment. On City-served parcels the City's codified schedule requires an executed standard interconnection agreement but publishes no equipment list; neither the City nor Sumter County maintains an approved-equipment list of its own.

Why the confidence is not higherSECO's requirement is explicit in its own standard. The city half is a proved absence in the published record with the unpublished agreement as the caveat.

utility standard checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, and the utility side is specified while the AHJ side is silent. SECO's standard carries a dedicated 'ENERGY STORAGE SYSTEM WITH RENEWABLE GENERATION SYSTEM UTILITY AC DISCONNECT REQUIREMENTS' drawing (page 2 of 4, Detail 'D') imposing exactly the same single lockable visible-break AC disconnect within 5 feet of the meter and the same two engraved placards. Neither Bushnell nor Sumter County has any ESS or battery provision: zero hits for 'energy storage' in either code, and the one 'battery' hit in Bushnell's code is a criminal-offence cross-reference to FS ch. 794 sexual battery. The Florida Fire Prevention Code applies as adopted.

Why the confidence is not higherSECO's half is first-hand and certain; the local half is a proved absence with controls passing, read rather than counted. Held at 68 because 'permitted, and under what conditions' for a battery on a City-served parcel is genuinely unanswered — the City's net metering schedule speaks only of a 'renewable generating facility' and does not address storage at all.

utility standard + codified codes checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSumter County's fee schedule in full — it has no ESS, battery or energy-storage line anywhere, and the nearest lines are 'Electric miscellaneous $82' and 'Building miscellaneous $82'; the county's Permit Types & Submittal Requirements index (16 permit types, none of them storage); the county Forms page; and both codified codes, which return zero for 'energy storage' with controls passing. Whether a battery is a separate permit or rides on the solar permit is not published by either government.

https://www.sumtercountyfl.gov/459/Permitting-Fees

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedThe City's unpublished Land Development Regulations again (see q27) — this is exactly the question they would answer. What can be said is that both fee schedules price accessory structures separately: the City's current LDR fee schedule (Ord. 2026-15, adopted 4 May 2026, read from the council packet) has 'Accessory Structures — Residential Compliance Review $35', and the county's has 'Accessory Buildings (non-living) ... plus applicable trades $486'. Neither names ground-mount solar, and nothing establishes which line a ground-mount array would fall on, or whether the City treats it as a structure for setback purposes. Zero hits for 'ground mount' or 'ground-mounted' in either codified code with controls passing.

https://www.cityofbushnellfl.com/May%204,%202026%20Regular%20Council%20Meeting%20Packet.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

SECO PARCELS — the most specific mounting rule in this survey: a MANUAL LOAD-BREAK AC DISCONNECT SWITCH providing a LOCKABLE VISIBLE BREAK. A circuit breaker or moulded-case switch does not provide an acceptable visible break and is not acceptable. It shall be mounted ADJACENT TO THE UTILITY METER ENCLOSURE WITHIN A 5 FEET 0 INCHES MAXIMUM DISTANCE, WITHIN LINE OF SIGHT, and shall be ACCESSIBLE AT ALL TIMES to SECO Energy. Mounting height is dimensioned on the drawing as 48 INCHES MINIMUM to 72 INCHES MAXIMUM. There is no size or tier exemption. On a retrofit the existing manual AC disconnect must be REMOVED and a single new utility AC disconnect installed. CITY OF BUSHNELL PARCELS — no disconnect location is published; the City's codified net metering schedule is silent and its standard interconnection agreement form is not published. Do not carry SECO's 5-foot rule onto a city-served parcel without asking.

Why the confidence is not higherFirst-hand from SECO's own current drawings, notes 1 and 6, dimensions read off the drawing text layer. This is now the fifth independent reading of the same numbers across this survey. The city-served half is an honest gap, and it matters: the two sellers are interleaved inside one small city.

utility standard checked 2026-09-13 https://www.secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone or portal. Call the Sumter County inspection request line on (352) 569-1529, or request online through Citizenserve for applications submitted after 23 September 2024. Have the permit number, inspection type, date, job-site address, contact name and phone number ready. Inspections may be scheduled 24 hours a day by either route. 92% · department page
    • How much notice is required? Next business day, with two different cut-offs depending on route: inspections called into the message line by 4:00 pm, or scheduled online by 7:00 pm, of the preceding business day are scheduled for the following business day. So the practical notice is under one business day if you book online. 92% · department page
    • Are same-day or AM/PM windows offered? No published AM/PM windows and no same-day service in normal conditions. The county's own answer is: 'We can only provide an estimated time if you contact the office on the day of the inspection at 352-689-4400.' The one exception is post-storm: the county's storm-recovery guide says service priority is given to storm-related inspections and to hazards and utilities/critical services. 85% · department FAQ
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Delegated — twice over. The City of Bushnell performs no solar inspection of any kind; Sumter County Building Services does. And the applicant may delegate again under FS 553.791: Sumter County accepts a private provider for plan review AND inspections, or for inspections alone (plan review by private provider is not allowed unless the private provider is also doing the inspections). Solar is expressly single-trade work under FS 553.791(1)(r), which names 'solar energy and energy storage installations or alterations', so a single-trade private-provider inspection is available; FS 553.791(6) even allows the switch after construction has commenced. The only carve-out the county reserves is fire: 'Sumter County does not accept Private Providers for fire review or fire inspections' — which does not touch a one- or two-family PV job, since those are outside the county's fire review scope anyway. 90% · department policy + Florida Statutes
    • If delegated, to whom? Sumter County Building Services, a division of the Development Services Department of the Sumter County Board of County Commissioners. Building Official: Jeanette Keller (Jeanette.Keller@sumtercountyfl.gov). Villages Sumter County Service Center, 7375 Powell Road, Suite 115, Wildwood FL 34785. Phone 352-689-4400, fax 352-689-4401, inspection line 352-569-1529, building@sumtercountyfl.gov. Hours Monday-Friday 7:30 am to 4:00 pm. Continuity-of-operations backup office is at 316 Dr. Martin Luther King Jr. Ave, Bushnell. 92% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for City of Bushnell on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No. Sumter County publishes three submittal checklists — Commercial, Mobile Homes, and Residential New Construction — and no inspection checklist of any kind, for solar or otherwise. The City of Bushnell publishes nothing: its Building Permitting and Zoning page carries a Document Center whose category list is rendered EMPTY in the served HTML, so the page has zero documents on it. 78% · forms page enumeration + site crawl
    • What must be on site at inspection? Three things, stated by the county: the PERMIT PLAQUE, the SUPPORTING DOCUMENTS, and the recorded NOTICE OF COMMENCEMENT. The county's Inspections page says 'Please have permit plaque, supporting documents and NOTICE OF COMMENCEMENT on the job site for the inspection', and the permit application repeats the statutory warning that a Notice of Commencement must be recorded and posted on the job site before the first inspection. A replacement inspection placard costs $10. 92% · department page + permit application
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? For a residential retrofit such as rooftop PV, the job is marked FINALED in Citizenserve rather than receiving a Certificate of Occupancy. The county's closeout policy separates 'Residential SFR' and 'Residential Mobile Home' (which get a Certificate of Occupancy, subject-line 'Request for CO') from 'Residential remodel, addition, miscellaneous' (subject-line 'Request for Project Closeout', 'These requirements shall be completed for the job to be marked Finaled in Citizenserve'). Allow two business days for a CO, a Certificate of Completion, or a job to be marked Finaled. 72% · department policy
    • Who notifies the utility for PTO? Installer, in both regimes, and on a private-provider job the county says so in terms. County policy item 9: 'Sumter County does not perform Green Tag inspections and/or issue stickers. It is up to the Private Provider to provide stickers and to inform the responsible power company.' On the utility side, SECO's standard puts the duty on the member: 'Members considering interconnection with net metering to an RGS installed at their site must complete the application, the interconnection agreement and the interconnection checklist on SECO Energy's Solar Dashboard.' On a City-served parcel, Sec. 27-37(a)(4) makes the customer provide the City with the executed interconnection agreement and the Tri-Party PPA. Nothing anywhere puts the notification on the AHJ. 68% · department policy + utility standard + codified rate schedule
    • Is there a re-inspection fee? $82. The fee schedule's line I.4.a is 'Inspection (Partial and Re-Inspection) $82', and the schedule adds 'Re-inspections will generate an inspection fee which must be paid prior to requesting final inspection.' Special inspections are $118 per hour with a one-hour minimum; pre-arranged weekend, holiday and after-hours inspections are $352 with a three-hour minimum. 90% · fee schedule
    • How are corrections issued and cleared? Results are posted to the Citizenserve portal and viewed there; a failed inspection generates an $82 re-inspection fee which must be paid before a final inspection can be requested. On a private-provider job the closing route is by email: the inspection history report with results and who performed each inspection, plus a certificate of compliance, uploaded to the permit in Citizenserve and then emailed to building@sumtercountyfl.gov with 'Request for Project Closeout' and the permit number in the subject line; allow two business days. 70% · department policy + fee schedule

14 questions answered against City of Bushnell’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone or portal. Call the Sumter County inspection request line on (352) 569-1529, or request online through Citizenserve for applications submitted after 23 September 2024. Have the permit number, inspection type, date, job-site address, contact name and phone number ready. Inspections may be scheduled 24 hours a day by either route.

Why the confidence is not higherStated on the county's Inspections page and repeated in the county's storm-recovery guide. Held at 92 only because the page is undated.

department page checked 2026-09-13 https://www.sumtercountyfl.gov/133/Inspections

Q50 How much notice is required? Core Booking & scheduling

Next business day, with two different cut-offs depending on route: inspections called into the message line by 4:00 pm, or scheduled online by 7:00 pm, of the preceding business day are scheduled for the following business day. So the practical notice is under one business day if you book online.

Why the confidence is not higherBoth cut-offs appear on the Inspections page and are repeated on the Building Services FAQ. The 7:00 pm online figure appears as 'before 7:00 pm' on one page and '7 pm' on the other — the same number.

department page checked 2026-09-13 https://www.sumtercountyfl.gov/133/Inspections

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No published AM/PM windows and no same-day service in normal conditions. The county's own answer is: 'We can only provide an estimated time if you contact the office on the day of the inspection at 352-689-4400.' The one exception is post-storm: the county's storm-recovery guide says service priority is given to storm-related inspections and to hazards and utilities/critical services.

Why the confidence is not higherThe county states the absence of windows in terms, which is a stronger form of this answer than not finding one. Held at 85 because the FAQ page is undated.

department FAQ checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Delegated — twice over. The City of Bushnell performs no solar inspection of any kind; Sumter County Building Services does. And the applicant may delegate again under FS 553.791: Sumter County accepts a private provider for plan review AND inspections, or for inspections alone (plan review by private provider is not allowed unless the private provider is also doing the inspections). Solar is expressly single-trade work under FS 553.791(1)(r), which names 'solar energy and energy storage installations or alterations', so a single-trade private-provider inspection is available; FS 553.791(6) even allows the switch after construction has commenced. The only carve-out the county reserves is fire: 'Sumter County does not accept Private Providers for fire review or fire inspections' — which does not touch a one- or two-family PV job, since those are outside the county's fire review scope anyway.

Why the confidence is not higherCounty policy page and the statute both read first-hand today. Held at 90 because the county's private-provider page is undated.

department policy + Florida Statutes checked 2026-09-13 https://www.sumtercountyfl.gov/1428/Private-Provider-Requirements

Q53 If delegated, to whom? Core Who inspects

Sumter County Building Services, a division of the Development Services Department of the Sumter County Board of County Commissioners. Building Official: Jeanette Keller (Jeanette.Keller@sumtercountyfl.gov). Villages Sumter County Service Center, 7375 Powell Road, Suite 115, Wildwood FL 34785. Phone 352-689-4400, fax 352-689-4401, inspection line 352-569-1529, building@sumtercountyfl.gov. Hours Monday-Friday 7:30 am to 4:00 pm. Continuity-of-operations backup office is at 316 Dr. Martin Luther King Jr. Ave, Bushnell.

Why the confidence is not higherNamed on the county's own Building Services page and on the storm-recovery guide the City publishes. The same Building Official is named in this survey's Wildwood record, which is an independent corroboration from a different city.

department page checked 2026-09-13 https://www.sumtercountyfl.gov/77/Building-Services

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedSumter County's Inspections page (which explains booking but lists no inspection types), the Building Services page and full FAQ set, the fee schedule (which prices inspections but names none), the Private Provider Requirements page (which lists closeout documents, not stages), the storm-recovery guide, and the Forms page. No published sequence of inspections for any permit type, let alone for solar. The Citizenserve portal, which would carry the inspection-type list, was not exercised — prior runs in this survey record Citizenserve refusing automated access.

https://www.sumtercountyfl.gov/133/Inspections

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame sources as q54. Nothing published on a rough-in or mid-roof inspection for PV. The county's fee schedule prices 'Inspection (Partial and Re-Inspection) $82' as a single line, which implies partial inspections exist but does not say when one is required. Worth noting that in this survey a Key Biscayne portal record showed a FRAMING/rough-in step on a rooftop PV job, so the absence of a published requirement is not evidence that no rough-in is called.

https://www.sumtercountyfl.gov/459/Permitting-Fees

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedSumter County's Inspections page, Building Services page and FAQ set, Private Provider Requirements page, Forms page and fee schedule; and both codified codes. Nothing states what an inspector checks at a solar final. There is no published inspection checklist at all (see q57), so there is nothing that either confirms or excludes label and listing verification. Note a relevant negative that IS established: the county 'does not perform Green Tag inspections and/or issue stickers', so whatever the inspector checks, the output is not a green tag.

https://www.sumtercountyfl.gov/1428/Private-Provider-Requirements

Q57 Is there a published inspection checklist? Core What is checked

No. Sumter County publishes three submittal checklists — Commercial, Mobile Homes, and Residential New Construction — and no inspection checklist of any kind, for solar or otherwise. The City of Bushnell publishes nothing: its Building Permitting and Zoning page carries a Document Center whose category list is rendered EMPTY in the served HTML, so the page has zero documents on it.

Why the confidence is not higherProved by enumeration rather than by search on the city side, which matters here because the CITY'S SITE SEARCH IS BROKEN: search.php returns a results page of identical byte length for 'electric' (a term certain to be present) and for 'zzqqxvv', and a token-stripped diff of the two responses is identical apart from my own substitution in the nav. So every city-side absence in this record was proved by crawling all 75 linked pages and enumerating all 192 documents, not by searching. The county's search does work (61 hits for 'electrical', 0 for 'zzqqxvv').

forms page enumeration + site crawl checked 2026-09-13 https://www.sumtercountyfl.gov/134/Forms

Q58 What must be on site at inspection? Core Documents on site

Three things, stated by the county: the PERMIT PLAQUE, the SUPPORTING DOCUMENTS, and the recorded NOTICE OF COMMENCEMENT. The county's Inspections page says 'Please have permit plaque, supporting documents and NOTICE OF COMMENCEMENT on the job site for the inspection', and the permit application repeats the statutory warning that a Notice of Commencement must be recorded and posted on the job site before the first inspection. A replacement inspection placard costs $10.

Why the confidence is not higherTwo county documents agree, one of them the permit application itself.

department page + permit application checked 2026-09-13 https://www.sumtercountyfl.gov/133/Inspections

Q59 Is there a re-inspection fee? Corrections & re-inspection

$82. The fee schedule's line I.4.a is 'Inspection (Partial and Re-Inspection) $82', and the schedule adds 'Re-inspections will generate an inspection fee which must be paid prior to requesting final inspection.' Special inspections are $118 per hour with a one-hour minimum; pre-arranged weekend, holiday and after-hours inspections are $352 with a three-hour minimum.

Why the confidence is not higherRead directly from the county's current fee schedule. Note this is $82 on an $82 permit — a failed re-inspection doubles the cost of a solar job's permit.

fee schedule checked 2026-09-13 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q60 How are corrections issued and cleared? Corrections & re-inspection

Results are posted to the Citizenserve portal and viewed there; a failed inspection generates an $82 re-inspection fee which must be paid before a final inspection can be requested. On a private-provider job the closing route is by email: the inspection history report with results and who performed each inspection, plus a certificate of compliance, uploaded to the permit in Citizenserve and then emailed to building@sumtercountyfl.gov with 'Request for Project Closeout' and the permit number in the subject line; allow two business days.

Why the confidence is not higherThe private-provider route is documented in detail on the county's policy page. The county-inspector route is thinner — the portal is said to carry results, but no correction-notice process is published — hence 70.

department policy + fee schedule checked 2026-09-13 https://www.sumtercountyfl.gov/1428/Private-Provider-Requirements

Q61 What is issued on pass? Core Final sign-off & PTO

For a residential retrofit such as rooftop PV, the job is marked FINALED in Citizenserve rather than receiving a Certificate of Occupancy. The county's closeout policy separates 'Residential SFR' and 'Residential Mobile Home' (which get a Certificate of Occupancy, subject-line 'Request for CO') from 'Residential remodel, addition, miscellaneous' (subject-line 'Request for Project Closeout', 'These requirements shall be completed for the job to be marked Finaled in Citizenserve'). Allow two business days for a CO, a Certificate of Completion, or a job to be marked Finaled.

Why the confidence is not higherThe four-way closeout table is explicit on the county's private-provider page. Held at 72 because that page frames the table for private-provider jobs; it is a reasonable but unstated inference that the same categories apply when the county inspects.

department policy checked 2026-09-13 https://www.sumtercountyfl.gov/1428/Private-Provider-Requirements

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer, in both regimes, and on a private-provider job the county says so in terms. County policy item 9: 'Sumter County does not perform Green Tag inspections and/or issue stickers. It is up to the Private Provider to provide stickers and to inform the responsible power company.' On the utility side, SECO's standard puts the duty on the member: 'Members considering interconnection with net metering to an RGS installed at their site must complete the application, the interconnection agreement and the interconnection checklist on SECO Energy's Solar Dashboard.' On a City-served parcel, Sec. 27-37(a)(4) makes the customer provide the City with the executed interconnection agreement and the Tri-Party PPA. Nothing anywhere puts the notification on the AHJ.

Why the confidence is not higherThe private-provider half is explicit. The county-inspector half is the gap: no county document says who tells the utility when the county itself does the final, and the negative — that the county issues no green tag and no sticker — is the clearest thing in the record. Held at 68 for that gap.

department policy + utility standard + codified rate schedule checked 2026-09-13 https://www.sumtercountyfl.gov/1428/Private-Provider-Requirements

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 85%

No. Neither the City of Bushnell nor Sumter County specifies placard wording of its own. The wording that applies comes from the NEC and, on SECO parcels, from SECO.

Size, colour & material 92%

The AHJ specifies nothing. SECO does, in full, and it is the most prescriptive placard specification found in Florida: the placard shall be permanent and durable NON-FERROUS METAL OR POLY-PLASTIC PLATES, UV RESISTANT, EPOXY GLUED OR RIVETED to the front cover of the disconnect switch, with ENGRAVED OR STAMPED lettering a MINIMUM OF 1/4 INCH HIGH, WHITE LETTERS ON A RED BACKGROUND. 'The use of peel-and-stick labels, paint, or marking pens to label the plates is not acceptable.' The same note is repeated on all four pages of the standard, including the energy storage and retrofit drawings.

Where they go 92%

SECO parcels: on the FRONT COVER of the utility AC disconnect switch (Detail A) and on the FRONT COVER of the meter enclosure (Detail B). The disconnect itself must be adjacent to the meter enclosure, so both labels end up in one place at the service. Attachment method is prescribed — epoxy glued or riveted — not adhesive. City-served parcels: no published placement requirement beyond the NEC's own locations.

What the utility wants on top 90%

Yes, where SECO is the seller — and this is the single most job-relevant fact in the record. SECO requires TWO placards that the AHJ does not: (1) Detail 'A', 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH', on the front cover of the utility AC disconnect switch; and (2) Detail 'B', 'DUAL POWER SOURCE', on the front cover of the meter enclosure. The identical requirement is repeated for a system with energy storage (Detail 'D') and for a new array retrofitted to an existing one (Detail 'E'). Where the CITY is the seller, no utility placard is published.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Sumter County
Regions covered
Authority Contact
Building Department
Direct Phone
(352) 569-2421
Booking & Scheduling