City of Delray Beach is a city authority in the State of Florida, serving 66,846 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Delray Beach against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Delray Beach is the authority having jurisdiction 88% confidence
Holds
Building and electrical. The City's Development Services Department, Building Division, issues and enforces both permit types itself and performs its own inspections, in-house.
Overridden by
Florida Statute 163.04 bars any city ordinance or HOA/deed covenant from prohibiting a solar installation (an HOA may only regulate roof orientation/location, not block or condition approval). FPL controls interconnection/PTO timing under its own tariff and requires the City's permit final/certification (Tariff Sheet 9.050 Sec. 3.4) before service; that step is sequenced after the City's inspection, not delegated to FPL. Palm Beach County's SolarAPP+ program (adopted county-wide 8 May 2025) does NOT reach the City of Delray Beach — Delray runs its own building department, independent of the County, the same as West Palm Beach, Boca Raton and Boynton Beach, all of which are confirmed SolarAPP+ negatives despite sitting in the same county. A site-wide Wayback CDX scan of delraybeachfl.gov found zero 'SolarApp' hits, corroborating that the City has not adopted it in its own right. About 19% of the City's building inspections are optionally routed through the state's private-provider statute (FS 553.791) at the applicant's election per the City's own FY2021/22 Ch. 553 utilization report — this is a statutory election, not an AHJ delegation.
Why not higher
The City's own 'Building Permit & Inspection Utilization Report' (Ch. 553, F.S., mandatory annual disclosure) for FY2021/2022 shows 28 personnel dedicated by the LOCAL GOVERNMENT to enforce the Florida Building Code, issue permits and conduct inspections, with 32,102 inspections conducted directly and 6,100 (19%) via private provider — proving an in-house City department, not a contracted third-party firm (unlike neighboring Deerfield Beach). The City's 2017 Building Division PV submittal checklist states plainly 'Building and Electrical Permits are required,' both issued by the City. Deduction of 12: I could not reach delraybeachfl.gov directly (Akamai blocks curl and WebFetch alike with a generic 403 on every path including /robots.txt), so all confirmation is via Wayback Machine snapshots rather than a live fetch, and I could not independently confirm on solarapp.org (site itself refused every connection) that Delray is absent from its adopter list — I inferred that from the County-vs-municipality pattern and the site-wide zero-hit CDX scan instead.

http://web.archive.org/web/20260608060323/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-permit-inspection-utilization-report

Permit required
Yes — a permit is required for a residential rooftop PV system88%
Plan review
No City-published PV-specific turnaround found. The statutory floor that applies statewide (and therefore to Delray Beach) is FS 553.792: within 5 business days of a complete application…60%
Portal
eServices / ePlans — the City's online permitting system, built on Laserfiche (application intake at weblink.mydelraybeach.com/Forms/ePLANS-Permit,78%
Electrical code
2023 — the City's own Building Codes page states: 'National Electric Code (NEC), 2023 Edition, enacted by Florida State Statute'92%
Own placard wording
No — the City specifies no placard wording of its own; its only signage instruction is that the site plan must show where signage will go, for Fire Department review65%
Booking an inspection
Portal — inspections are requested from inside the same ePlans/eServices permit record: 'go to the permit inspections tab and request [inspection type]'80%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes — a permit is required for a residential rooftop PV system Q3 Electrical and building permits — Combined at the application/submittal level — one PV permit application package covers both Building and Electrical review; Q4 Plan review — No City-published PV-specific turnaround found. The statutory floor that applies statewide (and therefore to Delray Beach) is FS 553.792: within 5 business days of… Q18 Where you file — eServices / ePlans — the City's online permitting system, built on Laserfiche (application intake at weblink.mydelraybeach.com/Forms/ePLANS-Permit, Q20

Permit required
Yes — a permit is required for a residential rooftop PV system88% source
Plan review turnaround
No City-published PV-specific turnaround found. The statutory floor that applies statewide (and therefore to Delray Beach) is FS 553.792: within 5 business days of a complete application for an…60% source
Key document
City Building Division PV submittal checklist (2017, still served live as of Apr 2025 crawl) cited by 8 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes — the City of Delray Beach Development Services Department, Building Division, is the AHJ for residential solar within city limits 90% · City utilization report + Building Division PV checklist
    • What does this authority permit itself, and what does it delegate? Both — the City itself issues and reviews both the Building permit and the Electrical permit for a residential PV installation; it does not delegate either to the County or to a private plan-review firm 82% · City Building Division PV submittal checklist (2017, still served live as of Apr 2025 crawl)
    • Is a permit required for a residential rooftop PV system? Yes — a permit is required for a residential rooftop PV system 88% · City Building Division PV submittal checklist
    • Is there a separate electrical permit, or is it combined? Combined at the application/submittal level — one PV permit application package covers both Building and Electrical review; in the City's ePlans permitting system, Electrical is tracked as a linked sub-permit/inspection record ('ELEC-PR') under the master (Building) permit rather than as an independent, separately-filed permit 62% · eServices Building Permit Quick Reference Guide
    • Is a HOA or architectural approval required first? No — a City ordinance or an HOA/deed restriction cannot require prior approval that would prohibit or effectively prohibit a solar installation. An HOA/governing document may only regulate WHERE on the roof panels go (within an orientation range of due south, or within 45° east/west of due south) if that doesn't impair the system's effective operation 85% · Florida Statute 163.04 (enacted text)
    • Is there a historic-district review? Likely yes for properties within one of Delray's locally-designated historic districts/individually-designated historic structures — the Historic Preservation Board (or Planning & Zoning staff, for minor work) requires a Certificate of Appropriateness (COA) for exterior alterations to a historic structure or property, and a roof-mounted PV array would ordinarily be an exterior alteration. No PV-specific COA guidance was found 58% · City Historic Preservation FAQ (2019 snapshot; not solar-specific)
    • Is a wind or windstorm certification required? No — no windstorm/wind-load certification scheme of Delray Beach's own was found; Florida instead builds wind-load compliance into the Florida Building Code itself (High-Velocity Hurricane Zone and wind-borne-debris provisions), enforced at plan review/inspection rather than via a separate certificate 50% · Absence across City Building Division's full published document set
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Roof-mounted PV minimum submittal package per the Building Division: (1) Building Permit Application, complete, in blue/black ink; (2) two complete sets of plans; (3) Survey/Site Plan showing official address, building footprint/north arrow, PV array configuration and location of all major components (sub-panels, main electrical service), with dimensions/clearances; (4) Building: framing plan showing PV layout on existing roof framing, existing roofing type/number of coverings, weatherproofing method for roof penetrations, manufacturer specs for all PV modules/inverters/combiner box/disconnects/mounting system, mounting system NRTL listing or FL-PE review, and a Florida engineer's seal on the existing roof structure review; (5) Electrical (ground AND roof mount): one-line diagram (three-line if system exceeds 10 kW), amperage/clearance compliance with NEC Article 110, PV array configuration/string config, grounding/bonding, AC and DC disconnects, conductor sizing, utility-interactive inverter data, point of utility connection per NEC 690.64, GFCI protection; (6) Fire Department: scaled site plan showing street access, array/disconnect/signage locations, required access pathways, plan/elevation views showing ridgelines/eaves/roof obstructions, and compliance with NFPA 1 Sec. 11.12 70% · City Building Division PV Submittal Checklist (dated 8/2017; live as of Apr 2025 crawl)
    • How many copies, and in what format? Electronic only, via the City's ePlans portal (a Laserfiche WebLink form at weblink.mydelraybeach.com). Documents folder: PDF only, letter/legal/tabloid size, multi- or single-page, portrait or landscape. Drawings folder: single-page PDF per plan sheet, all sheets in LANDSCAPE orientation, a blank 3" W x 2" H box reserved in the upper-right corner of every sheet for the City's digital approval stamp, minimum sheet size 17"x11" and maximum 36"x24" for residential (48"x36" for commercial). All professional drawings/plans/calcs/surveys must be digitally signed and sealed by a THIRD-PARTY certification authority — self-signed certificates are rejected — and files must be named to match the exact sheet number/title (e.g. 'E-5.0 – Electrical Riser and Schedules.pdf') 85% · City ePlans document-requirements page (current)
    • Is a site plan required, and what must it show? Yes. Survey or Site Plan must show: official property address with street name(s); footprint of the building and north arrow; site plan indicating location of major components on the property, including PV array configuration; all supporting equipment including sub-panels and the location of the main electrical service; dimensions and clearances for all equipment 75% · City Building Division PV Submittal Checklist (2017)
    • Is a one-line / three-line diagram required? Yes — an electrical one-line diagram is required for every PV system; a three-line diagram is additionally required if the system exceeds 10 kW 80% · City Building Division PV Submittal Checklist (2017)
    • Are string and conductor calculations required? Yes, in substance — the checklist requires the PV array configuration, size, type and number of modules per string (series/parallel), plus conductor sizes, types, temperature ratings and ampacities, which together function as the string/conductor calculation package, though the checklist does not use that exact phrase 68% · City Building Division PV Submittal Checklist (2017)
    • Is a structural PE stamp required, and at what threshold? No fixed dollar/weight threshold is published. Instead: all PV mounting systems and attachments must be either approved by a Nationally Recognized Testing Laboratory (NRTL) OR reviewed and approved by a Florida-licensed engineer; separately, 'Seal Documentation from a Florida Engineer's review of existing roof structure' is required as a standing item on every roof-mounted PV submittal, not gated to a size/weight threshold 75% · City Building Division PV Submittal Checklist (2017)
    • Is an electrical PE stamp required, and at what threshold? Yes, above 200 amps: 'PV systems that exceed 200 amp shall be prepared and stamped by a State of Florida licensed electrical engineer.' Below that threshold no PE stamp is required on the electrical drawings 80% · City Building Division PV Submittal Checklist (2017)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? eServices / ePlans — the City's online permitting system, built on Laserfiche (application intake at weblink.mydelraybeach.com/Forms/ePLANS-Permit, a Laserfiche Forms/WebLink product — confirmed by the server's own P3P header: 'Laserfiche does not have a P3P policy'). The prior system, a Selectron-branded portal at permitting.delraybeachfl.gov, appears to be decommissioned: it now resolves to a generic *.dnsmadeeasy.com certificate rather than a City site 78% · Direct portal probe (Laserfiche WebLink headers) + City ePlans pages
    • Can the whole application be completed online? Yes. 'As of June 5, 2023 all building permit applications, except for demolition applications, may be submitted online' through ePlans/eServices; the whole cycle (apply, upload drawings, respond to review comments, pay, download/print the issued permit) is described as happening online, and inspections are also requested from within the same portal ('permit inspections tab') 85% · City 'Getting Started with ePlans' page
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? No City-published PV-specific turnaround found. The statutory floor that applies statewide (and therefore to Delray Beach) is FS 553.792: within 5 business days of a complete application for an existing single-family dwelling if the value of the work is under $15,000 (most electrical-only components of a PV job may qualify), otherwise within 30 business days for structures under 7,500 sq ft, when using a local-government plan reviewer — with a mandatory 10%-per-business-day permit-fee rebate for City delay beyond the deadline 60% · Florida Statute 553.792 (enacted text)
    • How long is an issued permit valid before it expires? One year from issuance, or the effective date of the next Florida Building Code edition, whichever is later (for a single-family-dwelling permit) 65% · Florida Statute 553.79(1)(c) (enacted text) — no Delray-specific override found
    • Which utility handles interconnection here? Florida Power & Light Company (FPL) 92% · FPL PSC tariff, Section 7 'Communities Served', Sheet 7.020
    • Where does the utility sit in the sequence? After permit — FPL's Interconnection Agreement tariff (Tier 1, Sheet 9.050, Sec. 3.4) requires: 'The Customer agrees to provide Local Building Code Official inspection and certification of installation. The certification shall reflect that the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications' — i.e. FPL requires the City's permit approval and inspection certification before it will place the system in service/grant PTO 85% · FPL PSC tariff, Section 9, Sheet 9.050 (Tier 1 Interconnection Agreement)

28 questions answered against City of Delray Beach’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes — the City of Delray Beach Development Services Department, Building Division, is the AHJ for residential solar within city limits

Why the confidence is not higherThe City's own FY2021/22 Ch. 553 utilization report describes an active local-government building department (28 dedicated personnel, ~19,834-32,102 inspections/year over successive reports) enforcing the FBC; the 2017 PV submittal checklist is headed 'City of Delray Beach, Building Division'. I could not reach the live site directly (Akamai 403s every path) so this is read from Wayback snapshots of the City's own pages.

City utilization report + Building Division PV checklist checked 2026-09-12 http://web.archive.org/web/20260608060323/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-permit-inspection-utilization-report

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both — the City itself issues and reviews both the Building permit and the Electrical permit for a residential PV installation; it does not delegate either to the County or to a private plan-review firm

Why the confidence is not higherThe City's 2017 'Building Permit Submittal Checklist — Photovoltaic Systems' states plainly: 'Building and Electrical Permits are required.' The FY2021/22 utilization report shows the enforcement personnel are the City's own (28 employees), not a contracted firm. Marked down: the checklist is dated 2017 and I found no current (post-2020) restatement of this specific 'both permits' sentence.

City Building Division PV submittal checklist (2017, still served live as of Apr 2025 crawl) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes — a permit is required for a residential rooftop PV system

Why the confidence is not higherThe City's PV checklist opens 'Building and Electrical Permits are required' for photovoltaic systems (roof-mounted, commercial and residential); the City's Building Codes page confirms Florida Building Code 8th Ed. and NEC 2023 are enacted and enforced, with no PV/solar exemption stated anywhere in the City's permit-applications, quick-reference or ePlans documentation I read (positive control 'permit' had 20+ site-wide hits; fabricated control 'zzqqx' had zero).

City Building Division PV submittal checklist checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined at the application/submittal level — one PV permit application package covers both Building and Electrical review; in the City's ePlans permitting system, Electrical is tracked as a linked sub-permit/inspection record ('ELEC-PR') under the master (Building) permit rather than as an independent, separately-filed permit

Why the confidence is not higherThe PV checklist says both permits 'are required' without saying whether they are filed as one application; the City's own eServices Building Permit Quick Reference Guide describes 'sub permits can be applied from the sub-records tab' of a master permit, and lists an 'Electrical Release Agreement (Temp for Test) — ELEC-PR' inspection type nested under the permit-inspections tab of the master record. Inference across two City documents rather than a direct statement either way.

eServices Building Permit Quick Reference Guide checked 2026-09-12 http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either — a Florida-licensed electrical (or certified solar) contractor may pull the electrical permit, or the property owner may self-permit under Florida's owner-builder exemption

Why the confidence is not higherNo City document addresses this specifically for solar. State law: FS 489.103(7)(a) lets an owner act as their own contractor and personally sign the permit application for a one- or two-family residence they occupy, with direct on-site supervision; otherwise FS Ch. 489 requires a properly licensed and City-registered contractor whose license scope covers the work (the City's Contractor Registration page lists 'Electrical Contractors, NAICS 238210' as a recognized category; it does not list a distinct 'Solar Contractor' category). This is state law read generally, not a Delray-specific solar statement.

Florida Statute 489.103(7) + City Contractor Registration page (recognized contractor types) checked 2026-09-12 https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0489/Sections/0489.103.html

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — contractor registration with the City is required before a contractor may apply for any permit

Why the confidence is not higherThe City's Contractor Registration page states: 'Contractor registration is required for any contractor performing licensed work within the City of Delray Beach,' and lists the required documents (active FL contractor license matching scope of work, workers' comp certificate, general liability certificate) that must be gathered BEFORE submitting the online application.

City Contractor Registration page (current, eServices) checked 2026-09-12 http://web.archive.org/web/20250804220039/https://www.delraybeachfl.gov/government/city-departments/development-services/contractor-registration

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Nothing published by this authority.

Where we lookedChecked the City's Contractor Registration page and the 2017 PV submittal checklist for a homeowner self-permit / owner-builder statement specific to solar; neither addresses it. Florida's general owner-builder exemption (FS 489.103(7)) would apply to any residential electrical work including PV, but I found no City-specific confirmation or denial for solar specifically

http://web.archive.org/web/20250804220039/https://www.delraybeachfl.gov/government/city-departments/development-services/contractor-registration

Q8 What documents make up a complete submittal? Core Submittal package

Roof-mounted PV minimum submittal package per the Building Division: (1) Building Permit Application, complete, in blue/black ink; (2) two complete sets of plans; (3) Survey/Site Plan showing official address, building footprint/north arrow, PV array configuration and location of all major components (sub-panels, main electrical service), with dimensions/clearances; (4) Building: framing plan showing PV layout on existing roof framing, existing roofing type/number of coverings, weatherproofing method for roof penetrations, manufacturer specs for all PV modules/inverters/combiner box/disconnects/mounting system, mounting system NRTL listing or FL-PE review, and a Florida engineer's seal on the existing roof structure review; (5) Electrical (ground AND roof mount): one-line diagram (three-line if system exceeds 10 kW), amperage/clearance compliance with NEC Article 110, PV array configuration/string config, grounding/bonding, AC and DC disconnects, conductor sizing, utility-interactive inverter data, point of utility connection per NEC 690.64, GFCI protection; (6) Fire Department: scaled site plan showing street access, array/disconnect/signage locations, required access pathways, plan/elevation views showing ridgelines/eaves/roof obstructions, and compliance with NFPA 1 Sec. 11.12

Why the confidence is not higherVerbatim from the City Building Division's 'Building Permit Submittal Checklist — Photovoltaic Systems (Roof Mounted Systems Commercial and Residential),' dated 8/2017. This is the only PV-specific checklist the City publishes that I could find (linked from the City's Sustainability 'Solar Energy' FAQ page, id=4498), and it was still being served live at that same document ID as recently as an April 2025 Wayback crawl, so it appears to remain the operative document — but its NEC citations (Art. 110-2011, 690.64) predate the City's current NEC 2023 adoption, so specific article numbers may have been renumbered.

City Building Division PV Submittal Checklist (dated 8/2017; live as of Apr 2025 crawl) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q9 How many copies, and in what format? Submittal package

Electronic only, via the City's ePlans portal (a Laserfiche WebLink form at weblink.mydelraybeach.com). Documents folder: PDF only, letter/legal/tabloid size, multi- or single-page, portrait or landscape. Drawings folder: single-page PDF per plan sheet, all sheets in LANDSCAPE orientation, a blank 3" W x 2" H box reserved in the upper-right corner of every sheet for the City's digital approval stamp, minimum sheet size 17"x11" and maximum 36"x24" for residential (48"x36" for commercial). All professional drawings/plans/calcs/surveys must be digitally signed and sealed by a THIRD-PARTY certification authority — self-signed certificates are rejected — and files must be named to match the exact sheet number/title (e.g. 'E-5.0 – Electrical Riser and Schedules.pdf')

Why the confidence is not higherVerbatim from the City's current 'ePlans Requirements for Drawings and Documents' page (development-services/eplans-guide-to-permitting/document-requirements), captured March 2025. This supersedes the paper-copy instruction in the 2017 PV checklist ('two (2) complete sets of plans') now that the City has moved to all-digital submission (per the June 2023 mandate below, q21).

City ePlans document-requirements page (current) checked 2026-09-12 http://web.archive.org/web/20250306130521/https://www.delraybeachfl.gov/government/city-departments/development-services/eplans-guide-to-permitting/document-requirements

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes. Survey or Site Plan must show: official property address with street name(s); footprint of the building and north arrow; site plan indicating location of major components on the property, including PV array configuration; all supporting equipment including sub-panels and the location of the main electrical service; dimensions and clearances for all equipment

Why the confidence is not higherVerbatim bullet list from the City's 2017 PV submittal checklist. Deduction: 2017-dated, and general ePlans rules (q9) separately require a property survey no more than 12 months old only for projects that increase impervious area — a straightforward roof retrofit PV job may not trigger that specific survey-currency rule.

City Building Division PV Submittal Checklist (2017) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — an electrical one-line diagram is required for every PV system; a three-line diagram is additionally required if the system exceeds 10 kW

Why the confidence is not higherVerbatim from the City's PV submittal checklist: 'Electrical one-lined diagram is required; if the PV system exceeds 10 KW a three-line diagram is required.'

City Building Division PV Submittal Checklist (2017) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q12 Are string and conductor calculations required? Drawings & calculations

Yes, in substance — the checklist requires the PV array configuration, size, type and number of modules per string (series/parallel), plus conductor sizes, types, temperature ratings and ampacities, which together function as the string/conductor calculation package, though the checklist does not use that exact phrase

Why the confidence is not higherInferred from two bullet items on the City's PV checklist: '...number of modules per string. Whether they are in series or parallel' and 'Conductor sizes, types, temperature rating(s), and ampacity(s).' No separate line item is labelled 'calculations.'

City Building Division PV Submittal Checklist (2017) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No fixed dollar/weight threshold is published. Instead: all PV mounting systems and attachments must be either approved by a Nationally Recognized Testing Laboratory (NRTL) OR reviewed and approved by a Florida-licensed engineer; separately, 'Seal Documentation from a Florida Engineer's review of existing roof structure' is required as a standing item on every roof-mounted PV submittal, not gated to a size/weight threshold

Why the confidence is not higherVerbatim from the City's PV submittal checklist, Building Requirements section.

City Building Division PV Submittal Checklist (2017) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Yes, above 200 amps: 'PV systems that exceed 200 amp shall be prepared and stamped by a State of Florida licensed electrical engineer.' Below that threshold no PE stamp is required on the electrical drawings

Why the confidence is not higherVerbatim from the City's PV submittal checklist, Electrical Requirements section.

City Building Division PV Submittal Checklist (2017) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q15 What does a residential solar permit cost? Core Fees

Nothing published by this authority.

Where we lookedSearched the City's 'Paying Permit Fees' page (describes how to pay online, not a schedule), the 2017 PV checklist (no dollar figures at all), and looked for a Master Fee Schedule/Resolution document; none is linked from any City page I could reach via Wayback. library.municode.com/fl/delray_beach carries robots.txt 'User-agent: ClaudeBot / Disallow: /', so I did not fetch it if a fee resolution lives there. The City's own Laserfiche document repository (weblink.mydelraybeach.com/WebLink) requires an interactive JS session and returned no browsable content to a scripted fetch

https://www.delraybeachfl.gov/services/online-services/paying-permit-fees

Q16 How is the fee calculated? Core Fees

Nothing published by this authority.

Where we lookedSame search as q15 — no fee schedule document located to determine flat/valuation/per-kW/tiered structure

https://www.delraybeachfl.gov/services/online-services/paying-permit-fees

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedSame search as q15 — no fee schedule located to confirm whether plan review is billed separately from the permit fee

https://www.delraybeachfl.gov/services/online-services/paying-permit-fees

Q18 What is the stated plan-review turnaround? Core Timeline & validity

No City-published PV-specific turnaround found. The statutory floor that applies statewide (and therefore to Delray Beach) is FS 553.792: within 5 business days of a complete application for an existing single-family dwelling if the value of the work is under $15,000 (most electrical-only components of a PV job may qualify), otherwise within 30 business days for structures under 7,500 sq ft, when using a local-government plan reviewer — with a mandatory 10%-per-business-day permit-fee rebate for City delay beyond the deadline

Why the confidence is not higherFS 553.792 read directly from the current statute text (not a summary); this is the statewide backstop, not a number the City itself publishes anywhere I could reach — I did not find a City-specific 'plan review takes X days' statement on any of the ePlans/quick-reference/permit-application pages I read.

Florida Statute 553.792 (enacted text) checked 2026-09-12 https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0500-0599/0553/Sections/0553.792.html

Q19 How long is an issued permit valid before it expires? Timeline & validity

One year from issuance, or the effective date of the next Florida Building Code edition, whichever is later (for a single-family-dwelling permit)

Why the confidence is not higherFS 553.79(1)(c) read directly from the current statute text: a single-family-dwelling building permit 'expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later,' and the statute does not prevent a local government from extending it. No City-specific page overriding or shortening this for PV was found.

Florida Statute 553.79(1)(c) (enacted text) — no Delray-specific override found checked 2026-09-12 https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0500-0599/0553/Sections/0553.79.html

Q20 Which permit portal does this authority use? Core Portal & process

eServices / ePlans — the City's online permitting system, built on Laserfiche (application intake at weblink.mydelraybeach.com/Forms/ePLANS-Permit, a Laserfiche Forms/WebLink product — confirmed by the server's own P3P header: 'Laserfiche does not have a P3P policy'). The prior system, a Selectron-branded portal at permitting.delraybeachfl.gov, appears to be decommissioned: it now resolves to a generic *.dnsmadeeasy.com certificate rather than a City site

Why the confidence is not higherConfirmed directly: curl -I on weblink.mydelraybeach.com/Forms/ePLANS-Permit returns 'server: Microsoft-IIS/10.0' and 'p3p: CP="Laserfiche does not have a P3P policy"'; curl -v on permitting.delraybeachfl.gov shows TLS cert 'CN=*.dnsmadeeasy.com', not a City-owned certificate, so that legacy Selectron portal is no longer live under that name. Deduction: I could not load the live delraybeachfl.gov eServices landing page itself (Akamai 403s it), so this is assembled from linked sub-pages and direct probes of the two portal hostnames rather than one authoritative page.

Direct portal probe (Laserfiche WebLink headers) + City ePlans pages checked 2026-09-12 https://weblink.mydelraybeach.com/Forms/ePLANS-Permit

Q21 Can the whole application be completed online? Core Portal & process

Yes. 'As of June 5, 2023 all building permit applications, except for demolition applications, may be submitted online' through ePlans/eServices; the whole cycle (apply, upload drawings, respond to review comments, pay, download/print the issued permit) is described as happening online, and inspections are also requested from within the same portal ('permit inspections tab')

Why the confidence is not higherVerbatim from the City's 'Getting Started with ePlans' page, and corroborated by the eServices Building Permit Quick Reference Guide's description of applying, paying and requesting inspections all inside the same portal.

City 'Getting Started with ePlans' page checked 2026-09-12 http://web.archive.org/web/20240306191046/https://www.delraybeachfl.gov/government/city-departments/development-services/building/digital-permit-submissions-eplans/getting-started-with-eplans

Q22 Which utility handles interconnection here? Core Utility interconnection

Florida Power & Light Company (FPL)

Why the confidence is not higherConfirmed directly from FPL's own PSC-filed tariff, Section 7 'Communities Served', Sheet No. 7.020 (Ninth Revised, Effective January 1, 2026): 'Delray Beach' is listed by name under Palm Beach County. I downloaded and text-extracted this PDF myself.

FPL PSC tariff, Section 7 'Communities Served', Sheet 7.020 checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/rates/pdf/electric-tariff-section7.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit — FPL's Interconnection Agreement tariff (Tier 1, Sheet 9.050, Sec. 3.4) requires: 'The Customer agrees to provide Local Building Code Official inspection and certification of installation. The certification shall reflect that the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications' — i.e. FPL requires the City's permit approval and inspection certification before it will place the system in service/grant PTO

Why the confidence is not higherVerbatim from FPL's own tariff, Section 9, Sheet 9.050 Sec. 3.4, which I downloaded and text-extracted myself. Deduction: the interconnection APPLICATION itself can be filed with FPL in parallel with the City permit process (the tariff doesn't forbid that), but energization/PTO is sequenced after City sign-off.

FPL PSC tariff, Section 9, Sheet 9.050 (Tier 1 Interconnection Agreement) checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/rates/pdf/electric-tariff-section9.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — a City ordinance or an HOA/deed restriction cannot require prior approval that would prohibit or effectively prohibit a solar installation. An HOA/governing document may only regulate WHERE on the roof panels go (within an orientation range of due south, or within 45° east/west of due south) if that doesn't impair the system's effective operation

Why the confidence is not higherFlorida Statute 163.04, read directly: 'The adoption of an ordinance by a governing body...which prohibits or has the effect of prohibiting the installation of solar collectors...is expressly prohibited,' and 'A deed restriction, covenant, declaration, or similar binding agreement may not prohibit or have the effect of prohibiting solar collectors...from being installed,' with the HOA location carve-out quoted above. This is statewide law, not a Delray-specific statement, but it directly answers the question for any Florida city including Delray Beach.

Florida Statute 163.04 (enacted text) checked 2026-09-12 https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0163/Sections/0163.04.html

Q25 Is there a historic-district review? Overlays & special cases

Likely yes for properties within one of Delray's locally-designated historic districts/individually-designated historic structures — the Historic Preservation Board (or Planning & Zoning staff, for minor work) requires a Certificate of Appropriateness (COA) for exterior alterations to a historic structure or property, and a roof-mounted PV array would ordinarily be an exterior alteration. No PV-specific COA guidance was found

Why the confidence is not higherThe City's Historic Preservation FAQ states generally: '...the Historic Preservation Board requires a review process for exterior alterations or additions to a historic structure or property... known as a request for a Certificate of Appropriateness (COA)... done by the City's Planning and Zoning Staff depending on the extent of the work or by the Historic Preservation Board.' This document never mentions solar/photovoltaic by name, so the application to PV specifically is an inference, and FS 163.04 (q24) limits how restrictive any such review may be for solar collectors.

City Historic Preservation FAQ (2019 snapshot; not solar-specific) checked 2026-09-12 http://web.archive.org/web/20190823153057/https://www.delraybeachfl.gov/government/city-departments/development-services/historic-preservation/frequently-asked-questions

Q26 Is a wind or windstorm certification required? Overlays & special cases

No — no windstorm/wind-load certification scheme of Delray Beach's own was found; Florida instead builds wind-load compliance into the Florida Building Code itself (High-Velocity Hurricane Zone and wind-borne-debris provisions), enforced at plan review/inspection rather than via a separate certificate

Why the confidence is not higherAbsence proven by an extensive read of the City's own published Building Division material (2017 PV checklist, Building Codes page, eServices Quick Reference Guide, ePlans document-requirements page) — none mentions a wind/windstorm certificate. Marked down because this is an absence read across City documents, not a City statement that no such certificate exists, and Florida has no statewide TDI-equivalent scheme to compare against.

Absence across City Building Division's full published document set checked 2026-09-12 http://web.archive.org/web/20260818135551/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-codes

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedLooked for a Special/Conditional Use Permit or City Commission approval requirement specific to residential rooftop PV in the City's PV checklist, Quick Reference Guide, and Building Codes page — none mentions Council/Commission-level review for a standard residential retrofit. Could not check the Land Development Regulations directly: library.municode.com/fl/delray_beach carries robots.txt 'Disallow: /' for ClaudeBot, so I did not fetch the zoning code text that would definitively confirm or exclude a threshold (e.g. for ground-mount or oversized systems) that triggers Commission review

https://library.municode.com/fl/delray_beach

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedLooked for a residential system-size cap (kW or otherwise) in the City's PV checklist, Building Codes page and Quick Reference Guide — none states one. The Land Development Regulations chapter that would set any such cap sits on Municode, which is robots.txt-disallowed to ClaudeBot ('Disallow: /'), so I could not confirm a cap or its absence from the zoning ordinance itself

https://library.municode.com/fl/delray_beach

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? The City's checklist requires the site plan to show 'Location of required access pathways' and requires 'Compliance with NFPA 1, Section 11.12, as applicable' — i.e. it points to the state Fire Prevention Code's roof-access-pathway/ridge-setback table rather than stating its own City-specific dimensions 65% · City Building Division PV Submittal Checklist (2017), Fire Dept. Requirements
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? The City's own requirement is limited to the site plan showing 'Locations of arrays, disconnects and required signage' for Fire Department review (2017 checklist) — it does not itself enumerate placard text. Separately, FPL (the utility) specifies its own labels at the meter can and the DER/AC disconnect switch (see q42) that go beyond anything the City's documents ask for by name 68% · City PV checklist (signage referenced, not specified) + FPL Electric Service Standards (specified)
    • Does the authority specify placard wording of its own? No — the City specifies no placard wording of its own; its only signage instruction is that the site plan must show where signage will go, for Fire Department review 65% · City Building Division PV Submittal Checklist (2017) — absence across four City documents
    • Does it specify letter height, colour or material? Nothing City-specific found for letter height/colour/material. FPL (utility) specifies its own labels must be 'permanent and weatherproof/UV resistant placard with engraved letters,' with the battery-storage placard 'permanently affixed to the meter enclosure' — but FPL's Electric Service Standards do not themselves state a minimum letter height or a colour scheme for these particular labels 60% · FPL Electric Service Standards, rev. 10-30-25 (OCR'd pp. 162, 170 of 173)
    • Does the UTILITY specify placards beyond the AHJ's? Yes. FPL's Electric Service Standards (10-30-25) require, beyond anything the City asks for: at the interconnecting meter can — 'WARNING / MULTI POWER SOURCES / ENTER SOURCES HERE / RATED AC OUTPUT CURRENT ** AMPS / NOMINAL OPERATING VOLTAGE ** VOLTS'; at the DER (AC) disconnect switch — 'GENERATION SYSTEM AC DISCONNECT / RATED AC OUTPUT CURRENT ** AMPS / NOMINAL OPERATING VOLTAGE ** VOLTS'; and for battery storage, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility.' All labels must be 'permanent and weatherproof/UV resistant placard with engraved letters' 88% · FPL Electric Service Standards, rev. 10-30-25 (self-OCR'd, pp. 162 & 170 of 173)
    • Where must the labels be placed? City: signage located per the Fire-reviewed site plan, at array and disconnect locations. FPL: at the interconnecting meter can, and at the DER (AC) disconnect switch, which itself must be mounted 'separate from but adjacent to the FPL meter socket within 10 feet' 80% · City PV checklist + FPL Electric Service Standards (self-OCR'd)
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Per FPL (utility, not the City): the AC/DER disconnect switch must be mounted separate from, but adjacent to, the FPL meter socket, within 10 feet, and must remain readily accessible to FPL; it must be lockable for an FPL padlock, on the load side of the meter and line side of the inverter, with no locked gates/doors/fences between the meter socket and the disconnect switch 85% · FPL Electric Service Standards (self-OCR'd, p.161 of 173) + FPL tariff Sheet 9.051
    • Are batteries permitted, and under what conditions? Batteries/ESS are permitted. The City's own solar checklist does not separately address batteries (it predates most residential ESS adoption), so the governing conditions come from the utility and the adopted codes: FPL requires UL 1741-certified storage (or DC-coupling behind a UL 1741 device) and a placard 'permanently affixed to the meter enclosure' reading 'Battery storage utilized in this facility'; the City's adopted 2023 NEC and Florida Fire Prevention Code (NFPA 1, 8th Ed.) would separately govern ESS installation and fire-code compliance, though no Delray-specific ESS ordinance text was found 62% · FPL Electric Service Standards (self-OCR'd, p.170 of 173) — no City-specific ESS document found
    • Is a specific mounting system or attachment spacing required? No numeric spacing/attachment-pattern rule is published; instead the mounting system itself must be either NRTL-listed or reviewed/approved by a Florida-licensed engineer, and the existing roof structure must separately carry a Florida engineer's seal from a structural review 68% · City Building Division PV Submittal Checklist (2017)

20 questions answered against City of Delray Beach’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2023 — the City's own Building Codes page states: 'National Electric Code (NEC), 2023 Edition, enacted by Florida State Statute'

Why the confidence is not higherVerbatim from the City's current 'Building Codes and Ordinances' page (business/building-codes-and-ordinances, which forwards to the Building Division's building-codes page), captured via Wayback Aug 2026 — the page opens 'Effective December 31, 2023 the Florida Building Code will change to the 8th edition' and lists NEC 2023 alongside it as enacted by state statute. CONFLICT, recorded not resolved: this is the FIRST Florida authority in 74 to publish NEC 2023. Six others state 2020 outright on their own documents — Lakeland's FAQ, Clearwater's and Melbourne's 'Codes Enforced' pages, Deltona's and Nassau County's permit-application mastheads — and Broward BORA's Formal Interpretation FI-35, a formal code interpretation instrument, cites 'NFPA 70, 2020'. Four more authorities (Boynton Beach's ordinance, Monroe County's permit form, Palm Beach County, Miami Beach) adopt the NEC by reference with NO year at all. Note also that this page lists NEC 2023 immediately alongside 'Florida Building Code, 8th Edition' effective 31 Dec 2023, which is exactly the cycle-year conflation that put a wrong 2023 into our own Broward record before FI-35 corrected it. The value above is left as the city publishes it, because what the city publishes is what an installer will be told at the counter — but it should not be treated as settling the statewide edition, and no free statewide citation exists to settle it either way (checked 12 Sep 2026: Rule 61G20-1.001 F.A.C. adopts the FBC by reference without naming an NFPA 70 edition, FS 553.73 names the NEC with no year, Rule 69A-60.003 has zero occurrences of NFPA 70, and FBC Chapter 35 sits behind ICC's 403). Commercially this matters: NEC 2023 and 2020 differ on PV labelling.

City Building Division 'Building Codes and Ordinances' page (current) checked 2026-09-12 http://web.archive.org/web/20260818135551/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-codes

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition — effective December 31, 2023

Why the confidence is not higherVerbatim from the City's Building Codes page: 'Effective December 31,2023 the Florida Building Code will change to the 8th edition... Florida Building Code, 8th Edition was enacted by Florida State Statute for: Building Plumbing Mechanical Fuel and Gas.'

City Building Division 'Building Codes and Ordinances' page (current) checked 2026-09-12 http://web.archive.org/web/20260818135551/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-codes

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (adopts NFPA 1)

Why the confidence is not higherVerbatim from the City's Building Codes page: 'Florida Fire Prevention Code, 8th Edition, enacted by Florida State Statute.' Corroborated by the 2017 PV checklist's Fire Department section, which cites 'compliance with NFPA 1, Section 11.12.'

City Building Division 'Building Codes and Ordinances' page (current) checked 2026-09-12 http://web.archive.org/web/20260818135551/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-codes

Q32 Are there local amendments to any of the above? Core Code editions in force

Nothing published by this authority.

Where we lookedThe City's Building Codes page attributes every current code edition (FBC 8th, NEC 2023, Fire Prevention Code 8th) to 'Florida State Statute' rather than describing a local amendment ordinance, which suggests adoption largely follows the state cycle — but I could not read the Land Development Regulations / City Code chapter that would list any City-specific technical amendments, because library.municode.com/fl/delray_beach is robots.txt-disallowed to ClaudeBot

https://library.municode.com/fl/delray_beach

Q33 What is the installation judged against? Core Electrical

The installation is judged against the Florida Building Code 8th Edition (Building/Plumbing/Mechanical/Fuel-Gas), the 2023 National Electrical Code, and the Florida Fire Prevention Code 8th Edition (NFPA 1) as adopted by the City, plus the City's 2017 PV-specific submittal checklist requirements (NRTL-listed or PE-reviewed mounting, PE-stamped electrical over 200A, NEC 690.64 point of interconnection, NFPA 1 Sec. 11.12 fire pathways)

Why the confidence is not higherCombines the City's current Building Codes page (code editions) with its PV submittal checklist (solar-specific technical requirements) — two City documents, not one unified statement.

City Building Codes page + PV Submittal Checklist checked 2026-09-12 http://web.archive.org/web/20260818135551/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-codes

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedLooked in the City's PV checklist, Building Codes page and Quick Reference Guide for a City-specific service-upgrade or busbar-sizing rule (the kind Alameda County publishes for its 'instant' PV path) — none of the three mentions one

http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No numeric spacing/attachment-pattern rule is published; instead the mounting system itself must be either NRTL-listed or reviewed/approved by a Florida-licensed engineer, and the existing roof structure must separately carry a Florida engineer's seal from a structural review

Why the confidence is not higherSame two bullet items from the City's 2017 PV checklist used for q13; there is no attachment-spacing figure (e.g. inches on-center) published anywhere I found.

City Building Division PV Submittal Checklist (2017) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

The City's checklist requires the site plan to show 'Location of required access pathways' and requires 'Compliance with NFPA 1, Section 11.12, as applicable' — i.e. it points to the state Fire Prevention Code's roof-access-pathway/ridge-setback table rather than stating its own City-specific dimensions

Why the confidence is not higherVerbatim from the Fire Department Requirements section of the City's 2017 PV checklist; no ridge-setback distance in feet/inches is stated by the City itself. Deduction: the checklist is 2017-dated and cites NFPA 1 generically rather than the specific current NFPA 1 (2021 base of FBC 8th Ed.) pathway table, so the exact current dimensions were not independently confirmed for this run.

City Building Division PV Submittal Checklist (2017), Fire Dept. Requirements checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, required — via the 2023 NEC (Article 690.12) that the City enforces; the City adds no rapid-shutdown rule of its own in any published document

Why the confidence is not higherThe 'yes' half is inference from which NEC edition the City has adopted (q29, confirmed on the City's own Building Codes page); the 'no local rule' half is proved by absence — the 2017 PV checklist, the Quick Reference Guide and the Building Codes page contain no rapid-shutdown-specific language at all.

City Building Codes page (NEC 2023) — no City-specific rapid-shutdown text found checked 2026-09-12 http://web.archive.org/web/20260818135551/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-codes

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

The City's own requirement is limited to the site plan showing 'Locations of arrays, disconnects and required signage' for Fire Department review (2017 checklist) — it does not itself enumerate placard text. Separately, FPL (the utility) specifies its own labels at the meter can and the DER/AC disconnect switch (see q42) that go beyond anything the City's documents ask for by name

Why the confidence is not higherCity half verbatim from the 2017 PV checklist Fire Dept. section; utility half self-extracted from FPL's Electric Service Standards PDF (OCR'd, revision-stamped 10-30-25, pages 162 and 169 of 173) — see q42 for the exact quoted label text.

City PV checklist (signage referenced, not specified) + FPL Electric Service Standards (specified) checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No — the City specifies no placard wording of its own; its only signage instruction is that the site plan must show where signage will go, for Fire Department review

Why the confidence is not higherThe City's 2017 PV checklist's only signage-adjacent text is 'Locations of arrays, disconnects and required signage' as a site-plan item — it never quotes actual label wording. I checked the Building Codes page, the Quick Reference Guide and the ePlans document-requirements page as well; none contains placard text either.

City Building Division PV Submittal Checklist (2017) — absence across four City documents checked 2026-09-12 http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing City-specific found for letter height/colour/material. FPL (utility) specifies its own labels must be 'permanent and weatherproof/UV resistant placard with engraved letters,' with the battery-storage placard 'permanently affixed to the meter enclosure' — but FPL's Electric Service Standards do not themselves state a minimum letter height or a colour scheme for these particular labels

Why the confidence is not higherSelf-extracted (OCR) from FPL's Electric Service Standards, page 162 of 173 ('Labeling — All labels must be permanent and weatherproof/UV resistant placard with engraved letters') and page 170 ('A placard must be permanently affixed to the meter enclosure stating "Battery storage utilized in this facility."'). No City document addresses letter height/colour/material at all.

FPL Electric Service Standards, rev. 10-30-25 (OCR'd pp. 162, 170 of 173) checked 2026-09-12 https://www.fpl.com/partner/pdf/electric-service-standards.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedLooked for a City-specific 'plaque or directory' / facility-map placard requirement (the NEC 705.10 style requirement) in the PV checklist, Building Codes page and Quick Reference Guide — none states one directly; the closest is the checklist's Fire site-plan requirement to show 'Locations of arrays, disconnects and required signage,' which is a site-PLAN requirement rather than a placard specification

http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes. FPL's Electric Service Standards (10-30-25) require, beyond anything the City asks for: at the interconnecting meter can — 'WARNING / MULTI POWER SOURCES / ENTER SOURCES HERE / RATED AC OUTPUT CURRENT ** AMPS / NOMINAL OPERATING VOLTAGE ** VOLTS'; at the DER (AC) disconnect switch — 'GENERATION SYSTEM AC DISCONNECT / RATED AC OUTPUT CURRENT ** AMPS / NOMINAL OPERATING VOLTAGE ** VOLTS'; and for battery storage, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility.' All labels must be 'permanent and weatherproof/UV resistant placard with engraved letters'

Why the confidence is not higherI downloaded FPL's Electric Service Standards PDF myself, ran pdffonts (confirmed Type 3 embedded fonts on the relevant pages, so pdftotext alone would be unreliable), rendered pages 161-173 at 200dpi with pdftoppm and OCR'd them with tesseract. The quoted label text is verbatim from pages 162 and 170 of 173, under Section XIII 'Distributed Generation'.

FPL Electric Service Standards, rev. 10-30-25 (self-OCR'd, pp. 162 & 170 of 173) checked 2026-09-12 https://www.fpl.com/partner/pdf/electric-service-standards.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

City: signage located per the Fire-reviewed site plan, at array and disconnect locations. FPL: at the interconnecting meter can, and at the DER (AC) disconnect switch, which itself must be mounted 'separate from but adjacent to the FPL meter socket within 10 feet'

Why the confidence is not higherCity half from the 2017 PV checklist; FPL half self-OCR'd from the Electric Service Standards, p.162 ('Labeling...must be installed at the interconnecting meter can and the DER disconnect switch') and the '10 feet' distance appears identically on p.161 (net metering disconnect-switch requirements) and in FPL's tariff Sheet 9.051.

City PV checklist + FPL Electric Service Standards (self-OCR'd) checked 2026-09-12 https://www.fpl.com/partner/pdf/electric-service-standards.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedLooked for a City-maintained approved-equipment list in the PV checklist, Building Codes page, Quick Reference Guide and Contractor Registration page — none exists; the closest is the general NRTL-listing requirement for mounting systems (q13), which is a listing STANDARD, not a City-maintained list of specific approved products

http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries/ESS are permitted. The City's own solar checklist does not separately address batteries (it predates most residential ESS adoption), so the governing conditions come from the utility and the adopted codes: FPL requires UL 1741-certified storage (or DC-coupling behind a UL 1741 device) and a placard 'permanently affixed to the meter enclosure' reading 'Battery storage utilized in this facility'; the City's adopted 2023 NEC and Florida Fire Prevention Code (NFPA 1, 8th Ed.) would separately govern ESS installation and fire-code compliance, though no Delray-specific ESS ordinance text was found

Why the confidence is not higherUtility conditions self-OCR'd from FPL's Electric Service Standards p.170 of 173 ('Battery Storage... 1. Technical Specifications...must have a certification...to the current UL 1741 standard...A placard must be permanently affixed to the meter enclosure'). No City-specific ESS permitting page or ordinance text was found (Municode blocked, see q27/28/32).

FPL Electric Service Standards (self-OCR'd, p.170 of 173) — no City-specific ESS document found checked 2026-09-12 https://www.fpl.com/partner/pdf/electric-service-standards.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedLooked for a City statement on whether ESS requires a separate permit or inspection from the PV permit — none found in the PV checklist, Quick Reference Guide, or Building Codes page

http://web.archive.org/web/20250421202128/https://www.delraybeachfl.gov/home/showdocument?id=4498

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedThe City's 2017 PV checklist addresses 'Both Ground and Roof Mounted' systems under its Electrical Requirements section without ever classifying a ground mount as an accessory structure, and the zoning/setback text that would answer this (Land Development Regulations) sits on Municode, which is robots.txt-disallowed to ClaudeBot

https://library.municode.com/fl/delray_beach

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Per FPL (utility, not the City): the AC/DER disconnect switch must be mounted separate from, but adjacent to, the FPL meter socket, within 10 feet, and must remain readily accessible to FPL; it must be lockable for an FPL padlock, on the load side of the meter and line side of the inverter, with no locked gates/doors/fences between the meter socket and the disconnect switch

Why the confidence is not higherSelf-OCR'd verbatim from FPL's Electric Service Standards, p.161 of 173, Section XIII.A.4 'Disconnect Switch', and corroborated by identical '10 feet'/'adjacent' language in FPL's own tariff Sheet 9.051 (Manual Disconnect Switch), which I also downloaded and text-extracted directly.

FPL Electric Service Standards (self-OCR'd, p.161 of 173) + FPL tariff Sheet 9.051 checked 2026-09-12 https://www.fpl.com/partner/pdf/electric-service-standards.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the City performs its own final inspections in-house (Building Final - BLD, Electrical release codes, etc., requested and tracked inside the City's own ePlans permit record) 78% · City eServices Quick Reference Guide + FY2021/22 Ch.553 utilization report
    • If delegated, to whom? Not delegated as a matter of City policy — the City performs its own final inspections (see q52). Property owners/contractors may separately ELECT to use a private provider under Florida's FS 553.791 for a subset of inspections; per the City's own FY2021/22 report, 19% of all City building inspections (6,100 of 32,102) went this route that year, but that is an applicant election under state law, not an AHJ delegation of authority 75% · City FY2021/22 Ch.553 building-permit-and-inspection utilization report
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? No PV-specific inspection code or sequence is published by name. The City's full published inspection-type list (in the eServices Quick Reference Guide) is trade-generic: e.g. for a straightforward existing-building PV retrofit the relevant final inspections would be Building Final ('Building Final - BLD') and any applicable Electrical release/final, requested via the permit's inspections tab; the City's list of ~40 named inspection codes (foundation stages, framing, fire final, engineering final, landscape final, blower-door, elevation certificate, etc.) contains no 'PV', 'Solar' or 'Photovoltaic' entry anywhere 62% · eServices Building Permit Quick Reference Guide — full inspection-code list read end to end
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, but general rather than solar-specific — the City publishes a full inspection-code list (covering Building, Electrical, Plumbing, Mechanical, Fire, Engineering final inspections, etc.) inside its eServices Quick Reference Guide. It does NOT publish a separate PV/solar inspection checklist; the only solar-specific checklist the City publishes is the pre-application SUBMITTAL checklist (q8), not an inspection checklist 68% · eServices Building Permit Quick Reference Guide (general inspection-code list)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (a passed field inspection closes out the permit) — for a straightforward existing-building PV retrofit there is ordinarily no new Certificate of Occupancy. Where a project also involves new construction/major alteration, the City's process separately allows requesting a CO/CC: 'Request CO/CC: go to the permit sub-records tab and apply' 65% · eServices Building Permit Quick Reference Guide
    • Who notifies the utility for PTO? Installer (on the customer's behalf) or the customer directly — FPL's interconnection process is customer/installer-initiated: an Interconnection Agreement must be executed with FPL and, per Tariff Sec. 3.4, the customer must provide FPL with the local building official's inspection/certification before FPL will energize the system. The City does not initiate or notify FPL on the applicant's behalf 62% · FPL PSC tariff, Sheet 9.050-9.051 (self-extracted)
    • How are corrections issued and cleared? For PLAN REVIEW comments specifically, the City's ePlans portal has a 'Responding to Comments' tool (listed in the site navigation and as its own guide page) where the applicant uploads revised documents against reviewer comments inside the same permit record. No City document describes the process for clearing a FAILED FIELD INSPECTION specifically 58% · eServices/ePlans navigation — 'Responding to Comments' tool

14 questions answered against City of Delray Beach’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal — inspections are requested from inside the same ePlans/eServices permit record: 'go to the permit inspections tab and request [inspection type]'

Why the confidence is not higherVerbatim pattern repeated roughly twenty times across the City's eServices Building Permit Quick Reference Guide for every inspection type (foundation holds, construction holds, building final, fire final, electrical release, etc.) — I read the guide's full inspection-request section end to end; it never mentions phone or walk-in as an alternative booking route.

eServices Building Permit Quick Reference Guide (current, Aug 2025 crawl) checked 2026-09-12 http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedRead the City's full Building Permit Quick Reference Guide inspection section (the same document used for q49) looking for a stated advance-notice window (the kind Alameda County publishes as a 'before midnight the night before' rule) — none is stated

http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedSame document as q49/50 — no mention of same-day availability or AM/PM inspection windows anywhere in the guide's inspection-request instructions

http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the City performs its own final inspections in-house (Building Final - BLD, Electrical release codes, etc., requested and tracked inside the City's own ePlans permit record)

Why the confidence is not higherThe Quick Reference Guide's inspection-request instructions are all first-person City process ('go to the permit inspections tab...'); corroborated by the FY2021/22 utilization report showing City personnel conducting 32,102 of 38,202 requested/conducted inspections directly (6,100, or 19%, went through the state's optional private-provider statute, FS 553.791, at the applicant's election — not a City delegation).

City eServices Quick Reference Guide + FY2021/22 Ch.553 utilization report checked 2026-09-12 http://web.archive.org/web/20260608060323/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-permit-inspection-utilization-report

Q53 If delegated, to whom? Core Who inspects

Not delegated as a matter of City policy — the City performs its own final inspections (see q52). Property owners/contractors may separately ELECT to use a private provider under Florida's FS 553.791 for a subset of inspections; per the City's own FY2021/22 report, 19% of all City building inspections (6,100 of 32,102) went this route that year, but that is an applicant election under state law, not an AHJ delegation of authority

Why the confidence is not higherSame utilization-report figures as q52/q1, read directly from the City's own current published Ch. 553 disclosure.

City FY2021/22 Ch.553 building-permit-and-inspection utilization report checked 2026-09-12 http://web.archive.org/web/20260608060323/https://www.delraybeachfl.gov/government/city-departments/development-services/building/building-permit-inspection-utilization-report

Q54 Which inspections are required, and in what order? Core Stages & sequence

No PV-specific inspection code or sequence is published by name. The City's full published inspection-type list (in the eServices Quick Reference Guide) is trade-generic: e.g. for a straightforward existing-building PV retrofit the relevant final inspections would be Building Final ('Building Final - BLD') and any applicable Electrical release/final, requested via the permit's inspections tab; the City's list of ~40 named inspection codes (foundation stages, framing, fire final, engineering final, landscape final, blower-door, elevation certificate, etc.) contains no 'PV', 'Solar' or 'Photovoltaic' entry anywhere

Why the confidence is not higherI read the City's entire published inspection-type list (the same Quick Reference Guide used for q49-53) in full and it never names a PV/solar-specific inspection code; positive control passed ('BLD-PR' and 'ELEC-PR' style codes appear dozens of times), fabricated control not applicable here since this is a direct full-text read rather than a keyword search. This is a genuine, checked absence rather than an assumption.

eServices Building Permit Quick Reference Guide — full inspection-code list read end to end checked 2026-09-12 http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedRead the City's full inspection-type list (same document as q54) for a PV-specific rough-in or mid-roof inspection requirement — none is named; the closest analogues (Foundation Holds, Construction Holds) are new-construction stages that would not apply to a retrofit PV job

http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNo City document I could reach (PV checklist, Quick Reference Guide, Building Codes page) states whether the field inspector specifically verifies labels/listings at the solar final inspection; this is a reasonable inference from general FBC/NEC enforcement but not a City statement, so I am not recording it as an answer

http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q57 Is there a published inspection checklist? Core What is checked

Yes, but general rather than solar-specific — the City publishes a full inspection-code list (covering Building, Electrical, Plumbing, Mechanical, Fire, Engineering final inspections, etc.) inside its eServices Quick Reference Guide. It does NOT publish a separate PV/solar inspection checklist; the only solar-specific checklist the City publishes is the pre-application SUBMITTAL checklist (q8), not an inspection checklist

Why the confidence is not higherSame Quick Reference Guide used for q49-56. The distinction between a submittal checklist and an inspection checklist is my own reading of the two different City documents, not a City statement of that distinction.

eServices Building Permit Quick Reference Guide (general inspection-code list) checked 2026-09-12 http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedNo City document specifies what must be physically on site at the time of a PV inspection (e.g. approved plans, permit card, manufacturer spec sheets) — checked the PV checklist, Quick Reference Guide and Building Codes page

http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q59 Is there a re-inspection fee? Corrections & re-inspection

Nothing published by this authority.

Where we lookedNo fee schedule was located (see q15-17), so no re-inspection fee amount could be confirmed

https://www.delraybeachfl.gov/services/online-services/paying-permit-fees

Q60 How are corrections issued and cleared? Corrections & re-inspection

For PLAN REVIEW comments specifically, the City's ePlans portal has a 'Responding to Comments' tool (listed in the site navigation and as its own guide page) where the applicant uploads revised documents against reviewer comments inside the same permit record. No City document describes the process for clearing a FAILED FIELD INSPECTION specifically

Why the confidence is not higherThe 'Responding to Comments' page exists as a nav item and standalone guide in both the City's ePlans and eServices menus (confirmed from the Quick Reference Guide's site navigation dump); I did not fetch that page's full body text this run, and it addresses plan-review comments, not field-inspection corrections, so this only partially answers the question.

eServices/ePlans navigation — 'Responding to Comments' tool checked 2026-09-12 http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q61 What is issued on pass? Core Final sign-off & PTO

Final (a passed field inspection closes out the permit) — for a straightforward existing-building PV retrofit there is ordinarily no new Certificate of Occupancy. Where a project also involves new construction/major alteration, the City's process separately allows requesting a CO/CC: 'Request CO/CC: go to the permit sub-records tab and apply'

Why the confidence is not higherThe 'Request CO/CC' instruction is verbatim from the City's Quick Reference Guide's Building Final Holds section; the inference that a plain PV retrofit only needs the Building/Electrical Final rather than a new CO is mine, not a City statement specific to solar.

eServices Building Permit Quick Reference Guide checked 2026-09-12 http://web.archive.org/web/20250811074722/https://www.delraybeachfl.gov/government/city-departments/development-services/building-permit-quick-reference

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer (on the customer's behalf) or the customer directly — FPL's interconnection process is customer/installer-initiated: an Interconnection Agreement must be executed with FPL and, per Tariff Sec. 3.4, the customer must provide FPL with the local building official's inspection/certification before FPL will energize the system. The City does not initiate or notify FPL on the applicant's behalf

Why the confidence is not higherInferred from FPL's own tariff language ('The Customer agrees to provide Local Building Code Official inspection and certification...' — i.e. the CUSTOMER supplies this to FPL, not the reverse) — self-extracted from Tariff Sheet 9.050/9.051. No City document states who is responsible for notifying FPL, so this is drawn entirely from the utility side.

FPL PSC tariff, Sheet 9.050-9.051 (self-extracted) checked 2026-09-12 https://www.fpl.com/content/dam/fplgp/us/en/rates/pdf/electric-tariff-section9.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 65%

No — the City specifies no placard wording of its own; its only signage instruction is that the site plan must show where signage will go, for Fire Department review

Size, colour & material 60%

Nothing City-specific found for letter height/colour/material. FPL (utility) specifies its own labels must be 'permanent and weatherproof/UV resistant placard with engraved letters,' with the battery-storage placard 'permanently affixed to the meter enclosure' — but FPL's Electric Service Standards do not themselves state a minimum letter height or a colour scheme for these particular labels

Where they go 80%

City: signage located per the Fire-reviewed site plan, at array and disconnect locations. FPL: at the interconnecting meter can, and at the DER (AC) disconnect switch, which itself must be mounted 'separate from but adjacent to the FPL meter socket within 10 feet'

What the utility wants on top 88%

Yes. FPL's Electric Service Standards (10-30-25) require, beyond anything the City asks for: at the interconnecting meter can — 'WARNING / MULTI POWER SOURCES / ENTER SOURCES HERE / RATED AC OUTPUT CURRENT ** AMPS / NOMINAL OPERATING VOLTAGE ** VOLTS'; at the DER (AC) disconnect switch — 'GENERATION SYSTEM AC DISCONNECT / RATED AC OUTPUT CURRENT ** AMPS / NOMINAL OPERATING VOLTAGE ** VOLTS'; and for battery storage, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility.' All labels must be 'permanent and weatherproof/UV resistant placard with engraved letters'

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.delraybeachfl.gov/government/city-departments/development-services/building
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.