City of Dunedin

Pinellas County · Florida ← All authorities

City of Dunedin

Pinellas County

Verified Aug. 5, 2026

City of Dunedin is a city authority in the State of Florida, serving 36,068 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Dunedin against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Dunedin is the authority having jurisdiction 90% confidence
Holds
Both Building and Electrical, performed IN-HOUSE by City of Dunedin staff — not contracted to a private firm and not delegated to Pinellas County. This is directly confirmed by the City's own FS 553.80(7)(b) 'Building Permit and Inspection Utilization Report for FY 2025': personnel services costs to enforce the Florida Building Code were $1,017,029 with 11 personnel dedicated to enforcement/permitting/inspection — the opposite of the Oviedo/PDCS pattern (a city whose FS 553.80(7)(b) report shows $0 personnel cost and no dedicated staff, meaning a private firm runs the whole function). The same report shows 212 of 14,272 FY2025 inspections were performed by a private provider under FS 553.791 (an OWNER's per-job election, not delegation of the department) and that the City has never audited a private-provider inspection (0 audits) — a minor internal-controls gap worth flagging but not a jurisdiction question. Contractor LICENSING is split from permitting in the usual Florida pattern: contractors must be licensed by DBPR and/or the Pinellas County Construction Licensing Board (PCCLB) — the county issues the Certificate of Competency — but the CITY itself performs permitting, plan review and inspection, and additionally requires its own separate (no-fee) contractor registration with the City before a permit will be issued. Dunedin's own Local Business Tax schedule (Code of Ordinances § 70-91) even lists 'solar' explicitly as one of the enumerated 'Contractors' business classifications. Fire plan review is a separate City of Dunedin Fire Department function; no evidence found that it is engaged for a PV-only (no battery) residential job.
Overridden by
FL PSC Rule 25-6.065 (Interconnection and Net Metering of Customer-Owned Renewable Generation) binds Duke Energy Florida, the investor-owned utility referenced in the City's own materials, and requires that customer-owned renewable generation be inspected and approved by local code officials before the utility will allow parallel operation — i.e., the City's inspection gates the utility's energization, not the reverse. FS 471.003(2)(h) statewide exempts a licensed electrical contractor from a PE-stamp requirement on electrical work valued at $125,000 or less with aggregate service capacity of 600A (240V) or less on a residential system, regardless of city rule; Dunedin's own material states no different (or stricter) local threshold. FS 553.791 separately lets an OWNER elect a state-registered private provider for plan review/inspection on an individual job — a third-party option available on top of the City's own department, not an arrangement of the authority itself (see 'holds' above). Land Development Code § 103-40.11 is a local zoning amendment that specifically named a carve-out for solar (and wind) energy systems: they may exceed the district's maximum building height by up to 20% without additional setback, with the zoning administrator's written permission.
Why not higher
Primary, dated, city-issued evidence for the in-house/not-contracted finding: the City's own FY2025 FS 553.80(7)(b) utilization report (extracted directly from the PDF with pdf.js after the file's canvas-only viewer defeated a plain text read — never summarized) shows $1,017,029 in personnel costs and 11 dedicated staff, which rules out the private-outsourcing pattern this brief asked to check for. The City's own Permits & Inspections page and Practical Guide to Permitting (both dated/current, fetched directly) confirm in-house Building Inspectors by name (Chief Building Inspector/Plans Examiner Chuck Pitt; Senior Building Inspector Jay Hamrick) and the DBPR/PCCLB-plus-city-registration licensing pattern. Held at 90 rather than higher only because (a) the Land Development Code's zoning-precondition question for PV specifically (beyond the §103-40.11 height carve-out found) could not be fully swept — library.municode.com's Angular SPA returns nothing to a plain fetch and had to be read in a rendered browser session, which is not repeatable by every tool in this pipeline — and (b) the Fire Department's role, if any, on a PV-only job (no battery) is unconfirmed.

https://www.dunedin.gov/files/assets/city/v/1/community-development/documents/building/building-permit-and-inspection-utilization-report-for-fy-2025.pdf

Permit required
Yes — a permit is required.95%
Permit cost
No PV-specific fee exists. A typical electrical-only PV job is billed as an Electrical Permit: Base Fee $70.00 + $5.00 per $1,000 (or fraction) of the electrical work's cost.85%
Plan review
5-7 business days for residential permits (7-10 business days for commercial). Some trades are issued same-day (the City names A/C changeouts, electrical service changes,85%
Portal
Dunedin Citizen Self Service (CSS) Portal, built on Tyler Technologies' Enterprise Permitting & Licensing (EP&L) platform.90%
Electrical code
NEC 2020, effective 31 December 2023, under the Florida Building Code 8th Edition (2023) adoption cycle.65%
Booking an inspection
Through the Dunedin Citizen Self Service (CSS) Portal, online.88%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes — a permit is required. Q3 Electrical and building permits — Separate by trade, not a combined 'solar permit'. The City's fee schedule prices Building, Electrical, Gas, Q4 Plan review — 5-7 business days for residential permits (7-10 business days for commercial). Some trades are issued same-day (the City names A/C changeouts, Q18 Where you file — Dunedin Citizen Self Service (CSS) Portal, built on Tyler Technologies' Enterprise Permitting & Licensing (EP&L) platform. Q20

Permit required
Yes — a permit is required.95% source
What it costs
No PV-specific fee exists. A typical electrical-only PV job is billed as an Electrical Permit: Base Fee $70.00 + $5.00 per $1,000 (or fraction) of the electrical work's cost.85% source
Plan review turnaround
5-7 business days for residential permits (7-10 business days for commercial). Some trades are issued same-day (the City names A/C changeouts, electrical service changes,85% source
Key document
department page (fee schedule) cited by 10 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes — the City of Dunedin's Building Division is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV. Building and electrical are performed in-house by City staff, not delegated to Pinellas County. 90% · department page
    • What does this authority permit itself, and what does it delegate? The City permits and inspects both Building and Electrical itself, in-house. It does not delegate either function to Pinellas County. FS 553.791 separately lets an owner elect a private provider for plan review/inspection on an individual job (used on 212 of 14,272 FY2025 inspections per the City's own report) — a per-job option, not delegation of the department. 88% · FS 553.80(7)(b) statutory disclosure report
    • Is a permit required for a residential rooftop PV system? Yes — a permit is required. 95% · city permitting brochure
    • Is there a separate electrical permit, or is it combined? Separate by trade, not a combined 'solar permit'. The City's fee schedule prices Building, Electrical, Gas, Mechanical and Plumbing as distinct permit types with their own base fees. A straightforward electrical-only PV retrofit is billed and issued as an Electrical Permit; a Building Permit is added only if roof-attachment/structural scope is also part of the job. 70% · department page (fee schedule)
    • Is a HOA or architectural approval required first? No — the City does not require or check HOA/architectural approval as part of permitting; that burden sits with the property owner. 88% · department FAQ
    • Is there a historic-district review? Effectively no for the great majority of residential parcels. Dunedin does not run a blanket historic-OVERLAY district with citywide design review; instead it runs an individual local-landmark designation program. Only individually-designated historic landmark properties require a Certificate of Appropriateness for exterior modifications (which would include rooftop solar); the Historic Preservation Advisory Committee (HPAC) itself is advisory-only to the City Commission/Manager/staff and does not independently issue permits. 72% · city informational page
    • Is a wind or windstorm certification required? Standard Florida Product Approval regime applies — NOT HVHZ. Miami-Dade and Broward are the only High-Velocity Hurricane Zone counties in Florida; Pinellas County (Dunedin) sits outside HVHZ. As a Gulf-coastal county, Pinellas is understood to fall within the ASCE 7 Wind-Borne Debris Region, which is a distinct and less stringent regime than HVHZ. 60% · state code administering agency (general HVHZ definition, not independently re-verified this run)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor, or the property owner acting as their own contractor under the FS 489.103 owner-builder exemption on a one- or two-family home they own and occupy. 78% · city permitting guide
    • Must the contractor be registered with this authority before applying? Yes. Contractors and subcontractors must be licensed by DBPR and/or the Pinellas County Construction Licensing Board (PCCLB), and must ALSO register with the City of Dunedin (no city fee) before a permit will be issued. 90% · city permitting guide + Code of Ordinances § 70-91
    • Is a homeowner permitted to self-install and self-permit? A homeowner may self-permit as their own contractor (FS 489.103 owner-builder exemption, on a one- or two-family home they own and occupy), via the City's own Owner-Builder Disclosure Statement form. Whether that extends to self-performing the electrical installation work itself (vs. still needing a licensed EC for that trade) is not separately addressed in any City document found. 58% · city owner-builder form (referenced in Practical Guide)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No PV-specific checklist is published. For general residential permits requiring construction drawings, the City's Practical Guide to Permitting lists: a boundary Survey; a Site/Plot Plan; Construction Drawings (foundation plan, floor plan, framing plan, typical wall sections, roof plan, exterior elevations, electrical plan, mechanical plan, plumbing plan, wind design data — signed/sealed by a registered architect or PE where required); and a complete set of Florida Product Approvals for products used on the job. 50% · city permitting guide (general, not solar-specific)
    • How many copies, and in what format? Electronic submittal only, through the Dunedin Citizen Self Service (CSS) Portal (Tyler Technologies Enterprise Permitting & Licensing / EP&L). No Dunedin-specific rule on file count or PDF formatting (e.g., one file per plan section) was found. 60% · department page
    • Is a site plan required, and what must it show? A general site/plot plan is required, showing: location of the proposed building/addition, front/rear/side setbacks, driveway and sidewalk locations, a drainage plan, and lowest-floor elevation. No PV-specific site-plan content (array layout, fire-access paths, etc.) was found published by the City. 50% · city permitting guide (general, not solar-specific)
    • Is an electrical PE stamp required, and at what threshold? Statewide floor only: FS 471.003(2)(h) exempts a licensed electrical contractor from a PE-stamp requirement on residential electrical work valued at $125,000 or less with an aggregate service capacity of 600 amperes (240V) or less. 65% · Florida Statute
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Dunedin Citizen Self Service (CSS) Portal, built on Tyler Technologies' Enterprise Permitting & Licensing (EP&L) platform. 90% · portal landing page
    • Can the whole application be completed online? Yes — application submission, plan review, approval, fee payment, permit issuance, and inspection scheduling/results are all handled end-to-end through the CSS Portal. 82% · department page
    • What does a residential solar permit cost? No PV-specific fee exists. A typical electrical-only PV job is billed as an Electrical Permit: Base Fee $70.00 + $5.00 per $1,000 (or fraction) of the electrical work's cost. If a Building Permit is also triggered (e.g., roof-mount racking/structural scope), that fee is 0.80% of construction valuation, minimum $60.00, plus a Building Plan Review Fee of 25% of the building permit fee. 85% · city fee schedule
    • How is the fee calculated? Cost/valuation-based: Building Permit Fee is 0.80% of construction valuation; Electrical Permit Fee is a $70.00 base plus $5.00 per $1,000 of the electrical work's cost. Not amperage-tiered for a typical service-alteration PV job. 80% · city fee schedule
    • Is there a separate plan-check fee? Yes, for Building permits — a Building Plan Review Fee equal to 25% of the Building Permit Fee is charged. Not stated as applying separately to an Electrical-only PV permit. 60% · city fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 5-7 business days for residential permits (7-10 business days for commercial). Some trades are issued same-day (the City names A/C changeouts, electrical service changes, and water heater replacement as examples) — solar is not named among that same-day list. 85% · department FAQ
    • How long is an issued permit valid before it expires? 180 days from the date of issuance, or from the date of the last approved inspection. The permit is expired if the project is dormant for 180 days; it may be extended only by the Building Official on written request. 92% · department FAQ
    • Which utility handles interconnection here? Duke Energy Florida (investor-owned utility). 62% · city news article
    • Where does the utility sit in the sequence? After permit/inspection — the utility will not energize/parallel-operate a customer-owned system until the local AHJ has inspected and approved it. 55% · Florida Administrative Code rule text (state floor; Duke's own pages unreachable)

28 questions answered against City of Dunedin’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes — the City of Dunedin's Building Division is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV. Building and electrical are performed in-house by City staff, not delegated to Pinellas County.

Why the confidence is not higherConfirmed both by the City's own Permits & Inspections page (which describes City review across Building, Engineering, Fire, Utilities and Zoning through the City's own portal) and by the FY2025 FS 553.80(7)(b) utilization report showing $1,017,029 in personnel cost and 11 dedicated City staff enforcing the Florida Building Code.

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

The City permits and inspects both Building and Electrical itself, in-house. It does not delegate either function to Pinellas County. FS 553.791 separately lets an owner elect a private provider for plan review/inspection on an individual job (used on 212 of 14,272 FY2025 inspections per the City's own report) — a per-job option, not delegation of the department.

Why the confidence is not higherDirect evidence is the City's own FY2025 FS 553.80(7)(b) utilization report (personnel cost, staff count, and private-provider inspection count all stated in the City's own filing) plus the Permits & Inspections page naming City-employed Building Inspectors.

FS 553.80(7)(b) statutory disclosure report checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/1/community-development/documents/building/building-permit-and-inspection-utilization-report-for-fy-2025.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes — a permit is required.

Why the confidence is not higherThe City's own 'Residential Building Permits: A Homeowner's Guide' (current handout linked from the Permits & Inspections page) lists 'Solar Systems' by name among the common types of residential work requiring a City permit, alongside items like Electrical Service Change/Upgrade and Reroofing. No solar exemption exists anywhere else in the City's material; the only permit-exemption route the City publishes (the general owner's-affidavit/small-job exemption referenced in its FAQ) does not reach electrical work.

city permitting brochure checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/3/community-development/documents/building/residential-building-permits-brochure-04-15-2025.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate by trade, not a combined 'solar permit'. The City's fee schedule prices Building, Electrical, Gas, Mechanical and Plumbing as distinct permit types with their own base fees. A straightforward electrical-only PV retrofit is billed and issued as an Electrical Permit; a Building Permit is added only if roof-attachment/structural scope is also part of the job.

Why the confidence is not higherInferred from the City's own Fee Calculator and Schedule text (Electrical Permit Fees quoted separately from Building Permit Fees, each with independent base-fee structures) on the Permits & Inspections page; the City does not publish a PV-specific statement combining or separating the two for solar specifically.

department page (fee schedule) checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor, or the property owner acting as their own contractor under the FS 489.103 owner-builder exemption on a one- or two-family home they own and occupy.

Why the confidence is not higherThe City's Practical Guide to Permitting states 'Only licensed contractors may be issued permits except as indicated below' and separately describes the state-law owner-builder exemption implemented via the City's own Owner-Builder Disclosure Statement form. Not solar-specific — general permitting rule.

city permitting guide checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes. Contractors and subcontractors must be licensed by DBPR and/or the Pinellas County Construction Licensing Board (PCCLB), and must ALSO register with the City of Dunedin (no city fee) before a permit will be issued.

Why the confidence is not higherPractical Guide to Permitting states verbatim: 'All contractors and sub-contractors must be appropriately licensed by the DBPR and/or PCCLB and register with the City. There is no fee to register with the City.' Corroborated by Code of Ordinances § 70-91, which lists 'solar' as an explicit classification under its 'Contractors' local-business-tax category, and § 70-85, which requires an active DBPR/state license be exhibited before that city business-tax receipt (part of registering with the City) can issue.

city permitting guide + Code of Ordinances § 70-91 checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

A homeowner may self-permit as their own contractor (FS 489.103 owner-builder exemption, on a one- or two-family home they own and occupy), via the City's own Owner-Builder Disclosure Statement form. Whether that extends to self-performing the electrical installation work itself (vs. still needing a licensed EC for that trade) is not separately addressed in any City document found.

Why the confidence is not higherThe owner-builder exemption is a general, state-law mechanism the City has adopted a standard form for; it is not solar-specific and the City's material does not state whether an owner-builder may self-install PV electrical work or must still subcontract a licensed electrician for that portion.

city owner-builder form (referenced in Practical Guide) checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/2/community-development/documents/building/owner-builder-disclosure-statement.pdf

Q8 What documents make up a complete submittal? Core Submittal package

No PV-specific checklist is published. For general residential permits requiring construction drawings, the City's Practical Guide to Permitting lists: a boundary Survey; a Site/Plot Plan; Construction Drawings (foundation plan, floor plan, framing plan, typical wall sections, roof plan, exterior elevations, electrical plan, mechanical plan, plumbing plan, wind design data — signed/sealed by a registered architect or PE where required); and a complete set of Florida Product Approvals for products used on the job.

Why the confidence is not higherThis list is the City's GENERAL new-construction/renovation construction-document requirement, not a PV-specific submittal list — a sitemap-wide search for 'solar'/'photovoltaic' across the City's ~1,700 indexed pages returned no dedicated PV checklist or form.

city permitting guide (general, not solar-specific) checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q9 How many copies, and in what format? Submittal package

Electronic submittal only, through the Dunedin Citizen Self Service (CSS) Portal (Tyler Technologies Enterprise Permitting & Licensing / EP&L). No Dunedin-specific rule on file count or PDF formatting (e.g., one file per plan section) was found.

Why the confidence is not higherThe City's Permits & Inspections page states permits are 'submitted, reviewed and approved online using the Dunedin Citizen Self Service (CSS) Portal' but does not spell out a file-format policy the way some neighboring cities' sites do.

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q10 Is a site plan required, and what must it show? Core Submittal package

A general site/plot plan is required, showing: location of the proposed building/addition, front/rear/side setbacks, driveway and sidewalk locations, a drainage plan, and lowest-floor elevation. No PV-specific site-plan content (array layout, fire-access paths, etc.) was found published by the City.

Why the confidence is not higherDrawn from the general new-construction Site/Plot Plan requirement in the City's Practical Guide to Permitting; the City publishes no reduced or PV-specific version of this requirement for a rooftop retrofit.

city permitting guide (general, not solar-specific) checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedPractical Guide to Permitting's construction-drawings list names an 'Electrical plan' but never 'one-line diagram', 'three-line diagram', or 'riser diagram'; sitemap-wide search for 'solar'/'photovoltaic' across ~1,700 indexed City pages surfaced no dedicated PV submittal document

https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame Practical Guide to Permitting submittal list — no mention of string sizing, conductor sizing, or ampacity calculations by name

https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedPractical Guide to Permitting (requires drawings 'signed and sealed by a registered architect or professional engineer' generally, no dollar/scope threshold stated) and the Code of Ordinances (Land Development Code, Municode-hosted) not exhaustively searched for a structural threshold

https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Statewide floor only: FS 471.003(2)(h) exempts a licensed electrical contractor from a PE-stamp requirement on residential electrical work valued at $125,000 or less with an aggregate service capacity of 600 amperes (240V) or less.

Why the confidence is not higherSourced directly to the Florida Statute; the City's own Practical Guide to Permitting requires construction drawings to be 'signed and sealed by a registered architect or professional engineer' for the general submittal package but never states a dollar/amperage threshold of its own, so this is the state floor rather than a confirmed Dunedin-specific rule.

Florida Statute checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

No PV-specific fee exists. A typical electrical-only PV job is billed as an Electrical Permit: Base Fee $70.00 + $5.00 per $1,000 (or fraction) of the electrical work's cost. If a Building Permit is also triggered (e.g., roof-mount racking/structural scope), that fee is 0.80% of construction valuation, minimum $60.00, plus a Building Plan Review Fee of 25% of the building permit fee.

Why the confidence is not higherQuoted directly from the City's own Fee Calculator and Schedule text on the Permits & Inspections page, verified with controls in the same run: 'electrical'/'building permit fee' terms return multiple real hits in this fee section, while 'solar' and 'photovoltaic' return zero — confirming there is no dedicated PV fee line and the search mechanism itself works.

city fee schedule checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q16 How is the fee calculated? Core Fees

Cost/valuation-based: Building Permit Fee is 0.80% of construction valuation; Electrical Permit Fee is a $70.00 base plus $5.00 per $1,000 of the electrical work's cost. Not amperage-tiered for a typical service-alteration PV job.

Why the confidence is not higherQuoted directly from the City's own current fee schedule on the Permits & Inspections page.

city fee schedule checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q17 Is there a separate plan-check fee? Fees

Yes, for Building permits — a Building Plan Review Fee equal to 25% of the Building Permit Fee is charged. Not stated as applying separately to an Electrical-only PV permit.

Why the confidence is not higherStated in the City's Fee Calculator and Schedule text: 'Building Plan Review Fee: The building plan review fee shall be 25 percent of the building permit fee.' No equivalent electrical-only plan-review fee line was found.

city fee schedule checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q18 What is the stated plan-review turnaround? Core Timeline & validity

5-7 business days for residential permits (7-10 business days for commercial). Some trades are issued same-day (the City names A/C changeouts, electrical service changes, and water heater replacement as examples) — solar is not named among that same-day list.

Why the confidence is not higherDirect quote from the City's own Permits & Inspections FAQ: 'Average plan review times for residential permits is 5-7 business days, and 7-10 business days for commercial permits. Permits for certain types of work may be issued on the same day...'

department FAQ checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q19 How long is an issued permit valid before it expires? Timeline & validity

180 days from the date of issuance, or from the date of the last approved inspection. The permit is expired if the project is dormant for 180 days; it may be extended only by the Building Official on written request.

Why the confidence is not higherDirect quote from the City's own FAQ: 'A permit is valid for 180 days from the date of issuance, or from the last approved inspection date. If the project is dormant for 180 days then the permit is expired. A permit may be extended only by the Building Official with a written request.'

department FAQ checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q20 Which permit portal does this authority use? Core Portal & process

Dunedin Citizen Self Service (CSS) Portal, built on Tyler Technologies' Enterprise Permitting & Licensing (EP&L) platform.

Why the confidence is not higherNamed directly on the Permits & Inspections page: 'The City of Dunedin utilizes a full-service online permitting system called Enterprise Permitting & Licensing (EP&L) by Tyler Technologies... using the Dunedin Citizen Self Service (CSS) Portal.'

portal landing page checked 2026-09-12 https://cityofdunedinfl-energovweb.tylerhost.net/apps/selfservice#/home

Q21 Can the whole application be completed online? Core Portal & process

Yes — application submission, plan review, approval, fee payment, permit issuance, and inspection scheduling/results are all handled end-to-end through the CSS Portal.

Why the confidence is not higherConfirmed from the City's Permits & Inspections page description of the portal's role across the full permit lifecycle, and separately for inspections ('Inspection requests must be submitted online using the Dunedin Citizen Self Service (CSS) Portal').

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q22 Which utility handles interconnection here? Core Utility interconnection

Duke Energy Florida (investor-owned utility).

Why the confidence is not higherThe City's own site references Duke Energy directly in city-issued material (e.g., a 2024 City news post relaying a Duke Energy message to residents without power, and City news coverage of Duke's downtown light-pole replacement work), which is real city-side evidence rather than a PowerToChoose-style aggregator (deliberately not used per this brief's caution). However, the City's site never states in a single sentence 'Duke is our exclusive electric utility,' so this stops short of a full-confidence confirmation.

city news article checked 2026-09-12 https://www.dunedin.gov/News-articles/2024/Duke-Energy-has-provided-the-City-of-Dunedin-with-this-important-message-for-residents-without-power

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit/inspection — the utility will not energize/parallel-operate a customer-owned system until the local AHJ has inspected and approved it.

Why the confidence is not higherFL PSC Rule 25-6.065(5)(a) (state floor for all investor-owned utilities, including Duke Energy Florida) requires the Standard Interconnection Agreement to state that customer-owned renewable generation 'must be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility.' Duke Energy Florida's own interconnection/net-metering pages returned HTTP 403 on every route tried this run, so this is sourced to the state rule, not to Duke's own document — confidence held low per this brief's specific caution about asserting a Duke answer when Duke's own pages are blocked.

Florida Administrative Code rule text (state floor; Duke's own pages unreachable) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — the City does not require or check HOA/architectural approval as part of permitting; that burden sits with the property owner.

Why the confidence is not higherDirect quote from the City's own FAQ: 'What if my neighborhood has a homeowners association? The City does not enforce homeowners association rules and regulations. The property owner is responsible for adhering to deed restrictions and homeowners association requirements that apply to the subject property.'

department FAQ checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q25 Is there a historic-district review? Overlays & special cases

Effectively no for the great majority of residential parcels. Dunedin does not run a blanket historic-OVERLAY district with citywide design review; instead it runs an individual local-landmark designation program. Only individually-designated historic landmark properties require a Certificate of Appropriateness for exterior modifications (which would include rooftop solar); the Historic Preservation Advisory Committee (HPAC) itself is advisory-only to the City Commission/Manager/staff and does not independently issue permits.

Why the confidence is not higherDrawn from the City's own 'Historic Preservation in Dunedin' page: HPAC is described as serving 'an advisory capacity to the City Commission, the City Manager and City Staff,' and 'Any proposed modifications, demolitions, or relocations to the historically designated properties will be required to obtain a Certificate of Appropriateness.' The page does not explicitly confirm or rule out how this interacts with a rooftop-PV building permit specifically for a designated property, hence not scored higher.

city informational page checked 2026-09-12 https://www.dunedin.gov/Your-Government/Learn-and-Engage/Dunedin-insights/Enhancing-Dunedin/Historic-Preservation-in-Dunedin

Q26 Is a wind or windstorm certification required? Overlays & special cases

Standard Florida Product Approval regime applies — NOT HVHZ. Miami-Dade and Broward are the only High-Velocity Hurricane Zone counties in Florida; Pinellas County (Dunedin) sits outside HVHZ. As a Gulf-coastal county, Pinellas is understood to fall within the ASCE 7 Wind-Borne Debris Region, which is a distinct and less stringent regime than HVHZ.

Why the confidence is not higherThis is a county/state-level geographic and code-classification fact (HVHZ is defined in the Florida Building Code as Miami-Dade and Broward Counties only) rather than a Dunedin-specific city document; I could not pull a live floridabuilding.org page confirming this in this run (this session's web-search budget was exhausted before I could verify with a fresh citation, and I did not want to substitute a stale/guessed URL), so this rests on the well-established statewide FBC HVHZ definition rather than a freshly re-verified primary source.

state code administering agency (general HVHZ definition, not independently re-verified this run) checked 2026-09-12 https://www.floridabuilding.org

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedCode of Ordinances search for 'solar' (8 code hits, 3 ordinance hits reviewed) — the only hearing-related hit, § 104-21.8 'Conditions' under quasi-judicial development approvals, lists 'sustainable features, solar or other renewable energy source' as a condition a hearing body MAY consider imposing on a larger development, not a Specific Use Permit/Council-approval trigger for an ordinary residential rooftop PV job

https://library.municode.com/search?stateId=9&clientId=1981&searchText=solar&searchMode=CLIENTMODE&contentTypeId=CODES

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedCode of Ordinances search for 'solar' and 'ground mount' (Land Development Code) — no residential generation system-size cap provision found; §103-40.11 addresses a HEIGHT exception for solar panels, not a generation-size cap

https://library.municode.com/search?stateId=9&clientId=1981&searchText=solar&searchMode=CLIENTMODE&contentTypeId=CODES

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020, effective 31 December 2023, under the Florida Building Code 8th Edition (2023) adoption cycle. The City's own material never names a year for the NEC (it only refers to 'the currently adopted NEC'), so this answer relies on the statewide adoption record (NFPA enforcement map / Florida Building Commission), not a Dunedin-specific citation. 65% · city page (silent on NEC year) + statewide adoption record
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023). 96% · department page
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023). 92% · department page
    • What is the installation judged against? Florida Building Code 8th Edition (2023) and NEC 2020 (effective 31 Dec 2023) — combining the City's own confirmed FBC citation with the statewide NEC adoption record, since the City's own material never names an NEC year. 70% · department page + statewide adoption record
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Dunedin on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    Nothing recorded for City of Dunedin on this step yet — 1 question checked and found unpublished. The guidance above is general.

  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    Nothing recorded for City of Dunedin on this step yet — 6 questions checked and found unpublished. The guidance above is general.

  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? State floor only (Duke Energy Florida, per FL PSC Rule 25-6.065(6)(a)): where a manual AC disconnect switch is required, it must be mounted separate from, but adjacent to, the meter socket, and be readily accessible/lockable by the utility. Tier 1 systems (10kW or less, i.e. most residential rooftop PV) are explicitly EXEMPT from this switch requirement unless the utility elects to install one at its own expense. This brief's own baseline notes that FPL, TECO and Talquin each apply this differently at the tariff level (FPL: no disconnect needed for Tier 1; TECO: disconnect required even for Tier 1; Talquin: disconnect required, no exemption) — Duke Energy Florida's OWN tariff/DG manual could not be checked because every route to Duke's site returned HTTP 403 this run, so Duke's actual practice (which may differ from the generic PSC floor, the way TECO's does) is NOT confirmed and this answer should be treated as low-confidence. 45% · Florida Administrative Code rule text (state floor; Duke's own tariff unreachable)
    • Must equipment be on a specific approved list? No PV-specific equipment-listing requirement beyond the general Florida Product Approval process. The City's Product Approval Specification form requires Florida Product Approval numbers (FS 553.842 / F.A.C. 9B-72) for products used on a permitted job, which could sweep in PV racking/structural attachment hardware as a 'structural component,' but the form has no dedicated PV-module/inverter category. 48% · city permitting guide (general, not solar-specific)
    • Is a ground mount treated as a structure? Not defined as an accessory structure specifically for solar in the Land Development Code. A ground-mounted array would most likely fall under the LDC's general 'ground-mounted mechanical equipment' screening category (§105-25.5.3.2(c)) if it were treated as equipment at all, but §105-25.5.3.1 explicitly exempts solar (and wind) energy systems from that whole screening section, so the LDC does not clearly classify a ground-mount PV system as a regulated 'structure' one way or the other. 50% · Code of Ordinances search (Land Development Code)
    • Is a specific mounting system or attachment spacing required? No PV-specific mounting/attachment-spacing rule is published, but Land Development Code § 105-25.5.3.1 explicitly EXEMPTS 'systems that use solar or wind energy' from the City's mechanical-equipment screening standards (which otherwise cover roof- and ground-mounted equipment), so a rooftop or ground-mounted PV array is not subject to the City's general equipment-screening/setback design standards as long as it complies with applicable building codes and zoning. 65% · Code of Ordinances (Land Development Code)

20 questions answered against City of Dunedin’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020, effective 31 December 2023, under the Florida Building Code 8th Edition (2023) adoption cycle. The City's own material never names a year for the NEC (it only refers to 'the currently adopted NEC'), so this answer relies on the statewide adoption record (NFPA enforcement map / Florida Building Commission), not a Dunedin-specific citation.

Why the confidence is not higherNo Dunedin document names an NEC year. The 2020 edition (effective 31 Dec 2023) is the verified statewide answer paired with FBC 8th Ed. (2023) across a large number of other Florida AHJ checks this cycle; a 2023 NEC edition claim would be the FBC-cycle label bleeding into the electrical-code answer, a documented trap in Florida permit forms.

city page (silent on NEC year) + statewide adoption record checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023).

Why the confidence is not higherStated directly on the City's own Permits & Inspections page under 'Codes': 'Florida Building Code Florida Building Code, 8th Edition (2023)'.

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023).

Why the confidence is not higherStated directly on the City's own Permits & Inspections page: 'Fire Prevention & Life Safety Codes 8th Edition (2023) of the Florida Fire Prevention Code'.

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q32 Are there local amendments to any of the above? Core Code editions in force

Nothing published by this authority.

Where we lookedCity's Permits & Inspections page (states FBC 8th Ed. (2023) and Fire Prevention Code 8th Ed. (2023) as adopted) — no local-amendment ordinance analogous to another Florida city's fee-schedule-amending ordinance was identified for Dunedin this run; the full text of any building-code-amending chapter sits in the Land Development Code on Municode and was not exhaustively swept for technical (non-fee) amendments

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q33 What is the installation judged against? Core Electrical

Florida Building Code 8th Edition (2023) and NEC 2020 (effective 31 Dec 2023) — combining the City's own confirmed FBC citation with the statewide NEC adoption record, since the City's own material never names an NEC year.

Why the confidence is not higherFBC citation is the City's own (confidence 96 at Q30); NEC year is the statewide adoption record rather than a Dunedin-specific document (confidence 65 at Q29) — the combined answer inherits the lower of the two.

department page + statewide adoption record checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedCity's fee schedule (Electrical Permit Fees, tiered only by cost, not service size) and Practical Guide to Permitting — no service-upgrade or busbar-sizing rule of the City's own found

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No PV-specific mounting/attachment-spacing rule is published, but Land Development Code § 105-25.5.3.1 explicitly EXEMPTS 'systems that use solar or wind energy' from the City's mechanical-equipment screening standards (which otherwise cover roof- and ground-mounted equipment), so a rooftop or ground-mounted PV array is not subject to the City's general equipment-screening/setback design standards as long as it complies with applicable building codes and zoning.

Why the confidence is not higherRead directly from the Code of Ordinances via a rendered Municode session (library.municode.com blocks a plain fetch per this brief's known trap): '§105-25.5.3.1 Applicability... The standards of this section are not intended to impede systems that use solar or wind energy to reduce the costs of energy, if such systems are otherwise in compliance with applicable building codes and zoning requirements.' This answers what the LDC does NOT require, not a specific attachment-spacing spec, which was not found anywhere in city material.

Code of Ordinances (Land Development Code) checked 2026-09-12 https://library.municode.com/fl/dunedin/codes/code_of_ordinances?nodeId=SPBLADECO_CH105DEST_DIV2DEST_105-25.5.3.1AP

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedSitemap search for 'fire-prevention'/'fire-marshal'/'fire-department'/'fire-permit' — the only fire-related City page found is a general consumer 'Fire Prevention Tips' safety page; no PV-specific fire-access-pathway or ridge-setback document or Fire Department permitting page was found on the City's site

https://www.dunedin.gov/Your-Government/Learn-and-Engage/Dunedin-insights/City-Information-Resources/Fire-Prevention-Tips

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Nothing published by this authority.

Where we lookedPractical Guide to Permitting and City FAQ pages — rapid shutdown (NEC 690.12) is not mentioned by name anywhere in the City's material, and the City does not name a specific NEC edition (see q29) to check compliance against

https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedFull PDF-link list scraped from the Permits & Inspections page (40+ forms: floodplain, contractor, product-approval, storm-recovery, etc.) — no placard requirement of any kind is published for solar

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame PDF-link sweep as q38 — no placard wording published anywhere on the City's site

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame PDF-link sweep as q38 — no letter height/colour/material spec published

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame PDF-link sweep as q38 — no facility/site-plan placard spec published by the City

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedDuke Energy Florida's own net-metering/DG pages (duke-energy.com/home/products/renewable-energy/net-metering and /solar-energy/interconnection) returned HTTP 403 on WebFetch AND on an in-browser fetch from a live Chrome session (CORS/blocked, not a bot-UA issue) on every route tried this run. FL PSC Rule 25-6.065 (state floor, read in full) contains no placard specification beyond the AC-disconnect location covered at q48

https://www.duke-energy.com/home/products/renewable-energy/net-metering

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38/q42 — no City or (reachable) utility document specifies label placement beyond the PSC rule's AC-disconnect placement covered under q48

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q44 Must equipment be on a specific approved list? Equipment listing

No PV-specific equipment-listing requirement beyond the general Florida Product Approval process. The City's Product Approval Specification form requires Florida Product Approval numbers (FS 553.842 / F.A.C. 9B-72) for products used on a permitted job, which could sweep in PV racking/structural attachment hardware as a 'structural component,' but the form has no dedicated PV-module/inverter category.

Why the confidence is not higherInferred from the general Florida Product Approval framework referenced in the City's Practical Guide to Permitting submittal list; no PV-specific equipment-approval list or form was found on the City's site.

city permitting guide (general, not solar-specific) checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/5/community-development/documents/building/practical-guide-to-permitting-04-15-2025.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedFull PDF-link sweep of the Permits & Inspections page and a sitemap search for 'battery'/'ess' — no battery/ESS-specific permitting language exists anywhere on the City's site

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSame as q45 — no separate ESS permit or inspection type is named anywhere on the City's site

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q47 Is a ground mount treated as a structure? Core Ground mount

Not defined as an accessory structure specifically for solar in the Land Development Code. A ground-mounted array would most likely fall under the LDC's general 'ground-mounted mechanical equipment' screening category (§105-25.5.3.2(c)) if it were treated as equipment at all, but §105-25.5.3.1 explicitly exempts solar (and wind) energy systems from that whole screening section, so the LDC does not clearly classify a ground-mount PV system as a regulated 'structure' one way or the other.

Why the confidence is not higherBased on a Municode Library search of the Code of Ordinances for 'ground mount' (8 hits reviewed) and the solar/wind exemption at §105-25.5.3.1; no LDC provision defining a solar ground-mount as an 'accessory structure' (with its own setback/height table entry) was found.

Code of Ordinances search (Land Development Code) checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=1981&searchText=ground%20mount&searchMode=CLIENTMODE&contentTypeId=CODES

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

State floor only (Duke Energy Florida, per FL PSC Rule 25-6.065(6)(a)): where a manual AC disconnect switch is required, it must be mounted separate from, but adjacent to, the meter socket, and be readily accessible/lockable by the utility. Tier 1 systems (10kW or less, i.e. most residential rooftop PV) are explicitly EXEMPT from this switch requirement unless the utility elects to install one at its own expense. This brief's own baseline notes that FPL, TECO and Talquin each apply this differently at the tariff level (FPL: no disconnect needed for Tier 1; TECO: disconnect required even for Tier 1; Talquin: disconnect required, no exemption) — Duke Energy Florida's OWN tariff/DG manual could not be checked because every route to Duke's site returned HTTP 403 this run, so Duke's actual practice (which may differ from the generic PSC floor, the way TECO's does) is NOT confirmed and this answer should be treated as low-confidence.

Why the confidence is not higherQuoted directly from PSC Rule 25-6.065(6)(a), the state floor. Duke Energy Florida's own DG interconnection manual/tariff pages returned HTTP 403 on every route tried this run (see not_found), and this brief explicitly warns that Duke's own answer may differ materially from the PSC floor the way TECO's does — so per this brief's instruction, this is recorded at low confidence rather than asserted as Duke's actual practice.

Florida Administrative Code rule text (state floor; Duke's own tariff unreachable) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Through the Dunedin Citizen Self Service (CSS) Portal, online. 88% · department page
    • Are same-day or AM/PM windows offered? Yes — an AM window (9:30 a.m.-12:00 p.m.) or PM window (12:00 p.m.-3:30 p.m.) can be requested when scheduling online, though the City states inspectors 'will try to accommodate all requests' but cannot guarantee a specific time frame on high-volume days. 78% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the City's own Building Inspectors perform final inspections (named: Chuck Pitt, Chief Building Inspector/Plans Examiner; Jay Hamrick, Senior Building Inspector). Not delegated to Pinellas County. FS 553.791 lets an owner elect a private provider on an individual job (212 of 14,272 FY2025 inspections, per the City's own utilization report) — a per-job option, not delegation of the City's inspection function. 82% · department page
    • If delegated, to whom? N/A — not delegated to another government. A private-provider election under FS 553.791 is available at the owner's choice on an individual job (used for 212 of 14,272 inspections in FY2025 per the City's own report), which is a third-party option on a single job, not an arrangement of the authority. 75% · FS 553.80(7)(b) statutory disclosure report
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for City of Dunedin on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    Nothing recorded for City of Dunedin on this step yet — 3 questions checked and found unpublished. The guidance above is general.

  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • Who notifies the utility for PTO? The customer/installer — FL PSC Rule 25-6.065(7)(d) places the interconnection-agreement execution and pre-energization notice obligations on the customer, not the AHJ. Not confirmed for Duke Energy Florida specifically (Duke's own pages are unreachable this run), so treat as the state-floor answer only. 50% · Florida Administrative Code rule text (state floor; Duke's own pages unreachable)
    • Is there a re-inspection fee? $75.00 per re-inspection. 85% · city fee schedule
    • How are corrections issued and cleared? A failed inspection results in a 'Red Tag' being issued; the associated $75.00 re-inspection fee must be paid AND the noted work corrected before a re-inspection will be performed. 80% · department page

14 questions answered against City of Dunedin’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Through the Dunedin Citizen Self Service (CSS) Portal, online.

Why the confidence is not higherDirect quote: 'Inspection requests must be submitted online using the Dunedin Citizen Self Service (CSS) Portal.'

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedInspection-scheduling notice on the Permits & Inspections page (full text read) — states AM/PM preference options but never a minimum advance-notice period (e.g., 24/48 hours) for booking

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Yes — an AM window (9:30 a.m.-12:00 p.m.) or PM window (12:00 p.m.-3:30 p.m.) can be requested when scheduling online, though the City states inspectors 'will try to accommodate all requests' but cannot guarantee a specific time frame on high-volume days.

Why the confidence is not higherQuoted from the City's own inspection-scheduling notice: 'please provide... if you prefer a morning inspection (9:30 a.m.-12:00 p.m.) or an afternoon inspection (12:00 p.m.-3:30 p.m.)... Inspectors will try to accommodate all requests. However, on days when there is a high volume of inspections, inspectors may not be able to fulfill all requests for specific time frames.'

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the City's own Building Inspectors perform final inspections (named: Chuck Pitt, Chief Building Inspector/Plans Examiner; Jay Hamrick, Senior Building Inspector). Not delegated to Pinellas County. FS 553.791 lets an owner elect a private provider on an individual job (212 of 14,272 FY2025 inspections, per the City's own utilization report) — a per-job option, not delegation of the City's inspection function.

Why the confidence is not higherNamed directly on the City's Permits & Inspections page; cross-checked against the City's own FY2025 FS 553.80(7)(b) utilization report, which quantifies the small minority of inspections done by a private provider.

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated to another government. A private-provider election under FS 553.791 is available at the owner's choice on an individual job (used for 212 of 14,272 inspections in FY2025 per the City's own report), which is a third-party option on a single job, not an arrangement of the authority.

Why the confidence is not higherFollows directly from Q52 plus the City's own utilization report figures; no delegation to Pinellas County or any other government is mentioned anywhere in the City's material.

FS 553.80(7)(b) statutory disclosure report checked 2026-09-12 https://www.dunedin.gov/files/assets/city/v/1/community-development/documents/building/building-permit-and-inspection-utilization-report-for-fy-2025.pdf

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedPermits & Inspections page and Practical Guide to Permitting (both read in full) — neither lists an inspection sequence (rough-in, mid-roof, final, etc.) for any trade including electrical/PV

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame as q54 — no rough-in/mid-roof inspection requirement stated for PV or roofing generally

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedPermits & Inspections page and Practical Guide (both read in full) — neither states that the inspector verifies equipment labels/listings as a discrete checked item

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedFull PDF-link sweep of the Permits & Inspections page (40+ documents) — no published inspection checklist of any kind (PV or general) was found on the City's site

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedPermits & Inspections page and Practical Guide to Permitting (both read in full) — neither states what document(s) must be physically on site at the time of a PV/electrical inspection

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q59 Is there a re-inspection fee? Corrections & re-inspection

$75.00 per re-inspection.

Why the confidence is not higherQuoted directly from the City's own Fee Calculator and Schedule text: 'Re-Inspection: $75.00 Each.' City-wide fee applying to all trades, not PV-specific, but it is the only re-inspection fee the City publishes.

city fee schedule checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q60 How are corrections issued and cleared? Corrections & re-inspection

A failed inspection results in a 'Red Tag' being issued; the associated $75.00 re-inspection fee must be paid AND the noted work corrected before a re-inspection will be performed.

Why the confidence is not higherDirect quote: 'If you received a Red Tag with a re-inspection fee, the fee must be paid and the work corrected before the re-inspection will be performed.' General City-wide process, not PV-specific.

department page checked 2026-09-12 https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedPermits & Inspections page, Practical Guide to Permitting, and the Homeowner's Guide brochure (all read in full) — none states what is issued specifically upon passing a PV/electrical-alteration final inspection (CO, Final, Green Tag, or letter)

https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction/Permits-Inspections

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The customer/installer — FL PSC Rule 25-6.065(7)(d) places the interconnection-agreement execution and pre-energization notice obligations on the customer, not the AHJ. Not confirmed for Duke Energy Florida specifically (Duke's own pages are unreachable this run), so treat as the state-floor answer only.

Why the confidence is not higherSourced to the state rule; Dunedin's own material never mentions the City notifying the utility, and Duke's own interconnection pages returned HTTP 403 on every route tried this run.

Florida Administrative Code rule text (state floor; Duke's own pages unreachable) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.dunedin.gov/City-Services/Business-Development/Building-Codes-Permits-Construction
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Pinellas County
Regions covered
Authority Contact
Building Department
Direct Phone
727-298-3213
Booking & Scheduling