City of Greenacres
City of Greenacres
Palm Beach County
City of Greenacres is a city authority in the State of Florida, serving 43,990 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for City of Greenacres against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Greenacres is the authority having jurisdiction 82% confidence
- Holds
- Both Building and Electrical, held directly by the City itself — not delegated to Palm Beach County. The Building Division's own department page states it provides 'construction plan review, building permit issuance, inspections, contractor enrollment... and issuance of certificates of occupancy'; its permit-fee schedule, Contractor Enrollment Application, and its own MGO Connect (MyGovernmentOnline) online-permitting portal are all published and run by the City, with no reference anywhere to Palm Beach County's Planning, Zoning & Building Department handling permitting inside city limits. The City's own material lists 'electrical, gas, mechanical, or plumbing system work' among the trades requiring a City-issued permit. The one place the County DOES appear is contractor licensing: the City's Contractor Enrollment Application requires a 'Palm Beach County Certificate of Competency and/or State of Florida DBPR License' — i.e. the County (via its Construction Industry Licensing Board / PZB) or the state licenses the contractor, but the City itself issues the permit and performs the inspection. This is a licensing/permitting split, not a jurisdictional delegation.
- Overridden by
- FL PSC Rule 25-6.065(5)(a) (Fla. Admin. Code) requires that customer-owned renewable generation 'be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility' — so the City's inspection gates FPL's permission-to-operate rather than the reverse. FS 471.003(2)(h) statewide exempts a licensed electrical contractor from a PE-stamp requirement on residential electrical work valued at $125,000 or less with 600A (240V) or less aggregate service capacity, regardless of city rule. FS 489.103(7) lets an owner-occupant self-permit as their own general contractor, but the same statute (and Florida case/agency guidance built on it) still requires the electrical trade itself to be performed by a licensed electrical contractor — the owner-builder exemption does not extend to self-performing the PV electrical work. FS 553.73 makes the Florida Building Code edition a state-level decision the City has no discretion over: 'the initial adoption of, and any subsequent update or amendment to, the Florida Building Code by the [Florida Building] Commission is deemed adopted for use statewide without adoption by local government.'
- Why not higher
- Direct evidence is the City's own Building Division page, Building Permits page, Building Division Permit Fee Schedule, Applying-for-a-Permit page, and Contractor Enrollment Application — all published by Development & Neighborhood Services and all routed through the City's own MGO Connect portal, with no county involvement in permitting itself. Held below 90 because: (a) the City's website was substantially rebuilt in 2026 ('New Website Alert') and every URL in the original brief 404s — I had to re-derive working numeric-ID URLs via sitemap.xml and site-search, so some older cached content (pre-2026 forms, a Rev. 6/2009 permit application) may no longer reflect current practice; (b) the City's Land Development Code / Chapter 4 (Building) and Chapter 16 (Zoning) full text live only on library.municode.com, which serves a robots.txt line 'User-agent: ClaudeBot / Disallow: /' (checked 12 Sep 2026) — so any zoning precondition, ground-mount/structure classification, or local FBC technical amendment that lives only in that text could not be confirmed; and (c) as of 15 Apr 2026 the City stopped taking permit applications by email entirely and now requires an MGO Connect account, so the actual current PV submittal checklist (if any) is very likely gated behind a login I do not have, rather than genuinely unpublished.
- Permit required
- Yes78%
- Permit cost
- No PV-specific fee line exists; billed under the general valuation-based Building Division fee schedule, plus a flat non-refundable $75 application fee at submission.75%
- Portal
- MGO Connect (MyGovernmentOnline), replacing the former email-based submittal process90%
- Electrical code
- NEC 2020, incorporated by reference via the Florida Building Code, 8th Edition (2023) — a statewide, not city-specific, adoption65%
- Booking an inspection
- For permits submitted on or after 15 Apr 2026: through the MGO Contractor Portal. For permits submitted before that date: by phone (561-642-2062) or email (inspections@greenacresfl.gov)85%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Separate — electrical is a sub-permit distinct from the building permit Q4 Where you file — MGO Connect (MyGovernmentOnline), replacing the former email-based submittal process Q20
- Permit required
- Yes78% source
- What it costs
- No PV-specific fee line exists; billed under the general valuation-based Building Division fee schedule, plus a flat non-refundable $75 application fee at submission.75% source
- Key document
- City fee schedule (Resolution 2024-46) cited by 4 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes — the City of Greenacres Building Division (Development & Neighborhood Services) is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV; Palm Beach County does not perform in-city permitting or inspection 85% · department page
- What does this authority permit itself, and what does it delegate? Both — the City permits and inspects Building and Electrical itself; it delegates only contractor LICENSING eligibility (Palm Beach County Certificate of Competency or Florida DBPR license), not permitting authority 85% · City contractor enrollment application
- Is a permit required for a residential rooftop PV system? Yes 78% · City owner-builder affidavit form
- Is there a separate electrical permit, or is it combined? Separate — electrical is a sub-permit distinct from the building permit 68% · City fee schedule
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed electrical contractor (or the qualifying agent of one), enrolled with the City 72% · City contractor enrollment application
- Must the contractor be registered with this authority before applying? Yes 85% · City contractor enrollment application
- Is a homeowner permitted to self-install and self-permit? Partially — an owner-occupant of a one- or two-family residence may self-permit as their own general contractor under FS 489.103(7) using the City's Owner-Builder Affidavit, but the statute (and the affidavit's own disclosure text) still requires that any trade requiring a state license — including electrical — be performed by a licensed contractor; a true self-install of the PV electrical work is not permitted 62% · City owner-builder affidavit form + FS 489.103(7)
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- Is an electrical PE stamp required, and at what threshold? Statewide floor: no PE stamp required where the licensed EC performs electrical work valued at $125,000 or less with 600A (240V) or less aggregate residential service capacity (FS 471.003(2)(h)) 62% · Florida Statute
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? MGO Connect (MyGovernmentOnline), replacing the former email-based submittal process 90% · department page
- Can the whole application be completed online? Yes — MGO Connect supports full online submittal, tracking, fee payment, and inspection scheduling 85% · department page
- What does a residential solar permit cost? No PV-specific fee line exists; billed under the general valuation-based Building Division fee schedule, plus a flat non-refundable $75 application fee at submission. Formula: $75 minimum (or 2.5% of value) for $0–$100,000; +2% on the increment $100,001–$300,000; +1.25% on any value over $300,000. Electrical work folded into a master permit as a sub-permit is a flat $30 if its value is already included and it needs no independent review. 75% · City fee schedule (Resolution 2024-46)
- How is the fee calculated? Valuation (percentage of construction/contract value, tiered) 82% · City fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- How long is an issued permit valid before it expires? Statewide floor: a permit becomes void if no work commences or no passing inspection is documented within 180 days of issuance or of the prior passing inspection (FS 553.79); the City's own fee schedule separately prices 'Renewal of Expired Permits' at 50% of the permit fee if renewed within one year of expiration, 100% if renewed after one year (and may require resubmittal to current code) 65% · Florida Statute + City fee schedule
- Which utility handles interconnection here? Florida Power & Light (FPL) 72% · City fee schedule
- Where does the utility sit in the sequence? After permit and City inspection approval — FPL will not allow parallel operation (energization) until the local AHJ has inspected and approved the system, and FPL's own process only re-enters at final-inspection/PTO stage 75% · utility's own net-metering guidelines + FL Administrative Code (state floor)
28 questions answered against City of Greenacres’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes — the City of Greenacres Building Division (Development & Neighborhood Services) is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV; Palm Beach County does not perform in-city permitting or inspection
Why the confidence is not higherDepartment page states the Division provides 'construction plan review, building permit issuance, inspections... and the issuance of certificates of occupancy and completion' city-wide; no solar-specific statement exists, and no county involvement in permitting appears anywhere in the City's own material.
department page checked 2026-09-12 https://www.greenacresfl.gov/368/Building-Division
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both — the City permits and inspects Building and Electrical itself; it delegates only contractor LICENSING eligibility (Palm Beach County Certificate of Competency or Florida DBPR license), not permitting authority
Why the confidence is not higherCombines the Building Permits page (lists 'electrical... system work' as a permit type) with the Contractor Enrollment Application, which requires proof of a 'Palm Beach County Certificate of Competency and or State of Florida Department of Business and Professional Regulation License' before the City will let a contractor pull permits — licensing sits partly outside the City, permitting and inspection do not.
City contractor enrollment application checked 2026-09-12 https://www.greenacresfl.gov/DocumentCenter/View/405/Contractor-Registration
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherNo solar/PV exemption exists in any City document found. The City's own Owner-Builder Affidavit — the only permit-adjacent exemption route Greenacres publishes on its site — references FS 489.103(9)'s casual/minor-work carve-out, applicable only where the 'aggregate contract price for labor, materials, and all other items is less than $1,000'; a residential PV system is inherently well above that threshold and inherently electrical work, so no exemption route reaches it and a standard permit is required.
City owner-builder affidavit form checked 2026-09-12 https://www.greenacresfl.gov/DocumentCenter/View/404/Owner-Builder-Affidavit
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Separate — electrical is a sub-permit distinct from the building permit
Why the confidence is not higherThe City's Building Division Permit Fee Schedule prices a 'Sub Permit — with value included in total construction value and no independent review' at a flat $30, distinct from the master building-permit fee formula, implying electrical is billed and tracked as its own sub-permit under a master building permit rather than one combined solar permit. Not solar-specific; inferred from the general fee structure.
City fee schedule checked 2026-09-12 https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed electrical contractor (or the qualifying agent of one), enrolled with the City
Why the confidence is not higherThe City's Contractor Enrollment Application requires a Palm Beach County Certificate of Competency and/or Florida DBPR license, liability/workers'-comp insurance naming the City as certificate holder, and states 'I hereby apply to pull permits in the City of Greenacres and am solely responsible for any permitted work commenced under my license number' — a general contractor-enrollment requirement, not solar-specific, but with no field allowing an unlicensed applicant.
City contractor enrollment application checked 2026-09-12 https://www.greenacresfl.gov/DocumentCenter/View/405/Contractor-Registration
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes
Why the confidence is not higherEvery contractor must submit the City's Contractor Enrollment Application (with Certificate of Competency/DBPR license, insurance, and workers'-comp proof) before pulling any permit, and must also hold or create an MGO Connect account, which the City states requires registration; this is confirmed general practice, not solar-specific.
City contractor enrollment application checked 2026-09-12 https://www.greenacresfl.gov/DocumentCenter/View/405/Contractor-Registration
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Partially — an owner-occupant of a one- or two-family residence may self-permit as their own general contractor under FS 489.103(7) using the City's Owner-Builder Affidavit, but the statute (and the affidavit's own disclosure text) still requires that any trade requiring a state license — including electrical — be performed by a licensed contractor; a true self-install of the PV electrical work is not permitted
Why the confidence is not higherThe City's Owner-Builder Affidavit implements FS 489.103(7) and is a general-contractor-role exemption, not an electrical-trade exemption; state guidance on 489.103(7) is explicit that electrical, plumbing, mechanical and roofing subcontractors must still be licensed even when the owner self-permits the job. The City's own affidavit does not separately address PV, so this is a statutory inference layered on the City's general-purpose form.
City owner-builder affidavit form + FS 489.103(7) checked 2026-09-12 https://www.greenacresfl.gov/DocumentCenter/View/404/Owner-Builder-Affidavit
Q8 What documents make up a complete submittal? Core Submittal package
Nothing published by this authority.
Where we lookedBuilding Permits, Applying-for-a-Permit, and Checklists-to-Be-Attached-with-Permits pages (all read in full); the Checklists page states forms are 'currently under construction... some of the links may still be non-operational' and directs requests to groupblg@greenacresfl.gov; sitemap.xml and site-search for 'solar'/'photovoltaic' returned no dedicated PV checklist
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q9 How many copies, and in what format? Submittal package
Nothing published by this authority.
Where we lookedApplying-for-a-Permit page (full text) — states plans must be submitted via MGO Connect (post-15 Apr 2026) or as an unlocked PDF (pre-15 Apr 2026 revisions/resubmittals only); no copy-count or per-file-size format rule was stated the way Ocoee's site states one
Q10 Is a site plan required, and what must it show? Core Submittal package
Nothing published by this authority.
Where we lookedApplying-for-a-Permit and Checklists pages — no site-plan content list for a PV retrofit specifically; general checklist documents are behind the 'under construction' forms notice
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Nothing published by this authority.
Where we lookedApplying-for-a-Permit and Checklists pages, and the reachable DocumentCenter checklist PDFs (391-411, 417) — none is a PV/electrical one-line-diagram checklist; Chapter 4 (Building Regulations), where a citywide electrical-drawing requirement might be codified, is Municode-hosted and disallowed to ClaudeBot
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedSame document set as q11 — no string/conductor calculation requirement is stated anywhere reachable
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Nothing published by this authority.
Where we lookedBuilding Permits, Applying-for-a-Permit, Building Division Permit Fees, and the Re-Roof Package/Contractor Enrollment/Owner-Builder PDFs — none states a numeric structural PE-stamp threshold; Chapter 4 (Building Regulations), where such a threshold would likely be codified, is Municode-hosted and disallowed to ClaudeBot per robots.txt (checked 12 Sep 2026)
https://library.municode.com/fl/greenacres/codes/code_of_ordinances
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Statewide floor: no PE stamp required where the licensed EC performs electrical work valued at $125,000 or less with 600A (240V) or less aggregate residential service capacity (FS 471.003(2)(h))
Why the confidence is not higherFlorida Statute cited directly from the Florida Legislature's statute page; applies statewide absent a stricter local amendment. Chapter 4 (Building Regulations) of Greenacres' own code — where a stricter local threshold might be codified — is hosted only on library.municode.com, which disallows ClaudeBot, so I could not confirm whether Greenacres imposes anything stricter.
Florida Statute checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html
Q15 What does a residential solar permit cost? Core Fees
No PV-specific fee line exists; billed under the general valuation-based Building Division fee schedule, plus a flat non-refundable $75 application fee at submission. Formula: $75 minimum (or 2.5% of value) for $0–$100,000; +2% on the increment $100,001–$300,000; +1.25% on any value over $300,000. Electrical work folded into a master permit as a sub-permit is a flat $30 if its value is already included and it needs no independent review.
Why the confidence is not higherRead directly and verbatim from the City's own current 'Building Division Permit Fee Schedule Effective October 1, 2024 (Per Resolution 2024-46)'. No 'solar' or 'photovoltaic' fee line appears anywhere on the page; this is the general formula a PV job of a given contract value would be billed under, not a confirmed PV-specific charge.
City fee schedule (Resolution 2024-46) checked 2026-09-12 https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q16 How is the fee calculated? Core Fees
Valuation (percentage of construction/contract value, tiered)
Why the confidence is not higherThe fee schedule's headline table is explicitly headed 'Construction Values' against 'Fees & Charges' with percentage tiers ($0-$100,000 at 2.5% min $75; +2% on $100,001-$300,000; +1.25% above $300,000) — a valuation-based formula, with no separate amperage-tiered electrical schedule found on this page.
City fee schedule checked 2026-09-12 https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q17 Is there a separate plan-check fee? Fees
Nothing published by this authority.
Where we lookedBuilding Division Permit Fee Schedule (full text read) — the 'Plan Review Fees' table lists figures for 'Multi-Family Residential structures or PUD Single Family Master Building' ($300) and various commercial tiers, but does not clearly state whether a residential PV sub-permit (not a master building permit) triggers this fee independently; ambiguous enough that I did not record an answer
https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedBuilding Permits, Building Division, and Applying-for-a-Permit pages (all read in full) — none states a plan-review turnaround time for residential permits of any kind
Q19 How long is an issued permit valid before it expires? Timeline & validity
Statewide floor: a permit becomes void if no work commences or no passing inspection is documented within 180 days of issuance or of the prior passing inspection (FS 553.79); the City's own fee schedule separately prices 'Renewal of Expired Permits' at 50% of the permit fee if renewed within one year of expiration, 100% if renewed after one year (and may require resubmittal to current code)
Why the confidence is not higherCombines the statewide FS 553.79 180-day inaction rule (which Florida municipalities administer uniformly; I found no Greenacres-specific override, though Chapter 4 — where one could exist — is Municode-hosted and disallowed to ClaudeBot) with the City's own fee schedule's renewal pricing, which corroborates that permits do expire and can be reactivated at a cost.
Florida Statute + City fee schedule checked 2026-09-12 https://www.flsenate.gov/Laws/Statutes/2024/553.79
Q20 Which permit portal does this authority use? Core Portal & process
MGO Connect (MyGovernmentOnline), replacing the former email-based submittal process
Why the confidence is not higherThe Building Division page states the City is 'NOW LIVE with MGO Connect for permit submittals and tracking,' and the Applying-for-a-Permit page states that, starting 15 Apr 2026, 'new permit applications and plans are only being accepted electronically via MGO Connect' and permit applications will no longer be accepted by email starting 15 Apr 2026.
department page checked 2026-09-12 https://www.greenacresfl.gov/368/Building-Division
Q21 Can the whole application be completed online? Core Portal & process
Yes — MGO Connect supports full online submittal, tracking, fee payment, and inspection scheduling
Why the confidence is not higherBuilding Division page: MGO Connect's 'key features include: A simplified online application process... Ability to schedule inspections, Ability to pay permit fees,' plus a mobile app; the Applying-for-a-Permit and Schedule-an-Inspection pages both route current-permit customers through MGO for those functions.
department page checked 2026-09-12 https://www.greenacresfl.gov/368/Building-Division
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Power & Light (FPL)
Why the confidence is not higherThe City's own Building Division Permit Fee Schedule lists a line item 'FPL Electric Service Verification $40' — direct evidence FPL is the electric utility the City coordinates with on service verification for permitted work. Per this brief's own warning, PowerToChoose was NOT used as a source; Greenacres' geography (central Palm Beach County, inland of West Palm Beach, not one of Florida's municipal-electric cities) is also consistent with FPL territory, but I found no single City statement saying 'FPL is the sole residential electric utility.'
City fee schedule checked 2026-09-12 https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit and City inspection approval — FPL will not allow parallel operation (energization) until the local AHJ has inspected and approved the system, and FPL's own process only re-enters at final-inspection/PTO stage
Why the confidence is not higherFL PSC Rule 25-6.065(5)(a) (state floor for all investor-owned utilities, including FPL): customer-owned renewable generation 'must be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility.' FPL's own published Net Metering Guidelines corroborate the sequence: application/interconnection agreement first, then building permit, then construction, then local inspection approval, then FPL's bi-directional meter install — 'Operation of the renewable generation system, except for testing and inspection, prior to installation of a new bi-directional meter is strictly prohibited.'
utility's own net-metering guidelines + FL Administrative Code (state floor) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding Permits, Applying-for-a-Permit, Checklists pages, and the reachable Owner-Builder/Contractor-Enrollment/Re-Roof PDFs — none mentions HOA or architectural-review approval; the general Universal Building Permit Application (where an HOA disclaimer, if any, would likely appear, per the pattern seen in other FL cities) is only reachable inside the MGO Connect portal post-login, and the pre-2026 cached copy of that form (Rev. 6/2009) 404s
Q25 Is there a historic-district review? Overlays & special cases
Nothing published by this authority.
Where we lookedFull sitemap.xml grep for 'historic' returned zero results; no historic-preservation board, district, or review page appears in the City's page inventory
Q26 Is a wind or windstorm certification required? Overlays & special cases
Nothing published by this authority.
Where we lookedRe-Roof Package PDF (full text — requires an 'Uplift Chart for Single Family Homes' and engineer-sealed wind pressures for commercial/condo buildings, but this is a roofing-trade requirement tied to NOA/product approval, not a named 'wind/windstorm certification' for PV specifically); Chapter 4 full text is Municode-hosted and disallowed
https://www.greenacresfl.gov/DocumentCenter/View/2391/Roof-Package
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Nothing published by this authority.
Where we lookedDevelopment & Neighborhood Services page (full checklist/application inventory read directly, ~20 planning items) — no Specific Use Permit or Council-approval process is listed for residential PV; Chapter 16 (Zoning) full text, where this would be defined, is Municode-hosted and disallowed
https://www.greenacresfl.gov/198/Development-Neighborhood-Services
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Nothing published by this authority.
Where we lookedDevelopment & Neighborhood Services page and Ordinance No. 2022-04 (Chapter 16, Sec. 16-630 Yards — the one zoning-amendment ordinance text I could reach) — neither states a residential generation system-size cap; the balance of Chapter 16 is Municode-hosted and disallowed to ClaudeBot
https://library.municode.com/fl/greenacres/codes/code_of_ordinances
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? NEC 2020, incorporated by reference via the Florida Building Code, 8th Edition (2023) — a statewide, not city-specific, adoption 65% · adopted code text (state-level; no city-specific document found)
- Which building code edition is in force? Florida Building Code, 8th Edition (2023) — statewide, no local option to enforce an earlier edition 75% · Florida Statute (state-level; no reachable city-specific document)
- Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023) — the Florida-specific edition of NFPA 1 and NFPA 101 (2021 base editions), statewide 62% · State Fire Marshal page (state-level; no reachable city-specific document)
- What is the installation judged against? Florida Building Code, 8th Edition (2023), with electrical work judged against NEC 2020 as incorporated by that code 65% · adopted code text (state-level)
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for City of Greenacres on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, by operation of the statewide-adopted NEC 2020 — NEC Article 690.12 (Rapid Shutdown of PV Systems on Buildings) applies to any PV system installed on or in a building in Greenacres, since the City enforces the same statewide FBC 8th Ed. (2023)/NEC 2020 cycle as every other Florida jurisdiction 60% · adopted code text (state-level; inference, not city-specific)
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Does the UTILITY specify placards beyond the AHJ's? Yes — FPL requires (a) for systems using a manual disconnect switch (Tier 2/3, or Tier 1 where FPL installs one), a sign at the meter indicating the switch's location plus a warning that both sides may remain energized, and (b) for any system with battery storage, a placard 'permanently affixed to the meter enclosure stating "Battery storage utilized in this facility"' — both are utility requirements layered on top of whatever the AHJ requires 68% · utility's own net-metering guidelines
- Where must the labels be placed? At/adjacent to the FPL meter socket — the disconnect-location sign and the battery-storage placard are both required at the meter enclosure, not at the inverter or elsewhere on the building 65% · utility's own net-metering guidelines
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Tier 1 residential systems (10 kW gross or less — most residential rooftop PV) are EXEMPT from a separate manual AC disconnect switch requirement unless FPL installs one at its own expense. Where a switch IS required (Tier 2/3, or non-inverter-based systems), it must be 'mounted separate from, but adjacent to, the meter socket,' positioned to disengage only the renewable source, and capable of being secured open with a single FPL padlock 80% · utility's own guidelines + Florida Administrative Code (state floor)
- Must equipment be on a specific approved list? Not a dedicated PV/racking list, but the City's Re-Roof Package requires Florida Product Approval numbers or a valid (non-expired) Miami-Dade NOA for roof-attached products generally — 'NOA's or product approvals... Expired NOA will NOT be accepted' — and Palm Beach County is outside the High-Velocity Hurricane Zone (HVHZ is Miami-Dade and Broward only), so Florida Product Approval (rather than a mandatory Miami-Dade NOA) is the applicable statewide route, though an NOA remains acceptable alternative compliance 45% · City form (roofing, not solar-specific)
- Are batteries permitted, and under what conditions? Yes, with a utility-required placard: FPL permits batteries under its net-metering rules and requires 'a placard permanently affixed to the meter enclosure stating "Battery storage utilized in this facility"'; no City-published restriction on residential batteries/ESS was found 55% · utility's own net-metering guidelines
20 questions answered against City of Greenacres’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
NEC 2020, incorporated by reference via the Florida Building Code, 8th Edition (2023) — a statewide, not city-specific, adoption
Why the confidence is not higherFBC 8th Edition (2023) Chapter 27 (Building volume) adopts NFPA 70 (NEC), 2020 edition, by reference, effective statewide since 31 Dec 2023/1 Jan 2024. No Greenacres document I could reach names an NEC year explicitly (Chapter 4 of the City's code, where it might be restated, is Municode-hosted and disallowed to ClaudeBot), so this is the state-mandated edition rather than a City-published citation.
adopted code text (state-level; no city-specific document found) checked 2026-09-12 https://codes.iccsafe.org/content/FLBC2023P1/chapter-27-electrical
Q30 Which building code edition is in force? Core Code editions in force
Florida Building Code, 8th Edition (2023) — statewide, no local option to enforce an earlier edition
Why the confidence is not higherFS 553.73(2)(a): 'the initial adoption of, and any subsequent update or amendment to, the Florida Building Code by the [Florida Building] Commission is deemed adopted for use statewide without adoption by local government' — every Florida municipality including Greenacres is enforcing the same statewide edition by law. I could not find a Greenacres-published document stating this in so many words (Chapter 4 is Municode-hosted and disallowed to ClaudeBot; the only cached permit-application PDF found was a stale, pre-2020-cycle Rev. 6/2009 form), so this is a statutory certainty rather than a City citation.
Florida Statute (state-level; no reachable city-specific document) checked 2026-09-12 https://www.flsenate.gov/Laws/Statutes/2023/553.73
Q31 Which fire code edition is in force? Code editions in force
Florida Fire Prevention Code, 8th Edition (2023) — the Florida-specific edition of NFPA 1 and NFPA 101 (2021 base editions), statewide
Why the confidence is not higherState Fire Marshal-published edition, effective statewide since 31 Dec 2023, administered the same way FS 553.73 makes the FBC statewide — local fire codes in Florida do not carry independently-chosen editions. No Greenacres Fire-Rescue document naming this edition was found; the City's own Fire-Rescue pages were not reachable in this run in the way the Building Division pages were.
State Fire Marshal page (state-level; no reachable city-specific document) checked 2026-09-12 https://myfloridacfo.com/division/sfm/bfp/florida-fire-prevention-code
Q32 Are there local amendments to any of the above? Core Code editions in force
Nothing published by this authority.
Where we lookedSearched for a Greenacres ordinance amending Chapter 4 (Building Regulations) on technical (non-fee) grounds; found only Resolution 2024-46 (fee schedule) and Ordinance 2022-04 (Chapter 16 zoning setbacks, not building code) — neither confirms or rules out a technical FBC/NEC local amendment. Chapter 4 full text is Municode-hosted and disallowed to ClaudeBot
https://library.municode.com/fl/greenacres/codes/code_of_ordinances
Q33 What is the installation judged against? Core Electrical
Florida Building Code, 8th Edition (2023), with electrical work judged against NEC 2020 as incorporated by that code
Why the confidence is not higherCombines the statewide FBC 8th Ed. (2023) mandate (FS 553.73) with its Chapter 27 incorporation of NEC 2020; no Greenacres-specific document confirming this citation was reachable (see q29/q30 notes on Municode access).
adopted code text (state-level) checked 2026-09-12 https://codes.iccsafe.org/content/FLBC2023P1/chapter-27-electrical
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedBuilding Division Permit Fee Schedule (full text, no separate electrical/amperage-tiered schedule found) and Contractor Enrollment/Owner-Builder PDFs — no service-upgrade or busbar-sizing rule stated; Chapter 4 is Municode-hosted and disallowed
https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedChecklists page and all reachable DocumentCenter checklist PDFs (391-411, 417) plus a sitemap-wide search for 'solar'/'photovoltaic' (zero hits among indexed pages) — no mounting-system or attachment-spacing document published
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedBuilding Permits and Checklists pages — no ridge-setback or fire-access-pathway rule for rooftop PV is stated anywhere reachable; Greenacres' Fire-Rescue permitting pages were not successfully reached in this run (site restructuring left old Fire URLs 404ing and no working replacement was found via sitemap or search), and the Florida Fire Prevention Code full text sits behind an NFPA login
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, by operation of the statewide-adopted NEC 2020 — NEC Article 690.12 (Rapid Shutdown of PV Systems on Buildings) applies to any PV system installed on or in a building in Greenacres, since the City enforces the same statewide FBC 8th Ed. (2023)/NEC 2020 cycle as every other Florida jurisdiction
Why the confidence is not higherInference from the statewide code-adoption chain (FS 553.73 -> FBC 8th Ed. 2023 -> NEC 2020 Art. 690.12) rather than a Greenacres-specific statement; no City document mentions rapid shutdown by name.
adopted code text (state-level; inference, not city-specific) checked 2026-09-12 https://codes.iccsafe.org/content/FLBC2023P1/chapter-27-electrical
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedChecklists page (all reachable DocumentCenter items, 391-411 and 417, read/identified) and a sitemap-wide grep for 'solar'/'photovoltaic' — zero hits; no placard requirement of any kind is published by the City
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38 — no placard wording is published anywhere on the City's reachable site
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38 — no letter-height/colour/material spec published by the City itself (FPL's guidelines, cited under q42/43, do not specify letter height, colour, or material either)
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38 — no facility/site-plan placard spec published by the City
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Yes — FPL requires (a) for systems using a manual disconnect switch (Tier 2/3, or Tier 1 where FPL installs one), a sign at the meter indicating the switch's location plus a warning that both sides may remain energized, and (b) for any system with battery storage, a placard 'permanently affixed to the meter enclosure stating "Battery storage utilized in this facility"' — both are utility requirements layered on top of whatever the AHJ requires
Why the confidence is not higherSourced to FPL's own published Net Metering Guidelines page. The City of Greenacres publishes no placard requirement of its own that I could find (Building Permits, Applying-for-a-Permit, and Checklists pages, plus a sitemap-wide check, show no solar/PV placard document).
utility's own net-metering guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q43 Where must the labels be placed? Core Labels Signage & labelling
At/adjacent to the FPL meter socket — the disconnect-location sign and the battery-storage placard are both required at the meter enclosure, not at the inverter or elsewhere on the building
Why the confidence is not higherSame FPL guidelines page: the disconnect-location sign is posted 'at the meter,' and the battery-storage placard must be 'affixed to the meter enclosure.' No City-specific label-placement rule was found.
utility's own net-metering guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q44 Must equipment be on a specific approved list? Equipment listing
Not a dedicated PV/racking list, but the City's Re-Roof Package requires Florida Product Approval numbers or a valid (non-expired) Miami-Dade NOA for roof-attached products generally — 'NOA's or product approvals... Expired NOA will NOT be accepted' — and Palm Beach County is outside the High-Velocity Hurricane Zone (HVHZ is Miami-Dade and Broward only), so Florida Product Approval (rather than a mandatory Miami-Dade NOA) is the applicable statewide route, though an NOA remains acceptable alternative compliance
Why the confidence is not higherRead directly from the City's own Re-Roof Package PDF, which is a roofing-trade checklist, not a PV-specific one; racking/attachment hardware for a PV array would plausibly fall under the same general product-approval regime the City applies to roofing products, but no City document names PV racking as its own category, so this is an inference across trades, not a confirmed PV-equipment-listing rule.
City form (roofing, not solar-specific) checked 2026-09-12 https://www.greenacresfl.gov/DocumentCenter/View/2391/Roof-Package
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, with a utility-required placard: FPL permits batteries under its net-metering rules and requires 'a placard permanently affixed to the meter enclosure stating "Battery storage utilized in this facility"'; no City-published restriction on residential batteries/ESS was found
Why the confidence is not higherSourced to FPL's own guidelines page; the City's Fire-Rescue permitting pages that might separately address battery/ESS fire-code review were not reachable in this run in the way the Building Division pages were, so the City side of this answer is an absence, not a confirmed 'no restriction.'
utility's own net-metering guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Nothing published by this authority.
Where we lookedBuilding Permits, Checklists, and Applying-for-a-Permit pages, plus a sitemap search for 'battery'/'ESS' (zero hits) — no separate ESS permit or inspection type is named; the City's Fire-Rescue pages, which would most likely hold this (per the Ocoee pattern), were not reachable in this run
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedOrdinance No. 2022-04 (the one Chapter 16 zoning-amendment text reached — Sec. 16-630 Yards, which lists permitted setback encroachments such as HVAC, generators, and utility structures but does not mention ground-mount solar); whether the Land Development Code treats a ground mount as a 'structure' would be defined elsewhere in Chapter 16, which is Municode-hosted and disallowed to ClaudeBot
https://library.municode.com/fl/greenacres/codes/code_of_ordinances
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Tier 1 residential systems (10 kW gross or less — most residential rooftop PV) are EXEMPT from a separate manual AC disconnect switch requirement unless FPL installs one at its own expense. Where a switch IS required (Tier 2/3, or non-inverter-based systems), it must be 'mounted separate from, but adjacent to, the meter socket,' positioned to disengage only the renewable source, and capable of being secured open with a single FPL padlock
Why the confidence is not higherTwo independent, mutually corroborating sources: FL Admin. Code R. 25-6.065's Tier 1 exemption language and FPL's own published Net Metering Guidelines, which both state the same disconnect-location and Tier 1 exemption rule. The City of Greenacres publishes no AC-disconnect placement requirement of its own that I could find.
utility's own guidelines + Florida Administrative Code (state floor) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? For permits submitted on or after 15 Apr 2026: through the MGO Contractor Portal. For permits submitted before that date: by phone (561-642-2062) or email (inspections@greenacresfl.gov) 85% · department page
- How much notice is required? Inspection requests must be submitted by 3:00 p.m. the business day before the requested date; same-day inspections are not permitted; a Monday inspection must be requested by 3:00 p.m. the preceding Friday 88% · department page
- Are same-day or AM/PM windows offered? Not offered — no AM/PM or same-day window option is described; the page only states scheduling hours (Mon-Fri, 8:00 a.m.-3:00 p.m.) and explicitly rules out same-day inspections 65% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes 80% · department page
- If delegated, to whom? N/A — not delegated; the City's own Building Division performs the inspection 75% · department page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Is a rough-in or mid-roof inspection required? Not confirmed for electrical/PV specifically, but the City does require staged inspections for two other trades commonly bundled with a solar job: windows/doors require a 'Buck Inspection' before final, and re-roofing requires 'Sheathing, Tin Tag and In Progress' inspections before final — 'No affidavits are being accepted' 55% · department page (general, not solar-specific)
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
Nothing recorded for City of Greenacres on this step yet — 3 questions checked and found unpublished. The guidance above is general.
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- Who notifies the utility for PTO? Installer/customer 68% · Florida Administrative Code rule text (state floor)
- Is there a re-inspection fee? $50 first re-inspection, $100 second (same type), $200 third and subsequent (same type) 88% · City fee schedule
14 questions answered against City of Greenacres’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
For permits submitted on or after 15 Apr 2026: through the MGO Contractor Portal. For permits submitted before that date: by phone (561-642-2062) or email (inspections@greenacresfl.gov)
Why the confidence is not higherVerbatim from the City's own Schedule-an-Inspection page, which explicitly splits the process on the 15 Apr 2026 MGO cutover date.
department page checked 2026-09-12 https://www.greenacresfl.gov/379/Schedule-an-Inspection
Q50 How much notice is required? Core Booking & scheduling
Inspection requests must be submitted by 3:00 p.m. the business day before the requested date; same-day inspections are not permitted; a Monday inspection must be requested by 3:00 p.m. the preceding Friday
Why the confidence is not higherVerbatim from the Schedule-an-Inspection page's own scheduling rules, effective per the City's 3 Sep 2024 system change.
department page checked 2026-09-12 https://www.greenacresfl.gov/379/Schedule-an-Inspection
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Not offered — no AM/PM or same-day window option is described; the page only states scheduling hours (Mon-Fri, 8:00 a.m.-3:00 p.m.) and explicitly rules out same-day inspections
Why the confidence is not higherThe Schedule-an-Inspection page (read in full) covers request deadlines and cancellation notice but never describes a morning/afternoon window choice for the inspection visit itself, and explicitly states same-day inspections are not permitted.
department page checked 2026-09-12 https://www.greenacresfl.gov/379/Schedule-an-Inspection
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes
Why the confidence is not higherThe City's own Building Division page and Schedule-an-Inspection page describe City-employed inspectors and a City-run scheduling system (phone/email pre-MGO, MGO Contractor Portal post-15 Apr 2026); no third-party or delegated inspection agency is mentioned anywhere in the City's building-inspection material.
department page checked 2026-09-12 https://www.greenacresfl.gov/379/Schedule-an-Inspection
Q53 If delegated, to whom? Core Who inspects
N/A — not delegated; the City's own Building Division performs the inspection
Why the confidence is not higherFollows directly from q52 — no delegation is described anywhere in the City's inspection material. Note the City does maintain a private-provider audit SOP (Building Permits page) under FS 468.604, meaning a permit holder may independently hire a private provider for plan review/inspection under state law, but that is the applicant's option, not a City delegation of its own AHJ role.
department page checked 2026-09-12 https://www.greenacresfl.gov/378/Building-Permits
Q54 Which inspections are required, and in what order? Core Stages & sequence
Nothing published by this authority.
Where we lookedSchedule-an-Inspection page (full text) — states staged-inspection rules for windows/doors and roofing only (see q55); no inspection sequence is published for electrical or PV specifically
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Not confirmed for electrical/PV specifically, but the City does require staged inspections for two other trades commonly bundled with a solar job: windows/doors require a 'Buck Inspection' before final, and re-roofing requires 'Sheathing, Tin Tag and In Progress' inspections before final — 'No affidavits are being accepted'
Why the confidence is not higherVerbatim from the Schedule-an-Inspection page; these rules are stated for roofing and window/door trades, not for electrical or PV rough-in, so this is adjacent-trade evidence rather than a confirmed PV rough-in requirement.
department page (general, not solar-specific) checked 2026-09-12 https://www.greenacresfl.gov/379/Schedule-an-Inspection
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedSchedule-an-Inspection page (full text) — does not state that the inspector verifies equipment labels/listings as a discrete checked item
Q57 Is there a published inspection checklist? Core What is checked
Nothing published by this authority.
Where we lookedChecklists-to-Be-Attached-with-Permits page and Schedule-an-Inspection page — no published inspection checklist of any kind (PV or general) exists on the City's reachable site; the Checklists page as its name suggests holds pre-submittal checklists, not inspection-day checklists
https://www.greenacresfl.gov/381/Checklists-to-Be-Attached-with-Permits
Q58 What must be on site at inspection? Core Documents on site
Nothing published by this authority.
Where we lookedSchedule-an-Inspection page and Re-Roof Package PDF — neither states what documents (permit card, approved plans, NOA package) must be physically on site at a PV inspection specifically
Q59 Is there a re-inspection fee? Corrections & re-inspection
$50 first re-inspection, $100 second (same type), $200 third and subsequent (same type)
Why the confidence is not higherQuoted verbatim from the City's current Building Division Permit Fee Schedule (Resolution 2024-46) — a city-wide re-inspection fee applying to all trades, not PV-specific, but the only re-inspection fee schedule Greenacres publishes.
City fee schedule checked 2026-09-12 https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q60 How are corrections issued and cleared? Corrections & re-inspection
Nothing published by this authority.
Where we lookedBuilding Permits and Applying-for-a-Permit pages — no described corrections/re-submittal workflow beyond the general MGO 'track application status' feature; no PV-specific or general corrections-clearing procedure is spelled out
Q61 What is issued on pass? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedBuilding Division Permit Fee Schedule (mentions a 'Certificate of Completion for permits with construction value of less than $5,000.00 — $25', which would not apply to a typical PV job) and Schedule-an-Inspection page — neither states what document (CO, Certificate of Completion, green tag) is issued specifically on passing a PV/electrical-alteration final inspection
https://www.greenacresfl.gov/385/Building-Division-Permit-Fees
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Installer/customer
Why the confidence is not higherFL Admin. Code R. 25-6.065: the customer must execute the Standard Interconnection Agreement at least 30 days before parallel operation and 'notify the investor-owned utility at least 10 days prior to initially placing customer equipment... in service' — the rule places these obligations on the customer/installer, not the AHJ, and no Greenacres document states the City notifies FPL.
Florida Administrative Code rule text (state floor) checked 2026-09-12 https://www.law.cornell.edu/regulations/florida/Fla-Admin-Code-Ann-R-25-6-065
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording None%
Size, colour & material None%
Where they go 65%
At/adjacent to the FPL meter socket — the disconnect-location sign and the battery-storage placard are both required at the meter enclosure, not at the inverter or elsewhere on the building
What the utility wants on top 68%
Yes — FPL requires (a) for systems using a manual disconnect switch (Tier 2/3, or Tier 1 where FPL installs one), a sign at the meter indicating the switch's location plus a warning that both sides may remain energized, and (b) for any system with battery storage, a placard 'permanently affixed to the meter enclosure stating "Battery storage utilized in this facility"' — both are utility requirements layered on top of whatever the AHJ requires
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.