City of Holly Hill
City of Holly Hill
Volusia County
City of Holly Hill is a city authority in the State of Florida, serving 12,958 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for City of Holly Hill against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Holly Hill is the authority having jurisdiction 88% confidence
- Holds
- Building, Electrical, and Fire are all held in-house by the City itself under one combined organizational unit the City's own current Building Permit Application (rev. 1/2025) names 'Community Development Department — Building & Fire Division.' The City's own FS 553.80(7)(b) Building Permit & Inspection Utilization Report for FY 2024-2025 shows real, substantial dedicated personnel cost ($384,273.70 personal services + $37,970.77 operating) and 3 dedicated personnel, with only 52 of 2,961 building inspections (1.8%) performed by a private provider and zero private-provider audits — this is a genuinely in-house department, not a wholesale outsourcing arrangement like DeBary's PDCS contract or Oviedo's PDCS contract elsewhere in this survey. Contractor LICENSING sits with Volusia County (every City checklist and the general permit application require a 'Volusia County Listing Card #' / 'DBPR & Volusia County License Check' before the City will register a contractor) while the CITY itself issues the permit and performs the inspection — this is the same 'licensing/permitting split' pattern the baseline survey already documented for Broward, Palm Beach and Volusia County generally, not delegation. Fire inspection is a distinct named function (Fire Marshal Richard Beauregard) but organizationally sits inside the same Building & Fire Division, and its own page states its scope as 'all new construction and existing commercial businesses' — no residential-PV-specific fire review function was found, consistent with the pattern elsewhere in this survey (Sunny Isles Beach, Miami-Dade) that routes residential PV permits to Electrical, not Fire.
- Overridden by
- FL PSC Rule 25-6.065 (state floor for FPL, the investor-owned franchisee) requires customer-owned renewable generation to be inspected and approved by local code officials before parallel operation with the utility — the City's inspection gates FPL's energization, not the reverse. FS 471.003(2)(h) statewide exempts a licensed electrical contractor from a PE stamp for electrical work ≤$125,000 value / ≤600A aggregate service capacity on a residential system, regardless of any city rule (no Holly Hill-specific override found). Volusia County holds contractor Certificate of Competency / listing-card authority per the county-wide licensing split noted above; this does not touch permitting or inspection authority, which stays with the City.
- Why not higher
- Direct evidence: the City's current (rev. 1/2025) 'Building, Electrical, Mechanical and Plumbing Permit Application' masthead names the Community Development Department, Building & Fire Division, as the code-enforcing body and states the adopted codes; the City's own FS 553.80(7)(b) Permit Utilization Report for FY24-25 (media/10696) proves real in-house staffing rather than outsourcing; every Permit Checklist requires Volusia County licensing before City registration. Held at 88 rather than higher because (a) I could not confirm whether Holly Hill's Land Development/Zoning chapter (Ch. 114) imposes any solar-specific precondition — I read the accessory-structure definition (Sec. 78-14, which explicitly lists 'solar energy equipment' as an example of an accessory structure) but did not exhaustively review Ch. 114's permitted-use tables for every zoning district, and (b) whether a residential-PV-only job (no battery/ESS) ever triggers Fire Division review is inferred from the Fire page's own 'commercial businesses' framing rather than a direct City statement.
- Permit required
- Yes78%
- Permit cost
- No dedicated PV/solar fee line exists (confirmed — the schedule's only 'SOLAR' line is 'PLUMB - SOLAR WATER HEAT SYS $10.00', a plumbing fee for solar water heaters, not PV).78%
- Portal
- Tyler EnerGov SelfService — branded 'Holly Hill Civic Access' — at https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice96%
- Electrical code
- 2020 National Electrical Code (NEC)96%
- Booking an inspection
- Through the Tyler EnerGov self-service portal's 'Request Inspection' tool88%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Combined at the application level — one 'Building, Electrical, Mechanical and Plumbing Permit Application' form covers all trades including a SOLAR INFORMATION… Q4 Where you file — Tyler EnerGov SelfService — branded 'Holly Hill Civic Access' — at https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice Q20
- Permit required
- Yes78% source
- What it costs
- No dedicated PV/solar fee line exists (confirmed — the schedule's only 'SOLAR' line is 'PLUMB - SOLAR WATER HEAT SYS $10.00', a plumbing fee for solar water heaters, not PV).78% source
- Key document
- inference — no City-specific cap found cited by 7 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes — the City of Holly Hill's Community Development Department, Building & Fire Division, is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV 85% · department page
- What does this authority permit itself, and what does it delegate? The City permits and inspects Building, Electrical, Mechanical, Plumbing and Fire itself (all under one 'Building & Fire Division'); it does NOT permit contractor licensing — that sits with Volusia County (Certificate of Competency / 'Listing Card'), which every City checklist requires before the City will register a contractor 85% · building permit application masthead
- Is a permit required for a residential rooftop PV system? Yes 78% · building permit application
- Is there a separate electrical permit, or is it combined? Combined at the application level — one 'Building, Electrical, Mechanical and Plumbing Permit Application' form covers all trades including a SOLAR INFORMATION section — but fees are itemized separately by trade on the fee schedule (e.g. a distinct 'ELECTRICAL - RESIDENTIAL' fee line) 82% · building permit application
- Is there a historic-district review? A Historic Preservation Board exists (Code of Ordinances Ch. 2, Art. III, Div. 6) with review powers, but I could not confirm whether Holly Hill has an actual designated historic-district overlay that would trigger review for a residential rooftop PV permit specifically 55% · Code of Ordinances
- Is a wind or windstorm certification required? No Holly Hill-specific 'windstorm certification' document exists; the mechanism used generally is the statewide Florida Product Approval regime — the City publishes its own 'Florida Product Approval Number Spec Sheet' (per FS 553.842) as part of its standard Building Permit Applications, without a distinct PV/racking category 55% · City form
- Is there a system-size cap on residential generation? No Holly Hill-specific residential generation size cap found; the effective cap comes from FPL's own net-metering tariff tier structure (Tier 1 ≤10kW / Tier 2 ≤100kW / Tier 3 ≤2MW), which is a utility-level rather than a City zoning limit 55% · inference — no City-specific cap found
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A state-licensed electrical contractor (DBPR-licensed, Volusia County listing card), or the property owner acting as owner-builder under the City's Owner-Builder Affidavit 60% · building permit application
- Must the contractor be registered with this authority before applying? Yes 85% · City permit checklist
- Is a homeowner permitted to self-install and self-permit? Yes 65% · City owner-builder affidavit form
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? No solar-specific checklist exists (confirmed absent — see q57/not_found). For a general electrical/residential-alteration permit, the City's own checklists require: a completed combined Permit Application (signed by the licensed contractor, registered with the Building Department); Owner/Builder Disclosure if self-permitting; a Warranty Deed copy or Property Appraiser ownership verification; one copy of a 'detailed drawing of the proposed work'; a Notice of Commencement (certified recorded copy) for any job ≥$5,000 before first inspection; a completed Roll-Off Dumpster Form; DBPR & Volusia County License Check; and General Liability/Workers' Comp Certificates of Insurance (or a state workers'-comp exemption certificate) 62% · City permit checklist
- How many copies, and in what format? Residential: 1 hard copy of plans, signed and wet-sealed, plus 1 digital copy. Commercial: same (1 hard copy signed/wet-sealed + 1 digital copy). Applications and backup documentation are emailed to Permitdesk@hollyhillfl.org; large signed/sealed hard-copy plan sets are delivered in person/courier accompanied by a thumb drive if not already emailed 88% · building permit application masthead
- Is a site plan required, and what must it show? No PV-specific site plan requirement is published. The general combined Permit Application itself captures site data directly on the form: existing/proposed finished elevation, flood zone, and setback fields (F/R/S/S) filled in by the applicant, rather than requiring a separate drawn site plan for a retrofit job 50% · building permit application
- Is a one-line / three-line diagram required? A 'detailed drawing of the proposed work' (one copy) is required per the Electric Permit Checklist, which would function as the one-line/riser diagram for an electrical/PV job, but the City's documents never use the term 'one-line diagram' or 'riser diagram' by name 50% · City permit checklist
- Is an electrical PE stamp required, and at what threshold? Statewide floor only: FS 471.003(2)(h) exempts a licensed electrical/plumbing/AC contractor from a PE-stamp requirement on residential electrical work valued at $125,000 or less with aggregate service capacity of 600 amperes (240V) or less 65% · Florida Statute
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Tyler EnerGov SelfService — branded 'Holly Hill Civic Access' — at https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice 96% · portal
- Can the whole application be completed online? Partially — the portal has a live 'Apply' tool ('This tool can be used to apply for a permit, plan or license'), but the Building Division's own page instructs applicants to email full applications and backup documentation to Permitdesk@hollyhillfl.org, and separately says 'To request an inspection, please begin to go to your portal... as we begin to transition away from the website' — indicating the City is mid-migration from email-based intake to the portal rather than fully on one channel 55% · department page + live portal
- What does a residential solar permit cost? No dedicated PV/solar fee line exists (confirmed — the schedule's only 'SOLAR' line is 'PLUMB - SOLAR WATER HEAT SYS $10.00', a plumbing fee for solar water heaters, not PV). A residential rooftop PV job would be billed under: 'APPLIC FEE - RES BLDG PRMIT' $30.00 (or 'APPLIC FEE - RES ACCES.STRC' $30.00 if a ground mount is treated as an accessory structure), plus 'ELECTRICAL - RESIDENTIAL' $30.00 application fee, plus 'ELEC - PER AMP SINGLE PHASE' $0.60/amp (or the 3-phase per-amp tiers), plus 'ELEC - EACH ADDITIONAL CIRCUIT' $3.00 if applicable 78% · City fee schedule (current, eff. 10/1/2024)
- How is the fee calculated? Flat application fee plus a metered/tiered component: electrical is billed per-amp (by phase/voltage tier) and per additional circuit rather than by dollar valuation; if a ground-mount array is billed as an accessory structure, that component would be an application-fee flat rate ('APPLIC FEE - RES ACCES.STRC' $30) rather than a valuation-based building fee 62% · City fee schedule
- Is there a separate plan-check fee? Yes, a separate plan-review fee is codified 68% · Code of Ordinances
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- Which utility handles interconnection here? Florida Power & Light Company (FPL) 96% · codified franchise ordinance
- Where does the utility sit in the sequence? After permit — FPL will not allow parallel operation until the local AHJ has inspected and approved the system 72% · Florida Administrative Code rule text (state floor)
28 questions answered against City of Holly Hill’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes — the City of Holly Hill's Community Development Department, Building & Fire Division, is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV
Why the confidence is not higherBuilding Division page: 'Responsible for regulating all construction activity within the City of Holly Hill... processing and issuing Building permits, verifying Contractor competency and licensing requirements, performing associated plan reviews, inspections.' No county or other agency named anywhere in the City's building material.
department page checked 2026-09-12 https://www.hollyhillfl.org/cd/page/building-division
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
The City permits and inspects Building, Electrical, Mechanical, Plumbing and Fire itself (all under one 'Building & Fire Division'); it does NOT permit contractor licensing — that sits with Volusia County (Certificate of Competency / 'Listing Card'), which every City checklist requires before the City will register a contractor
Why the confidence is not higherMasthead of current combined Building/Electrical/Mechanical/Plumbing Permit Application (rev. 1/2025) names 'Community Development Department Building & Fire Division.' Every Permit Checklist (e.g. Residential Addition/Alteration, Single Family/Duplex) requires a 'VOLUSIA COUNTY LISTING CARD #' and 'DBPR & Volusia County License Check' as a precondition to City registration.
building permit application masthead checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherNo solar/PV exemption exists in any City document reviewed. Positively, the City's general combined Building Permit Application contains a dedicated 'SOLAR INFORMATION' section (Electrical System? / Heating System? / Cooling System? / Water Heater System? Yes/No checkboxes) as part of the standard permit intake — meaning solar work is a captured, permitted category, not exempt.
building permit application checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined at the application level — one 'Building, Electrical, Mechanical and Plumbing Permit Application' form covers all trades including a SOLAR INFORMATION section — but fees are itemized separately by trade on the fee schedule (e.g. a distinct 'ELECTRICAL - RESIDENTIAL' fee line)
Why the confidence is not higherDirectly read the current combined application form (media/4021), which is a single document used for 'Construction, Electrical, Plumbing, Demo, and Mechanical Work,' and the current Fee Schedule (media/8231, eff. 10/1/2024), which prices 'ELECTRICAL PERMITS' as a distinct fee category from 'BUILDING PERMIT FEES'.
building permit application checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A state-licensed electrical contractor (DBPR-licensed, Volusia County listing card), or the property owner acting as owner-builder under the City's Owner-Builder Affidavit
Why the confidence is not higherThe general Building Permit Application has a dedicated 'ELECTRICAL CONTRACTOR' block requiring Volusia County Listing Card #, License Holder, DBPR License #; the City also publishes a separate Owner-Builder Affidavit (media/4061) implementing the FS 489.103/489.503 statewide owner-builder exemption. Neither document is solar-specific.
building permit application checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes
Why the confidence is not higherVerbatim from the Residential Addition/Alteration and Single Family/Duplex Permit Checklists: contractors 'must be listed at the time of application and must be registered with the Building Department... must be registered with Volusia County, provide license and insurance documents.'
City permit checklist checked 2026-09-12 https://www.hollyhillfl.org/media/4181
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes
Why the confidence is not higherThe City publishes its own Owner-Builder Affidavit form (media/4061) implementing the statewide FS 489.103/489.503 owner-builder mechanism. This is a general statewide exemption route the City has adopted a form for; it is not solar-specific and does not separately state whether an owner may self-pull the electrical sub-permit for a PV system specifically.
City owner-builder affidavit form checked 2026-09-12 https://www.hollyhillfl.org/media/4061
Q8 What documents make up a complete submittal? Core Submittal package
No solar-specific checklist exists (confirmed absent — see q57/not_found). For a general electrical/residential-alteration permit, the City's own checklists require: a completed combined Permit Application (signed by the licensed contractor, registered with the Building Department); Owner/Builder Disclosure if self-permitting; a Warranty Deed copy or Property Appraiser ownership verification; one copy of a 'detailed drawing of the proposed work'; a Notice of Commencement (certified recorded copy) for any job ≥$5,000 before first inspection; a completed Roll-Off Dumpster Form; DBPR & Volusia County License Check; and General Liability/Workers' Comp Certificates of Insurance (or a state workers'-comp exemption certificate)
Why the confidence is not higherAssembled from the Electric Permit Checklist and Residential Addition/Alteration Permit Checklist, both read in full, plus the Building Division page's general insurance-certificate requirement. Neither checklist names solar/PV; this is the closest analog (the Electric Permit Checklist itself is internally titled 'COMMERCIAL ELECTRIC' per its Word-doc metadata even though it is the only electric checklist offered generally — a labeling/vintage mismatch worth flagging).
City permit checklist checked 2026-09-12 https://www.hollyhillfl.org/media/4146
Q9 How many copies, and in what format? Submittal package
Residential: 1 hard copy of plans, signed and wet-sealed, plus 1 digital copy. Commercial: same (1 hard copy signed/wet-sealed + 1 digital copy). Applications and backup documentation are emailed to Permitdesk@hollyhillfl.org; large signed/sealed hard-copy plan sets are delivered in person/courier accompanied by a thumb drive if not already emailed
Why the confidence is not higherDirectly quoted from the current Building Permit Application (rev 1/2025) masthead and the Building Division department page, both read in full and consistent with each other.
building permit application masthead checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q10 Is a site plan required, and what must it show? Core Submittal package
No PV-specific site plan requirement is published. The general combined Permit Application itself captures site data directly on the form: existing/proposed finished elevation, flood zone, and setback fields (F/R/S/S) filled in by the applicant, rather than requiring a separate drawn site plan for a retrofit job
Why the confidence is not higherRead directly off the combined Building Permit Application form fields; no dedicated PV/rooftop-retrofit site-plan document was found on the Building Permit Applications or Permit Checklists pages (both fully enumerated).
building permit application checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
A 'detailed drawing of the proposed work' (one copy) is required per the Electric Permit Checklist, which would function as the one-line/riser diagram for an electrical/PV job, but the City's documents never use the term 'one-line diagram' or 'riser diagram' by name
Why the confidence is not higherVerbatim checklist item: 'Drawing Detail – One (1) copy of a detailed drawing of the proposed work.' This is generic, not PV-specific, and not labeled as a one-line/riser diagram.
City permit checklist checked 2026-09-12 https://www.hollyhillfl.org/media/4146
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedElectric Permit Checklist (media/4146), Residential Addition/Alteration Checklist (media/4181), general combined Building Permit Application (media/4021) — none names string or conductor sizing calculations by term; Code Ch. 14 Electric Division technical-standards article not read section-by-section within budget
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Nothing published by this authority.
Where we lookedGeneral Building Permit Application, Electric/Residential Addition Checklists, Florida Product Approval Spec Sheet — none states a numeric structural PE-stamp threshold; Code Ch. 14, Article II (Administration) not read in full for a codified threshold
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Statewide floor only: FS 471.003(2)(h) exempts a licensed electrical/plumbing/AC contractor from a PE-stamp requirement on residential electrical work valued at $125,000 or less with aggregate service capacity of 600 amperes (240V) or less
Why the confidence is not higherSourced directly to the Florida Statute; no Holly Hill-specific stricter or looser threshold was found in the general application, checklists, or the searchable portions of Code Ch. 14 (Buildings and Building Regulations, Article IV — Electric Division) that I reviewed.
Florida Statute checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html
Q15 What does a residential solar permit cost? Core Fees
No dedicated PV/solar fee line exists (confirmed — the schedule's only 'SOLAR' line is 'PLUMB - SOLAR WATER HEAT SYS $10.00', a plumbing fee for solar water heaters, not PV). A residential rooftop PV job would be billed under: 'APPLIC FEE - RES BLDG PRMIT' $30.00 (or 'APPLIC FEE - RES ACCES.STRC' $30.00 if a ground mount is treated as an accessory structure), plus 'ELECTRICAL - RESIDENTIAL' $30.00 application fee, plus 'ELEC - PER AMP SINGLE PHASE' $0.60/amp (or the 3-phase per-amp tiers), plus 'ELEC - EACH ADDITIONAL CIRCUIT' $3.00 if applicable
Why the confidence is not higherDirectly extracted and keyword-searched the City's current (effective 10/01/2024) 'City Wide Fee Schedule' PDF (media/8231) — positive control 'ELECTRICAL' returned real fee lines, fabricated-pattern check ('SOLAR') returned exactly one hit and it was for solar water heating, not PV, confirming the search worked and the absence is genuine.
City fee schedule (current, eff. 10/1/2024) checked 2026-09-12 https://www.hollyhillfl.org/media/8231
Q16 How is the fee calculated? Core Fees
Flat application fee plus a metered/tiered component: electrical is billed per-amp (by phase/voltage tier) and per additional circuit rather than by dollar valuation; if a ground-mount array is billed as an accessory structure, that component would be an application-fee flat rate ('APPLIC FEE - RES ACCES.STRC' $30) rather than a valuation-based building fee
Why the confidence is not higherRead directly from the current fee schedule's 'ELECTRICAL PERMITS' section (flat application fee $30 residential + per-amp/per-circuit add-ons) versus the separate valuation-tiered 'BUILDING PERMIT FEES' section (e.g. building value $4,001-$100,000: $75 base + $4.00/thousand). No City statement ties a PV job to one method exclusively — this is an inference from how the two fee families are structured.
City fee schedule checked 2026-09-12 https://www.hollyhillfl.org/media/8231
Q17 Is there a separate plan-check fee? Fees
Yes, a separate plan-review fee is codified
Why the confidence is not higherCode of Ordinances Sec. 14-107, 'Plan review fee': 'hereby established a plan review fee to be charged for the review of building construction plans submitted to the city for the issuance of a building permit. The city commission...' sets the fee by resolution. I did not confirm the specific dollar amount/percentage in the fee-schedule PDF pass I performed (search budget spent elsewhere), so the existence is confirmed at higher confidence than the amount.
Code of Ordinances checked 2026-09-12 https://library.municode.com/fl/holly_hill/codes/code_of_ordinances?nodeId=PTIICOOR_CH14BUBURE_ARTIIAD_DIV5FE_S14-107PLREFE
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedBuilding Division page, Building Permit Applications page, general Permit Application, Fee Schedule — none states a plan-review turnaround time (business days)
Q19 How long is an issued permit valid before it expires? Timeline & validity
Nothing published by this authority.
Where we lookedGeneral Permit Application, Fee Schedule, Building Division page — no stated permit-validity/expiration period found. A 'Request to Extend Active Permit' form is published (media/4066), which proves permits DO expire and can be extended, but the base validity period itself was not stated on that page or anywhere else reached
Q20 Which permit portal does this authority use? Core Portal & process
Tyler EnerGov SelfService — branded 'Holly Hill Civic Access' — at https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice
Why the confidence is not higherConfirmed directly by navigating the live portal (Login/Register, Apply, Today's Inspections, Map, Fee Estimator, Pay Invoices, Search, Calendar tabs all present and Tyler-branded URL). Linked from the Building Division page.
portal checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice
Q21 Can the whole application be completed online? Core Portal & process
Partially — the portal has a live 'Apply' tool ('This tool can be used to apply for a permit, plan or license'), but the Building Division's own page instructs applicants to email full applications and backup documentation to Permitdesk@hollyhillfl.org, and separately says 'To request an inspection, please begin to go to your portal... as we begin to transition away from the website' — indicating the City is mid-migration from email-based intake to the portal rather than fully on one channel
Why the confidence is not higherTwo City-sourced statements in tension: the live portal's own 'Apply' card, and the Building Division page's email-first instruction plus its own 'transition' language. Recorded as a genuine transitional state rather than picking one.
department page + live portal checked 2026-09-12 https://www.hollyhillfl.org/cd/page/building-division
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Power & Light Company (FPL)
Why the confidence is not higherPOPULATED franchise appendix — Code of Ordinances Appendix A, Article II, Electric Franchise: current Ordinance No. 2899 (adopted 2011) grants FPL a 30-year nonexclusive electric franchise at a 5.9% franchise fee on residential/commercial/industrial billed revenues, superseding the prior Ord. No. 1051 (1981, 30-year, 6%). Full standard present: grantee, percentage, term. This is the strongest utility-identification route in this survey's own hierarchy (a populated, current, codified franchise grant), well above the ACFR-inference route used at neighbouring Edgewater.
codified franchise ordinance checked 2026-09-12 https://library.municode.com/fl/holly_hill/codes/code_of_ordinances?nodeId=PTIICOOR_APXAFR_ARTIIELFR
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit — FPL will not allow parallel operation until the local AHJ has inspected and approved the system
Why the confidence is not higherState floor: FL PSC Rule 25-6.065(5)(a), applicable to all investor-owned utilities including FPL: the Standard Interconnection Agreement must require that customer-owned renewable generation 'be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility.' No Holly Hill-specific document was found stating this independently; FPL's own DG/interconnection pages were not re-fetched this run.
Florida Administrative Code rule text (state floor) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedGeneral Building Permit Application (full text read) — no HOA/architectural-approval disclaimer or requirement clause was found (unlike Ocoee's explicit disclaimer); Land Development Code Ch. 114 not exhaustively searched for an HOA-adjacent covenant-enforcement clause
Q25 Is there a historic-district review? Overlays & special cases
A Historic Preservation Board exists (Code of Ordinances Ch. 2, Art. III, Div. 6) with review powers, but I could not confirm whether Holly Hill has an actual designated historic-district overlay that would trigger review for a residential rooftop PV permit specifically
Why the confidence is not higherConfirmed the board's existence and general functions/powers section (Sec. 2-182) exists in the current code; did not locate a zoning-map historic-district boundary or a PV-specific trigger in the time available. This is a genuine partial finding, not a clean absence.
Code of Ordinances checked 2026-09-12 https://library.municode.com/fl/holly_hill/codes/code_of_ordinances?nodeId=PTIICOOR_CH2AD_ARTIIIBOCOCO_DIV6HIPRBO
Q26 Is a wind or windstorm certification required? Overlays & special cases
No Holly Hill-specific 'windstorm certification' document exists; the mechanism used generally is the statewide Florida Product Approval regime — the City publishes its own 'Florida Product Approval Number Spec Sheet' (per FS 553.842) as part of its standard Building Permit Applications, without a distinct PV/racking category
Why the confidence is not higherConfirmed the Product Approval Spec Sheet exists on the Building Permit Applications page; did not find a separate windstorm certification requirement distinct from that statewide product-approval process.
City form checked 2026-09-12 https://www.hollyhillfl.org/media/10861
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding Permit Applications page (23-item document list, fully enumerated), Permit Checklists page (21-item list, fully enumerated) — no Specific Use Permit / Council-approval process or form found for residential PV; Land Development Code Ch. 114 not exhaustively searched
https://www.hollyhillfl.org/cd/page/building-permit-applications
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No Holly Hill-specific residential generation size cap found; the effective cap comes from FPL's own net-metering tariff tier structure (Tier 1 ≤10kW / Tier 2 ≤100kW / Tier 3 ≤2MW), which is a utility-level rather than a City zoning limit
Why the confidence is not higherNo City zoning or building document names a system-size cap. FPL's own tariff tiers are the well-established statewide mechanism documented throughout this survey; not independently re-verified against FPL's current filed tariff this run.
inference — no City-specific cap found checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2020 National Electrical Code (NEC) 96% · live portal banner + building permit application masthead
- Which building code edition is in force? Florida Building Code, 8th Edition (2023) 96% · live portal banner + building permit application masthead
- Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition 92% · live portal banner + building permit application masthead
- Are there local amendments to any of the above? The Electric Division's NEC adoption is a floating clause ('that publication known as the National Electrical Code, except where amended or superseded by ordinance') per Code Sec. 14-196, but I found no confirmed instance of an actual local technical amendment overriding the base 2020 NEC edition 58% · Code of Ordinances
- What is the installation judged against? Florida Building Code 8th Edition (2023), the 2020 NEC, and the Florida Fire Prevention Code 8th Edition 90% · building permit application masthead
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for City of Holly Hill on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Rapid shutdown per NEC 690.12 should apply, since the City's own currently-adopted NEC edition is 2020 (which mandates 690.12 module-level rapid shutdown) — but no Holly Hill document explicitly names NEC 690.12 or 'rapid shutdown' by term 62% · inference from confirmed current NEC edition
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Does the UTILITY specify placards beyond the AHJ's? FPL's own general policy (documented extensively elsewhere in this survey from FPL's Electric Service Standards and net-metering guidelines) specifies placards beyond what any AHJ requires, e.g. a 'Battery storage utilized in this facility' plaque and disconnect signage — not independently re-verified against FPL's current published document this run 55% · utility publication (not reproved this run)
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? State floor (FPL, PSC Rule 25-6.065(6)(a)): where a manual AC disconnect is required, it must be mounted separate from, but adjacent to, the meter socket, readily accessible and utility-lockable; Tier 1 systems (≤10kW, most residential rooftop PV) are exempt from this switch unless the utility installs one at its own expense. Separately, the City's own current portal notice requires an EXTERIOR disconnect whenever a job's scope changes the service entry conductors or meter can, per the 2020 NEC — directly relevant when a PV interconnection requires a panel/service upgrade 80% · live portal banner + Florida Administrative Code rule text
- Is a ground mount treated as a structure? Yes — 'solar energy equipment' is explicitly listed as an example under the codified definition of 'Accessory use or structure' 88% · Code of Ordinances
- Is there a local rule on service upgrades or busbar sizing? Yes — the City's own current portal notice states: 'IMPORTANT UPDATE AFFECTING ELECTRICAL PANEL CHANGE OUTS: When the scope of work includes the changing of the service entry conductors or meter can, an exterior disconnect is required per the 2020 NEC.' This directly affects PV jobs that require a service/panel upgrade to accommodate a new PV interconnection 85% · live portal banner
20 questions answered against City of Holly Hill’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2020 National Electrical Code (NEC)
Why the confidence is not higherConfirmed by TWO independent first-party current sources: the current (rev. 1/2025) Building Permit Application masthead ('2020 National Electrical Code'), and the live Tyler EnerGov portal's own rotating banner, read directly off a screenshot of the portal home page: 'The 8th Edition (2023) Florida Building Code, 8th Edition Florida Fire Prevention Code, and the 2020 National Electrical Code (NEC) are currently in effect.'
live portal banner + building permit application masthead checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q30 Which building code edition is in force? Core Code editions in force
Florida Building Code, 8th Edition (2023)
Why the confidence is not higherSame two independent, current, first-party sources as q29 (Building Permit Application masthead and the live portal's own banner).
live portal banner + building permit application masthead checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q31 Which fire code edition is in force? Code editions in force
Florida Fire Prevention Code, 8th Edition
Why the confidence is not higherSame two sources as q29/q30. Code Ch. 34 (fire) itself was not deep-read for a possible frozen technical provision underneath a floating adoption clause — the pattern seen elsewhere in this survey (Edgewater, DeBary) — so this is the currently-stated edition, not a guarantee every fire-code section is current.
live portal banner + building permit application masthead checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q32 Are there local amendments to any of the above? Core Code editions in force
The Electric Division's NEC adoption is a floating clause ('that publication known as the National Electrical Code, except where amended or superseded by ordinance') per Code Sec. 14-196, but I found no confirmed instance of an actual local technical amendment overriding the base 2020 NEC edition
Why the confidence is not higherSec. 14-196 quoted directly. This is the same floating-adoption structure documented elsewhere in the survey (e.g. Edgewater, Ocoee) that can coexist with a frozen provision elsewhere in the same chapter; I did not have search budget remaining to read the entire Electric Division technical-standards article section by section to rule that out.
Code of Ordinances checked 2026-09-12 https://library.municode.com/fl/holly_hill/codes/code_of_ordinances?nodeId=PTIICOOR_CH14BUBURE_ARTIVELEC_DIV3TEST_S14-196NAELCO
Q33 What is the installation judged against? Core Electrical
Florida Building Code 8th Edition (2023), the 2020 NEC, and the Florida Fire Prevention Code 8th Edition
Why the confidence is not higherCombines the Building Permit Application masthead with the live portal's own banner — both current, first-party, and mutually consistent.
building permit application masthead checked 2026-09-12 https://www.hollyhillfl.org/media/4021
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Yes — the City's own current portal notice states: 'IMPORTANT UPDATE AFFECTING ELECTRICAL PANEL CHANGE OUTS: When the scope of work includes the changing of the service entry conductors or meter can, an exterior disconnect is required per the 2020 NEC.' This directly affects PV jobs that require a service/panel upgrade to accommodate a new PV interconnection
Why the confidence is not higherRead directly from a live, current rotating banner on the Tyler EnerGov self-service portal home page (screenshot captured). This is exactly the kind of AHJ-specific electrical rule the brief instructs finding via portal banners; confidence held below 90 only because the banner itself carries no visible publish/revision date.
live portal banner checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedRoofing Checklist (media/4186) — the PDF's text layer extracted EMPTY (no text content) via pdf.js despite being a real, non-corrupt 32KB PDF that opens and paginates correctly; this is a canvas-only-scan or non-standard-encoding failure per the brief's own warning, and was NOT treated as an absence. No other City document addresses PV mounting/attachment spacing
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedFire Inspection page (full text read) — no ridge-setback or fire-access-pathway rule for rooftop PV stated; Florida Fire Prevention Code / NFPA 1 solar pathway provisions not independently searched in Municode within budget
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Rapid shutdown per NEC 690.12 should apply, since the City's own currently-adopted NEC edition is 2020 (which mandates 690.12 module-level rapid shutdown) — but no Holly Hill document explicitly names NEC 690.12 or 'rapid shutdown' by term
Why the confidence is not higherInference from the confirmed current NEC 2020 adoption (q29); this survey has repeatedly found authorities whose only PV-specific written guidance is stale and predates 690.12 (Hialeah Gardens, Miami Lakes) — no such stale Holly Hill-specific solar guideline document exists at all here (a genuine absence, since the City publishes no dedicated solar guideline of any vintage), so there is no document to contradict this inference, but also none to confirm it directly.
inference from confirmed current NEC edition checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedBuilding Permit Applications page (full 23-item list), Permit Checklists page (full 21-item list), Fire Inspection page — no placard/label specification of any kind published by the City
https://www.hollyhillfl.org/cd/page/building-permit-applications
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38 — no placard wording published
https://www.hollyhillfl.org/cd/page/building-permit-applications
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38 — no letter height/colour/material spec published
https://www.hollyhillfl.org/cd/page/building-permit-applications
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38 — no facility/site-plan placard spec published by the City
https://www.hollyhillfl.org/cd/page/building-permit-applications
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
FPL's own general policy (documented extensively elsewhere in this survey from FPL's Electric Service Standards and net-metering guidelines) specifies placards beyond what any AHJ requires, e.g. a 'Battery storage utilized in this facility' plaque and disconnect signage — not independently re-verified against FPL's current published document this run
Why the confidence is not higherNot re-fetched this run; relying on the survey's own well-corroborated (89-citation) FPL placard finding recorded in the baseline for this authority's confirmed franchisee (FPL). Held at reduced confidence because it was not independently reproved for Holly Hill specifically.
utility publication (not reproved this run) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q43 Where must the labels be placed? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q38, plus the live portal banners (q34/q48 fully read) — neither states a label PLACEMENT rule beyond the exterior-disconnect location itself
https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q44 Must equipment be on a specific approved list? Equipment listing
Nothing published by this authority.
Where we lookedBuilding Permit Applications page, Florida Product Approval Number Spec Sheet page reference — no equipment-approved-list requirement naming PV modules/inverters specifically found
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Nothing published by this authority.
Where we lookedFire Inspection page, Building Permit Applications list (Fire Protection Application, media/4046, is a generic fire-alarm/suppression form) — no battery/ESS-specific permitting language found
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Nothing published by this authority.
Where we lookedSame as q45 — no separate ESS permit/inspection type named
Q47 Is a ground mount treated as a structure? Core Ground mount
Yes — 'solar energy equipment' is explicitly listed as an example under the codified definition of 'Accessory use or structure'
Why the confidence is not higherCode of Ordinances Sec. 78-14, Definitions (Ch. 78, General Provisions — Land Use and Development Regulations, applying citywide): 'Accessory use or structure means any use or structure, clearly incidental, subordinate and related to the principal use or structure... The term shall include but not be limited to satellite dish antennas, windmills, solar energy equipment, detached garages and carports, above-grade swimming pools and utility sheds.' Read directly and verbatim; positive control ('electrical') and the search tool both functioned correctly in the same session.
Code of Ordinances checked 2026-09-12 https://library.municode.com/fl/holly_hill/codes/code_of_ordinances?nodeId=PTIICOOR_CH78GEPR_S78-14DE
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
State floor (FPL, PSC Rule 25-6.065(6)(a)): where a manual AC disconnect is required, it must be mounted separate from, but adjacent to, the meter socket, readily accessible and utility-lockable; Tier 1 systems (≤10kW, most residential rooftop PV) are exempt from this switch unless the utility installs one at its own expense. Separately, the City's own current portal notice requires an EXTERIOR disconnect whenever a job's scope changes the service entry conductors or meter can, per the 2020 NEC — directly relevant when a PV interconnection requires a panel/service upgrade
Why the confidence is not higherCombines the PSC state-floor rule (not Holly Hill-specific) with the City's own live, current portal banner (q34) — two aligned sources at different levels (utility tariff/state rule and AHJ notice) pointing to the same physical requirement.
live portal banner + Florida Administrative Code rule text checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Through the Tyler EnerGov self-service portal's 'Request Inspection' tool 88% · department page + live portal
- How much notice is required? Same-business-day cutoff at 6:00 AM — inspections requested/scheduled after 6:00 AM are pushed to the next business day 72% · live portal
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes — the City's own Building & Fire Division staff perform its inspections in-house 80% · FS 553.80(7)(b) utilization report (current, FY24-25)
- If delegated, to whom? N/A — not delegated; performed in-house, with only an incidental 1.8% private-provider share (likely isolated FS 553.791 registered-private-provider elections on individual jobs, not a standing arrangement) 78% · FS 553.80(7)(b) utilization report
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? No PV-specific inspection sequence is published. For a general residential addition/alteration (the closest analog), the City's own checklist lists, in order: First Rough Plumbing, Foundation/Footer, Fill Cell, Second Rough Plumbing, Rough Electric, Rough Mechanical, Framing, Gas, Insulation, Roof Dry-In, Roof Final, Final Plumbing, Final Electric, Final Mechanical, Final Building. For electrical-only work, the (commercial-titled) Electric Permit Checklist lists: Electric Underground, Electric Rough, Electric Ceiling, Electric Final 70% · City permit checklist
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Yes, but NOT a solar-specific one — the City publishes a full set of ~21 trade/project-type Permit Checklists (Carport, Commercial Additions/Alterations, Commercial Building New, Demo, Dock, Driveway, Electric, Fence, Gas, House Moving, Mechanical, Plumbing, Pool, Residential Addition/Alteration, Residential SFR, Roofing, Screen Enclosure, Single Family and Duplex, Shed/Accessory Buildings, Siding, Windows/Doors/Shutters) — with NO dedicated 'Solar' or 'Photovoltaic' checklist among them 90% · department page (complete checklist enumeration)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- Who notifies the utility for PTO? Installer/customer, per state floor 55% · Florida Administrative Code rule text (state floor)
- Is there a re-inspection fee? A fire-specific annual-inspection re-inspection fee schedule exists ($40 1st reinspection, $50 2nd, $160 3rd-and-subsequent, citing FS 553.80(2)(c)) but I did not confirm a separate general building/electrical trade re-inspection fee distinct from the fire-safety one 55% · City fee schedule
14 questions answered against City of Holly Hill’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Through the Tyler EnerGov self-service portal's 'Request Inspection' tool
Why the confidence is not higherBuilding Division page: '*** To request an inspection, please begin to go to your portal and request your inspection as we begin to transition away from the website ***'. The live portal's own home page has a 'Request Inspection' card: 'Click here to request an inspection on an existing permit.'
department page + live portal checked 2026-09-12 https://www.hollyhillfl.org/cd/page/building-division
Q50 How much notice is required? Core Booking & scheduling
Same-business-day cutoff at 6:00 AM — inspections requested/scheduled after 6:00 AM are pushed to the next business day
Why the confidence is not higherQuoted directly from the live portal's own 'Request Inspection' card text: 'Inspections scheduled after 6:00 AM will be scheduled the next business day.'
live portal checked 2026-09-12 https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Nothing published by this authority.
Where we lookedLive Tyler EnerGov portal 'Request Inspection' card and home banners (fully read) — only a 6:00 AM same/next-business-day cutoff is stated; no AM/PM window option is offered or described
https://cityofhollyhillfl-energovweb.tylerhost.net/apps/selfservice#/home
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes — the City's own Building & Fire Division staff perform its inspections in-house
Why the confidence is not higherThe City's own FS 553.80(7)(b) 'Building Permit & Inspection Utilization Report' for FY 2024-2025 (media/10696) shows real dedicated personnel cost ($384,273.70 personal services, $37,970.77 operating), 3 personnel dedicated to Florida Building Code enforcement/permitting/inspection, and only 52 of 2,961 building inspections (1.8%) performed by a private provider, with zero private-provider audits recorded — the opposite profile from a wholesale-outsourced department (contrast DeBary's PDCS or Oviedo's PDCS, both $0-personnel-cost arrangements documented elsewhere in this survey).
FS 553.80(7)(b) utilization report (current, FY24-25) checked 2026-09-12 https://www.hollyhillfl.org/media/10696
Q53 If delegated, to whom? Core Who inspects
N/A — not delegated; performed in-house, with only an incidental 1.8% private-provider share (likely isolated FS 553.791 registered-private-provider elections on individual jobs, not a standing arrangement)
Why the confidence is not higherFollows directly from the utilization report at q52.
FS 553.80(7)(b) utilization report checked 2026-09-12 https://www.hollyhillfl.org/media/10696
Q54 Which inspections are required, and in what order? Core Stages & sequence
No PV-specific inspection sequence is published. For a general residential addition/alteration (the closest analog), the City's own checklist lists, in order: First Rough Plumbing, Foundation/Footer, Fill Cell, Second Rough Plumbing, Rough Electric, Rough Mechanical, Framing, Gas, Insulation, Roof Dry-In, Roof Final, Final Plumbing, Final Electric, Final Mechanical, Final Building. For electrical-only work, the (commercial-titled) Electric Permit Checklist lists: Electric Underground, Electric Rough, Electric Ceiling, Electric Final
Why the confidence is not higherBoth checklists read and quoted verbatim; neither names a PV-specific stage (e.g. no 'PV Final' or 'interconnection' inspection distinct from Final Electric), so a rooftop PV job would presumably route through Rough Electric + Final Electric within whichever general checklist applies to the scope of work.
City permit checklist checked 2026-09-12 https://www.hollyhillfl.org/media/4181
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Nothing published by this authority.
Where we lookedResidential Addition/Alteration Checklist (full inspection sequence read, includes 'Framing' as a discrete step) — no PV-specific rough-in or mid-roof inspection step is named distinct from the general 'Framing' and 'Rough Electric' steps already listed under q54
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedBuilding Division page, Electric/Residential checklists — none states that the inspector verifies equipment labels/listings as a discrete checked item
Q57 Is there a published inspection checklist? Core What is checked
Yes, but NOT a solar-specific one — the City publishes a full set of ~21 trade/project-type Permit Checklists (Carport, Commercial Additions/Alterations, Commercial Building New, Demo, Dock, Driveway, Electric, Fence, Gas, House Moving, Mechanical, Plumbing, Pool, Residential Addition/Alteration, Residential SFR, Roofing, Screen Enclosure, Single Family and Duplex, Shed/Accessory Buildings, Siding, Windows/Doors/Shutters) — with NO dedicated 'Solar' or 'Photovoltaic' checklist among them
Why the confidence is not higherConfirmed by reading the complete, enumerated list on the Permit Checklists page (all ~21 items and their file sizes captured directly) — this is a genuine, proven absence of a dedicated solar checklist, the mirror image of North Palm Beach's dedicated-but-short solar checklist documented elsewhere in this survey. A residential PV job would most likely be worked from the Electric Permit Checklist and/or Residential Addition/Alteration Permit Checklist by analogy.
department page (complete checklist enumeration) checked 2026-09-12 https://www.hollyhillfl.org/cd/page/permit-checklists
Q58 What must be on site at inspection? Core Documents on site
Nothing published by this authority.
Where we lookedGeneral Permit Application, Electric/Residential checklists — none states what documents must be physically on site at the time of inspection
Q59 Is there a re-inspection fee? Corrections & re-inspection
A fire-specific annual-inspection re-inspection fee schedule exists ($40 1st reinspection, $50 2nd, $160 3rd-and-subsequent, citing FS 553.80(2)(c)) but I did not confirm a separate general building/electrical trade re-inspection fee distinct from the fire-safety one
Why the confidence is not higherDirectly read from the current Fee Schedule PDF (media/8231), 'ANNUAL FIRE SAFETY INSPECTION FEES' section — this is explicitly a fire-safety-inspection fee, not a general building-permit re-inspection fee, so it may not apply to a failed electrical/PV rough or final inspection. Recorded at reduced confidence because I could not rule out a separate general re-inspection fee elsewhere in the schedule that I did not reach with my search budget.
City fee schedule checked 2026-09-12 https://www.hollyhillfl.org/media/8231
Q60 How are corrections issued and cleared? Corrections & re-inspection
Nothing published by this authority.
Where we lookedBuilding Division page, live portal (Search/Apply tools tested) — no described process for how corrections are issued and cleared (e.g. portal comment threads, revision forms) was found for Holly Hill specifically
Q61 What is issued on pass? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedBuilding Division page, general Permit Application, Fee Schedule — none states what document (CO, Final Approval, Green Tag) is issued specifically on passing a PV/electrical-alteration final inspection
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Installer/customer, per state floor
Why the confidence is not higherInferred from FL PSC Rule 25-6.065(7)(d): the customer must execute the Standard Interconnection Agreement and notify the utility (FPL) at least 10 days before placing equipment in service. No Holly Hill document states the City notifies FPL for PTO.
Florida Administrative Code rule text (state floor) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording None%
Size, colour & material None%
Where they go None%
What the utility wants on top 55%
FPL's own general policy (documented extensively elsewhere in this survey from FPL's Electric Service Standards and net-metering guidelines) specifies placards beyond what any AHJ requires, e.g. a 'Battery storage utilized in this facility' plaque and disconnect signage — not independently re-verified against FPL's current published document this run
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.