City of Hollywood is a city authority in the State of Florida, serving 153,067 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Hollywood against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Hollywood is the authority having jurisdiction 88% confidence
Holds
Building and Electrical (self-permitted by the City's own Development Services/Building Division, using the City's own Accela portal since 4 Aug 2026), plus a separate City Fire-Rescue & Beach Safety plan-review/permit track for the PV/ESS life-safety piece. Hollywood is an incorporated municipality and is NOT part of the Broward Municipal Services District that Broward County directly administers.
Overridden by
Broward County's Board of Rules and Appeals (BORA) amends the Florida Building/Fire Prevention Codes COUNTY-WIDE and binds Hollywood's building officials via Policy #09-02 (Uniform Solar Permit Submittal Matrix, master-permit and inspection procedures) and Formal Interpretation FI-31 (rooftop-clearance exemption for PV) -- BORA issues no permits itself. Florida is an HVHZ state for Broward, so racking/attachment components need HVHZ-rated product approval, not the statewide approval. FPL, not the City, controls net-metering interconnection, PTO timing, and (where applicable) the AC-disconnect switch spec, under Florida PSC Rule 25-6.065. HB 803 (2026, effective 1 Jul 2026) imposes NEW statewide floors on permit-review turnaround (F.S. 553.792) and permit validity (F.S. 553.79) that override the City's own currently-published (and apparently stale) FAQ figures. F.S. 163.04 (Solar Rights Act) and F.S. 720.3035(1)(c) limit what an HOA/architectural committee may require.
Why not higher
Hollywood's own Building Division, Permits, and fee-schedule pages are all issued in the City's name via the City's own Accela portal and City-specific fee lines (including a City Fire-Rescue-specific PV/ESS fee), and the City publishes its own Solar Photovoltaic System Checklist -- none of this is Broward County-branded. Broward's county-level BORA policies and formal interpretations were independently confirmed (via own OCR/extraction) to bind Hollywood by their own terms ('all Building Officials' / 'Countywide'). Deduction from 95: the City's own solar-specific Code of Ordinances section (151.124) could not be read in full due to a Cloudflare block on codelibrary.amlegal.com, and one Hollywood FAQ (permit expiration) is demonstrably stale relative to a state law that took effect this year.

https://www.hollywoodfl.org/1545/Permits

Permit required
Yes, a permit is required for residential rooftop PV95%
Permit cost
Building permit: valuation-based tiered fee — 10% of value up to $1,000, then 2.20% for $1,001-$1,000,000 (1.65% $1,000,001-$2,000,000;78%
Plan review
5 business days for an existing single-family dwelling electrical permit valued under $15,000; 30 business days otherwise (most residential PV exceeds $15,000) — this is a STATE FLOOR (F.S.75%
Portal
Accela Citizen Access (ACA) — aca-prod.accela.com/HOLLYWOOD — effective for ALL NEW permit applications since 4 Aug 2026.95%
Electrical code
2020 NEC (NFPA 70-2020), adopted via Chapter 27 of the Florida Building Code, 8th Edition (2023), effective statewide 31 Dec 202385%
Own placard wording
No — the City does not publish its own placard wording; it requires only that the submittal show the disconnect/labeling scheme called for by NEC 690/705, without adding City-specific text55%
Booking an inspection
Phone (24-hour automated IVR inspection line, English/Spanish, 954-921-3646) or online through the Accela/Building Permit Search portal92%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes, a permit is required for residential rooftop PV Q3 Electrical and building permits — Combined — Broward BORA Policy 09-02 requires 'Building Departments shall establish an individual master permit for both Solar Thermal and Solar Electric… Q4 Plan review — 5 business days for an existing single-family dwelling electrical permit valued under $15,000; Q18 Where you file — Accela Citizen Access (ACA) — aca-prod.accela.com/HOLLYWOOD — effective for ALL NEW permit applications since 4 Aug 2026. Q20

Permit required
Yes, a permit is required for residential rooftop PV95% source
What it costs
Building permit: valuation-based tiered fee — 10% of value up to $1,000, then 2.20% for $1,001-$1,000,000 (1.65% $1,000,001-$2,000,000;78% source
Plan review turnaround
5 business days for an existing single-family dwelling electrical permit valued under $15,000; 30 business days otherwise (most residential PV exceeds $15,000) — this is a STATE FLOOR (F.S.75% source
Key document
City Solar Photovoltaic System Checklist, updated 5/03/23 cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes — the City of Hollywood Development Services/Building Division is the AHJ for residential solar building+electrical permits within city limits 95% · City department page (rendered)
    • What does this authority permit itself, and what does it delegate? Both — Building and Electrical are permitted and inspected by the City itself (Development Services/Building Division); the City's own Fire-Rescue & Beach Safety department separately reviews/permits the PV/ESS life-safety piece. Nothing is delegated to Broward County for solar in the incorporated City. 88% · City Comprehensive Schedule of Fees, adopted 12/4/2024
    • Is a permit required for a residential rooftop PV system? Yes, a permit is required for residential rooftop PV 95% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Is there a separate electrical permit, or is it combined? Combined — Broward BORA Policy 09-02 requires 'Building Departments shall establish an individual master permit for both Solar Thermal and Solar Electric installations to which applicable subsidiary categories are tied,' with a mandatory separate trade review (not necessarily a wholly separate permit) for each added category 85% · Broward County BORA Policy #09-02 (OCR'd scanned PDF, county-wide, binds Hollywood)
    • Is a HOA or architectural approval required first? No City-imposed HOA/architectural pre-approval requirement was found; and by state law an HOA/architectural review committee (a) may NOT prohibit solar installation outright (F.S. 163.04, the Solar Rights Act — may only regulate specific roof placement within a south-facing +/-45-degree arc without impairing performance), and (b) may NOT require that a building permit already be issued as a precondition for the association's OWN review (F.S. 720.3035(1)(c), added by HB 803 Sec. 11, effective 1 Jul 2026) 75% · Florida Statute 163.04 (Solar Rights Act) + HB 803 enrolled text
    • Is there a historic-district review? Likely yes for properties within a City-designated historic district — the Historic Preservation Board (HPB) reviews 'additions to existing buildings, major restorations, and substantial alterations' within historic districts, and the City's own Express Permitting Service page separately warns 'Applications in an Historic District may be delayed as additional review may be required' 72% · City FAQ (Historic Preservation Board scope)
    • Is a wind or windstorm certification required? No stand-alone 'windstorm certification' document — its function is folded into the mandatory PE/RA-sealed wind-load, uplift, and lateral-force design package required on every roof-mounted PV installation under the BORA Uniform Permit Submittal Matrix 82% · Broward BORA Uniform Permit Submittal Matrix (OCR'd), county-wide binding
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed Electrical Contractor (EC) or a licensed Solar Contractor (CVC) may pull the permit; if a CVC pulls it, an EC must still be engaged for the electrical work 80% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Must the contractor be registered with this authority before applying? Yes — contractors must complete a 'Contractor Registration' application in the City's Accela portal (selecting License > Contractor Registration type) before they can apply for permits 85% · City how-to guide (Accela contractor registration steps)
    • Is a homeowner permitted to self-install and self-permit? Yes in general (City-wide owner-builder permits exist, subject to F.S. 489.103(7)/489.503(6) restrictions incl. a 1-year no-sale rule), but the City's Solar Photovoltaic Checklist itself frames the required license as EC or CVC only and does not mention an owner-builder route for solar specifically 62% · City FAQ + Owner-Builder Disclosure form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Broward County Uniform Permit Application (from a licensed Electrical/Solar contractor) plus any sub-permit applications; roof plan/scale drawing showing panel locations; Mandatory Countywide Rooftop Mounted Equipment Affidavit (BORA Policy 22-03); FSEC System Approval Report OR signed-and-sealed engineered drawings; electrical diagram (PV array configuration, wiring, over-current protection, inverter disconnect, grounding, AC connection to building); manufacturer spec sheets/installation manuals for all components (modules, inverter(s), combiner box, disconnect, mounting system); attachment/flashing/structural details sealed by the design professional for the wind zone; for battery backup — standby-load summary, impact protection, and interconnected smoke alarms throughout the dwelling and garage; electrical calculations (ampacity, conduit fill, ambient derating); a recorded Notice of Commencement if job value exceeds $5,000 95% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • How many copies, and in what format? At least two sets of plans/specifications per the countywide BORA administrative floor ('two or more sets of plans and/or specifications... with each application'), submitted electronically through the City's Accela Citizen Access portal (effective for all new permits since 4 Aug 2026) 68% · City Permits page (rendered) + BORA administrative provisions
    • Is a site plan required, and what must it show? A roof plan (scale drawing showing the location of the solar panel installation on the roof) is required for roof-mounted PV; no separate full property site plan (lot lines, setbacks) is called for in the City's solar checklist, and the City publishes no separate ground-mount solar checklist 80% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Is a one-line / three-line diagram required? Yes — an electrical diagram per NEC Article 690 (Solar Photovoltaic Systems) 'in its entirety' is required 95% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Are string and conductor calculations required? Yes — electrical calculations showing wire sizing determined with proper ampacity, conduit fill, and ambient derating factors are required 92% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Is a structural PE stamp required, and at what threshold? Yes, for all roof-mounted PV — no dollar threshold. Signed and sealed drawings and design calculations by a licensed Professional Engineer or Registered Architect are required for every roof-mounted PV panel/solar-thermal installation, covering wind-load, uplift/lateral force, connection design and dead-load compliance for the support framing 88% · Broward BORA Uniform Permit Submittal Matrix (OCR'd), county-wide binding
    • Is an electrical PE stamp required, and at what threshold? Only above a threshold: an electrical PE stamp is required if (a) the PV system value exceeds $50,000, or (b) the system's aggregate residential service capacity is 600A (240V) or more, or (c) 800A (240V) or more for commercial/industrial 85% · Broward BORA Uniform Permit Submittal Matrix (OCR'd), county-wide binding
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Accela Citizen Access (ACA) — aca-prod.accela.com/HOLLYWOOD — effective for ALL NEW permit applications since 4 Aug 2026. The prior system ('BCLA ePermits') is retained only for searching/servicing existing BCLA-numbered permits (e.g., B24-100000) 95% · City Permits page (rendered, current)
    • Can the whole application be completed online? Yes — apply for a new permit, upload documents, manage the permit, pay fees, and schedule inspections can all be done through the Accela Citizen Access portal 90% · City Permits page (rendered, current)
    • What does a residential solar permit cost? Building permit: valuation-based tiered fee — 10% of value up to $1,000, then 2.20% for $1,001-$1,000,000 (1.65% $1,000,001-$2,000,000; 1.15% above $2,000,000) — PLUS a Process Fee (25% of estimated job cost for a new system/addition/alteration, or a minimum $10 per discipline for repair-type work) PLUS surcharges (3% state DCA/DBPR, Broward County $0.52 per $1,000 of value, 2% Technology Fee, 1% Educational Fee). SEPARATELY, the City's Fire-Rescue Dept. charges a flat $160 'Photovoltaic System (Solar Panels - Stationary Energy Storage System)' plan-review/permit fee 78% · City Comprehensive Schedule of Fees, adopted 12/4/2024
    • How is the fee calculated? Valuation (tiered percentage-of-declared-value scale) for the Building Division permit fee, plus a flat fee for the Fire-Rescue PV/ESS plan-review/permit line 80% · City Comprehensive Schedule of Fees, adopted 12/4/2024
    • Is there a separate plan-check fee? Yes — a separate Process Fee (25% of estimated job cost for new/addition/alteration permits, or a minimum $10 per discipline for repair-type permits) is charged on top of the Building Permit Fee, and the fee schedule further prices 'Plan Review Services' separately from 'Building Inspection Services' under the Private Provider Administrative Fee section (72% vs 84% of the respective base fee) 82% · City Comprehensive Schedule of Fees, adopted 12/4/2024
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 5 business days for an existing single-family dwelling electrical permit valued under $15,000; 30 business days otherwise (most residential PV exceeds $15,000) — this is a STATE FLOOR (F.S. 553.792(1)(a), as rewritten by HB 803, enrolled text, effective 1 Jul 2026) that binds Hollywood as a 'local government.' No Hollywood-specific page was found publishing a faster committed turnaround for solar, and the City's Express Permitting (same-day) program explicitly excludes solar from its short list of eligible permit types 75% · Enrolled bill text, CS/CS/HB 803 (2026), amending F.S. 553.792
    • How long is an issued permit valid before it expires? 1 year from issuance (or the effective date of the next Florida Building Code edition, whichever is later) for a single-family-dwelling permit — this is the NEW state floor under F.S. 553.79(1)(c) as rewritten by HB 803 (enrolled text), effective 1 Jul 2026, and it OVERRIDES the City's own currently-published FAQ, which still states permits 'expire if work is not commenced within 180 days or if abandoned for a period of 90 days' citing the older FBC 105.3.2.1 rule 78% · Enrolled bill text, CS/CS/HB 803 (2026), amending F.S. 553.79
    • Which utility handles interconnection here? Florida Power & Light (FPL) 88% · City Business Directory listing
    • Where does the utility sit in the sequence? After permit / parallel-but-independent — Florida law requires that customer-owned renewable generation 'must be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility,' so FPL's Permission-to-Operate follows the City's building/electrical final inspection, but FPL's own interconnection application/agreement process runs on its own separate track 85% · Florida Administrative Code Rule 25-6.065 (own extraction)

28 questions answered against City of Hollywood’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes — the City of Hollywood Development Services/Building Division is the AHJ for residential solar building+electrical permits within city limits

Why the confidence is not higherHollywood's own Building Division page, Permits page, and its dedicated 'Solar Photovoltaic System Checklist' (updated 5/03/23) all issue instructions in the City's own name via the City's own Accela portal; the City's Comprehensive Schedule of Fees (adopted 12/4/2024) carries City-specific solar-related fee lines. Hollywood self-permits and is not part of the Broward Municipal Services District that the County directly administers.

City department page (rendered) checked 2026-09-11 https://www.hollywoodfl.org/328/Building

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both — Building and Electrical are permitted and inspected by the City itself (Development Services/Building Division); the City's own Fire-Rescue & Beach Safety department separately reviews/permits the PV/ESS life-safety piece. Nothing is delegated to Broward County for solar in the incorporated City.

Why the confidence is not higherComprehensive Schedule of Fees (adopted 12/4/2024, Res. R-2024-400) lists City Building Division fees (valuation-based Building Permit Fee, p.4) AND a separate City Fire-Rescue 'Photovoltaic System (Solar Panels - Stationary Energy Storage System)' permit fee of $160 (p.15, under Dept. of Fire Rescue and Beach Safety > Permits) — both administered by the City, not the County.

City Comprehensive Schedule of Fees, adopted 12/4/2024 checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes, a permit is required for residential rooftop PV

Why the confidence is not higherThe City publishes a dedicated 'Solar Photovoltaic System Checklist' (required documents to obtain the permit) and a distinct $160 PV/ESS fee line in its fee schedule; Broward BORA Policy 09-02 (binding county-wide, including Hollywood) establishes mandatory master-permit procedures for solar. Search controls run on hollywoodfl.org: positive control 'electrical' returns real hits on Building/Permits pages; fabricated control 'zzqqx' returns 'No results found' — search is working.

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined — Broward BORA Policy 09-02 requires 'Building Departments shall establish an individual master permit for both Solar Thermal and Solar Electric installations to which applicable subsidiary categories are tied,' with a mandatory separate trade review (not necessarily a wholly separate permit) for each added category

Why the confidence is not higherOwn OCR of BORA Policy #09-02 (effective 5/15/2009), which binds every Broward building official including Hollywood's; Hollywood's own Solar Photovoltaic Checklist corroborates by describing a structural SUB-permit tied to the main Solar Panel permit when an Electrical Contractor pulls it. Deduction: the matrix predates the City's 2026 Accela migration and Accela's own permit-type taxonomy was not independently confirmed to show a single master permit number in practice.

Broward County BORA Policy #09-02 (OCR'd scanned PDF, county-wide, binds Hollywood) checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed Electrical Contractor (EC) or a licensed Solar Contractor (CVC) may pull the permit; if a CVC pulls it, an EC must still be engaged for the electrical work

Why the confidence is not higherHollywood's own Solar Photovoltaic System Checklist states: 'When an Electrical Contractor (EC license) pulls a Solar Panel Permit, they are required to have a Roofing Contractor (CCC license) to pull a structural sub-permit... If a Solar Panel Contractor (CVC license) pulls a Solar Panel permit they do not need a roofing contractor... but will require an Electrical Contractor (EC license).' The checklist does not mention an owner-builder route for solar specifically, even though the City has a general owner-builder policy for other permit types (see q7).

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — contractors must complete a 'Contractor Registration' application in the City's Accela portal (selecting License > Contractor Registration type) before they can apply for permits

Why the confidence is not higherCity's own step-by-step guide 'Steps to Register a License Contractor' (Scribe walkthrough hosted on hollywoodfl.org DocumentCenter) shows registration is its own application type in Accela, separate from pulling an actual building/electrical permit application.

City how-to guide (Accela contractor registration steps) checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/23503/Steps-to-Registrating-a-License-Contractor_Accela2

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes in general (City-wide owner-builder permits exist, subject to F.S. 489.103(7)/489.503(6) restrictions incl. a 1-year no-sale rule), but the City's Solar Photovoltaic Checklist itself frames the required license as EC or CVC only and does not mention an owner-builder route for solar specifically

Why the confidence is not higherCity FAQ 'Can I apply for an Owner-Builder Permit?' and the 'Owner Builder Permit Disclosure Statement and Affidavit' form establish a general owner-builder pathway city-wide; but the dedicated Solar Photovoltaic Checklist's 'WHAT TYPE OF LICENSE IS REQUIRED?' section only names EC and CVC contractors, not an owner-builder option, so it is unclear in practice whether the City accepts owner-builder solar applications.

City FAQ + Owner-Builder Disclosure form checked 2026-09-11 https://www.hollywoodfl.org/faq.aspx?qid=439

Q8 What documents make up a complete submittal? Core Submittal package

Broward County Uniform Permit Application (from a licensed Electrical/Solar contractor) plus any sub-permit applications; roof plan/scale drawing showing panel locations; Mandatory Countywide Rooftop Mounted Equipment Affidavit (BORA Policy 22-03); FSEC System Approval Report OR signed-and-sealed engineered drawings; electrical diagram (PV array configuration, wiring, over-current protection, inverter disconnect, grounding, AC connection to building); manufacturer spec sheets/installation manuals for all components (modules, inverter(s), combiner box, disconnect, mounting system); attachment/flashing/structural details sealed by the design professional for the wind zone; for battery backup — standby-load summary, impact protection, and interconnected smoke alarms throughout the dwelling and garage; electrical calculations (ampacity, conduit fill, ambient derating); a recorded Notice of Commencement if job value exceeds $5,000

Why the confidence is not higherVerbatim from the City's own current 'Solar Photovoltaic System Checklist' (Building Division, updated 5/03/23) — a Hollywood-specific published document, not a county template.

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q9 How many copies, and in what format? Submittal package

At least two sets of plans/specifications per the countywide BORA administrative floor ('two or more sets of plans and/or specifications... with each application'), submitted electronically through the City's Accela Citizen Access portal (effective for all new permits since 4 Aug 2026)

Why the confidence is not higherBORA Broward County Administrative Chapter 1 Sec.106.1.1 (own OCR of the countywide matrix PDF) sets the 2-sets floor; the City's own Permits page confirms the Accela portal is now used to 'apply for a new permit, upload documents.' Deduction: no Hollywood-specific page was found stating a solar-specific copy count or confirming a strict single-PDF electronic-only rule the way some other cities' checklists do.

City Permits page (rendered) + BORA administrative provisions checked 2026-09-11 https://www.hollywoodfl.org/1545/Permits

Q10 Is a site plan required, and what must it show? Core Submittal package

A roof plan (scale drawing showing the location of the solar panel installation on the roof) is required for roof-mounted PV; no separate full property site plan (lot lines, setbacks) is called for in the City's solar checklist, and the City publishes no separate ground-mount solar checklist

Why the confidence is not higherVerbatim from the City's Solar Photovoltaic System Checklist: 'Submit roof plan, a scale drawing indicating the location of the solar panels installation on the roof.' A site search of hollywoodfl.org for 'ground mount solar' returned no dedicated City document (only rooftop-focused items), so a ground-mount-specific site-plan requirement could not be confirmed either way for Hollywood.

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — an electrical diagram per NEC Article 690 (Solar Photovoltaic Systems) 'in its entirety' is required

Why the confidence is not higherOwn OCR of BORA's Uniform Permit Submittal Matrix (binds Hollywood): 'Submit electrical diagram designed in accordance to the National Electrical Code Article 690 Solar Photovoltaic Systems, in its entirety.' Hollywood's own checklist independently requires an 'Electrical diagram showing PV array configuration, wiring system, over-current protection, inverter disconnect, grounding... AC connection to building.'

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q12 Are string and conductor calculations required? Drawings & calculations

Yes — electrical calculations showing wire sizing determined with proper ampacity, conduit fill, and ambient derating factors are required

Why the confidence is not higherVerbatim from the City's own Solar Photovoltaic System Checklist.

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Yes, for all roof-mounted PV — no dollar threshold. Signed and sealed drawings and design calculations by a licensed Professional Engineer or Registered Architect are required for every roof-mounted PV panel/solar-thermal installation, covering wind-load, uplift/lateral force, connection design and dead-load compliance for the support framing

Why the confidence is not higherOwn OCR of BORA's Uniform Permit Submittal Matrix for Solar Thermal and Solar Electric Installations in the HVHZ (binds every Broward building official incl. Hollywood's), citing FBCR 4402/4403 and FBCB 1512/1516; Hollywood's own checklist separately requires 'attachment details, flashing details, construction design for the unit and any supporting frame members (sealed by the appropriate design professional) for the Wind Zone.'

Broward BORA Uniform Permit Submittal Matrix (OCR'd), county-wide binding checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Only above a threshold: an electrical PE stamp is required if (a) the PV system value exceeds $50,000, or (b) the system's aggregate residential service capacity is 600A (240V) or more, or (c) 800A (240V) or more for commercial/industrial

Why the confidence is not higherOwn OCR of the BORA Uniform Permit Submittal Matrix, citing F.S. 471.003(h): 'Plans must be signed and sealed by a Professional Engineer if: a) value > $50,000; b) aggregate service capacity of 600A (240V) or more for residential...' This is a countywide floor binding on Hollywood; no Hollywood-specific document was found narrowing or widening it.

Broward BORA Uniform Permit Submittal Matrix (OCR'd), county-wide binding checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q15 What does a residential solar permit cost? Core Fees

Building permit: valuation-based tiered fee — 10% of value up to $1,000, then 2.20% for $1,001-$1,000,000 (1.65% $1,000,001-$2,000,000; 1.15% above $2,000,000) — PLUS a Process Fee (25% of estimated job cost for a new system/addition/alteration, or a minimum $10 per discipline for repair-type work) PLUS surcharges (3% state DCA/DBPR, Broward County $0.52 per $1,000 of value, 2% Technology Fee, 1% Educational Fee). SEPARATELY, the City's Fire-Rescue Dept. charges a flat $160 'Photovoltaic System (Solar Panels - Stationary Energy Storage System)' plan-review/permit fee

Why the confidence is not higherFrom the City's own current Comprehensive Schedule of Fees (adopted 12/4/2024, Res. R-2024-400), read directly from the extracted PDF text (pdftotext -layout; verified with pdffonts that the file has embedded, extractable text, not scanned images). Deduction: the fee schedule gives the GENERAL building-permit valuation formula and one dedicated PV/ESS Fire fee line, but does not spell out, for solar specifically, whether the 25%-of-job-cost Process Fee or the $10-per-discipline minimum applies (that depends on whether the City classifies a PV installation as an 'addition/alteration' or a 'repair'-type permit) — a real system-cost example was not available to disambiguate.

City Comprehensive Schedule of Fees, adopted 12/4/2024 checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q16 How is the fee calculated? Core Fees

Valuation (tiered percentage-of-declared-value scale) for the Building Division permit fee, plus a flat fee for the Fire-Rescue PV/ESS plan-review/permit line

Why the confidence is not higherSame Comprehensive Schedule of Fees: the Building Permit Fee section is explicitly described as tiered percentages of 'the value of work, labor and material'; the Fire-Rescue 'Photovoltaic System (Solar Panels - Stationary Energy Storage System)' line is a flat $160 regardless of size.

City Comprehensive Schedule of Fees, adopted 12/4/2024 checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q17 Is there a separate plan-check fee? Fees

Yes — a separate Process Fee (25% of estimated job cost for new/addition/alteration permits, or a minimum $10 per discipline for repair-type permits) is charged on top of the Building Permit Fee, and the fee schedule further prices 'Plan Review Services' separately from 'Building Inspection Services' under the Private Provider Administrative Fee section (72% vs 84% of the respective base fee)

Why the confidence is not higherComprehensive Schedule of Fees, Dept. of Development Services > Building > 'Process Fee' and 'Private Provider Administrative Fee' sections (p.4-5), read directly from extracted PDF text.

City Comprehensive Schedule of Fees, adopted 12/4/2024 checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q18 What is the stated plan-review turnaround? Core Timeline & validity

5 business days for an existing single-family dwelling electrical permit valued under $15,000; 30 business days otherwise (most residential PV exceeds $15,000) — this is a STATE FLOOR (F.S. 553.792(1)(a), as rewritten by HB 803, enrolled text, effective 1 Jul 2026) that binds Hollywood as a 'local government.' No Hollywood-specific page was found publishing a faster committed turnaround for solar, and the City's Express Permitting (same-day) program explicitly excludes solar from its short list of eligible permit types

Why the confidence is not higherRead directly from the HB 803 enrolled bill text (flsenate.gov) Section 553.792(1)(a)(1)-(2); cross-checked against the City's own Express Permitting Service page, which lists only A/C replacement, water heater, reroof, and residential electrical service change as eligible — not solar — confirming solar is NOT on the expedited track and instead falls under the standard statutory timeframe.

Enrolled bill text, CS/CS/HB 803 (2026), amending F.S. 553.792 checked 2026-09-11 https://www.flsenate.gov/Session/Bill/2026/803/BillText/er/PDF

Q19 How long is an issued permit valid before it expires? Timeline & validity

1 year from issuance (or the effective date of the next Florida Building Code edition, whichever is later) for a single-family-dwelling permit — this is the NEW state floor under F.S. 553.79(1)(c) as rewritten by HB 803 (enrolled text), effective 1 Jul 2026, and it OVERRIDES the City's own currently-published FAQ, which still states permits 'expire if work is not commenced within 180 days or if abandoned for a period of 90 days' citing the older FBC 105.3.2.1 rule

Why the confidence is not higherHB 803 enrolled text amends F.S. 553.79 to add: 'A building permit issued by a local government for a single-family dwelling expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' Hollywood's own FAQ page (dated 2016, apparently not yet refreshed post-HB803) still quotes the old 180-day FBC rule — this is a real, currently-existing conflict between a stale City page and the new statewide floor, not a settled fact; I'm flagging it rather than picking one silently.

Enrolled bill text, CS/CS/HB 803 (2026), amending F.S. 553.79 checked 2026-09-11 https://www.flsenate.gov/Session/Bill/2026/803/BillText/er/PDF

Q20 Which permit portal does this authority use? Core Portal & process

Accela Citizen Access (ACA) — aca-prod.accela.com/HOLLYWOOD — effective for ALL NEW permit applications since 4 Aug 2026. The prior system ('BCLA ePermits') is retained only for searching/servicing existing BCLA-numbered permits (e.g., B24-100000)

Why the confidence is not higherVerbatim from the City's own current Permits page: 'Effective August 4, 2026, the City has transitioned to the ACA for all new permit applications... Other - BCLA ePermits *For EXISTING BCLA permits ONLY.'

City Permits page (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1545/Permits

Q21 Can the whole application be completed online? Core Portal & process

Yes — apply for a new permit, upload documents, manage the permit, pay fees, and schedule inspections can all be done through the Accela Citizen Access portal

Why the confidence is not higherCity's own Permits page describes the ACA portal functions in these terms, and separately links How-To guides for 'Create an Accela Citizen Account,' 'Apply for a Permit,' 'Download Accela Documents,' and 'Schedule Inspection.'

City Permits page (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1545/Permits

Q22 Which utility handles interconnection here? Core Utility interconnection

Florida Power & Light (FPL)

Why the confidence is not higherHollywood's own Business Directory lists 'Electricity Service (Florida Power & Light)' with FPL's residential phone number as the City's referral for electric service; Hollywood has no municipal electric utility.

City Business Directory listing checked 2026-09-11 https://www.hollywoodfl.org/businessdirectoryii.aspx?bid=146

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit / parallel-but-independent — Florida law requires that customer-owned renewable generation 'must be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility,' so FPL's Permission-to-Operate follows the City's building/electrical final inspection, but FPL's own interconnection application/agreement process runs on its own separate track

Why the confidence is not higherFlorida Administrative Code 25-6.065(5)(a) (Florida PSC rule governing all investor-owned utilities incl. FPL), text extracted directly from the .doc served by flrules.org.

Florida Administrative Code Rule 25-6.065 (own extraction) checked 2026-09-11 https://www.flrules.org/gateway/readFile.asp?sid=0&type=1&tid=5455200&file=25-6.065.doc

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No City-imposed HOA/architectural pre-approval requirement was found; and by state law an HOA/architectural review committee (a) may NOT prohibit solar installation outright (F.S. 163.04, the Solar Rights Act — may only regulate specific roof placement within a south-facing +/-45-degree arc without impairing performance), and (b) may NOT require that a building permit already be issued as a precondition for the association's OWN review (F.S. 720.3035(1)(c), added by HB 803 Sec. 11, effective 1 Jul 2026)

Why the confidence is not higherF.S. 163.04 text confirmed via the official Florida Legislature statutes site; F.S. 720.3035(1)(c) confirmed directly from the HB 803 enrolled bill text. No Hollywood-specific ordinance requiring HOA sign-off before permit issuance was found in the City's Solar Photovoltaic Checklist, Permits page, or fee schedule.

Florida Statute 163.04 (Solar Rights Act) + HB 803 enrolled text checked 2026-09-11 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0163/Sections/0163.04.html

Q25 Is there a historic-district review? Overlays & special cases

Likely yes for properties within a City-designated historic district — the Historic Preservation Board (HPB) reviews 'additions to existing buildings, major restorations, and substantial alterations' within historic districts, and the City's own Express Permitting Service page separately warns 'Applications in an Historic District may be delayed as additional review may be required'

Why the confidence is not higherCity FAQ 'What gets reviewed by Historic Preservation Board?' and the Express Permitting Service page (both hollywoodfl.org). Deduction: neither document names rooftop solar specifically as an HPB-reviewable item — the inference is that a roof-mounted PV installation on a contributing historic structure would fall under 'substantial alterations,' but no document states this in terms.

City FAQ (Historic Preservation Board scope) checked 2026-09-11 https://www.hollywoodfl.org/faq.aspx?qid=86

Q26 Is a wind or windstorm certification required? Overlays & special cases

No stand-alone 'windstorm certification' document — its function is folded into the mandatory PE/RA-sealed wind-load, uplift, and lateral-force design package required on every roof-mounted PV installation under the BORA Uniform Permit Submittal Matrix

Why the confidence is not higherOwn OCR of the BORA matrix: 'Documentation/verification exposed solar panel equipment meet wind loads... support framing meets both uplift and lateral forces... Design of connections for the wind loads,' citing FBCR 4403.1.2/4403.7.8/4403.9.1-3/4403.10 — these are wind-load design requirements embedded in the PE-stamped structural submittal, not a separate certificate.

Broward BORA Uniform Permit Submittal Matrix (OCR'd), county-wide binding checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedSearched Hollywood's Solar Photovoltaic System Checklist, Permits page, Building page, and Comprehensive Schedule of Fees for any mention of a Specific/Special Use Permit or City Commission approval step for residential rooftop solar; none of these documents mention one

https://www.hollywoodfl.org/documentcenter/view/21420

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedChapter 151.124 of the City's own Code of Ordinances is literally titled 'Rooftop photovoltaic solar systems' (confirmed live via the chapter's table of contents), and would be the natural place for a size cap, but the section's own text is served only from codelibrary.amlegal.com/codes/hollywood/latest/hollywood_fl/0-0-0-76871, which returns a Cloudflare 'Just a moment...' JS challenge to both curl and headless Chrome (dump-dom), and no Wayback Machine capture of that specific node exists (CDX query returned zero snapshots)

https://codelibrary.amlegal.com/codes/hollywood/latest/hollywood_fl/0-0-0-76871

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2020 NEC (NFPA 70-2020), adopted via Chapter 27 of the Florida Building Code, 8th Edition (2023), effective statewide 31 Dec 2023 85% · Broward BORA Formal Interpretations index (current, downloaded live)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) — Building, Residential, and Existing Building volumes — effective 31 Dec 2023, statewide, with local adoption codified at City Code Sec. 151.002 'Adoption of Florida Building Code' 85% · Florida Building Commission page (current)
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023) — statewide, effective alongside the 8th-edition FBC cycle 62% · Broward BORA page (confirms 8th Ed. FFPC cycle county-wide)
    • Are there local amendments to any of the above? Yes — the City's own Code of Ordinances contains a solar-specific section, Sec. 151.124 'Rooftop photovoltaic solar systems' (part of the 'Building Safety Inspection Program' subdivision of Chapter 151), layered on top of the state Florida Building Code; Broward's BORA also publishes county-wide technical amendments and Formal Interpretations (e.g., FI-31, see q36) that bind Hollywood 80% · City Code of Ordinances, Ch. 151 table of contents (Wayback capture, dated 10 Jun 2023)
    • What is the installation judged against? NEC Article 690 (2020 NEC, via FBC 8th Ed. (2023) Ch. 27), the Florida Building Code Building/Residential volumes' roof-mounted-equipment provisions (Ch. 15 series) as amended by BORA's HVHZ product-approval matrix, and the City's own Code Sec. 151.124 and published Solar Photovoltaic System Checklist 78% · Composite: City Solar Checklist + BORA matrix + Ch.151 TOC
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? The standard FBC rooftop-clearance rule for permanently mounted equipment (Sec. 1522.3, 1522.3.1) is EXPRESSLY held not to apply to rooftop-mounted photovoltaic panels or solar thermal installations, per BORA Formal Interpretation FI-31 (effective 24 Oct 2022) — so no minimum walkway/clearance distance is mandated by that section for solar specifically. A specific ridge setback or fire-access pathway DIMENSION for Hollywood was not found in any City document reviewed 75% · Broward BORA Formal Interpretation #31 (Wayback capture of PDF with embedded, extractable text)
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes — rapid shutdown is required, per NEC Article 690.12, as adopted via the 2020 NEC (FBC 8th Ed. (2023) Ch. 27). No Hollywood-specific amendment, exemption, or affidavit requirement (unlike some other Broward cities) was found in the City's own Solar Photovoltaic Checklist 80% · Inference from adopted NEC edition; City Solar Checklist silent on the term
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? The City's own checklist does not spell out placard wording; the applicable labels come from the adopted code itself: an NEC 690.56/705.10-style PV/AC-disconnect identification placard, an NEC 690.12 rapid-shutdown label at the service disconnect, and (per FPL, see q42) a padlockable manual AC disconnect switch label at the meter 55% · Inference from adopted NEC + City checklist wording
    • Does the authority specify placard wording of its own? No — the City does not publish its own placard wording; it requires only that the submittal show the disconnect/labeling scheme called for by NEC 690/705, without adding City-specific text 55% · Absence noted in City's own checklist/affidavit documents
    • Does the UTILITY specify placards beyond the AHJ's? Yes, indirectly — FPL requires (per Florida PSC rule) a customer-installed manual AC disconnect switch of the visible load-break type, padlockable in the open position with a single FPL padlock, mounted adjacent to (but separate from) the meter socket, for Tiers 2 and 3; Tier 1 inverter-based systems (the typical <=10kW residential case) are EXEMPT from this switch requirement unless FPL installs it at its own expense 80% · Florida Administrative Code Rule 25-6.065 (own extraction)
    • Where must the labels be placed? Where required (Tier 2/3, or Tier 1 if FPL-installed), the manual AC disconnect switch/label must be mounted adjacent to, but physically separate from, the electric meter socket, readily accessible to FPL and lockable in the open position with an FPL padlock 80% · Florida Administrative Code Rule 25-6.065 (own extraction)
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Where a switch is required (Tier 2/3 net metering, or Tier 1 if FPL-installed), FPL's manual AC disconnect must be mounted separate from, but adjacent to, the meter socket. Typical residential Tier 1 (<=10kW) inverter-based systems are exempt from the switch requirement itself unless installed at FPL's expense 85% · Florida Administrative Code Rule 25-6.065 (own extraction)
    • Must equipment be on a specific approved list? Yes — a Florida Solar Energy Center (FSEC) System Approval Report is required (or, alternatively, signed-and-sealed engineered drawings), and FSEC Certification/Component Documentation is separately required per F.S. 377.705 and NEC 110.3(B) 85% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Are batteries permitted, and under what conditions? Yes, batteries/ESS are permitted, conditioned on: a written summary of all standby loads (power ratings and estimated daily energy consumption) to show the inverter/battery selection meets the standby needs; the battery must be protected from impact and its location indicated on the plans; fire detection is required; and smoke alarms must be interconnected throughout the dwelling and in the garage 90% · City Solar Photovoltaic System Checklist, updated 5/03/23
    • Is there a separate ESS permit or inspection? Yes, functionally — the City's Fire-Rescue & Beach Safety department charges its own distinct $160 permit/plan-review fee specifically for 'Photovoltaic System (Solar Panels - Stationary Energy Storage System),' separate from the Building Division's electrical/structural permit fee 78% · City Comprehensive Schedule of Fees, adopted 12/4/2024
    • Is a specific mounting system or attachment spacing required? No single prescribed mounting system or spacing is set by the City; instead, every roof-attached component (panels, racking, clamps, flashing, fasteners) must individually carry a current HVHZ-rated Florida Product Approval or Miami-Dade NOA, per the BORA matrix, and the attachment/flashing/structural design must be sealed by a PE/RA for the wind zone 80% · Broward BORA Uniform Permit Submittal Matrix (OCR'd) + City Solar Checklist

20 questions answered against City of Hollywood’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2020 NEC (NFPA 70-2020), adopted via Chapter 27 of the Florida Building Code, 8th Edition (2023), effective statewide 31 Dec 2023

Why the confidence is not higherIndependently confirmed via Broward BORA's current Formal Interpretations index (downloaded directly from browardcdn.org, not from a search-engine summary), which references 'FI-35 Modification of NFPA 70, 2020, Section 555.5 and 555.9' under the '8th Edition (2023)' FBC cycle heading — i.e., the 8th-edition electrical volume is built on the 2020 NEC, not the 2023 NEC. (Note: an earlier Broward-county GovBot run recorded '2023 NEC' for this same fact; five OTHER independently-researched Florida files — Miami-Dade, Palm Beach, Hillsborough, Tampa, Pembroke Pines — all say 2020 NEC, and my own primary-source read agrees with the 2020 majority, not the outlier.)

Broward BORA Formal Interpretations index (current, downloaded live) checked 2026-09-11 https://www.browardcdn.org/api/public/content/c756fd30ac2b45daa56bef35f20fda74?v=75c14cfd

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023) — Building, Residential, and Existing Building volumes — effective 31 Dec 2023, statewide, with local adoption codified at City Code Sec. 151.002 'Adoption of Florida Building Code'

Why the confidence is not higherfloridabuilding.org's own current page states the 8th Edition (2023) effective date is 31 Dec 2023; the City's own Code of Ordinances Chapter 151 table of contents (fetched live via Wayback capture of the real chapter page, not a summary) confirms a section titled '151.002 Adoption of Florida Building Code' exists, evidencing local adoption-by-reference. The section's own body text could not be extracted (see q28 note on the Cloudflare block).

Florida Building Commission page (current) checked 2026-09-11 https://www.floridabuilding.org/c/default.aspx

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023) — statewide, effective alongside the 8th-edition FBC cycle

Why the confidence is not higherThis is confirmed at the Broward County/BORA level (broward.org, which administers formal interpretations of the Fire Prevention Code for all Broward building/fire officials including Hollywood's), but no Hollywood-specific ordinance section adopting the Fire Prevention Code by its own citation number was independently located in this run — the Cloudflare block on codelibrary.amlegal.com prevented reading Hollywood's own fire-code adoption section directly.

Broward BORA page (confirms 8th Ed. FFPC cycle county-wide) checked 2026-09-11 https://www.broward.org/CodeAppeals/Pages/Default.aspx

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — the City's own Code of Ordinances contains a solar-specific section, Sec. 151.124 'Rooftop photovoltaic solar systems' (part of the 'Building Safety Inspection Program' subdivision of Chapter 151), layered on top of the state Florida Building Code; Broward's BORA also publishes county-wide technical amendments and Formal Interpretations (e.g., FI-31, see q36) that bind Hollywood

Why the confidence is not higherThe existence and exact title of Sec. 151.124 was confirmed live from the chapter's own table of contents (via a dated Wayback capture of codelibrary.amlegal.com, not a stale index) — I could not read the substantive amendment text itself due to a Cloudflare block on the section's own page (see q28).

City Code of Ordinances, Ch. 151 table of contents (Wayback capture, dated 10 Jun 2023) checked 2026-09-11 https://web.archive.org/web/20230610014431/https://codelibrary.amlegal.com/codes/hollywood/latest/hollywood_fl/0-0-0-45611

Q33 What is the installation judged against? Core Electrical

NEC Article 690 (2020 NEC, via FBC 8th Ed. (2023) Ch. 27), the Florida Building Code Building/Residential volumes' roof-mounted-equipment provisions (Ch. 15 series) as amended by BORA's HVHZ product-approval matrix, and the City's own Code Sec. 151.124 and published Solar Photovoltaic System Checklist

Why the confidence is not higherComposite of the BORA matrix (own OCR), the confirmed existence of City Code Sec. 151.124, and the City's own checklist requirements (NEC 690 electrical diagram, PE-sealed structural design). No single City document states this as one sentence; it is assembled from several of the City's and county's own primary documents.

Composite: City Solar Checklist + BORA matrix + Ch.151 TOC checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedSearched the City's Solar Photovoltaic System Checklist, the BORA Uniform Permit Submittal Matrix, and the Comprehensive Schedule of Fees for any Hollywood-specific rule on service-panel/busbar upsizing, backfeed breaker sizing, or the 120%-rule beyond the generic NEC 690/705 requirement; none of them state a local rule

https://www.hollywoodfl.org/documentcenter/view/21420

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No single prescribed mounting system or spacing is set by the City; instead, every roof-attached component (panels, racking, clamps, flashing, fasteners) must individually carry a current HVHZ-rated Florida Product Approval or Miami-Dade NOA, per the BORA matrix, and the attachment/flashing/structural design must be sealed by a PE/RA for the wind zone

Why the confidence is not higherOwn OCR of the BORA Uniform Permit Submittal Matrix and Hollywood's own checklist item requiring 'attachment details, flashing details, construction design for the unit and any supporting frame members (sealed by the appropriate design professional) for the Wind Zone.'

Broward BORA Uniform Permit Submittal Matrix (OCR'd) + City Solar Checklist checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

The standard FBC rooftop-clearance rule for permanently mounted equipment (Sec. 1522.3, 1522.3.1) is EXPRESSLY held not to apply to rooftop-mounted photovoltaic panels or solar thermal installations, per BORA Formal Interpretation FI-31 (effective 24 Oct 2022) — so no minimum walkway/clearance distance is mandated by that section for solar specifically. A specific ridge setback or fire-access pathway DIMENSION for Hollywood was not found in any City document reviewed

Why the confidence is not higherFI-31 was retrieved and read in full from a genuine Wayback capture of broward.org/CodeAppeals/Documents/FI-31.pdf (the live URL now 404s; the county has migrated its site to a new Next.js platform) — the text reads: 'The ROOFTOP CLEARANCE REQUIREMENTS FOR PERMANENTLY MOUNTED EQUIPMENT as specified in FBC Section 1522.3, 1522.3.1 are not intended to be applied to rooftop mounted photovoltaic panels and solar thermal installations.' No Hollywood-specific fire-access pathway width/ridge-setback figure was located.

Broward BORA Formal Interpretation #31 (Wayback capture of PDF with embedded, extractable text) checked 2026-09-11 https://web.archive.org/web/20230204161813if_/https://www.broward.org/CodeAppeals/Documents/FI-31.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — rapid shutdown is required, per NEC Article 690.12, as adopted via the 2020 NEC (FBC 8th Ed. (2023) Ch. 27). No Hollywood-specific amendment, exemption, or affidavit requirement (unlike some other Broward cities) was found in the City's own Solar Photovoltaic Checklist

Why the confidence is not higherNEC edition per q29; the City's own checklist does not mention rapid shutdown by name (unlike, e.g., Pembroke Pines' checklist, which has a dedicated Rapid Shutdown Affidavit) — the requirement is inferred from the adopted code edition rather than stated in a Hollywood-specific document, hence not scored higher.

Inference from adopted NEC edition; City Solar Checklist silent on the term checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

The City's own checklist does not spell out placard wording; the applicable labels come from the adopted code itself: an NEC 690.56/705.10-style PV/AC-disconnect identification placard, an NEC 690.12 rapid-shutdown label at the service disconnect, and (per FPL, see q42) a padlockable manual AC disconnect switch label at the meter

Why the confidence is not higherNo Hollywood-specific placard-wording document (of the kind Bay County or Charlotte County publish) was found on hollywoodfl.org; this answer is assembled from the generically-adopted 2020 NEC sections that the City's checklist itself invokes ('over-current protection, inverter disconnect... AC connection to building') rather than a City-specific placard spec.

Inference from adopted NEC + City checklist wording checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No — the City does not publish its own placard wording; it requires only that the submittal show the disconnect/labeling scheme called for by NEC 690/705, without adding City-specific text

Why the confidence is not higherReviewed the City's Solar Photovoltaic Checklist, Rooftop Mounted Equipment Affidavit, and fee schedule; none prescribe specific placard wording (contrast with cities that publish a sign-template PDF).

Absence noted in City's own checklist/affidavit documents checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSearched the City's Solar Photovoltaic Checklist, Rooftop Mounted Equipment Affidavit, and Building/Fire fee-schedule pages for any letter-height, colour, or material specification for solar placards/labels; none was found

https://www.hollywoodfl.org/documentcenter/view/21420

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSearched the City's Solar Photovoltaic Checklist and general Permits pages for a site-plan/facility-map placard requirement (NEC 705.10-style); the City's checklist calls only for a roof plan showing panel locations (see q10), not a facility-map placard, and no separate document addressing 705.10 signage was found

https://www.hollywoodfl.org/documentcenter/view/21420

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, indirectly — FPL requires (per Florida PSC rule) a customer-installed manual AC disconnect switch of the visible load-break type, padlockable in the open position with a single FPL padlock, mounted adjacent to (but separate from) the meter socket, for Tiers 2 and 3; Tier 1 inverter-based systems (the typical <=10kW residential case) are EXEMPT from this switch requirement unless FPL installs it at its own expense

Why the confidence is not higherFlorida Administrative Code Rule 25-6.065(6)(a), text extracted directly from the flrules.org .doc file: 'the manual disconnect switch shall be mounted separate from, but adjacent to, the meter socket... Inverter-based Tier 1 customer-owned renewable generation systems shall be exempt from this requirement.' This is a state PSC rule applying to all investor-owned utilities including FPL, Hollywood's utility.

Florida Administrative Code Rule 25-6.065 (own extraction) checked 2026-09-11 https://www.flrules.org/gateway/readFile.asp?sid=0&type=1&tid=5455200&file=25-6.065.doc

Q43 Where must the labels be placed? Core Labels Signage & labelling

Where required (Tier 2/3, or Tier 1 if FPL-installed), the manual AC disconnect switch/label must be mounted adjacent to, but physically separate from, the electric meter socket, readily accessible to FPL and lockable in the open position with an FPL padlock

Why the confidence is not higherSame FAC 25-6.065(6)(a) provision as q42/q48.

Florida Administrative Code Rule 25-6.065 (own extraction) checked 2026-09-11 https://www.flrules.org/gateway/readFile.asp?sid=0&type=1&tid=5455200&file=25-6.065.doc

Q44 Must equipment be on a specific approved list? Equipment listing

Yes — a Florida Solar Energy Center (FSEC) System Approval Report is required (or, alternatively, signed-and-sealed engineered drawings), and FSEC Certification/Component Documentation is separately required per F.S. 377.705 and NEC 110.3(B)

Why the confidence is not higherCity's own checklist: 'Florida Solar Energy Center (FSEC) System Approval Report - All solar systems drawings shall be accompanied by a FSEC Approval report or Signed and Sealed Engineered drawings'; corroborated by BORA matrix citing F.S. 377.705 and NEC 110.3(B) for 'Component Documentation - FSEC Certification.'

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, batteries/ESS are permitted, conditioned on: a written summary of all standby loads (power ratings and estimated daily energy consumption) to show the inverter/battery selection meets the standby needs; the battery must be protected from impact and its location indicated on the plans; fire detection is required; and smoke alarms must be interconnected throughout the dwelling and in the garage

Why the confidence is not higherVerbatim from the City's own Solar Photovoltaic System Checklist, under the battery-backup bullet.

City Solar Photovoltaic System Checklist, updated 5/03/23 checked 2026-09-11 https://www.hollywoodfl.org/documentcenter/view/21420

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Yes, functionally — the City's Fire-Rescue & Beach Safety department charges its own distinct $160 permit/plan-review fee specifically for 'Photovoltaic System (Solar Panels - Stationary Energy Storage System),' separate from the Building Division's electrical/structural permit fee

Why the confidence is not higherComprehensive Schedule of Fees (adopted 12/4/2024), Dept. of Fire Rescue and Beach Safety > Permits section, read directly from extracted PDF text. Deduction: the fee schedule does not explicitly say this is a SEPARATE 'permit' as opposed to a bundled plan-review line item within the same overall PV project — but it is billed and administered by a different City department (Fire, not Building), which functions as a separate review track.

City Comprehensive Schedule of Fees, adopted 12/4/2024 checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedSearched hollywoodfl.org (site search for 'ground mount solar') and the City's own Solar Photovoltaic System Checklist and Rooftop Mounted Equipment Affidavit; the City publishes no dedicated ground-mount solar document, and none of the rooftop-focused documents address whether a ground-mounted array is treated as an accessory structure for zoning/setback purposes

https://www.hollywoodfl.org/Search/Results?searchPhrase=ground%20mount%20solar

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Where a switch is required (Tier 2/3 net metering, or Tier 1 if FPL-installed), FPL's manual AC disconnect must be mounted separate from, but adjacent to, the meter socket. Typical residential Tier 1 (<=10kW) inverter-based systems are exempt from the switch requirement itself unless installed at FPL's expense

Why the confidence is not higherFlorida Administrative Code Rule 25-6.065(6)(a) — a Florida PSC rule binding all investor-owned utilities, including FPL, Hollywood's utility; text extracted directly from the flrules.org-served document.

Florida Administrative Code Rule 25-6.065 (own extraction) checked 2026-09-11 https://www.flrules.org/gateway/readFile.asp?sid=0&type=1&tid=5455200&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone (24-hour automated IVR inspection line, English/Spanish, 954-921-3646) or online through the Accela/Building Permit Search portal 92% · City department page (rendered, current)
    • How much notice is required? Effectively next business day — inspections requested Monday-Thursday before 8:00 p.m. are scheduled for the next business day; requests made Saturday or Sunday are scheduled for the 2nd business day. Cancellations must be called in before 5:00 a.m. on the day of the scheduled inspection 90% · City department page (rendered, current)
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the City performs its own final Building/Electrical solar inspections through its Development Services/Building Division; the separate Fire-Rescue & Beach Safety department (also City, not County) handles the PV/ESS life-safety plan-review/permit piece. Not delegated to Broward County 85% · City department pages (rendered, current)
    • If delegated, to whom? N/A — not delegated; the City of Hollywood performs its own final solar inspections (see q52) 85% · City department pages (rendered, current)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Per Broward BORA Policy 09-02's inspection matrix (binding on Hollywood): for Solar Electric — Building/Structure/Roofing (time of installation and final) and Electrical (rough and final); for Solar Thermal — Building/Structure/Roofing (time of installation and final) and Plumbing (final); for Hybrid PV+solar-thermal systems, all three trades (Building/Structure/Roofing, Electrical rough+final, Plumbing final) 85% · Broward BORA Policy #09-02 (OCR'd), county-wide binding
    • Is a rough-in or mid-roof inspection required? Yes — a 'time of installation' inspection (functionally a rough-in/mid-roof-stage inspection for the Building/Structure/Roofing trade) is required in addition to the final, per the BORA inspection matrix; Electrical similarly gets a rough inspection in addition to final 78% · Broward BORA Policy #09-02 (OCR'd), county-wide binding
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    Nothing recorded for City of Hollywood on this step yet — 3 questions checked and found unpublished. The guidance above is general.

  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? A Certificate of Completion for a permit issued to a licensed contractor (or to a property owner) — since a residential solar retrofit is an alteration to an existing structure rather than new construction requiring a full Certificate of Occupancy 70% · City Comprehensive Schedule of Fees, adopted 12/4/2024 (inference)
    • Who notifies the utility for PTO? The installer/customer notifies FPL directly — FPL's net-metering interconnection process (application, Standard Interconnection Agreement, and Permission-to-Operate) is a separate submission the customer or their installer makes directly to FPL, independent of the City's building-permit process; state rule requires the City's own inspection/approval to occur before FPL allows parallel operation 82% · Florida Administrative Code Rule 25-6.065 (own extraction)
    • Is there a re-inspection fee? $75 per discipline 88% · City Comprehensive Schedule of Fees, adopted 12/4/2024
    • How are corrections issued and cleared? Corrections are issued and tracked through the Accela portal (applicants can 'check permit status, view comments, schedule inspections, and pay fees' online); applicants can also book a QLess in-person or call-back appointment with a Plan Reviewer to resolve plan-review comments 65% · City Permits page (rendered, current)

14 questions answered against City of Hollywood’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone (24-hour automated IVR inspection line, English/Spanish, 954-921-3646) or online through the Accela/Building Permit Search portal

Why the confidence is not higherVerbatim from the City's own 'Schedule an Inspection' page.

City department page (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q50 How much notice is required? Core Booking & scheduling

Effectively next business day — inspections requested Monday-Thursday before 8:00 p.m. are scheduled for the next business day; requests made Saturday or Sunday are scheduled for the 2nd business day. Cancellations must be called in before 5:00 a.m. on the day of the scheduled inspection

Why the confidence is not higherVerbatim from the City's own 'Schedule an Inspection' page.

City department page (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedRead the City's full 'Schedule an Inspection' page; it describes booking windows (next business day / 2nd business day for weekend requests) and an after-hours request process requiring a separate approval form and fee, but does not state whether AM/PM or same-day time windows are offered for a routine scheduled inspection

https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the City performs its own final Building/Electrical solar inspections through its Development Services/Building Division; the separate Fire-Rescue & Beach Safety department (also City, not County) handles the PV/ESS life-safety plan-review/permit piece. Not delegated to Broward County

Why the confidence is not higherComposite of the City's own Building Division/Permits/Schedule-an-Inspection pages (all City-branded, City phone numbers) and the Comprehensive Schedule of Fees showing both Building and Fire-Rescue fee lines administered by the City.

City department pages (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated; the City of Hollywood performs its own final solar inspections (see q52)

Why the confidence is not higherSame evidence as q52.

City department pages (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q54 Which inspections are required, and in what order? Core Stages & sequence

Per Broward BORA Policy 09-02's inspection matrix (binding on Hollywood): for Solar Electric — Building/Structure/Roofing (time of installation and final) and Electrical (rough and final); for Solar Thermal — Building/Structure/Roofing (time of installation and final) and Plumbing (final); for Hybrid PV+solar-thermal systems, all three trades (Building/Structure/Roofing, Electrical rough+final, Plumbing final)

Why the confidence is not higherOwn OCR of BORA Policy #09-02, Section D, which lists these exact inspection stages by system type and states 'More than one inspection may be performed during any inspection visit.'

Broward BORA Policy #09-02 (OCR'd), county-wide binding checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Yes — a 'time of installation' inspection (functionally a rough-in/mid-roof-stage inspection for the Building/Structure/Roofing trade) is required in addition to the final, per the BORA inspection matrix; Electrical similarly gets a rough inspection in addition to final

Why the confidence is not higherSame BORA Policy #09-02 matrix as q54: 'Building/Structure/Roofing — Time of installation and Final' and 'Electrical — Rough and Final.'

Broward BORA Policy #09-02 (OCR'd), county-wide binding checked 2026-09-11 https://web.archive.org/web/20240616140513/https://www.broward.org/CodeAppeals/Documents/SolarThermalElectPermits.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedChecked the City's Schedule-an-Inspection, Building, and Permits pages, and the Solar Photovoltaic Checklist, for a statement that the field inspector specifically verifies equipment labels/listings at inspection; none of these documents state this explicitly (it is implied generally by NEC-based inspection practice but not documented for Hollywood)

https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedSite-searched hollywoodfl.org for a published FIELD inspection checklist (as distinct from the pre-permit submittal checklist); the only solar-named checklist found is the 'Solar Photovoltaic System Checklist,' which is a submittal/application document, not an inspection-day checklist. Only the first page of 124 search hits for 'solar' was reviewed in full, so a later checklist cannot be ruled out with certainty

https://www.hollywoodfl.org/Search/Results?searchPhrase=solar

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedChecked the City's Schedule-an-Inspection page and Solar Photovoltaic Checklist for a stated list of documents that must be physically on site at the time of inspection; neither document states this

https://www.hollywoodfl.org/1554/Schedule-an-Inspection

Q59 Is there a re-inspection fee? Corrections & re-inspection

$75 per discipline

Why the confidence is not higherComprehensive Schedule of Fees, Dept. of Development Services > Building > 'Additional Associated Fees' section: 'Re-Inspection $75 per discipline.'

City Comprehensive Schedule of Fees, adopted 12/4/2024 checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q60 How are corrections issued and cleared? Corrections & re-inspection

Corrections are issued and tracked through the Accela portal (applicants can 'check permit status, view comments, schedule inspections, and pay fees' online); applicants can also book a QLess in-person or call-back appointment with a Plan Reviewer to resolve plan-review comments

Why the confidence is not higherCity's own Permits page describes these two channels in general terms for all permit types; no Hollywood document was found describing a solar-specific corrections/re-submittal workflow.

City Permits page (rendered, current) checked 2026-09-11 https://www.hollywoodfl.org/1545/Permits

Q61 What is issued on pass? Core Final sign-off & PTO

A Certificate of Completion for a permit issued to a licensed contractor (or to a property owner) — since a residential solar retrofit is an alteration to an existing structure rather than new construction requiring a full Certificate of Occupancy

Why the confidence is not higherComprehensive Schedule of Fees, 'Certificate of Occupancy and Completion' section distinguishes CO (new construction/occupancy change) from Certificate of Completion (alterations to an existing permitted structure); a rooftop PV retrofit fits the latter category, but no Hollywood document states this outcome for solar specifically, hence the inference.

City Comprehensive Schedule of Fees, adopted 12/4/2024 (inference) checked 2026-09-11 https://www.hollywoodfl.org/DocumentCenter/View/2104

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The installer/customer notifies FPL directly — FPL's net-metering interconnection process (application, Standard Interconnection Agreement, and Permission-to-Operate) is a separate submission the customer or their installer makes directly to FPL, independent of the City's building-permit process; state rule requires the City's own inspection/approval to occur before FPL allows parallel operation

Why the confidence is not higherFlorida Administrative Code Rule 25-6.065(5)(a) and (7) (own extraction) establish the customer-facing application/agreement obligation and the requirement for prior local-code-official approval; in practice the installer typically files on the customer's behalf, though the rule frames the obligation as the customer's.

Florida Administrative Code Rule 25-6.065 (own extraction) checked 2026-09-11 https://www.flrules.org/gateway/readFile.asp?sid=0&type=1&tid=5455200&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 55%

No — the City does not publish its own placard wording; it requires only that the submittal show the disconnect/labeling scheme called for by NEC 690/705, without adding City-specific text

Size, colour & material None%

Where they go 80%

Where required (Tier 2/3, or Tier 1 if FPL-installed), the manual AC disconnect switch/label must be mounted adjacent to, but physically separate from, the electric meter socket, readily accessible to FPL and lockable in the open position with an FPL padlock

What the utility wants on top 80%

Yes, indirectly — FPL requires (per Florida PSC rule) a customer-installed manual AC disconnect switch of the visible load-break type, padlockable in the open position with a single FPL padlock, mounted adjacent to (but separate from) the meter socket, for Tiers 2 and 3; Tier 1 inverter-based systems (the typical <=10kW residential case) are EXEMPT from this switch requirement unless FPL installs it at its own expense

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Separate roof inspection
Permits: Apply, monitor, pay for, obtain a building permit or schedule inspections by using the internet. QLess Virtual Check-In System: In an effort to improve productivity and reduce the time spent waiting for service at the City Hall for permits and licenses; to request information and documents
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.