City of Inverness

Citrus County · Florida ← All authorities

City of Inverness

Citrus County

Verified Aug. 6, 2026

City of Inverness is a city authority in the State of Florida, serving 7,543 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Inverness against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Inverness is the authority having jurisdiction 92% confidence
Holds
building and electrical permitting and inspection, plus zoning, floodplain administration and fire
Overridden by
Architectural/Aesthetic Review Committee Certificate of Appropriateness inside the Central Business District or on a historic structure anywhere in the city limits (LDC Sec. 2.11.B.4 — the Building Division may not issue the permit until a COA is issued); and, after inspection, the electric utility (SECO Energy or Duke Energy Florida) which gates operation and metering
Why not higher
The City has its own adopted building code (Code Ch. 7, 'the Inverness Building Code'), its own named Building Official, its own fee schedule, its own permit application and its own iWorQ portal doing live inspection scheduling. Citrus County's Ch. 18 Art. II contractor licensing applies 'to all contractors working in the unincorporated areas of Citrus County; and in certain incorporated areas... where the building official and his/her designees are authorized to provide regulation' — a conditional clause that does not reach Inverness, which runs its own registration programme. Citrus County's Code contains zero PV provisions (searched independently, controls passed), so there is no county floor beneath the City's silence. TWO CORRECTIONS TO THE BRIEF: (1) Municode's client record and the iWorQ portal both give the City's website as www.inverness-fl.gov — that domain is DEAD (delegated to CivicPlus nameservers with no A record at the apex and NXDOMAIN on www). The live site is www.inverness.gov. (2) The building-inspection function appears to be contracted: the Building Official is named on the staff directory but is not a budgeted FTE.

https://www.inverness.gov/71/Community-Development

Permit required
Yes. A permit is required. There is no PV-specific statement anywhere in the City's published material, but PV is not within any exemption: Code Sec.80%
Permit cost
No solar fee line. A rooftop PV job is priced on the general schedule: Residential Permit $120.00 minimum plus 1.25% of cost of construction;85%
Plan review
'Please allow 2-3 days for processing the permit.' That line appears identically on the Electrical, Generator, Roofing and Single-Family checklists.75%
Portal
iWorQ — invernessfl.portal.iworq.net/portalhome/invernessfl. It carries permit application, existing-permit search, pre-July-2021 permit search, inspection requests,95%
Electrical code
NEC 2020, as adopted statewide by the Florida Building Commission, effective 31 December 2023, under FBC 8th Edition (2023). LOCAL CONFLICT WORTH KNOWING: Code Sec.90%
Own placard wording
No. The City specifies no placard wording of its own anywhere.85%
Booking an inspection
Portal. Inspections are requested through the iWorQ portal's 'Request An Inspection' form, which requires the contractor's ACCESS CODE (obtainable by email from the portal),88%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. A permit is required. There is no PV-specific statement anywhere in the City's published material, but PV is not within any exemption: Code Sec. Q3 Electrical and building permits — Either. A separate ELECTRICAL permit exists and is priced separately ($120 minimum), Q4 Plan review — 'Please allow 2-3 days for processing the permit.' That line appears identically on the Electrical, Generator, Roofing and Single-Family checklists. Q18 Where you file — iWorQ — invernessfl.portal.iworq.net/portalhome/invernessfl. It carries permit application, existing-permit search, pre-July-2021 permit search, Q20

Permit required
Yes. A permit is required. There is no PV-specific statement anywhere in the City's published material, but PV is not within any exemption: Code Sec.80% source
What it costs
No solar fee line. A rooftop PV job is priced on the general schedule: Residential Permit $120.00 minimum plus 1.25% of cost of construction;85% source
Plan review turnaround
'Please allow 2-3 days for processing the permit.' That line appears identically on the Electrical, Generator, Roofing and Single-Family checklists.75% source
Key document
published checklist cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes. The City of Inverness is the AHJ for residential solar inside the city limits; building and electrical permitting and inspection sit in the Community Development Department, 212 W. Main Street. 95% · department page
    • What does this authority permit itself, and what does it delegate? Both. The City issues and inspects building AND electrical permits itself. Fire plan review and fire inspections are the City of Inverness Fire Department. Nothing is delegated to Citrus County. 90% · permit portal application form
    • Is a permit required for a residential rooftop PV system? Yes. A permit is required. There is no PV-specific statement anywhere in the City's published material, but PV is not within any exemption: Code Sec. 7-3 SECTION 104 requires a permit for building and electrical work, and the City's amendments add no exemption list of their own, so FBC 105.2 applies unamended. 80% · adopting ordinance (FBC Ch.1 local amendments)
    • Is there a separate electrical permit, or is it combined? Either. A separate ELECTRICAL permit exists and is priced separately ($120 minimum), but electrical work can also ride on a building permit as subcontracted work — the application has a 'Subcontractor Work on Project: Electrical' checkbox with a Subcontractor List attachment. 70% · permit application
    • Is a HOA or architectural approval required first? Yes where the property is caught. Architectural: a Certificate of Appropriateness from the Architectural/Aesthetic Review Committee is a hard pre-condition — 'The Building Division shall not issue the building or demolition permit until a certificate of appropriateness has been issued by the committee' — for any building permit affecting the exterior architectural appearance of a property within the Central Business District OR of a historic structure anywhere within the city limits. HOA: the City's Generator Permit Checklist requires written HOA approval where the equipment is within an HOA; the Electrical Permit Checklist carries no equivalent line. 85% · land development code
    • Is there a historic-district review? Yes — and this is the strongest historic gate recorded in this survey, because all three of the usual escape hatches are closed. (1) NOT limited to designated properties: LDC Sec. 2.11.B.4.i reaches 'a property within a Central Business District or historic structure within the city limits', and Sec. 2.11.B.4.g.4 gives the committee power over 'proposed or designated historic structures'. (2) Designation is NOT voluntary: the historic district IS the Central Business District, 'as designated by the Inverness Land Development Code which has been established as an historic district' — an ordinance designation, not an owner election. (3) The trigger list DOES include ALTERATION, expressly defined as 'any act or process that changes one (1) or more of the exterior architectural features of a structure, including, but not limited to, the painting, erection, construction, reconstruction, or removal of any structure'. Committee decides within 15 days; written notice within 5 days; denial appealable to City Council within 30 days; a COA is void if work has not begun one year after issuance. 90% · land development code
    • Is a wind or windstorm certification required? No windstorm certification instrument exists. Inverness is not HVHZ (Miami-Dade and Broward only). Code Sec. 7-3 101.4.15 fixes a local figure — 'Basic Wind Speed Line. The Basic Wind Speed for the City of Inverness shall be 110 mph' — which dates from Ord. No. 2003-616 and is a stale local number against the current FBC/ASCE 7 mapped values. The Product Approval Specification Sheet (Florida Product Approval) is demanded for roofing, underlayment, windows, doors, garage doors, soffits, truss fasteners and steel lintels; it is NOT asked for PV. 75% · adopting ordinance
    • Is a Specific Use Permit or Council approval ever required? Not for rooftop PV. Special exceptions under LDC Sec. 2.5 go to the Zoning Board of Adjustment (fee $1,000); variances go to the ZBA (fee $750, or $150 administrative); the only route to City Council is an appeal from a denied Certificate of Appropriateness, within 30 days. 70% · fee schedule + land development code
    • Is there a system-size cap on residential generation? None imposed by the City. The caps are the utility's. SECO Energy: net metering limited to Tier 1 (10 kW or less), Tier 2 (>10 to 100 kW) and Tier 3 (>100 to 1,000 kW), the system 'shall be rated at no more than 1,000 kilowatts (kW) alternating current power output', and 'The rating of the system cannot exceed 90% of the customer's utility distribution service rating.' Duke Energy Florida runs the standard PSC Rule 25-6.065 tiers. 88% · utility filed tariff
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Licensed electrical contractor or the homeowner. The Electrical Permit Checklist allows an owner to pull it with a notarised Owner/Builder Disclosure Statement — EXCEPT that item 12 states: 'if the property is listed as a company name, corporation or an LLC on the property appraiser card/deed, a licensed contractor is required to submit permit for electrical.' 85% · published checklist
    • Must the contractor be registered with this authority before applying? No — registration is voluntary, but the paperwork is not. The Voluntary Registration Program costs $30.00 a year and expires every 30 September; the form states: 'This program is voluntary... If you choose not to participate in this program all items in section 11 and this form will be required per each building permit. There will be no exceptions.' 95% · registration form
    • Is a homeowner permitted to self-install and self-permit? Yes, with a completed, signed and notarised Owner/Builder Disclosure Statement — except where the property is titled to a company, corporation or LLC, in which case a licensed contractor must pull the permit. 90% · published form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar submittal checklist exists. The nearest applicable instrument is the ELECTRICAL PERMIT CHECKLIST: (1) notarised Building Permit Application; (2) proof of property ownership; (3) explanation of proposed work on the application; (4) building layout plan showing the location of the electrical panel; (5) 'Include the power company on the permit and electrical panel needs to be marked'; (6) notarised Owner/Builder Disclosure if the owner is pulling it; (7) Contractor Registration pack; (8) recorded Notice of Commencement if the job is $5,000 or more. 75% · published checklist
    • How many copies, and in what format? Submitted online through the iWorQ portal with file uploads (.docx, .jpeg, .jpg, .png or .pdf), or in person. The only hard count published is for new single-family construction — '3 sets of engineered/sealed building plans' — and that checklist does not apply to a PV retrofit. 70% · permit portal application form
    • Is a site plan required, and what must it show? No full site plan is required for an electrical permit — the Electrical Permit Checklist asks only for a 'Building layout plan, showing the location of the electrical panel'. (By contrast the Generator Permit Checklist requires a scaled site plan showing the equipment location with measurements.) Code Sec. 7-3 104.2.4 lets the Building Official require a boundary-line survey where property lines cannot be determined in the field. 65% · published checklist
    • Is a one-line / three-line diagram required? Not by the City — no City document requires a one-line or three-line diagram. The UTILITY does: SECO Energy requires a one-line diagram with its interconnection application and publishes a sample. 70% · utility published form
    • Are string and conductor calculations required? Not required by any City document. The only calculation requirement published is 'electrical energy calculations' on the Single-Family Residential Permit Checklist, which applies to new house construction, not to a PV retrofit. 55% · published checklist
    • Is a structural PE stamp required, and at what threshold? No published threshold. The City publishes no structural PE requirement for rooftop PV. Two discretionary hooks exist: Code Sec. 7-3 104.2.1.2 (the Building Official may require 'details, computations, stress diagrams and other data'), and Residential Roofing Permit Checklist item 12 ('The Building Official, at his discretion, may require an engineer sealed letter stating the roof was installed according to the current building code'). 55% · published checklist
    • Is an electrical PE stamp required, and at what threshold? Nothing local. The governing threshold is state: FS 471.003(2)(h) exempts electrical work from the PE-stamp requirement below $125,000 and 600 amperes. No City document cites any figure. 55% · state statute (city silent)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? iWorQ — invernessfl.portal.iworq.net/portalhome/invernessfl. It carries permit application, existing-permit search, pre-July-2021 permit search, inspection requests, contractor registration, business tax receipts, fire inspection invoice payment and citizen code complaints. 95% · permit portal
    • Can the whole application be completed online? No — not completely. The online application has an E-Signature field but also a hard required upload headed 'Notarized Signature', and the City's Permitting page states for both routes that 'The Building permit application must be submitted with the property owner and contractor signatures when using the portal.' Both the owner's and the contractor's signatures must be notarised. 90% · department page + portal form
    • What does a residential solar permit cost? No solar fee line. A rooftop PV job is priced on the general schedule: Residential Permit $120.00 minimum plus 1.25% of cost of construction; or Electrical Permit $120.00 minimum, covering the first $7,500 with $10.00 for each added $1,000 of value. Florida State Surcharge 3.50% of permit value (minimum $4.00) on top. Worked example on a $25,000 system taken as a residential permit: $312.50 + $10.94 surcharge = about $323. 85% · fee schedule (undated)
    • How is the fee calculated? Valuation, with a minimum. Residential and Pool permits are a percentage of cost of construction (1.25%); Commercial, Sign and Communication Tower permits are 1.5%; Electrical, Mechanical, Plumbing, Gas, Demolition, Shed, Fence, Generator and Window/Door permits are a flat minimum covering the first $7,500 plus $10.00 per added $1,000 of value; Roofing is the minimum plus $5.00 per $1,000 of contract price. 90% · fee schedule (undated)
    • Is there a separate plan-check fee? No separate plan-check fee is published on the fee schedule. CONFLICT: the City's own permit application has a 'Plan Review $' field in its office-use fee box, and a 'Fire Plan Review $' field beside it, so a plan review charge can evidently be raised even though no line exists for it. 60% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 'Please allow 2-3 days for processing the permit.' That line appears identically on the Electrical, Generator, Roofing and Single-Family checklists. There is no published plan-review service standard, and the City does not publish or reference the FS 553.792 statutory timeframes anywhere. 75% · published checklist
    • How long is an issued permit valid before it expires? A permit becomes invalid unless work is commenced within six months of issuance, and failure to obtain an approved inspection within 180 days of the previous approved inspection constitutes suspension or abandonment. An unissued APPLICATION is void 180 days after filing (permit application) / six months after filing (Code Sec. 7-3 104.1.6). Demolition permits expire in 60 days. CONFLICT ON EXTENSIONS: Code Sec. 7-3 104.5.1 allows extensions 'for periods not more than 180 days each' with no cap, while the fee schedule prices 'Permit Extensions: $50.00 (two maximum permitted up to 90 days each)'. 85% · adopting ordinance + fee schedule
    • Which utility handles interconnection here? TWO electric utilities serve the City: SECO Energy (Sumter Electric Cooperative, Inc. — a Seminole Electric Cooperative member) and Duke Energy Florida, LLC. The City's own Street Lights page splits its instructions into 'Sumter Electric Customers' and 'Duke Energy Customers'. Which one serves a given address has to be established per address. 88% · department page
    • Where does the utility sit in the sequence? Parallel, with a hard utility gate at the end. SECO's published 10-step process puts the Interconnection Agreement at step 4, BEFORE the permit at step 5; installation is step 6, City/County inspection step 7, document and photo upload step 8, bi-directional meter step 9. The Interconnection Agreement then requires, before the system may operate, 'written certification that the RGS installation has been inspected by the local code official who has certified that the installation was permitted and has been approved', plus at least ten days' notice of the in-service date. 88% · utility process page + filed interconnection agreement

28 questions answered against City of Inverness’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes. The City of Inverness is the AHJ for residential solar inside the city limits; building and electrical permitting and inspection sit in the Community Development Department, 212 W. Main Street.

Why the confidence is not higherThe City has its own adopted building code (Code of Ordinances Ch. 7, 'the Inverness Building Code'), its own Building Official post (Jimmy Strickland, named on the City staff directory), its own fee schedule, its own permit application and its own iWorQ permit portal. Citrus County's own code was searched independently and contains no PV provision, so there is no county floor beneath the City. Not 100 because the Building Official is not a budgeted FTE (see Q53) and part of the function is contracted.

department page checked 2026-09-13 https://www.inverness.gov/71/Community-Development

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both. The City issues and inspects building AND electrical permits itself. Fire plan review and fire inspections are the City of Inverness Fire Department. Nothing is delegated to Citrus County.

Why the confidence is not higherThe iWorQ application's Permit Type list carries BUILDING, ELECTRICAL, FIRE, GAS, MECHANICAL, PLUMBING and others as City permit types; the fee schedule prices Residential, Electrical, Mechanical, Plumbing, Gas and Roofing permits separately, and the permit application's office-use box has separate Building / Electrical / Gas / Mechanical / Plumbing fee fields plus Zoning, Engineering, Fire and Building staff-review initials.

permit portal application form checked 2026-09-13 https://invernessfl.portal.iworq.net/INVERNESSFL/new-permit/600/1932

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. A permit is required. There is no PV-specific statement anywhere in the City's published material, but PV is not within any exemption: Code Sec. 7-3 SECTION 104 requires a permit for building and electrical work, and the City's amendments add no exemption list of their own, so FBC 105.2 applies unamended.

Why the confidence is not higherProved as an absence-of-exemption rather than a positive rule. 'solar' and 'photovoltaic' were searched three independent ways with controls passing (Municode codebank index, a 3,778-document DocumentCenter name sweep, and the City's own site search) and the City publishes nothing PV-specific. Sec. 7-3 104.6.2 penalises work commenced before permit issuance at 100% of the usual fee. Held at 80 because the conclusion is inferential.

adopting ordinance (FBC Ch.1 local amendments) checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Either. A separate ELECTRICAL permit exists and is priced separately ($120 minimum), but electrical work can also ride on a building permit as subcontracted work — the application has a 'Subcontractor Work on Project: Electrical' checkbox with a Subcontractor List attachment.

Why the confidence is not higherBoth routes are on the City's own current forms; the City publishes no rule saying which applies to a PV array, because it publishes nothing about PV at all. 70 rather than higher for that reason.

permit application checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6581/Building-Department-Application-PDF

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Licensed electrical contractor or the homeowner. The Electrical Permit Checklist allows an owner to pull it with a notarised Owner/Builder Disclosure Statement — EXCEPT that item 12 states: 'if the property is listed as a company name, corporation or an LLC on the property appraiser card/deed, a licensed contractor is required to submit permit for electrical.'

Why the confidence is not higherRead first-hand off the Electrical Permit Checklist (image-only PDF, recovered by pdftoppm + tesseract). The iWorQ online form additionally requires a linked contractor with an unexpired licence and tells owner-builders to 'type in "Owner"', which is a workaround rather than a rule.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6820/Electrical-permit-checklist-PDF

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

No — registration is voluntary, but the paperwork is not. The Voluntary Registration Program costs $30.00 a year and expires every 30 September; the form states: 'This program is voluntary... If you choose not to participate in this program all items in section 11 and this form will be required per each building permit. There will be no exceptions.'

Why the confidence is not higherQuoted verbatim from the City's own Contractor Registration Application. This resolves an apparent conflict: the Electrical, Generator, Roofing and Single-Family checklists all say 'Contractor Registration Application is required', and the portal calls it 'VOLUNTARY CONTRACTOR REGISTRATION' — both are true, because the documents are mandatory and only the annual registration is optional. Section 11 requires the DBPR state licence, GL and workers' comp certificates naming the City of Inverness as certificate holder, the licence holder's driver's licence, a BTR, a Sunbiz active-status printout and a list of authorised agents on letterhead.

registration form checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/2793/Contractor-Registration-Application-PDF

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes, with a completed, signed and notarised Owner/Builder Disclosure Statement — except where the property is titled to a company, corporation or LLC, in which case a licensed contractor must pull the permit.

Why the confidence is not higherOwner/Builder Disclosure Statement appears as a required item on the Electrical, Roofing and Single-Family checklists and is published on the iWorQ portal as a downloadable form. The company/LLC carve-out is item 12 of the Electrical checklist and item 13 of the Single-Family checklist.

published form checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/383/OwnerBuilder-Disclosure-PDF

Q8 What documents make up a complete submittal? Core Submittal package

No solar submittal checklist exists. The nearest applicable instrument is the ELECTRICAL PERMIT CHECKLIST: (1) notarised Building Permit Application; (2) proof of property ownership; (3) explanation of proposed work on the application; (4) building layout plan showing the location of the electrical panel; (5) 'Include the power company on the permit and electrical panel needs to be marked'; (6) notarised Owner/Builder Disclosure if the owner is pulling it; (7) Contractor Registration pack; (8) recorded Notice of Commencement if the job is $5,000 or more.

Why the confidence is not higherThe checklist is the authority's own current document but is written for electrical work generally, not for PV. Item 5 is the only City instrument anywhere that requires the power company to be identified on a permit — worth noting for a two-utility city.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6820/Electrical-permit-checklist-PDF

Q9 How many copies, and in what format? Submittal package

Submitted online through the iWorQ portal with file uploads (.docx, .jpeg, .jpg, .png or .pdf), or in person. The only hard count published is for new single-family construction — '3 sets of engineered/sealed building plans' — and that checklist does not apply to a PV retrofit.

Why the confidence is not higherUpload file types and the mandatory 'Notarized Signature' upload are read off the live iWorQ application form; the 3-set requirement is item 5 of the Single-Family Residential Permit Checklist. No copy count is published for an electrical permit.

permit portal application form checked 2026-09-13 https://invernessfl.portal.iworq.net/INVERNESSFL/new-permit/600/1932

Q10 Is a site plan required, and what must it show? Core Submittal package

No full site plan is required for an electrical permit — the Electrical Permit Checklist asks only for a 'Building layout plan, showing the location of the electrical panel'. (By contrast the Generator Permit Checklist requires a scaled site plan showing the equipment location with measurements.) Code Sec. 7-3 104.2.4 lets the Building Official require a boundary-line survey where property lines cannot be determined in the field.

Why the confidence is not higherTwo City checklists disagree about the level of site detail for comparable exterior equipment, and neither is written for PV. The Building Official's discretionary power at 104.2.1.2 and 104.2.4 means a site plan can still be demanded case by case.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6820/Electrical-permit-checklist-PDF

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Not by the City — no City document requires a one-line or three-line diagram. The UTILITY does: SECO Energy requires a one-line diagram with its interconnection application and publishes a sample.

Why the confidence is not higherCity absence proved from the full published checklist set (21 inspection checklists, 15 permit checklists) plus a site-wide search; the SECO requirement is on its own interconnection page with a published sample one-line PDF. 70 because a City absence of this kind can still be overridden by the Building Official's discretionary power at Code Sec. 7-3 104.2.1.2.

utility published form checked 2026-09-13 https://secoenergy.com/sites/default/files/2025-10/sample-one-line-diagram.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Not required by any City document. The only calculation requirement published is 'electrical energy calculations' on the Single-Family Residential Permit Checklist, which applies to new house construction, not to a PV retrofit.

Why the confidence is not higherThis is an absence with no positive counterpart, and the Building Official may require 'details, computations, stress diagrams, and other data' under Code Sec. 7-3 104.2.1.2, so in practice it is discretionary.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6831/Single-family-residential-permit-checklist-PDF

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No published threshold. The City publishes no structural PE requirement for rooftop PV. Two discretionary hooks exist: Code Sec. 7-3 104.2.1.2 (the Building Official may require 'details, computations, stress diagrams and other data'), and Residential Roofing Permit Checklist item 12 ('The Building Official, at his discretion, may require an engineer sealed letter stating the roof was installed according to the current building code').

Why the confidence is not higherRecorded as discretionary rather than absent, because both hooks are in current City documents. New single-family construction does require sealed plans (SFR checklist item 5), but that is a different job.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6828/Residential-roof-permit-checklist-PDF

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing local. The governing threshold is state: FS 471.003(2)(h) exempts electrical work from the PE-stamp requirement below $125,000 and 600 amperes. No City document cites any figure.

Why the confidence is not higherThe City is silent, so this is the state default rather than a City answer. Flagged in line with the standing Florida note that some local documents still carry an older $50,000 trigger — Inverness carries neither figure.

state statute (city silent) checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q15 What does a residential solar permit cost? Core Fees

No solar fee line. A rooftop PV job is priced on the general schedule: Residential Permit $120.00 minimum plus 1.25% of cost of construction; or Electrical Permit $120.00 minimum, covering the first $7,500 with $10.00 for each added $1,000 of value. Florida State Surcharge 3.50% of permit value (minimum $4.00) on top. Worked example on a $25,000 system taken as a residential permit: $312.50 + $10.94 surcharge = about $323.

Why the confidence is not higherRead off the City's own Building Permit Fee Schedule, which is an image-only PDF recovered by OCR and then read directly from a 200 dpi render to get the table columns right. Held at 85 because the schedule carries NO DATE and no adopting resolution number, and because the City publishes no rule saying which of the two lines a PV array falls under.

fee schedule (undated) checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/7074/Permit-fees-PDF

Q16 How is the fee calculated? Core Fees

Valuation, with a minimum. Residential and Pool permits are a percentage of cost of construction (1.25%); Commercial, Sign and Communication Tower permits are 1.5%; Electrical, Mechanical, Plumbing, Gas, Demolition, Shed, Fence, Generator and Window/Door permits are a flat minimum covering the first $7,500 plus $10.00 per added $1,000 of value; Roofing is the minimum plus $5.00 per $1,000 of contract price.

Why the confidence is not higherDirectly off the fee schedule table. Undated document, hence 90 not 95.

fee schedule (undated) checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/7074/Permit-fees-PDF

Q17 Is there a separate plan-check fee? Fees

No separate plan-check fee is published on the fee schedule. CONFLICT: the City's own permit application has a 'Plan Review $' field in its office-use fee box, and a 'Fire Plan Review $' field beside it, so a plan review charge can evidently be raised even though no line exists for it.

Why the confidence is not higherTwo current City documents disagree. Recorded as a conflict rather than resolved; the Community Development Fee Schedule does price plan reviews for change-of-use and site plans ($25-$200) but nothing for a building permit plan review.

fee schedule checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/7073/Community-Development-Fee-Schedule-PDF

Q18 What is the stated plan-review turnaround? Core Timeline & validity

'Please allow 2-3 days for processing the permit.' That line appears identically on the Electrical, Generator, Roofing and Single-Family checklists. There is no published plan-review service standard, and the City does not publish or reference the FS 553.792 statutory timeframes anywhere.

Why the confidence is not higherThe 2-3 days figure is the authority's own repeated statement, but it is described as 'processing' rather than plan review, and it is not a commitment. The FS 553.792 absence was proved: a site search for '553.792' returned zero results while offering spelling alternatives (so the query ran), and '553.80' likewise returned zero; a 3,778-name DocumentCenter sweep contains no document with 553, 'expedit' or 'utiliz' in its name.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6820/Electrical-permit-checklist-PDF

Q19 How long is an issued permit valid before it expires? Timeline & validity

A permit becomes invalid unless work is commenced within six months of issuance, and failure to obtain an approved inspection within 180 days of the previous approved inspection constitutes suspension or abandonment. An unissued APPLICATION is void 180 days after filing (permit application) / six months after filing (Code Sec. 7-3 104.1.6). Demolition permits expire in 60 days. CONFLICT ON EXTENSIONS: Code Sec. 7-3 104.5.1 allows extensions 'for periods not more than 180 days each' with no cap, while the fee schedule prices 'Permit Extensions: $50.00 (two maximum permitted up to 90 days each)'.

Why the confidence is not higherThree City documents — the Code, the permit application and the fee schedule — say three slightly different things about extensions, and the Inspection Guideline adds a fourth framing ('it is a State Law that permits are valid for six (6) months... a $50.00 reinstatement fee'). Recorded as a conflict rather than resolved.

adopting ordinance + fee schedule checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q20 Which permit portal does this authority use? Core Portal & process

iWorQ — invernessfl.portal.iworq.net/portalhome/invernessfl. It carries permit application, existing-permit search, pre-July-2021 permit search, inspection requests, contractor registration, business tax receipts, fire inspection invoice payment and citizen code complaints.

Why the confidence is not higherLive, linked from the City's Permitting page and read directly. The portal's own 'Back' link still points at the dead domain www.inverness-fl.gov (see the jurisdiction note).

permit portal checked 2026-09-13 https://invernessfl.portal.iworq.net/portalhome/invernessfl

Q21 Can the whole application be completed online? Core Portal & process

No — not completely. The online application has an E-Signature field but also a hard required upload headed 'Notarized Signature', and the City's Permitting page states for both routes that 'The Building permit application must be submitted with the property owner and contractor signatures when using the portal.' Both the owner's and the contractor's signatures must be notarised.

Why the confidence is not higherRead off the live iWorQ form ('If submitted without file(s) listed below or with the wrong file type, application will not be accepted') and the City's Permitting page. There is no sign of the FS 489.103(7) SunShot e-signature carve-out anywhere on this City's site.

department page + portal form checked 2026-09-13 https://www.inverness.gov/586/Permitting

Q22 Which utility handles interconnection here? Core Utility interconnection

TWO electric utilities serve the City: SECO Energy (Sumter Electric Cooperative, Inc. — a Seminole Electric Cooperative member) and Duke Energy Florida, LLC. The City's own Street Lights page splits its instructions into 'Sumter Electric Customers' and 'Duke Energy Customers'. Which one serves a given address has to be established per address.

Why the confidence is not higherIdentified from the City's own operative page, not from a taxpayer schedule. Corroborated three ways: Seminole Electric's member page publishes 'Counties Served: Citrus, Hernando, Lake, Levy, Marion, Pasco, Sumter' for SECO; the City's business directory carries 'SECO - Sumter Electric Company — Electric service provider'; and the City's DocumentCenter holds Duke Energy logo assets. NOT proved from the budget: the FY2027 adopted budget carries a single undifferentiated 'FRANCHISE FEE - ELECTRICITY' ($830,000) and a single 'UTILITY SERVICE TAX-ELECTRIC' ($960,000) line, neither naming a company, and there is NO codified electric franchise at all (Code Ch. 17.5 'Public Service Tax and Franchises' contains only cable and natural gas articles; Art. I, Secs. 17.5-1—17.5-15, is Reserved; Code Sec. 20-16 levies the public service tax on 'electricity' naming no seller). Withlacoochee River Electric Cooperative also serves Citrus County per Seminole Electric but is NOT named by the City for any address inside the city limits — held at 88 for that residual uncertainty.

department page checked 2026-09-13 https://www.inverness.gov/115/Street-Lights

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel, with a hard utility gate at the end. SECO's published 10-step process puts the Interconnection Agreement at step 4, BEFORE the permit at step 5; installation is step 6, City/County inspection step 7, document and photo upload step 8, bi-directional meter step 9. The Interconnection Agreement then requires, before the system may operate, 'written certification that the RGS installation has been inspected by the local code official who has certified that the installation was permitted and has been approved', plus at least ten days' notice of the in-service date.

Why the confidence is not higherBoth the process page and the tariff-filed agreement are SECO's own current documents. Duke's sequence was not separately established for this address; the White Book says only that the customer must contact the Distribution Interconnected Generation Office before any interconnection is established.

utility process page + filed interconnection agreement checked 2026-09-13 https://secoenergy.com/interconnection-process

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Yes where the property is caught. Architectural: a Certificate of Appropriateness from the Architectural/Aesthetic Review Committee is a hard pre-condition — 'The Building Division shall not issue the building or demolition permit until a certificate of appropriateness has been issued by the committee' — for any building permit affecting the exterior architectural appearance of a property within the Central Business District OR of a historic structure anywhere within the city limits. HOA: the City's Generator Permit Checklist requires written HOA approval where the equipment is within an HOA; the Electrical Permit Checklist carries no equivalent line.

Why the confidence is not higherQuoted verbatim from LDC Sec. 2.11.B.4.i. The gate is geographic: outside the CBD, and on a house that is not a historic structure, nothing applies. The HOA line is on the nearest comparable City checklist but not on the electrical one, so it is an analogy, not a rule for PV.

land development code checked 2026-09-13 https://library.municode.com/fl/inverness/codes/land_development_code?nodeId=CO_CH2ZOLAUSDESTPASITRCOREPRLARE_S2.11REPR

Q25 Is there a historic-district review? Overlays & special cases

Yes — and this is the strongest historic gate recorded in this survey, because all three of the usual escape hatches are closed. (1) NOT limited to designated properties: LDC Sec. 2.11.B.4.i reaches 'a property within a Central Business District or historic structure within the city limits', and Sec. 2.11.B.4.g.4 gives the committee power over 'proposed or designated historic structures'. (2) Designation is NOT voluntary: the historic district IS the Central Business District, 'as designated by the Inverness Land Development Code which has been established as an historic district' — an ordinance designation, not an owner election. (3) The trigger list DOES include ALTERATION, expressly defined as 'any act or process that changes one (1) or more of the exterior architectural features of a structure, including, but not limited to, the painting, erection, construction, reconstruction, or removal of any structure'. Committee decides within 15 days; written notice within 5 days; denial appealable to City Council within 30 days; a COA is void if work has not begun one year after issuance.

Why the confidence is not higherEach of the three limbs was checked separately against the ordinance text rather than inferred from the section title. A rooftop array is an alteration of an exterior architectural feature requiring a building permit, so it is inside the trigger list on the face of the text. Held at 90 rather than 95 because the ordinance nowhere sets out a nomination procedure for individual historic structures outside the CBD, so the size of the 'historic structure within the city limits' class is not fixed by the code; the City publishes 15 plaque-programme addresses and a 1993 Historic, Architectural and Archaeological Survey as the underlying inventory.

land development code checked 2026-09-13 https://library.municode.com/fl/inverness/codes/land_development_code?nodeId=CO_CH2ZOLAUSDESTPASITRCOREPRLARE_S2.11REPR

Q26 Is a wind or windstorm certification required? Overlays & special cases

No windstorm certification instrument exists. Inverness is not HVHZ (Miami-Dade and Broward only). Code Sec. 7-3 101.4.15 fixes a local figure — 'Basic Wind Speed Line. The Basic Wind Speed for the City of Inverness shall be 110 mph' — which dates from Ord. No. 2003-616 and is a stale local number against the current FBC/ASCE 7 mapped values. The Product Approval Specification Sheet (Florida Product Approval) is demanded for roofing, underlayment, windows, doors, garage doors, soffits, truss fasteners and steel lintels; it is NOT asked for PV.

Why the confidence is not higherThe 110 mph figure is read verbatim from the current codified text but is 23 years old and sits alongside Sec. 7-4's equally stale adoption of ASCE 7-98 and 2001-edition FBC volumes. Recorded, not reconciled.

adopting ordinance checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Not for rooftop PV. Special exceptions under LDC Sec. 2.5 go to the Zoning Board of Adjustment (fee $1,000); variances go to the ZBA (fee $750, or $150 administrative); the only route to City Council is an appeal from a denied Certificate of Appropriateness, within 30 days.

Why the confidence is not higherInferred from the LDC's permitted-use and special-exception structure plus the published fee schedule; no City document addresses PV as a use at all, so no positive statement exists either way.

fee schedule + land development code checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/7073/Community-Development-Fee-Schedule-PDF

Q28 Is there a system-size cap on residential generation? Overlays & special cases

None imposed by the City. The caps are the utility's. SECO Energy: net metering limited to Tier 1 (10 kW or less), Tier 2 (>10 to 100 kW) and Tier 3 (>100 to 1,000 kW), the system 'shall be rated at no more than 1,000 kilowatts (kW) alternating current power output', and 'The rating of the system cannot exceed 90% of the customer's utility distribution service rating.' Duke Energy Florida runs the standard PSC Rule 25-6.065 tiers.

Why the confidence is not higherQuoted from SECO's filed rate tariff (Net Metering, First Revised Sheet No. 17.0). The City itself has no size provision — 'solar' and 'photovoltaic' return nothing across the Code, the LDC and the whole City site.

utility filed tariff checked 2026-09-13 https://secoenergy.com/sites/default/files/2025-10/seco_energy_rate_tariff_current.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020, as adopted statewide by the Florida Building Commission, effective 31 December 2023, under FBC 8th Edition (2023). LOCAL CONFLICT WORTH KNOWING: Code Sec. 7-4(4) still adopts by reference 'The National Electric Code, 2002 Edition, including all chapters and revisions' (Ord. No. 2003-616). That frozen local adoption is 23 years out of date and is superseded by the state code; it is not a live alternative. 90% · adopting ordinance
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023). CONFLICT: the City's paper permit application (revised 5-14-2020 / 6-8-2020) says '8th Edition (2023)', but the LIVE iWorQ online application still says 'the Florida Building Code, 7th Edition (2020), the Inverness Land Development Code, and the Inverness Code of Ordinances'. 88% · permit application vs portal form
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023). Code Sec. 9-1 adopts 'the Florida Fire Prevention Code as amended from time to time and as adopted by the Florida State Fire Marshal pursuant to F.S. Ch. 633' — a floating adoption that tracks the State Fire Marshal, so it cannot diverge from the state edition. 88% · adopting ordinance
    • Are there local amendments to any of the above? Yes, extensive — but none of them touch PV. Code Sec. 7-3 rewrites FBC Chapter 1 (department, powers, permits, fees, valuations, inspections, certificates, tests, violations, flood variances) and adds local definitions including the 110 mph basic wind speed; Sec. 7-4 adopts additional codes; Secs. 7-5 to 7-5.11 are a local Unsafe Building Code; Sec. 7-7 adopts a Property Maintenance Code; Ch. 9.5 is the local floodplain management ordinance. 92% · adopting ordinance
    • What is the installation judged against? Florida Building Code 8th Edition (2023) including FBC-Residential and FBC-Existing Building; NEC 2020 as adopted by the Florida Building Commission; the Inverness Building Code local amendments at Code Ch. 7; the Inverness Land Development Code; and FFPC 8th Edition (2023). Code Sec. 7-3 101.4.14.2 sets the tie-breaker: 'In case of a conflict between different parts of this chapter; conflicts within the same code; or conflicts between codes; the more stringent requirements shall be applicable.' 85% · adopting ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? No local amendment. Ridge setbacks and roof access pathways are whatever the Florida Fire Prevention Code, 8th Edition (2023) requires by state adoption — the City adopts the FFPC as the State Fire Marshal adopts it and adds nothing. The City of Inverness Fire Department's published fee schedule prices fire safety inspections but sets no PV standard. 60% · adopting ordinance (state default)
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes — required by NEC 2020 Article 690.12 as adopted statewide. The City says nothing: 'rapid shutdown' returns zero hits in the Code of Ordinances index, zero in the Land Development Code index and zero on the City's own site search. 82% · adopting ordinance + NEC edition in force
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? The City requires no PV placards of its own. The only City marking requirements are generic and pre-PV: 'Include the power company on the permit and electrical panel needs to be marked' (Electrical Permit Checklist item 5); 'Meter boxes must be marked' (Inspection Guideline, Rough Electric); 'Panel labeled with electrician's name and address. All circuits identified and spare breakers must be marked accordingly' (Electrical Final Checklist, Enclosures item 1). The real placard regime here is the utility's — see Q42. NEC 2020 690/705 labelling applies by code adoption. 90% · published checklist
    • Does the authority specify placard wording of its own? No. The City specifies no placard wording of its own anywhere. 85% · code index search (absence)
    • Does it specify letter height, colour or material? Not by the City. SECO ENERGY DOES, in detail: 'THE PERMANENT AND DURABLE PLACARD SHALL BE NON-FERROUS METAL OR POLY-PLASTIC PLATES, UV RESISTANT, EPOXY GLUED OR RIVETED TO THE FRONT COVER OF THE DISCONNECT SWITCH WITH ENGRAVED OR STAMPED LETTERING A MINIMUM OF 1/4" HIGH, WHITE LETTERS ON A RED BACKGROUND. THE USE OF PEEL-AND-STICK LABELS, PAINT, OR MARKING PENS TO LABEL THE PLATES IS NOT ACCEPTABLE.' Duke Energy Florida instead specifies six catalogued label part numbers with fixed sizes (3"x2", 6"x4", 9"x6") and fits them itself. 92% · utility published standard
    • Is a site plan / facility map placard required, and what must it show? Not required by the City. NEC 2020 Section 705.10 (directory of all electric power sources at the service equipment) applies by code adoption. Neither utility requires a site plan or facility map placard: SECO requires two specific placards on the disconnect and the meter enclosure, and Duke requires only its own catalogued warning and isolation labels. 60% · code adoption + utility standards
    • Does the UTILITY specify placards beyond the AHJ's? Yes — and in this city the utility placards are the entire placard regime, because the AHJ requires none. SECO ENERGY: a placard on the front cover of the utility AC disconnect switch identifying the on-site power generation source (Detail A, 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH'), and a permanent placard on the front cover of the meter enclosure indicating DUAL POWER SOURCE (Detail B). On a 400 A split-breaker service, two disconnects, plus Detail C (dual power source) and Detail D ('ON-SITE GENERATION UTILITY AC DISCONNECT 1 AND 2 MUST BE OPENED TO ISOLATE THE SOLAR SYSTEMS') on the meter enclosure. DUKE ENERGY FLORIDA: six catalogued items, installed by Duke itself — 1505316 Electric Generator Warning label 3"x2" at the meter base/primary meter, lower left; 1505322 same 6"x4" above the lock on a pad-mounted transformer; 1505691 sign 9"x6" on an overhead transformer pole 5-6 ft above ground; 1505328 Generator Isolation Device label 3"x2" near the OFF position of a small disconnect switch; 1505332 same 6"x4" on a large disconnect switch; 4205529 sign 9"x6" on a recloser/pole disconnect 5-6 ft above ground. Duke's notes: 'Signs and labels are installed by Duke Energy'; 'Install signs and labels on all KW sizes of Distributed Generation sites'; 'Clean the surface before installing labels.' 92% · utility construction standard
    • Where must the labels be placed? SECO customers: Detail A placard on the front cover of the utility AC disconnect switch; Detail B placard on the front cover of the meter enclosure. The disconnect itself must be mounted 48 inches minimum to 72 inches maximum above grade and within 5'-0" maximum of the utility meter enclosure, in line of sight. Duke customers: at the meter base (lower left) and near the OFF position of the disconnect switch, fitted by Duke. The City specifies no placement of its own. 90% · utility published standard
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Per utility, and they differ. SECO ENERGY (co-op): 'A MANUAL LOAD BREAK AC DISCONNECT SWITCH PROVIDING A LOCKABLE VISIBLE BREAK SEPARATION... SHALL BE PROVIDED. A CIRCUIT BREAKER OR MOLDED CASE SWITCH DOES NOT PROVIDE AN ACCEPTABLE VISIBLE BREAK AND IS NOT ACCEPTABLE. THE UTILITY AC DISCONNECT SWITCH SHALL BE MOUNTED ADJACENT TO THE UTILITY METER ENCLOSURE WITHIN A 5'-0" MAXIMUM DISTANCE, WITHIN LINE OF SIGHT, AND SHALL BE ACCESSIBLE AT ALL TIMES TO SECO ENERGY.' Mounting height 48" minimum to 72" maximum. No size exemption of any kind, and where an existing array is being added to, 'THE EXISTING MANUAL AC DISCONNECT SHALL BE REMOVED AND A NEW UTILITY AC DISCONNECT MUST BE INSTALLED'. Co-ops sit outside PSC Rule 25-6.065 substantively (Fla. Stat. 366.91). DUKE ENERGY FLORIDA (IOU): White Book Figure 48A, 'NET GENERATION METERING SINGLE OR THREE-PHASE, SELF-CONTAINED METERED SERVICE, RESIDENTIAL/SMALL COMMERCIAL' (rev 3 dated 3/31/24, DEF column ticked) — 'GENERATION DISCONNECT REQUIRED AT ALL CONNECTION POINTS A, B, C, OR D'; 'MUST BE LOAD-BREAK RATED, INCORPORATE A LOCKABLE OPEN POSITION, AND PROVIDE A VISIBLE OPEN'; 'MUST BE WITHIN SITE [sight] OF METERBASE AND READILY ACCESSIBLE'. PSC Rule 25-6.065(6)(a) provides that 'Inverter-based Tier 1 customer-owned renewable generation systems shall be exempt from this requirement, unless the manual disconnect switch is installed at the investor-owned utility's expense' — that is an exemption from PAYING for the switch, not from having one; Duke's own published spec still requires it. Where the rule governs placement it says 'mounted separate from, but adjacent to, the meter socket... capable of being locked in the open position with a single investor-owned utility padlock'. 92% · utility construction standard + PSC rule
    • Must equipment be on a specific approved list? Not by the City for PV. Florida Product Approval via the Product Approval Specification Sheet is required for roofing, underlayment, windows, mullions, skylights, exterior doors, garage doors, soffits, truss fasteners and steel lintels — PV is not on that list. The utilities do impose listing requirements: SECO requires the system, inverters and associated equipment to adhere to IEEE-1547, UL-1741, the NEC and, where applicable, FSEC Std. 203-10, with the inverter submitted to an OSHA-approved NRTL; Duke requires the generation system to be 'CERTIFIED AS UL 1741 AND IEEE 1547 COMPLIANT'. 80% · utility filed interconnection agreement
    • Are batteries permitted, and under what conditions? The City has no battery or ESS provision of any kind — no permit type, no inspection type, no code section. FBC-Residential and FFPC 8th Ed. (2023) apply by adoption. SECO Energy does address storage: its standards carry a dedicated sheet, 'ENERGY STORAGE SYSTEM WITH RENEWABLE GENERATION SYSTEM UTILITY AC DISCONNECT REQUIREMENTS' (Detail D), and on a split service each AC disconnect 'MUST ISOLATE BOTH THE RGS AND THE ENERGY STORAGE SYSTEMS IF APPLICABLE'. 70% · utility standard + portal type lists
    • Is there a separate ESS permit or inspection? No. The iWorQ Permit Type list (BUILDING, CHANGE OF USE, DEMOLITION, ELECTRICAL, FIRE, GAS, MECHANICAL, OTHER, PLUMBING, RIGHT OF WAY, SIDEWALK CAFE, SIGN, SITE, TREE REMOVAL, ZONING VERIFICATION) has no ESS or battery type, and the 60-entry inspection-type list has none either. 75% · permit portal type list
    • Is a ground mount treated as a structure? Yes, by inference — a ground-mounted array is a detached accessory structure. The LDC defines 'Accessory building or structure' as 'a detached building or structure... customarily clearly incidental and subordinate to that of the principal building', and the historic ordinance defines 'Structure' as 'anything constructed or erected, the use of which requires permanent or temporary location on or in the ground'. LDC Sec. 2.8.C then applies: no detached structure in any part of the front yard; one accessory structure may sit in the side yard behind the front setback with the principal building's setbacks, screened on front and side by a six-foot wood privacy fence or masonry wall; not closer to a side lot line than half the principal building's minimum; not closer than five feet to the rear lot line; maximum 15 feet in height in a residential district; not more than 30 percent of the rear yard; not more than three accessory buildings per residential lot. 65% · land development code
    • Is there a local rule on service upgrades or busbar sizing? No local rule on service upgrades or busbar sizing. What the City does publish on enclosures is generic and predates PV: the Inspection Guideline's Rough Electric stage requires 'Meter boxes must be marked', and the Electrical Final Checklist requires 'Panel labeled with electrician's name and address. All circuits identified and spare breakers must be marked accordingly.' Nothing on the 120% rule, feeder taps or supply-side connections. 70% · published checklist
    • Is a specific mounting system or attachment spacing required? Nothing published. No mounting system, attachment spacing, flashing or racking requirement exists in the Code, the LDC or any City checklist. The Product Approval Specification Sheet (Florida Product Approval numbers, manufacturer, product description) is required for roofing and underlayment on a roofing permit but is not asked for PV racking or modules. 65% · published form

20 questions answered against City of Inverness’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020, as adopted statewide by the Florida Building Commission, effective 31 December 2023, under FBC 8th Edition (2023). LOCAL CONFLICT WORTH KNOWING: Code Sec. 7-4(4) still adopts by reference 'The National Electric Code, 2002 Edition, including all chapters and revisions' (Ord. No. 2003-616). That frozen local adoption is 23 years out of date and is superseded by the state code; it is not a live alternative.

Why the confidence is not higherState position is the settled Florida baseline. The stale local adoption was read first-hand from the current codified text (Supp. 54, codified through Ord. No. 2026-853 enacted 3 Feb 2026) — it has never been updated. Unlike a floating 'most current edition' adoption, this one points backwards, so it cannot outrun the state.

adopting ordinance checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-4ADSTBUCOAD

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023). CONFLICT: the City's paper permit application (revised 5-14-2020 / 6-8-2020) says '8th Edition (2023)', but the LIVE iWorQ online application still says 'the Florida Building Code, 7th Edition (2020), the Inverness Land Development Code, and the Inverness Code of Ordinances'.

Why the confidence is not higherBoth documents are current and in use; the online one is the more likely to be read by an applicant and is the wrong one. Recorded as a stale-document artefact rather than resolved. Note also Code Sec. 7-4 still adopts 2001-edition FBC Plumbing/Mechanical/Fuel Gas volumes.

permit application vs portal form checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6581/Building-Department-Application-PDF

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023). Code Sec. 9-1 adopts 'the Florida Fire Prevention Code as amended from time to time and as adopted by the Florida State Fire Marshal pursuant to F.S. Ch. 633' — a floating adoption that tracks the State Fire Marshal, so it cannot diverge from the state edition.

Why the confidence is not higherThe qualifier 'as adopted by the Florida State Fire Marshal' is what makes this floating adoption safe, in contrast to floating adoptions elsewhere in Florida whose literal words outrun the state. Enforced locally by the City of Inverness Fire Department, which has its own published inspection fee schedule.

adopting ordinance checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH9FIPRPR_S9-1COAD

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, extensive — but none of them touch PV. Code Sec. 7-3 rewrites FBC Chapter 1 (department, powers, permits, fees, valuations, inspections, certificates, tests, violations, flood variances) and adds local definitions including the 110 mph basic wind speed; Sec. 7-4 adopts additional codes; Secs. 7-5 to 7-5.11 are a local Unsafe Building Code; Sec. 7-7 adopts a Property Maintenance Code; Ch. 9.5 is the local floodplain management ordinance.

Why the confidence is not higherRead the whole of Chapter 7 (131 KB from the content API) and Chapter 9.5. 'solar', 'photovoltaic', 'inverter', 'rapid shutdown' and 'net metering' all return zero across the Code of Ordinances index; 'solar' returns exactly one hit and it is contaminated (Sec. 12-27, a business tax classification schedule).

adopting ordinance checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE

Q33 What is the installation judged against? Core Electrical

Florida Building Code 8th Edition (2023) including FBC-Residential and FBC-Existing Building; NEC 2020 as adopted by the Florida Building Commission; the Inverness Building Code local amendments at Code Ch. 7; the Inverness Land Development Code; and FFPC 8th Edition (2023). Code Sec. 7-3 101.4.14.2 sets the tie-breaker: 'In case of a conflict between different parts of this chapter; conflicts within the same code; or conflicts between codes; the more stringent requirements shall be applicable.'

Why the confidence is not higherThe stack is assembled from the adopting sections rather than from any single City statement; the City publishes no code-editions page of its own.

adopting ordinance checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local rule on service upgrades or busbar sizing. What the City does publish on enclosures is generic and predates PV: the Inspection Guideline's Rough Electric stage requires 'Meter boxes must be marked', and the Electrical Final Checklist requires 'Panel labeled with electrician's name and address. All circuits identified and spare breakers must be marked accordingly.' Nothing on the 120% rule, feeder taps or supply-side connections.

Why the confidence is not higherAbsence proved against the full published checklist set and the codified electrical provisions; NEC 705.12 therefore applies unamended. 70 because an absence of this kind is always subject to inspector practice.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6844/Electrical-final-inspection-checklist-PDF

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published. No mounting system, attachment spacing, flashing or racking requirement exists in the Code, the LDC or any City checklist. The Product Approval Specification Sheet (Florida Product Approval numbers, manufacturer, product description) is required for roofing and underlayment on a roofing permit but is not asked for PV racking or modules.

Why the confidence is not higherAbsence proved across all three search routes with controls. Held at 65 because Code Sec. 7-3 104.2.1.2 and Roofing Checklist item 12 both give the Building Official discretion to demand engineering, so a case-by-case requirement is live.

published form checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6582/Product-Approval-Form-PDF

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

No local amendment. Ridge setbacks and roof access pathways are whatever the Florida Fire Prevention Code, 8th Edition (2023) requires by state adoption — the City adopts the FFPC as the State Fire Marshal adopts it and adds nothing. The City of Inverness Fire Department's published fee schedule prices fire safety inspections but sets no PV standard.

Why the confidence is not higherThis is a state-default answer, not a City answer. The City's fire chapter was read in full; it contains no technical amendment of any kind. 60 because the operative pathway dimensions were not read out of the FFPC itself in this run.

adopting ordinance (state default) checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH9FIPRPR_S9-1COAD

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — required by NEC 2020 Article 690.12 as adopted statewide. The City says nothing: 'rapid shutdown' returns zero hits in the Code of Ordinances index, zero in the Land Development Code index and zero on the City's own site search.

Why the confidence is not higherThe requirement comes entirely from the adopted NEC edition (see Q29); the local NEC 2002 adoption at Sec. 7-4(4) predates rapid shutdown entirely and is superseded. Controls passed on all three absence searches.

adopting ordinance + NEC edition in force checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-4ADSTBUCOAD

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

The City requires no PV placards of its own. The only City marking requirements are generic and pre-PV: 'Include the power company on the permit and electrical panel needs to be marked' (Electrical Permit Checklist item 5); 'Meter boxes must be marked' (Inspection Guideline, Rough Electric); 'Panel labeled with electrician's name and address. All circuits identified and spare breakers must be marked accordingly' (Electrical Final Checklist, Enclosures item 1). The real placard regime here is the utility's — see Q42. NEC 2020 690/705 labelling applies by code adoption.

Why the confidence is not higherThree City documents read first-hand, two of them recovered by OCR. The City-level absence is proved three ways with controls passing. Electrical Permit Checklist item 5 is unusual and worth carrying: in a two-utility city the power company has to be named on the permit.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6820/Electrical-permit-checklist-PDF

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. The City specifies no placard wording of its own anywhere.

Why the confidence is not higherSearched 'placard' (2 hits in the Code, both unrelated — FBC Ch.1 'permit card or placard' and a parks regulation), 'label' (3 hits, all business-tax or franchise), 'signage' (2 hits, both land-use). Site-wide search and the 3,778-document DocumentCenter sweep turned up nothing. Controls passed.

code index search (absence) checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Not by the City. SECO ENERGY DOES, in detail: 'THE PERMANENT AND DURABLE PLACARD SHALL BE NON-FERROUS METAL OR POLY-PLASTIC PLATES, UV RESISTANT, EPOXY GLUED OR RIVETED TO THE FRONT COVER OF THE DISCONNECT SWITCH WITH ENGRAVED OR STAMPED LETTERING A MINIMUM OF 1/4" HIGH, WHITE LETTERS ON A RED BACKGROUND. THE USE OF PEEL-AND-STICK LABELS, PAINT, OR MARKING PENS TO LABEL THE PLATES IS NOT ACCEPTABLE.' Duke Energy Florida instead specifies six catalogued label part numbers with fixed sizes (3"x2", 6"x4", 9"x6") and fits them itself.

Why the confidence is not higherQuoted verbatim from SECO Energy's Renewable Generation System Standards (sheets revised 8-01-2023 and 2/26/2025, published as final 2026) and from Duke's White Book Section VI-E. This is a genuine, enforceable material-and-letter-height spec for a residential job — unlike Duke's Section VII.B 5"x8"/half-inch spec, which applies only to three-phase modular meter centres and must not be quoted for a house.

utility published standard checked 2026-09-13 https://secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Not required by the City. NEC 2020 Section 705.10 (directory of all electric power sources at the service equipment) applies by code adoption. Neither utility requires a site plan or facility map placard: SECO requires two specific placards on the disconnect and the meter enclosure, and Duke requires only its own catalogued warning and isolation labels.

Why the confidence is not higherRecorded as a state-code default with both utility specs checked for a map/directory requirement and neither having one. 60 because the NEC text was not read out in this run.

code adoption + utility standards checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-4ADSTBUCOAD

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes — and in this city the utility placards are the entire placard regime, because the AHJ requires none. SECO ENERGY: a placard on the front cover of the utility AC disconnect switch identifying the on-site power generation source (Detail A, 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH'), and a permanent placard on the front cover of the meter enclosure indicating DUAL POWER SOURCE (Detail B). On a 400 A split-breaker service, two disconnects, plus Detail C (dual power source) and Detail D ('ON-SITE GENERATION UTILITY AC DISCONNECT 1 AND 2 MUST BE OPENED TO ISOLATE THE SOLAR SYSTEMS') on the meter enclosure. DUKE ENERGY FLORIDA: six catalogued items, installed by Duke itself — 1505316 Electric Generator Warning label 3"x2" at the meter base/primary meter, lower left; 1505322 same 6"x4" above the lock on a pad-mounted transformer; 1505691 sign 9"x6" on an overhead transformer pole 5-6 ft above ground; 1505328 Generator Isolation Device label 3"x2" near the OFF position of a small disconnect switch; 1505332 same 6"x4" on a large disconnect switch; 4205529 sign 9"x6" on a recloser/pole disconnect 5-6 ft above ground. Duke's notes: 'Signs and labels are installed by Duke Energy'; 'Install signs and labels on all KW sizes of Distributed Generation sites'; 'Clean the surface before installing labels.'

Why the confidence is not higherBoth specs read first-hand: SECO's from its own published Renewable Generation System Standards, Duke's from the White Book 'Requirements for Electric Service and Meter Installations, Florida Service Area, Revised April 1, 2026' (124 pages, downloaded by plain curl and extracted with pdftotext -layout). 'ALL KW SIZES' reaches a domestic rooftop array. The commercial figure adds 'WARNING LABEL PROVIDED/INSTALLED BY DUKE ENERGY MUST BE PLACED AT METER AND GENERATOR DISCONNECT'; Figure 48A, the residential/small-commercial sheet, points to Section VI for the same requirement. Note the split in who fits them: Duke fits its own, SECO's are the installer's to fit.

utility construction standard checked 2026-09-13 https://www.duke-energy.com/-/media/pdfs/partner-with-us/construction-toolbox/white-book.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

SECO customers: Detail A placard on the front cover of the utility AC disconnect switch; Detail B placard on the front cover of the meter enclosure. The disconnect itself must be mounted 48 inches minimum to 72 inches maximum above grade and within 5'-0" maximum of the utility meter enclosure, in line of sight. Duke customers: at the meter base (lower left) and near the OFF position of the disconnect switch, fitted by Duke. The City specifies no placement of its own.

Why the confidence is not higherDimensions read off SECO's standard sheets (48" Min / 72" Max and 5'-0" Maximum are printed on the elevation details); Duke placements from the White Book Section VI-E table. This is the third Florida utility in this survey with an explicit distance figure, against a run of three that had none.

utility published standard checked 2026-09-13 https://secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Not by the City for PV. Florida Product Approval via the Product Approval Specification Sheet is required for roofing, underlayment, windows, mullions, skylights, exterior doors, garage doors, soffits, truss fasteners and steel lintels — PV is not on that list. The utilities do impose listing requirements: SECO requires the system, inverters and associated equipment to adhere to IEEE-1547, UL-1741, the NEC and, where applicable, FSEC Std. 203-10, with the inverter submitted to an OSHA-approved NRTL; Duke requires the generation system to be 'CERTIFIED AS UL 1741 AND IEEE 1547 COMPLIANT'.

Why the confidence is not higherCity position read off the Product Approval form and the checklists; utility positions from SECO's filed Interconnection Agreement (clause 3 and clause 6) and Duke's White Book figure notes.

utility filed interconnection agreement checked 2026-09-13 https://secoenergy.com/sites/default/files/2025-10/seco_energy_rate_tariff_current.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

The City has no battery or ESS provision of any kind — no permit type, no inspection type, no code section. FBC-Residential and FFPC 8th Ed. (2023) apply by adoption. SECO Energy does address storage: its standards carry a dedicated sheet, 'ENERGY STORAGE SYSTEM WITH RENEWABLE GENERATION SYSTEM UTILITY AC DISCONNECT REQUIREMENTS' (Detail D), and on a split service each AC disconnect 'MUST ISOLATE BOTH THE RGS AND THE ENERGY STORAGE SYSTEMS IF APPLICABLE'.

Why the confidence is not higherCity absence proved from the enumerated iWorQ permit-type and inspection-type lists plus the code index. 70 because the state fire and residential code requirements for ESS were not read out in this run.

utility standard + portal type lists checked 2026-09-13 https://secoenergy.com/sites/default/files/2026-04/renewable-generation-system-standards-final-2026.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No. The iWorQ Permit Type list (BUILDING, CHANGE OF USE, DEMOLITION, ELECTRICAL, FIRE, GAS, MECHANICAL, OTHER, PLUMBING, RIGHT OF WAY, SIDEWALK CAFE, SIGN, SITE, TREE REMOVAL, ZONING VERIFICATION) has no ESS or battery type, and the 60-entry inspection-type list has none either.

Why the confidence is not higherThese are the authority's own operative enumerations, readable without a login, and they are the best evidence available that no separate ESS permit exists. An ESS job would go in as ELECTRICAL or OTHER.

permit portal type list checked 2026-09-13 https://invernessfl.portal.iworq.net/INVERNESSFL/new-permit/600/1932

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes, by inference — a ground-mounted array is a detached accessory structure. The LDC defines 'Accessory building or structure' as 'a detached building or structure... customarily clearly incidental and subordinate to that of the principal building', and the historic ordinance defines 'Structure' as 'anything constructed or erected, the use of which requires permanent or temporary location on or in the ground'. LDC Sec. 2.8.C then applies: no detached structure in any part of the front yard; one accessory structure may sit in the side yard behind the front setback with the principal building's setbacks, screened on front and side by a six-foot wood privacy fence or masonry wall; not closer to a side lot line than half the principal building's minimum; not closer than five feet to the rear lot line; maximum 15 feet in height in a residential district; not more than 30 percent of the rear yard; not more than three accessory buildings per residential lot.

Why the confidence is not higherNo PV-specific provision exists, so this is applied by definition rather than by a rule written for arrays — the same gap recorded at other Florida authorities. In a flood hazard area Code Sec. 9.5-42(a)(3) also requires it to be 'anchored to prevent flotation, collapse or lateral movement'.

land development code checked 2026-09-13 https://library.municode.com/fl/inverness/codes/land_development_code?nodeId=CO_CH2ZOLAUSDESTPASITRCOREPRLARE_S2.8LABUVISCTRRE

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Per utility, and they differ. SECO ENERGY (co-op): 'A MANUAL LOAD BREAK AC DISCONNECT SWITCH PROVIDING A LOCKABLE VISIBLE BREAK SEPARATION... SHALL BE PROVIDED. A CIRCUIT BREAKER OR MOLDED CASE SWITCH DOES NOT PROVIDE AN ACCEPTABLE VISIBLE BREAK AND IS NOT ACCEPTABLE. THE UTILITY AC DISCONNECT SWITCH SHALL BE MOUNTED ADJACENT TO THE UTILITY METER ENCLOSURE WITHIN A 5'-0" MAXIMUM DISTANCE, WITHIN LINE OF SIGHT, AND SHALL BE ACCESSIBLE AT ALL TIMES TO SECO ENERGY.' Mounting height 48" minimum to 72" maximum. No size exemption of any kind, and where an existing array is being added to, 'THE EXISTING MANUAL AC DISCONNECT SHALL BE REMOVED AND A NEW UTILITY AC DISCONNECT MUST BE INSTALLED'. Co-ops sit outside PSC Rule 25-6.065 substantively (Fla. Stat. 366.91). DUKE ENERGY FLORIDA (IOU): White Book Figure 48A, 'NET GENERATION METERING SINGLE OR THREE-PHASE, SELF-CONTAINED METERED SERVICE, RESIDENTIAL/SMALL COMMERCIAL' (rev 3 dated 3/31/24, DEF column ticked) — 'GENERATION DISCONNECT REQUIRED AT ALL CONNECTION POINTS A, B, C, OR D'; 'MUST BE LOAD-BREAK RATED, INCORPORATE A LOCKABLE OPEN POSITION, AND PROVIDE A VISIBLE OPEN'; 'MUST BE WITHIN SITE [sight] OF METERBASE AND READILY ACCESSIBLE'. PSC Rule 25-6.065(6)(a) provides that 'Inverter-based Tier 1 customer-owned renewable generation systems shall be exempt from this requirement, unless the manual disconnect switch is installed at the investor-owned utility's expense' — that is an exemption from PAYING for the switch, not from having one; Duke's own published spec still requires it. Where the rule governs placement it says 'mounted separate from, but adjacent to, the meter socket... capable of being locked in the open position with a single investor-owned utility padlock'.

Why the confidence is not higherAll three documents read first-hand this run: SECO's standards PDF, Duke's White Book (rev. 1 April 2026) extracted with pdftotext -layout, and the official Rule 25-6.065 .doc downloaded from flrules.org (notice file ID 5455200, effective 4/7/2008, chapter 'ELECTRIC SERVICE BY ELECTRIC PUBLIC UTILITIES' — which is itself why it does not bind SECO). Held at 92 rather than 95 because Duke's filed Tier 1 Standard Interconnection Agreement, which would settle who pays, was not retrieved.

utility construction standard + PSC rule checked 2026-09-13 https://www.duke-energy.com/-/media/pdfs/partner-with-us/construction-toolbox/white-book.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal. Inspections are requested through the iWorQ portal's 'Request An Inspection' form, which requires the contractor's ACCESS CODE (obtainable by email from the portal), an inspection type from a fixed list and a date from a published calendar. Phone is the fallback: (352) 726-3401. 88% · permit portal
    • How much notice is required? No stated notice period, but a hard constraint: 'Inspections are scheduled only on Mondays, Wednesdays and Fridays.' The portal's live availability calendar at the time of checking offered the next weekday from the following day onward, i.e. roughly one business day. Fire inspections: 'PLEASE ALLOW UP TO 5 DAYS FOR FIRE INSPECTIONS.' 80% · department page + portal
    • Are same-day or AM/PM windows offered? Not offered. The portal books a day, not a window, and no AM/PM or same-day option is published. The only scheduling variable published is the Monday/Wednesday/Friday restriction. 65% · permit portal
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the City performs its own inspections, through its Building Official. But there is NO solar inspection type: the portal's 60-entry inspection-type list contains ELECTRIC 1ST ROUGH, ELECTRIC 2ND ROUGH, ELECTRIC ABOVE-CEILING, ELECTRIC DISCONNECT, ELECTRIC FINAL, ELECTRIC METER POWER-UP, ROOF IN-PROGRESS, ROOF FINAL, ROOF SHEATHING, ROOF TIE-IN, STRUCTURAL and FINAL — and nothing headed solar or PV. 82% · permit portal inspection type list
    • If delegated, to whom? Not delegated. Fire safety inspections are the City of Inverness Fire Department's, priced on the City's own fire fee schedule. NOTE ON HOW THE FUNCTION IS STAFFED: the City has a named Building Official (Jimmy Strickland, Community Development, ext. 1102) but the post is NOT a budgeted FTE — the FY2027 Adopted Budget's personnel schedule shows Community Development at 3.00 FTE across FY2026 and FY2027 (CDD Director, Development Review Coordinator, Code Compliance Technician) against Contractual Services of $212,000 (FY2026 budget) and $217,000 (FY2027 proposed), set against Building Permits revenue of $450,000. The building-inspection function is therefore substantially contracted while the City remains the legal AHJ. 75% · adopted budget line-item appendix (FY2027 Tentative)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? No published PV sequence. Derived from the portal's own inspection types and the City's Inspection Guideline, a rooftop retrofit would run: ELECTRIC FINAL, then FINAL; with ROOF IN-PROGRESS and ROOF FINAL added if the roof covering or deck is opened, and ELECTRIC METER POWER-UP where a new meter or service is set. The Inspection Guideline's general rule is that 'the building official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection' (Code Sec. 7-3 105.6). 65% · published inspection guideline + portal type list
    • Is a rough-in or mid-roof inspection required? Not for a PV retrofit — nothing is published. For roof work it is: 'Partial roof or Roof in Progress... Do not start shingling until after the partial roof inspection has passed. A ladder must be on-site for the Building Official use for this inspection.' For new electrical work the Rough Electric stage comes 'Before framing inspection... All conductors pulled (Including low voltage) and home runs complete. Meter boxes must be marked.' 60% · published inspection guideline
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes — 21 published inspection checklists plus a two-page Inspection Guideline, including Electrical Final, Electrical Rough, Electrical In-Ground, Building Final, Roof, Rough Framing, T-Pole and Change of Use. NONE of them is solar-specific, and none mentions PV. 95% · department page
    • What must be on site at inspection? A recorded Notice of Commencement, posted on the job site 'BEFORE THE FIRST INSPECTION' (required where the job is $5,000 or more, recorded at the Citrus County Clerk of Courts, 120 N. Montgomery Avenue); the permit card, which the inspector signs and dates on pass; the approved plans, which must be returned to their original location; and a ladder where roof or attic access is needed — 'Ladders must be provided for the Building Officials for inspections.' The Generator checklist additionally requires site plans and equipment specifications to be on site, which is the nearest analogue for PV. 80% · published inspection guideline + permit application
    • Does the inspector verify labels and listings? Yes for listings and panel labelling generally. The Electrical Final Checklist's first General item is '1. All fixtures must be listed and suitable for location used', and its Enclosures section requires 'Panel labeled with electrician's name and address. All circuits identified and spare breakers must be marked accordingly.' There is no PV-specific label verification, because the City requires no PV labels. 80% · published checklist
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? For a PV retrofit, a passed final inspection recorded on the signed and dated permit card, and a Certificate of Completion ($30.00 on the fee schedule). A Certificate of Occupancy ($30.00) is the instrument for a building — Code Sec. 7-3 106.1.2 issues it 'Upon completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems... and after the final inspection'. 65% · fee schedule + adopting ordinance
    • Who notifies the utility for PTO? The installer or the member — not the City. SECO Energy's filed Interconnection Agreement clause 2: 'The Member agrees to provide the Cooperative with written certification that the RGS installation has been inspected by the local code official who has certified that the installation was permitted and has been approved and has met all electrical and mechanical requirements. Such certification shall be delivered to Cooperative prior to the operation of the RGS.' Clause 5 requires at least ten days' notice before the in-service date. The published process then has the contractor or member upload documents and system photos (5-7 business days for SECO approval) before SECO sets the bi-directional meter. Duke customers go through Duke's own interconnection application process. The City notifies nobody. 85% · utility filed interconnection agreement
    • Is there a re-inspection fee? Yes. Re-Inspections Fees: First $50.00, Second $75.00 (Building Permit Fee Schedule). The checklists put it more bluntly: 'Failed inspections will be charged $50.00; and must be paid prior to final inspection', and the Inspection Guideline adds 'The reinspection fee is required to be paid prior to the re-inspection taking place.' The fire re-inspection fee for an unnecessary or information-only trip is $35.00. 88% · fee schedule (undated)
    • How are corrections issued and cleared? The inspector either releases that portion of the work or 'shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical codes' (Code Sec. 7-3 105.6). In practice, per the Electrical Final Checklist: 'Return plans to original location, sign and date permit card, or leave correction notice with items listed.' A correction notice is cleared by paying the re-inspection fee and booking RE-INSPECTION, which is its own type on the portal. Revision Fees are $100.00. 80% · adopting ordinance + published checklist

14 questions answered against City of Inverness’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal. Inspections are requested through the iWorQ portal's 'Request An Inspection' form, which requires the contractor's ACCESS CODE (obtainable by email from the portal), an inspection type from a fixed list and a date from a published calendar. Phone is the fallback: (352) 726-3401.

Why the confidence is not higherRead off the live portal. The City's checklists also carry the phone number; fire inspections are explicitly booked by phone ('PLEASE CALL 352-726-3401 TO SCHEDULE').

permit portal checked 2026-09-13 https://invernessfl.portal.iworq.net/INVERNESSFL/permits/600

Q50 How much notice is required? Core Booking & scheduling

No stated notice period, but a hard constraint: 'Inspections are scheduled only on Mondays, Wednesdays and Fridays.' The portal's live availability calendar at the time of checking offered the next weekday from the following day onward, i.e. roughly one business day. Fire inspections: 'PLEASE ALLOW UP TO 5 DAYS FOR FIRE INSPECTIONS.'

Why the confidence is not higherThe Mon/Wed/Fri rule appears identically on four City checklists, on the Permitting page and on the portal itself, so it is solid. The one-day figure is observed from the live calendar rather than published, hence 80.

department page + portal checked 2026-09-13 https://www.inverness.gov/653/Online-Permitting-Portal

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Not offered. The portal books a day, not a window, and no AM/PM or same-day option is published. The only scheduling variable published is the Monday/Wednesday/Friday restriction.

Why the confidence is not higherAn absence: the live scheduler exposes a date picker and an inspection type and nothing else. 65 because practice by phone may differ from what the portal exposes.

permit portal checked 2026-09-13 https://invernessfl.portal.iworq.net/INVERNESSFL/permits/600

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the City performs its own inspections, through its Building Official. But there is NO solar inspection type: the portal's 60-entry inspection-type list contains ELECTRIC 1ST ROUGH, ELECTRIC 2ND ROUGH, ELECTRIC ABOVE-CEILING, ELECTRIC DISCONNECT, ELECTRIC FINAL, ELECTRIC METER POWER-UP, ROOF IN-PROGRESS, ROOF FINAL, ROOF SHEATHING, ROOF TIE-IN, STRUCTURAL and FINAL — and nothing headed solar or PV.

Why the confidence is not higherThe inspection-type list is the authority's own operative enumeration, read directly from the live portal. Held at 82 because the City is silent on which types it applies to a PV job.

permit portal inspection type list checked 2026-09-13 https://invernessfl.portal.iworq.net/INVERNESSFL/permits/600

Q53 If delegated, to whom? Core Who inspects

Not delegated. Fire safety inspections are the City of Inverness Fire Department's, priced on the City's own fire fee schedule. NOTE ON HOW THE FUNCTION IS STAFFED: the City has a named Building Official (Jimmy Strickland, Community Development, ext. 1102) but the post is NOT a budgeted FTE — the FY2027 Adopted Budget's personnel schedule shows Community Development at 3.00 FTE across FY2026 and FY2027 (CDD Director, Development Review Coordinator, Code Compliance Technician) against Contractual Services of $212,000 (FY2026 budget) and $217,000 (FY2027 proposed), set against Building Permits revenue of $450,000. The building-inspection function is therefore substantially contracted while the City remains the legal AHJ.

Why the confidence is not higherNo FS 553.80(7)(b) utilization report is published — '553.80' returns zero on the City's own search (with spelling suggestions offered, so the query ran) and no document in a 3,778-name DocumentCenter sweep carries 553, 'utiliz' or 'expedit' in its name. The adopted budget's line-item appendix is the substitute, as the standing method says, and it is read across six years (FY2022 actual through FY2027 proposed). Direction of travel is OUTWARD, not inward: contractual services rose from $151,453 (FY2022 actual) to $217,000 (FY2027 proposed) while FTE stayed flat at 3.00. The budget does not name the contractor, so the inference that the Building Official is paid out of that line is mine — hence 75, not higher.

adopted budget line-item appendix (FY2027 Tentative) checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/10390

Q54 Which inspections are required, and in what order? Core Stages & sequence

No published PV sequence. Derived from the portal's own inspection types and the City's Inspection Guideline, a rooftop retrofit would run: ELECTRIC FINAL, then FINAL; with ROOF IN-PROGRESS and ROOF FINAL added if the roof covering or deck is opened, and ELECTRIC METER POWER-UP where a new meter or service is set. The Inspection Guideline's general rule is that 'the building official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection' (Code Sec. 7-3 105.6).

Why the confidence is not higherInferred from enumerated types rather than from a published PV sequence, which does not exist. The Roofing checklist states that 'Roofing permits will require a minimum of 2 inspections', which is the nearest published count for comparable work.

published inspection guideline + portal type list checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6852/Inspection-guideline-PDF

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Not for a PV retrofit — nothing is published. For roof work it is: 'Partial roof or Roof in Progress... Do not start shingling until after the partial roof inspection has passed. A ladder must be on-site for the Building Official use for this inspection.' For new electrical work the Rough Electric stage comes 'Before framing inspection... All conductors pulled (Including low voltage) and home runs complete. Meter boxes must be marked.'

Why the confidence is not higherBoth quotations are from the City's current Inspection Guideline, but neither is written for a rooftop array. 60 because whether a mid-course inspection is called is at the Building Official's discretion under Code Sec. 7-3 105.6.

published inspection guideline checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6852/Inspection-guideline-PDF

Q56 Does the inspector verify labels and listings? Core What is checked

Yes for listings and panel labelling generally. The Electrical Final Checklist's first General item is '1. All fixtures must be listed and suitable for location used', and its Enclosures section requires 'Panel labeled with electrician's name and address. All circuits identified and spare breakers must be marked accordingly.' There is no PV-specific label verification, because the City requires no PV labels.

Why the confidence is not higherRead first-hand off the published checklist. The checklist carries its own caveat — 'THESE GUIDELINES ARE NOT ALL INCLUSIVE' — so it is a floor, not a ceiling.

published checklist checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6844/Electrical-final-inspection-checklist-PDF

Q57 Is there a published inspection checklist? Core What is checked

Yes — 21 published inspection checklists plus a two-page Inspection Guideline, including Electrical Final, Electrical Rough, Electrical In-Ground, Building Final, Roof, Rough Framing, T-Pole and Change of Use. NONE of them is solar-specific, and none mentions PV.

Why the confidence is not higherThe full Inspection Checklists page was read and every document link enumerated; the electrical ones were downloaded and read. This is an unusually complete published set for a city of 7,500.

department page checked 2026-09-13 https://www.inverness.gov/607/Inspection-Checklists

Q58 What must be on site at inspection? Core Documents on site

A recorded Notice of Commencement, posted on the job site 'BEFORE THE FIRST INSPECTION' (required where the job is $5,000 or more, recorded at the Citrus County Clerk of Courts, 120 N. Montgomery Avenue); the permit card, which the inspector signs and dates on pass; the approved plans, which must be returned to their original location; and a ladder where roof or attic access is needed — 'Ladders must be provided for the Building Officials for inspections.' The Generator checklist additionally requires site plans and equipment specifications to be on site, which is the nearest analogue for PV.

Why the confidence is not higherAssembled from the permit application's warning to owner, the Electrical Final Checklist item 6, the Inspection Guideline and the Roofing and Generator checklists. Every PV job exceeds the $5,000 NOC threshold in practice.

published inspection guideline + permit application checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/6852/Inspection-guideline-PDF

Q59 Is there a re-inspection fee? Corrections & re-inspection

Yes. Re-Inspections Fees: First $50.00, Second $75.00 (Building Permit Fee Schedule). The checklists put it more bluntly: 'Failed inspections will be charged $50.00; and must be paid prior to final inspection', and the Inspection Guideline adds 'The reinspection fee is required to be paid prior to the re-inspection taking place.' The fire re-inspection fee for an unnecessary or information-only trip is $35.00.

Why the confidence is not higherFee schedule read from a 200 dpi render of an image-only PDF. 88 because the schedule is undated and carries no adopting resolution number, and because no third-and-subsequent re-inspection fee is published.

fee schedule (undated) checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/7074/Permit-fees-PDF

Q60 How are corrections issued and cleared? Corrections & re-inspection

The inspector either releases that portion of the work or 'shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical codes' (Code Sec. 7-3 105.6). In practice, per the Electrical Final Checklist: 'Return plans to original location, sign and date permit card, or leave correction notice with items listed.' A correction notice is cleared by paying the re-inspection fee and booking RE-INSPECTION, which is its own type on the portal. Revision Fees are $100.00.

Why the confidence is not higherThree current City sources agree. 80 because no written turnaround or appeal route for a correction notice is published (code-interpretation appeals go to the Zoning Board of Adjustment, which Code Sec. 7-3 101.4.15 designates as 'the Board').

adopting ordinance + published checklist checked 2026-09-13 https://library.municode.com/fl/inverness/codes/code_of_ordinances?nodeId=PTIICOOR_CH7BUBURE_S7-3FLBUCOCH1AM

Q61 What is issued on pass? Core Final sign-off & PTO

For a PV retrofit, a passed final inspection recorded on the signed and dated permit card, and a Certificate of Completion ($30.00 on the fee schedule). A Certificate of Occupancy ($30.00) is the instrument for a building — Code Sec. 7-3 106.1.2 issues it 'Upon completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems... and after the final inspection'.

Why the confidence is not higherThe City prices both certificates but publishes no rule allocating them between occupancy and non-occupancy work, so the allocation to Certificate of Completion is inferred. The permit card is the only document the City's own process explicitly stamps on pass.

fee schedule + adopting ordinance checked 2026-09-13 https://www.inverness.gov/DocumentCenter/View/7074/Permit-fees-PDF

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The installer or the member — not the City. SECO Energy's filed Interconnection Agreement clause 2: 'The Member agrees to provide the Cooperative with written certification that the RGS installation has been inspected by the local code official who has certified that the installation was permitted and has been approved and has met all electrical and mechanical requirements. Such certification shall be delivered to Cooperative prior to the operation of the RGS.' Clause 5 requires at least ten days' notice before the in-service date. The published process then has the contractor or member upload documents and system photos (5-7 business days for SECO approval) before SECO sets the bi-directional meter. Duke customers go through Duke's own interconnection application process. The City notifies nobody.

Why the confidence is not higherQuoted from SECO's filed tariff and its published 10-step process. The Duke half is weaker — the White Book requires the customer to contact Duke's Distribution Interconnected Generation Office but the filed Tier 1 agreement was not retrieved this run, so the Duke PTO mechanics are not first-hand.

utility filed interconnection agreement checked 2026-09-13 https://secoenergy.com/sites/default/files/2025-10/seco_energy_rate_tariff_current.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 85%

No. The City specifies no placard wording of its own anywhere.

Size, colour & material 92%

Not by the City. SECO ENERGY DOES, in detail: 'THE PERMANENT AND DURABLE PLACARD SHALL BE NON-FERROUS METAL OR POLY-PLASTIC PLATES, UV RESISTANT, EPOXY GLUED OR RIVETED TO THE FRONT COVER OF THE DISCONNECT SWITCH WITH ENGRAVED OR STAMPED LETTERING A MINIMUM OF 1/4" HIGH, WHITE LETTERS ON A RED BACKGROUND. THE USE OF PEEL-AND-STICK LABELS, PAINT, OR MARKING PENS TO LABEL THE PLATES IS NOT ACCEPTABLE.' Duke Energy Florida instead specifies six catalogued label part numbers with fixed sizes (3"x2", 6"x4", 9"x6") and fits them itself.

Where they go 90%

SECO customers: Detail A placard on the front cover of the utility AC disconnect switch; Detail B placard on the front cover of the meter enclosure. The disconnect itself must be mounted 48 inches minimum to 72 inches maximum above grade and within 5'-0" maximum of the utility meter enclosure, in line of sight. Duke customers: at the meter base (lower left) and near the OFF position of the disconnect switch, fitted by Duke. The City specifies no placement of its own.

What the utility wants on top 92%

Yes — and in this city the utility placards are the entire placard regime, because the AHJ requires none. SECO ENERGY: a placard on the front cover of the utility AC disconnect switch identifying the on-site power generation source (Detail A, 'ON-SITE GENERATION UTILITY DISCONNECT SWITCH'), and a permanent placard on the front cover of the meter enclosure indicating DUAL POWER SOURCE (Detail B). On a 400 A split-breaker service, two disconnects, plus Detail C (dual power source) and Detail D ('ON-SITE GENERATION UTILITY AC DISCONNECT 1 AND 2 MUST BE OPENED TO ISOLATE THE SOLAR SYSTEMS') on the meter enclosure. DUKE ENERGY FLORIDA: six catalogued items, installed by Duke itself — 1505316 Electric Generator Warning label 3"x2" at the meter base/primary meter, lower left; 1505322 same 6"x4" above the lock on a pad-mounted transformer; 1505691 sign 9"x6" on an overhead transformer pole 5-6 ft above ground; 1505328 Generator Isolation Device label 3"x2" near the OFF position of a small disconnect switch; 1505332 same 6"x4" on a large disconnect switch; 4205529 sign 9"x6" on a recloser/pole disconnect 5-6 ft above ground. Duke's notes: 'Signs and labels are installed by Duke Energy'; 'Install signs and labels on all KW sizes of Distributed Generation sites'; 'Clean the surface before installing labels.'

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)")) --- Fetch failed: connection: HTTPSConnectionPool(host='www.inverness-fl.gov', port=443): Max retries exceeded with url: /586/Permitting (Caused by NameResolutionError("HTTPSConnection(host='www.inverness-fl.gov', port=443): Failed to resolve 'www.inverness-fl.gov' ([Errno 8] nodename nor servname provided, or not known)"))
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Citrus County
Regions covered
Authority Contact
Building Department
Booking & Scheduling