City of Key West is a city authority in the State of Florida, serving 26,444 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Key West against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Key West is the authority having jurisdiction 88% confidence
Holds
Both Building and Electrical, held in-house by the City of Key West Building Department (1300 White Street) -- not delegated to Monroe County and not outsourced to a private firm (SAFEbuilt/PDCS/CAP/JPI/M.T. Causley/Bureau Veritas/CGA Solutions were checked for by name in staff contacts and forms; none appear). Fire is held separately, also in-house, by the City of Key West Fire Department's own Fire Marshal's Office (Fire Prevention Bureau: 1 Fire Marshal + 4 Fire Inspectors) -- NOT Monroe County Fire Rescue. Within the locally-designated Historic District (one of the largest in the US), the Historic Architectural Review Commission (HARC), also a City board, holds a mandatory pre-permit architectural review (Certificate of Appropriateness) for exterior work including solar, with its own written Solar Collectors design guidance favoring installations not visible from the public right-of-way.
Overridden by
The City's own jurisdiction is limited to its CORPORATE LIMITS -- the City's own Floodplain Management page states plainly that Key Haven, Rockland Key, and Stock Island (South Side) carry 'Key West' mailing addresses but are NOT inside the City and fall to Monroe County instead; this same corporate-limits caveat should be checked against the parcel address, not the mailing address, before assuming City jurisdiction. Separately, Keys Energy Services (KEYS) -- a MUNICIPALLY OWNED utility (Utility Board of the City of Key West, self-declared, NOT Keys Energy Services being FPL/Duke/a co-op) -- sits outside FL PSC Rule 25-6.065 the way municipal utilities do, and runs its own net-metering tariff (Schedule NM1), interconnection application, and Standard Interconnection Agreement; KEYS also imposes its own manual-disconnect requirement (NFPA 70 Sec. 225.31, no stated size exemption) and reserves the right to require its own warning signage, both independent of anything the City itself requires. FS 471.003(2)(h) sets a $125,000/600A statewide PE-stamp exemption floor for electrical work, but the City's own Solar checklist requires a signed/sealed engineered plan on every solar job with no monetary threshold -- a stricter-than-state local rule.
Why not higher
Direct evidence: City's own Building Department/Permits pages and dated Solar checklist (created 13 Jan 2025); the FS 553.80(7)(b) Building Permit and Inspection Utilization Report FY2024/25 (12 dedicated personnel, $1,341,299 personnel cost -- the in-house signature per this brief's own discriminator); the Fire Marshal's Office page (own Fire Prevention Bureau); the HARC Jurisdiction page and current Historic Architectural Design Guidelines (Solar Collectors section, Ordinance 12-07/2012); the Floodplain Management page's own corporate-limits disclaimer; and Keys Energy Services' own Standard Interconnection Agreement, which self-declares 'a municipal owned utility.' Held below 95 because (a) the exact corporate-limits parcel boundary was not independently mapped against a specific address, and (b) several LDR/zoning questions (ground mount as structure, system-size cap, SUP) returned no local text at all, leaving open the possibility of an amendment not surfaced by the Municode search used (positive/fabricated controls both passed, so the search tool itself was not the failure).

https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Permit required
Yes. A permit is required for a residential rooftop PV system, and the City publishes a dedicated Solar Installation Permit checklist.95%
Permit cost
No solar-specific fee line was found. General building permit fees run $24.00-$36.00 per $1,000 of job valuation, per the City's own FAQ;70%
Portal
eTRAKiT (etrakit.cityofkeywest-fl.gov), the City of Key West's own permit portal.90%
Electrical code
NEC 2020, effective 31 December 2023, is the statewide-adopted edition under the Florida Building Code 8th Edition (2023) cycle. Key West's own Code of Ordinances (Sec.80%
Booking an inspection
Not explicitly stated for solar/electrical specifically; the general practice implied by the City's Quick Links is via the eTRAKiT online permit portal and/or by phone to the Building…45%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. A permit is required for a residential rooftop PV system, and the City publishes a dedicated Solar Installation Permit checklist. Q3 Electrical and building permits — The City lists 'Solar' as its own distinct permit-type checklist, separate from the 'Electrical' checklist also listed on the same Permits page. Q4 Where you file — eTRAKiT (etrakit.cityofkeywest-fl.gov), the City of Key West's own permit portal. Q20

Permit required
Yes. A permit is required for a residential rooftop PV system, and the City publishes a dedicated Solar Installation Permit checklist.95% source
What it costs
No solar-specific fee line was found. General building permit fees run $24.00-$36.00 per $1,000 of job valuation, per the City's own FAQ; fencing-type permits are charged by linear foot instead.70% source
Key document
City solar-specific checklist (dated, current) cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes, but only within the corporate limits of the City of Key West. The City of Key West Building Department (1300 White Street) is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV. 90% · department page (jurisdiction caveat) + building department page
    • What does this authority permit itself, and what does it delegate? Both Building and Electrical are permitted, plan-reviewed and inspected by the City's own Building Department (in-house, not contracted or delegated to Monroe County). Fire is held separately, in-house, by the City of Key West Fire Department's own Fire Marshal's Office (Fire Prevention Bureau: 1 Fire Marshal + 4 Fire Inspectors). 92% · FS 553.80(7)(b) utilization report (statutory, City's own)
    • Is a permit required for a residential rooftop PV system? Yes. A permit is required for a residential rooftop PV system, and the City publishes a dedicated Solar Installation Permit checklist. 95% · City checklist (dated PDF, current)
    • Is there a separate electrical permit, or is it combined? The City lists 'Solar' as its own distinct permit-type checklist, separate from the 'Electrical' checklist also listed on the same Permits page. The Solar checklist itself does not state whether a companion Electrical sub-permit is also required, but the City's general electrical-requirements guidance ('All applications involving work on service needs a riser diagram & Keys Energy Services meter location') and the fact Electrical is listed as its own line item strongly suggest the two are administered as related but distinct permit records, as is typical for FBC-adopting Florida cities. 55% · City permit-type checklist listing
    • Is a HOA or architectural approval required first? No City-imposed HOA-approval precondition was found. However, exterior work within the Historic District requires HARC's own architectural review (a Certificate of Appropriateness) BEFORE building permit issuance -- see Q25. 70% · City department page
    • Is there a historic-district review? Yes, and this is a first-order issue for Key West. The Historic Architectural Review Commission (HARC) has a written Solar Collectors policy inside its Historic Architectural Design Guidelines requiring HARC approval, a preferred-location hierarchy favoring locations NOT visible from public streets, and specific design constraints, BEFORE a building permit for exterior solar work can be issued. 95% · City's own current Historic Architectural Design Guidelines (dated section, ordinance-approved)
    • Is a wind or windstorm certification required? Monroe County (and Key West within it) is NOT in the High-Velocity Hurricane Zone (HVHZ) -- HVHZ is Miami-Dade and Broward Counties only under the Florida Building Code. Key West/Monroe County sits in the ASCE 7 Wind-Borne Debris Region with high design wind speeds, so the applicable regime for solar equipment is the standard statewide Florida Product Approval process (FS 553.842) with wind-load design per the locally applicable ASCE 7 basic wind speed, not the separate Miami-Dade/Broward HVHZ product-approval/NOA regime. No City-specific wind-certification document (distinct from standard Product Approval submittal) was found in Key West's own material. 65% · Florida Building Commission (state-level; no City-specific document found)
    • Is there a system-size cap on residential generation? No zoning-code cap on residential generation system SIZE was found. At the utility level, Keys Energy Services caps its Renewable Generation System (RGS) definition itself at 2 megawatts (Tier 3 ceiling), and its Schedule NM1 tariff and Application form both flag that 'renewable generation system size limits may be subject to a cumulative ENROLLMENT limit on net metering customers located within KEYS' service area' -- i.e. a possible program-wide aggregate cap, not a per-system zoning cap, and the aggregate figure itself was not stated in the reachable tariff text. 55% · utility's own interconnection application (first-party)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed contractor, or an owner/builder under Florida's owner-builder exemption -- electrical permits are issued 'in the name of the person performing the work.' 85% · City FAQ page
    • Must the contractor be registered with this authority before applying? No City-specific contractor registration step was found beyond verification against the state DBPR license database; the City's online permit-submission form is explicitly gated to 'DBPR State Licensed Contractors' rather than to a separate City registration list. Local competency CARDS (for the specific-trades list e.g. drywall, masonry, awning erection -- not electrical/solar) are issued by Monroe County, not the City. 60% · City department page (specialty-contractor licensing)
    • Is a homeowner permitted to self-install and self-permit? Yes, under Florida's statutory owner-builder exemption (FS 489.103/489.503), which the City has adopted its own disclosure form for. 85% · City solar checklist + FAQ
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Per the City's own 'CHECKLIST FOR SOLAR INSTALLATION PERMIT APPLICATION': Permit application with property address; owner name/contact; contractor name/contact; qualifier name/contact; proof of ownership (MCPAO property record card or deed); job valuation (all overhead, labor, materials); detailed scope of work. Required plans/documentation: signed and sealed engineered plans; technical specifications of the solar equipment to be installed; Keys Energy Riser Diagram Approval. Notes: a recorded Notice of Commencement (NOC) is required for jobs valued $5,000+ before the first inspection; Owner-Builders must submit a signed/notarized Owner-Builder Disclosure Form. 96% · City solar-specific checklist (dated, current)
    • How many copies, and in what format? Two (2) sets of hardcopy plans plus one (1) PDF electronic copy, for all permit applications generally (not a solar-specific figure, but the City's stated general rule). 70% · City requirements handout (general, not solar-specific)
    • Is a site plan required, and what must it show? Not explicitly stated as a distinct 'site plan' line for solar. The Solar checklist requires 'signed and sealed engineered plans' rather than naming a site plan separately; the general Minimum Requirements document requires a 'Survey with Site Plan' only for equipment placed on roof/ground for AC units, exhaust fans, pools, propane/fuel tanks, etc. -- solar is not one of the rows given a site-plan requirement in that table. 50% · City requirements handout (general table, solar not listed as a row)
    • Is a one-line / three-line diagram required? Yes -- a Keys Energy Riser Diagram, approved by the utility, is a required submittal item. 90% · City solar-specific checklist
    • Are string and conductor calculations required? Not stated by name. The Solar checklist requires 'signed and sealed engineered plans' and 'technical specifications of solar equipment,' which in practice would need to include string/conductor sizing, but the City's own documents do not use the words 'string calculation' or 'conductor calculation.' 45% · City solar-specific checklist (inference)
    • Is a structural PE stamp required, and at what threshold? Yes, and with NO monetary threshold -- the City's Solar checklist requires 'signed and sealed engineered plans' on every solar permit application, unconditionally. 90% · City solar-specific checklist (dated, current)
    • Is an electrical PE stamp required, and at what threshold? State floor: no PE stamp is required for electrical work performed by a licensed EC where the electrical work value is $125,000 or less and aggregate service capacity is 600A (240V) or less on a residential system (FS 471.003(2)(h)). No Key West-specific stricter electrical threshold was found (contrast Q13, where the City's own solar checklist DOES require an engineer seal on the structural/PV side unconditionally). 60% · Florida Statute (state floor)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? eTRAKiT (etrakit.cityofkeywest-fl.gov), the City of Key West's own permit portal. 90% · portal landing link (City's own site)
    • Can the whole application be completed online? Partially -- the City's on-line submission form (routing into eTRAKiT) is explicitly offered to 'DBPR State Licensed Contractors' for submitting applications online. Whether an owner-builder can complete a full solar application online (vs. having to submit certain notarized forms in person/by mail) was not confirmed. 55% · department homepage
    • What does a residential solar permit cost? No solar-specific fee line was found. General building permit fees run $24.00-$36.00 per $1,000 of job valuation, per the City's own FAQ; fencing-type permits are charged by linear foot instead. A residential rooftop PV job (job valuation stated on the Solar checklist itself) would be billed under this general valuation-based schedule via the electronic fee calculator built into eTRAKiT. 70% · City FAQ page
    • How is the fee calculated? Valuation-based (job cost, including labor and materials) for the general building/electrical permit fee, per the City's own FAQ; the Solar checklist itself requires 'Job valuation (including all overhead, labor, and cost of materials)' as an application field, consistent with a valuation-based fee calculation. 72% · City FAQ page + City solar checklist
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • Which utility handles interconnection here? Keys Energy Services (KEYS), formally the Utility Board of the City of Key West DBA Keys Energy Services -- a MUNICIPALLY OWNED utility (self-declared in its own contract language), NOT FPL, Duke, or a cooperative. KEYS serves the City of Key West and the Lower Keys 'to the Seven-Mile Bridge at Marathon.' 97% · utility's own Standard Interconnection Agreement (first-party, self-declared)
    • Where does the utility sit in the sequence? After the City's building-code inspection, and before KEYS allows parallel operation. The RGS Owner must obtain the City's inspection/certification first and provide a copy to KEYS in writing; only then does KEYS install the required bi-directional meter, and the RGS Owner 'shall not commence parallel operation... unless and until Utility has installed a bi-directional meter.' 92% · utility's own net metering checklist (first-party)

28 questions answered against City of Key West’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes, but only within the corporate limits of the City of Key West. The City of Key West Building Department (1300 White Street) is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV.

Why the confidence is not higherCity's own Building Department page and Permits page describe the Department's function and list 'Solar' as a named Building Permit Requirements checklist item. Critically, the City's own Floodplain Management page states in writing: 'This site is only applicable to those buildings within the corporate limits of the City of Key West, Florida. Several areas outside the City's jurisdiction may have a "Key West" mailing address but aren't located in the City, such as: Key Haven, Rockland Key, Stock Island (South Side). If you are located in one of these communities, please refer to Monroe County Floodplain Management.' The same corporate-limits caveat applies to building/electrical jurisdiction generally -- a 'Key West' mailing address is not proof the parcel is inside the City.

department page (jurisdiction caveat) + building department page checked 2026-09-12 https://www.cityofkeywest-fl.gov/181/Floodplain-Management-FEMA

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both Building and Electrical are permitted, plan-reviewed and inspected by the City's own Building Department (in-house, not contracted or delegated to Monroe County). Fire is held separately, in-house, by the City of Key West Fire Department's own Fire Marshal's Office (Fire Prevention Bureau: 1 Fire Marshal + 4 Fire Inspectors).

Why the confidence is not higherThe FS 553.80(7)(b) Building Permit and Inspection Utilization Report FY2024/25 is the discriminator per this brief's own instruction: it shows $1,341,299 in personnel costs, 12 personnel dedicated by the local government to enforce the FBC/issue permits/conduct inspections, and 2,231 of 7,610 inspections performed by a 'private provider' -- that private-provider figure is a MINORITY alongside real dedicated staff and real personnel cost, which per this brief's own run-41 finding is the signature of the FS 553.791 OWNER-ELECTED private-provider route, not department outsourcing (PDCS/SAFEbuilt-style operation shows ~$0 personnel cost and no dedicated staff -- the opposite pattern). Fire is confirmed as a separate, in-house City Fire Marshal's Office on the Fire Marshal's Office page, with no reference anywhere to Monroe County Fire Rescue for city-limits solar work.

FS 553.80(7)(b) utilization report (statutory, City's own) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/5992/Building-Permit-Inspection-Utilization-Report-PDF

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. A permit is required for a residential rooftop PV system, and the City publishes a dedicated Solar Installation Permit checklist.

Why the confidence is not higherCity's Permits page: 'A building permit is required prior to any work or construction of any kind, permanent or temporary, that has a value greater than $1,000... at the discretion of the building official.' The same page lists 'Solar' as its own named checklist item among ~35 permit-type checklists, linking to a City document titled 'CHECKLIST FOR SOLAR INSTALLATION PERMIT APPLICATION' (created 13 Jan 2025, current).

City checklist (dated PDF, current) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

The City lists 'Solar' as its own distinct permit-type checklist, separate from the 'Electrical' checklist also listed on the same Permits page. The Solar checklist itself does not state whether a companion Electrical sub-permit is also required, but the City's general electrical-requirements guidance ('All applications involving work on service needs a riser diagram & Keys Energy Services meter location') and the fact Electrical is listed as its own line item strongly suggest the two are administered as related but distinct permit records, as is typical for FBC-adopting Florida cities.

Why the confidence is not higherRead directly off the City's Permits page (35+ checklist items listed alphabetically, 'Electrical' and 'Solar' both appear as separate lines) and the Solar checklist PDF itself, which does not mention a separate electrical permit number or combined-permit language.

City permit-type checklist listing checked 2026-09-12 https://www.cityofkeywest-fl.gov/220/Permits

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed contractor, or an owner/builder under Florida's owner-builder exemption -- electrical permits are issued 'in the name of the person performing the work.'

Why the confidence is not higherCity FAQ, Building Department category, 'How do I get an Electrical Permit?': 'Electrical permits are issued in the name of the person performing the work. Only licensed contractors or owners/builders may obtain a permit. Owner/builder permits are limited to the construction of one single-family residence or duplex in which the owner resides.' Not solar-specific, but is the City's general electrical-permit rule.

City FAQ page checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

No City-specific contractor registration step was found beyond verification against the state DBPR license database; the City's online permit-submission form is explicitly gated to 'DBPR State Licensed Contractors' rather than to a separate City registration list. Local competency CARDS (for the specific-trades list e.g. drywall, masonry, awning erection -- not electrical/solar) are issued by Monroe County, not the City.

Why the confidence is not higherBuilding Department homepage banner: 'Submit On-Line Form -- Online form available to DBPR State Licensed Contractors.' The City's own 'Contractor Licensing Competency Cards' page states: 'The City of Key West does not offer testing. Please contact Monroe County Contractor License Coordinator... for more information regarding testing' for the listed specialty trades (which do not include electrical or solar). No City ordinance or form requiring a separate City contractor registration (distinct from DBPR/county competency) was found for electrical or solar contractors specifically.

City department page (specialty-contractor licensing) checked 2026-09-12 https://www.cityofkeywest-fl.gov/271/Contractor-Licensing-Competency-Cards

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes, under Florida's statutory owner-builder exemption (FS 489.103/489.503), which the City has adopted its own disclosure form for.

Why the confidence is not higherCity publishes an 'Owner-Builder Disclosure Form' (Affidavits and Forms page) and its Building FAQ devotes a full section to owner-builder requirements and restrictions, including the statutory disclosure language ('State law requires construction to be done by a licensed contractor. You have applied for a permit under an exemption to that law...'). The Solar checklist itself explicitly contemplates this: 'Homeowner Builders must submit a signed and notarized Owner-Builder Disclosure Form with application.'

City solar checklist + FAQ checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q8 What documents make up a complete submittal? Core Submittal package

Per the City's own 'CHECKLIST FOR SOLAR INSTALLATION PERMIT APPLICATION': Permit application with property address; owner name/contact; contractor name/contact; qualifier name/contact; proof of ownership (MCPAO property record card or deed); job valuation (all overhead, labor, materials); detailed scope of work. Required plans/documentation: signed and sealed engineered plans; technical specifications of the solar equipment to be installed; Keys Energy Riser Diagram Approval. Notes: a recorded Notice of Commencement (NOC) is required for jobs valued $5,000+ before the first inspection; Owner-Builders must submit a signed/notarized Owner-Builder Disclosure Form.

Why the confidence is not higherDirect, verbatim transcription of the City's own current, dated (created 13 Jan 2025) solar-specific checklist PDF -- this is the single most solar-specific document found for this authority.

City solar-specific checklist (dated, current) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q9 How many copies, and in what format? Submittal package

Two (2) sets of hardcopy plans plus one (1) PDF electronic copy, for all permit applications generally (not a solar-specific figure, but the City's stated general rule).

Why the confidence is not higherCity's 'Minimum Requirements For Application Submittals' document, 'All Applications' row: 'Two (2) sets of hardcopy plans and one (1) PDF electronic copy of the plans.' The Solar-specific checklist does not restate a copy count, so this is the general City-wide rule applied to solar by default.

City requirements handout (general, not solar-specific) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/90/Minimum-Requirements-for-Permit-Applications-Submittals-PDF

Q10 Is a site plan required, and what must it show? Core Submittal package

Not explicitly stated as a distinct 'site plan' line for solar. The Solar checklist requires 'signed and sealed engineered plans' rather than naming a site plan separately; the general Minimum Requirements document requires a 'Survey with Site Plan' only for equipment placed on roof/ground for AC units, exhaust fans, pools, propane/fuel tanks, etc. -- solar is not one of the rows given a site-plan requirement in that table.

Why the confidence is not higherCross-checked the Solar checklist (no 'site plan' line item) against the Minimum Requirements table, which lists a site-plan/survey requirement only for specific named work types (AC units, exhaust fans, fences, pools, propane tanks) and does not include a Solar row at all.

City requirements handout (general table, solar not listed as a row) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/90/Minimum-Requirements-for-Permit-Applications-Submittals-PDF

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes -- a Keys Energy Riser Diagram, approved by the utility, is a required submittal item.

Why the confidence is not higherSolar checklist: 'REQUIRED PLANS AND DOCUMENTATION WITH APPLICATION -- ... Keys Energy Riser Diagram Approval.' Corroborated by the City's general Electrical requirement in the Minimum Requirements document: 'All applications involving work on service needs a riser diagram & Keys Energy Services meter location.'

City solar-specific checklist checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q12 Are string and conductor calculations required? Drawings & calculations

Not stated by name. The Solar checklist requires 'signed and sealed engineered plans' and 'technical specifications of solar equipment,' which in practice would need to include string/conductor sizing, but the City's own documents do not use the words 'string calculation' or 'conductor calculation.'

Why the confidence is not higherSolar checklist and general Electrical requirements reviewed in full; neither names string or conductor calculations specifically. Inference only from the general 'signed and sealed engineered plans' requirement.

City solar-specific checklist (inference) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Yes, and with NO monetary threshold -- the City's Solar checklist requires 'signed and sealed engineered plans' on every solar permit application, unconditionally.

Why the confidence is not higherSolar checklist, 'REQUIRED PLANS AND DOCUMENTATION WITH APPLICATION': 'Signed and sealed engineered plans' is listed as a flat requirement with no cost/size qualifier -- unlike the state PE-stamp exemption thresholds (FS 471.003(2)(h): $125,000/600A), the City does not carve out an exemption for small residential systems in its own solar-specific checklist. This is a stricter-than-state local rule (same pattern documented elsewhere in this survey, e.g. DeSoto County).

City solar-specific checklist (dated, current) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

State floor: no PE stamp is required for electrical work performed by a licensed EC where the electrical work value is $125,000 or less and aggregate service capacity is 600A (240V) or less on a residential system (FS 471.003(2)(h)). No Key West-specific stricter electrical threshold was found (contrast Q13, where the City's own solar checklist DOES require an engineer seal on the structural/PV side unconditionally).

Why the confidence is not higherFlorida Statute cited directly; City's own Solar checklist and Minimum Requirements documents do not state a numeric electrical PE-stamp threshold of their own, so this is the state floor rather than a confirmed City-specific rule.

Florida Statute (state floor) checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

No solar-specific fee line was found. General building permit fees run $24.00-$36.00 per $1,000 of job valuation, per the City's own FAQ; fencing-type permits are charged by linear foot instead. A residential rooftop PV job (job valuation stated on the Solar checklist itself) would be billed under this general valuation-based schedule via the electronic fee calculator built into eTRAKiT.

Why the confidence is not higherCity FAQ (Building Department category), 'Is the Permit Fee based on the price of the job?': 'Yes, from $24.00 to $36.00 per thousand. Some permit fees are based on linear feet, such as fencing permits.' No PDF fee schedule was reachable outside the eTRAKiT portal itself (which requires an active application to price); the City's top navigation 'Building Fees' link routes directly into the eTRAKiT login/fee-calculator rather than to a static schedule.

City FAQ page checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q16 How is the fee calculated? Core Fees

Valuation-based (job cost, including labor and materials) for the general building/electrical permit fee, per the City's own FAQ; the Solar checklist itself requires 'Job valuation (including all overhead, labor, and cost of materials)' as an application field, consistent with a valuation-based fee calculation.

Why the confidence is not higherCity FAQ ($24-$36 per $1,000 valuation) plus the Solar checklist's own requirement to state job valuation including overhead, labor and materials -- these two sources together support a valuation basis, though no PV-specific fee formula was independently reachable outside the eTRAKiT fee calculator.

City FAQ page + City solar checklist checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedCity FAQ (Building Department category, full text read), Solar checklist, Minimum Requirements document -- none states whether a separate plan-check/plan-review fee is charged on top of the permit fee. The static fee detail lives inside the eTRAKiT fee calculator, which requires an active application to price and could not be queried without one.

https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedCity FAQ, Permits page, Building Department page -- none states a plan-review turnaround time (in business days) for a residential building or electrical permit, solar or otherwise.

https://www.cityofkeywest-fl.gov/220/Permits

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedCity FAQ, Solar checklist, Minimum Requirements document, Sec. 14-31 (Adopted construction codes, Municode) -- none of the City's own reachable material states a numeric permit-validity/expiration period (the FBC's own default 180-day provision was not independently confirmed as adopted without local amendment).

https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q20 Which permit portal does this authority use? Core Portal & process

eTRAKiT (etrakit.cityofkeywest-fl.gov), the City of Key West's own permit portal.

Why the confidence is not higherLinked directly and repeatedly from the Building Department page, the Permits page, and every Building Department sub-page's Quick Links sidebar as 'eTRAKiT Permit Portal.' A separate 'GovBuilt Licensing Payment Portal' handles contractor licensing payments specifically.

portal landing link (City's own site) checked 2026-09-12 https://etrakit.cityofkeywest-fl.gov/eTRAKiT/login.aspx?lt=either&rd=~/PermitApplication/confirmation.aspx

Q21 Can the whole application be completed online? Core Portal & process

Partially -- the City's on-line submission form (routing into eTRAKiT) is explicitly offered to 'DBPR State Licensed Contractors' for submitting applications online. Whether an owner-builder can complete a full solar application online (vs. having to submit certain notarized forms in person/by mail) was not confirmed.

Why the confidence is not higherBuilding Department homepage banner: 'Submit On-Line Form -- Online form available to DBPR State Licensed Contractors. Click here to access the on-line form.' No equivalent statement was found describing an owner-builder's online path, and the Owner-Builder Disclosure Form is described elsewhere as requiring notarization, which is not a pure online-only step.

department homepage checked 2026-09-12 https://www.cityofkeywest-fl.gov/1077/Building-Department

Q22 Which utility handles interconnection here? Core Utility interconnection

Keys Energy Services (KEYS), formally the Utility Board of the City of Key West DBA Keys Energy Services -- a MUNICIPALLY OWNED utility (self-declared in its own contract language), NOT FPL, Duke, or a cooperative. KEYS serves the City of Key West and the Lower Keys 'to the Seven-Mile Bridge at Marathon.'

Why the confidence is not higherKEYS' own Standard Interconnection Agreement for Renewable Generation System states verbatim: '...Utility Board of the City of Key West, DBA Keys Energy Services, (hereinafter "Utility"), a municipal owned utility, organized and existing under the laws of the State of Florida... Utility operates an electric distribution system serving the City of Key West to the Seven-Mile Bridge at Marathon.' This directly disproves any assumption that FL PSC Rule 25-6.065 (which binds only investor-owned utilities) governs interconnection here -- KEYS runs its own net-metering tariff (Schedule NM1) and its own interconnection agreements, outside the PSC rule, consistent with Fla. Stat. 366.91.

utility's own Standard Interconnection Agreement (first-party, self-declared) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb9588c025154109aa6_Standard%20interconnection%20Agreement%20Final%20August%202024.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After the City's building-code inspection, and before KEYS allows parallel operation. The RGS Owner must obtain the City's inspection/certification first and provide a copy to KEYS in writing; only then does KEYS install the required bi-directional meter, and the RGS Owner 'shall not commence parallel operation... unless and until Utility has installed a bi-directional meter.'

Why the confidence is not higherKEYS' own Net Metering Customer Checklist, step 9: 'RGS Owner must obtain all inspections and approvals as required by applicable jurisdictions. The RGS owner must provide KEYS with a copy of the local building code official inspection and certification of installation in writing.' Step 10: '...within five (5) business days after receipt of all required documents and final approval KEYS will install a bi-directional meter. RGS Owner shall not commence parallel operation of the RGS unless and until KEYS has installed a bi-directional meter.' Also restated in the Standard Interconnection Agreement, Sec. 11(a).

utility's own net metering checklist (first-party) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb808da860809eb6603_Net%20Metering%20Checklist%20August%202024%20Final.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No City-imposed HOA-approval precondition was found. However, exterior work within the Historic District requires HARC's own architectural review (a Certificate of Appropriateness) BEFORE building permit issuance -- see Q25.

Why the confidence is not higherNo HOA-specific requirement or disclaimer (of the kind seen in some other FL cities) was found on the City's Permits page, Solar checklist, or Minimum Requirements document. The City's own 'Is My Property Under HARC Jurisdiction?' page states: 'The applicant shall obtain HARC approval before the permit issuance if a building permit is required' -- that is a City board's own architectural review, not a private HOA, but functions similarly as a pre-permit gate for many parcels.

City department page checked 2026-09-12 https://www.cityofkeywest-fl.gov/452/Is-My-Property-Under-HARC-Jurisdiction

Q25 Is there a historic-district review? Overlays & special cases

Yes, and this is a first-order issue for Key West. The Historic Architectural Review Commission (HARC) has a written Solar Collectors policy inside its Historic Architectural Design Guidelines requiring HARC approval, a preferred-location hierarchy favoring locations NOT visible from public streets, and specific design constraints, BEFORE a building permit for exterior solar work can be issued.

Why the confidence is not higherCity's HARC Guidelines document ('Solar Collectors' section, pp. 27-28, guideline text approved by City Commission Ordinance 12-07/May 1, 2012, within the current guidelines document linked from the City's live HARC Jurisdiction page): 'HARC supports the introduction of new and emerging technology for renewable energy but will seek to achieve this by ensuring equipment is installed without permanent detriment to the historic fabric... and the least visual impact to buildings and streetscapes. HARC's goal is high performance conservation with low public visibility... Any proposal to install solar energy collectors shall be based on a hierarchy of preferred locations starting with roofing not visible from public streets, then locations within rear gardens or on pergolas and only if none of these are viable... will HARC consider schemes which involve collectors on roofing areas or other locations visible from public streets.' Rules also cover array orientation (parallel to roofline, not above the ridge on pitched roofs), color/shape matching the roof, screening, and a ban on wall-projecting mounts. Confirmed the same page names the required application: 'Certificate of Appropriateness (COA)', and that 'HARC Guidelines state that all exterior work must have HARC approval, whether a building permit is required.'

City's own current Historic Architectural Design Guidelines (dated section, ordinance-approved) checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/1551/HARC-Guidelines-PDF

Q26 Is a wind or windstorm certification required? Overlays & special cases

Monroe County (and Key West within it) is NOT in the High-Velocity Hurricane Zone (HVHZ) -- HVHZ is Miami-Dade and Broward Counties only under the Florida Building Code. Key West/Monroe County sits in the ASCE 7 Wind-Borne Debris Region with high design wind speeds, so the applicable regime for solar equipment is the standard statewide Florida Product Approval process (FS 553.842) with wind-load design per the locally applicable ASCE 7 basic wind speed, not the separate Miami-Dade/Broward HVHZ product-approval/NOA regime. No City-specific wind-certification document (distinct from standard Product Approval submittal) was found in Key West's own material.

Why the confidence is not higherThis is the statewide HVHZ boundary as established in the Florida Building Code and corroborated in this survey's baseline notes (floridabuilding.org); it is not sourced to a Key West-specific document because none discussing HVHZ/wind-certification status was found on the City's site or in its Municode-searchable ordinances ('wind speed' search returned no Key West-specific design-speed provision). Confidence held at 65 because this is state-level context applied to the authority, not an authority-specific citation.

Florida Building Commission (state-level; no City-specific document found) checked 2026-09-12 https://floridabuilding.org/

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedCity's Permits page (full list of ~35 checklist items, no 'Specific Use Permit' or 'solar SUP' item), Municode search for 'specific use' zoning chapters (Ch. 122, Art. V, Div. 5, Specific Use Regulation) which lists named uses (e.g. manufactured housing) but not solar/PV -- no Council/SUP requirement specific to residential rooftop PV was found.

https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No zoning-code cap on residential generation system SIZE was found. At the utility level, Keys Energy Services caps its Renewable Generation System (RGS) definition itself at 2 megawatts (Tier 3 ceiling), and its Schedule NM1 tariff and Application form both flag that 'renewable generation system size limits may be subject to a cumulative ENROLLMENT limit on net metering customers located within KEYS' service area' -- i.e. a possible program-wide aggregate cap, not a per-system zoning cap, and the aggregate figure itself was not stated in the reachable tariff text.

Why the confidence is not higherKEYS' Application for Interconnection of Renewable Generation System states: 'Note: Renewable generation system size limits may be subject to a cumulative enrollment limit on net metering customers located within KEYS' service area. Please refer to KEYS' Net Metering Rate Schedule NM1.' The OCR'd NM1 tariff sheets (Sheet Nos. 5.15.1-5.15.3, Effective 1 Jan 2021) define the three size tiers (up to 2 MW) but the specific aggregate/cumulative enrollment cap number was not visible in the extracted text.

utility's own interconnection application (first-party) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb881a65261177d7539_Solar%20application%20Revisions%20final%20August%202024.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020, effective 31 December 2023, is the statewide-adopted edition under the Florida Building Code 8th Edition (2023) cycle. Key West's own Code of Ordinances (Sec. 14-31, 'Adopted construction codes') adopts NFPA 70/the National Electrical Code by a FLOATING reference to 'editions as adopted by the State of Florida Building Commission,' without naming a year itself -- so the City has not independently stated a year, and the answer is the statewide baseline, not an independently reproved local fact. 80% · Municode (Key West's own Sec. 14-31, floating adoption) + state baseline
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023), by floating reference in the City's own Code of Ordinances. 80% · Municode (Key West's own Sec. 14-31)
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023) (incorporating NFPA 1 and NFPA 101), by floating reference in the City's own Code of Ordinances to 'the most recent' editions. 75% · Municode (Key West's own Sec. 30-57, floating adoption)
    • Are there local amendments to any of the above? Yes, at least administratively. Chapter 14 (Buildings and Building Regulations) contains City-specific administrative provisions layered on top of the floating FBC/NEC/Fire Code adoption -- e.g. its own owner-builder procedures, demolition-permit types, floating-home electrical rules, and (via HARC) its own historic-district design standards that function as local amendments for exterior/solar work. A full technical (non-administrative) amendment review of Chapters 14 and 30 was not completed given the volume of the code. 65% · Municode (Key West Code of Ordinances, Ch. 14 & 30, browsed directly)
    • What is the installation judged against? The Florida Building Code (8th Ed., 2023) and NFPA 70/NEC (2020 ed., statewide baseline), both adopted by floating reference; plus, for the historic district, HARC's Solar Collectors guidelines; plus Keys Energy Services' own interconnection standards (IEEE 1547, IEEE 1547.1, UL 1741, and NFPA 70 Sec. 225.31 for the manual disconnect) as a condition of utility interconnection. 78% · combination: Municode + utility's own interconnection agreement
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Key West on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Not stated by the City itself. Inferred: since Key West's own Code floats to the state-adopted NEC (2020 edition, statewide baseline per this survey), and NEC 2020 Art. 690.12 mandates PV rapid shutdown, rapid shutdown should be required to the 2020 NEC. No City document uses the words 'rapid shutdown' or '690.12.' 55% · inference from state-adopted NEC edition; no City-specific statement found
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Relative to the meter, no explicit City rule was found; at the utility level, Keys Energy Services requires an NFPA 70 (NEC) Sec. 225.31-compliant manual disconnecting means on every interconnected Renewable Generation System, with NO stated Tier-1/size exemption -- if a compliant disconnect is not already present, it 'shall be added prior to KEYS installing the bi-directional meter and commencing parallel operation.' 85% · utility's own Standard Interconnection Agreement (first-party)
    • Is a specific mounting system or attachment spacing required? No engineering attachment-spacing spec was found from the Building Department. Within the Historic District, HARC's Solar Collectors guidelines impose de facto placement/mounting constraints: arrays on pitched roofs must run parallel to the original roofline and not rise above the ridge; on flat roofs, arrays must be set back from the parapet edge; single installations on a single roof plane are preferred over multiple/disjointed arrays; and 'all energy collection equipment shall not be mounted to project from walls or other parts of the building.' 60% · City's own current Historic Architectural Design Guidelines

20 questions answered against City of Key West’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020, effective 31 December 2023, is the statewide-adopted edition under the Florida Building Code 8th Edition (2023) cycle. Key West's own Code of Ordinances (Sec. 14-31, 'Adopted construction codes') adopts NFPA 70/the National Electrical Code by a FLOATING reference to 'editions as adopted by the State of Florida Building Commission,' without naming a year itself -- so the City has not independently stated a year, and the answer is the statewide baseline, not an independently reproved local fact.

Why the confidence is not higherSec. 14-31 (Key West Code of Ordinances, confirmed via Municode search, positive/fabricated controls run and passed) floats the adoption to the state-adopted edition rather than naming a year. The NEC 2020 / effective 31 Dec 2023 baseline itself is corroborated from floridabuilding.org (the Florida Building Commission's own site) per this survey's Florida baseline, not from a Key West-specific document naming '2020.'

Municode (Key West's own Sec. 14-31, floating adoption) + state baseline checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=2837&searchText=Adopted%20construction%20codes&searchMode=CLIENTMODE&contentTypeId=CODES

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023), by floating reference in the City's own Code of Ordinances.

Why the confidence is not higherSec. 14-31, 'Adopted construction codes' (Key West Code of Ordinances, Ch. 14, Art. II): '...editions as adopted by the State of Florida Building Commission of the Florida Building Code, Building; the Florida Building Code, Plumbing; the Florida Building Code, Mechanical...' -- a floating reference to whatever the state currently has adopted, which is the FBC 8th Edition (2023) per floridabuilding.org.

Municode (Key West's own Sec. 14-31) checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=2837&searchText=Adopted%20construction%20codes&searchMode=CLIENTMODE&contentTypeId=CODES

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023) (incorporating NFPA 1 and NFPA 101), by floating reference in the City's own Code of Ordinances to 'the most recent' editions.

Why the confidence is not higherSec. 30-57, 'Adoption of fire prevention and life safety codes' (Key West Code of Ordinances, Ch. 30, Art. III): '...most recent Life Safety Code (NFPA 1), (NFPA 101), published by the National Fire Protection Association; the Florida Fire Prevention Code, published by the National Fire Protection [Association]...' -- again a floating reference rather than a year named by the City itself; the current statewide edition (8th Ed., 2023) is assumed per the Florida baseline.

Municode (Key West's own Sec. 30-57, floating adoption) checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=2837&searchText=Adopted%20construction%20codes&searchMode=CLIENTMODE&contentTypeId=CODES

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, at least administratively. Chapter 14 (Buildings and Building Regulations) contains City-specific administrative provisions layered on top of the floating FBC/NEC/Fire Code adoption -- e.g. its own owner-builder procedures, demolition-permit types, floating-home electrical rules, and (via HARC) its own historic-district design standards that function as local amendments for exterior/solar work. A full technical (non-administrative) amendment review of Chapters 14 and 30 was not completed given the volume of the code.

Why the confidence is not higherConfirmed from Municode search results across Chapter 14 (Divisions 1-8 covering electrical, plumbing/gas, floating homes) and Chapter 30 (fire prevention definitions/administration) showing City-specific administrative text layered on the floating state-code adoption; HARC's own Solar Collectors guidelines (Q25) are themselves a local amendment-equivalent constraint on solar installations in the historic district.

Municode (Key West Code of Ordinances, Ch. 14 & 30, browsed directly) checked 2026-09-12 https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q33 What is the installation judged against? Core Electrical

The Florida Building Code (8th Ed., 2023) and NFPA 70/NEC (2020 ed., statewide baseline), both adopted by floating reference; plus, for the historic district, HARC's Solar Collectors guidelines; plus Keys Energy Services' own interconnection standards (IEEE 1547, IEEE 1547.1, UL 1741, and NFPA 70 Sec. 225.31 for the manual disconnect) as a condition of utility interconnection.

Why the confidence is not higherCombines Sec. 14-31 (FBC/NEC floating adoption), the HARC Guidelines Solar Collectors section, and KEYS' Standard Interconnection Agreement Sec. 11(b) ('...operating safely per IEEE 1547, IEEE 1547.1, UL 1741 and NFPA 70 (latest published editions)') and Sec. 13 (NFPA 70 Sec. 225.31 disconnect requirement).

combination: Municode + utility's own interconnection agreement checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb9588c025154109aa6_Standard%20interconnection%20Agreement%20Final%20August%202024.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedChapter 14, Division 3 (Electrical Code) and Division 1 (Generally) browsed via Municode search for 'electrical' -- no service-upgrade or busbar-sizing-specific local rule was found beyond the floating NEC adoption itself.

https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No engineering attachment-spacing spec was found from the Building Department. Within the Historic District, HARC's Solar Collectors guidelines impose de facto placement/mounting constraints: arrays on pitched roofs must run parallel to the original roofline and not rise above the ridge; on flat roofs, arrays must be set back from the parapet edge; single installations on a single roof plane are preferred over multiple/disjointed arrays; and 'all energy collection equipment shall not be mounted to project from walls or other parts of the building.'

Why the confidence is not higherHARC Guidelines, Solar Collectors, items 7 and 9 (quoted above) are aesthetic/historic-preservation constraints, not a structural attachment-spacing engineering spec, so this only partially answers the question and only for historic-district parcels.

City's own current Historic Architectural Design Guidelines checked 2026-09-12 https://www.cityofkeywest-fl.gov/DocumentCenter/View/1551/HARC-Guidelines-PDF

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedBuilding Department Permits/Inspections pages, Solar checklist, Fire Marshal's Office page, and Municode search ('roof setback', 'access pathway') -- no Key West-specific ridge-setback or fire-access-pathway rule for rooftop PV (of the kind found in some other FL cities' fire codes) was located; this likely flows through the Florida Fire Prevention Code's own incorporated NFPA/IFC access-pathway provisions via the floating adoption at Sec. 30-57, which was not independently reviewed page-by-page.

https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Not stated by the City itself. Inferred: since Key West's own Code floats to the state-adopted NEC (2020 edition, statewide baseline per this survey), and NEC 2020 Art. 690.12 mandates PV rapid shutdown, rapid shutdown should be required to the 2020 NEC. No City document uses the words 'rapid shutdown' or '690.12.'

Why the confidence is not higherInference chain: Sec. 14-31 (floating NEC adoption) + statewide NEC 2020 baseline (floridabuilding.org) + NEC 2020 Art. 690.12 (not itself a Key West-specific citation). Solar checklist, Minimum Requirements document, and Municode search for 'rapid shutdown' / '690.12' all returned nothing City-specific.

inference from state-adopted NEC edition; no City-specific statement found checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=2837&searchText=Adopted%20construction%20codes&searchMode=CLIENTMODE&contentTypeId=CODES

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSolar checklist, Minimum Requirements document, Building Permits/Affidavits & Forms pages -- none specifies a placard requirement of the AHJ's own at the service equipment (distinct from Keys Energy's own manual-disconnect signage, see Q42).

https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no AHJ-specified placard wording was found.

https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no AHJ-specified letter height, colour or material spec was found.

https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no AHJ-specified site plan/facility map placard was found.

https://www.cityofkeywest-fl.gov/DocumentCenter/View/13192

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes -- Keys Energy Services reserves the right to require its own signage at the manual disconnect switch, beyond whatever the AHJ requires.

Why the confidence is not higherKEYS' Standard Interconnection Agreement, Sec. 13(b): 'Utility may install, at its sole discretion, additional signage on or near the manual disconnect switch to, among other things, warn that both sides of the switch may be energized.' The RGS application's internal processing checklist also has a line item, 'Location and Warning Labels installed,' confirmed by KEYS before the bi-directional meter is installed.

utility's own Standard Interconnection Agreement (first-party) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb9588c025154109aa6_Standard%20interconnection%20Agreement%20Final%20August%202024.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

On or near the manual (AC) disconnect switch, per Keys Energy Services -- see Q42 and Q48. No AHJ-specified label-placement rule beyond this utility requirement was found.

Why the confidence is not higherSame KEYS SIA Sec. 13(b) citation as Q42.

utility's own Standard Interconnection Agreement (first-party) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb9588c025154109aa6_Standard%20interconnection%20Agreement%20Final%20August%202024.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedSolar checklist, Minimum Requirements document, Building Applications & Forms -- no City-specific approved-equipment list was found. KEYS' own Standard Interconnection Agreement requires equipment to operate 'per IEEE 1547, IEEE 1547.1, UL 1741 and NFPA 70', which is a utility interconnection standard rather than a City equipment-listing requirement.

https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb9588c025154109aa6_Standard%20interconnection%20Agreement%20Final%20August%202024.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedMunicode search ('battery energy storage', 'battery', positive/fabricated controls passed) across the full Code of Ordinances -- no residential battery/ESS-specific permitting provision was found. The Fire Marshal's Office publishes a 'Dangers of Lithium-Ion Batteries Flyer,' but it addresses consumer e-bike/e-scooter battery fire safety, not stationary ESS permitting conditions, and does not answer this question.

https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSame search as Q45 -- no separate ESS permit or inspection type was found on the City's Permits page (no 'ESS' or 'battery' checklist item among ~35 listed) or in the Code of Ordinances.

https://www.cityofkeywest-fl.gov/220/Permits

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedMunicode search ('ground mount', 'accessory structure', 'structure' definitions in Ch. 86 General Provisions and Ch. 122 Zoning) -- no ground-mount-specific definition or classification (as a 'structure' vs. equipment) was found in the Land Development Regulations.

https://library.municode.com/fl/key_west/codes/code_of_ordinances

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Relative to the meter, no explicit City rule was found; at the utility level, Keys Energy Services requires an NFPA 70 (NEC) Sec. 225.31-compliant manual disconnecting means on every interconnected Renewable Generation System, with NO stated Tier-1/size exemption -- if a compliant disconnect is not already present, it 'shall be added prior to KEYS installing the bi-directional meter and commencing parallel operation.'

Why the confidence is not higherKEYS' Standard Interconnection Agreement, Sec. 13(a): 'If a disconnecting means in accordance with section 225.31 of the NFPA 70 (NEC) is not present, the disconnecting means shall be added prior to KEYS installing the bi-directional meter and commencing parallel operation of the RGS.' This is a DISTINCT regime from FPL (Tier 1 exempt), TECO (required, all tiers), the co-ops (required, all tiers, no exemption), Lake Worth Beach, Winter Park (discretionary), and New Smyrna Beach (required, all tiers + inverter shown on one-line) documented elsewhere in this survey -- KEYS requires it for all tiers via a general NEC-compliance clause rather than a utility-specific technical spec, and does not itself state a placement (e.g. 'adjacent to the meter') requirement.

utility's own Standard Interconnection Agreement (first-party) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb9588c025154109aa6_Standard%20interconnection%20Agreement%20Final%20August%202024.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes. The City's own Building Department inspectors perform final inspections in-house; this is not delegated. 85% · City FAQ page + FS 553.80(7)(b) utilization report
    • If delegated, to whom? N/A -- not delegated; the City's own Building Department performs the inspection (see Q52). 80% · City FAQ page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? General (not solar-specific) sequences published by the City: Building -- Foundation, Framing, Sheathing, Roofing (in that order, per the City's own Building inspections page). Electrical -- Underground, Rough-In, Final (per the Electrical inspections page). For a rooftop PV retrofit on an existing structure, Rough-In and Final electrical inspections, and possibly a Roofing inspection if mounting affects roof covering, would be the applicable stages; the City publishes no PV-specific sequence. 60% · City department pages (general, not solar-specific)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • What must be on site at inspection? Not stated specifically for solar. General City rule: 'This permit must be displayed on the job site' -- applies to all permitted work including solar. 55% · City FAQ page (general, not solar-specific)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? A Certificate of Occupancy (for new construction, additions, or a change of use) or a Certificate of Completion (for specified permit types not requiring occupancy, e.g. sheds, fences, window replacements, additions). Neither the CO nor the CoC list on the City's FAQ names 'solar' as one of its own line items, so which document (if any) is issued for a rooftop PV retrofit on an already-occupied home was not confirmed -- likely neither is required and the final electrical/building sign-off alone closes the permit, but the City did not state this directly. 50% · City FAQ page (general; solar not named on either document's applicability list)
    • Who notifies the utility for PTO? The RGS Owner (installer/customer), not the City -- the owner/installer must provide Keys Energy Services with a copy of the City's own building-code-official inspection and certification in writing; KEYS then installs the bi-directional meter that enables parallel operation (functionally, PTO). 85% · utility's own net metering checklist (first-party)

14 questions answered against City of Key West’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Not explicitly stated for solar/electrical specifically; the general practice implied by the City's Quick Links is via the eTRAKiT online permit portal and/or by phone to the Building Department (305-809-3956).

Why the confidence is not higherNo dedicated 'how to schedule an inspection' statement was found on the Inspections page, Building page, or Electrical page (all three were read in full and describe only what is inspected at each stage, not the booking mechanism). Inferred from eTRAKiT being the City's general permit-and-inspection portal and the Building Department's published phone number.

inference from department contact info + portal (no explicit statement found) checked 2026-09-12 https://www.cityofkeywest-fl.gov/252/Building

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedInspections, Building, and Electrical pages (all read in full) -- none states a required notice period for scheduling an inspection.

https://www.cityofkeywest-fl.gov/253/Electrical

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedSame pages as Q50 -- no AM/PM or same-day inspection-window option is described.

https://www.cityofkeywest-fl.gov/253/Electrical

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes. The City's own Building Department inspectors perform final inspections in-house; this is not delegated.

Why the confidence is not higherCity FAQ, 'What is an inspection?': 'Once a permit has been issued and work has begun, the City's inspectors perform inspections at intervals designated by the Building Code... The contractor should call the Building Department when the stage of work indicated on the building permit has been completed.' Consistent with the FS 553.80(7)(b) utilization report showing 12 dedicated City personnel and $1.34M in personnel costs (Q2).

City FAQ page + FS 553.80(7)(b) utilization report checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q53 If delegated, to whom? Core Who inspects

N/A -- not delegated; the City's own Building Department performs the inspection (see Q52).

Why the confidence is not higherFollows directly from Q52; no delegation to Monroe County or a private firm is mentioned anywhere in the City's inspection material or its FS 553.80(7)(b) report.

City FAQ page checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q54 Which inspections are required, and in what order? Core Stages & sequence

General (not solar-specific) sequences published by the City: Building -- Foundation, Framing, Sheathing, Roofing (in that order, per the City's own Building inspections page). Electrical -- Underground, Rough-In, Final (per the Electrical inspections page). For a rooftop PV retrofit on an existing structure, Rough-In and Final electrical inspections, and possibly a Roofing inspection if mounting affects roof covering, would be the applicable stages; the City publishes no PV-specific sequence.

Why the confidence is not higherBoth pages (cityofkeywest-fl.gov/252/Building and /253/Electrical) were read in full; neither mentions solar/PV by name, so this is the general trade-inspection sequence applied to a PV job by inference, not a confirmed PV-specific sequence.

City department pages (general, not solar-specific) checked 2026-09-12 https://www.cityofkeywest-fl.gov/253/Electrical

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedBuilding and Electrical inspection pages (read in full) -- neither states whether a rough-in or mid-roof inspection is specifically required for a rooftop PV retrofit (as opposed to new construction).

https://www.cityofkeywest-fl.gov/252/Building

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedBuilding and Electrical inspection pages, City FAQ (inspection section) -- none explicitly states that the inspector verifies equipment labels/listings as a discrete checked item.

https://www.cityofkeywest-fl.gov/253/Electrical

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedPermits page (~35 checklist items, all reviewed), Affidavits and Forms page (documents listed in full) -- no published PV-specific INSPECTION checklist exists (the Solar document found, DocumentCenter/View/13192, is an APPLICATION checklist, not an inspection-day checklist).

https://www.cityofkeywest-fl.gov/220/Permits

Q58 What must be on site at inspection? Core Documents on site

Not stated specifically for solar. General City rule: 'This permit must be displayed on the job site' -- applies to all permitted work including solar.

Why the confidence is not higherCity FAQ, 'What is an inspection?': '...This permit must be displayed on the job site. The contractor should call the Building Department when the stage of work indicated on the building permit has been completed.' Not solar-specific.

City FAQ page (general, not solar-specific) checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q59 Is there a re-inspection fee? Corrections & re-inspection

Nothing published by this authority.

Where we lookedCity FAQ (full text read), eTRAKiT fee schedule (not independently reachable without an active application) -- no re-inspection fee amount was found published as static text on the City's site.

https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedCity FAQ, Permits/Inspections pages -- none explicitly describes how corrections are issued to the applicant or how they are cleared/re-verified, beyond the general statement that failure to comply with inspection requirements 'could result in a request to dismantle any work beyond the inspection stage.'

https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q61 What is issued on pass? Core Final sign-off & PTO

A Certificate of Occupancy (for new construction, additions, or a change of use) or a Certificate of Completion (for specified permit types not requiring occupancy, e.g. sheds, fences, window replacements, additions). Neither the CO nor the CoC list on the City's FAQ names 'solar' as one of its own line items, so which document (if any) is issued for a rooftop PV retrofit on an already-occupied home was not confirmed -- likely neither is required and the final electrical/building sign-off alone closes the permit, but the City did not state this directly.

Why the confidence is not higherCity FAQ, 'When is a Certificate of Occupancy (C.O.) required?' and 'When is a Certificate of Completion issued?' (full list of permit types quoted verbatim: 'Shell buildings, Construction trailers, Additions, Demolitions, Detached garages, Exterior doors, Fences, Pools, Sheds, Screen rooms, Vinyl siding, Window replacements' -- solar/PV is not on this list).

City FAQ page (general; solar not named on either document's applicability list) checked 2026-09-12 https://www.cityofkeywest-fl.gov/FAQ.aspx?TID=15

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The RGS Owner (installer/customer), not the City -- the owner/installer must provide Keys Energy Services with a copy of the City's own building-code-official inspection and certification in writing; KEYS then installs the bi-directional meter that enables parallel operation (functionally, PTO).

Why the confidence is not higherKEYS' Net Metering Customer Checklist, step 9: 'The RGS owner must provide KEYS with a copy of the local building code official inspection and certification of installation in writing.' No City document describes the City itself notifying KEYS on the owner's behalf.

utility's own net metering checklist (first-party) checked 2026-09-12 https://cdn.prod.website-files.com/627285baad33681929feb6d9/66c65cb808da860809eb6603_Net%20Metering%20Checklist%20August%202024%20Final.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go 65%

On or near the manual (AC) disconnect switch, per Keys Energy Services -- see Q42 and Q48. No AHJ-specified label-placement rule beyond this utility requirement was found.

What the utility wants on top 75%

Yes -- Keys Energy Services reserves the right to require its own signage at the manual disconnect switch, beyond whatever the AHJ requires.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Monroe County
Regions covered
Authority Contact
Building Department
Direct Phone
305-809-3810