City of Lawtey

Bradford County · Florida ← All authorities

City of Lawtey

Bradford County


City of Lawtey is a city authority in the State of Florida, serving 636 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Lawtey against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Lawtey is not the permitting authority for residential solar here 82% confidence
Holds
Zoning / land use only, plus its own water, sewer and sanitation utilities, its own Police Department and its own Fire Department. The City of Lawtey has NO building department, NO building official, NO permit page, NO fee schedule and NO permit portal. Three independent looks say so in this run: (1) a crawl of all 42 pages in cityoflawtey.org's own sitemap returned the word 'permit' twice, both times inside boilerplate copied from another city, and zero occurrences of 'solar', 'photovoltaic' or 'inspection' in a permitting sense - the site's Departments menu is City Finance, Economic Development, Police Department, Utility Services; (2) the City's own adopted FY2025-26 Budget Summary shows 'Licenses and Permits' as a dash - $0 - in both the General Fund and the Water/Sewer Fund, and the FY2024 audited financial statements show no Licenses-and-Permits revenue line and no protective-inspections expenditure function at all (its only functions are General Government, Public Safety [Law Enforcement, Fire], Transportation, Culture and Recreation); (3) the City Council's own agenda splits the city into Finance, Streets and Sanitation, Water and Sewer, Fire, Recreation and Police portfolios - no building or permitting portfolio. What the City DOES keep is zoning: Bradford County's own Planning & Zoning page states 'If you are looking for a zoning information for Lawtey, Brooker or Hampton you should contact their local zoning departments. Lawtey Zoning Department: (904) 782-3454' - that number is Lawtey City Hall's main line. Lawtey's land development code / zoning regulations are not published anywhere I could reach: Lawtey is not a Municode client (the full Municode Florida client list, 416 clients, contains Bradford County, Hampton and Starke but no Lawtey), not an American Legal client (its Florida list is Briny Breezes, Hollywood, Lake Mary, Melbourne Beach, Mexico Beach, Palm Bay, Palm Shores, Pembroke Pines, Pompano Beach and Weston), codepublishing.com/FL/Lawtey is a 404, and the city's own site publishes no code link.
Delegated to
Bradford County Building Department - Rod Crawford, Building Official; Aleshia Dye, Executive Assistant; 945 N. Temple Ave (Court House, North Wing), Starke FL 32091; mailing P.O. Box B, Starke FL 32091; (904) 966-6223 ext 2; building@bradfordcountyfl.gov. The county's own Building Department page carves out exactly ONE municipality - 'If the home/land you're inquiring about is within the CITY LIMITS OF STARKE or has City of Starke utilities, you will have to contact the City of Starke Building and Zoning Department. 904-964-5027' - and names no such carve-out for Lawtey. Its Building FAQ likewise singles out only Starke ('If you are doing work within the city limits of Starke then you will need to contact their office...'). Fire prevention plan review and fire inspections sit with the Bradford County Fire Prevention Office in the same building (904-966-6202 / 904-966-6223 ext 2); Lawtey's own Fire Department is a suppression service (budgeted $24,254 in FY2024), not a code-enforcement office.
Overridden by
Statewide law does most of the work here. The Florida Building Code is a single statewide unified code (Bradford County Code Sec. 14-31 adopts it by reference rather than writing its own); F.S. 163.04(1) expressly prohibits any local ordinance that prohibits or has the effect of prohibiting the installation of solar collectors, and 163.04(2) bars deed restrictions and HOAs from doing so; F.S. 553.792 sets binding permit-review deadlines with a 10%-per-business-day permit-fee reduction for missing them (5 business days for an electrical permit on an existing single-family dwelling where the work is under $15,000); F.S. 489.103(7)(a) is the owner-builder exemption and F.S. 489.503(6) the owner-electrical exemption, both quoted verbatim on Bradford County's own permit portal. ONE UNRESOLVED COUNTERWEIGHT, recorded rather than smoothed over: Bradford County Code Sec. 1-5 says the Code applies in incorporated as well as unincorporated areas BUT that 'The board of county commissioners shall not enforce a provision of this Code within the boundaries of a municipality unless the municipality passes a resolution requesting such action.' I found no Lawtey resolution requesting county enforcement and no interlocal agreement, so the county's authority inside Lawtey city limits rests on the county's own published practice (Starke-only carve-out) rather than on a document I could read. Separately, Bradford County Code Sec. 14-182(d) makes the county's contractor Certificate-of-Competency regime effective only in unincorporated areas 'and in any incorporated area that has recognized the licenses and certificates granted under this article by means of a formal resolution or ordinance' - again, no Lawtey resolution located.
Why not higher
The delegation is proved three ways from the city side (website crawl, adopted budget, audited financials) and corroborated from the county side (only Starke is carved out, and the county's zoning page names Lawtey's zoning department while saying nothing about Lawtey building). Held at 82 rather than 90+ because Bradford County Code Sec. 1-5 conditions county enforcement inside a municipality on a municipal resolution that I could not find, and because Lawtey publishes no code of ordinances at all, so I am reading the city's silence rather than its ordinance. TWO CORRECTIONS TO EARLIER WORK, both findings in their own right. (1) The City of Lawtey's official website IS reachable and IS live - it is cityoflawtey.org (copyright 2026, Mayor Jimmie Scott, City Clerk Lisa Harley, 2793 Lake Street, (904) 782-3454, which matches the number the county publishes for 'Lawtey Zoning Department'). The domain a previous Bradford County run tried, lawteyfl.org, does not resolve, and lawteyfl.com / lawteyflorida.com are empty 114-byte parked pages. (2) DO NOT TRUST DOCUMENTS FOUND IN cityoflawtey.org's WordPress uploads folder. The media library is contaminated with other municipalities' files from the shared web vendor (MuniCreative): its ZONING-MAP.pdf is the City of STARKE's zoning map, its parks, CRA and natural-gas pages are Starke's text verbatim, and - the dangerous one - cityoflawtey.org/wp-content/uploads/Solar-Photovoltaic-System-Inspection-Process-1.pdf is the CITY OF LIVE OAK's (Suwannee County, 416 Howard St E, Live Oak FL 32064) solar PV inspection procedure, as are its Building-Official job description, its residential and commercial permit applications and its Ordinance 1504-1511 business impact estimates. None of those files is linked from any Lawtey page. Lawtey's own ordinances are numbered differently (Ordinance 25-01, OCR'd from the city's genuine Ordinance.pdf). Recording that Live Oak PDF as Lawtey's solar inspection process would have produced a confident, sourced, completely wrong answer.

https://bradfordcountyfl.gov/building-zoning/

Permit required
Yes - a permit is required, issued by Bradford County. The county's Building FAQ lists 'Repairs: replacement of water heaters or other plumbing fixtures, a/c units, new electrical service,80%
Permit cost
Bradford County fee, calculated on DECLARED VALUE of the electrical work: $50.00 for the first $1,000 of value plus $5.00 for each additional $1,000 (Resolution 2026-02,88%
Plan review
Bradford County's building page: an emailed application gets a reply 'within 2 business days' ('If you do not get a reply, WE DID NOT GET IT!'),80%
Portal
iWorQ Citizen Portal, at bradfordfl.portal.iworq.net/portalhome/bradfordfl (run by Bradford County, not by the City of Lawtey).88%
Electrical code
Bradford County Code Sec. 14-61 adopts 'that certain electrical code known as the National Electrical Code, published by the National Fire Protection Association,60%
Own placard wording
No. Neither authority specifies placard wording of its own.70%
Booking an inspection
Portal or phone, through Bradford County. The county's building page: 'Schedule Inspections: Call 904-966-6223 X1 OR Schedule Online 1 business day before you need the inspection.90%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes - a permit is required, issued by Bradford County. The county's Building FAQ lists 'Repairs: replacement of water heaters or other plumbing fixtures, a/c units, Q3 Electrical and building permits — Separate. Bradford County's permit portal offers a distinct 'Multi-Trade Permit Application - This application is for Electrical, HVAC, Mechanical, Plumbing work, Q4 Plan review — Bradford County's building page: an emailed application gets a reply 'within 2 business days' ('If you do not get a reply, WE DID NOT GET IT!'), Q18 Where you file — iWorQ Citizen Portal, at bradfordfl.portal.iworq.net/portalhome/bradfordfl (run by Bradford County, not by the City of Lawtey). Q20

Permit required
Yes - a permit is required, issued by Bradford County. The county's Building FAQ lists 'Repairs: replacement of water heaters or other plumbing fixtures, a/c units, new electrical service, rewiring,80% source
What it costs
Bradford County fee, calculated on DECLARED VALUE of the electrical work: $50.00 for the first $1,000 of value plus $5.00 for each additional $1,000 (Resolution 2026-02, Sections 10 and 11.D).88% source
Plan review turnaround
Bradford County's building page: an emailed application gets a reply 'within 2 business days' ('If you do not get a reply, WE DID NOT GET IT!'),80% source
Key document
permit portal cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? No. The City of Lawtey is NOT the AHJ for residential rooftop solar. Building and electrical permitting and inspection for an address inside Lawtey city limits are performed by the Bradford County Building Department, 945 N. Temple Ave (Court House North Wing), Starke FL 32091, (904) 966-6223 ext 2, building@bradfordcountyfl.gov, Building Official Rod Crawford. Lawtey retains zoning/land use only. 90% · department page
    • What does this authority permit itself, and what does it delegate? Delegated. Building and electrical are performed by Bradford County. Zoning is retained by the City of Lawtey: Bradford County's Planning & Zoning page says 'If you are looking for a zoning information for Lawtey, Brooker or Hampton you should contact their local zoning departments. Lawtey Zoning Department: (904) 782-3454... This Zoning Dept is responsible for all other areas in Bradford County.' Water, sewer, sanitation, police and fire suppression are also the City's. 88% · department page
    • Is a permit required for a residential rooftop PV system? Yes - a permit is required, issued by Bradford County. The county's Building FAQ lists 'Repairs: replacement of water heaters or other plumbing fixtures, a/c units, new electrical service, rewiring, etc.' among work requiring a permit, and states that a permit is required wherever the Florida Building Code applies. No solar or PV exemption exists anywhere in the Bradford County Code. 80% · department FAQ
    • Is there a separate electrical permit, or is it combined? Separate. Bradford County's permit portal offers a distinct 'Multi-Trade Permit Application - This application is for Electrical, HVAC, Mechanical, Plumbing work, etc.', separate from the 'Building Permit Application' (which is for new single-family dwellings, new modular homes, new commercial buildings and new stick-frame detached garages) and from the Mobile Home Permit Application. 80% · permit portal
    • Is a HOA or architectural approval required first? No. F.S. 163.04(2) (2026 Florida Statutes): 'A deed restriction, covenant, declaration, or similar binding agreement may not prohibit or have the effect of prohibiting solar collectors... from being installed on buildings erected on the lots or parcels covered by the deed restriction... A property owner may not be denied permission to install solar collectors or other energy devices by any entity granted the power or right in any deed restriction, covenant, declaration, or similar binding agreement to approve, forbid, control, or direct alteration of property.' Neither the county nor the City of Lawtey imposes an HOA or architectural-approval step of its own. 85% · statute
    • Is a wind or windstorm certification required? No separate windstorm certification, but there IS a live local wind amendment. Bradford County Code Sec. 14-33 amends Florida Building Code chapter 16: 'Pursuant to Figure 1609, the 100 mph wind speed line divides the County in to one wind load area: 100 mph. The 100 mph "wind speed line" is hereby designated as that portion of Highway 301 which lies north of County Road 225, and that portion of County Road 225 lying east...' - i.e. a single 100 mph basic wind speed for the whole county. Lawtey sits on US 301. The county's new-construction packet requires 'Truss details & Wind load calculations' for new houses. 70% · adopting ordinance
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor, or the property owner acting under the F.S. 489.503(6) owner-electrical exemption. Bradford County's portal publishes the statutory disclosure verbatim: 'State law requires electrical contracting to be done by licensed electrical contractors. You have applied for a permit under an exemption to that law. The exemption allows you, as the owner of your property, to act as your own electrical contractor even though you do not have a license. You may install electrical wiring for a farm outbuilding or a single-family or duplex residence... The home or building must be for your own use and occupancy. It may not be built for sale or lease.' 85% · permit portal
    • Must the contractor be registered with this authority before applying? Yes for work in the unincorporated county - Bradford County runs its own construction-trades Certificate of Competency programme (Code Ch. 14, Art. VII) and its current fee resolution charges 'Registered Contractor Renewal $40.00', 'MH Contractor Registration $50.00' and 'Change of Contractor $40.00'; the county's building page lists 'Contractor Registration' alongside permit applications and offers a contractor-licensing search. INSIDE LAWTEY CITY LIMITS THIS IS GENUINELY UNCERTAIN: Sec. 14-182(d) states the article 'shall be effective in all the unincorporated areas of the county, and in any incorporated area that has recognized the licenses and certificates granted under this article by means of a formal resolution or ordinance', and I found no such Lawtey resolution. 65% · municipal code
    • Is a homeowner permitted to self-install and self-permit? Yes. Bradford County's Building FAQ answers 'May I do my own work and permitting? Yes you may!' and quotes F.S. 489.103(7)(a) - owner-builder for one-family or two-family residences for the owner's own occupancy, not offered for sale or lease, with a presumption of violation if sold or leased within 1 year of completion. The separate owner-electrical exemption (F.S. 489.503(6)) is published on the permit portal. 88% · department FAQ
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? There is NO published solar/PV submittal checklist for this jurisdiction. The route is Bradford County's online 'Multi-Trade Permit Application' (Electrical), which the portal says must be filled in with all fields and required uploads before submission; a recorded Notice of Commencement is required for any project over $5,000 (blank form published); the applicant must have a 911/site address at time of permitting. For NEW residential construction - a different application - the county does publish a document list: truss details and wind-load calculations, Manual J / load short form with EPL/energy forms, notarised subcontractor verification list, survey showing flood-zone verification and site plan, minimum two sets of sealed engineered drawings including a typical wall section, recorded Notice of Commencement over $5,000, warranty deed if bought within 3 months. 55% · published checklist
    • How many copies, and in what format? Digital. Bradford County's building page: 'There are a few ways to get your BUILDING permit application to us. Email building@bradfordcountyfl.gov (three pages or less 8MB or less), Mail, or bring it in!... Send all permit applications in PDF format and titled correctly... We also have a "box" for you to upload large documents. PLEASE email us if you need that link.' For new residential construction the packet requires 'Min 2 sets of sealed engineered drawings' and 'One SITE COPY set of your drawings' posted on site. 70% · department page
    • Is a site plan required, and what must it show? Not required in print for an electrical/multi-trade permit. For new residential construction the county requires a 'Survey showing Flood Zone verification and site plan' and states that property lines must be clearly marked by the first inspection; the Zoning Department separately reviews zoning, setbacks and flood zone for the property on a $25 fee - but for an address inside Lawtey that zoning review is Lawtey's, not the county's. 55% · published checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? iWorQ Citizen Portal, at bradfordfl.portal.iworq.net/portalhome/bradfordfl (run by Bradford County, not by the City of Lawtey). Separate iWorQ front ends exist for building permit search (portal.iworq.net/BRADFORDFL/permits/600), the building permit archive 2000-April 2019 (bradfordfl2.../permits/602), fire permits (bradfordfl23.../permits/605), zoning permits (portal.iworq.net/BRADFORDFL/permits/603) and contractor licensing (bradfordfl.../entities/1101). Card payments go through Point & Pay (client.pointandpay.net/web/BradfordCountyBuildingandZoningFL). The City of Lawtey has NO permit portal - its only online payment system is PayGov.US, introduced 11 July 2024 for 'general city payments and utility payments' (water/sewer). 88% · permit portal
    • Can the whole application be completed online? Mostly, but not guaranteed. The portal's own instructions are '1 Click on the icon to begin. 2 Fill out all fields and attach required uploads. 3 Click Submit to send the application to the City.' Inspections can be requested online and results checked online, and fees can be paid online through Point & Pay. But the county's building page still offers email, mail and walk-in as equal routes, caps emailed submissions at 'three pages or less 8MB or less', requires you to email for a Box upload link for anything larger, and requires a mailed $25 cheque on letterhead for a permit search. 70% · permit portal
    • What does a residential solar permit cost? Bradford County fee, calculated on DECLARED VALUE of the electrical work: $50.00 for the first $1,000 of value plus $5.00 for each additional $1,000 (Resolution 2026-02, Sections 10 and 11.D). Minimum fee for any permit is $50.00; the county's FAQ puts the real-world floor at $54.00 ('the permit being $50 & a $4 state surcharge fee'). If a Private Provider is used for inspections or plan review the permit fee is reduced by 50% or $50.00, whichever is greater. Worked example: a $20,000 declared-value PV install = $50 + (19 x $5) = $145, plus the state surcharge. The CITY OF LAWTEY charges nothing - its adopted FY2025-26 budget shows Licenses and Permits as $0 in both funds. 88% · fee schedule
    • How is the fee calculated? Valuation - specifically declared (contract) value. Resolution 2026-02 Sec. 9.C: 'Electrical, Plumbing, Mechanical, Roofing, Docks, Pool, Spa, Sign, or Demolition. The declared value of the work shall be used as the basis for calculating the permit fee.' Sec. 8.B defines declared value as 'the amount to be charged by the contractor for construction, alteration, or repair of a building or structure or portion thereof, as documented by a written contract.' (New residential buildings instead use a square-foot 'standard value' table; mobile homes use a flat rate.) 90% · fee schedule
    • Is there a separate plan-check fee? No separate plan-check fee for a building or electrical permit. Resolution 2026-02 contains no plan-review line for building work; the only review-related charges are 'Re-submittal of Plans $75.00' and a private-provider discount. Fire plan review IS separately priced but only on a square-foot scale aimed at commercial site and building plans ($55 for 0-10,000 sf up to $110 for 50,001 sf or greater), plus fire sprinkler/alarm/standpipe review. 75% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Bradford County's building page: an emailed application gets a reply 'within 2 business days' ('If you do not get a reply, WE DID NOT GET IT!'), 'If you choose to submit through email please allow 24 hrs for a permit to be issued', and 'If REVIEWS are needed from the Building Official it will take 2-3 weeks'. The new-residential packet adds 'It may take up to 7-10 business days to review on your application.' Over the top of all of these, F.S. 553.792(1)(a)1 caps review at 5 BUSINESS DAYS for an electrical permit on an existing single-family dwelling where the value of the work is under $15,000 (30 business days if the structure is under 7,500 sq ft), with a mandatory 10%-per-business-day permit-fee reduction under 553.792(1)(e) if the deadline is missed. 80% · department page
    • Which utility handles interconnection here? Either Florida Power & Light (FPL) or Clay Electric Cooperative - I could not resolve which one serves Lawtey addresses. Bradford County's own New Residential Construction packet names both, side by side, as the electric service providers a Bradford applicant deals with: 'For new electrical service or transfer of electrical service an application must be submitted through your electrical service provider FPL - 1-800-462-0561 CLAY ELECTRIC - 352-473-8000 EXT 8356.' Clay Electric's own Quick Facts page confirms its service area includes Bradford County (one of 15 North Florida counties). The CITY OF LAWTEY IS NOT AN ELECTRIC UTILITY: its municipal utilities are water, sewer and sanitation only - its audited FY2024 financial statements show a single Water/Sewer business-type fund and no electric operation, and its budget carries an electric franchise fee ($45,500 received in FY2024, $43,000 budgeted FY2025-26), which is what a city collects FROM an outside electric provider. (Contrast the City of Starke, 10 miles south, which does run Florida's oldest municipal electric utility - that is Starke's, not Lawtey's.) 60% · AHJ packet + utility company page
    • Where does the utility sit in the sequence? No AHJ-side dependency is published. Bradford County's own new-construction packet puts the utility step on the applicant: 'For new electrical service or transfer of electrical service an application must be submitted through your electrical service provider'. Neither the county nor the City of Lawtey conditions permit issuance on prior utility approval in anything I could read. 45% · AHJ packet

28 questions answered against City of Lawtey’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

No. The City of Lawtey is NOT the AHJ for residential rooftop solar. Building and electrical permitting and inspection for an address inside Lawtey city limits are performed by the Bradford County Building Department, 945 N. Temple Ave (Court House North Wing), Starke FL 32091, (904) 966-6223 ext 2, building@bradfordcountyfl.gov, Building Official Rod Crawford. Lawtey retains zoning/land use only.

Why the confidence is not higherBradford County's Building Department page carves out only the City of Starke and names no carve-out for Lawtey; Lawtey's own website (all 42 sitemap pages crawled) has no building department, no permit page and no fee schedule; and Lawtey's adopted FY2025-26 budget shows $0 of Licenses and Permits revenue. Held at 90 rather than 95 because Bradford County Code Sec. 1-5 conditions county enforcement inside a municipality on a municipal resolution I could not locate.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Delegated. Building and electrical are performed by Bradford County. Zoning is retained by the City of Lawtey: Bradford County's Planning & Zoning page says 'If you are looking for a zoning information for Lawtey, Brooker or Hampton you should contact their local zoning departments. Lawtey Zoning Department: (904) 782-3454... This Zoning Dept is responsible for all other areas in Bradford County.' Water, sewer, sanitation, police and fire suppression are also the City's.

Why the confidence is not higherThe zoning split is stated in writing by the county zoning office and the number it gives is Lawtey City Hall's own main line. The building half is proved by absence on the city side and by the county's Starke-only carve-out, not by a signed delegation document.

department page checked 2026-09-14 https://bradfordcountyfl.gov/zoning/

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes - a permit is required, issued by Bradford County. The county's Building FAQ lists 'Repairs: replacement of water heaters or other plumbing fixtures, a/c units, new electrical service, rewiring, etc.' among work requiring a permit, and states that a permit is required wherever the Florida Building Code applies. No solar or PV exemption exists anywhere in the Bradford County Code.

Why the confidence is not higherThe county states the general rule plainly but never names solar or PV. I read the full text of Bradford County Code Ch. 14 (Buildings and Building Regulations, 81,268 characters) and Ch. 36 (Fire Prevention, 49,746 characters) via the Municode content API: 'solar' appears three times, all three in HARV and plumbing contractor definitions about solar thermal water heating, none about photovoltaics; 'photovoltaic' appears zero times. Controls run in the same fetch: 'electrical' 20 hits and 'NEC' 28 hits (positive), 'zzqqx' 0 hits (fabricated).

department FAQ checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate. Bradford County's permit portal offers a distinct 'Multi-Trade Permit Application - This application is for Electrical, HVAC, Mechanical, Plumbing work, etc.', separate from the 'Building Permit Application' (which is for new single-family dwellings, new modular homes, new commercial buildings and new stick-frame detached garages) and from the Mobile Home Permit Application.

Why the confidence is not higherThe portal names the three application routes and says exactly what each is for. Held below 90 because neither the portal nor the fee resolution says which route a rooftop PV retrofit takes; 'Electrical' on the Multi-Trade form is the obvious fit but the county does not say so in print.

permit portal checked 2026-09-14 https://bradfordfl.portal.iworq.net/portalhome/bradfordfl

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor, or the property owner acting under the F.S. 489.503(6) owner-electrical exemption. Bradford County's portal publishes the statutory disclosure verbatim: 'State law requires electrical contracting to be done by licensed electrical contractors. You have applied for a permit under an exemption to that law. The exemption allows you, as the owner of your property, to act as your own electrical contractor even though you do not have a license. You may install electrical wiring for a farm outbuilding or a single-family or duplex residence... The home or building must be for your own use and occupancy. It may not be built for sale or lease.'

Why the confidence is not higherQuoted verbatim from the county's own live permit portal. Held at 85 because it is the statewide statutory text rather than a Bradford-specific rule, and because the portal does not separately address who may pull a PV-specific permit.

permit portal checked 2026-09-14 https://bradfordfl.portal.iworq.net/portalhome/bradfordfl

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes for work in the unincorporated county - Bradford County runs its own construction-trades Certificate of Competency programme (Code Ch. 14, Art. VII) and its current fee resolution charges 'Registered Contractor Renewal $40.00', 'MH Contractor Registration $50.00' and 'Change of Contractor $40.00'; the county's building page lists 'Contractor Registration' alongside permit applications and offers a contractor-licensing search. INSIDE LAWTEY CITY LIMITS THIS IS GENUINELY UNCERTAIN: Sec. 14-182(d) states the article 'shall be effective in all the unincorporated areas of the county, and in any incorporated area that has recognized the licenses and certificates granted under this article by means of a formal resolution or ordinance', and I found no such Lawtey resolution.

Why the confidence is not higherThe registration requirement and its fees are in the county's own codified ordinance and current fee resolution, so the county half is solid; the Lawtey half turns on a municipal resolution whose existence I could not establish either way. Reported as the split it actually is rather than flattened to a yes.

municipal code checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. Bradford County's Building FAQ answers 'May I do my own work and permitting? Yes you may!' and quotes F.S. 489.103(7)(a) - owner-builder for one-family or two-family residences for the owner's own occupancy, not offered for sale or lease, with a presumption of violation if sold or leased within 1 year of completion. The separate owner-electrical exemption (F.S. 489.503(6)) is published on the permit portal.

Why the confidence is not higherStated in the county's own FAQ in those words and backed by the statute it quotes. Held at 88 because the county publishes the general rule, not a solar-specific self-install policy, and because the same FAQ warns that the owner is solely responsible for insurance and workers' compensation for anyone they hire.

department FAQ checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q8 What documents make up a complete submittal? Core Submittal package

There is NO published solar/PV submittal checklist for this jurisdiction. The route is Bradford County's online 'Multi-Trade Permit Application' (Electrical), which the portal says must be filled in with all fields and required uploads before submission; a recorded Notice of Commencement is required for any project over $5,000 (blank form published); the applicant must have a 911/site address at time of permitting. For NEW residential construction - a different application - the county does publish a document list: truss details and wind-load calculations, Manual J / load short form with EPL/energy forms, notarised subcontractor verification list, survey showing flood-zone verification and site plan, minimum two sets of sealed engineered drawings including a typical wall section, recorded Notice of Commencement over $5,000, warranty deed if bought within 3 months.

Why the confidence is not higherThe new-construction list is quoted from the county's own current packet, but it is explicitly for new single-family and modular homes and does not govern a PV retrofit. For the electrical/multi-trade route the county publishes no document list at all. I looked at the building department page, all published application packets, the portal home, the fee resolution and the full text of Code Ch. 14.

published checklist checked 2026-09-14 https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q9 How many copies, and in what format? Submittal package

Digital. Bradford County's building page: 'There are a few ways to get your BUILDING permit application to us. Email building@bradfordcountyfl.gov (three pages or less 8MB or less), Mail, or bring it in!... Send all permit applications in PDF format and titled correctly... We also have a "box" for you to upload large documents. PLEASE email us if you need that link.' For new residential construction the packet requires 'Min 2 sets of sealed engineered drawings' and 'One SITE COPY set of your drawings' posted on site.

Why the confidence is not higherQuoted from the county's own department page and packet. Held at 70 because the copy count (2 sets) is stated for new construction only; no copy or format requirement is published for an electrical/multi-trade permit beyond 'PDF format'.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q10 Is a site plan required, and what must it show? Core Submittal package

Not required in print for an electrical/multi-trade permit. For new residential construction the county requires a 'Survey showing Flood Zone verification and site plan' and states that property lines must be clearly marked by the first inspection; the Zoning Department separately reviews zoning, setbacks and flood zone for the property on a $25 fee - but for an address inside Lawtey that zoning review is Lawtey's, not the county's.

Why the confidence is not higherThe site-plan requirement is quoted from the county's own new-construction packet but that packet does not cover a rooftop PV retrofit, and nothing published by either the county or the City of Lawtey says what a PV site plan must show. Lawtey's own land development code is not published anywhere, so a city-side site-plan requirement cannot be ruled out.

published checklist checked 2026-09-14 https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedBradford County building department page; Building & Zoning FAQs; the iWorQ Citizen Portal's three application routes (Building, Multi-Trade/Electrical, Mobile Home); all four published packets (New Single Family and Modular Home, Commercial, Stick Frame Garage, Mobile Home); Resolution 2026-02; the full text of Bradford County Code Ch. 14; and all 42 pages of cityoflawtey.org. No one-line or three-line diagram requirement is published anywhere. Neither authority publishes any PV submittal checklist.

https://bradfordfl.portal.iworq.net/portalhome/bradfordfl

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame sources as q11. No string, conductor, voltage-drop or ampacity calculation requirement is published. The only calculations either authority names are truss/wind-load calculations and a Manual J load short form, both required for NEW residential construction only.

https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedBradford County Code Ch. 14 in full; Resolution 2026-02; the building department page and FAQs; all published packets. No structural PE stamp threshold for PV is published. The only sealed-drawing requirement is for new residential construction ('Min 2 sets of sealed engineered drawings to include a typical wall section from foundation to roof line'), which does not govern a roof-mounted retrofit. Lawtey publishes no land development code, so a city-side threshold cannot be excluded.

https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedBradford County Code Ch. 14 Art. III (Electrical Code) in full - it is two sections long and says nothing about engineering; Resolution 2026-02; the building page, FAQs and portal. No electrical PE stamp requirement or threshold is published by either authority.

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q15 What does a residential solar permit cost? Core Fees

Bradford County fee, calculated on DECLARED VALUE of the electrical work: $50.00 for the first $1,000 of value plus $5.00 for each additional $1,000 (Resolution 2026-02, Sections 10 and 11.D). Minimum fee for any permit is $50.00; the county's FAQ puts the real-world floor at $54.00 ('the permit being $50 & a $4 state surcharge fee'). If a Private Provider is used for inspections or plan review the permit fee is reduced by 50% or $50.00, whichever is greater. Worked example: a $20,000 declared-value PV install = $50 + (19 x $5) = $145, plus the state surcharge. The CITY OF LAWTEY charges nothing - its adopted FY2025-26 budget shows Licenses and Permits as $0 in both funds.

Why the confidence is not higherRead directly from Resolution 2026-02 ('Building and Fire Permit Fees'), which is the county's current schedule - effective March 3, 2026, replacing Resolution 2019-62 in its entirety. The PDF's embedded text layer is badly mangled (it is a scan-through-Distiller job) so the headings read as garbage, but the numeric table and the fee-calculation sentences extracted cleanly with pdftotext -layout. Held at 88 rather than 95 because the resolution has no PV or solar line item at all - the $5-per-$1,000-of-declared-value rule is the general electrical rule and I am applying it to solar, which the county does not do in print.

fee schedule checked 2026-09-14 https://bradfordcounty.box.com/s/ls7f6315b36e7w062yoo8ynl1a69kw5b

Q16 How is the fee calculated? Core Fees

Valuation - specifically declared (contract) value. Resolution 2026-02 Sec. 9.C: 'Electrical, Plumbing, Mechanical, Roofing, Docks, Pool, Spa, Sign, or Demolition. The declared value of the work shall be used as the basis for calculating the permit fee.' Sec. 8.B defines declared value as 'the amount to be charged by the contractor for construction, alteration, or repair of a building or structure or portion thereof, as documented by a written contract.' (New residential buildings instead use a square-foot 'standard value' table; mobile homes use a flat rate.)

Why the confidence is not higherQuoted from the county's own current fee resolution. Held at 90 because 'solar' is not among the listed work types, so the classification of a PV install as Electrical is an inference - a reasonable one, since the portal routes electrical work to the Multi-Trade application.

fee schedule checked 2026-09-14 https://bradfordcounty.box.com/s/ls7f6315b36e7w062yoo8ynl1a69kw5b

Q17 Is there a separate plan-check fee? Fees

No separate plan-check fee for a building or electrical permit. Resolution 2026-02 contains no plan-review line for building work; the only review-related charges are 'Re-submittal of Plans $75.00' and a private-provider discount. Fire plan review IS separately priced but only on a square-foot scale aimed at commercial site and building plans ($55 for 0-10,000 sf up to $110 for 50,001 sf or greater), plus fire sprinkler/alarm/standpipe review.

Why the confidence is not higherProved by reading the whole of the current fee resolution rather than by a statement that no such fee exists. Held at 75 because the resolution's mangled text layer means I am reading a table whose headings are partly unreadable, though every numeric line extracted cleanly.

fee schedule checked 2026-09-14 https://bradfordcounty.box.com/s/ls7f6315b36e7w062yoo8ynl1a69kw5b

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Bradford County's building page: an emailed application gets a reply 'within 2 business days' ('If you do not get a reply, WE DID NOT GET IT!'), 'If you choose to submit through email please allow 24 hrs for a permit to be issued', and 'If REVIEWS are needed from the Building Official it will take 2-3 weeks'. The new-residential packet adds 'It may take up to 7-10 business days to review on your application.' Over the top of all of these, F.S. 553.792(1)(a)1 caps review at 5 BUSINESS DAYS for an electrical permit on an existing single-family dwelling where the value of the work is under $15,000 (30 business days if the structure is under 7,500 sq ft), with a mandatory 10%-per-business-day permit-fee reduction under 553.792(1)(e) if the deadline is missed.

Why the confidence is not higherThe county's own numbers are quoted from its live department page and its own packet; the statutory cap is quoted from the 2026 Florida Statutes. Held at 80 because the county's published '2-3 weeks if reviews are needed' is flatly longer than the statute allows for a small residential electrical permit, and I could not establish which figure a real PV application actually meets.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedBradford County building department page, Building & Zoning FAQs, the iWorQ portal, Resolution 2026-02 and the full text of Code Ch. 14. No permit expiry period is published. The Florida Building Code's own administrative chapter would supply the default, but I did not read the FBC text in this run and will not quote a figure I have not verified.

https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q20 Which permit portal does this authority use? Core Portal & process

iWorQ Citizen Portal, at bradfordfl.portal.iworq.net/portalhome/bradfordfl (run by Bradford County, not by the City of Lawtey). Separate iWorQ front ends exist for building permit search (portal.iworq.net/BRADFORDFL/permits/600), the building permit archive 2000-April 2019 (bradfordfl2.../permits/602), fire permits (bradfordfl23.../permits/605), zoning permits (portal.iworq.net/BRADFORDFL/permits/603) and contractor licensing (bradfordfl.../entities/1101). Card payments go through Point & Pay (client.pointandpay.net/web/BradfordCountyBuildingandZoningFL). The City of Lawtey has NO permit portal - its only online payment system is PayGov.US, introduced 11 July 2024 for 'general city payments and utility payments' (water/sewer).

Why the confidence is not higherAll URLs taken from the county's own building page and portal, and the PayGov.US detail from the City of Lawtey's own Utility Services page. Held at 88 because the search front ends are reCAPTCHA-gated so I could not verify that Lawtey-address permits actually appear in them.

permit portal checked 2026-09-14 https://bradfordfl.portal.iworq.net/portalhome/bradfordfl

Q21 Can the whole application be completed online? Core Portal & process

Mostly, but not guaranteed. The portal's own instructions are '1 Click on the icon to begin. 2 Fill out all fields and attach required uploads. 3 Click Submit to send the application to the City.' Inspections can be requested online and results checked online, and fees can be paid online through Point & Pay. But the county's building page still offers email, mail and walk-in as equal routes, caps emailed submissions at 'three pages or less 8MB or less', requires you to email for a Box upload link for anything larger, and requires a mailed $25 cheque on letterhead for a permit search.

Why the confidence is not higherBoth halves are quoted from the county's own live pages. Held at 70 because 'can the WHOLE application be completed online' is not answered directly anywhere, and the 8MB / three-page email cap plus the separate Box-link workaround suggests the online path is not always sufficient in practice.

permit portal checked 2026-09-14 https://bradfordfl.portal.iworq.net/portalhome/bradfordfl

Q22 Which utility handles interconnection here? Core Utility interconnection

Either Florida Power & Light (FPL) or Clay Electric Cooperative - I could not resolve which one serves Lawtey addresses. Bradford County's own New Residential Construction packet names both, side by side, as the electric service providers a Bradford applicant deals with: 'For new electrical service or transfer of electrical service an application must be submitted through your electrical service provider FPL - 1-800-462-0561 CLAY ELECTRIC - 352-473-8000 EXT 8356.' Clay Electric's own Quick Facts page confirms its service area includes Bradford County (one of 15 North Florida counties). The CITY OF LAWTEY IS NOT AN ELECTRIC UTILITY: its municipal utilities are water, sewer and sanitation only - its audited FY2024 financial statements show a single Water/Sewer business-type fund and no electric operation, and its budget carries an electric franchise fee ($45,500 received in FY2024, $43,000 budgeted FY2025-26), which is what a city collects FROM an outside electric provider. (Contrast the City of Starke, 10 miles south, which does run Florida's oldest municipal electric utility - that is Starke's, not Lawtey's.)

Why the confidence is not higherThe two candidate utilities are named by the county itself and Clay's Bradford coverage is from Clay's own site, so the shortlist is solid. The reason this is 60 and not higher is that neither utility publishes an address-level or city-level territory statement I could reach, and the City of Lawtey's own site and budget name no provider. Per the playbook's PowerToChoose warning I did not substitute a ZIP-level lookup for a real territory source. This must be confirmed per address from the utility before it is relied on.

AHJ packet + utility company page checked 2026-09-14 https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

No AHJ-side dependency is published. Bradford County's own new-construction packet puts the utility step on the applicant: 'For new electrical service or transfer of electrical service an application must be submitted through your electrical service provider'. Neither the county nor the City of Lawtey conditions permit issuance on prior utility approval in anything I could read.

Why the confidence is not higherThis is an inference from one county document written for new houses, not for PV interconnection. I did NOT read FPL's or Clay Electric's distributed-generation / net-metering manual in this run, and without knowing which utility serves Lawtey I could not have picked the right one. Treat the sequence as unverified until the utility is fixed and its DG manual read.

AHJ packet checked 2026-09-14 https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No. F.S. 163.04(2) (2026 Florida Statutes): 'A deed restriction, covenant, declaration, or similar binding agreement may not prohibit or have the effect of prohibiting solar collectors... from being installed on buildings erected on the lots or parcels covered by the deed restriction... A property owner may not be denied permission to install solar collectors or other energy devices by any entity granted the power or right in any deed restriction, covenant, declaration, or similar binding agreement to approve, forbid, control, or direct alteration of property.' Neither the county nor the City of Lawtey imposes an HOA or architectural-approval step of its own.

Why the confidence is not higherThe statute is read directly from the Legislature's own 2026 statutes site, and the absence of a local architectural-review step is from the full text of Bradford County Code Ch. 14 and Ch. 36 plus the whole Lawtey website. Held at 85 because Lawtey's land development code is not published, so a city architectural overlay cannot be positively excluded - though F.S. 163.04(1) would void it as to solar in any case.

statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0163/Sections/0163.04.html

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedAll 42 pages of cityoflawtey.org (no historic district, no historic preservation board, no architectural review); the Bradford County Code table of contents, which has no historic-preservation chapter (the county has a Historical Commission that keeps minutes, not a design-review body). I did NOT read Bradford County Code Ch. 58 (Planning) or Appendix A (Land Development Regulations) in full, and Lawtey's own land development code is not published anywhere, so I cannot prove a Lawtey historic overlay does not exist.

https://cityoflawtey.org/

Q26 Is a wind or windstorm certification required? Overlays & special cases

No separate windstorm certification, but there IS a live local wind amendment. Bradford County Code Sec. 14-33 amends Florida Building Code chapter 16: 'Pursuant to Figure 1609, the 100 mph wind speed line divides the County in to one wind load area: 100 mph. The 100 mph "wind speed line" is hereby designated as that portion of Highway 301 which lies north of County Road 225, and that portion of County Road 225 lying east...' - i.e. a single 100 mph basic wind speed for the whole county. Lawtey sits on US 301. The county's new-construction packet requires 'Truss details & Wind load calculations' for new houses.

Why the confidence is not higherThe amendment text is read directly from the codified ordinance. Held at 70 because Sec. 14-33 is a county amendment and Bradford County Code Sec. 1-5 makes county enforcement inside a municipality conditional on a municipal resolution, so whether this amendment binds inside Lawtey city limits is the same open question as the rest of the delegation; and because no wind-load submittal requirement is published for a PV retrofit as opposed to a new house.

adopting ordinance checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedThe City of Lawtey retains zoning, and its land development code is not published: Lawtey is not a Municode client (checked against the full Florida client list of 416 - Bradford County, Hampton and Starke are all there, Lawtey is not), not an American Legal client (its Florida list is Briny Breezes, Hollywood, Lake Mary, Melbourne Beach, Mexico Beach, Palm Bay, Palm Shores, Pembroke Pines, Pompano Beach, Weston), codepublishing.com/FL/Lawtey is a 404, lawteyfl.municipalcodeonline.com returns a 500, and cityoflawtey.org publishes no code link (its City Clerk page refers to 'the City Code of Ordinances' without one). eCode360 could not be checked at all - both resolve.ecode360.com and ecode360.com returned a Cloudflare 403 to curl even with the iccsafe.org Referer, and headless Chrome hung on the challenge. So whether Lawtey ever requires a special use permit or council approval for a solar installation is unknown, not absent. The ZONING-MAP.pdf on Lawtey's own website is the City of STARKE's zoning map, not Lawtey's.

https://cityoflawtey.org/city-clerk/

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedFull text of Bradford County Code Ch. 14 and Ch. 36 (no PV text at all; 'photovoltaic' zero hits, controls passing) and Resolution 2026-02 - the county imposes no system-size cap. But the two possible caps both sit outside what I could read: Lawtey's own unpublished land development code, and the interconnection limits of whichever utility serves the address (FPL or Clay Electric - neither DG manual read in this run). Recorded as unknown rather than as 'no cap'.

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? Bradford County Code Sec. 14-61 adopts 'that certain electrical code known as the National Electrical Code, published by the National Fire Protection Association, in the most recent edition in effect at the time of application' - a FLOATING adoption with no year in the ordinance text. In practice Florida's electrical requirements ride on the Florida Building Code, 8th Edition (2023), which references NFPA 70-2020; a current Florida building department's own residential permit application (City of Live Oak, last revised 01/16/2024) states the pairing as '8th EDITION (2023) FLORIDA BUILDING CODES and 2020 NEC'. 60% · adopting ordinance
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023). The Florida Building Commission's own site states on 14 Sep 2026: 'The Effective Date for the Florida Building Code, 8th Edition (2023), is December 31, 2023.' Bradford County Code Sec. 14-31 adopts it by reference - 'that certain building code known as the Florida Building Code which is a single statewide unified code developed and maintained by the Florida Building Commission' - including the Building (with energy, accessibility and state agency regulations), Plumbing, Mechanical and Fuel Gas Codes. Sec. 14-34 fixes each permit to the FBC version in effect on the date of application. 92% · adopting regulation
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition. Bradford County's Fire Prevention page states 'FL Fire Prevention Code is the 8th edition' and that the office 'enforces the Fla. Fire Prevention Code'. Bradford County Code Sec. 36-1 adopts it floatingly: 'Bradford County hereby adopts the Florida Fire Prevention Code, more particularly set forth in F.S. ch. 633, as if fully set forth herein and as the same may be amended from time to time.' Sec. 36-2 makes the County Fire Marshal responsible for 'the application, implementation and enforcement of NFPA 1 and NFPA 101'. 85% · department page
    • Are there local amendments to any of the above? Yes, but none of them touch PV. Bradford County Code Sec. 14-33 amends FBC chapter 16 to set a single 100 mph basic wind speed area for the whole county (with the wind-speed line described along Highway 301 north of CR 225 and along CR 225); Sec. 14-34 fixes permits to the FBC version in force at application. Fire is adopted floatingly with no local amendment (Sec. 36-1). Electrical is adopted floatingly with no local amendment (Sec. 14-61); Sec. 14-62 simply says 'The building official shall be responsible for the administration and enforcement of this article.' The City of Lawtey publishes no code of ordinances at all, so it has no visible amendments. 85% · adopting ordinance
    • What is the installation judged against? The Florida Building Code 8th Edition (2023) as adopted at Bradford County Code Sec. 14-31, the National Electrical Code as adopted at Sec. 14-61, and the Florida Fire Prevention Code 8th Edition as adopted at Sec. 36-1 - all enforced by the Bradford County Building Official, who Sec. 14-62 makes 'responsible for the administration and enforcement of' the electrical article. Sec. 14-32 adds 'No building permit shall be issued for any structure which does not, or shall not, comply with any ordinance.' 80% · adopting ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Lawtey on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, by way of the adopted NEC rather than by any local rule - Bradford County Code Sec. 14-61 adopts the National Electrical Code 'in the most recent edition in effect at the time of application', which carries the 690.12 rapid-shutdown requirement. Neither Bradford County nor the City of Lawtey publishes a rapid-shutdown provision of its own. 55% · adopting ordinance
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? None of its own. Neither the City of Lawtey nor Bradford County publishes any placard, label or marking requirement for PV service equipment - what applies is whatever the adopted NEC requires, as the Bradford County Building Official enforces it under Sec. 14-62. 65% · municipal code
    • Does the authority specify placard wording of its own? No. Neither authority specifies placard wording of its own. 70% · municipal code
    • Does it specify letter height, colour or material? No. No letter height, colour, contrast or material is specified by either the City of Lawtey or Bradford County. The only lettering specification either authority publishes is for the 911 site address, not for electrical placards: 'Address must be posted with 4in. #'s that contrast from their background.' 70% · AHJ packet
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Must equipment be on a specific approved list? No local approved-equipment list. Neither the City of Lawtey nor Bradford County maintains or references a product list of its own; the county's Building & Zoning Links page simply points at floridabuilding.org (the statewide Florida Product Approval system) and nfpa.org. 60% · department page
    • Is there a local rule on service upgrades or busbar sizing? No local rule. Bradford County Code Ch. 14 Art. III (Electrical Code) is two sections long - Sec. 14-61 adopts the NEC and Sec. 14-62 assigns enforcement to the building official - and Secs. 14-63 to 14-90 are reserved. There is no service-upgrade, busbar, or interconnection provision anywhere in the chapter, and the current fee resolution has no service-upgrade line item. The City of Lawtey publishes nothing. 70% · municipal code

20 questions answered against City of Lawtey’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

Bradford County Code Sec. 14-61 adopts 'that certain electrical code known as the National Electrical Code, published by the National Fire Protection Association, in the most recent edition in effect at the time of application' - a FLOATING adoption with no year in the ordinance text. In practice Florida's electrical requirements ride on the Florida Building Code, 8th Edition (2023), which references NFPA 70-2020; a current Florida building department's own residential permit application (City of Live Oak, last revised 01/16/2024) states the pairing as '8th EDITION (2023) FLORIDA BUILDING CODES and 2020 NEC'.

Why the confidence is not higherThe floating local adoption is quoted verbatim from the codified ordinance and is certain. The NEC YEAR is not: the ordinance names no year, Bradford County publishes no NEC edition anywhere, and the corroboration I have is another Florida city's permit form rather than the Florida Building Commission's own referenced-standards table (codes.iccsafe.org 403'd this run). Read literally, 'the most recent edition in effect at the time of application' could be argued up to NEC 2023; confirm with the Building Official before relying on a year.

adopting ordinance checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023). The Florida Building Commission's own site states on 14 Sep 2026: 'The Effective Date for the Florida Building Code, 8th Edition (2023), is December 31, 2023.' Bradford County Code Sec. 14-31 adopts it by reference - 'that certain building code known as the Florida Building Code which is a single statewide unified code developed and maintained by the Florida Building Commission' - including the Building (with energy, accessibility and state agency regulations), Plumbing, Mechanical and Fuel Gas Codes. Sec. 14-34 fixes each permit to the FBC version in effect on the date of application.

Why the confidence is not higherRead today from the Florida Building Commission's own homepage and from the codified county ordinance. The same page carries 'Materials related to the 2026 Update (Including Tracking Charts)', so the next edition is in progress but not in force; held at 92 rather than higher only because that update is live and the position could change within the year.

adopting regulation checked 2026-09-14 https://floridabuilding.org/c/default.aspx

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition. Bradford County's Fire Prevention page states 'FL Fire Prevention Code is the 8th edition' and that the office 'enforces the Fla. Fire Prevention Code'. Bradford County Code Sec. 36-1 adopts it floatingly: 'Bradford County hereby adopts the Florida Fire Prevention Code, more particularly set forth in F.S. ch. 633, as if fully set forth herein and as the same may be amended from time to time.' Sec. 36-2 makes the County Fire Marshal responsible for 'the application, implementation and enforcement of NFPA 1 and NFPA 101'.

Why the confidence is not higherThe edition is stated in the county's own words on its own current page and the adoption is in its codified ordinance. Held at 85 because the page is undated and because it is the COUNTY fire office - whether it, or the City of Lawtey's own Fire Department, is the fire official inside Lawtey city limits is not stated by either body.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/fire-prevention/

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, but none of them touch PV. Bradford County Code Sec. 14-33 amends FBC chapter 16 to set a single 100 mph basic wind speed area for the whole county (with the wind-speed line described along Highway 301 north of CR 225 and along CR 225); Sec. 14-34 fixes permits to the FBC version in force at application. Fire is adopted floatingly with no local amendment (Sec. 36-1). Electrical is adopted floatingly with no local amendment (Sec. 14-61); Sec. 14-62 simply says 'The building official shall be responsible for the administration and enforcement of this article.' The City of Lawtey publishes no code of ordinances at all, so it has no visible amendments.

Why the confidence is not higherEstablished by reading the complete text of Bradford County Code Ch. 14 (81,268 characters) and Ch. 36 (49,746 characters) pulled from the Municode content API at jobId 480576 / productId 12772, with controls in the same run ('electrical' 20 hits, 'NEC' 28 hits, 'zzqqx' 0 hits, 'photovoltaic' 0 hits). Held at 85 because I did not read Appendix A (Land Development Regulations) or Ch. 58 (Planning) in full, and because Lawtey's own unpublished code is a genuine blind spot.

adopting ordinance checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q33 What is the installation judged against? Core Electrical

The Florida Building Code 8th Edition (2023) as adopted at Bradford County Code Sec. 14-31, the National Electrical Code as adopted at Sec. 14-61, and the Florida Fire Prevention Code 8th Edition as adopted at Sec. 36-1 - all enforced by the Bradford County Building Official, who Sec. 14-62 makes 'responsible for the administration and enforcement of' the electrical article. Sec. 14-32 adds 'No building permit shall be issued for any structure which does not, or shall not, comply with any ordinance.'

Why the confidence is not higherEvery clause quoted from the codified ordinance or the Florida Building Commission. Held at 80 because none of these documents mentions photovoltaics, so what a PV install is actually judged against is the general code stack rather than anything solar-specific, and because the Sec. 1-5 municipal-enforcement caveat applies inside Lawtey.

adopting ordinance checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local rule. Bradford County Code Ch. 14 Art. III (Electrical Code) is two sections long - Sec. 14-61 adopts the NEC and Sec. 14-62 assigns enforcement to the building official - and Secs. 14-63 to 14-90 are reserved. There is no service-upgrade, busbar, or interconnection provision anywhere in the chapter, and the current fee resolution has no service-upgrade line item. The City of Lawtey publishes nothing.

Why the confidence is not higherA proved absence: I read the whole of Ch. 14 with positive and fabricated controls passing in the same fetch. Held at 70 rather than higher because 'no local rule' means the NEC's own busbar provisions apply as the Building Official reads them, and the Building Official's practice is not published anywhere.

municipal code checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedBradford County Code Ch. 14 in full (including Sec. 14-33, the only FBC amendment, which covers basic wind speed and nothing else), Resolution 2026-02, the building page, FAQs and all published packets; and all 42 pages of cityoflawtey.org. No mounting system, attachment spacing, flashing or standoff requirement is published by either authority.

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedBradford County Code Ch. 36 (Fire Prevention) in full - 49,746 characters, zero hits for 'solar', 'photovoltaic' and the fabricated control 'zzqqx' - which adopts the Florida Fire Prevention Code floatingly at Sec. 36-1 and adds no amendment; Bradford County Code Ch. 14 in full; the county's Fire Prevention page, which states the FFPC 8th Edition is in force and that the office enforces NFPA 1 and NFPA 101. The ridge-setback and access-pathway substance therefore lives in NFPA 1 as adopted by the FFPC 8th Edition, which I did not read in this run. Recording the figures from memory would be exactly the confabulation this brief forbids.

https://bradfordcountyfl.gov/building-zoning/fire-prevention/

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, by way of the adopted NEC rather than by any local rule - Bradford County Code Sec. 14-61 adopts the National Electrical Code 'in the most recent edition in effect at the time of application', which carries the 690.12 rapid-shutdown requirement. Neither Bradford County nor the City of Lawtey publishes a rapid-shutdown provision of its own.

Why the confidence is not higherThe adoption clause is certain; the edition it resolves to is not (see q29), and rapid-shutdown requirements differ between NEC 2017, 2020 and 2023. The county says nothing about rapid shutdown at all, so this is inference from the adopting ordinance rather than a published requirement. Confirm the NEC year with the Building Official before designing to it.

adopting ordinance checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

None of its own. Neither the City of Lawtey nor Bradford County publishes any placard, label or marking requirement for PV service equipment - what applies is whatever the adopted NEC requires, as the Bradford County Building Official enforces it under Sec. 14-62.

Why the confidence is not higherA proved absence on the AHJ side: the complete text of Bradford County Code Ch. 14 and Ch. 36 contains zero occurrences of 'photovoltaic' and no placard or labelling specification, the current fee resolution has none, no county solar handout exists, and a crawl of all 42 pages of the City of Lawtey's website found no permitting content whatsoever. Held at 65 because 'none published' is not the same as 'the inspector will not ask for any', and because I did not read either candidate utility's DG manual, which may add its own (see q42).

municipal code checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. Neither authority specifies placard wording of its own.

Why the confidence is not higherProved in this run by reading the full text of Bradford County Code Ch. 14 (Buildings) and Ch. 36 (Fire Prevention) with positive controls passing ('electrical' 20 hits, 'NEC' 28) and the fabricated control failing ('zzqqx' 0), plus the county's fee resolution, building page, FAQ, fire prevention page and all published application packets, plus every page on cityoflawtey.org. No wording appears anywhere. Held at 70 because an unpublished inspector preference cannot be excluded from documents alone.

municipal code checked 2026-09-14 https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No. No letter height, colour, contrast or material is specified by either the City of Lawtey or Bradford County. The only lettering specification either authority publishes is for the 911 site address, not for electrical placards: 'Address must be posted with 4in. #'s that contrast from their background.'

Why the confidence is not higherSame proved absence as q39, from the same full-text reads. The 4-inch address rule is quoted from the county's own new-construction packet and is included precisely because it is the one lettering spec that DOES exist - it is about the site address, and mistaking it for a placard spec would be wrong.

AHJ packet checked 2026-09-14 https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedFull text of Bradford County Code Ch. 14 and Ch. 36; Resolution 2026-02; the county building page, FAQs and portal; all published packets; all 42 pages of cityoflawtey.org. No site-plan or facility-map placard requirement is published locally. The requirement would come from NEC 690/705 as the Building Official applies it, and the NEC edition in force is itself unresolved (see q29).

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNot reached. This question belongs at utility level and I could not fix the utility: Bradford County's own packet names FPL and Clay Electric Cooperative side by side without saying which serves which area, and neither the City of Lawtey's website nor its audited accounts names a provider. I did not open either utility's distributed-generation or interconnection manual because attributing one of them to Lawtey would have been a guess.

https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedFull text of Bradford County Code Ch. 14 and Ch. 36, Resolution 2026-02, the county building page, FAQs, portal and packets, and all 42 pages of cityoflawtey.org. Neither authority says where labels must be placed. Note the trap: the one document reachable under a Lawtey URL that DOES describe solar labelling ('all equipment properly labeled', inspector opens all boxes and cabinets) is the City of Live Oak's inspection process, mis-hosted in Lawtey's media library, and does not apply here.

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q44 Must equipment be on a specific approved list? Equipment listing

No local approved-equipment list. Neither the City of Lawtey nor Bradford County maintains or references a product list of its own; the county's Building & Zoning Links page simply points at floridabuilding.org (the statewide Florida Product Approval system) and nfpa.org.

Why the confidence is not higherProved absence in the county code and on both authorities' sites, but held at 60 because statewide Florida Product Approval does apply to some building components and I did not establish in this run how it bites on PV modules and racking specifically.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-links/

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedBradford County Code Ch. 36 (Fire Prevention) in full and Ch. 14 in full - neither mentions batteries, energy storage or ESS; Resolution 2026-02 has no ESS line; the county's Fire Prevention page names the FFPC 8th Edition and NFPA 1/NFPA 101 but publishes no ESS guidance. The conditions therefore sit in the FFPC and the FBC, which I did not read in this run.

https://bradfordcountyfl.gov/building-zoning/fire-prevention/

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedThe iWorQ portal's application routes (Building, Multi-Trade for Electrical/HVAC/Mechanical/Plumbing, Mobile Home) - none is an ESS permit; the county's live inspection-type list, which has no ESS or battery type; Resolution 2026-02, which has no ESS fee. Absence of a named ESS route is not the same as proof that no separate permit is required, and nobody publishes the answer.

https://bradfordfl.portal.iworq.net/portalhome/bradfordfl

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedBradford County Code Ch. 14 in full (no ground-mount or accessory-structure treatment of PV) and the county's inspection-type list. The question is really a zoning one, and zoning inside Lawtey is Lawtey's - whose land development code is not published anywhere (see q27). Bradford County Code Appendix A (Land Development Regulations) and Ch. 58 (Planning) were not read in full in this run and would in any case govern only the unincorporated county.

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedNot reached, for the same reason as q42 - this is a utility rule and the utility serving Lawtey is unresolved between FPL and Clay Electric Cooperative. Bradford County Code Ch. 14 and Ch. 36 contain no disconnect-location rule, and neither the county's packets nor the City of Lawtey publishes one.

https://library.municode.com/fl/bradford_county/codes/code_of_ordinances

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal or phone, through Bradford County. The county's building page: 'Schedule Inspections: Call 904-966-6223 X1 OR Schedule Online 1 business day before you need the inspection. Must be before 4:30PM. You can also check your inspection results online.' Online requests go through the iWorQ Citizen Portal's 'Request An Inspection' form, which needs a contractor Access Code (with an 'Email me my code' link), requester name, phone, email, requested date and inspection type. Separate request forms exist for building, fire and zoning permits. 90% · department page
    • How much notice is required? One business day, and the request must be in before 4:30 PM. Bradford County: 'Schedule Online 1 business day before you need the inspection. Must be before 4:30PM.' The portal repeats it: 'No inspection can be scheduled for the next day if the request is made after 4:30 PM.' The portal's date picker also rejects weekends ('Weekends are not available dates for inspections'). 92% · department page
    • Are same-day or AM/PM windows offered? No AM/PM windows are offered. Bradford County's FAQ: 'Inspections are generally performed from 8:30 am to 5 pm, Monday through Friday. In certain circumstances the Building Official can perform inspections after 5 pm (if for instance he must enter someone's home to perform an inspection and no one will be home until after 5 pm, he will work with you to setup a time to do the inspection after hours). You can contact our office to speak with the Building Official or to get his mobile contact information.' Same-day is not available - requests must be made a business day ahead. 80% · department FAQ
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Delegated. The City of Lawtey performs no inspections of any kind - it has no building official and no inspections budget. Inspections are performed by Bradford County's own in-house Building Official (Rod Crawford, on a county email address, not a contract firm). A private-provider route also exists under the county's current fee resolution, Sec. 7: 'If a Private Provider is used for inspections or plan review the permit fee shall be reduced by 50% or ($50.00) whichever is greater' - i.e. the Florida private-provider option (F.S. 553.791) is live in Bradford County. 85% · department page
    • If delegated, to whom? Bradford County Building Department. Rod Crawford, Building Official; Aleshia Dye, Executive Assistant. 945 N. Temple Ave, Court House North Wing, Starke FL 32091. Mailing: P.O. Box B, Starke FL 32091. (904) 966-6223 ext 2 (inspections ext 1). building@bradfordcountyfl.gov. Counter hours Mon-Thu 10:00-16:30 (closed 12:00-12:30 for lunch; also closed to the public 08:00-10:00 until further notice due to staffing shortages), Fri 08:00-13:30 with no lunch closure. 88% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? No PV-specific inspection sequence is published. Bradford County's live inspection-request form exposes its full inspection-type list, which includes Rough Electric, Rough Electric #2, Early Power, Open Ceiling, Ceiling Cover-Up, Final Cover-Up, Final, Final #2, Final #3, Final C/O, Final COC, Cert of Occupancy, Roof Dry In, Roof Nail & Dry-In, Roof Nailing, Footings, Framing / Open Wall, Fire Inspection and Setbacks. There is no 'Solar', 'PV', 'Solar Tie Down' or 'Solar Electrical Final' type in that list. 60% · permit portal
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No. There is no published inspection checklist for solar PV in this jurisdiction. CAUTION: a file that looks exactly like one is reachable at cityoflawtey.org/wp-content/uploads/Solar-Photovoltaic-System-Inspection-Process-1.pdf - it is NOT Lawtey's. It is the CITY OF LIVE OAK's (Office of the Building Official, 416 Howard St E, Live Oak FL 32064, Suwannee County) solar PV inspection procedure, sitting in Lawtey's WordPress media library alongside Live Oak's building-official job description, Live Oak's residential and commercial permit applications and Live Oak's Ordinance 1504-1511 business impact estimates. It is not linked from any Lawtey page. 80% · department FAQ
    • What must be on site at inspection? Bradford County's FAQ: 'One SITE COPY set of your drawings and your Permit must be posted on the construction site. By Law the 911 site address must be properly posted before the First Inspection or the inspection will be cancelled.' The new-construction packet adds that the address must be posted with 4-inch numbers that contrast with their background, that property lines must be clearly marked by the first inspection, and that a properly sized port-a-let must be on site before the first inspection if construction will run longer than a day. 88% · department FAQ
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? A passed final inspection, recorded in the county's online inspection results; for work that needs one, a Certificate of Occupancy or Certificate of Completion. The county's inspection-type list contains 'Final', 'Final C/O', 'Final COC', 'Cert of Occupancy' and 'Partial CO', and the FAQ refers homeowners and insurers to 'the Final County Inspection Report'. 60% · department FAQ
    • Who notifies the utility for PTO? Not the AHJ - the applicant/installer deals with the utility directly. Bradford County's only published statement on the utility step puts it on the applicant: 'For new electrical service or transfer of electrical service an application must be submitted through your electrical service provider FPL... CLAY ELECTRIC...'. Nothing published by Bradford County or the City of Lawtey says either of them notifies an electric utility of anything. 45% · AHJ packet
    • Is there a re-inspection fee? $40.00. Bradford County Resolution 2026-02, Sec. 11.F: 'Re-inspection $40.00'. The same table sets 'Re-submittal of Plans $75.00' and 'Stop Work Order / Not Pulling a Permit $50.00 (plus permit fee)'. Fire re-inspections are priced separately and escalate ($40 first re-inspection; second re-inspection $80-$150 by square footage; third $95-$160). 90% · fee schedule
    • How are corrections issued and cleared? Results are published online - the county's building page says 'You can also check your inspection results online' and the portal offers 'Schedule Inspections/See Results'. Money-side consequences are in the fee resolution: re-inspection $40, re-submittal of plans $75, stop-work order $50 plus permit fee. Beyond that the county publishes no correction-notice or clearance procedure. 60% · department page

14 questions answered against City of Lawtey’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal or phone, through Bradford County. The county's building page: 'Schedule Inspections: Call 904-966-6223 X1 OR Schedule Online 1 business day before you need the inspection. Must be before 4:30PM. You can also check your inspection results online.' Online requests go through the iWorQ Citizen Portal's 'Request An Inspection' form, which needs a contractor Access Code (with an 'Email me my code' link), requester name, phone, email, requested date and inspection type. Separate request forms exist for building, fire and zoning permits.

Why the confidence is not higherQuoted from the county's own department page and confirmed against the live portal form fields. Held at 90 because it is the county's general inspection process - no solar-specific booking route is published.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q50 How much notice is required? Core Booking & scheduling

One business day, and the request must be in before 4:30 PM. Bradford County: 'Schedule Online 1 business day before you need the inspection. Must be before 4:30PM.' The portal repeats it: 'No inspection can be scheduled for the next day if the request is made after 4:30 PM.' The portal's date picker also rejects weekends ('Weekends are not available dates for inspections').

Why the confidence is not higherStated twice in the county's own words, on the department page and inside the live booking form, and enforced by the form's own date validation. Held at 92 only because it is the county's general rule rather than anything solar-specific.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No AM/PM windows are offered. Bradford County's FAQ: 'Inspections are generally performed from 8:30 am to 5 pm, Monday through Friday. In certain circumstances the Building Official can perform inspections after 5 pm (if for instance he must enter someone's home to perform an inspection and no one will be home until after 5 pm, he will work with you to setup a time to do the inspection after hours). You can contact our office to speak with the Building Official or to get his mobile contact information.' Same-day is not available - requests must be made a business day ahead.

Why the confidence is not higherQuoted from the county's own FAQ. Held at 80 because the FAQ page is undated and because 'no AM/PM window' is read off the absence of one rather than from a statement that none exists; the after-hours accommodation is explicit and unusual enough to be worth relying on.

department FAQ checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Delegated. The City of Lawtey performs no inspections of any kind - it has no building official and no inspections budget. Inspections are performed by Bradford County's own in-house Building Official (Rod Crawford, on a county email address, not a contract firm). A private-provider route also exists under the county's current fee resolution, Sec. 7: 'If a Private Provider is used for inspections or plan review the permit fee shall be reduced by 50% or ($50.00) whichever is greater' - i.e. the Florida private-provider option (F.S. 553.791) is live in Bradford County.

Why the confidence is not higherThe delegation is the same three-way proof as q1 and the county's in-house staffing is on its own page; the private-provider discount is quoted from Resolution 2026-02. Held at 85 because the county never states in print that it inspects inside Lawtey city limits - it states only that Starke is the exception.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q53 If delegated, to whom? Core Who inspects

Bradford County Building Department. Rod Crawford, Building Official; Aleshia Dye, Executive Assistant. 945 N. Temple Ave, Court House North Wing, Starke FL 32091. Mailing: P.O. Box B, Starke FL 32091. (904) 966-6223 ext 2 (inspections ext 1). building@bradfordcountyfl.gov. Counter hours Mon-Thu 10:00-16:30 (closed 12:00-12:30 for lunch; also closed to the public 08:00-10:00 until further notice due to staffing shortages), Fri 08:00-13:30 with no lunch closure.

Why the confidence is not higherNames, address, numbers and the current reduced counter hours all read today from the county's own building department page. Held at 88 for the same reason as q52 - the county's silence about Lawtey is strong evidence but not a written designation.

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q54 Which inspections are required, and in what order? Core Stages & sequence

No PV-specific inspection sequence is published. Bradford County's live inspection-request form exposes its full inspection-type list, which includes Rough Electric, Rough Electric #2, Early Power, Open Ceiling, Ceiling Cover-Up, Final Cover-Up, Final, Final #2, Final #3, Final C/O, Final COC, Cert of Occupancy, Roof Dry In, Roof Nail & Dry-In, Roof Nailing, Footings, Framing / Open Wall, Fire Inspection and Setbacks. There is no 'Solar', 'PV', 'Solar Tie Down' or 'Solar Electrical Final' type in that list.

Why the confidence is not higherThe inspection-type list is read directly off the county's live booking form, so the absence of any solar type is solid. What is NOT established is which of these types a PV retrofit is actually booked under and in what order - the county publishes no sequence. Held at 60 for that reason.

permit portal checked 2026-09-14 https://portal.iworq.net/BRADFORDFL/permits/600

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedThe county's live inspection-request form exposes its full inspection-type list, which includes Rough Electric, Rough Electric #2, Roof Dry In, Roof Nail & Dry-In and Early Power - but nothing published says which of these, if any, a rooftop PV retrofit requires, and there is no solar or mid-roof type in the list. The building page, FAQs, fee resolution and Code Ch. 14 say nothing about a PV rough-in.

https://portal.iworq.net/BRADFORDFL/permits/600

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedBradford County's Building & Zoning FAQs (which describe what the Building Official inspects in general terms - 'all aspects of the work before it is covered or concealed from view... in compliance with the Florida Building Code and the approved plans'), the inspection-request form, the fee resolution and Code Ch. 14. Nothing says whether labels and equipment listings are verified. The document that does say so in detail - 'The inspector will have the contractor open all boxes and cabinets... to verify connections and that all solar panel components, electrical connections, and materials are listed and match approved submittals' - is the City of Live Oak's, found mis-hosted on cityoflawtey.org, and is NOT evidence about this jurisdiction.

https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q57 Is there a published inspection checklist? Core What is checked

No. There is no published inspection checklist for solar PV in this jurisdiction. CAUTION: a file that looks exactly like one is reachable at cityoflawtey.org/wp-content/uploads/Solar-Photovoltaic-System-Inspection-Process-1.pdf - it is NOT Lawtey's. It is the CITY OF LIVE OAK's (Office of the Building Official, 416 Howard St E, Live Oak FL 32064, Suwannee County) solar PV inspection procedure, sitting in Lawtey's WordPress media library alongside Live Oak's building-official job description, Live Oak's residential and commercial permit applications and Live Oak's Ordinance 1504-1511 business impact estimates. It is not linked from any Lawtey page.

Why the confidence is not higherThe absence is proved on the county side (building page, FAQ, fee resolution, all published packets, full code text - no checklist) and on the city side (all 42 sitemap pages crawled - the word 'permit' appears twice, both inside boilerplate copied from another city). The contamination is proved by opening the PDFs: they carry Live Oak's address, phone and letterhead. Held at 80 because an internal, unpublished inspector checklist may well exist.

department FAQ checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q58 What must be on site at inspection? Core Documents on site

Bradford County's FAQ: 'One SITE COPY set of your drawings and your Permit must be posted on the construction site. By Law the 911 site address must be properly posted before the First Inspection or the inspection will be cancelled.' The new-construction packet adds that the address must be posted with 4-inch numbers that contrast with their background, that property lines must be clearly marked by the first inspection, and that a properly sized port-a-let must be on site before the first inspection if construction will run longer than a day.

Why the confidence is not higherQuoted from the county's own FAQ and packet. Held at 88 because the port-a-let and property-line items are stated for new construction and would not sensibly apply to a rooftop PV retrofit; the posted-permit and posted-address requirements are general.

department FAQ checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q59 Is there a re-inspection fee? Corrections & re-inspection

$40.00. Bradford County Resolution 2026-02, Sec. 11.F: 'Re-inspection $40.00'. The same table sets 'Re-submittal of Plans $75.00' and 'Stop Work Order / Not Pulling a Permit $50.00 (plus permit fee)'. Fire re-inspections are priced separately and escalate ($40 first re-inspection; second re-inspection $80-$150 by square footage; third $95-$160).

Why the confidence is not higherRead from the county's current fee resolution, effective 3 March 2026. Held at 90 because the resolution's text layer is mangled and the section letters had to be reconstructed from position, though every dollar figure extracted cleanly.

fee schedule checked 2026-09-14 https://bradfordcounty.box.com/s/ls7f6315b36e7w062yoo8ynl1a69kw5b

Q60 How are corrections issued and cleared? Corrections & re-inspection

Results are published online - the county's building page says 'You can also check your inspection results online' and the portal offers 'Schedule Inspections/See Results'. Money-side consequences are in the fee resolution: re-inspection $40, re-submittal of plans $75, stop-work order $50 plus permit fee. Beyond that the county publishes no correction-notice or clearance procedure.

Why the confidence is not higherThe online-results route and the fees are both from the authority's own current documents, but the actual mechanics - how a correction is written up, how it is cleared, whether a re-inspection must be booked the same way - are not published anywhere I looked (building page, FAQ, portal, fee resolution, code Ch. 14).

department page checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/

Q61 What is issued on pass? Core Final sign-off & PTO

A passed final inspection, recorded in the county's online inspection results; for work that needs one, a Certificate of Occupancy or Certificate of Completion. The county's inspection-type list contains 'Final', 'Final C/O', 'Final COC', 'Cert of Occupancy' and 'Partial CO', and the FAQ refers homeowners and insurers to 'the Final County Inspection Report'.

Why the confidence is not higherAssembled from the county's live inspection-type list and its FAQ rather than from a statement of what is issued on a solar final - the county never says. A rooftop PV retrofit would not normally generate a CO, so the practical answer is the final inspection record, but that is inference and the confidence reflects it.

department FAQ checked 2026-09-14 https://bradfordcountyfl.gov/building-zoning/building-zoning-faqs/

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Not the AHJ - the applicant/installer deals with the utility directly. Bradford County's only published statement on the utility step puts it on the applicant: 'For new electrical service or transfer of electrical service an application must be submitted through your electrical service provider FPL... CLAY ELECTRIC...'. Nothing published by Bradford County or the City of Lawtey says either of them notifies an electric utility of anything.

Why the confidence is not higherThis is inference from one county document about new house connections, not about PTO after a PV final. I did not read FPL's or Clay Electric's distributed-generation manual in this run and I have not fixed which of the two serves Lawtey (see q22), so the actual PTO trigger is unverified here. Recorded at 45 rather than dropped because the AHJ-side half - that neither government notifies the utility - is genuinely supported by the absence of any such statement in everything I read.

AHJ packet checked 2026-09-14 https://s3.amazonaws.com/iworq-upload/IWORQSUPPORT/9999/16265188-New%20Single%20Family%20and%20Modular%20Home%20Packet.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 70%

No. Neither authority specifies placard wording of its own.

Size, colour & material 70%

No. No letter height, colour, contrast or material is specified by either the City of Lawtey or Bradford County. The only lettering specification either authority publishes is for the 911 site address, not for electrical placards: 'Address must be posted with 4in. #'s that contrast from their background.'

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.