City of Longwood
City of Longwood
Seminole County
City of Longwood is a city authority in the State of Florida, serving 15,087 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for City of Longwood against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Longwood is the authority having jurisdiction 90% confidence
- Holds
- Building AND Electrical, both performed in-house by the City's own Building Division (FY2025-26 adopted budget lists a dedicated Building & Inspection Fund staffed by 1 Building Official, 1 Building Inspector, 1 Plans Examiner/Inspector and 2 Permit Clerks — 5 FTE total, no private-firm letterhead or $0-personnel signature found). Fire is ALSO in-house: the City of Longwood Fire Department is a City department (44.5 FTE per the same budget, ~6,000 annual calls), not delegated to Seminole County or a sheriff's office — unlike neighboring Winter Springs (Seminole County MSTU) noted in the baseline. The City's own dedicated Photovoltaic System Guidelines state plainly 'Each system will require a building and electrical permit,' both issued from the same Building Division desk. Zoning/Planning review sits with the City's own Community Development function. One caveat found nowhere else in this survey: the FY2025-26 Building & Inspection Fund objectives explicitly state the division is 'transitioning to a HYBRID CONTRACT-STAFF INSPECTION MODEL and Building Official schedule' — a partial, named move toward contracted inspection capacity, distinct from full outsourcing (no firm named) and distinct from the in-house baseline. Seminole County's only role found is administrative/adjacent: County impact fees are collected by the City at permitting, and parcel ownership is verified via the County Property Appraiser's site — neither is delegation of AHJ authority.
- Overridden by
- FS 471.003(2)(h) sets the statewide electrical PE-stamp exemption floor ($125,000/600A) where the City has not stated its own stricter threshold. Duke Energy Florida's own Standard Interconnection Agreement (FPSC-filed Tier 1 tariff, Sheet No. 7.310, effective 29 Apr 2013) governs energization sequencing and the AC-disconnect rule for the residential case and was read directly (OCR'd) in this run, not carried from the baseline file. FL PSC Rule 25-6.065 is the residual state floor only where Duke's own tariff is silent (e.g., no placard spec was found in Duke's Tier 1 sheet, confirmed by keyword enumeration).
- Why not higher
- Direct evidence: City's own Permitting-and-Inspections page (building@longwoodfl.org contact, contractor registration instructions), the dedicated Photovoltaic System Guidelines PDF (Building Division letterhead, dated 3 Jan 2024 per PDF metadata), the Electrical and Building Permit Application PDFs (no county checkbox, no county Certificate-of-Competency field — only a state license-number field), and the FY2025-26 Adopted Budget Book's Building & Inspection Fund staffing table and Fire Department section. Held at 90 rather than higher only because of the hybrid contract-staff inspection transition disclosed in the budget, which this run could not resolve to a named firm or a specific inspection type.
- Permit required
- Yes.92%
- Permit cost
- Dedicated line item: 'RESIDENTIAL PHOTOVOLTAIC SYSTEM - NEW' and '... - ADDITION' both $299.31 flat (includes the 2.5% state surcharge).80%
- Plan review
- Not published for residential permits.40%
- Portal
- SmartGov (by Granicus), at ci-longwood-fl.smartgovcommunity.com/Public/Home.95%
- Electrical code
- 2020 NEC (NFPA 70), effective as adopted 31 Dec 2023, under the current FBC 8th Edition (2023) cycle.95%
- Own placard wording
- No City-specific placard wording was found.40%
- Booking an inspection
- By phone (Inspection Request Line, 407-260-3471) or through the SmartGov portal's inspection-scheduling feature.85%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes. Q3 Electrical and building permits — Separate — a building permit and a separate electrical permit are both required. Q4 Plan review — Not published for residential permits. Q18 Where you file — SmartGov (by Granicus), at ci-longwood-fl.smartgovcommunity.com/Public/Home. Q20
- Permit required
- Yes.92% source
- What it costs
- Dedicated line item: 'RESIDENTIAL PHOTOVOLTAIC SYSTEM - NEW' and '... - ADDITION' both $299.31 flat (includes the 2.5% state surcharge).80% source
- Plan review turnaround
- Not published for residential permits.40% source
- Key document
- city PV guideline (absence) cited by 9 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes — City of Longwood Building Division is the AHJ for residential building and electrical permitting, including rooftop PV, inside city limits. 90% · department page
- What does this authority permit itself, and what does it delegate? The City permits and inspects Building AND Electrical itself, in-house, and also runs its own Fire Department in-house (not delegated to Seminole County). Zoning/Planning is also in-house. The City is transitioning part of its inspection capacity to a 'hybrid contract-staff inspection model' per its own FY2025-26 budget, though no contracted firm is named. Seminole County's only role is collecting County impact fees through the City's permit process and hosting the Property Appraiser parcel-ID lookup used on permit applications — not delegation of AHJ authority. 85% · city budget document
- Is a permit required for a residential rooftop PV system? Yes. 92% · city PV guideline
- Is there a separate electrical permit, or is it combined? Separate — a building permit and a separate electrical permit are both required. 92% · city PV guideline
- Is a HOA or architectural approval required first? No City-mandated HOA/architectural approval was found as a submittal requirement for a PV permit; the City's material does not raise HOA approval in the PV Guideline at all. 55% · city PV guideline (absence)
- Is there a historic-district review? Yes, but narrowly: LDC §10.1.5 ('Additional standards for the review of permits within the historic district') requires that 'Submittal of a construction permit for addition, alteration, or significant repair of a CONTRIBUTING, SUPPORT, or ANNEX structure shall require a pre-application meeting with staff before submittal' (added by Ord. No. 22-2219, 2022). This is a STAFF-LEVEL procedural gate, not a board vote — Longwood's actual Historic Preservation BOARD was ABOLISHED in 2006 (LDC §8.6.0 is now 'Reserved,' with an editor's note that the 2006 repealing ordinance removed the board originally created in 2004). Nothing in either provision names solar specifically. This is an eighth historic-review shape for this survey, distinct from all seven catalogued in the baseline: a formally-abolished board, replaced by a later-added staff pre-application-meeting requirement that applies to any exterior work (including PV) on a contributing/support/annex structure. 82% · codified ordinance (Land Development Code)
- Is a wind or windstorm certification required? Yes — engineered wind-load design is required for the mounting/attachment system: 139 mph for roof-mounted systems, 129 mph for ground-mounted systems, both signed and sealed by a state-licensed engineer citing FBC Chapter 16 and FBC-Residential §324. 88% · city PV guideline
- Is a Specific Use Permit or Council approval ever required? No Specific Use Permit or Council approval appears to be required for residential rooftop or accessory ground-mount PV. 62% · codified ordinance (full-text enumeration)
- Is there a system-size cap on residential generation? No City-imposed system-size cap on residential generation was found in the Land Development Code. 55% · codified ordinance (full-text enumeration)
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed electrical contractor pulls the electrical permit (the Electrical Permit Application requires Contractor Company, License Number and License Holder's Name fields); a homeowner may self-permit under the owner-builder route (see Q7). 70% · city electrical permit application
- Must the contractor be registered with this authority before applying? Yes — the City requires contractors to register with it before applying ('All contractor registration information is to be sent to: building@longwoodfl.org'), but no Seminole County Certificate of Competency field appears anywhere on the current Building or Electrical Permit Applications — only a state license number field, consistent with post-1 July 2025 state-direct licensing (the same pattern this survey already confirmed at Lake Mary, also Seminole County). 68% · department page + city permit application forms
- Is a homeowner permitted to self-install and self-permit? Yes — the City publishes an 'Owner Builder Disclosure Statement Form' implementing the FS 489.103/489.503 owner-builder exemption. 65% · city owner-builder disclosure form
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Per the City's own PV Guideline: completed and notarized permit application (contractor and homeowner signatures); Notice of Commencement (recorded with Seminole County) if valuation exceeds $5,000; documented proof of construction cost/signed contract; signed and sealed structural roof-evaluation and rack/attachment engineering (wind-rated); rack, panel and inverter product information/listings; roof flashing/penetration details; an electrical line diagram with wire types/sizes/ampacity; FSEC system-certification approval form (cited to F.S. 377.705); a signed owner's notification re: roof-warranty impact; and for ground-mount, a scaled, signed/sealed survey/site plan for Planning/Zoning. 88% · city PV guideline
- How many copies, and in what format? Two routes coexist: (1) hard copy — the PV Guideline requires documents on 11x17" paper, minimum 2 hard copies (engineering letters/product info may be 8.5x11"); (2) digital — the City's separate 'Digital Permitting/Plans Submittal' guide (dated April 2024, newer than the PV Guideline) requires one PDF per discipline uploaded to the SmartGov portal, with digitally signed-and-sealed plans left unlocked for 'Allow Mark-Ups' only, per F.S. 471.025/481.221 and FBC §107. 78% · city digital-submittal guide
- Is a site plan required, and what must it show? For roof-mount: a roof layout drawing showing required setbacks (per NFPA 1 §11.12) must be provided at submittal. For ground-mount: a full scaled, signed-and-sealed survey/site plan showing locations, setbacks, measurements, easements and flood information, reviewed by Planning/Zoning. 82% · city PV guideline
- Is a one-line / three-line diagram required? Yes. 92% · city PV guideline
- Are string and conductor calculations required? Implied yes — the required line diagram must show 'wire types, sizes and ampacity requirements,' which is conductor sizing/calculation by another name, though the City does not use the words 'string calculation' anywhere. 62% · city PV guideline
- Is a structural PE stamp required, and at what threshold? Yes, with NO dollar threshold — a structural PE evaluation is required on EVERY residential PV job, roof-mount or ground-mount. 90% · city PV guideline
- Is an electrical PE stamp required, and at what threshold? No City-specific electrical PE-stamp threshold was found; the statewide floor applies: FS 471.003(2)(h) exempts a licensed EC's electrical work valued at $125,000 or less with 600A or less aggregate residential service capacity from a PE stamp. 60% · Florida Statute (state floor)
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? SmartGov (by Granicus), at ci-longwood-fl.smartgovcommunity.com/Public/Home. 95% · portal landing page
- Can the whole application be completed online? Yes — the portal supports account sign-up, application submittal, digital plan uploads, fee payment, inspection scheduling and viewing results/comments end to end ('My Portal: View your applications and inspection results'). 85% · portal landing page
- What does a residential solar permit cost? Dedicated line item: 'RESIDENTIAL PHOTOVOLTAIC SYSTEM - NEW' and '... - ADDITION' both $299.31 flat (includes the 2.5% state surcharge). 80% · city fee schedule
- How is the fee calculated? Flat fee, not valuation-based — the Residential Photovoltaic System line sits in the 'Specialty and Activity-Based Permits' section of the fee schedule alongside other flat per-trade fees (contrast with the ICC-BVD valuation formula used for general new construction/additions). 78% · city fee schedule
- Is there a separate plan-check fee? No separate up-front plan-review fee was found for PV; the fee schedule's only review-adjacent charge is 'PLAN REVISIONS / SUPPLEMENTAL SUBMITTALS: $35.00 flat processing fee plus $46.76/hour for digital plan review time exceeding 30 minutes' — which applies to REVISIONS/resubmittals, not the initial review. 65% · city fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? Not published for residential permits. 40% · department page
- How long is an issued permit valid before it expires? An issued permit becomes invalid unless work is commenced within 180 days of issuance, or if inspection activity lapses for 180 days; the Building Official may grant extensions of up to 180 days each, with one demolition-specific exception (60 days). 82% · adopted ordinance (FBC Ch.1 administrative amendments, dated 2021 — flagged stale)
- Which utility handles interconnection here? Duke Energy Florida — and, unusually for this survey, it appears to be the SOLE electric utility citywide (not split by address). The codified Code of Ordinances, Part IV, Appendix A — Franchises contains only ONE electric-franchise article: 'ARTICLE I. ELECTRIC UTILITY FRANCHISE,' granted to Florida Power Corporation dba Progress Energy Florida (now Duke) by Ordinance No. 03-1666 (4 Aug 2003), a 30-year, nonexclusive franchise (6% of base revenues) running to 2033. No FPL or other electric franchise article exists in the same Appendix. This is corroborated by the City's own FY2025-26 Adopted Budget, which shows exactly ONE 'Franchise Fees - Electric' revenue line (account 323-1000, $1,527,000 budgeted) — no second electric-utility line, unlike Lake Mary's two-line Duke/FPL split noted in this survey's baseline for the same county. 88% · codified ordinance (Franchises appendix) + city budget document
- Where does the utility sit in the sequence? The City's own building-code-official inspection and certification of the installation must occur BEFORE Duke will allow parallel operation. The customer (installer/homeowner) must then give Duke at least 10 days' notice before connecting/operating in parallel, and must execute and return Duke's Standard Interconnection Agreement at least 30 calendar days before beginning parallel operation. 88% · utility's own filed FPSC tariff (Duke Energy Florida)
28 questions answered against City of Longwood’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes — City of Longwood Building Division is the AHJ for residential building and electrical permitting, including rooftop PV, inside city limits.
Why the confidence is not higherCity's own Permitting-and-Inspections page and dedicated Photovoltaic System Guidelines both route PV permitting to the Building Division; no other agency is named.
department page checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
The City permits and inspects Building AND Electrical itself, in-house, and also runs its own Fire Department in-house (not delegated to Seminole County). Zoning/Planning is also in-house. The City is transitioning part of its inspection capacity to a 'hybrid contract-staff inspection model' per its own FY2025-26 budget, though no contracted firm is named. Seminole County's only role is collecting County impact fees through the City's permit process and hosting the Property Appraiser parcel-ID lookup used on permit applications — not delegation of AHJ authority.
Why the confidence is not higherFY2025-26 Adopted Budget Book, Building & Inspection Fund section (staffing table: Building Official, Building Inspector, Plans Examiner/Inspector, 2 Permit Clerks) and Fire Department section (44.5 FTE); Electrical Permit Application references the Seminole County Property Appraiser only for parcel lookup and County impact fees.
city budget document checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/9512/ADOPTED-BUDGET-BOOK-9-15-2025_FY25-26
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes.
Why the confidence is not higherThe City's own Photovoltaic System Guidelines state under 'Required Permit': 'Each system will require a building and electrical permit.' No PV/solar exemption exists anywhere else in City material located.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Separate — a building permit and a separate electrical permit are both required.
Why the confidence is not higherVerbatim from the PV Guideline: 'Each system will require a building and electrical permit.' The general Electrical Permit Application also states a separate permit must be secured for electrical work distinct from the building permit.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed electrical contractor pulls the electrical permit (the Electrical Permit Application requires Contractor Company, License Number and License Holder's Name fields); a homeowner may self-permit under the owner-builder route (see Q7).
Why the confidence is not higherRead directly from the City's current Electrical Permit Application form fields; not solar-specific.
city electrical permit application checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/4598/Electrical-Permit-Application-PDF-
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes — the City requires contractors to register with it before applying ('All contractor registration information is to be sent to: building@longwoodfl.org'), but no Seminole County Certificate of Competency field appears anywhere on the current Building or Electrical Permit Applications — only a state license number field, consistent with post-1 July 2025 state-direct licensing (the same pattern this survey already confirmed at Lake Mary, also Seminole County).
Why the confidence is not higherCity registration instruction is explicit on its own Permitting-and-Inspections page; the state-direct inference is drawn from the ABSENCE of a county competency-card field on the current permit application PDFs, which is inference, not a City statement that it has moved to state-direct — flagged accordingly.
department page + city permit application forms checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes — the City publishes an 'Owner Builder Disclosure Statement Form' implementing the FS 489.103/489.503 owner-builder exemption.
Why the confidence is not higherThis is the general statewide owner-builder mechanism with the City's own form; it is not solar-specific and does not separately address whether an owner may self-pull the electrical sub-permit for a PV system versus needing a licensed EC for that trade.
city owner-builder disclosure form checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/4368/Owner-Builder-Disclosure-Statement-Form-PDF-
Q8 What documents make up a complete submittal? Core Submittal package
Per the City's own PV Guideline: completed and notarized permit application (contractor and homeowner signatures); Notice of Commencement (recorded with Seminole County) if valuation exceeds $5,000; documented proof of construction cost/signed contract; signed and sealed structural roof-evaluation and rack/attachment engineering (wind-rated); rack, panel and inverter product information/listings; roof flashing/penetration details; an electrical line diagram with wire types/sizes/ampacity; FSEC system-certification approval form (cited to F.S. 377.705); a signed owner's notification re: roof-warranty impact; and for ground-mount, a scaled, signed/sealed survey/site plan for Planning/Zoning.
Why the confidence is not higherEnumerated directly and verbatim from the City's own dedicated Photovoltaic System Guidelines (PDF metadata: created 3 Jan 2024).
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q9 How many copies, and in what format? Submittal package
Two routes coexist: (1) hard copy — the PV Guideline requires documents on 11x17" paper, minimum 2 hard copies (engineering letters/product info may be 8.5x11"); (2) digital — the City's separate 'Digital Permitting/Plans Submittal' guide (dated April 2024, newer than the PV Guideline) requires one PDF per discipline uploaded to the SmartGov portal, with digitally signed-and-sealed plans left unlocked for 'Allow Mark-Ups' only, per F.S. 471.025/481.221 and FBC §107.
Why the confidence is not higherTwo City documents of different vintages give two different-looking answers that are in fact both live options (the City's Permitting page itself says it will help with 'hard copy submittals as well' alongside SmartGov). Recorded both rather than picking one.
city digital-submittal guide checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8529/Digital-Permitting-and-Plans-Submittal-PDF
Q10 Is a site plan required, and what must it show? Core Submittal package
For roof-mount: a roof layout drawing showing required setbacks (per NFPA 1 §11.12) must be provided at submittal. For ground-mount: a full scaled, signed-and-sealed survey/site plan showing locations, setbacks, measurements, easements and flood information, reviewed by Planning/Zoning.
Why the confidence is not higherBoth requirements are stated explicitly and separately (by mount type) in the City's own PV Guideline.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes.
Why the confidence is not higherPV Guideline, every system type (standalone/hybrid/BIPV/ground-mount): 'All electrical must be presented in a line-diagram form, with applicable wire types, sizes and ampacity requirements.'
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q12 Are string and conductor calculations required? Drawings & calculations
Implied yes — the required line diagram must show 'wire types, sizes and ampacity requirements,' which is conductor sizing/calculation by another name, though the City does not use the words 'string calculation' anywhere.
Why the confidence is not higherInference from the line-diagram wording quoted directly from the PV Guideline; no separate string-calculation worksheet is published.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Yes, with NO dollar threshold — a structural PE evaluation is required on EVERY residential PV job, roof-mount or ground-mount.
Why the confidence is not higherPV Guideline, repeated for every system type: 'an evaluation of the roof system and the ability for the existing roof system to handle the applicable dead and live loads must be provided. This evaluation must be completed, signed and sealed by a licensed structural engineer,' plus separately sealed wind-rated attachment engineering (139 mph roof-mount / 129 mph ground-mount) — no valuation exemption is stated anywhere in the document. This makes Longwood a sixth jurisdiction in this survey requiring a sealed engineer's plan with no dollar floor.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
No City-specific electrical PE-stamp threshold was found; the statewide floor applies: FS 471.003(2)(h) exempts a licensed EC's electrical work valued at $125,000 or less with 600A or less aggregate residential service capacity from a PE stamp.
Why the confidence is not higherState statute is the only source found; the City's own material is silent on an electrical-specific PE threshold (its structural PE requirement at Q13 is separate and has no threshold at all).
Florida Statute (state floor) checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html
Q15 What does a residential solar permit cost? Core Fees
Dedicated line item: 'RESIDENTIAL PHOTOVOLTAIC SYSTEM - NEW' and '... - ADDITION' both $299.31 flat (includes the 2.5% state surcharge).
Why the confidence is not higherRead verbatim from the City's current Fee Schedule webpage. Positive control ('electrical') and fabricated control ('zzqqx') both behaved as expected on the page's own content, confirming the schedule is genuinely populated. Held at 80 rather than higher because it is unclear from the page whether this single PV line covers BOTH the building and electrical permit named in Q4, or only one of them — the City's general building-permit valuation formula (ICC BVD table) may apply on top for the structural/roof scope.
city fee schedule checked 2026-09-12 https://www.longwoodfl.org/702/Fee-Schedule
Q16 How is the fee calculated? Core Fees
Flat fee, not valuation-based — the Residential Photovoltaic System line sits in the 'Specialty and Activity-Based Permits' section of the fee schedule alongside other flat per-trade fees (contrast with the ICC-BVD valuation formula used for general new construction/additions).
Why the confidence is not higherStructure of the City's own Fee Schedule page: the PV line appears among flat dollar amounts (Residential Electrical - New $585.78, Residential Mechanical - New $297.49, etc.), not in the valuation-formula section.
city fee schedule checked 2026-09-12 https://www.longwoodfl.org/702/Fee-Schedule
Q17 Is there a separate plan-check fee? Fees
No separate up-front plan-review fee was found for PV; the fee schedule's only review-adjacent charge is 'PLAN REVISIONS / SUPPLEMENTAL SUBMITTALS: $35.00 flat processing fee plus $46.76/hour for digital plan review time exceeding 30 minutes' — which applies to REVISIONS/resubmittals, not the initial review.
Why the confidence is not higherRead directly from the fee schedule's 'Miscellaneous Operational and Administrative Fees' section; no Ocoee-style '50% of permit fee' up-front plan-review line was found anywhere on the page.
city fee schedule checked 2026-09-12 https://www.longwoodfl.org/702/Fee-Schedule
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Not published for residential permits.
Why the confidence is not higherChecked the Permitting-and-Inspections page, the Fee Schedule page, and the PV Guideline; none states a plan-review turnaround time for any residential permit type, PV or otherwise.
department page checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q19 How long is an issued permit valid before it expires? Timeline & validity
An issued permit becomes invalid unless work is commenced within 180 days of issuance, or if inspection activity lapses for 180 days; the Building Official may grant extensions of up to 180 days each, with one demolition-specific exception (60 days).
Why the confidence is not higherThis is FBC §105.4/105.5 as locally adopted in the City's 'FBC Chapter 1 — Scope and Administration' administrative-amendments ordinance (Ord. No. 21-2196). Note this specific document is labeled '2020 FBC' / '7th Edition, FBC' on its own title page (adopted 2021) and is therefore STALE relative to the City's current 8th Edition (2023) baseline stated elsewhere (see Q32) — the 180-day expiration mechanics themselves are standard FBC boilerplate unlikely to have changed between cycles, but the document itself is not current.
adopted ordinance (FBC Ch.1 administrative amendments, dated 2021 — flagged stale) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/4736/2020-FBC-Longwood-Administrative-Amendments-PDF-
Q20 Which permit portal does this authority use? Core Portal & process
SmartGov (by Granicus), at ci-longwood-fl.smartgovcommunity.com/Public/Home.
Why the confidence is not higherConfirmed directly — City's Permitting-and-Inspections page links it, and the portal's own landing page identifies itself as 'SmartGov Public Portal by Granicus' for Longwood, FL.
portal landing page checked 2026-09-12 https://ci-longwood-fl.smartgovcommunity.com/Public/Home
Q21 Can the whole application be completed online? Core Portal & process
Yes — the portal supports account sign-up, application submittal, digital plan uploads, fee payment, inspection scheduling and viewing results/comments end to end ('My Portal: View your applications and inspection results').
Why the confidence is not higherRead directly from the SmartGov Public Portal home page and the City's Digital Permitting/Plans Submittal guide describing the full digital workflow.
portal landing page checked 2026-09-12 https://ci-longwood-fl.smartgovcommunity.com/Public/Home
Q22 Which utility handles interconnection here? Core Utility interconnection
Duke Energy Florida — and, unusually for this survey, it appears to be the SOLE electric utility citywide (not split by address). The codified Code of Ordinances, Part IV, Appendix A — Franchises contains only ONE electric-franchise article: 'ARTICLE I. ELECTRIC UTILITY FRANCHISE,' granted to Florida Power Corporation dba Progress Energy Florida (now Duke) by Ordinance No. 03-1666 (4 Aug 2003), a 30-year, nonexclusive franchise (6% of base revenues) running to 2033. No FPL or other electric franchise article exists in the same Appendix. This is corroborated by the City's own FY2025-26 Adopted Budget, which shows exactly ONE 'Franchise Fees - Electric' revenue line (account 323-1000, $1,527,000 budgeted) — no second electric-utility line, unlike Lake Mary's two-line Duke/FPL split noted in this survey's baseline for the same county.
Why the confidence is not higherTwo independent City-published, dated, first-party sources (codified franchise appendix and the current adopted budget) agree on a single electric franchise. Not full confidence because no parcel-level map rules out a small edge-of-city FPL pocket, and the franchise being 'nonexclusive' means legally another utility could serve without a franchise, which the budget's single revenue line makes unlikely but does not fully foreclose.
codified ordinance (Franchises appendix) + city budget document checked 2026-09-12 https://library.municode.com/fl/longwood/codes/code_of_ordinances?nodeId=PTIVLOCOPL_APXAFR
Q23 Where does the utility sit in the sequence? Core Utility interconnection
The City's own building-code-official inspection and certification of the installation must occur BEFORE Duke will allow parallel operation. The customer (installer/homeowner) must then give Duke at least 10 days' notice before connecting/operating in parallel, and must execute and return Duke's Standard Interconnection Agreement at least 30 calendar days before beginning parallel operation.
Why the confidence is not higherRead and OCR'd directly from Duke Energy Florida's own FPSC-filed Tier 1 Standard Interconnection Agreement (Third Revised Sheet No. 7.310, effective 29 Apr 2013) this run: 'The Customer agrees to provide Local Building Code Official inspection and certification of installation... Prior to connection and parallel operation... the Customer shall provide 10 days notice...' and '...return it to the Company at least thirty calendar days prior to beginning parallel operations.' This is a first-party utility document, not the PSC floor.
utility's own filed FPSC tariff (Duke Energy Florida) checked 2026-09-12 https://www.duke-energy.com/-/media/pdfs/for-your-business/generate-your-own-renewable/florida/tier-1-contract.pdf
Q24 Is a HOA or architectural approval required first? Overlays & special cases
No City-mandated HOA/architectural approval was found as a submittal requirement for a PV permit; the City's material does not raise HOA approval in the PV Guideline at all.
Why the confidence is not higherChecked the PV Guideline and the general Building Permit Application; neither lists an HOA-approval letter among required documents. This is an absence, not a City statement that HOA approval is unnecessary — recorded at reduced confidence accordingly.
city PV guideline (absence) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q25 Is there a historic-district review? Overlays & special cases
Yes, but narrowly: LDC §10.1.5 ('Additional standards for the review of permits within the historic district') requires that 'Submittal of a construction permit for addition, alteration, or significant repair of a CONTRIBUTING, SUPPORT, or ANNEX structure shall require a pre-application meeting with staff before submittal' (added by Ord. No. 22-2219, 2022). This is a STAFF-LEVEL procedural gate, not a board vote — Longwood's actual Historic Preservation BOARD was ABOLISHED in 2006 (LDC §8.6.0 is now 'Reserved,' with an editor's note that the 2006 repealing ordinance removed the board originally created in 2004). Nothing in either provision names solar specifically. This is an eighth historic-review shape for this survey, distinct from all seven catalogued in the baseline: a formally-abolished board, replaced by a later-added staff pre-application-meeting requirement that applies to any exterior work (including PV) on a contributing/support/annex structure.
Why the confidence is not higherBoth facts (the 2022 pre-application-meeting requirement and the 2006 board repeal) were read directly from the codified LDC via a rendered Municode session with passing positive ('electrical') and fabricated ('zzqqx') search controls in the same session.
codified ordinance (Land Development Code) checked 2026-09-12 https://library.municode.com/fl/longwood/codes/code_of_ordinances?nodeId=PTIIILODECO_ARTXAD_10.1.0COPE
Q26 Is a wind or windstorm certification required? Overlays & special cases
Yes — engineered wind-load design is required for the mounting/attachment system: 139 mph for roof-mounted systems, 129 mph for ground-mounted systems, both signed and sealed by a state-licensed engineer citing FBC Chapter 16 and FBC-Residential §324.
Why the confidence is not higherQuoted directly from the City's own PV Guideline, for every system type.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
No Specific Use Permit or Council approval appears to be required for residential rooftop or accessory ground-mount PV.
Why the confidence is not higherThe Land Development Code contains essentially zero solar-specific text (a sitewide keyword count found only one 'solar' hit in the entire 780,000-character LDC, in a fence-gate definition unrelated to PV) — so no SUP/Council-approval trigger naming solar exists. This is an absence proved by full-text enumeration with passing controls, not a City statement that none is required; ground-mount systems ARE separately routed to Planning/Zoning per the PV Guideline (see Q10/Q47), which is administrative review, not a Council-level Specific Use Permit.
codified ordinance (full-text enumeration) checked 2026-09-12 https://library.municode.com/fl/longwood/codes/code_of_ordinances?nodeId=PTIIILODECO_ARTXAD_10.1.0COPE
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No City-imposed system-size cap on residential generation was found in the Land Development Code.
Why the confidence is not higherSame zero-solar-hits enumeration as Q27. Note this is distinct from Duke Energy Florida's own UTILITY-level Tier boundaries (Tier 1 ≤10kW, Tier 2 >10-100kW, Tier 3 >100kW-2MW), which govern interconnection terms and disconnect requirements, not a City zoning cap on system size.
codified ordinance (full-text enumeration) checked 2026-09-12 https://library.municode.com/fl/longwood/codes/code_of_ordinances?nodeId=PTIIILODECO_ARTXAD_10.1.0COPE
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2020 NEC (NFPA 70), effective as adopted 31 Dec 2023, under the current FBC 8th Edition (2023) cycle. 95% · live portal notice + city PV guideline (two independent current primary sources)
- Which building code edition is in force? Florida Building Code, 8th Edition (2023). 92% · live portal notice
- Which fire code edition is in force? Not stated by the City in any document reached this run. 40% · city PV guideline (silent)
- Are there local amendments to any of the above? Yes, and the local amendment document itself is now stale: the City's own 'FBC Chapter 1 — Scope and Administration' local administrative amendments (Ord. No. 21-2196) are titled on their own cover page '2020, 7th Edition, FBC' and were adopted in 2021 — one full code cycle behind the current 8th Edition (2023) that the SmartGov portal and PV Guideline both now require (Q29/Q30). Separately, the Electrical Permit Application's service-upgrade clause still cites 'section 220.87, 2014 NEC' (see Q34) inside an otherwise current-looking form. 80% · adopted ordinance (dated, stale)
- What is the installation judged against? FBC 8th Edition (2023) for the structural/roof/attachment scope, and the 2020 NEC (Art. 690/705) for the electrical scope — both stated together in the City's current PV Guideline and portal notice. 88% · live portal notice + city PV guideline
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
- What ridge setback and access pathways are required? The City incorporates NFPA 1 §11.12 by reference rather than stating its own numeric setback: 'All roof top mounted system must comply with setback requirements as outlined in NFPA 1, section 11.12. A roof layout with applicable setbacks shown, must be provided at permit submittal.' No City-specific numeric ridge setback or access-pathway dimension is separately stated. 78% · city PV guideline
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Rapid shutdown is not named by that term anywhere in City material, but is required by incorporation: the PV Guideline mandates 'All electrical installation must be per 2020 NEC 690, 705 and applicable sections' and 'outline of all labels required in the 2020 NEC, 690' — NEC 690.12 (rapid shutdown) is squarely inside Article 690 of the 2020 NEC the City has adopted. 75% · city PV guideline
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? No City-specific placard is named; the City requires compliance with 'all labels required in the 2020 NEC, 690 and NFPA 1, section 11.12' at the service equipment, i.e., it defers to the NEC/NFPA 1 labeling requirements rather than specifying its own placard. 62% · city PV guideline
- Does the authority specify placard wording of its own? No City-specific placard wording was found. 40% · city PV guideline (silent)
- Does it specify letter height, colour or material? No City-specific letter height, colour or material spec was found. 40% · city PV guideline (silent)
- Is a site plan / facility map placard required, and what must it show? No dedicated facility-map PLACARD requirement was found; the City does require a roof-layout DRAWING showing setbacks at permit SUBMITTAL (see Q10/Q36), but that is a submittal document, not a posted facility map at the equipment. 50% · city PV guideline
- Does the UTILITY specify placards beyond the AHJ's? No — Duke Energy Florida's own filed Tier 1 tariff specifies NO placard/plaque/sign of any kind. This was proved by enumeration this run: the OCR'd text of all four pages of Duke's Tier 1 Standard Interconnection Agreement was grepped for 'placard,' 'plaque,' 'sign' and 'label' with zero hits. 82% · utility's own filed FPSC tariff (Duke Energy Florida), OCR'd directly
- Where must the labels be placed? No City or utility label-PLACEMENT rule beyond the AC-disconnect placement itself was found (see Q48 for the disconnect's own location rule). 45% · city PV guideline (silent)
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Utility-dependent, and Duke Energy Florida is the sole utility here (Q22). For the residential-typical Tier 1 case (≤10kW), Duke's own filed tariff makes the AC disconnect DISCRETIONARY, installed only if Duke elects to, AT DUKE'S EXPENSE: 'In the event the Company elects to install a manual disconnect switch, it shall be at the Company's expense... visible load break type... mounted separate from, but adjacent to, the Company's meter socket... capable of being locked in the open position with a single Company utility lock.' No distance figure is given (contrast FPL's 10 ft, SECO's 5 ft). For Tier 2/3 systems the disconnect becomes mandatory at the customer's expense, per this survey's baseline finding for Duke (not independently re-verified for Tiers 2/3 this run, but consistent with the Tier 1 sheet's parallel structure). 88% · utility's own filed FPSC tariff (Duke Energy Florida), OCR'd directly
- Must equipment be on a specific approved list? No formal 'approved equipment list' is named; the City instead requires product information/listing documentation to be submitted for the rack system, PV panels, inverter, and (for hybrid systems) the energy storage/charge-control equipment. 60% · city PV guideline
- Are batteries permitted, and under what conditions? Yes — the City's PV Guideline has a dedicated 'PV Hybrid system' category explicitly covering energy storage systems, requiring 'product information and listing for energy storage systems, charge system and control units' and that 'All DC circuitry must be outlined and applicable loads shown.' No prohibition or size cap on batteries was found. 82% · city PV guideline
- Is there a separate ESS permit or inspection? No separate ESS permit or inspection type is named — batteries/energy storage are folded into the same PV Hybrid building-and-electrical permit described at Q4/Q45. 55% · department page (permit-type list, absence)
- Is a ground mount treated as a structure? Effectively yes — a ground-mounted PV system 'must also be approved by planning/zoning' with a full survey/site plan (setbacks, easements, flood information), and the LDC's own broad definition of 'Structure' explicitly includes 'above-ground equipment' and 'poles,' which would sweep in ground-mount racking. No PV-specific ground-mount ordinance exists, so absent a special rule it would default to the LDC's generic accessory-structure setback (7 feet from the property line generally, or 5 feet for 'necessary equipment such as condenser units and pool pumps' — the closest analogous category). 72% · city PV guideline + codified LDC definitions/accessory-structure section
- Is there a local rule on service upgrades or busbar sizing? Yes, but the citation is STALE: the Electrical Permit Application requires that 'Any additional service added to an existing service must be accompanied by an evaluation of the existing service to handle the additional load as declared in section 220.87, 2014 NEC' — a specific NEC edition six years behind the City's own current 2020 NEC adoption (Q29), on an otherwise-current form. 78% · city electrical permit application (stale citation flagged)
- Is a specific mounting system or attachment spacing required? Yes — an engineered rack/attachment system is required, designed for 139 mph wind (roof-mount) or 129 mph (ground-mount), with the engineer's drawings required to 'specific [sic] type, location and number of fasteners.' No generic attachment-spacing table beyond the engineering requirement was found. 85% · city PV guideline
20 questions answered against City of Longwood’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2020 NEC (NFPA 70), effective as adopted 31 Dec 2023, under the current FBC 8th Edition (2023) cycle.
Why the confidence is not higherTWO current, dated City primary sources agree explicitly: (1) the SmartGov public portal's own live NOTICE banner states 'As of December 31, 2023, all permit packages submitted must be based on the 2023, 8th Edition of the Florida Building Code, and 2020 NEC'; (2) the City's PV Guideline (metadata-dated 3 Jan 2024) repeatedly cites 'the 2020 NEC 690, 705 and applicable sections.' Codified Sec. 18-33 separately floats to 'the most recent state-adopted NEC, NFPA 70 Edition' without naming a year, which is consistent rather than contradictory.
live portal notice + city PV guideline (two independent current primary sources) checked 2026-09-12 https://ci-longwood-fl.smartgovcommunity.com/Public/Home
Q30 Which building code edition is in force? Core Code editions in force
Florida Building Code, 8th Edition (2023).
Why the confidence is not higherSame SmartGov portal notice as Q29, stated in the same sentence as the NEC figure, dated by its own '31 Dec 2023' effective language.
live portal notice checked 2026-09-12 https://ci-longwood-fl.smartgovcommunity.com/Public/Home
Q31 Which fire code edition is in force? Code editions in force
Not stated by the City in any document reached this run.
Why the confidence is not higherChecked the PV Guideline (cites NFPA 1 sections without a year), Sec. 18-33 Electric Code (silent on fire code), and the Fire Department's budget narrative — none names a Florida Fire Prevention Code edition. Per this survey's statewide baseline the current adoption is FFPC 8th Ed. (2023), but that is carried forward from the baseline, not independently reproved from a Longwood document, so it is not recorded as an answer here.
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes, and the local amendment document itself is now stale: the City's own 'FBC Chapter 1 — Scope and Administration' local administrative amendments (Ord. No. 21-2196) are titled on their own cover page '2020, 7th Edition, FBC' and were adopted in 2021 — one full code cycle behind the current 8th Edition (2023) that the SmartGov portal and PV Guideline both now require (Q29/Q30). Separately, the Electrical Permit Application's service-upgrade clause still cites 'section 220.87, 2014 NEC' (see Q34) inside an otherwise current-looking form.
Why the confidence is not higherPDF metadata (CreationDate Feb 2021) and the document's own printed '2020, 7th Edition, FBC' title, read directly against the current 8th-Ed/2023 baseline confirmed on the live portal — the same 'local amendments lag the floating base adoption' pattern this baseline has already caught at other Florida authorities.
adopted ordinance (dated, stale) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/4736/2020-FBC-Longwood-Administrative-Amendments-PDF-
Q33 What is the installation judged against? Core Electrical
FBC 8th Edition (2023) for the structural/roof/attachment scope, and the 2020 NEC (Art. 690/705) for the electrical scope — both stated together in the City's current PV Guideline and portal notice.
Why the confidence is not higherCombines Q29/Q30 sourcing; both figures come from the same two current, dated City documents (SmartGov portal notice; PV Guideline).
live portal notice + city PV guideline checked 2026-09-12 https://ci-longwood-fl.smartgovcommunity.com/Public/Home
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Yes, but the citation is STALE: the Electrical Permit Application requires that 'Any additional service added to an existing service must be accompanied by an evaluation of the existing service to handle the additional load as declared in section 220.87, 2014 NEC' — a specific NEC edition six years behind the City's own current 2020 NEC adoption (Q29), on an otherwise-current form.
Why the confidence is not higherQuoted verbatim from the current Electrical Permit Application PDF found on the City's own Permitting-and-Inspections page.
city electrical permit application (stale citation flagged) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/4598/Electrical-Permit-Application-PDF-
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Yes — an engineered rack/attachment system is required, designed for 139 mph wind (roof-mount) or 129 mph (ground-mount), with the engineer's drawings required to 'specific [sic] type, location and number of fasteners.' No generic attachment-spacing table beyond the engineering requirement was found.
Why the confidence is not higherQuoted directly from the City's PV Guideline for every system type.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
The City incorporates NFPA 1 §11.12 by reference rather than stating its own numeric setback: 'All roof top mounted system must comply with setback requirements as outlined in NFPA 1, section 11.12. A roof layout with applicable setbacks shown, must be provided at permit submittal.' No City-specific numeric ridge setback or access-pathway dimension is separately stated.
Why the confidence is not higherQuoted directly and identically across every system-type section of the City's PV Guideline.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Rapid shutdown is not named by that term anywhere in City material, but is required by incorporation: the PV Guideline mandates 'All electrical installation must be per 2020 NEC 690, 705 and applicable sections' and 'outline of all labels required in the 2020 NEC, 690' — NEC 690.12 (rapid shutdown) is squarely inside Article 690 of the 2020 NEC the City has adopted.
Why the confidence is not higherInference from the City's own 2020 NEC Art. 690 adoption (quoted directly); the document itself never uses the phrase 'rapid shutdown,' unlike the pre-2017 stale guidelines this survey found elsewhere (Miami Lakes, Leesburg's utility agreement) which predate 690.12 entirely — Longwood's document is dated Jan 2024 and cites the correct current NEC cycle, so the omission of the phrase appears stylistic rather than substantive staleness.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
No City-specific placard is named; the City requires compliance with 'all labels required in the 2020 NEC, 690 and NFPA 1, section 11.12' at the service equipment, i.e., it defers to the NEC/NFPA 1 labeling requirements rather than specifying its own placard.
Why the confidence is not higherQuoted directly from the PV Guideline, repeated for every system type; no City document beyond this general incorporation was found.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No City-specific placard wording was found.
Why the confidence is not higherChecked the PV Guideline, the Building/Electrical Permit Applications, and the Fee Schedule/forms list on the Permitting-and-Inspections page; none specifies wording distinct from NEC/NFPA 1's own required label text.
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
No City-specific letter height, colour or material spec was found.
Why the confidence is not higherSame review as Q39 — absent.
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
No dedicated facility-map PLACARD requirement was found; the City does require a roof-layout DRAWING showing setbacks at permit SUBMITTAL (see Q10/Q36), but that is a submittal document, not a posted facility map at the equipment.
Why the confidence is not higherDistinguishing the submittal-stage roof layout (confirmed) from a posted site-plan placard (not found) — the PV Guideline never describes the roof layout as something posted on site.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
No — Duke Energy Florida's own filed Tier 1 tariff specifies NO placard/plaque/sign of any kind. This was proved by enumeration this run: the OCR'd text of all four pages of Duke's Tier 1 Standard Interconnection Agreement was grepped for 'placard,' 'plaque,' 'sign' and 'label' with zero hits.
Why the confidence is not higherDirect OCR extraction (pdftoppm + tesseract) of Duke's own FPSC-filed document performed in this run, not carried forward from the baseline — the tariff PDF defeats pdftotext (Aspose-generated non-rendering text layer), exactly as this survey's baseline warned for Duke and FPL documents alike.
utility's own filed FPSC tariff (Duke Energy Florida), OCR'd directly checked 2026-09-12 https://www.duke-energy.com/-/media/pdfs/for-your-business/generate-your-own-renewable/florida/tier-1-contract.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
No City or utility label-PLACEMENT rule beyond the AC-disconnect placement itself was found (see Q48 for the disconnect's own location rule).
Why the confidence is not higherAbsence across the same PV Guideline and Duke tariff review used for Q38-Q42.
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q44 Must equipment be on a specific approved list? Equipment listing
No formal 'approved equipment list' is named; the City instead requires product information/listing documentation to be submitted for the rack system, PV panels, inverter, and (for hybrid systems) the energy storage/charge-control equipment.
Why the confidence is not higherQuoted directly from the PV Guideline's submittal requirements for each system type; this functions as a de facto listing requirement (implying UL/NRTL-listed equipment) without naming a specific list or standard.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes — the City's PV Guideline has a dedicated 'PV Hybrid system' category explicitly covering energy storage systems, requiring 'product information and listing for energy storage systems, charge system and control units' and that 'All DC circuitry must be outlined and applicable loads shown.' No prohibition or size cap on batteries was found.
Why the confidence is not higherRead directly from the City's own PV Guideline, the only document found that addresses batteries at all.
city PV guideline checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q46 Is there a separate ESS permit or inspection? Battery / ESS
No separate ESS permit or inspection type is named — batteries/energy storage are folded into the same PV Hybrid building-and-electrical permit described at Q4/Q45.
Why the confidence is not higherInference from the absence of any distinct ESS permit application among the City's ~19 listed permit types (Building, Electrical, Fire Alarm, Fire Suppression, etc. — no 'Battery' or 'ESS' type) and the PV Guideline folding storage into the same submittal.
department page (permit-type list, absence) checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q47 Is a ground mount treated as a structure? Core Ground mount
Effectively yes — a ground-mounted PV system 'must also be approved by planning/zoning' with a full survey/site plan (setbacks, easements, flood information), and the LDC's own broad definition of 'Structure' explicitly includes 'above-ground equipment' and 'poles,' which would sweep in ground-mount racking. No PV-specific ground-mount ordinance exists, so absent a special rule it would default to the LDC's generic accessory-structure setback (7 feet from the property line generally, or 5 feet for 'necessary equipment such as condenser units and pool pumps' — the closest analogous category).
Why the confidence is not higherCombines the City's PV Guideline's ground-mount planning/zoning routing with the LDC's own 'Structure' definition and its Accessory Structures section (§5.3.0) generic setback figures, since no PV-specific ground-mount section exists in the LDC (confirmed by the zero-solar-hit full-text enumeration at Q27/Q28).
city PV guideline + codified LDC definitions/accessory-structure section checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Utility-dependent, and Duke Energy Florida is the sole utility here (Q22). For the residential-typical Tier 1 case (≤10kW), Duke's own filed tariff makes the AC disconnect DISCRETIONARY, installed only if Duke elects to, AT DUKE'S EXPENSE: 'In the event the Company elects to install a manual disconnect switch, it shall be at the Company's expense... visible load break type... mounted separate from, but adjacent to, the Company's meter socket... capable of being locked in the open position with a single Company utility lock.' No distance figure is given (contrast FPL's 10 ft, SECO's 5 ft). For Tier 2/3 systems the disconnect becomes mandatory at the customer's expense, per this survey's baseline finding for Duke (not independently re-verified for Tiers 2/3 this run, but consistent with the Tier 1 sheet's parallel structure).
Why the confidence is not higherThe Tier 1 language was OCR'd directly from Duke's own FPSC-filed Standard Interconnection Agreement in THIS run (pdftoppm -r 200 + tesseract, since the PDF defeats pdftotext) — not carried forward from the baseline file, though it corroborates the baseline's run-87 finding exactly.
utility's own filed FPSC tariff (Duke Energy Florida), OCR'd directly checked 2026-09-12 https://www.duke-energy.com/-/media/pdfs/for-your-business/generate-your-own-renewable/florida/tier-1-contract.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? By phone (Inspection Request Line, 407-260-3471) or through the SmartGov portal's inspection-scheduling feature. 85% · department page
- How much notice is required? Inspections must be requested by 3:30 P.M. on the business day prior to the desired inspection date — roughly one business day's notice. 85% · department page
- Are same-day or AM/PM windows offered? Not stated. 40% · department page (silent)
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Largely yes, in-house — but with a disclosed, unresolved caveat: the FY2025-26 Adopted Budget states the Building & Inspection Fund's objective to be 'transitioning to a hybrid contract-staff inspection model,' meaning some inspections may now involve contracted inspectors alongside the 1 Building Inspector / 1 Plans Examiner-Inspector on staff. 72% · city budget document
- If delegated, to whom? Partially unresolved — the City's own budget document discloses a transition toward contracted inspection capacity but does not name the contracted firm or which inspection types it covers. 50% · city budget document (partial)
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? Not published for PV specifically. The City's own live permit portal (SmartGov) does not support a keyword or permit-type search — its only public lookup is 'Parcel Search' by parcel number, address, or owner name (live-tested this run) — so this run could NOT pull a real, finaled Longwood solar permit record to observe an actual inspection sequence, unlike the Tyler EnerGov successes elsewhere in this survey (e.g., Marco Island's named 'Photo Voltaic Solar' inspection, New Port Richey). This is recorded as a GENUINE PORTAL LIMITATION (SmartGov joins BS&A and the Lake Wales ADG platform as a third portal type that defeats the keyword-search technique), not an absence of PV permits in Longwood. 55% · live portal test (limitation) + inference from Q4/Q8
- Is a rough-in or mid-roof inspection required? Not stated. 40% · city PV guideline (silent)
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? No published PV-specific inspection checklist was found. 40% · department page (document list, absence)
- What must be on site at inspection? Not stated specifically for PV. 40% · city PV guideline (silent)
- Does the inspector verify labels and listings? Not stated explicitly. 40% · city PV guideline (silent)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? Not stated by name (no document specifies whether a Certificate of Completion, a green tag, or a portal status change is issued on a passed PV/electrical final). 40% · department page (silent)
- Who notifies the utility for PTO? The customer/installer notifies the utility, not the City — Duke Energy Florida's own Standard Interconnection Agreement places the notice obligation on the Customer: at least 10 days' notice before parallel operation, and the executed agreement itself returned to Duke at least 30 calendar days before operation begins. No Longwood document describes the City notifying Duke on the customer's behalf. 82% · utility's own filed FPSC tariff (Duke Energy Florida), OCR'd directly
- Is there a re-inspection fee? $55.00 flat re-inspection fee. 88% · city fee schedule
- How are corrections issued and cleared? Corrections/comments are handled through the SmartGov portal ('View Inspection Results,' 'Submit Comment Responses'); for plan revisions specifically, a completed 'Additional Information/Revision form' plus a narrative of changes and clouded/marked-up plan sheets must be submitted, per the City's own Digital Permitting/Plans Submittal guide. 62% · city digital-submittal guide + portal capabilities
14 questions answered against City of Longwood’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
By phone (Inspection Request Line, 407-260-3471) or through the SmartGov portal's inspection-scheduling feature.
Why the confidence is not higherBoth routes stated on the City's own Permitting-and-Inspections page.
department page checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q50 How much notice is required? Core Booking & scheduling
Inspections must be requested by 3:30 P.M. on the business day prior to the desired inspection date — roughly one business day's notice.
Why the confidence is not higherQuoted directly from the City's Permitting-and-Inspections page.
department page checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Not stated.
Why the confidence is not higherThe Permitting-and-Inspections page gives the phone-in cutoff time (Q50) but does not describe AM/PM windows or same-day options; the City also separately offers 'Virtual Inspection Services for specific permit types' per its own SmartGov portal notice, but does not detail scheduling windows for that either.
department page (silent) checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Largely yes, in-house — but with a disclosed, unresolved caveat: the FY2025-26 Adopted Budget states the Building & Inspection Fund's objective to be 'transitioning to a hybrid contract-staff inspection model,' meaning some inspections may now involve contracted inspectors alongside the 1 Building Inspector / 1 Plans Examiner-Inspector on staff.
Why the confidence is not higherCity's own current adopted budget document, Building & Inspection Fund section, read directly; the word 'hybrid' and the transition itself are stated by the City, but no contracted firm is named anywhere reached this run.
city budget document checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/9512/ADOPTED-BUDGET-BOOK-9-15-2025_FY25-26
Q53 If delegated, to whom? Core Who inspects
Partially unresolved — the City's own budget document discloses a transition toward contracted inspection capacity but does not name the contracted firm or which inspection types it covers.
Why the confidence is not higherSame budget-document caveat as Q52; this run could not find a firm name (no SAFEbuilt/PDCS/CAP-Government-style letterhead or domain was found on any Longwood permit form or staff contact reached).
city budget document (partial) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/9512/ADOPTED-BUDGET-BOOK-9-15-2025_FY25-26
Q54 Which inspections are required, and in what order? Core Stages & sequence
Not published for PV specifically. The City's own live permit portal (SmartGov) does not support a keyword or permit-type search — its only public lookup is 'Parcel Search' by parcel number, address, or owner name (live-tested this run) — so this run could NOT pull a real, finaled Longwood solar permit record to observe an actual inspection sequence, unlike the Tyler EnerGov successes elsewhere in this survey (e.g., Marco Island's named 'Photo Voltaic Solar' inspection, New Port Richey). This is recorded as a GENUINE PORTAL LIMITATION (SmartGov joins BS&A and the Lake Wales ADG platform as a third portal type that defeats the keyword-search technique), not an absence of PV permits in Longwood.
Why the confidence is not higherThe portal limitation was live-tested directly this run (clicked into 'Parcel Search,' confirmed its only inputs are parcel #, address, or owner name). Given the general two-permit structure (Q4), a real job would need at minimum a building/structural inspection and an electrical final, but no City document states the sequence or names a rough-in step.
live portal test (limitation) + inference from Q4/Q8 checked 2026-09-12 https://ci-longwood-fl.smartgovcommunity.com/Parcels/ParcelHome
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Not stated.
Why the confidence is not higherNo rough-in or mid-roof inspection is named in the PV Guideline or on the Building Inspections page; and as at Q54, the portal's search limitation prevented pulling a real permit's inspection history to check directly.
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q56 Does the inspector verify labels and listings? Core What is checked
Not stated explicitly.
Why the confidence is not higherNo City document describes what the inspector checks label-by-label; inferred only that labels are required to exist (Q38) under the 2020 NEC/NFPA 1 incorporation.
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q57 Is there a published inspection checklist? Core What is checked
No published PV-specific inspection checklist was found.
Why the confidence is not higherChecked the full Permit Applications/Checklists/Additional Forms list on the Permitting-and-Inspections page (~35 documents enumerated) — the only PV-specific document is the Photovoltaic System Guidelines itself, which is a submittal guide, not an inspection checklist.
department page (document list, absence) checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q58 What must be on site at inspection? Core Documents on site
Not stated specifically for PV.
Why the confidence is not higherNo City document lists what must be physically on site at a PV inspection (approved plans, product listings, etc. are implied by the submittal package at Q8, but no on-site-document requirement is stated for inspection day).
city PV guideline (silent) checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8328/Photovoltaic-permit-information2023-PDF
Q59 Is there a re-inspection fee? Corrections & re-inspection
$55.00 flat re-inspection fee.
Why the confidence is not higherQuoted verbatim from the City's current Fee Schedule, 'Miscellaneous Operational and Administrative Fees': 'RE-INSPECTION FEE: $55.00. A flat rate per occurrence based on the average field time of the inspector and processing time of the permit clerk.' Not PV-specific, but the only re-inspection fee the City publishes.
city fee schedule checked 2026-09-12 https://www.longwoodfl.org/702/Fee-Schedule
Q60 How are corrections issued and cleared? Corrections & re-inspection
Corrections/comments are handled through the SmartGov portal ('View Inspection Results,' 'Submit Comment Responses'); for plan revisions specifically, a completed 'Additional Information/Revision form' plus a narrative of changes and clouded/marked-up plan sheets must be submitted, per the City's own Digital Permitting/Plans Submittal guide.
Why the confidence is not higherCombines the SmartGov portal's stated capabilities with the City's April 2024 Digital Permitting/Plans Submittal guide's explicit revision-submittal procedure; neither is PV-specific.
city digital-submittal guide + portal capabilities checked 2026-09-12 https://www.longwoodfl.org/DocumentCenter/View/8529/Digital-Permitting-and-Plans-Submittal-PDF
Q61 What is issued on pass? Core Final sign-off & PTO
Not stated by name (no document specifies whether a Certificate of Completion, a green tag, or a portal status change is issued on a passed PV/electrical final).
Why the confidence is not higherChecked the Building Inspections/Permitting pages and the PV Guideline; none names the specific document or status issued upon a passing final inspection.
department page (silent) checked 2026-09-12 https://www.longwoodfl.org/169/Permitting-and-Inspections
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
The customer/installer notifies the utility, not the City — Duke Energy Florida's own Standard Interconnection Agreement places the notice obligation on the Customer: at least 10 days' notice before parallel operation, and the executed agreement itself returned to Duke at least 30 calendar days before operation begins. No Longwood document describes the City notifying Duke on the customer's behalf.
Why the confidence is not higherRead and OCR'd directly from Duke's own FPSC-filed Tier 1 tariff this run (same document as Q23/Q48) — a first-party utility source, not the PSC floor.
utility's own filed FPSC tariff (Duke Energy Florida), OCR'd directly checked 2026-09-12 https://www.duke-energy.com/-/media/pdfs/for-your-business/generate-your-own-renewable/florida/tier-1-contract.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording 40%
No City-specific placard wording was found.
Size, colour & material 40%
No City-specific letter height, colour or material spec was found.
Where they go 45%
No City or utility label-PLACEMENT rule beyond the AC-disconnect placement itself was found (see Q48 for the disconnect's own location rule).
What the utility wants on top 82%
No — Duke Energy Florida's own filed Tier 1 tariff specifies NO placard/plaque/sign of any kind. This was proved by enumeration this run: the OCR'd text of all four pages of Duke's Tier 1 Standard Interconnection Agreement was grepped for 'placard,' 'plaque,' 'sign' and 'label' with zero hits.
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.