City of Moore Haven is a city authority in the State of Florida, serving 1,566 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for City of Moore Haven against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of Moore Haven is not the permitting authority for residential solar here 82% confidence
- Holds
- Zoning and Land Development Code administration only, self-run under the City's own Building and Zoning Official (LDC Ch. 125, Sec. 125-41) — rezoning, variance, site plan, subdivision, home-occupation review.
- Delegated to
- Glades County Community Development Department — Building Division (in-house; 3 personnel, real salaries per its FY2023-24 FS 553.80(7) report) — for Building, Electrical, Plumbing, Mechanical and all other Florida Building Code permitting and inspection, county-wide including inside Moore Haven's city limits.
- Why not higher
- Moore Haven is ABSENT from floridabuilding.org's statewide registry of every Florida local government that actually enforces the FBC and issues building permits (392 entries; checked by exact substring match, zero hits for 'moore' in any form), while 'County of Glades' IS present. Positive controls (Dade City, Eagle Lake, Frostproof, Polk City) and negative controls (Bowling Green, Wauchula, Zolfo Springs, St. Leo, San Antonio) both landed exactly as the standing brief predicts, confirming the registry itself works today. Corroborating evidence: Glades County's own FS 553.80(7) utilization report for FY2023-24 shows a genuine, salaried, in-house 3-person Building Division (not a bought-in contractor: real personnel-cost line, $94,659, non-zero) handling 889 applications/887 permits/zero private-provider inspections COUNTY-WIDE, filed only under the county's name; Moore Haven's own site (moorehaven.org) carries no building permit application, no fee schedule, and no FS 553.80(7) filing anywhere (checked via the site's WordPress media-library search API for 'fee', 'building', 'permit', 'solar', 'chapter34'); and Moore Haven's own LDC Sec. 125-41 creates a 'City of Moore Haven Building and Zoning Official' whose every enumerated duty is a ZONING function, never FBC permit issuance. THIS CORRECTS A PRIOR FILED FINDING: the standing baseline's Glades County entry (run 121) states 'MOORE HAVEN IS A SEPARATE AHJ, proved from BOTH sides,' citing this same Sec. 125-41 as proof of an independent building department. Re-reading that section today shows its duties are exclusively zoning/land-development, not construction permitting — the title 'Building and Zoning Official' describes one office wearing a zoning hat, not two departments. NOT fully closed: the county's Building Division office sits physically inside Moore Haven (198 6th Street SW) — precisely the office-in-the-county-seat pattern this task was launched to test — so this finding rests on registry absence and document enumeration rather than an explicit interlocal agreement or a live geocoded permit match. The strongest available closing test (geocoding a current county iWorQ permit-ledger address against the Moore Haven place polygon, with City Hall as a positive control and a nonsense street as a fabricated control) could NOT be completed: the county's iWorQ permit search is gated behind Google reCAPTCHA v2/v3 and a scripted POST bounces silently to no results. Also unresolved: whether Moore Haven's own municipal code (outside the LDC, e.g., a 'Chapter 34 — Buildings') independently adopts anything — Municode is unreachable survey-wide as of today, proved by a failing control on a KNOWN-GOOD clientId (Jacksonville Beach, 2757 -> 404 on /Jobs/latest, and library.municode.com/api -> 401) rather than inferred from Moore Haven's own 404.
- Permit required
- Yes — a Florida Building Code permit is required for a residential rooftop PV system, issued through Glades County's Building Division ('The Building Division issues building…85%
- Permit cost
- Ambiguous — the county's fee ordinance (Ord. 2020-16, amended 7/7/2021) has no line item using the words 'solar' or 'photovoltaic' anywhere in its 8 pages.55%
- Portal
- iWorQ — the county's public permit portal is hosted at gladescounty.portal.iworq.net.90%
- Electrical code
- Uncertain and apparently stale on the county's own page: the county's 'State Construction Rules and Regulations' page names only '2008 National Electric Code (NEC),55%
- Booking an inspection
- By phone or email: 'For inspections or to schedule an appointment please call (863) 946-6018 or email kfischer@myglades.com or ajones@myglades.com.'85%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes — a Florida Building Code permit is required for a residential rooftop PV system, Q3 Electrical and building permits — Combined submittal, one 'Permit Number' on the county's Building Permit Application, but each trade (Building, Mobile Home, Electrical, Plumbing, Mechanical, Q4 Where you file — iWorQ — the county's public permit portal is hosted at gladescounty.portal.iworq.net. Q20
- Permit required
- Yes — a Florida Building Code permit is required for a residential rooftop PV system, issued through Glades County's Building Division ('The Building Division issues building permits...Inspecting…85% source
- What it costs
- Ambiguous — the county's fee ordinance (Ord. 2020-16, amended 7/7/2021) has no line item using the words 'solar' or 'photovoltaic' anywhere in its 8 pages.55% source
- Key document
- permit application form cited by 6 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? No — Glades County is the AHJ for building and electrical permitting at a Moore Haven address; the City of Moore Haven itself is absent from Florida's statewide registry of entities that actually enforce the Florida Building Code and issue permits. 82% · statewide registry (floridabuilding.org)
- What does this authority permit itself, and what does it delegate? Delegates Building, Electrical, Plumbing, Mechanical and all FBC-governed construction permitting to Glades County's Community Development Department (Building Division), in-house. Retains, self-run, its own Zoning / Land Development Code authority under LDC Ch. 125 (rezoning, variance, site plan, subdivision, home-occupation review) — a 'City of Moore Haven Building and Zoning Official' position exists on paper but its duties are zoning-only. 80% · adopted ordinance (LDC Ch. 125)
- Is a permit required for a residential rooftop PV system? Yes — a Florida Building Code permit is required for a residential rooftop PV system, issued through Glades County's Building Division ('The Building Division issues building permits...Inspecting building, mechanical, plumbing and electrical work'). 85% · department page
- Is there a separate electrical permit, or is it combined? Combined submittal, one 'Permit Number' on the county's Building Permit Application, but each trade (Building, Mobile Home, Electrical, Plumbing, Mechanical, Aluminum, Gas, Roofing, Drywall, Carpentry, Masonry, Concrete) is listed on the attached 'Contractor Assignment and Authorization' sheet and priced SEPARATELY on the fee schedule (Building Permits vs. Electrical Permits are distinct fee tables). 68% · permit application form
- Is there a historic-district review? Only within one specific overlay: Moore Haven's LDC creates an 'M-HMS, Marina Historic Main Street District' with its own historic-preservation-flavored use provisions (Article XVI, historically significant structures). Outside that mapped district, no citywide historic-review board or ordinance was found. 70% · adopted ordinance (LDC Ch. 125)
- Is a wind or windstorm certification required? No local wind/windstorm certification beyond standard statewide Florida Building Code wind design — Glades County is not a High-Velocity Hurricane Zone (HVHZ) county (HVHZ is Miami-Dade/Broward only), and the county's own code-reference page lists HVHZ test-protocol documents only as part of the generic statewide FBC document set, not as an applicable local overlay. 65% · department page
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? Either a licensed contractor registered per-trade with the County (via the Contractor Assignment and Authorization sheet, one signature line per trade including Electrical), or the property owner as Owner-Builder (a dedicated 'Check if Owner-Builder' box sits at the top of the same application, with a separate Owner-Builder Affidavit form available). 60% · permit application form
- Must the contractor be registered with this authority before applying? Yes — the County requires contractor registration before applying: 'There is also an initial fee of $50.00 to register with the County,' via the Contractor Registration Form (no faxes; email to ajones@myglades.com or sbuchans@myglades.com). 90% · department page
- Is a homeowner permitted to self-install and self-permit? Yes — the county's Building Permit Application has a 'Check if Owner-Builder' box, and a dedicated Owner-Builder Affidavit Form is listed among the county's building forms. 88% · permit application form
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Full submittal checklist (16 numbered items) attached to the county Building Permit Application: (1) plan sets — 1 paper+1 digital residential, 2 paper+1 digital commercial, including electrical/mechanical/plumbing/gas plans where applicable; (2) a scaled site plan; (3) a property survey (county-only, with 3 stated exemptions); (4) proof of potable water/well and sanitary sewer/septic availability; (5) right-of-way construction approval; (6) a completed Florida Energy Code form (Central Zone 7) with equipment load-sizing calc; (7) truss layout and truss engineering; (8) Mobile Home Installation Plan Review Workbook (mobile homes only); (9) aluminum-structure engineering where applicable; (10) contract/cost-to-build documentation; (11) Florida Product Approval/NOA for roofing, doors and windows; (12) proof of ownership if recently purchased; (13) stormwater pollution prevention plan (commercial only); (14) commercial landscape/buffering plan; (15) SHIP approval documentation where applicable; (16) E911 address verification for new construction. 93% · permit application form
- How many copies, and in what format? Residential: one paper set plus one digital set of plans. Commercial: two paper sets plus one digital set. 11x17 accepted if legible, otherwise standard size. 93% · permit application form
- Is a site plan required, and what must it show? Yes. Must be drawn to scale (may be on a copy of the property survey); must show actual lot dimensions/shape, existing structures, proposed structure location and dimensions, distances between structures, adjacent roads and distance to property lines, well/septic locations where present, and (in a mobile home/RV park) distance to nearest surrounding structures on adjacent lots. 93% · permit application form
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? iWorQ — the county's public permit portal is hosted at gladescounty.portal.iworq.net. 90% · permit portal landing page
- Can the whole application be completed online? Partially — the portal exposes 'new-permit' submission links (e.g. /GLADESCOUNTY/new-permit/600/2779) suggesting an online application flow exists, but the permit SEARCH function is gated behind a Google reCAPTCHA (v2/v3) and a scripted submission is silently bounced, so the full online path could not be exercised end-to-end today. 55% · permit portal (live)
- What does a residential solar permit cost? Ambiguous — the county's fee ordinance (Ord. 2020-16, amended 7/7/2021) has no line item using the words 'solar' or 'photovoltaic' anywhere in its 8 pages. The single closest category is 'Energy Generator,' amended by that ordinance from a flat $50 to Residential $150 / Commercial $50 min. (figured as a building permit). Whether county staff apply the 'Energy Generator' line to grid-tied residential PV, or size PV under the general valuation-based Building Permit schedule instead, could not be confirmed from the document alone. 55% · fee schedule (scanned ordinance, OCR'd)
- How is the fee calculated? Most likely flat ($150 residential) under the 'Energy Generator' line; the general Building Permit schedule beside it is valuation-tiered ($50 min., then $10/$1,000 up to $15k, stepping down per bracket to $5/$1,000 above $1M) if PV is instead sized as ordinary construction value. 50% · fee schedule (scanned ordinance, OCR'd)
- Is there a separate plan-check fee? Yes — Plan Review Fee is 15% of the permit fee, $35 minimum, per the Building Permits section of the fee ordinance. Additional inspections beyond those included are $25 each. 78% · fee schedule (scanned ordinance, OCR'd)
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- Which utility handles interconnection here? Split, and not resolved to city-limits precision: the county's own 'Information You Should Know' page names BOTH Florida Power & Light and Glades Electric Cooperative as active servers within Glades County ('Electrical Reconnect: If your service is with Florida Power and Light... If your service is with Glades Electric...'). GEC is headquartered inside Moore Haven itself (26733 US Hwy 27), but per this survey's own standing caution a co-op's office being physically in the town is suggestive of nothing about which parcels it actually serves — GEC describes itself as serving the SPARSER rural parts of its four-county territory (avg. 7 meters/mile vs. 63-78 for the neighboring IOU), which if anything argues for the denser incorporated city core being FPL territory, not GEC's. Could not close this with a GIS service-area layer, a tariff Communities-Served list, or a franchise ordinance today. 62% · department page
- Where does the utility sit in the sequence? Before/parallel to the county permit: GEC's own guidance asks the homeowner to contact its Engineering Department BEFORE signing with a solar contractor, for a transformer load analysis and to execute GEC's Net Metering Agreement, and to arrange inspection to prevent back-feed hazards. 68% · utility program page
28 questions answered against City of Moore Haven’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
No — Glades County is the AHJ for building and electrical permitting at a Moore Haven address; the City of Moore Haven itself is absent from Florida's statewide registry of entities that actually enforce the Florida Building Code and issue permits.
Why the confidence is not higherfloridabuilding.org's sc_org_srch.aspx registry (392 entries, every FL local government that issues building permits) lists 'County of Glades' but contains ZERO entries matching 'Moore Haven' in any form (checked with substring search, case-insensitive, across all 392 option values). Positive controls present (City of Dade City, City of Eagle Lake, City of Frostproof, Town of Polk City); negative controls (Bowling Green, Wauchula, Zolfo Springs, St. Leo, San Antonio) correctly absent, confirming the registry itself works. Corroborated by: (1) Glades County's own FS 553.80(7) utilization report for FY2023-24 shows a real, staffed, salaried Building Division (3 personnel, $94,659 personnel cost, 889 applications, 887 permits issued, ZERO private-provider inspections) filed under the COUNTY's name, with no separate Moore Haven filing found anywhere; (2) no Moore Haven-specific building permit application, fee schedule, or FS 553.80(7) report exists anywhere on moorehaven.org (checked via WordPress media-library search for 'fee', 'building', 'permit', 'solar' — none returned a building/fee document); (3) Moore Haven's own Land Development Code (Ch. 125, Ord. 336, Sept 2018) Sec. 125-41 creates a 'City of Moore Haven Building and Zoning Official' but every one of its enumerated duties (B through the list) is a ZONING/land-development function — receiving rezoning, variance, site-plan, subdivision and home-occupation applications — never technical Florida Building Code permit issuance. THIS REVERSES A PRIOR FILED FINDING (Glades County run 121 in the standing baseline) that stated 'MOORE HAVEN IS A SEPARATE AHJ.' That run's own evidence (Sec. 125-41 creating a City 'Building and Zoning Official') is real but was read as proving building-code authority when it only establishes ZONING authority — the same 'title says Building, duties say Zoning' pattern the standing brief documents elsewhere. NOT fully closed: the county's building office happens to sit physically inside Moore Haven (198 6th Street SW) — exactly the location-is-not-jurisdiction trap this task named going in — and I could not complete the strongest available test (geocoding a live county permit-ledger address against the Moore Haven place polygon) because the county's iWorQ permit search is reCAPTCHA-v2/v3 gated and a scripted POST bounces silently; and Municode (which might hold a separate city 'Chapter 34 — Buildings' outside the LDC) is unreachable survey-wide today, confirmed by a failing control on a known-good clientId (Jacksonville Beach, 2757 -> 404) rather than assumed.
statewide registry (floridabuilding.org) checked 2026-09-13 https://www.floridabuilding.org/sc/sc_org_srch.aspx
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Delegates Building, Electrical, Plumbing, Mechanical and all FBC-governed construction permitting to Glades County's Community Development Department (Building Division), in-house. Retains, self-run, its own Zoning / Land Development Code authority under LDC Ch. 125 (rezoning, variance, site plan, subdivision, home-occupation review) — a 'City of Moore Haven Building and Zoning Official' position exists on paper but its duties are zoning-only.
Why the confidence is not higherSec. 125-41 of the LDC lists the Building and Zoning Official's powers; none reach FBC construction permitting. Absence from the floridabuilding.org FBC-enforcement registry and absence of any city fee schedule/permit application/FS 553.80(7) filing corroborate that the technical permitting function sits with the County.
adopted ordinance (LDC Ch. 125) checked 2026-09-13 https://moorehaven.org/wp-content/uploads/2023/08/Chapter-125-ZONING-Ord-336-Sep-2018.pdf
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes — a Florida Building Code permit is required for a residential rooftop PV system, issued through Glades County's Building Division ('The Building Division issues building permits...Inspecting building, mechanical, plumbing and electrical work').
Why the confidence is not higherCounty Building Division index page states its scope in its own words; no PV-specific exemption found anywhere the county publishes (checked 'What Doesn't Need a Building Permit' page listing — solar/PV is not among the exempted items).
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/index.php
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Combined submittal, one 'Permit Number' on the county's Building Permit Application, but each trade (Building, Mobile Home, Electrical, Plumbing, Mechanical, Aluminum, Gas, Roofing, Drywall, Carpentry, Masonry, Concrete) is listed on the attached 'Contractor Assignment and Authorization' sheet and priced SEPARATELY on the fee schedule (Building Permits vs. Electrical Permits are distinct fee tables).
Why the confidence is not higherRead directly off the county's current Building Permit Application PDF (dated 08/09/2023) and the accompanying Fee Schedule (Ord. 2020-16, amended 7/7/2021, OCR'd from its 8-page scanned original).
permit application form checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q5 Who is allowed to pull the electrical permit? Core Who may apply
Either a licensed contractor registered per-trade with the County (via the Contractor Assignment and Authorization sheet, one signature line per trade including Electrical), or the property owner as Owner-Builder (a dedicated 'Check if Owner-Builder' box sits at the top of the same application, with a separate Owner-Builder Affidavit form available).
Why the confidence is not higherStructure of the county's own Building Permit Application and its companion Owner-Builder Affidavit form; no separate ordinance text found restricting the electrical permit specifically to a licensed electrician.
permit application form checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes — the County requires contractor registration before applying: 'There is also an initial fee of $50.00 to register with the County,' via the Contractor Registration Form (no faxes; email to ajones@myglades.com or sbuchans@myglades.com).
Why the confidence is not higherDirect quote from the county's own 'Building Applications' page text.
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/building_fees.php
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes — the county's Building Permit Application has a 'Check if Owner-Builder' box, and a dedicated Owner-Builder Affidavit Form is listed among the county's building forms.
Why the confidence is not higherConfirmed directly on the current (08/09/2023) county Building Permit Application PDF and the Building Applications forms list.
permit application form checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q8 What documents make up a complete submittal? Core Submittal package
Full submittal checklist (16 numbered items) attached to the county Building Permit Application: (1) plan sets — 1 paper+1 digital residential, 2 paper+1 digital commercial, including electrical/mechanical/plumbing/gas plans where applicable; (2) a scaled site plan; (3) a property survey (county-only, with 3 stated exemptions); (4) proof of potable water/well and sanitary sewer/septic availability; (5) right-of-way construction approval; (6) a completed Florida Energy Code form (Central Zone 7) with equipment load-sizing calc; (7) truss layout and truss engineering; (8) Mobile Home Installation Plan Review Workbook (mobile homes only); (9) aluminum-structure engineering where applicable; (10) contract/cost-to-build documentation; (11) Florida Product Approval/NOA for roofing, doors and windows; (12) proof of ownership if recently purchased; (13) stormwater pollution prevention plan (commercial only); (14) commercial landscape/buffering plan; (15) SHIP approval documentation where applicable; (16) E911 address verification for new construction.
Why the confidence is not higherTranscribed verbatim from the 'Required Documents Descriptions' section of the county's current Building Permit Application PDF.
permit application form checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q9 How many copies, and in what format? Submittal package
Residential: one paper set plus one digital set of plans. Commercial: two paper sets plus one digital set. 11x17 accepted if legible, otherwise standard size.
Why the confidence is not higherVerbatim from item 1 of the county Building Permit Application's Required Documents list.
permit application form checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes. Must be drawn to scale (may be on a copy of the property survey); must show actual lot dimensions/shape, existing structures, proposed structure location and dimensions, distances between structures, adjacent roads and distance to property lines, well/septic locations where present, and (in a mobile home/RV park) distance to nearest surrounding structures on adjacent lots.
Why the confidence is not higherVerbatim 'SITE PLAN REQUIREMENTS' text, item 2 of the county Building Permit Application.
permit application form checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Nothing published by this authority.
Where we lookedCounty Building Permit Application's 16-item Required Documents checklist (read in full) — item 1 names electrical/mechanical/plumbing/gas plans generically but no PV-specific one-line/three-line diagram requirement is named anywhere in the checklist.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedSame 16-item checklist as Q11 — no string/conductor calculation requirement named.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Nothing published by this authority.
Where we lookedSame checklist — item 9 requires engineering only for 'aluminum structure' connections/foundations/spans; no PV-racking-specific structural PE threshold stated.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Nothing published by this authority.
Where we lookedSame checklist and the county's fee/application documents — no electrical PE stamp threshold stated.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q15 What does a residential solar permit cost? Core Fees
Ambiguous — the county's fee ordinance (Ord. 2020-16, amended 7/7/2021) has no line item using the words 'solar' or 'photovoltaic' anywhere in its 8 pages. The single closest category is 'Energy Generator,' amended by that ordinance from a flat $50 to Residential $150 / Commercial $50 min. (figured as a building permit). Whether county staff apply the 'Energy Generator' line to grid-tied residential PV, or size PV under the general valuation-based Building Permit schedule instead, could not be confirmed from the document alone.
Why the confidence is not higherOCR'd (tesseract --psm 4, 300 dpi) from the county's scanned 8-page fee ordinance PDF, since it carries no text layer. The document itself never uses 'solar' or 'photovoltaic' — this is exactly the 'read the line, do not count the hit' risk the survey brief warns about, in the opposite direction (no hit to read at all). Recorded at reduced confidence rather than not_found because 'Energy Generator' is a real, priced line and the most plausible category for a residential PV system.
fee schedule (scanned ordinance, OCR'd) checked 2026-09-13 https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502
Q16 How is the fee calculated? Core Fees
Most likely flat ($150 residential) under the 'Energy Generator' line; the general Building Permit schedule beside it is valuation-tiered ($50 min., then $10/$1,000 up to $15k, stepping down per bracket to $5/$1,000 above $1M) if PV is instead sized as ordinary construction value.
Why the confidence is not higherSame OCR'd fee ordinance as Q15; genuine ambiguity over which schedule governs, recorded honestly rather than picking one.
fee schedule (scanned ordinance, OCR'd) checked 2026-09-13 https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502
Q17 Is there a separate plan-check fee? Fees
Yes — Plan Review Fee is 15% of the permit fee, $35 minimum, per the Building Permits section of the fee ordinance. Additional inspections beyond those included are $25 each.
Why the confidence is not higherOCR'd from the 'BUILDING PERMITS' fee table, same document as Q15/16.
fee schedule (scanned ordinance, OCR'd) checked 2026-09-13 https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedCounty Building Division index page and FAQ page (fetched in full) — neither states a numeric plan-review turnaround time.
https://www.myglades.com/departments/community_development/building_department/index.php
Q19 How long is an issued permit valid before it expires? Timeline & validity
Nothing published by this authority.
Where we lookedCounty Building Permit Application and fee ordinance (both fetched and OCR'd in full) — no stated permit validity/expiration period found.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q20 Which permit portal does this authority use? Core Portal & process
iWorQ — the county's public permit portal is hosted at gladescounty.portal.iworq.net.
Why the confidence is not higherLinked directly from the county's own 'Building Applications' page as 'Building Permit Portal Link.'
permit portal landing page checked 2026-09-13 https://gladescounty.portal.iworq.net/portalhome/gladescounty
Q21 Can the whole application be completed online? Core Portal & process
Partially — the portal exposes 'new-permit' submission links (e.g. /GLADESCOUNTY/new-permit/600/2779) suggesting an online application flow exists, but the permit SEARCH function is gated behind a Google reCAPTCHA (v2/v3) and a scripted submission is silently bounced, so the full online path could not be exercised end-to-end today.
Why the confidence is not higherObserved directly on the portal's homepage and search form; recorded as a proved capability limit, not a clean yes/no.
permit portal (live) checked 2026-09-13 https://gladescounty.portal.iworq.net/portalhome/gladescounty
Q22 Which utility handles interconnection here? Core Utility interconnection
Split, and not resolved to city-limits precision: the county's own 'Information You Should Know' page names BOTH Florida Power & Light and Glades Electric Cooperative as active servers within Glades County ('Electrical Reconnect: If your service is with Florida Power and Light... If your service is with Glades Electric...'). GEC is headquartered inside Moore Haven itself (26733 US Hwy 27), but per this survey's own standing caution a co-op's office being physically in the town is suggestive of nothing about which parcels it actually serves — GEC describes itself as serving the SPARSER rural parts of its four-county territory (avg. 7 meters/mile vs. 63-78 for the neighboring IOU), which if anything argues for the denser incorporated city core being FPL territory, not GEC's. Could not close this with a GIS service-area layer, a tariff Communities-Served list, or a franchise ordinance today.
Why the confidence is not higherCounty's Information You Should Know page (direct quote) plus GEC's own 'Our Story' page describing its territory and rural density profile.
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/information_you_should_know.php
Q23 Where does the utility sit in the sequence? Core Utility interconnection
Before/parallel to the county permit: GEC's own guidance asks the homeowner to contact its Engineering Department BEFORE signing with a solar contractor, for a transformer load analysis and to execute GEC's Net Metering Agreement, and to arrange inspection to prevent back-feed hazards.
Why the confidence is not higherDirect quote, GEC's current 'Considering Solar?' page.
utility program page checked 2026-09-13 https://www.gladeselectric.com/member-services/considering-solar/
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedMoore Haven LDC Ch. 125 (3,277-line document, grepped for 'homeowners association', 'HOA', 'architectural review' — zero hits) and the county's Building Applications/forms list — no HOA/architectural-approval-first requirement found in either government's own material.
https://moorehaven.org/wp-content/uploads/2023/08/Chapter-125-ZONING-Ord-336-Sep-2018.pdf
Q25 Is there a historic-district review? Overlays & special cases
Only within one specific overlay: Moore Haven's LDC creates an 'M-HMS, Marina Historic Main Street District' with its own historic-preservation-flavored use provisions (Article XVI, historically significant structures). Outside that mapped district, no citywide historic-review board or ordinance was found.
Why the confidence is not higherConfirmed by reading LDC Ch. 125 Article XVI and the M-HMS district definition directly; the zoning code was grepped end-to-end for 'historic' with all six hits located and read.
adopted ordinance (LDC Ch. 125) checked 2026-09-13 https://moorehaven.org/wp-content/uploads/2023/08/Chapter-125-ZONING-Ord-336-Sep-2018.pdf
Q26 Is a wind or windstorm certification required? Overlays & special cases
No local wind/windstorm certification beyond standard statewide Florida Building Code wind design — Glades County is not a High-Velocity Hurricane Zone (HVHZ) county (HVHZ is Miami-Dade/Broward only), and the county's own code-reference page lists HVHZ test-protocol documents only as part of the generic statewide FBC document set, not as an applicable local overlay.
Why the confidence is not higherInference from Florida Building Code HVHZ scope (statewide public knowledge, not a local document) plus the county's own 'State Construction Rules and Regulations' page, which lists the FBC's HVHZ chapters only as part of the full statewide code collection rather than flagging local HVHZ applicability.
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/state_construction_rules_and_regulations.php
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Nothing published by this authority.
Where we lookedMoore Haven LDC Ch. 125 read for special-exception/variance/Council-approval triggers generally, but no PV-specific Special Use Permit or Council-approval requirement located.
https://moorehaven.org/wp-content/uploads/2023/08/Chapter-125-ZONING-Ord-336-Sep-2018.pdf
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Nothing published by this authority.
Where we lookedMoore Haven LDC Ch. 125 grepped end-to-end for 'solar', 'photovoltaic', 'renewable', 'generat' — zero hits on any PV-specific term (positive control 'electrical' = 2 hits, fabricated control 'zzqqx' = 0 hits, confirming the search itself works); no system-size cap on residential generation found in the zoning code, and the county's fee ordinance and permit application likewise name no cap.
https://moorehaven.org/wp-content/uploads/2023/08/Chapter-125-ZONING-Ord-336-Sep-2018.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? Uncertain and apparently stale on the county's own page: the county's 'State Construction Rules and Regulations' page names only '2008 National Electric Code (NEC), otherwise known as NFPA 70, 5th Edition' — an edition and label that predate the statewide 2020 NEC now bundled into the FBC 8th Edition (2023). This reads as an unmaintained links page rather than a reliable statement of the edition currently enforced. 55% · department page (stale)
- Which building code edition is in force? The county's own page names '2020 Florida Building Code (7th Edition)' as current, and the county's Building Permit Application form (dated 08/09/2023) independently prints the same 'FBC 2020 7th Edition' in its header — but the statewide code cycle moved to the FBC 8th Edition (2023), effective 31 Dec 2023, before today. Both of the county's own current-facing documents still name the superseded 7th Edition. 80% · permit application form + department page (both stale)
- What is the installation judged against? Florida Building Code and NEC as adopted by Glades County (no distinct Moore Haven adoption ordinance found; city LDC Ch. 125 does not itself adopt a technical construction code). 72% · department page
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for City of Moore Haven on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
Nothing recorded for City of Moore Haven on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
Nothing recorded for City of Moore Haven on this step yet — 6 questions checked and found unpublished. The guidance above is general.
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? GEC's own current Net Metering Guide specifies only that inverters must have an automatic shut-off to prevent back-feeding the grid ('Inverters are required to have an automatic shut-off to avoid back-feeding electricity onto the grid and endangering lineworkers') — it names NO manual exterior AC disconnect location or spec anywhere in the document. This reconfirms, on a document fetched independently today, the standing baseline's prior finding that GEC is the only Florida utility recorded in this survey with no published manual-disconnect requirement. The company's private Member Interconnection Agreement is not published, so an unpublished agreement could still impose one — this is a hedge, not a claim of certainty. 80% · utility program document (current)
20 questions answered against City of Moore Haven’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
Uncertain and apparently stale on the county's own page: the county's 'State Construction Rules and Regulations' page names only '2008 National Electric Code (NEC), otherwise known as NFPA 70, 5th Edition' — an edition and label that predate the statewide 2020 NEC now bundled into the FBC 8th Edition (2023). This reads as an unmaintained links page rather than a reliable statement of the edition currently enforced.
Why the confidence is not higherDirect quote of the county's own page; flagged as likely stale rather than asserted as current practice.
department page (stale) checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/state_construction_rules_and_regulations.php
Q30 Which building code edition is in force? Core Code editions in force
The county's own page names '2020 Florida Building Code (7th Edition)' as current, and the county's Building Permit Application form (dated 08/09/2023) independently prints the same 'FBC 2020 7th Edition' in its header — but the statewide code cycle moved to the FBC 8th Edition (2023), effective 31 Dec 2023, before today. Both of the county's own current-facing documents still name the superseded 7th Edition.
Why the confidence is not higherCross-confirmed on two of the county's own documents fetched today: the State Construction Rules page and the live Building Permit Application PDF header.
permit application form + department page (both stale) checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q31 Which fire code edition is in force? Code editions in force
Nothing published by this authority.
Where we lookedCounty's State Construction Rules and Regulations page links only a generic 'Florida Fire Prevention Code' with no edition/year stated.
Q32 Are there local amendments to any of the above? Core Code editions in force
Nothing published by this authority.
Where we lookedNo county or city ordinance text identifying local amendments to the NEC/FBC/fire code was located; Municode (which might carry the codified amendment chapter for either government) is unreachable survey-wide today — confirmed by a failing control on a known-good clientId (Jacksonville Beach, 2757 -> 404 on api.municode.com/Jobs/latest) rather than assumed from the target's own 404.
Q33 What is the installation judged against? Core Electrical
Florida Building Code and NEC as adopted by Glades County (no distinct Moore Haven adoption ordinance found; city LDC Ch. 125 does not itself adopt a technical construction code).
Why the confidence is not higherAbsence of any city-side code-adoption ordinance in the LDC text fetched; county's own state-construction-rules page is the only adoption reference found for this area.
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/state_construction_rules_and_regulations.php
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedCounty fee ordinance and permit application (both read in full) — no service-upgrade or busbar-sizing rule stated.
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedNo county or city document found specifying a PV mounting system or attachment spacing requirement.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedNo county or city document found specifying a ridge setback or fire-access pathway requirement for rooftop PV.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Nothing published by this authority.
Where we lookedRapid shutdown depends on the NEC edition genuinely enforced, which could not be pinned down (see Q29) — recording as not_found rather than inferring a code-year-specific requirement from an edition I cannot confirm.
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedNo county or city document naming required placards at the service equipment was located; GEC's own Considering Solar / Net Metering Guide pages are silent on placards.
https://www.gladeselectric.com/wp-content/uploads/Net-Metering-Guide.pdf
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame search as Q38 — no authority-specified placard wording found.
https://www.gladeselectric.com/wp-content/uploads/Net-Metering-Guide.pdf
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame search as Q38 — no letter height/colour/material spec found.
https://www.gladeselectric.com/wp-content/uploads/Net-Metering-Guide.pdf
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame search as Q38 — no site-plan/facility-map placard requirement found beyond the generic site-plan content already recorded at Q10.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedGEC's Considering Solar and Net Metering Guide pages/PDF (fetched and read in full) name no placard requirement of their own beyond the automatic-shutoff language already recorded at Q48.
https://www.gladeselectric.com/wp-content/uploads/Net-Metering-Guide.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame search as Q38 — no label-placement rule found.
https://www.gladeselectric.com/wp-content/uploads/Net-Metering-Guide.pdf
Q44 Must equipment be on a specific approved list? Equipment listing
Nothing published by this authority.
Where we lookedNo county or city document requiring equipment to be on a specific approved list was located.
https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Nothing published by this authority.
Where we lookedNo county or city fire-code or ordinance text on battery/ESS installations was located; Glades County's fire code adoption could not be reached (Municode outage, see Q32).
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Nothing published by this authority.
Where we lookedSame as Q45 — no separate ESS permit/inspection requirement located.
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedMoore Haven LDC Ch. 125 does not address ground-mounted solar arrays specifically (grepped for 'ground mount', 'accessory structure' height/setback provisions exist generically but none reference solar equipment); county documents likewise silent.
https://moorehaven.org/wp-content/uploads/2023/08/Chapter-125-ZONING-Ord-336-Sep-2018.pdf
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
GEC's own current Net Metering Guide specifies only that inverters must have an automatic shut-off to prevent back-feeding the grid ('Inverters are required to have an automatic shut-off to avoid back-feeding electricity onto the grid and endangering lineworkers') — it names NO manual exterior AC disconnect location or spec anywhere in the document. This reconfirms, on a document fetched independently today, the standing baseline's prior finding that GEC is the only Florida utility recorded in this survey with no published manual-disconnect requirement. The company's private Member Interconnection Agreement is not published, so an unpublished agreement could still impose one — this is a hedge, not a claim of certainty.
Why the confidence is not higherFull-text fetch and read of GEC's current Net Metering Guide PDF today, not merely carried forward from a prior run.
utility program document (current) checked 2026-09-13 https://www.gladeselectric.com/wp-content/uploads/Net-Metering-Guide.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? By phone or email: 'For inspections or to schedule an appointment please call (863) 946-6018 or email kfischer@myglades.com or ajones@myglades.com.' 85% · department page
- How much notice is required? Same-day-ahead cutoff: 'You must have your inspection request called in by 4 pm the day before in order for it to be put on the schedule the next day.' Inspections are performed every day of the week. 88% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? No — the City of Moore Haven does not perform its own final solar inspection; Glades County's Building Division performs building, mechanical, plumbing and electrical inspections for the area (see jurisdiction finding). 82% · statewide registry + department page
- If delegated, to whom? Glades County Community Development Department — Building Division, 198 6th Street SW, Moore Haven, FL 33471, (863) 946-6018. 85% · department staff page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
Nothing recorded for City of Moore Haven on this step yet — 2 questions checked and found unpublished. The guidance above is general.
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
Nothing recorded for City of Moore Haven on this step yet — 3 questions checked and found unpublished. The guidance above is general.
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- Is there a re-inspection fee? $25 for each additional inspection beyond those included with the permit, per the Building Permits section of the fee ordinance; no fee item titled specifically 'Re-inspection' was found in the ordinance. 58% · fee schedule (scanned ordinance, OCR'd)
14 questions answered against City of Moore Haven’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
By phone or email: 'For inspections or to schedule an appointment please call (863) 946-6018 or email kfischer@myglades.com or ajones@myglades.com.'
Why the confidence is not higherDirect quote, county Building Division index page.
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/index.php
Q50 How much notice is required? Core Booking & scheduling
Same-day-ahead cutoff: 'You must have your inspection request called in by 4 pm the day before in order for it to be put on the schedule the next day.' Inspections are performed every day of the week.
Why the confidence is not higherDirect quote, county Building Division index page.
department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/index.php
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Nothing published by this authority.
Where we lookedCounty Building Division index page states inspections run 'every day of the week' but does not describe AM/PM windows or same-day accommodation.
https://www.myglades.com/departments/community_development/building_department/index.php
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
No — the City of Moore Haven does not perform its own final solar inspection; Glades County's Building Division performs building, mechanical, plumbing and electrical inspections for the area (see jurisdiction finding).
Why the confidence is not higherSame registry-absence and county FS 553.80(7) evidence underlying the Q1 jurisdiction finding.
statewide registry + department page checked 2026-09-13 https://www.floridabuilding.org/sc/sc_org_srch.aspx
Q53 If delegated, to whom? Core Who inspects
Glades County Community Development Department — Building Division, 198 6th Street SW, Moore Haven, FL 33471, (863) 946-6018.
Why the confidence is not higherCounty Building Division staff and contact page.
department staff page checked 2026-09-13 https://www.myglades.com/departments/community_development/staff.php
Q54 Which inspections are required, and in what order? Core Stages & sequence
Nothing published by this authority.
Where we lookedNo county-published, PV-specific inspection sequence/checklist was located (county's public documents fetched today are the permit application, fee ordinance, and the general department pages listed above; none itemizes a solar inspection sequence).
https://www.myglades.com/departments/community_development/building_department/index.php
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Nothing published by this authority.
Where we lookedSame search as Q54 — no statement on a separate rough-in/mid-roof inspection for PV.
https://www.myglades.com/departments/community_development/building_department/index.php
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedSame search as Q54 — no statement on whether the inspector verifies labels/listings.
https://www.myglades.com/departments/community_development/building_department/index.php
Q57 Is there a published inspection checklist? Core What is checked
Nothing published by this authority.
Where we lookedNo published inspection checklist (PV or general) was found on the county's site or in the documents fetched today.
https://www.myglades.com/departments/community_development/building_department/index.php
Q58 What must be on site at inspection? Core Documents on site
Nothing published by this authority.
Where we lookedNo statement of what must be on site at inspection time was located.
https://www.myglades.com/departments/community_development/building_department/index.php
Q59 Is there a re-inspection fee? Corrections & re-inspection
$25 for each additional inspection beyond those included with the permit, per the Building Permits section of the fee ordinance; no fee item titled specifically 'Re-inspection' was found in the ordinance.
Why the confidence is not higherOCR'd from the fee ordinance's Building Permits table; recorded at reduced confidence because the line reads 'Additional Inspections' rather than being explicitly labeled a re-inspection fee.
fee schedule (scanned ordinance, OCR'd) checked 2026-09-13 https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502
Q60 How are corrections issued and cleared? Corrections & re-inspection
Nothing published by this authority.
Where we lookedNo description of the corrections/re-inspection process was located beyond the flat 'Additional Inspections' fee at Q59.
Q61 What is issued on pass? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedNo document naming what is issued on a passed final (CO / Final tag / Green tag / Letter) was located.
https://www.myglades.com/departments/community_development/building_department/index.php
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedNo document naming who notifies the utility for PTO (AHJ, installer, or utility-pulls) was located; GEC's Considering Solar page describes homeowner-initiated contact with GEC but does not name a PTO-notification step explicitly.
https://www.gladeselectric.com/member-services/considering-solar/
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording None%
Size, colour & material None%
Where they go None%
What the utility wants on top None%
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.