City of North Bay Village
City of North Bay Village
Miami-Dade County
City of North Bay Village is a city authority in the State of Florida, serving 8,159 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for City of North Bay Village against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
City of North Bay Village is the authority having jurisdiction 92% confidence
- Holds
- Building and electrical - two separate Village permits per PV job (BLDR and ELER), applied for and issued the same day - together with plan review and all inspections. The legal AHJ is the Village; the entire building function is performed under contract by C.A.P. Government, Inc. (Professional Service Agreement dated 14 October 2021, from RFP 2021-009 'Building Services'), which supplies the Building Official, Assistant Building Official/Chief Building Code Inspector, Plan Examiners and Inspectors. Named staff: Pedro Martinez, Chief Building Official (PMartinez@nbvillage.com); Leilani Calzadilla, Building Director (buildingclerk@nbvillage.com / LCalzadilla@NBVillage.com); 1666 Kennedy Causeway Suite 101, North Bay Village, FL 33141; (305) 754-6740; Monday-Friday 8:00 am - 4:00 pm.
- Overridden by
- Miami-Dade County Code Chapter 8 Article II and the Miami-Dade County Board of Rules and Appeals govern the qualification of the Building Official, Assistant Building Official, Plan Examiners and Inspectors - the Village says so in its own RFP. Contractor licensing is Miami-Dade County's (CTQB Certificate of Competency) on top of state licensure, with annual Village registration as well - a licensing split, not delegation. Miami-Dade County DERM reviews new buildings, additions, remodelling and commercial roofing; asbestos and Certificates of Use also route to the County. The Village has no fire department: Miami-Dade Fire Rescue serves it, and the Florida Fire Prevention Code applies by state law because the Village adopts no fire code at all. Planning and Zoning is staffed by Calvin, Giordano & Associates. Interconnection terms - disconnect, equipment listing, notification and PTO sequence - sit with Florida Power & Light under Ord. 2013-06 and FPL's filed tariff, not with the Village. The entire Village is inside the High Velocity Hurricane Zone.
- Why not higher
- Code Sec. 151.01 adopts the Florida Building Code as the 'Building Code of North Bay Village' and directs every FBC reference to Village officials; Sec. 151.02 puts the qualifications of the Building Official, Plumbing Inspector and Electrical Inspector with the Village Manager. Verified against practice rather than assumed: twelve real Village-issued residential solar permits covering six PV projects between August 2021 and March 2023, each with its own inspection history, recovered from the Village's own Permits Issued and Completed Inspections Reports. 92 rather than 95 because the operative building department is a contractor whose agreement was last documented publicly in February 2024, and because the Village's principal plan-review document, though authored by its own Chief Building Official, still carries another city's code section and board names.
- Permit required
- Yes, always. The Village's fee schedule sets a $500 threshold for building permits but carves PV straight back in: 'Exception: Any construction activities, regardless of the value,95%
- Permit cost
- On the current schedule (Res. 2025-119, adopted 16 December 2025): $125.00 non-refundable upfront application fee per application;88%
- Plan review
- Contractually 10 business days for a residential alteration. RFP 2021-009 Sec. 3.2.H.1 binds the building-services contractor to: Major Permits (Commercial or Residential) Additions,80%
- Portal
- None that is public-facing. Applications and plans go by email to buildingclerk@nbvillage.com as PDFs.85%
- Electrical code
- NEC 2020, effective 31 December 2023, as part of the Florida Building Code 8th Edition (2023). The Village adopts the FBC wholesale and publishes no NEC edition of its own.85%
- Own placard wording
- No. North Bay Village specifies no placard wording of its own. The only prescribed wording that reaches the job is FPL's battery placard,85%
- Booking an inspection
- By email. The Building Department page's own 'Schedule an Inspection' control is a mailto link to buildingclerk@nbvillage.com.88%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes, always. The Village's fee schedule sets a $500 threshold for building permits but carves PV straight back in: 'Exception: Any construction activities, Q3 Electrical and building permits — SEPARATE. Every residential PV job carries two permits - a BLDR (Building - Residential) and an ELER (Electrical - Residential) - applied for and issued on the same… Q4 Plan review — Contractually 10 business days for a residential alteration. RFP 2021-009 Sec. 3.2.H.1 binds the building-services contractor to: Major Permits (Commercial or… Q18 Where you file — None that is public-facing. Applications and plans go by email to buildingclerk@nbvillage.com as PDFs. Q20
- Permit required
- Yes, always. The Village's fee schedule sets a $500 threshold for building permits but carves PV straight back in: 'Exception: Any construction activities, regardless of the value,95% source
- What it costs
- On the current schedule (Res. 2025-119, adopted 16 December 2025): $125.00 non-refundable upfront application fee per application;88% source
- Plan review turnaround
- Contractually 10 business days for a residential alteration. RFP 2021-009 Sec. 3.2.H.1 binds the building-services contractor to: Major Permits (Commercial or Residential) Additions, Alterations,80% source
- Key document
- fee schedule cited by 4 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes. The City of North Bay Village (a Miami-Dade County municipality of three islands - North Bay Island, Harbor Island and Treasure Island) is the AHJ for residential rooftop PV inside its limits. Its own Building Department receives applications, reviews plans, issues permits and performs inspections. The Village lies entirely within the High Velocity Hurricane Zone. 95% · adopting ordinance
- What does this authority permit itself, and what does it delegate? Both, and neither is delegated to another government - but the whole building function is performed by a private firm under contract. C.A.P. Government, Inc. holds the Professional Service Agreement dated 14 October 2021 arising from RFP 2021-009 'Building Services', and supplies the Building Official, Assistant Building Official/Chief Building Code Inspector, Plan Examiners and Inspectors. Planning & Zoning is separately staffed by Calvin, Giordano & Associates. Contractor LICENSING is Miami-Dade County (CTQB Certificate of Competency) plus annual Village registration - a licensing split, not delegation. 90% · RFP / procurement document
- Is a permit required for a residential rooftop PV system? Yes, always. The Village's fee schedule sets a $500 threshold for building permits but carves PV straight back in: 'Exception: Any construction activities, regardless of the value, that include structural, electrical, plumbing, or mechanical work, shall require a permit.' 95% · fee schedule
- Is there a separate electrical permit, or is it combined? SEPARATE. Every residential PV job carries two permits - a BLDR (Building - Residential) and an ELER (Electrical - Residential) - applied for and issued on the same day, each with its own valuation, fee and inspection sequence. 95% · permit records
- Is a HOA or architectural approval required first? No. The Village expressly declines to enforce private covenants: 'The Village recommends, although does not require, that the owner secure any required approvals from Homeowner/Condominium Association prior to submitting this building permit application... the Village does not enforce any non-governmental deed restrictions or Homeowner/Condominium restrictions upon this property.' But ULDC Sec. 8.25.C.1 makes the owner ACKNOWLEDGE at application that 'If the property is within a homeowners' association, condominium association, or otherwise subject to restrictive covenants, the property may be subject to additional regulations or requirements despite the issuance of a permit by the Village'. A condominium approval letter IS required where the work is in a common area. 92% · department form
- Is there a historic-district review? No. North Bay Village has no historic district, no historic preservation board, no local register and no certificate-of-appropriateness process. Code Ch. 32 creates only two standing boards - the Civil Service Board and the Planning and Zoning Board - with other advisory boards created by resolution and purely advisory. The only occurrence of 'historic structure' in the ULDC is the FEMA definition inside the flood chapter, used for flood variances. 88% · adopting ordinance
- Is a wind or windstorm certification required? No separate windstorm certification is issued, but the Village is wholly inside the HVHZ and says so in its own documents, so FBC High Velocity Hurricane Zone provisions govern. The PV submittal requires Structural Calculations and roofing details; the Village's roofing permit type requires Uniform Roofing Application, Hurricane Mitigation Retrofit Forms, Owner's Notification for Roofing Considerations and Product Approvals. The Village itself states NO design wind speed anywhere - 'mph', 'wind speed' and '175' return zero hits across the Code, the ULDC, the fee schedule, the permit application and the 131-page plan-review document. 70% · RFP / procurement document
- Is a Specific Use Permit or Council approval ever required? No. ULDC Sec. 8.25.A deems rooftop PV 'permitted accessory equipment to conforming and nonconforming buildings in all zoning categories and Districts', and states that 'Nothing contained in this Chapter, including design standards or guidelines included or referenced herein, shall be deemed to prohibit the installation of rooftop photovoltaic solar systems'. One caveat worth carrying to a job: the Village's plan-review sheet for Photovoltaic - Residential Alteration carries the residual line 'May require Land Use Board approval if visible from ROW', which sits awkwardly against Sec. 8.25 and appears to be inherited from the document's un-localised source. 75% · ordinance
- Is there a system-size cap on residential generation? No local cap. The Village imposes no size limit on residential generation. The binding cap is FPL's: Tier 1 requires a Gross Power Rating of 10 kW AC or less, not exceeding 90 percent of the customer's utility distribution service rating, and with AC generating capacity less than 115 percent of the customer's previous 12 months' kWh usage. At or above 10 kW FPL's current Electric Service Standards route the job to a Large Generation Interconnection Agreement. 85% · utility tariff
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed electrical contractor - either state-certified, or holding a Miami-Dade County CTQB Certificate of Competency with state registration - who is registered with the Village. A homeowner may pull it as an owner-builder under Fla. Stat. 489.103(7) on a one- or two-family primary residence. 85% · department form
- Must the contractor be registered with this authority before applying? Yes. Annual Contractor Registration with the Village runs 1 October to 30 September. The contractor must file a certificate of general liability insurance and workers' compensation (or an exemption certificate) naming NORTH BAY VILLAGE as certificate holder; if an exemption certificate is used, the property owner must sign a Hold Harmless Agreement. State-certified contractors pay no registration fee; Certificate of Competency holders pay $25.00 a year. The form is notarised. 92% · department form
- Is a homeowner permitted to self-install and self-permit? Yes, with two restrictions the Village states itself: the owner-builder route is 'Only applicable if subject property is owner's primary residence' and is 'Not available for condominium units'. A notarised Owner-Builder Affidavit reciting the Fla. Stat. 489.103(7) disclosure must accompany the application. 90% · published checklist
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Six general items plus a PV-specific drawing set. General (Permit Package Requirements): (1) completed and NOTARISED permit application - all trade applications submitted together with the master permit, plus Owner-Builder Affidavit or Workers Comp Hold Harmless where applicable; (2) proof of ownership (Property Appraiser printout or deed; articles of incorporation and agent ID if an entity); (3) one set of plans, digitally signed and sealed if job value is $25,000 or more; (4) executed Construction Cost Affidavit; (5) condominium approval letter if work is in a common area; (6) $125.00 minimum upfront processing fee per application. A recorded Notice of Commencement is required for any work over $5,000. PV-specific (Plan Review and Inspection Requirements, 'Photovoltaic - Residential Alteration'): signed and sealed topographic/boundary survey dated no more than one year old showing BFE and grade elevation; architectural plans; structural plans; electrical plans 'to include listing of equipment'; plumbing plans; proposed roof plan showing height of solar panels above the main roofline and setbacks of equipment/panels to the edge of roof; site plan with property lines and adjacent right-of-way; structural calculations; roofing details; and a section/detail measured from finish roof material. 88% · published checklist
- How many copies, and in what format? One set, PDF only, submitted digitally by email to buildingclerk@nbvillage.com. The Village states: 'In an effort to streamline the permitting process, effective April 1st, 2022, the Building Department will only be accepting applications digitally.' The plan-review document's standing rule is 'Electronic Review requires 1 Set of Digitally or Electronically signed and sealed drawings; In-person Review requires 2 Sets of signed and sealed drawings.' 92% · department page
- Is a site plan required, and what must it show? Yes. The PV submittal requires a site plan with property lines showing the adjacent right-of-way, and separately a signed and sealed topographic/boundary survey, dated no more than one year from submittal, that 'must provide: BFE, and grade elevation in NGVD or NAVD values'. If the array is on grade, a fuller site plan is required showing existing and proposed setbacks, property lines, lot dimensions, grade elevation per survey, and all proposed structures (fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment). 75% · published checklist
- Is a one-line / three-line diagram required? Not in those words. The Village requires 'Electrical plans to include listing of equipment' for Photovoltaic - Residential Alteration; it never uses the terms one-line or three-line diagram for PV. FPL does: its Electric Service Standards Section XIII requires meter numbers associated with the interconnecting premise to be included in Single Line Diagrams and/or plans, and where a System Impact Study applies, 'All relaying, protection and metering shall be provided in a one-line diagram... in some cases a three-line diagram may be required.' 60% · published checklist
- Is a structural PE stamp required, and at what threshold? Yes in effect, and by two different thresholds that the Village's own documents state differently. All PV drawings are submitted as 'Digitally or Electronically signed and sealed drawings', and 'Structural Calculations' are a listed supporting document. Code Sec. 151.10(A) requires plans for any work over $1,000 or involving structural design to 'bear the signature of an architect or engineer registered under the laws of the Village, unless waived by the Building Official. However, in no circumstances may the certification be waived for any construction valued at $10,000.00 or more, including labor and material.' The current Permit Package Requirements sheet instead says plans must be 'digitally signed and sealed if job value is $25,000+'. Both are live; the $10,000 figure is in the codified ordinance, the $25,000 figure on the operative counter handout. 80% · adopting ordinance
- Is an electrical PE stamp required, and at what threshold? No electrical-specific threshold is published. The Village applies one seal rule across all disciplines - see Q13 ($10,000 non-waivable in Code Sec. 151.10(A); $25,000 on the Permit Package Requirements sheet) - and the PV checklist requires the electrical plans in the same signed-and-sealed set as the rest. The state floor is Fla. Stat. 471.003(2)(h), which is not a North Bay Village instrument and was not re-verified in this run. 60% · adopting ordinance
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? None that is public-facing. Applications and plans go by email to buildingclerk@nbvillage.com as PDFs. Behind the counter the Village runs a 'Village-owned permitting software' (its record numbering is BLDR-/ELER-/IBLD-/IELE- and its reports carry an 'Applied Online' column - 'No' on every one of the six solar permits). The FY2026 adopted budget sets a goal to 'Implement an online permit and plan submission portal, achieving 70% adoption by June 2026', so this is expected to change. 85% · department page
- Can the whole application be completed online? Digitally yes, self-service no. Since 1 April 2022 the Building Department accepts applications only digitally, by email, as PDFs - but the permit application must be notarised (separate notary blocks for owner and contractor), so the package cannot be completed entirely online without notarisation, and there is no public portal to submit into or track status. 80% · department page
- What does a residential solar permit cost? On the current schedule (Res. 2025-119, adopted 16 December 2025): $125.00 non-refundable upfront application fee per application; building permit for an alteration to a single-family home = estimated value x 1.5 percent; electrical permit = estimated value x 5.0 percent; minimum permit fee for all disciplines $125.00; plus a 5 percent information-technology surcharge (minimum $5, maximum $500) and a Building Department Training and Education surcharge of $0.25 per $1,000 of construction cost. Crucially, 'Applicants are entitled to receive a 50% discount of base permit fees for these permit types: impact windows and doors, shutters, roofs, generators, SOLAR INSTALLATIONS, and living seawalls' - the discount expires 31 December 2026 unless the Commission renews it. Real totals actually charged, before that discount existed: $611.74, $1,189.38, $1,307.68, $1,588.57, $1,878.03 for ordinary rooftop arrays (building + electrical combined), and $14,475.62 for a Tesla Solar Roof permitted as a roof at $90,265.73 valuation. 88% · fee schedule
- How is the fee calculated? Valuation - a percentage of the estimated value of the work, per discipline, with a $125.00 minimum permit fee for all disciplines and a $125.00 non-refundable upfront application fee on top. Not flat, not per kW, not per panel. 95% · fee schedule
- Is there a separate plan-check fee? Yes, and it is payable up front. 'Base Permit Fee Exceeds $400.00: Non-refundable plan review fee equal to one-third of the base building permit fee (including electrical, plumbing, and mechanical) paid at the time of submittal of the building permit application. This fee shall be applied to the total fees at the time of issuance of the building permit. Should a building permit not be issued, this fee shall not be refunded.' A separate revised-plan processing fee is 33 1/3 percent of the original building permit fee or $100/hour for staff review, whichever is less. 95% · fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? Contractually 10 business days for a residential alteration. RFP 2021-009 Sec. 3.2.H.1 binds the building-services contractor to: Major Permits (Commercial or Residential) Additions, Alterations, Demolition or New Construction - 10 business days; Specialty Permits (Pool or Sign) - 5 business days; Minor Permits (all others) - 2-3 business days. The FY2026 adopted budget sets department goals of reviewing 90 percent of applications within five business days and approving 95 percent of compliant plans within seven business days by June 2026. What actually happened on the six real PV jobs: 7, 10, 29, 31, 45 and 49 calendar days from application to issue, median about 30 days. 80% · RFP / procurement document
- How long is an issued permit valid before it expires? The application is valid 180 days: 'THIS APPLICATION IS VALID FOR 180 DAYS FROM DATE APPROVED. APPLICATION AND ALL ATTACHMENTS WILL BE DESTROYED AFTER THAT DATE IF PERMIT IS NOT ISSUED.' Once issued, the permit runs on the FBC 180-day inspection clock: in all six real PV permits the recorded expiration date falls almost exactly 180 days after the last inspection (e.g. BLDR-000122-2023 finaled 16 May 2023, expiry 13 Nov 2023). Expired permits can be reactivated - two of the six were, by written revision with a new expiration date. 78% · department form
- Which utility handles interconnection here? Florida Power & Light Company, by codified franchise. Table VII of the Code records Ord. 2013-06, adopted 16 July 2013, 'Granting to Florida Power & Light Company an electric franchise, imposing provisions and conditions relating thereto, providing for monthly payments to North Bay Village'; the predecessor was Ord. 83-15 of 24 August 1983, a 30-year grant. The Village bills only water, sewer and stormwater itself. 95% · adopting ordinance
- Where does the utility sit in the sequence? After the permit and after the local final inspection. FPL's filed Tier 1 agreement Sec. 3.4: 'The Customer agrees to provide Local Building Code Official inspection and certification of installation. The certification shall reflect that the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications.' Sec. 3.5 requires the customer to notify FPL at least 10 calendar days before initially placing the equipment in service, and FPL has the right to have personnel present on the in-service date. Sec. 3.6 requires FPL to execute the agreement within 30 calendar days of a completed application. There is no application fee for Tier 1. 92% · utility tariff
28 questions answered against City of North Bay Village’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes. The City of North Bay Village (a Miami-Dade County municipality of three islands - North Bay Island, Harbor Island and Treasure Island) is the AHJ for residential rooftop PV inside its limits. Its own Building Department receives applications, reviews plans, issues permits and performs inspections. The Village lies entirely within the High Velocity Hurricane Zone.
Why the confidence is not higherCode Sec. 151.01 adopts the Florida Building Code as the 'Building Code of North Bay Village' and directs every FBC reference to 'Building Official', 'Electrical Inspector', 'jurisdiction' to Village officials. Confirmed against practice: 12 real Village-issued residential solar permits (6 paired building+electrical projects, FY2021-FY2023) recovered from the Village's own Permits Issued Reports. The Village's own RFP 2021-009 states it procures building services for 'a municipality in High Velo[city] Hurricane Zones (HVHZ); specifically defined as Broward and Miami-Dade counties'.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITXVLAUS_CH151BU_GEPR_S151.01ADFLBUCO
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both, and neither is delegated to another government - but the whole building function is performed by a private firm under contract. C.A.P. Government, Inc. holds the Professional Service Agreement dated 14 October 2021 arising from RFP 2021-009 'Building Services', and supplies the Building Official, Assistant Building Official/Chief Building Code Inspector, Plan Examiners and Inspectors. Planning & Zoning is separately staffed by Calvin, Giordano & Associates. Contractor LICENSING is Miami-Dade County (CTQB Certificate of Competency) plus annual Village registration - a licensing split, not delegation.
Why the confidence is not higherRFP 2021-009 Sec. 3.2 procures 'comprehensive professional services to administer and enforce the Florida Building Code to include but not be limited to the receipt of permit applications, the review of plans, the issuance of permits, the performance of inspections, the issuance of Certificates of Occupancy' as an independent contractor; Sec. 3.2.C.1 requires the contractor to 'provide for and perform the duties of the Building Official, Assistant Building Official/Chief Building Code Inspector, Plan Examiners, and Inspectors as defined in Section 103 of the Florida Building Code and Miami-Dade County Board of Rules and Appeals in accordance with Chapter 8 Article II of the Code of Miami-Dade County'. The Village Clerk's 13 Feb 2024 recommendation memorandum names 'C.A.P. Government, Inc.' and 'the existing Professional Service Agreement dated October 14, 2021'. The Planning & Zoning page states 'Calvin, Giordano & Associates provides Planning & Zoning services to North Bay Village.' 90 rather than 95 because no post-2024 contract renewal document was located, though the FY2026 Building Fund books $1,062,000 of Professional Services against $508,947 of in-house personnel.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes, always. The Village's fee schedule sets a $500 threshold for building permits but carves PV straight back in: 'Exception: Any construction activities, regardless of the value, that include structural, electrical, plumbing, or mechanical work, shall require a permit.'
Why the confidence is not higherFee Schedule Exhibit A (Res. 2025-119, adopted 16 Dec 2025), Building and Permits Fees. Corroborated by 6 real residential PV projects permitted 2021-2023.
fee schedule checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/12/Resolution-No.-2025-119-Approving-Updated-Fee-Schedule.pdf
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
SEPARATE. Every residential PV job carries two permits - a BLDR (Building - Residential) and an ELER (Electrical - Residential) - applied for and issued on the same day, each with its own valuation, fee and inspection sequence.
Why the confidence is not higherProved on evidence, not inference: all 6 PV projects recovered from the Permits Issued Reports are BLDR/ELER pairs with identical application and issue dates (e.g. BLDR-000401-2022 and ELER-000402-2022, 7512 W Treasure Dr, both applied 25 Jul 2022 and issued 12 Sep 2022). The permit application itself states 'I understand that a separate permit must be obtained for ELECTRICAL, MECHANICAL, PLUMBING...'. The fee schedule's solar-thermal line adds 'Note: Due to many variable designs and applications a separate electrical permit will be required.' This is the exact inverse of the Brooksville result (0 of 32 with a companion electrical permit).
permit records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-22-PERMITS-ISSUED-REPORT.pdf
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed electrical contractor - either state-certified, or holding a Miami-Dade County CTQB Certificate of Competency with state registration - who is registered with the Village. A homeowner may pull it as an owner-builder under Fla. Stat. 489.103(7) on a one- or two-family primary residence.
Why the confidence is not higherThe permit application has fields for 'State License #' and 'Certificate of Competency #'. The Contractor Registration form sets two tracks: 'STATE CERTIFIED CONTRACTORS (Annual Registration Fee waived)' and 'CONTRACTORS HOLDING A CERTIFICATE OF COMPETENCY ($25.00 Annual Registration Fee) - BUSINESS CERTIFICATE OF COMPETENCY (MIAMI-DADE CTQB LICENSE)'. 85 rather than higher because no document names the electrical trade specifically; the rule is general to all trades.
department form checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/08/CONTRACTOR-REGISTRATION.pdf
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes. Annual Contractor Registration with the Village runs 1 October to 30 September. The contractor must file a certificate of general liability insurance and workers' compensation (or an exemption certificate) naming NORTH BAY VILLAGE as certificate holder; if an exemption certificate is used, the property owner must sign a Hold Harmless Agreement. State-certified contractors pay no registration fee; Certificate of Competency holders pay $25.00 a year. The form is notarised.
Why the confidence is not higherContractor Registration form, North Bay Village Building Department, 1666 Kennedy Causeway Suite 101. 92 rather than 95 because the form is undated.
department form checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/08/CONTRACTOR-REGISTRATION.pdf
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes, with two restrictions the Village states itself: the owner-builder route is 'Only applicable if subject property is owner's primary residence' and is 'Not available for condominium units'. A notarised Owner-Builder Affidavit reciting the Fla. Stat. 489.103(7) disclosure must accompany the application.
Why the confidence is not higherPermit Package Requirements item 1; Owner-Builder Affidavit carries the full statutory disclosure and the Village's own added undertaking that failure to physically do or supervise the work 'will cause the project to be shut down by the inspector staff of the North Bay Village Building Department'. The fee schedule adds 'Owner/Builder permits are exempt from contract requirements.'
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2023/09/PERMIT-PACKAGE-REQUIREMENTS.pdf
Q8 What documents make up a complete submittal? Core Submittal package
Six general items plus a PV-specific drawing set. General (Permit Package Requirements): (1) completed and NOTARISED permit application - all trade applications submitted together with the master permit, plus Owner-Builder Affidavit or Workers Comp Hold Harmless where applicable; (2) proof of ownership (Property Appraiser printout or deed; articles of incorporation and agent ID if an entity); (3) one set of plans, digitally signed and sealed if job value is $25,000 or more; (4) executed Construction Cost Affidavit; (5) condominium approval letter if work is in a common area; (6) $125.00 minimum upfront processing fee per application. A recorded Notice of Commencement is required for any work over $5,000. PV-specific (Plan Review and Inspection Requirements, 'Photovoltaic - Residential Alteration'): signed and sealed topographic/boundary survey dated no more than one year old showing BFE and grade elevation; architectural plans; structural plans; electrical plans 'to include listing of equipment'; plumbing plans; proposed roof plan showing height of solar panels above the main roofline and setbacks of equipment/panels to the edge of roof; site plan with property lines and adjacent right-of-way; structural calculations; roofing details; and a section/detail measured from finish roof material.
Why the confidence is not higherTwo Village documents read together. 88 rather than higher because the Plan Review and Inspection Requirements document, though authored by the Village's Chief Building Official Pedro Martinez (PDF author metadata) and published on the Building Department page, never names North Bay Village and carries unamended references to another city's instruments - 'Section 114-1 of the City Code', and DRB/HPB/BOA boards that North Bay Village does not have.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2023/09/PERMIT-PACKAGE-REQUIREMENTS.pdf
Q9 How many copies, and in what format? Submittal package
One set, PDF only, submitted digitally by email to buildingclerk@nbvillage.com. The Village states: 'In an effort to streamline the permitting process, effective April 1st, 2022, the Building Department will only be accepting applications digitally.' The plan-review document's standing rule is 'Electronic Review requires 1 Set of Digitally or Electronically signed and sealed drawings; In-person Review requires 2 Sets of signed and sealed drawings.'
Why the confidence is not higherBuilding Department page (modified 1 Oct 2025) and the plan-review document. 92 because the two documents phrase it slightly differently and the in-person route appears to be obsolete.
department page checked 2026-09-13 https://northbayvillage-fl.gov/building-department/
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes. The PV submittal requires a site plan with property lines showing the adjacent right-of-way, and separately a signed and sealed topographic/boundary survey, dated no more than one year from submittal, that 'must provide: BFE, and grade elevation in NGVD or NAVD values'. If the array is on grade, a fuller site plan is required showing existing and proposed setbacks, property lines, lot dimensions, grade elevation per survey, and all proposed structures (fences/walls, accessory buildings, pool, decks, walkways, mechanical equipment).
Why the confidence is not higherPlan Review and Inspection Requirements, 'Photovoltaic - Residential Alteration'. 75 because the section cites 'Section 114-1 of the City Code' for the datum rule, which is not a North Bay Village code section - the requirement is real and published by the Village but its cross-reference was never localised.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/03/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Not in those words. The Village requires 'Electrical plans to include listing of equipment' for Photovoltaic - Residential Alteration; it never uses the terms one-line or three-line diagram for PV. FPL does: its Electric Service Standards Section XIII requires meter numbers associated with the interconnecting premise to be included in Single Line Diagrams and/or plans, and where a System Impact Study applies, 'All relaying, protection and metering shall be provided in a one-line diagram... in some cases a three-line diagram may be required.'
Why the confidence is not higherVillage side is an absence proved against its own PV checklist; utility side is first-party from FPL. 60 because the Village's phrase 'electrical plans' plainly covers a one-line in practice but no document says so, and the FPL requirement is tied to study cases rather than every Tier 1 job.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/03/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedThe Village's own PV submittal list (Plan Review and Inspection Requirements, 'Photovoltaic - Residential Alteration' and 'Photovoltaic - Residential New' - it requires 'Structural Calculations' and 'Electrical plans to include listing of equipment' but names no electrical calculation); the Permit Package Requirements sheet; the permit application form; the full 1.3 MB Code of Ordinances and 1.0 MB Unified Land Development Code corpora assembled from the Municode content API (controls: 'electrical' 23/40 hits, 'building permit' 55/60 hits, fabricated 'zzqqxvv' 0 hits, zero documents returned with empty Content); and the Dec 2025 fee schedule. The words 'voltage drop', 'conductor calculation' and 'string' appear nowhere. FPL requires string-level detail only where a System Impact Study applies. The Village publishes no string or conductor calculation requirement.
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Yes in effect, and by two different thresholds that the Village's own documents state differently. All PV drawings are submitted as 'Digitally or Electronically signed and sealed drawings', and 'Structural Calculations' are a listed supporting document. Code Sec. 151.10(A) requires plans for any work over $1,000 or involving structural design to 'bear the signature of an architect or engineer registered under the laws of the Village, unless waived by the Building Official. However, in no circumstances may the certification be waived for any construction valued at $10,000.00 or more, including labor and material.' The current Permit Package Requirements sheet instead says plans must be 'digitally signed and sealed if job value is $25,000+'. Both are live; the $10,000 figure is in the codified ordinance, the $25,000 figure on the operative counter handout.
Why the confidence is not higherCode Sec. 151.10(A) (1964 Code Sec. 6-5, last amended Ord. 2008-21, 14 Oct 2008) against Permit Package Requirements (posted Sep 2023). Real permits straddle both: the six PV jobs were valued $20,235 to $94,668. 80, and the discrepancy is recorded rather than resolved because no document repeals the older figure.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITXVLAUS_CH151BU_CO_S151.10PLSP
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
No electrical-specific threshold is published. The Village applies one seal rule across all disciplines - see Q13 ($10,000 non-waivable in Code Sec. 151.10(A); $25,000 on the Permit Package Requirements sheet) - and the PV checklist requires the electrical plans in the same signed-and-sealed set as the rest. The state floor is Fla. Stat. 471.003(2)(h), which is not a North Bay Village instrument and was not re-verified in this run.
Why the confidence is not higherInference from two of the Village's own documents plus the absence of any electrical-specific figure in Code Ch. 151, the ULDC, the fee schedule and the plan-review document. 60 because it is an inference, not a statement.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITXVLAUS_CH151BU_CO_S151.10PLSP
Q15 What does a residential solar permit cost? Core Fees
On the current schedule (Res. 2025-119, adopted 16 December 2025): $125.00 non-refundable upfront application fee per application; building permit for an alteration to a single-family home = estimated value x 1.5 percent; electrical permit = estimated value x 5.0 percent; minimum permit fee for all disciplines $125.00; plus a 5 percent information-technology surcharge (minimum $5, maximum $500) and a Building Department Training and Education surcharge of $0.25 per $1,000 of construction cost. Crucially, 'Applicants are entitled to receive a 50% discount of base permit fees for these permit types: impact windows and doors, shutters, roofs, generators, SOLAR INSTALLATIONS, and living seawalls' - the discount expires 31 December 2026 unless the Commission renews it. Real totals actually charged, before that discount existed: $611.74, $1,189.38, $1,307.68, $1,588.57, $1,878.03 for ordinary rooftop arrays (building + electrical combined), and $14,475.62 for a Tesla Solar Roof permitted as a roof at $90,265.73 valuation.
Why the confidence is not higherFee Schedule Exhibit A, Res. 2025-119, read against the six real permit pairs in the FY21-FY23 Permits Issued Reports. 88 rather than 95 because the six real fees were charged under earlier versions of the schedule and do not reconcile exactly to the current percentages, and because the fee schedule's own building table sends 'Solar energy systems' to 'See electrical and plumbing fee schedules' while the real permits show a substantial separate building fee as well.
fee schedule checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/12/Resolution-No.-2025-119-Approving-Updated-Fee-Schedule.pdf
Q16 How is the fee calculated? Core Fees
Valuation - a percentage of the estimated value of the work, per discipline, with a $125.00 minimum permit fee for all disciplines and a $125.00 non-refundable upfront application fee on top. Not flat, not per kW, not per panel.
Why the confidence is not higherFee Schedule Exhibit A: alterations to single-family homes 'Estimated value times 1.5 percent'; 'Electrical permits: Estimated value x 5.0 percent'. Confirmed by the real permits, three of which were charged exactly $135.45 on electrical valuations of $200, $1,000 and $2,000 - a floor, not a percentage.
fee schedule checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/12/Resolution-No.-2025-119-Approving-Updated-Fee-Schedule.pdf
Q17 Is there a separate plan-check fee? Fees
Yes, and it is payable up front. 'Base Permit Fee Exceeds $400.00: Non-refundable plan review fee equal to one-third of the base building permit fee (including electrical, plumbing, and mechanical) paid at the time of submittal of the building permit application. This fee shall be applied to the total fees at the time of issuance of the building permit. Should a building permit not be issued, this fee shall not be refunded.' A separate revised-plan processing fee is 33 1/3 percent of the original building permit fee or $100/hour for staff review, whichever is less.
Why the confidence is not higherFee Schedule Exhibit A; the revised-plan fee is Code Sec. 151.10(F).
fee schedule checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/12/Resolution-No.-2025-119-Approving-Updated-Fee-Schedule.pdf
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Contractually 10 business days for a residential alteration. RFP 2021-009 Sec. 3.2.H.1 binds the building-services contractor to: Major Permits (Commercial or Residential) Additions, Alterations, Demolition or New Construction - 10 business days; Specialty Permits (Pool or Sign) - 5 business days; Minor Permits (all others) - 2-3 business days. The FY2026 adopted budget sets department goals of reviewing 90 percent of applications within five business days and approving 95 percent of compliant plans within seven business days by June 2026. What actually happened on the six real PV jobs: 7, 10, 29, 31, 45 and 49 calendar days from application to issue, median about 30 days.
Why the confidence is not higherThree sources - a contract standard, a budget goal and the real record - which do not agree. 80 because the contractual figure is the only binding one and the real record is worse than all three published figures.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q19 How long is an issued permit valid before it expires? Timeline & validity
The application is valid 180 days: 'THIS APPLICATION IS VALID FOR 180 DAYS FROM DATE APPROVED. APPLICATION AND ALL ATTACHMENTS WILL BE DESTROYED AFTER THAT DATE IF PERMIT IS NOT ISSUED.' Once issued, the permit runs on the FBC 180-day inspection clock: in all six real PV permits the recorded expiration date falls almost exactly 180 days after the last inspection (e.g. BLDR-000122-2023 finaled 16 May 2023, expiry 13 Nov 2023). Expired permits can be reactivated - two of the six were, by written revision with a new expiration date.
Why the confidence is not higherPermit application footer plus arithmetic on the real permit records. 78 because the Village publishes no permit-expiry statement of its own; the 180-day pattern is derived from six records and the FBC default.
department form checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2024/11/Permit-Application-Revised-11-2024.pdf
Q20 Which permit portal does this authority use? Core Portal & process
None that is public-facing. Applications and plans go by email to buildingclerk@nbvillage.com as PDFs. Behind the counter the Village runs a 'Village-owned permitting software' (its record numbering is BLDR-/ELER-/IBLD-/IELE- and its reports carry an 'Applied Online' column - 'No' on every one of the six solar permits). The FY2026 adopted budget sets a goal to 'Implement an online permit and plan submission portal, achieving 70% adoption by June 2026', so this is expected to change.
Why the confidence is not higherBuilding Department page; RFP 2021-009 Sec. 3.2.D.2 and D.10 refer to 'the Village-owned permitting software'; permit reports; FY2026 budget Goal 6. 85 because the software product is never named in any published document.
department page checked 2026-09-13 https://northbayvillage-fl.gov/building-department/
Q21 Can the whole application be completed online? Core Portal & process
Digitally yes, self-service no. Since 1 April 2022 the Building Department accepts applications only digitally, by email, as PDFs - but the permit application must be notarised (separate notary blocks for owner and contractor), so the package cannot be completed entirely online without notarisation, and there is no public portal to submit into or track status.
Why the confidence is not higherBuilding Department page and the permit application form. 80 because 'completed online' is ambiguous between these two readings and the Village has not published a portal.
department page checked 2026-09-13 https://northbayvillage-fl.gov/building-department/
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Power & Light Company, by codified franchise. Table VII of the Code records Ord. 2013-06, adopted 16 July 2013, 'Granting to Florida Power & Light Company an electric franchise, imposing provisions and conditions relating thereto, providing for monthly payments to North Bay Village'; the predecessor was Ord. 83-15 of 24 August 1983, a 30-year grant. The Village bills only water, sewer and stormwater itself.
Why the confidence is not higherThe strongest available route - a codified franchise ordinance naming the company. Corroborated three further ways from Village documents: the Village's own plan-review document requires a 'Disconnection letter from FPL, if total demo' for residential electrical demolition; the FY2026 adopted budget books Franchise Fee-Electric at $550,000 and Utility Service Tax-Electricity at $700,000 (neither naming a company, so neither is the proof); and budget amendment BA0000635 of 24 Aug 2026 is titled 'TO COVER OVERBUDGET FOR STORMWATER FPL GL'. No ACFR Principal Taxpayers schedule was used.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TASPOR_TABLE_VIIFR
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After the permit and after the local final inspection. FPL's filed Tier 1 agreement Sec. 3.4: 'The Customer agrees to provide Local Building Code Official inspection and certification of installation. The certification shall reflect that the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications.' Sec. 3.5 requires the customer to notify FPL at least 10 calendar days before initially placing the equipment in service, and FPL has the right to have personnel present on the in-service date. Sec. 3.6 requires FPL to execute the agreement within 30 calendar days of a completed application. There is no application fee for Tier 1.
Why the confidence is not higherFPL Interconnection Agreement for Customer-Owned Renewable Generation Tier 1 - 10 kW or Less, Third Revised Sheet No. 9.050 / First Revised Sheet No. 9.051, in the current filed tariff (Sheet 9.050 effective 1 January 2026). Read first-party from the tariff PDF, not carried forward.
utility tariff checked 2026-09-13 https://www.fpl.com/rates/pdf/electric-tariff-section9.pdf
Q24 Is a HOA or architectural approval required first? Overlays & special cases
No. The Village expressly declines to enforce private covenants: 'The Village recommends, although does not require, that the owner secure any required approvals from Homeowner/Condominium Association prior to submitting this building permit application... the Village does not enforce any non-governmental deed restrictions or Homeowner/Condominium restrictions upon this property.' But ULDC Sec. 8.25.C.1 makes the owner ACKNOWLEDGE at application that 'If the property is within a homeowners' association, condominium association, or otherwise subject to restrictive covenants, the property may be subject to additional regulations or requirements despite the issuance of a permit by the Village'. A condominium approval letter IS required where the work is in a common area.
Why the confidence is not higherPermit application 'NOTICE TO OWNER' block; ULDC Sec. 8.25.C.1 (Ord. 2021-007, 9 Mar 2021, as amended by Ord. 2024-004, 12 Mar 2024); Permit Package Requirements item 5.
department form checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2024/11/Permit-Application-Revised-11-2024.pdf
Q25 Is there a historic-district review? Overlays & special cases
No. North Bay Village has no historic district, no historic preservation board, no local register and no certificate-of-appropriateness process. Code Ch. 32 creates only two standing boards - the Civil Service Board and the Planning and Zoning Board - with other advisory boards created by resolution and purely advisory. The only occurrence of 'historic structure' in the ULDC is the FEMA definition inside the flood chapter, used for flood variances.
Why the confidence is not higherCode Ch. 32 (Ord. 2020-003, 14 Jan 2020) read in full; controlled search of the whole 1.0 MB ULDC corpus and 1.3 MB Code of Ordinances corpus assembled from the Municode content API (positive controls: 'electrical' 40/23 hits, 'building permit' 60/55 hits; fabricated control 'zzqqxvv' 0 hits; and zero documents returned with empty Content, so the run-143 empty-body failure did not occur). 'Certificate of appropriateness' 0 hits, 'historic preservation board' 0 hits.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITIIIAD_CH32ADBO
Q26 Is a wind or windstorm certification required? Overlays & special cases
No separate windstorm certification is issued, but the Village is wholly inside the HVHZ and says so in its own documents, so FBC High Velocity Hurricane Zone provisions govern. The PV submittal requires Structural Calculations and roofing details; the Village's roofing permit type requires Uniform Roofing Application, Hurricane Mitigation Retrofit Forms, Owner's Notification for Roofing Considerations and Product Approvals. The Village itself states NO design wind speed anywhere - 'mph', 'wind speed' and '175' return zero hits across the Code, the ULDC, the fee schedule, the permit application and the 131-page plan-review document.
Why the confidence is not higherRFP 2021-009 Sec. 2.1 requires proposers experienced in 'High Velo[city] Hurricane Zones (HVHZ); specifically defined as Broward and Miami-Dade counties'. The wind-speed absence is a controlled absence, not a failure to look. 70 because the answer is assembled from a procurement document and submittal lists rather than a single statement of installation standard.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
No. ULDC Sec. 8.25.A deems rooftop PV 'permitted accessory equipment to conforming and nonconforming buildings in all zoning categories and Districts', and states that 'Nothing contained in this Chapter, including design standards or guidelines included or referenced herein, shall be deemed to prohibit the installation of rooftop photovoltaic solar systems'. One caveat worth carrying to a job: the Village's plan-review sheet for Photovoltaic - Residential Alteration carries the residual line 'May require Land Use Board approval if visible from ROW', which sits awkwardly against Sec. 8.25 and appears to be inherited from the document's un-localised source.
Why the confidence is not higherULDC Sec. 8.25 (Ord. 2021-007, 9 Mar 2021; Ord. 2024-004, 12 Mar 2024) against the plan-review document. 75 because of that unresolved residual line.
ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/unified_land_development_code?nodeId=CH8ZO_DIV5GRBUPR_S8.25ROPHSOSYSOWAHESY
Q28 Is there a system-size cap on residential generation? Overlays & special cases
No local cap. The Village imposes no size limit on residential generation. The binding cap is FPL's: Tier 1 requires a Gross Power Rating of 10 kW AC or less, not exceeding 90 percent of the customer's utility distribution service rating, and with AC generating capacity less than 115 percent of the customer's previous 12 months' kWh usage. At or above 10 kW FPL's current Electric Service Standards route the job to a Large Generation Interconnection Agreement.
Why the confidence is not higherControlled search of both Village codes found no generation-size provision; FPL Tier 1 agreement Sec. 2.1 gives the three limits verbatim. 85 because the Village-side answer is an absence and the utility-side figure is a tier boundary rather than a prohibition.
utility tariff checked 2026-09-13 https://www.fpl.com/rates/pdf/electric-tariff-section9.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? NEC 2020, effective 31 December 2023, as part of the Florida Building Code 8th Edition (2023). The Village adopts the FBC wholesale and publishes no NEC edition of its own. 85% · department page
- Which building code edition is in force? Florida Building Code 8th Edition (2023), effective 31 December 2023, with the High Velocity Hurricane Zone provisions applying because the Village is in Miami-Dade County. Code Sec. 151.01 adopts the FBC and renames it 'Building Code of North Bay Village'. 95% · department page
- Which fire code edition is in force? Florida Fire Prevention Code, by operation of state law - the Village adopts no fire code of its own. Code Ch. 93 'FIRE PREVENTION' is a fossil: it regulates explosive waste in sewers, outdoor fires, bonfires, fireworks and Knox boxes, and contains zero references to NFPA, the Florida Fire Prevention Code, a fire code edition or a fire marshal. The Village has no fire department; Miami-Dade Fire Rescue serves it, and the Knox-box ordinance is administered by the Village's Chief of Police rather than a fire chief. 80% · adopting ordinance
- Are there local amendments to any of the above? Yes - a substantial set, several of which bite on a PV job. Code Ch. 151: Sec. 151.10(A) seal thresholds (see Q13); Sec. 151.10(E) $75 re-inspection charge; Sec. 151.10(G) doubles permit fees for day-labour work supervised by anyone the Building Official has not certified as skilled; Sec. 151.10(H) doubles fees plus $200 for work started without a permit, escalating to +$300, +$600 for repeat offences; Sec. 151.15(H) 'Miscellaneous electrical standards. Orange colored wire shall be used on all appliances and motor circuits'; Sec. 151.03 classifies the entire Village as fire zone 2A; Sec. 151.16 residential minimum floor elevation 16 inches above the crown of the abutting street; Sec. 151.19 off-duty police officer required throughout construction of any structure over three stories. ULDC: Ch. 10 flood provisions with a two-foot freeboard and a cumulative ten-year substantial-improvement rule; Sec. 8.17.G.2 solar height exception; Sec. 8.25 solar access. 92% · adopting ordinance
- What is the installation judged against? The Florida Building Code 8th Edition (2023) including its High Velocity Hurricane Zone provisions, NEC 2020 as adopted by the state, the Village's own Ch. 151 amendments, and the Unified Land Development Code. RFP 2021-009 states the reviewing authority chain precisely: the contractor performs Building Official duties 'as defined in Section 103 of the Florida Building Code and Miami-Dade County Board of Rules and Appeals in accordance with Chapter 8 Article II of the Code of Miami-Dade County', and coordinates with the Miami-Dade County Board of Rules and Appeals and the Florida Building Commission as needed. 88% · RFP / procurement document
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
- What ridge setback and access pathways are required? No numeric ridge setback or access pathway dimension is published by the Village. What it does require is that they be SHOWN: the PV submittal calls for a 'Proposed roof plan including height of solar panels above the main roofline, provide setbacks of equipment / panels to edge of roof'. The dimensional rule therefore comes from the Florida Fire Prevention Code as adopted by the state, enforced through Miami-Dade Fire Rescue, not from any North Bay Village instrument. 65% · published checklist
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Yes, by state adoption of NEC 2020 Article 690.12 - not by any local instrument. The words 'rapid shutdown' appear zero times in the Code of Ordinances, zero times in the Unified Land Development Code, and zero times in the 131-page Plan Review and Inspection Requirements document. 70% · ordinance
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? The Village requires none of its own. The placards that actually have to go on a North Bay Village job come from FPL and from NEC 690/705 as adopted. FPL, first-party: (a) filed Tier 1 tariff Sec. 5.3 - where the manual disconnect is located away from the meter socket, 'the customer shall install a permanent weather-proof plaque adjacent to FPL's meter socket indicating the location of the manual disconnect switch or switches'; (b) Electric Service Standards Section XIII B.1 (battery storage) - 'A placard must be permanently affixed to the meter enclosure stating battery storage utilized in this facility'; (c) Electric Service Standards Section XIII g (labeling) - 'All labels should be permanent and weatherproof / UV resistant placard with engraved letters. The customer is responsible for all labeling requirements. The following labels must be installed at the interconnecting meter can and the Disconnect Switch.' 85% · utility standards manual
- Does the authority specify placard wording of its own? No. North Bay Village specifies no placard wording of its own. The only prescribed wording that reaches the job is FPL's battery placard, which must state that battery storage is utilized in this facility. 85% · ordinance
- Does it specify letter height, colour or material? The Village specifies nothing. FPL does, and it is a material specification rather than a dimensional one: labels must be a 'permanent and weatherproof / UV resistant placard with engraved letters', and the same formula is used elsewhere in FPL's standards for meter identification ('permanent and weatherproof/UV resistant placard with engraved letters'). No letter height and no colour is specified by either the Village or FPL. 80% · utility standards manual
- Is a site plan / facility map placard required, and what must it show? Not required by the Village. No North Bay Village instrument requires a site plan or facility map placard; NEC 690.56 / 705.10 apply through the state's adoption of NEC 2020. What the Village does require is a roof plan in the SUBMITTAL showing panel heights above the main roofline and setbacks to the roof edge - a drawing requirement, not a placard. 55% · published checklist
- Does the UTILITY specify placards beyond the AHJ's? Yes - on a North Bay Village job every placard requirement is FPL's. See Q38 for the three: the disconnect-location plaque (filed tariff Sheet 9.051 Sec. 5.3), the battery-storage placard permanently affixed to the meter enclosure (Electric Service Standards Section XIII B.1), and the general labeling standard requiring permanent, weatherproof/UV-resistant placards with engraved letters at the interconnecting meter can and the disconnect switch (Section XIII g). 85% · utility standards manual
- Where must the labels be placed? At the meter. FPL's labeling rule places them 'at the interconnecting meter can and the Disconnect Switch'; the battery placard is 'permanently affixed to the meter enclosure'; and the disconnect-location plaque goes 'adjacent to FPL's meter socket'. The Village prescribes no placement. 80% · utility standards manual
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? FPL's two current documents give different answers, and an installer needs to know both. THE FILED TARIFF (which governs legally): Sheet No. 9.051 Sec. 5.1 - 'U.L.1741 Listed, inverter-based Tier 1 customer-owned renewable generation systems do not require a customer-installed manual disconnect switch.' Where one IS required (non-UL1741 systems), Sec. 5.2 - a manual disconnect of the visible load break type, 'mounted separate from, but adjacent to, the FPL meter socket', readily accessible to FPL and capable of being locked open with a single FPL utility padlock; Sec. 5.3 - if that is impractical, it may be relocated by agreement with a permanent weather-proof plaque next to the meter socket giving its location. THE CURRENT ELECTRIC SERVICE STANDARDS (which the field crew uses), Section XIII: 'An FPL approved visually open disconnect is required to allow safe restoration of FPL system. The disconnect switch must be installed according to FPL instruction and must remain accessible to FPL at all times. The disconnect switch shall be connected on the load side of the meter to the approved inverter and the line side of the disconnect switch shall be connected to FPL power grid. This device will vary depending on the configuration, voltage and generation capacity.' Section XIII also prohibits line-side connection: 'Customer shall interconnect their DER system behind customer main panel; the customer shall not interconnect in FPL equipment or on a line side tap.' No distance figure appears in either document. 75% · utility tariff
- Must equipment be on a specific approved list? Yes, two lists on two axes. Electrical: FPL requires the generating equipment to be certified by a Nationally Recognized Testing Laboratory to the latest version of IEEE 1547 and UL 1741, and states 'Equipment that does not meet these certification requirements will not be approved for interconnection'; the filed Tier 1 agreement Sec. 3.1 requires listing 'for continuous interactive operation with an electric distribution system in compliance with the applicable codes and standards of IEEE 1547, IEEE 1547.1, and UL 1741', and Sec. 3.2 requires a utility-interactive inverter that automatically isolates on loss of grid. Structural: because the Village is in the HVHZ, roof-borne components carry a Florida Product Approval or a Miami-Dade NOA - and the Village has demonstrably accepted FLORIDA PRODUCT APPROVAL rather than requiring an NOA. Its own permit record for BLDR-000149-2022 reads 'REVISION #1- REVISE PLANS TO CURRENT TESLA SOLAR ROOF AND POWERWALL(S) APPROVED FLORIDA PRODUCT APPROVAL 41923.' The Village's PV submittal separately requires 'Electrical plans to include listing of equipment'. 88% · permit records
- Are batteries permitted, and under what conditions? Yes, and the Village has already permitted them. BLDR-000401-2022 / ELER-000402-2022 at 7512 W Treasure Dr was 'INSTALLATION OF PV SOLAR SYSTEM TO ROOFTOP PLUS 2 BATTERIES', valued at $94,668, issued 12 Sep 2022 and finaled 1 Dec 2022; BLDR-000149-2022 was revised to a 'TESLA SOLAR ROOF AND POWERWALL(S)'. Conditions come from FPL, first-party: battery storage installed behind the customer's meter must be certified by a Nationally Recognized Testing Laboratory to the current UL safety standard; a battery that is not so certified must be DC-coupled behind a listed device; energy stored is for the customer's use only and may not at present be exported to the grid; battery storage for small (sub-10 kW) systems is reviewed in the fast-track study; and stand-alone storage is not renewable energy under FAC Rule 25-6.065 and is not net metered. The ULDC treats PV with back-up battery storage as a green-building option worth 8 or 10 points. 85% · permit records
- Is there a separate ESS permit or inspection? No. The battery job went through exactly the same two permits and the same inspection stages as an ordinary array: BLDR-000401-2022 and ELER-000402-2022, with Electrical Service (22 Sep 2022), Electrical Rough/Fire (15 Nov 2022), Final Electrical and Final Building (both 1 Dec 2022). No ESS permit type, no fire-department sign-off and no separate ESS inspection appears anywhere in the record or in the Village's own permit-type list. 82% · inspection records
- Is a ground mount treated as a structure? The Village has no ground-mount PV rule - Sec. 8.25 is expressly about ROOFTOP systems only - but a grade-mounted array falls into the equipment rules. The plan-review sheet branches: 'If located on grade, provide: Site Plan (with setbacks - existing and proposed, property lines, lot dimensions, grade elevation as per survey)', so it is reviewed against setbacks like a structure. ULDC Sec. 8.17 allows, in single-family districts only, 'Ground mounted mechanical equipment, including air conditioning equipment, pool equipment, heat pumps, water heaters, generators, and other similar equipment' to be placed in a side yard setback area provided the unobstructed side setback is not reduced by more than 50 percent of the district requirement and the equipment does not operate above 70 decibels; and Sec. 9 requires ground-mounted mechanical equipment to be screened from public view at a minimum to the height of the equipment. 65% · ordinance
- Is there a local rule on service upgrades or busbar sizing? No local rule on busbar sizing. Changes to electrical service are expressly treated as ordinary permit work - the fee schedule's valuation rule covers 'miscellaneous permit activity not otherwise provided for in this section, including but not limited to repair, or alterations, or changes to electrical service', valued by the applicant and approved by the Building Official. The only local electrical amendment in the whole Code is Sec. 151.15(H): 'Orange colored wire shall be used on all appliances and motor circuits.' On the real jobs an 'Electrical Service' inspection is a distinct stage, run where the service is touched (2 of the 6 PV projects had one). 65% · fee schedule
- Is a specific mounting system or attachment spacing required? No mounting system or attachment spacing is specified locally. The requirement is evidential rather than prescriptive: the PV submittal calls for Structural Calculations, roofing details, and a 'section/detail measured from finish roof material', and roof products go through Florida Product Approval or a Miami-Dade NOA under the HVHZ regime. The Village's PV checklist does not itself name product approval; its A/C checklist requires a 'Tie Down NOA (if applicable)' and its roofing checklist requires 'Product Approvals'. 65% · published checklist
20 questions answered against City of North Bay Village’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
NEC 2020, effective 31 December 2023, as part of the Florida Building Code 8th Edition (2023). The Village adopts the FBC wholesale and publishes no NEC edition of its own.
Why the confidence is not higherCode Sec. 151.01 adopts the FBC in its entirety; the Building Department page carries the notice 'Please be advised that the Florida Building Code EIGHTH (2023) Edition became effective on December 31, 2023.' 85 rather than 95 because the Village nowhere prints an NEC year - the 2020 edition comes from the state adoption, and the Village's own Code contains no National Electrical Code reference at all (0 hits).
department page checked 2026-09-13 https://northbayvillage-fl.gov/building-department/
Q30 Which building code edition is in force? Core Code editions in force
Florida Building Code 8th Edition (2023), effective 31 December 2023, with the High Velocity Hurricane Zone provisions applying because the Village is in Miami-Dade County. Code Sec. 151.01 adopts the FBC and renames it 'Building Code of North Bay Village'.
Why the confidence is not higherBuilding Department page notice (page modified 1 Oct 2025) plus Code Sec. 151.01.
department page checked 2026-09-13 https://northbayvillage-fl.gov/building-department/
Q31 Which fire code edition is in force? Code editions in force
Florida Fire Prevention Code, by operation of state law - the Village adopts no fire code of its own. Code Ch. 93 'FIRE PREVENTION' is a fossil: it regulates explosive waste in sewers, outdoor fires, bonfires, fireworks and Knox boxes, and contains zero references to NFPA, the Florida Fire Prevention Code, a fire code edition or a fire marshal. The Village has no fire department; Miami-Dade Fire Rescue serves it, and the Knox-box ordinance is administered by the Village's Chief of Police rather than a fire chief.
Why the confidence is not higherCode Ch. 93 read in full; 'NFPA' and 'fire prevention code' return 0 hits in the whole Code of Ordinances. The ULDC does reference the 'Florida Fire Prevention Code' but only as a ground for suspending a vacation-rental licence, and names 'Miami-Dade Fire Rescue Department' as an external reviewer on the Development Review Committee. Fire service confirmed by the Village's own 2 Nov 2021 release on developing Village Hall 'to accommodate a Miami-Dade Fire-Rescue Station'. 80 because the operative edition (8th, 2023) is a state fact, not a Village statement.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITIXGERE_CH93FIPR
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes - a substantial set, several of which bite on a PV job. Code Ch. 151: Sec. 151.10(A) seal thresholds (see Q13); Sec. 151.10(E) $75 re-inspection charge; Sec. 151.10(G) doubles permit fees for day-labour work supervised by anyone the Building Official has not certified as skilled; Sec. 151.10(H) doubles fees plus $200 for work started without a permit, escalating to +$300, +$600 for repeat offences; Sec. 151.15(H) 'Miscellaneous electrical standards. Orange colored wire shall be used on all appliances and motor circuits'; Sec. 151.03 classifies the entire Village as fire zone 2A; Sec. 151.16 residential minimum floor elevation 16 inches above the crown of the abutting street; Sec. 151.19 off-duty police officer required throughout construction of any structure over three stories. ULDC: Ch. 10 flood provisions with a two-foot freeboard and a cumulative ten-year substantial-improvement rule; Sec. 8.17.G.2 solar height exception; Sec. 8.25 solar access.
Why the confidence is not higherAll read from the Municode content API corpora with controls passing and zero empty-body documents. 92 because the Ch. 151 amendments derive largely from the 1964 Code and Ord. 149 of 1959 and have not been reconciled to the current FBC cycle - Sec. 151.03 still cites the repealed South Florida Building Code.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITXVLAUS_CH151BU
Q33 What is the installation judged against? Core Electrical
The Florida Building Code 8th Edition (2023) including its High Velocity Hurricane Zone provisions, NEC 2020 as adopted by the state, the Village's own Ch. 151 amendments, and the Unified Land Development Code. RFP 2021-009 states the reviewing authority chain precisely: the contractor performs Building Official duties 'as defined in Section 103 of the Florida Building Code and Miami-Dade County Board of Rules and Appeals in accordance with Chapter 8 Article II of the Code of Miami-Dade County', and coordinates with the Miami-Dade County Board of Rules and Appeals and the Florida Building Commission as needed.
Why the confidence is not higherCode Sec. 151.01 plus RFP 2021-009 Sec. 3.2.C.1 and D.16. This is the Village's own statement of the Miami-Dade Chapter 8 / Board of Rules and Appeals instrument applying to it - the county instrument the caller asked about, found on the Village side rather than carried in from the county.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
No local rule on busbar sizing. Changes to electrical service are expressly treated as ordinary permit work - the fee schedule's valuation rule covers 'miscellaneous permit activity not otherwise provided for in this section, including but not limited to repair, or alterations, or changes to electrical service', valued by the applicant and approved by the Building Official. The only local electrical amendment in the whole Code is Sec. 151.15(H): 'Orange colored wire shall be used on all appliances and motor circuits.' On the real jobs an 'Electrical Service' inspection is a distinct stage, run where the service is touched (2 of the 6 PV projects had one).
Why the confidence is not higherFee Schedule Exhibit A valuation rule; Code Sec. 151.15(H); inspection records. 65 because the busbar half of the question is an absence proved only against Village documents, and NEC 705.12(B) applies unchanged.
fee schedule checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/12/Resolution-No.-2025-119-Approving-Updated-Fee-Schedule.pdf
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
No mounting system or attachment spacing is specified locally. The requirement is evidential rather than prescriptive: the PV submittal calls for Structural Calculations, roofing details, and a 'section/detail measured from finish roof material', and roof products go through Florida Product Approval or a Miami-Dade NOA under the HVHZ regime. The Village's PV checklist does not itself name product approval; its A/C checklist requires a 'Tie Down NOA (if applicable)' and its roofing checklist requires 'Product Approvals'.
Why the confidence is not higherPlan Review and Inspection Requirements, Photovoltaic and Roofing sections. 65 because the PV section's silence on product approval sits oddly beside the same document's roofing section requiring it, and because the document is not fully localised.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/03/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
No numeric ridge setback or access pathway dimension is published by the Village. What it does require is that they be SHOWN: the PV submittal calls for a 'Proposed roof plan including height of solar panels above the main roofline, provide setbacks of equipment / panels to edge of roof'. The dimensional rule therefore comes from the Florida Fire Prevention Code as adopted by the state, enforced through Miami-Dade Fire Rescue, not from any North Bay Village instrument.
Why the confidence is not higherPlan Review and Inspection Requirements PV section; controlled search of both Village codes for 'setback' in a fire/roof context found nothing PV-related. 65 because the Village requires the dimension on the drawing while publishing no standard to measure it against, which is a real and awkward gap for an installer.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/03/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Yes, by state adoption of NEC 2020 Article 690.12 - not by any local instrument. The words 'rapid shutdown' appear zero times in the Code of Ordinances, zero times in the Unified Land Development Code, and zero times in the 131-page Plan Review and Inspection Requirements document.
Why the confidence is not higherControlled searches over all three corpora with positive controls passing. 70 because the requirement is real but entirely inherited, and the Village has published nothing that would tell an installer which edition its inspectors are applying.
ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
The Village requires none of its own. The placards that actually have to go on a North Bay Village job come from FPL and from NEC 690/705 as adopted. FPL, first-party: (a) filed Tier 1 tariff Sec. 5.3 - where the manual disconnect is located away from the meter socket, 'the customer shall install a permanent weather-proof plaque adjacent to FPL's meter socket indicating the location of the manual disconnect switch or switches'; (b) Electric Service Standards Section XIII B.1 (battery storage) - 'A placard must be permanently affixed to the meter enclosure stating battery storage utilized in this facility'; (c) Electric Service Standards Section XIII g (labeling) - 'All labels should be permanent and weatherproof / UV resistant placard with engraved letters. The customer is responsible for all labeling requirements. The following labels must be installed at the interconnecting meter can and the Disconnect Switch.'
Why the confidence is not higherVillage absence proved by controlled search ('placard' 6 hits in the Code, all in the Knox-box and sign sections; 0 in the ULDC; 0 in the plan-review document). FPL side recovered first-party this run. NOTE ON METHOD: FPL's Electric Service Standards Section XIII is set in subsetted fonts whose extracted text is substitution-ciphered - the failure that defeated an earlier run. The cipher was broken against crib words in the same font ('permanent and weatherproof', 'resistant placard with engraved letters', 'The customer is responsible for all labeling requirements') and the decode verified by reading continuous English across the whole section. 85 rather than higher because the numeric UL standard references in that section are set in a digit font that does not decode, so the standard NUMBERS in Section XIII were not recovered and are not asserted here.
utility standards manual checked 2026-09-13 https://www.fpl.com/partner/pdf/electric-service-standards.pdf
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No. North Bay Village specifies no placard wording of its own. The only prescribed wording that reaches the job is FPL's battery placard, which must state that battery storage is utilized in this facility.
Why the confidence is not higherControlled search of the Code of Ordinances, the Unified Land Development Code, the fee schedule, the permit application, the Permit Package Requirements and the 131-page Plan Review and Inspection Requirements. Positive controls passed on all corpora; fabricated control returned zero.
ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
The Village specifies nothing. FPL does, and it is a material specification rather than a dimensional one: labels must be a 'permanent and weatherproof / UV resistant placard with engraved letters', and the same formula is used elsewhere in FPL's standards for meter identification ('permanent and weatherproof/UV resistant placard with engraved letters'). No letter height and no colour is specified by either the Village or FPL.
Why the confidence is not higherFPL Electric Service Standards Section XIII g (recovered by breaking the font cipher) and Section VI.E, which is in a normal font and states the same formula - the second occurrence is what makes the decode of the first trustworthy. 80 because the absence of a letter height is an absence on FPL's side, proved only against this manual.
utility standards manual checked 2026-09-13 https://www.fpl.com/partner/pdf/electric-service-standards.pdf
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Not required by the Village. No North Bay Village instrument requires a site plan or facility map placard; NEC 690.56 / 705.10 apply through the state's adoption of NEC 2020. What the Village does require is a roof plan in the SUBMITTAL showing panel heights above the main roofline and setbacks to the roof edge - a drawing requirement, not a placard.
Why the confidence is not higherInference from the Village's proven silence plus the adopted code. 55 because it is an inference from two documents rather than a statement, and because no Village or FPL document confirms what an inspector actually looks for.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/03/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Yes - on a North Bay Village job every placard requirement is FPL's. See Q38 for the three: the disconnect-location plaque (filed tariff Sheet 9.051 Sec. 5.3), the battery-storage placard permanently affixed to the meter enclosure (Electric Service Standards Section XIII B.1), and the general labeling standard requiring permanent, weatherproof/UV-resistant placards with engraved letters at the interconnecting meter can and the disconnect switch (Section XIII g).
Why the confidence is not higherBoth FPL documents read first-party this run; the Village side is a proved absence.
utility standards manual checked 2026-09-13 https://www.fpl.com/partner/pdf/electric-service-standards.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
At the meter. FPL's labeling rule places them 'at the interconnecting meter can and the Disconnect Switch'; the battery placard is 'permanently affixed to the meter enclosure'; and the disconnect-location plaque goes 'adjacent to FPL's meter socket'. The Village prescribes no placement.
Why the confidence is not higherFPL Electric Service Standards Section XIII g and B.1; FPL tariff Sheet 9.051 Sec. 5.3. 80 because two of the three come from the decoded section.
utility standards manual checked 2026-09-13 https://www.fpl.com/partner/pdf/electric-service-standards.pdf
Q44 Must equipment be on a specific approved list? Equipment listing
Yes, two lists on two axes. Electrical: FPL requires the generating equipment to be certified by a Nationally Recognized Testing Laboratory to the latest version of IEEE 1547 and UL 1741, and states 'Equipment that does not meet these certification requirements will not be approved for interconnection'; the filed Tier 1 agreement Sec. 3.1 requires listing 'for continuous interactive operation with an electric distribution system in compliance with the applicable codes and standards of IEEE 1547, IEEE 1547.1, and UL 1741', and Sec. 3.2 requires a utility-interactive inverter that automatically isolates on loss of grid. Structural: because the Village is in the HVHZ, roof-borne components carry a Florida Product Approval or a Miami-Dade NOA - and the Village has demonstrably accepted FLORIDA PRODUCT APPROVAL rather than requiring an NOA. Its own permit record for BLDR-000149-2022 reads 'REVISION #1- REVISE PLANS TO CURRENT TESLA SOLAR ROOF AND POWERWALL(S) APPROVED FLORIDA PRODUCT APPROVAL 41923.' The Village's PV submittal separately requires 'Electrical plans to include listing of equipment'.
Why the confidence is not higherThis is the direct answer to the product-approval question and it is evidential rather than inferred: the Village wrote 'Florida Product Approval' into its own permit revision for a Tesla Solar Roof with Powerwalls. The only NOA reference anywhere in the Village's 131-page plan-review document is 'Tie Down NOA (if applicable)' for an A/C changeout, with 'Product Approval' used 43 times. 88 rather than 95 because no Village document states a general rule of the form 'NOA or Florida Product Approval accepted' - the finding rests on one real permit plus the wording pattern of the checklist.
permit records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-22-PERMITS-ISSUED-REPORT.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Yes, and the Village has already permitted them. BLDR-000401-2022 / ELER-000402-2022 at 7512 W Treasure Dr was 'INSTALLATION OF PV SOLAR SYSTEM TO ROOFTOP PLUS 2 BATTERIES', valued at $94,668, issued 12 Sep 2022 and finaled 1 Dec 2022; BLDR-000149-2022 was revised to a 'TESLA SOLAR ROOF AND POWERWALL(S)'. Conditions come from FPL, first-party: battery storage installed behind the customer's meter must be certified by a Nationally Recognized Testing Laboratory to the current UL safety standard; a battery that is not so certified must be DC-coupled behind a listed device; energy stored is for the customer's use only and may not at present be exported to the grid; battery storage for small (sub-10 kW) systems is reviewed in the fast-track study; and stand-alone storage is not renewable energy under FAC Rule 25-6.065 and is not net metered. The ULDC treats PV with back-up battery storage as a green-building option worth 8 or 10 points.
Why the confidence is not higherPermit records (FY22 and FY23 Permits Issued Reports) plus FPL Electric Service Standards Section XIII B, recovered by decoding. 85 because the numeric UL standard references in Section XIII do not decode and are therefore not asserted.
permit records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-22-PERMITS-ISSUED-REPORT.pdf
Q46 Is there a separate ESS permit or inspection? Battery / ESS
No. The battery job went through exactly the same two permits and the same inspection stages as an ordinary array: BLDR-000401-2022 and ELER-000402-2022, with Electrical Service (22 Sep 2022), Electrical Rough/Fire (15 Nov 2022), Final Electrical and Final Building (both 1 Dec 2022). No ESS permit type, no fire-department sign-off and no separate ESS inspection appears anywhere in the record or in the Village's own permit-type list.
Why the confidence is not higherFY22 and FY23 Permits Issued and Completed Inspections Reports; the permit application's own permit-type checkboxes (BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, ROOF, PAVING, DEMOLITION, FENCE, SIGN, DOCK, SEAWALL, PAINT, SHED, DUMPSTER, POOL/SPA, WINDOWS/DOORS, PUBLIC WORKS) contain no solar or ESS type. 82 because a single battery project is a thin evidence base.
inspection records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-23-COMPLETED-INSPECTIONS-REPORT.pdf
Q47 Is a ground mount treated as a structure? Core Ground mount
The Village has no ground-mount PV rule - Sec. 8.25 is expressly about ROOFTOP systems only - but a grade-mounted array falls into the equipment rules. The plan-review sheet branches: 'If located on grade, provide: Site Plan (with setbacks - existing and proposed, property lines, lot dimensions, grade elevation as per survey)', so it is reviewed against setbacks like a structure. ULDC Sec. 8.17 allows, in single-family districts only, 'Ground mounted mechanical equipment, including air conditioning equipment, pool equipment, heat pumps, water heaters, generators, and other similar equipment' to be placed in a side yard setback area provided the unobstructed side setback is not reduced by more than 50 percent of the district requirement and the equipment does not operate above 70 decibels; and Sec. 9 requires ground-mounted mechanical equipment to be screened from public view at a minimum to the height of the equipment.
Why the confidence is not higherPlan Review and Inspection Requirements PV section; ULDC Sec. 8.17 and the mechanical-equipment screening provision. 65 because no document says in terms that a ground-mounted PV array is 'similar equipment', and because the height exception and the no-screening rule of Sec. 8.17.G.2 are expressly rooftop-only, so a ground array loses both protections.
ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/unified_land_development_code?nodeId=CH8ZO_DIV4SUDEST_S8.17SUDEST
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
FPL's two current documents give different answers, and an installer needs to know both. THE FILED TARIFF (which governs legally): Sheet No. 9.051 Sec. 5.1 - 'U.L.1741 Listed, inverter-based Tier 1 customer-owned renewable generation systems do not require a customer-installed manual disconnect switch.' Where one IS required (non-UL1741 systems), Sec. 5.2 - a manual disconnect of the visible load break type, 'mounted separate from, but adjacent to, the FPL meter socket', readily accessible to FPL and capable of being locked open with a single FPL utility padlock; Sec. 5.3 - if that is impractical, it may be relocated by agreement with a permanent weather-proof plaque next to the meter socket giving its location. THE CURRENT ELECTRIC SERVICE STANDARDS (which the field crew uses), Section XIII: 'An FPL approved visually open disconnect is required to allow safe restoration of FPL system. The disconnect switch must be installed according to FPL instruction and must remain accessible to FPL at all times. The disconnect switch shall be connected on the load side of the meter to the approved inverter and the line side of the disconnect switch shall be connected to FPL power grid. This device will vary depending on the configuration, voltage and generation capacity.' Section XIII also prohibits line-side connection: 'Customer shall interconnect their DER system behind customer main panel; the customer shall not interconnect in FPL equipment or on a line side tap.' No distance figure appears in either document.
Why the confidence is not higherBoth read first-party this run: the tariff from the filed Section 9 PDF (plain text, Sheet 9.051 First Revised, effective 20 February 2014, still in the tariff issued 1 January 2026), the standards manual from Section XIII after breaking its font cipher. 75, not higher, precisely BECAUSE the two conflict and nothing published says which prevails on a small residential retrofit. The filed tariff is the legal instrument; the standards manual is what an FPL inspector carries. The Village itself says nothing about disconnects at all.
utility tariff checked 2026-09-13 https://www.fpl.com/rates/pdf/electric-tariff-section9.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? By email. The Building Department page's own 'Schedule an Inspection' control is a mailto link to buildingclerk@nbvillage.com. The contract standard is broader: 'Customers may schedule inspections in-person, via telephone, online through the Village-owned software, or via email.' Department phone (305) 754-6740; office hours Monday-Friday 8:00 am - 4:00 pm. 88% · department page
- How much notice is required? No notice period is published. The contract requires the Village's building-services contractor to answer consumer inquiries within one business day, to respond to hazards or code violations within one business day, and to provide personnel able to respond within one hour, 24/7, to an emergency call-out. The FY2026 adopted budget sets a goal to 'Complete 95% of scheduled inspections within 24 hours of request by May 2026'. On the real record, every one of the solar inspections shows Scheduled Start Date equal to Actual Start Date, so once booked they were performed on the day scheduled. 70% · RFP / procurement document
- Are same-day or AM/PM windows offered? Yes to AM/PM, and the working window is narrow. RFP 2021-009 Sec. 3.2.C.2: 'Contractor as requested by the Village shall inform the customer of the date and time period (morning or afternoon) during which the inspection will occur.' Sec. 3.2.D.9: 'Generally perform inspections between 9:00 AM and 11:00 AM Monday - Friday, except on an as-needed basis'. After-hours inspections are available 'when requested and scheduled with prior notice by the permit holder', compensated at the rates in the Village code. 80% · RFP / procurement document
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes. The Village performs its own final solar inspections - a Final Building and a Final Electrical on every one of the six real PV projects, all passed, all recorded in the Village's own inspection reports under Village inspection numbers (IBLD-/IELE-). 95% · inspection records
- If delegated, to whom? Not delegated to another government. The Village remains the AHJ and issues in its own name; the inspection is physically performed by C.A.P. Government, Inc.'s certified inspectors under the Professional Service Agreement of 14 October 2021. The contract requires 'a minimum of one plans reviewer/inspector for each discipline (i.e., structural, plumbing, electrical and mechanical) with all applicable certifications required pursuant to Florida Statutes and the Miami-Dade County Board of Rules and Appeals', each with at least five years' experience in their discipline, all fluent in English with at least one person fluent in English and Spanish. 85% · RFP / procurement document
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? Recovered from the real record rather than from a published list. For a residential rooftop PV retrofit the sequence is, per permit: BUILDING - 'In Progress', then 'Final Building'. ELECTRICAL - 'Electrical Service' where the service is touched, then 'Electrical Rough/Fire', then 'Final Electrical'. Final Building and Final Electrical fell on the same day in four of the six projects. For an integrated PV roof (the Tesla Solar Roof) the building permit instead ran 'Roofing In-Progress' then 'Final Roofing', under a Roofing Inspector. Inspector identities are recorded only as roles - Building Inspector, Electrical Inspector, Roofing Inspector. 90% · inspection records
- Is a rough-in or mid-roof inspection required? Yes. An 'Electrical Rough/Fire' inspection was performed and passed on all six projects, and a building 'In Progress' inspection on five of the six (the sixth being the Tesla roof, which took 'Roofing In-Progress' instead). There is no separate mid-roof inspection type. 88% · inspection records
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? Partly, and the gap matters. The Village publishes a 131-page 'PLAN REVIEW AND INSPECTION REQUIREMENTS' document, permit type by permit type, which sets out plan reviews, inspections, drawings and supporting documents. It has dedicated entries for Photovoltaic - Residential Alteration and Photovoltaic - Residential New. But for every Photovoltaic category - unlike A/C, Electrical, Roofing and the rest - the 'Plan Reviews:' and 'Inspections:' lines are LEFT BLANK. So the checklist exists, the drawing list is real and usable, and the review-and-inspection half of the PV entries was never filled in. 80% · published checklist
- What must be on site at inspection? Two things are inferable from what the Village charges to replace them: the permit inspection card ('If the permit inspection card for which a permit has been issued is lost and research has to be conducted for replacement of the card, a charge of $30.00 per hour will be charged up to a maximum total cost of $100.00 for residential properties') and an approved field copy of the plans ('When plans for which a permit was issued is lost by the owner, contractor, applicants, or any other representatives of the project, a recertification fee will be required to review, stamp and approve a new set of plans as a field copy'). A recorded Notice of Commencement is required for any work over $5,000. 60% · adopting ordinance
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? A passed final inspection closing the permit - the permit status moves to 'Complete'. All six PV projects ended that way, with Final Building and Final Electrical passed and no certificate issued. No certificate of occupancy is involved in a retrofit: the fee schedule prices a 'Certificate of occupancy, temporary or final, fee per unit $180.00' and a separate 'Certificate of completion $180.00', neither of which appears on any of the solar permits. The Village does not issue a green tag or PTO letter. 75% · permit records
- Who notifies the utility for PTO? The customer or installer, not the Village. FPL's Tier 1 agreement puts the obligation on the customer twice over: Sec. 3.4, 'The Customer agrees to provide Local Building Code Official inspection and certification of installation', and Sec. 3.5, 'The Customer shall notify FPL at least ten (10) calendar days prior to initially placing Customer's equipment and protective apparatus in service and FPL shall have the right to have personnel present on the in-service date.' No North Bay Village document places any notification duty on the Village. 88% · utility tariff
- Is there a re-inspection fee? $75.00, but not on the first failure. The fee schedule: '(a) First inspection and first re-inspection included as part of the permit fee, no additional charge. Second re-inspection and each subsequent re-inspection, $75.00. (b) Repairs or corrections not made when inspection is called $75.00. (c) Work not ready for inspection when called, $75.00. (d) The payment for re-inspection fees, correction of workmanship or violations, shall be made before any further permits will be issued to the person responsible for or owing same.' Code Sec. 151.10(E) states the same $75.00 figure. 95% · fee schedule
- How are corrections issued and cleared? Through the Village-owned permitting software, with the result recorded against the inspection record: 'All inspection data/reports shall be logged in the Village-owned permitting software after completing an inspection.' The statuses actually used in the Village's reports are Passed, Partial Pass, Canceled and Re-inspection. A real worked example from the solar set: the Tesla Solar Roof at 7623 Beach View Dr took a 'Roofing In-Progress' Partial Pass on 31 Oct 2023, passed Roofing In-Progress on 9 Nov 2023, then failed Final Roofing re-inspections on 25 Jan 2024 and 2 Feb 2024 before passing Final Roofing on 13 Mar 2024. The contractor must also give the Village Manager monthly activity updates including a report of ALL expired permits. 70% · inspection records
14 questions answered against City of North Bay Village’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
By email. The Building Department page's own 'Schedule an Inspection' control is a mailto link to buildingclerk@nbvillage.com. The contract standard is broader: 'Customers may schedule inspections in-person, via telephone, online through the Village-owned software, or via email.' Department phone (305) 754-6740; office hours Monday-Friday 8:00 am - 4:00 pm.
Why the confidence is not higherBuilding Department page (modified 1 Oct 2025); RFP 2021-009 Sec. 3.2.D.2. 88 because the page offers only the email route while the contract offers four.
department page checked 2026-09-13 https://northbayvillage-fl.gov/building-department/
Q50 How much notice is required? Core Booking & scheduling
No notice period is published. The contract requires the Village's building-services contractor to answer consumer inquiries within one business day, to respond to hazards or code violations within one business day, and to provide personnel able to respond within one hour, 24/7, to an emergency call-out. The FY2026 adopted budget sets a goal to 'Complete 95% of scheduled inspections within 24 hours of request by May 2026'. On the real record, every one of the solar inspections shows Scheduled Start Date equal to Actual Start Date, so once booked they were performed on the day scheduled.
Why the confidence is not higherRFP 2021-009 Sec. 3.2.C.3, D and H.2; FY2026 adopted budget Goal 2; FY21-FY23 Completed Inspections Reports. 70 because a goal and a contract standard are not a published notice requirement, and the Village states none.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Yes to AM/PM, and the working window is narrow. RFP 2021-009 Sec. 3.2.C.2: 'Contractor as requested by the Village shall inform the customer of the date and time period (morning or afternoon) during which the inspection will occur.' Sec. 3.2.D.9: 'Generally perform inspections between 9:00 AM and 11:00 AM Monday - Friday, except on an as-needed basis'. After-hours inspections are available 'when requested and scheduled with prior notice by the permit holder', compensated at the rates in the Village code.
Why the confidence is not higherRFP 2021-009. 80 because this is a contract standard rather than a published customer-facing policy, and the 9-11 AM window is far tighter than most authorities'.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes. The Village performs its own final solar inspections - a Final Building and a Final Electrical on every one of the six real PV projects, all passed, all recorded in the Village's own inspection reports under Village inspection numbers (IBLD-/IELE-).
Why the confidence is not higherFY21-FY23 Completed Inspections Reports.
inspection records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-23-COMPLETED-INSPECTIONS-REPORT.pdf
Q53 If delegated, to whom? Core Who inspects
Not delegated to another government. The Village remains the AHJ and issues in its own name; the inspection is physically performed by C.A.P. Government, Inc.'s certified inspectors under the Professional Service Agreement of 14 October 2021. The contract requires 'a minimum of one plans reviewer/inspector for each discipline (i.e., structural, plumbing, electrical and mechanical) with all applicable certifications required pursuant to Florida Statutes and the Miami-Dade County Board of Rules and Appeals', each with at least five years' experience in their discipline, all fluent in English with at least one person fluent in English and Spanish.
Why the confidence is not higherRFP 2021-009 Sec. 3.2.I; Village Clerk's 13 Feb 2024 memorandum naming C.A.P. Government, Inc. and the October 2021 agreement. 85 because no renewal after 2024 was located.
RFP / procurement document checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2021/07/RFP-2021-009-Building-Services-revised-07.23.21.pdf
Q54 Which inspections are required, and in what order? Core Stages & sequence
Recovered from the real record rather than from a published list. For a residential rooftop PV retrofit the sequence is, per permit: BUILDING - 'In Progress', then 'Final Building'. ELECTRICAL - 'Electrical Service' where the service is touched, then 'Electrical Rough/Fire', then 'Final Electrical'. Final Building and Final Electrical fell on the same day in four of the six projects. For an integrated PV roof (the Tesla Solar Roof) the building permit instead ran 'Roofing In-Progress' then 'Final Roofing', under a Roofing Inspector. Inspector identities are recorded only as roles - Building Inspector, Electrical Inspector, Roofing Inspector.
Why the confidence is not higherAll six projects traced through the FY21, FY22 and FY23 Completed Inspections Reports by case number and address. 90 rather than 95 because the Village's own Plan Review and Inspection Requirements document leaves the 'Inspections:' field BLANK for every Photovoltaic category while filling it in for other permit types - so the published sequence for PV does not exist and this had to be reconstructed.
inspection records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-22-COMPLETED-INSPECTIONS-REPORT.pdf
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Yes. An 'Electrical Rough/Fire' inspection was performed and passed on all six projects, and a building 'In Progress' inspection on five of the six (the sixth being the Tesla roof, which took 'Roofing In-Progress' instead). There is no separate mid-roof inspection type.
Why the confidence is not higherFY21-FY23 Completed Inspections Reports. 88 because the stage names come from the records rather than from any published description of what each stage covers.
inspection records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-22-COMPLETED-INSPECTIONS-REPORT.pdf
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedThe Plan Review and Inspection Requirements document - whose 'Inspections:' field is blank for every Photovoltaic category, so it says nothing about what is checked; the Building Department page; the FY21-FY24 Completed Inspections Reports, which record only inspection type, inspector role, status and date with no checklist or comment field; the fee schedule; the permit application; and RFP 2021-009, which specifies that 'Village inspection forms shall be used' but does not publish those forms. Nothing states whether an inspector verifies labels or equipment listings. Note for the caller: the inspection module of the Village's permitting software is not public, and the Village's inspection forms are referenced in its contract but not posted - a records request for a completed Village inspection form on one of the six named solar permits would settle this.
Q57 Is there a published inspection checklist? Core What is checked
Partly, and the gap matters. The Village publishes a 131-page 'PLAN REVIEW AND INSPECTION REQUIREMENTS' document, permit type by permit type, which sets out plan reviews, inspections, drawings and supporting documents. It has dedicated entries for Photovoltaic - Residential Alteration and Photovoltaic - Residential New. But for every Photovoltaic category - unlike A/C, Electrical, Roofing and the rest - the 'Plan Reviews:' and 'Inspections:' lines are LEFT BLANK. So the checklist exists, the drawing list is real and usable, and the review-and-inspection half of the PV entries was never filled in.
Why the confidence is not higherPlan Review and Inspection Requirements, PDF author 'Pedro Martinez' (the Village's Chief Building Official), created 11 March 2022, linked from the Building Department page. 80 because the document never names North Bay Village and carries un-localised references to another city's code section and boards.
published checklist checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2022/03/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf
Q58 What must be on site at inspection? Core Documents on site
Two things are inferable from what the Village charges to replace them: the permit inspection card ('If the permit inspection card for which a permit has been issued is lost and research has to be conducted for replacement of the card, a charge of $30.00 per hour will be charged up to a maximum total cost of $100.00 for residential properties') and an approved field copy of the plans ('When plans for which a permit was issued is lost by the owner, contractor, applicants, or any other representatives of the project, a recertification fee will be required to review, stamp and approve a new set of plans as a field copy'). A recorded Notice of Commencement is required for any work over $5,000.
Why the confidence is not higherCode Sec. 151.10(I)-(J) and the permit application's warning to owner. 60 because this is inferred from replacement-fee provisions rather than stated as a site requirement - the Village publishes no 'what must be on site' list.
adopting ordinance checked 2026-09-13 https://library.municode.com/fl/north_bay_village/codes/code_of_ordinances?nodeId=TITXVLAUS_CH151BU_CO_S151.10PLSP
Q59 Is there a re-inspection fee? Corrections & re-inspection
$75.00, but not on the first failure. The fee schedule: '(a) First inspection and first re-inspection included as part of the permit fee, no additional charge. Second re-inspection and each subsequent re-inspection, $75.00. (b) Repairs or corrections not made when inspection is called $75.00. (c) Work not ready for inspection when called, $75.00. (d) The payment for re-inspection fees, correction of workmanship or violations, shall be made before any further permits will be issued to the person responsible for or owing same.' Code Sec. 151.10(E) states the same $75.00 figure.
Why the confidence is not higherFee Schedule Exhibit A (Res. 2025-119, 16 Dec 2025) and Code Sec. 151.10(E), which agree - the only fee in this record where the ordinance and the current schedule match exactly.
fee schedule checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/12/Resolution-No.-2025-119-Approving-Updated-Fee-Schedule.pdf
Q60 How are corrections issued and cleared? Corrections & re-inspection
Through the Village-owned permitting software, with the result recorded against the inspection record: 'All inspection data/reports shall be logged in the Village-owned permitting software after completing an inspection.' The statuses actually used in the Village's reports are Passed, Partial Pass, Canceled and Re-inspection. A real worked example from the solar set: the Tesla Solar Roof at 7623 Beach View Dr took a 'Roofing In-Progress' Partial Pass on 31 Oct 2023, passed Roofing In-Progress on 9 Nov 2023, then failed Final Roofing re-inspections on 25 Jan 2024 and 2 Feb 2024 before passing Final Roofing on 13 Mar 2024. The contractor must also give the Village Manager monthly activity updates including a report of ALL expired permits.
Why the confidence is not higherRFP 2021-009 Sec. 3.2.C.4 and D.11-12; FY23 and FY24 Completed Inspections Reports. 70 because the Village publishes no correction-notice procedure and this is assembled from the contract plus the record.
inspection records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-23-COMPLETED-INSPECTIONS-REPORT.pdf
Q61 What is issued on pass? Core Final sign-off & PTO
A passed final inspection closing the permit - the permit status moves to 'Complete'. All six PV projects ended that way, with Final Building and Final Electrical passed and no certificate issued. No certificate of occupancy is involved in a retrofit: the fee schedule prices a 'Certificate of occupancy, temporary or final, fee per unit $180.00' and a separate 'Certificate of completion $180.00', neither of which appears on any of the solar permits. The Village does not issue a green tag or PTO letter.
Why the confidence is not higherFY21-FY23 Permits Issued Reports (status field) and Completed Inspections Reports; Fee Schedule Exhibit A. 75 because the Village publishes no statement of what is issued on pass - this is read off six real records.
permit records checked 2026-09-13 https://northbayvillage-fl.gov/wp-content/uploads/2025/06/FY-23-PERMITS-ISSUED-REPORT.pdf
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
The customer or installer, not the Village. FPL's Tier 1 agreement puts the obligation on the customer twice over: Sec. 3.4, 'The Customer agrees to provide Local Building Code Official inspection and certification of installation', and Sec. 3.5, 'The Customer shall notify FPL at least ten (10) calendar days prior to initially placing Customer's equipment and protective apparatus in service and FPL shall have the right to have personnel present on the in-service date.' No North Bay Village document places any notification duty on the Village.
Why the confidence is not higherFPL Interconnection Agreement Tier 1, Sheets 9.050 and 9.051, read first-party; Village-side absence proved by controlled search. 88 because the Village's silence is an absence, albeit a well-proved one.
utility tariff checked 2026-09-13 https://www.fpl.com/rates/pdf/electric-tariff-section9.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording 85%
No. North Bay Village specifies no placard wording of its own. The only prescribed wording that reaches the job is FPL's battery placard, which must state that battery storage is utilized in this facility.
Size, colour & material 80%
The Village specifies nothing. FPL does, and it is a material specification rather than a dimensional one: labels must be a 'permanent and weatherproof / UV resistant placard with engraved letters', and the same formula is used elsewhere in FPL's standards for meter identification ('permanent and weatherproof/UV resistant placard with engraved letters'). No letter height and no colour is specified by either the Village or FPL.
Where they go 80%
At the meter. FPL's labeling rule places them 'at the interconnecting meter can and the Disconnect Switch'; the battery placard is 'permanently affixed to the meter enclosure'; and the disconnect-location plaque goes 'adjacent to FPL's meter socket'. The Village prescribes no placement.
What the utility wants on top 85%
Yes - on a North Bay Village job every placard requirement is FPL's. See Q38 for the three: the disconnect-location plaque (filed tariff Sheet 9.051 Sec. 5.3), the battery-storage placard permanently affixed to the meter enclosure (Electric Service Standards Section XIII B.1), and the general labeling standard requiring permanent, weatherproof/UV-resistant placards with engraved letters at the interconnecting meter can and the disconnect switch (Section XIII g).
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.