City of Orlando

Orange County · Florida ← All authorities

City of Orlando

Orange County

Verified Aug. 5, 2026

City of Orlando is a city authority in the State of Florida, serving 307,573 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Orlando against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Orlando is the authority having jurisdiction 90% confidence
Holds
Building, Electrical, and Plumbing permitting for residential solar all sit with the City of Orlando's own Permitting Services Division (Economic Development Department) — issued as an Electrical Permit for photovoltaic, Plumbing for solar thermal, and Building+Electrical for solar shingles. Design review in historic districts sits with the City's own Historic Preservation Board (Certificate of Appropriateness, staff-level Minor Review). None of this is delegated to Orange County.
Overridden by
Florida Statutes govern several pieces on top of the City's process: FS 163.04 (Solar Rights Act) bars HOA prohibition of solar and limits HOA control to reasonable, uniform siting conditions; FS 553.792 sets statutory plan-review timelines the City has adopted verbatim on its own 'Building Permit Guidelines (FL 553.792)' page; FS 489.103(7) governs any owner-builder path. Grid interconnection and permission-to-operate sit entirely with the interconnecting utility — predominantly Orlando Utilities Commission (OUC, municipal) but NOT exclusively: the City's own Electrical Permit Application form has a checkbox for Duke Energy as well, so some addresses inside city limits interconnect through Duke Energy Florida instead of OUC. OUC's own interconnection standards (Tier 1/2/3 fees, PE-sealed one-line diagrams, disconnect-switch rules) are a utility-level gate that runs AFTER the City's permit is finaled, not before.
Why not higher
City's Permitting Services Division page and Solar Plan Review Checklist are the City's own current documents describing self-permitting; the Duke Energy checkbox on the City's own Electrical Permit Application form is the clearest direct evidence that OUC is not the sole utility inside city limits, which is a correction worth flagging given how often 'Orlando = OUC' is assumed.

https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Permit required
Yes — a permit is required for residential rooftop PV (issued as an Electrical Permit).95%
Permit cost
Valuation-based Electrical Permit Fee: $63.67 for the first $1,000 of construction cost, plus $10.60 per additional $1,000 up to and including $25,000,85%
Plan review
No single published 'X business days' figure specific to solar. Two overlapping sources: (1) the City's Digital Plans Review Quick Start Guide states staff target 2 business days to…70%
Portal
Two City systems, not one: ProjectDox-based 'Digital Permits' for plan submission and review (digitalpermits.orlando.gov / digitalpermits@orlando.gov),88%
Electrical code
2020 NEC — adopted statewide as part of the Florida Building Code, 8th Edition (2023 cycle), effective 31 Dec 2023;82%
Own placard wording
No — checked the City's Solar Plan Review Checklist and all three of OUC's current solar-specific PDFs (combined interconnection requirements, contractor sign-up guide,85%
Booking an inspection
Portal (myRelayView — enter permit number, 'Schedule Inspection'), text message ('INSPECTION' or 'SCHEDULE' to 866.205.3881), or phone (407.246.4444 automated IVR, press 1 then 1 twice).90%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes — a permit is required for residential rooftop PV (issued as an Electrical Permit). Q3 Electrical and building permits — Separate — photovoltaic-only installations are a standalone Electrical Permit; a Building Permit is only pulled in addition for solar shingles or a solar attic fan… Q4 Plan review — No single published 'X business days' figure specific to solar. Two overlapping sources: (1) the City's Digital Plans Review Quick Start Guide states staff target 2… Q18 Where you file — Two City systems, not one: ProjectDox-based 'Digital Permits' for plan submission and review (digitalpermits.orlando.gov / digitalpermits@orlando.gov), Q20

Permit required
Yes — a permit is required for residential rooftop PV (issued as an Electrical Permit).95% source
What it costs
Valuation-based Electrical Permit Fee: $63.67 for the first $1,000 of construction cost, plus $10.60 per additional $1,000 up to and including $25,000,85% source
Plan review turnaround
No single published 'X business days' figure specific to solar. Two overlapping sources: (1) the City's Digital Plans Review Quick Start Guide states staff target 2 business days to complete EACH…70% source
Key document
ordinance/department page cited by 11 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes — the City of Orlando's own Permitting Services Division (Economic Development Department) is the AHJ for residential solar within city limits; it is not delegated to Orange County. 92% · authority's own page
    • What does this authority permit itself, and what does it delegate? Both — the City issues Electrical permits (photovoltaic), Building permits (solar shingles, solar attic fan, and any new structure), and Plumbing permits (solar thermal) itself; nothing is delegated to the county. Historic-district design review is also done in-house by the City's own Historic Preservation Board. 90% · ordinance/department page
    • Is a permit required for a residential rooftop PV system? Yes — a permit is required for residential rooftop PV (issued as an Electrical Permit). 95% · department checklist
    • Is there a separate electrical permit, or is it combined? Separate — photovoltaic-only installations are a standalone Electrical Permit; a Building Permit is only pulled in addition for solar shingles or a solar attic fan (roof-integrated/structural work), and Plumbing is added for solar thermal or hybrid systems. For new/existing RESIDENTIAL projects the checklist states 'only the applicable trade application is required' (i.e., no separate Building Permit for a bolt-on PV array). 90% · department checklist
    • Is a HOA or architectural approval required first? No — the City does not require proof of HOA/architectural approval as a permit submittal item for residential PV. Florida's Solar Rights Act (FS 163.04) bars any deed restriction/HOA covenant from prohibiting solar collectors outright; an HOA may only impose reasonable, uniform siting/aesthetic conditions (e.g., orientation within 45° of due south) that don't impair performance. 75% · statute
    • Is there a historic-district review? Yes — solar installations within a historic district or on a designated historic landmark property require a Certificate of Appropriateness (COA) BEFORE the building/electrical permit. The Historic Preservation Board handles this as a staff-level 'Minor Review' (up to ~10 days once all items are submitted), and the express design standard is that the installation 'must not be visible to the street.' 95% · authority's own review-process document
    • Is a wind or windstorm certification required? Yes — Florida product approval with a minimum wind-speed rating (and installation/attachment details, signed and sealed) is required for the mounting system on every solar submittal type, standard statewide High-Velocity-Hurricane-Zone-adjacent wind engineering practice (Orlando is inland, not HVHZ, but still requires a wind-rated product approval). 88% · department checklist
    • Is a Specific Use Permit or Council approval ever required? Not for a typical residential rooftop PV job — only the staff-level Historic Preservation Board 'Minor Review' (COA) applies in historic districts, not a full Board/Council hearing. A Council-level 'Certificate of Appearance Approval' from the Architectural Review Board is required, but only for COMMERCIAL solar within a Community Redevelopment Area (CRA) — not applicable to residential. 82% · department checklist
    • Is there a system-size cap on residential generation? No absolute City-side kW cap found; the practical ceiling comes from OUC's interconnection rule that a system's Gross Power Rating (GPR) may not exceed 90% of the customer's existing electric service size (transformer/service rating) without the customer paying for a service upgrade — this functions as the de facto size cap for a given home's panel/service. 75% · utility DG manual
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A City-registered Solar contractor (may obtain all solar permit types) or a City-registered Electrical contractor (may obtain the Photovoltaic Electrical Permit specifically). 90% · department checklist
    • Must the contractor be registered with this authority before applying? Yes — any State-certified contractor must register with the City of Orlando Permitting Services Division before the City will issue them a permit. 92% · department page
    • Is a homeowner permitted to self-install and self-permit? Ambiguous/likely limited — Florida Statute 489.103(7) lets an owner act as their own contractor on their own homestead generally, but Orlando's Solar Plan Review Checklist names only 'Solar contractor,' 'Electrical contractor,' and 'Plumbing contractor' as who 'may obtain' each solar permit type; it does not list an owner-builder path for the Photovoltaic Electrical Permit the way the general Building/Electrical permit forms do (which do carry an owner-notarized-signature line for other trades). 50% · statute + department checklist (inference)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Photovoltaic submittal: electrical diagram showing PV array configuration, wiring, overcurrent protection, inverter disconnect, grounding, required signs, and AC connection to the building (per the City's supplied standard electrical diagram), with the PV disconnect identified per FFPC/NFPA 1; spec sheets and installation manuals for all manufactured components (modules, inverters, combiner box, disconnect, mounting system); sealed attachment/flashing/construction details for wind zone and site conditions; for battery backup, a standby-load summary with power ratings and daily energy consumption; and electrical calculations for wire sizing (ampacity, conduit fill, ambient derating). Roof plan and Florida product approval (wind speed) are required for all solar submittal types. 95% · department checklist
    • How many copies, and in what format? Digital only — no physical copies. All drawings and documents are uploaded through the City's ProjectDox-based digital plan review system; nothing is submitted on paper. 88% · department guide
    • Is a site plan required, and what must it show? Yes — a roof plan is required for every solar submittal type (showing panel layout/attachment). The City's general residential site-plan/survey standard (which the solar submittal draws on for the broader project) must show property lines and lot dimensions, adjacent street locations/names, easements, a north arrow, dimensions/locations of structures and equipment, existing tree locations, distances from property lines to existing/proposed improvements, and must distinguish existing conditions from proposed work. 80% · department checklist
    • Is a one-line / three-line diagram required? Yes — an electrical (one-line/three-line style) diagram is required showing PV array configuration, wiring system, overcurrent protection, inverter disconnect, grounding, required signage, and the AC connection to the building. 95% · department checklist
    • Are string and conductor calculations required? Yes — electrical calculations showing wire sizing with proper ampacity, conduit fill, and ambient derating factors are required. 95% · department checklist
    • Is a structural PE stamp required, and at what threshold? Yes, and with no stated dollar/size threshold — attachment, flashing, and construction design details for the PV mounting system and any supporting frame members must be 'sealed by the appropriate design professional' for wind zone, additional loading, and site conditions, for EVERY solar submittal type (residential or commercial, any size). 85% · department checklist
    • Is an electrical PE stamp required, and at what threshold? Yes, at the utility (not city) level and with no stated size threshold in the current guide — OUC's own step-by-step solar guide lists a PE-sealed electrical one-line diagram as one of three 'Required Documents for Submission' for every solar interconnection application. The City's own building-permit checklist does not separately require an electrical PE seal beyond the structural attachment seal. 75% · utility's own guide
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Two City systems, not one: ProjectDox-based 'Digital Permits' for plan submission and review (digitalpermits.orlando.gov / digitalpermits@orlando.gov), and myRelayView (cityoforlandofl-permits.myrelayview.com) for permit status, fee payment, and inspection scheduling. 88% · portal landing pages
    • Can the whole application be completed online? Yes, for submission and management — plans are uploaded and reviewed entirely digitally (no paper accepted), and fee payment/inspection scheduling/status checks are all done online via myRelayView, text, or IVR phone. A notarized owner's signature, where required, is uploaded as a scanned document rather than requiring an in-person visit. 82% · department guide
    • What does a residential solar permit cost? Valuation-based Electrical Permit Fee: $63.67 for the first $1,000 of construction cost, plus $10.60 per additional $1,000 up to and including $25,000, plus $7.96 per additional $1,000 above $25,000 — e.g. roughly $265 base fee for a $20,000 system. On top of the base fee: 1.5% Administrative Inspection Fund surcharge (min $2), 1% DCA Operational Trust Fund surcharge (min $2), and a 3% Technology Surcharge. OUC also charges its own separate interconnection application fee (see q28/q22 utility answers): $0 for systems ≤10kW AC (Tier 1, the vast majority of residential), $340 for 10–100kW. 85% · fee schedule
    • How is the fee calculated? Valuation/tiered — the Electrical Permit fee is calculated per $1,000 of stated construction cost in stepped tiers (see q15), not a flat fee, not per-kW, and not per-panel. 88% · fee schedule
    • Is there a separate plan-check fee? No — no separate initial plan-check/plan-review fee line item exists in either the Electrical (ELE) or Building (BLD) sections of the residential fee schedule. The only review-stage charge is a $50 'Plan Revision Fee' applied starting at the third submittal (i.e., the second revision), not an upfront plan-check fee. 80% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? No single published 'X business days' figure specific to solar. Two overlapping sources: (1) the City's Digital Plans Review Quick Start Guide states staff target 2 business days to complete EACH review task/stage (application processing, pre-screen, review routing, review-complete/batch-stamp) — a multi-stage process, not a single total; (2) under the City's own FS 553.792 timeline page, an EXISTING single-family residence permit valued under $15,000 gets a 5-business-day statutory review commitment — but most residential PV jobs exceed $15,000, and the City's own guidance page does not list a named tier for existing-SFR work at or above that threshold, so those fall back to the statute's general (30-business-day) track rather than a City-published solar-specific number. 70% · department page
    • Which utility handles interconnection here? Primarily Orlando Utilities Commission (OUC), a municipally-owned utility — but NOT exclusively: the City's own Electrical Permit Application form has a checkbox for 'Electric Utility: Orlando Utilities Commission [ ] Duke Energy [ ]', confirming Duke Energy Florida also serves some addresses inside Orlando city limits. The correct utility must be confirmed per address, not assumed from OUC's dominance. 85% · authority's own permit application form
    • Where does the utility sit in the sequence? After permit — OUC's own solar guide lists a 'Passed City/County Permit Inspection or Certificate of Completion' as a required document for the interconnection application; parallel operation with the grid may not begin without OUC's separate interconnection approval, which follows permit completion. 90% · utility's own guide

28 questions answered against City of Orlando’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes — the City of Orlando's own Permitting Services Division (Economic Development Department) is the AHJ for residential solar within city limits; it is not delegated to Orange County.

Why the confidence is not higherCity's own Solar Plan Review Checklist and Permitting Services Division page describe the City issuing its own Electrical/Building/Plumbing permits for solar; Orange County's own record (checked in a separate run) does not reach addresses inside Orlando city limits.

authority's own page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both — the City issues Electrical permits (photovoltaic), Building permits (solar shingles, solar attic fan, and any new structure), and Plumbing permits (solar thermal) itself; nothing is delegated to the county. Historic-district design review is also done in-house by the City's own Historic Preservation Board.

Why the confidence is not higherSolar Plan Review Checklist lists City permit types by system type with no county referral; Historic Preservation review sheet is a City of Orlando document.

ordinance/department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes — a permit is required for residential rooftop PV (issued as an Electrical Permit).

Why the confidence is not higherSolar Plan Review Checklist states plainly: 'Photovoltaic: Electrical Permit.'

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate — photovoltaic-only installations are a standalone Electrical Permit; a Building Permit is only pulled in addition for solar shingles or a solar attic fan (roof-integrated/structural work), and Plumbing is added for solar thermal or hybrid systems. For new/existing RESIDENTIAL projects the checklist states 'only the applicable trade application is required' (i.e., no separate Building Permit for a bolt-on PV array).

Why the confidence is not higherSolar Plan Review Checklist, 'Permit Requirements' table and note that residential projects need only the applicable trade application (commercial needs Building Permit + trade application).

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A City-registered Solar contractor (may obtain all solar permit types) or a City-registered Electrical contractor (may obtain the Photovoltaic Electrical Permit specifically).

Why the confidence is not higherChecklist 'Contractor License Requirements': 'Solar contractor may obtain all solar permits listed above. Electrical contractors may obtain the Electrical Permit in the Photovoltaic category.'

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — any State-certified contractor must register with the City of Orlando Permitting Services Division before the City will issue them a permit.

Why the confidence is not higherChecklist: 'If you are not registered with the City of Orlando as a contractor, please register here in order to allow us to issue your permit.' Confirmed by the City's own contractor-registration page requiring current business tax receipt, workers' comp proof, and a surety bond on file.

department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Other/Register-a-Contractor

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Ambiguous/likely limited — Florida Statute 489.103(7) lets an owner act as their own contractor on their own homestead generally, but Orlando's Solar Plan Review Checklist names only 'Solar contractor,' 'Electrical contractor,' and 'Plumbing contractor' as who 'may obtain' each solar permit type; it does not list an owner-builder path for the Photovoltaic Electrical Permit the way the general Building/Electrical permit forms do (which do carry an owner-notarized-signature line for other trades).

Why the confidence is not higherNo Orlando-specific page affirmatively confirms or denies homeowner self-permitting for PV specifically; inferred from the statute plus the checklist's contractor-only framing.

statute + department checklist (inference) checked 2026-09-11 https://www.flsenate.gov/laws/statutes/2024/489.103

Q8 What documents make up a complete submittal? Core Submittal package

Photovoltaic submittal: electrical diagram showing PV array configuration, wiring, overcurrent protection, inverter disconnect, grounding, required signs, and AC connection to the building (per the City's supplied standard electrical diagram), with the PV disconnect identified per FFPC/NFPA 1; spec sheets and installation manuals for all manufactured components (modules, inverters, combiner box, disconnect, mounting system); sealed attachment/flashing/construction details for wind zone and site conditions; for battery backup, a standby-load summary with power ratings and daily energy consumption; and electrical calculations for wire sizing (ampacity, conduit fill, ambient derating). Roof plan and Florida product approval (wind speed) are required for all solar submittal types.

Why the confidence is not higherVerbatim from the City's Solar Plan Review Checklist, 'Plans & Forms Requirements' / 'Construction Documents & Specifications — Photovoltaic' sections (extracted from the live page's own HTML, not a summarizer).

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q9 How many copies, and in what format? Submittal package

Digital only — no physical copies. All drawings and documents are uploaded through the City's ProjectDox-based digital plan review system; nothing is submitted on paper.

Why the confidence is not higherResidential Permitting Requirements page: 'The following plans and documents must be uploaded for review and approval'; Quick Start Guide: Digital Plans Review describes the ProjectDox upload/resubmit workflow exclusively.

department guide checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/1/departments/edv/permitting-services-division/bld/quick-start-guide-2021_november.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes — a roof plan is required for every solar submittal type (showing panel layout/attachment). The City's general residential site-plan/survey standard (which the solar submittal draws on for the broader project) must show property lines and lot dimensions, adjacent street locations/names, easements, a north arrow, dimensions/locations of structures and equipment, existing tree locations, distances from property lines to existing/proposed improvements, and must distinguish existing conditions from proposed work.

Why the confidence is not higherSolar Plan Review Checklist requires a roof plan for all solar types; site-plan content list is from the City's general Residential Permitting Requirements checklist (not solar-specific), so applied here as the City's standing site-plan standard.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Residential-Permitting-Requirements

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — an electrical (one-line/three-line style) diagram is required showing PV array configuration, wiring system, overcurrent protection, inverter disconnect, grounding, required signage, and the AC connection to the building.

Why the confidence is not higherSolar Plan Review Checklist, Photovoltaic construction-document requirements.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q12 Are string and conductor calculations required? Drawings & calculations

Yes — electrical calculations showing wire sizing with proper ampacity, conduit fill, and ambient derating factors are required.

Why the confidence is not higherSolar Plan Review Checklist, Photovoltaic construction-document requirements.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Yes, and with no stated dollar/size threshold — attachment, flashing, and construction design details for the PV mounting system and any supporting frame members must be 'sealed by the appropriate design professional' for wind zone, additional loading, and site conditions, for EVERY solar submittal type (residential or commercial, any size).

Why the confidence is not higherSolar Plan Review Checklist repeats this sealed-design-professional requirement identically under Solar Thermal, Photovoltaic, and Solar Attic Fan sections with no valuation carve-out.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Yes, at the utility (not city) level and with no stated size threshold in the current guide — OUC's own step-by-step solar guide lists a PE-sealed electrical one-line diagram as one of three 'Required Documents for Submission' for every solar interconnection application. The City's own building-permit checklist does not separately require an electrical PE seal beyond the structural attachment seal.

Why the confidence is not higherOUC 'Step-by-Step to Installing Solar' guide, 'Required Documents for Submission' list (self-extracted with pdftotext, not a summarizer): 'Electrical One-Line Diagram (must include the seal & signature of a licensed professional engineer)' — listed without a tier/kW qualifier in this document, though OUC's separate Appendix A interconnection-requirements document ties other obligations (insurance, application fee) to Tier 2/3 (>10kW).

utility's own guide checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/OUC-RooftopSolar04_07_25.pdf

Q15 What does a residential solar permit cost? Core Fees

Valuation-based Electrical Permit Fee: $63.67 for the first $1,000 of construction cost, plus $10.60 per additional $1,000 up to and including $25,000, plus $7.96 per additional $1,000 above $25,000 — e.g. roughly $265 base fee for a $20,000 system. On top of the base fee: 1.5% Administrative Inspection Fund surcharge (min $2), 1% DCA Operational Trust Fund surcharge (min $2), and a 3% Technology Surcharge. OUC also charges its own separate interconnection application fee (see q28/q22 utility answers): $0 for systems ≤10kW AC (Tier 1, the vast majority of residential), $340 for 10–100kW.

Why the confidence is not higherCity fee schedule 'Fees — Residential Development,' ELE (Electrical) section, 'Effective January 2023' / revised 5-22-2023 — still the live linked schedule from the current permitting pages, though it predates the Dec 2023 FBC 8th Edition cycle so a rate change since then can't be ruled out.

fee schedule checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/3/departments/edv/permitting-services-division/bld/fee-schedule-residential-development-05.22.23.pdf

Q16 How is the fee calculated? Core Fees

Valuation/tiered — the Electrical Permit fee is calculated per $1,000 of stated construction cost in stepped tiers (see q15), not a flat fee, not per-kW, and not per-panel.

Why the confidence is not higherCity fee schedule, ELE section fee formula.

fee schedule checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/3/departments/edv/permitting-services-division/bld/fee-schedule-residential-development-05.22.23.pdf

Q17 Is there a separate plan-check fee? Fees

No — no separate initial plan-check/plan-review fee line item exists in either the Electrical (ELE) or Building (BLD) sections of the residential fee schedule. The only review-stage charge is a $50 'Plan Revision Fee' applied starting at the third submittal (i.e., the second revision), not an upfront plan-check fee.

Why the confidence is not higherFull read of the City's residential fee schedule PDF (ELE and BLD sections) with a positive control ('electrical' — multiple hits) and negative control ('zzqqx' — zero hits) confirming the extraction was reliable; no 'plan review fee' or 'plan check fee' line item found anywhere in the document.

fee schedule checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/3/departments/edv/permitting-services-division/bld/fee-schedule-residential-development-05.22.23.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

No single published 'X business days' figure specific to solar. Two overlapping sources: (1) the City's Digital Plans Review Quick Start Guide states staff target 2 business days to complete EACH review task/stage (application processing, pre-screen, review routing, review-complete/batch-stamp) — a multi-stage process, not a single total; (2) under the City's own FS 553.792 timeline page, an EXISTING single-family residence permit valued under $15,000 gets a 5-business-day statutory review commitment — but most residential PV jobs exceed $15,000, and the City's own guidance page does not list a named tier for existing-SFR work at or above that threshold, so those fall back to the statute's general (30-business-day) track rather than a City-published solar-specific number.

Why the confidence is not higherCity's own 'Building Permit Guidelines (FL 553.792)' page (self-extracted HTML) and Quick Start Guide (pdftotext) — the >=$15,000 existing-SFR tier is conspicuously absent from the City's own tier list, which is itself a notable finding.

department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Building-Permit-Guidelines

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedCity's 'Renew an Expired Permit' page and the residential fee schedule's 'Renewal of Expired Permit' line (both only describe the POST-expiration reinstatement grace window, not the initial validity period before expiration); general secondary sources claim 180 days but that figure could not be confirmed on any current City of Orlando primary-source page, and Florida HB 803's 1-year floor for single-family permits (eff. 1 Jul 2026) may not yet be reflected there.

https://www.orlando.gov/Building-Development/Permits-Inspections/Renew-Extend-Close-or-Withdraw-a-Permit/Renew-an-Expired-Permit

Q20 Which permit portal does this authority use? Core Portal & process

Two City systems, not one: ProjectDox-based 'Digital Permits' for plan submission and review (digitalpermits.orlando.gov / digitalpermits@orlando.gov), and myRelayView (cityoforlandofl-permits.myrelayview.com) for permit status, fee payment, and inspection scheduling.

Why the confidence is not higherSolar/Residential checklists route uploads through ProjectDox; the Schedule-or-Cancel-an-Inspection and permit-status pages route through myRelayView.

portal landing pages checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Schedule-or-Cancel-an-Inspection

Q21 Can the whole application be completed online? Core Portal & process

Yes, for submission and management — plans are uploaded and reviewed entirely digitally (no paper accepted), and fee payment/inspection scheduling/status checks are all done online via myRelayView, text, or IVR phone. A notarized owner's signature, where required, is uploaded as a scanned document rather than requiring an in-person visit.

Why the confidence is not higherQuick Start Guide (digital-only submission); Solar Plan Review Checklist (notarized signature required on application, uploaded); Schedule-or-Cancel-an-Inspection page (online/text/phone booking).

department guide checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/1/departments/edv/permitting-services-division/bld/quick-start-guide-2021_november.pdf

Q22 Which utility handles interconnection here? Core Utility interconnection

Primarily Orlando Utilities Commission (OUC), a municipally-owned utility — but NOT exclusively: the City's own Electrical Permit Application form has a checkbox for 'Electric Utility: Orlando Utilities Commission [ ] Duke Energy [ ]', confirming Duke Energy Florida also serves some addresses inside Orlando city limits. The correct utility must be confirmed per address, not assumed from OUC's dominance.

Why the confidence is not higherCity of Orlando Electrical Permit Application (self-extracted with pdftotext), Service Type section, utility checkbox line.

authority's own permit application form checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/2/departments/edv/permitting-services-division/bld/electrical-permit-2024.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit — OUC's own solar guide lists a 'Passed City/County Permit Inspection or Certificate of Completion' as a required document for the interconnection application; parallel operation with the grid may not begin without OUC's separate interconnection approval, which follows permit completion.

Why the confidence is not higherOUC 'Step-by-Step to Installing Solar' guide, 'Required Documents for Submission' and Appendix A interconnection requirements, Sec. C.4 ('OUC Inspection and Approval').

utility's own guide checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/OUC-RooftopSolar04_07_25.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — the City does not require proof of HOA/architectural approval as a permit submittal item for residential PV. Florida's Solar Rights Act (FS 163.04) bars any deed restriction/HOA covenant from prohibiting solar collectors outright; an HOA may only impose reasonable, uniform siting/aesthetic conditions (e.g., orientation within 45° of due south) that don't impair performance.

Why the confidence is not higherFS 163.04 text; absence of any HOA-approval line item on the Solar Plan Review Checklist or Residential Permitting Requirements checklist.

statute checked 2026-09-11 https://www.flsenate.gov/laws/statutes/2011/163.04

Q25 Is there a historic-district review? Overlays & special cases

Yes — solar installations within a historic district or on a designated historic landmark property require a Certificate of Appropriateness (COA) BEFORE the building/electrical permit. The Historic Preservation Board handles this as a staff-level 'Minor Review' (up to ~10 days once all items are submitted), and the express design standard is that the installation 'must not be visible to the street.'

Why the confidence is not higherSolar Plan Review Checklist ('Permit Requirements'); City's own 'Continue Your Historic Preservation Review' sheet, review-matrix row for 'Solar Installations' (self-extracted with pdftotext).

authority's own review-process document checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/1/departments/edv/city-planning/historic-preservation/historic-preservation-review-sheet-24.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

Yes — Florida product approval with a minimum wind-speed rating (and installation/attachment details, signed and sealed) is required for the mounting system on every solar submittal type, standard statewide High-Velocity-Hurricane-Zone-adjacent wind engineering practice (Orlando is inland, not HVHZ, but still requires a wind-rated product approval).

Why the confidence is not higherSolar Plan Review Checklist, Photovoltaic and Solar Attic Fan construction-document sections ('minimum windspeed product approvals').

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Not for a typical residential rooftop PV job — only the staff-level Historic Preservation Board 'Minor Review' (COA) applies in historic districts, not a full Board/Council hearing. A Council-level 'Certificate of Appearance Approval' from the Architectural Review Board is required, but only for COMMERCIAL solar within a Community Redevelopment Area (CRA) — not applicable to residential.

Why the confidence is not higherSolar Plan Review Checklist 'Permit Requirements' paragraph distinguishing residential (only trade permit) from CRA-commercial (ARB Certificate of Appearance) and historic (HPB COA).

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No absolute City-side kW cap found; the practical ceiling comes from OUC's interconnection rule that a system's Gross Power Rating (GPR) may not exceed 90% of the customer's existing electric service size (transformer/service rating) without the customer paying for a service upgrade — this functions as the de facto size cap for a given home's panel/service.

Why the confidence is not higherOUC Appendix A Interconnection Requirements, Sec. B.3(a).

utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2020 NEC — adopted statewide as part of the Florida Building Code, 8th Edition (2023 cycle), effective 31 Dec 2023; the City of Orlando enforces this edition with no separate local electrical code override identified. 82% · adopting regulation (statewide, city-enforced)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023), based on the 2021 International Building Code family, effective 31 Dec 2023 — adopted statewide and enforced by the City of Orlando. 85% · adopting regulation (statewide, city-enforced)
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023), based on NFPA 1 (2021) with Florida-specific amendments, effective 31 Dec 2023. The City's own Solar Plan Review Checklist directly cites 'FFPC NFPA 1' for PV disconnect identification, confirming City enforcement of this edition. 85% · adopting regulation (statewide, city-enforced) + city checklist
    • Are there local amendments to any of the above? Partial yes — I found a local land-use-level amendment (the Historic Preservation Board's 'solar must not be visible to the street' design standard for historic districts, and the CRA Architectural Review Board approval for commercial solar) layered on top of the statewide codes, but no distinct LOCAL TECHNICAL amendment to the NEC/FBC/FFPC electrical, structural, or fire provisions themselves was found in the sources checked (Municode's Chapter 13 Building Code and Chapter 22 Electrical Code pages returned 403 Forbidden and could not be directly verified for amendment language). 60% · inference from available department documents
    • What is the installation judged against? The Florida Building Code 8th Edition (2023, incl. 2020 NEC via reference) and Florida Fire Prevention Code 8th Edition (NFPA 1, 2021), plus — as a condition of grid interconnection rather than of the permit itself — OUC's own standards requiring UL 1741-listed inverters, UL 1703-listed modules/panels, and IEEE 1547-2018 compliance. 82% · ordinance + utility DG manual
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Orlando on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes — rapid shutdown is required under NEC Article 690.12 as adopted via the Florida Building Code 8th Edition (2020 NEC), the statewide floor the City enforces. 80% · adopting regulation
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? The City's checklist requires 'required signs' to appear on the submitted electrical diagram and requires the PV disconnecting means to be 'identified per FFPC NFPA 1' — i.e., standard NEC 690/705 disconnect and rapid-shutdown labeling — but the City does not publish its own supplemental placard beyond that code reference. 70% · department checklist
    • Does the authority specify placard wording of its own? No — checked the City's Solar Plan Review Checklist and all three of OUC's current solar-specific PDFs (combined interconnection requirements, contractor sign-up guide, and rooftop solar step-by-step guide); none specify placard WORDING of their own (they reference code sections like 'FFPC NFPA 1' rather than quoting label text). Positive control ('disconnect'/'meter' — multiple hits in each document) and negative control ('zzqqx' — zero hits) confirm the searches were working. 85% · utility DG manual + city checklist (absence confirmed with controls)
    • Does it specify letter height, colour or material? No — none of the checked documents (City Solar Plan Review Checklist; OUC's combined interconnection requirements, contractor guide, or rooftop solar guide) specify letter height, color, or material for placards, unlike neighboring municipal utilities (e.g., JEA's 6x6in white-on-red spec). 85% · utility DG manual + city checklist (absence confirmed with controls)
    • Does the UTILITY specify placards beyond the AHJ's? No — OUC does not publish placard specifications beyond the AHJ's own code references. Checked OUC's combined interconnection requirements (Appendix A), its contractor sign-up guide, its rooftop solar step-by-step guide, and its 2025 Development Services Guide (general electric-service standards) — none contain the words 'placard' or any letter-height/color/material spec; the Development Services Guide doesn't even mention 'solar' or 'photovoltaic' (confirmed with a positive control of 128 hits for 'meter' and a negative control of 0 hits for 'zzqqx' in that document). 85% · utility's own documents (absence confirmed with controls)
    • Where must the labels be placed? Per code default rather than a City/utility-specific rule: labels go at each PV disconnecting means/service equipment location per NEC 690/705 and FFPC/NFPA 1. Separately, OUC dictates PLACEMENT of the physical Tier 2/3 disconnect device itself (not a label) — 'located separate from, but adjacent to, the meter base,' visible and accessible to OUC personnel and lockable with a single OUC lock; for Tier 1 (≤10kW, most residential) an external disconnect is recommended but not required. 75% · utility DG manual
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Tier-dependent per OUC (the utility, not the City): for Tier 1 (≤10kW AC, essentially all residential rooftop PV), an external AC disconnect near the meter is RECOMMENDED but NOT required — if none is installed, OUC will simply pull the meter to isolate the system when needed. For Tier 2/3 (>10kW), a manual, visible load-break disconnect IS required and must be 'located separate from, but adjacent to, the meter base,' visible/accessible to OUC personnel and lockable with a single OUC utility lock. 90% · utility DG manual
    • Must equipment be on a specific approved list? No dedicated discretionary 'approved equipment list' — equipment just needs to meet standard listings: inverters UL 1741 / IEEE 1547-2018 compliant, PV modules/panels UL 1703 and IEEE 1262-1995 (or IEC 61215) compliant. OUC does separately vet non-standard 'meter collar' products through its own review process, but that is a narrow accessory item, not a general equipment approved-list. 80% · utility DG manual
    • Are batteries permitted, and under what conditions? Yes, permitted — the City's Photovoltaic submittal requirements explicitly contemplate battery backup, requiring 'a summary of all standby loads, including power ratings and estimated daily energy consumption for each load to show that inverter and battery selection will meet the standby needs.' No separate battery-specific ordinance or size cap was found; governed by the adopted FBC/NEC (Art. 706) and FFPC (NFPA 1/855 by reference). 80% · department checklist
    • Is there a separate ESS permit or inspection? No standalone ESS permit type — battery/ESS documentation is folded into the same Photovoltaic Electrical Permit submittal and inspection (Electrical Rough + Final); the City's permit-type table lists no separate 'Energy Storage System' permit category. 75% · department checklist
    • Is there a local rule on service upgrades or busbar sizing? Partial — no City-published busbar/service-upgrade rule was found, but OUC's interconnection standard requires the system's Gross Power Rating not exceed 90% of the customer's existing service/transformer rating, with the customer responsible for paying for any needed service upgrade to stay within that threshold; this functions as the operative 'busbar sizing' constraint for a given address. 70% · utility DG manual
    • Is a specific mounting system or attachment spacing required? No prescriptive spacing table published — the City requires attachment/flashing/construction design for the mounting system and supporting frame members to be sealed by a Florida-licensed design professional for the specific wind zone, loading, and site conditions on a case-by-case (performance-based) basis, rather than publishing a fixed spacing standard. 65% · department checklist

20 questions answered against City of Orlando’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2020 NEC — adopted statewide as part of the Florida Building Code, 8th Edition (2023 cycle), effective 31 Dec 2023; the City of Orlando enforces this edition with no separate local electrical code override identified.

Why the confidence is not higherFlorida Building Code Effective Dates notice (official floridabuilding.org publication); City's Solar Plan Review Checklist itself cites the FFPC/NFPA 1 code family for the same 2023 cycle, corroborating the City is on the current statewide edition.

adopting regulation (statewide, city-enforced) checked 2026-09-11 https://www.floridabuilding.org/fbc/Publications/2023_Effective_Dates.pdf

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023), based on the 2021 International Building Code family, effective 31 Dec 2023 — adopted statewide and enforced by the City of Orlando.

Why the confidence is not higherOfficial Florida Building Code Effective Dates publication.

adopting regulation (statewide, city-enforced) checked 2026-09-11 https://www.floridabuilding.org/fbc/Publications/2023_Effective_Dates.pdf

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023), based on NFPA 1 (2021) with Florida-specific amendments, effective 31 Dec 2023. The City's own Solar Plan Review Checklist directly cites 'FFPC NFPA 1' for PV disconnect identification, confirming City enforcement of this edition.

Why the confidence is not higherFlorida State Fire Marshal's Florida Fire Prevention Code page; corroborated by the City's own Solar Plan Review Checklist citation of 'FFPC NFPA 1, Sec. 11.1.9.3.1.'

adopting regulation (statewide, city-enforced) + city checklist checked 2026-09-11 https://myfloridacfo.com/division/sfm/bfp/florida-fire-prevention-code

Q32 Are there local amendments to any of the above? Core Code editions in force

Partial yes — I found a local land-use-level amendment (the Historic Preservation Board's 'solar must not be visible to the street' design standard for historic districts, and the CRA Architectural Review Board approval for commercial solar) layered on top of the statewide codes, but no distinct LOCAL TECHNICAL amendment to the NEC/FBC/FFPC electrical, structural, or fire provisions themselves was found in the sources checked (Municode's Chapter 13 Building Code and Chapter 22 Electrical Code pages returned 403 Forbidden and could not be directly verified for amendment language).

Why the confidence is not higherHistoric Preservation review sheet (confirmed local overlay); Municode 403 blocked direct verification of Ch. 13/22 technical-amendment text, so the 'no technical amendments' half of this answer is not independently confirmed — treat as partial.

inference from available department documents checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/1/departments/edv/city-planning/historic-preservation/historic-preservation-review-sheet-24.pdf

Q33 What is the installation judged against? Core Electrical

The Florida Building Code 8th Edition (2023, incl. 2020 NEC via reference) and Florida Fire Prevention Code 8th Edition (NFPA 1, 2021), plus — as a condition of grid interconnection rather than of the permit itself — OUC's own standards requiring UL 1741-listed inverters, UL 1703-listed modules/panels, and IEEE 1547-2018 compliance.

Why the confidence is not higherSolar Plan Review Checklist (FBC/FFPC references); OUC Appendix A Interconnection Requirements, Sec. C.1–C.2.

ordinance + utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Partial — no City-published busbar/service-upgrade rule was found, but OUC's interconnection standard requires the system's Gross Power Rating not exceed 90% of the customer's existing service/transformer rating, with the customer responsible for paying for any needed service upgrade to stay within that threshold; this functions as the operative 'busbar sizing' constraint for a given address.

Why the confidence is not higherOUC Appendix A Interconnection Requirements, Sec. B.3(a).

utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No prescriptive spacing table published — the City requires attachment/flashing/construction design for the mounting system and supporting frame members to be sealed by a Florida-licensed design professional for the specific wind zone, loading, and site conditions on a case-by-case (performance-based) basis, rather than publishing a fixed spacing standard.

Why the confidence is not higherSolar Plan Review Checklist, Photovoltaic and Solar Thermal construction-document sections (identical sealed-design-professional language, no numeric spacing given).

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedOrlando Fire Department's own 'Building Construction Fire Permits and Inspections Guide' page (self-extracted HTML; zero mentions of 'solar' or 'photovoltaic' anywhere on the page, confirmed against positive controls for 'fire'/'permit' which each returned multiple hits) and the Solar Plan Review Checklist (which cites FFPC/NFPA 1 only for disconnect MARKING, Sec. 11.1.9.3.1, not for roof-access pathways or ridge setbacks).

https://www.orlando.gov/Public-Safety/OFD/Building-Construction-Fire-Permits-and-Inspections-Guide

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — rapid shutdown is required under NEC Article 690.12 as adopted via the Florida Building Code 8th Edition (2020 NEC), the statewide floor the City enforces.

Why the confidence is not higherFlorida Building Code Effective Dates publication (2020 NEC via FBC 8th Ed.); NEC 690.12 is the rapid-shutdown article in that edition.

adopting regulation checked 2026-09-11 https://www.floridabuilding.org/fbc/Publications/2023_Effective_Dates.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

The City's checklist requires 'required signs' to appear on the submitted electrical diagram and requires the PV disconnecting means to be 'identified per FFPC NFPA 1' — i.e., standard NEC 690/705 disconnect and rapid-shutdown labeling — but the City does not publish its own supplemental placard beyond that code reference.

Why the confidence is not higherSolar Plan Review Checklist, Photovoltaic construction-document section.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No — checked the City's Solar Plan Review Checklist and all three of OUC's current solar-specific PDFs (combined interconnection requirements, contractor sign-up guide, and rooftop solar step-by-step guide); none specify placard WORDING of their own (they reference code sections like 'FFPC NFPA 1' rather than quoting label text). Positive control ('disconnect'/'meter' — multiple hits in each document) and negative control ('zzqqx' — zero hits) confirm the searches were working.

Why the confidence is not higherSelf-extracted text of all four documents (city checklist HTML + 3 OUC PDFs via pdftotext), controls run in the same session.

utility DG manual + city checklist (absence confirmed with controls) checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No — none of the checked documents (City Solar Plan Review Checklist; OUC's combined interconnection requirements, contractor guide, or rooftop solar guide) specify letter height, color, or material for placards, unlike neighboring municipal utilities (e.g., JEA's 6x6in white-on-red spec).

Why the confidence is not higherSame four-document review and controls as q39.

utility DG manual + city checklist (absence confirmed with controls) checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSolar Plan Review Checklist and OUC's three solar PDFs — none describe a facility/site-plan placard beyond the generic NEC 705.10 baseline; no Orlando-specific supplement found.

https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

No — OUC does not publish placard specifications beyond the AHJ's own code references. Checked OUC's combined interconnection requirements (Appendix A), its contractor sign-up guide, its rooftop solar step-by-step guide, and its 2025 Development Services Guide (general electric-service standards) — none contain the words 'placard' or any letter-height/color/material spec; the Development Services Guide doesn't even mention 'solar' or 'photovoltaic' (confirmed with a positive control of 128 hits for 'meter' and a negative control of 0 hits for 'zzqqx' in that document).

Why the confidence is not higherSelf-extracted OUC PDFs with controls run in the same session — this is a genuine, controls-proven absence, notably different from JEA/SECO/TECO which do publish exact wording.

utility's own documents (absence confirmed with controls) checked 2026-09-11 https://www.ouc.com/wp-content/uploads/2025/08/2025_08-Development-Services-Guide.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Per code default rather than a City/utility-specific rule: labels go at each PV disconnecting means/service equipment location per NEC 690/705 and FFPC/NFPA 1. Separately, OUC dictates PLACEMENT of the physical Tier 2/3 disconnect device itself (not a label) — 'located separate from, but adjacent to, the meter base,' visible and accessible to OUC personnel and lockable with a single OUC lock; for Tier 1 (≤10kW, most residential) an external disconnect is recommended but not required.

Why the confidence is not higherOUC Appendix A Interconnection Requirements, Sec. C.7; Solar Plan Review Checklist's generic code-reference for disconnect identification.

utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

No dedicated discretionary 'approved equipment list' — equipment just needs to meet standard listings: inverters UL 1741 / IEEE 1547-2018 compliant, PV modules/panels UL 1703 and IEEE 1262-1995 (or IEC 61215) compliant. OUC does separately vet non-standard 'meter collar' products through its own review process, but that is a narrow accessory item, not a general equipment approved-list.

Why the confidence is not higherOUC Appendix A Interconnection Requirements, Sec. C.1 (listing standards) and Sec. 14–15 (meter collar review process, a distinct narrow item).

utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Yes, permitted — the City's Photovoltaic submittal requirements explicitly contemplate battery backup, requiring 'a summary of all standby loads, including power ratings and estimated daily energy consumption for each load to show that inverter and battery selection will meet the standby needs.' No separate battery-specific ordinance or size cap was found; governed by the adopted FBC/NEC (Art. 706) and FFPC (NFPA 1/855 by reference).

Why the confidence is not higherSolar Plan Review Checklist, Photovoltaic construction-document section, battery-backup line item.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No standalone ESS permit type — battery/ESS documentation is folded into the same Photovoltaic Electrical Permit submittal and inspection (Electrical Rough + Final); the City's permit-type table lists no separate 'Energy Storage System' permit category.

Why the confidence is not higherSolar Plan Review Checklist 'Permit Types by Installation Category' table (Solar Thermal / Photovoltaic / Hybrid / Solar Shingles / Solar Attic Fan only — no ESS row).

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedOrlando zoning code Chapter 58 (Zoning Districts and Uses), Part 5B 'Specific Accessory Uses and Structures' — Municode Library returned HTTP 403 Forbidden on repeated fetches, and the elaws.us mirror (orlando-fl.elaws.us) timed out/failed to load during this session, so the ground-mount-as-structure classification could not be confirmed from primary text.

https://library.municode.com/fl/orlando/codes/code_of_ordinances?nodeId=TITIICICO_CH58ZODIUS

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Tier-dependent per OUC (the utility, not the City): for Tier 1 (≤10kW AC, essentially all residential rooftop PV), an external AC disconnect near the meter is RECOMMENDED but NOT required — if none is installed, OUC will simply pull the meter to isolate the system when needed. For Tier 2/3 (>10kW), a manual, visible load-break disconnect IS required and must be 'located separate from, but adjacent to, the meter base,' visible/accessible to OUC personnel and lockable with a single OUC utility lock.

Why the confidence is not higherOUC Appendix A Interconnection Requirements, Sec. C.7 (External Disconnect Switch), self-extracted with pdftotext.

utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/combined-interconnection-requirements-document.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (myRelayView — enter permit number, 'Schedule Inspection'), text message ('INSPECTION' or 'SCHEDULE' to 866.205.3881), or phone (407.246.4444 automated IVR, press 1 then 1 twice). 90% · department page
    • How much notice is required? Effectively next-business-day, with a specific same-day cutoff: the page states 'the cut-off time for same day inspections is 6 a.m.' No separate multi-day advance-notice requirement is published beyond that cutoff. 75% · department page
    • Are same-day or AM/PM windows offered? Same-day is offered if requested by the 6 a.m. cutoff; the page does not mention AM/PM appointment windows. 72% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the City performs its own Electrical Rough and Final inspections for photovoltaic work; not delegated to the county or a private provider by default. 88% · department checklist
    • If delegated, to whom? N/A — not delegated; the City performs its own final solar inspection (see q52). (A State-law 'Private Provider' alternative-inspection route exists for any Orlando electrical permit if the applicant elects it, per FS 553.791, but that is an applicant choice, not a standing delegation.) 85% · department page / permit form
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Photovoltaic: Electrical – Rough, then Electrical – Final. (For comparison: Solar Thermal = Plumbing Final only; Hybrid = Electrical Rough+Final AND Plumbing Final; Solar Shingles = Building Final AND Electrical Rough+Final; Solar Attic Fan = Building Final only.) 92% · department checklist
    • Is a rough-in or mid-roof inspection required? Yes — an Electrical Rough inspection is required for photovoltaic systems, in addition to the Electrical Final. 92% · department checklist
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • What must be on site at inspection? An approved set of plans (and any revisions), a valid permit and permit card, a copy of the recorded Notice of Commencement (where the job exceeds $5,000), and any engineering documents for the project must be visible/accessible at the job site for inspection. 85% · department page
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? An approved Final inspection closes out the permit — the checklist states 'The permit(s) are considered completed upon receiving an approved final inspection.' No separate Certificate of Occupancy, green tag, or letter is described for a retrofit residential PV installation on an existing dwelling. 78% · department checklist
    • Who notifies the utility for PTO? Installer/customer — OUC requires the contractor or customer to submit the Solar Interconnection Application themselves (through OUC's online portal), including proof of the passed City permit inspection; the City does not notify OUC on the applicant's behalf. 88% · utility DG manual
    • Is there a re-inspection fee? $150 re-inspection fee. (Related: a $50 Inspection Cancellation Fee applies if an inspection is cancelled within 24 hours or less of the scheduled time.) 90% · fee schedule
    • How are corrections issued and cleared? For PLAN corrections: reviewers post comments in ProjectDox; the applicant uploads corrected files under the SAME file name (system auto-appends 'V2'), clouds all revisions, attaches a narrative response on company letterhead, and completes the 'Applicant Resubmit Task'; the cycle repeats until all disciplines approve. A $50 Plan Revision Fee applies from the third submittal onward. The process for clearing FIELD/inspection corrections specifically is not separately documented on the pages checked. 70% · department checklist

14 questions answered against City of Orlando’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (myRelayView — enter permit number, 'Schedule Inspection'), text message ('INSPECTION' or 'SCHEDULE' to 866.205.3881), or phone (407.246.4444 automated IVR, press 1 then 1 twice).

Why the confidence is not higherCity's Schedule-or-Cancel-an-Inspection page (self-extracted HTML).

department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Schedule-or-Cancel-an-Inspection

Q50 How much notice is required? Core Booking & scheduling

Effectively next-business-day, with a specific same-day cutoff: the page states 'the cut-off time for same day inspections is 6 a.m.' No separate multi-day advance-notice requirement is published beyond that cutoff.

Why the confidence is not higherCity's Schedule-or-Cancel-an-Inspection page.

department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Schedule-or-Cancel-an-Inspection

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Same-day is offered if requested by the 6 a.m. cutoff; the page does not mention AM/PM appointment windows.

Why the confidence is not higherCity's Schedule-or-Cancel-an-Inspection page.

department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Schedule-or-Cancel-an-Inspection

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the City performs its own Electrical Rough and Final inspections for photovoltaic work; not delegated to the county or a private provider by default.

Why the confidence is not higherSolar Plan Review Checklist, 'Inspections' section listing Electrical Rough/Final under City-issued permits; no private-provider carve-out mentioned for solar specifically (a separate 'Private Provider' route exists City-wide per the Electrical Permit Application header, but is an applicant option, not a delegation of the AHJ's own inspection default).

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated; the City performs its own final solar inspection (see q52). (A State-law 'Private Provider' alternative-inspection route exists for any Orlando electrical permit if the applicant elects it, per FS 553.791, but that is an applicant choice, not a standing delegation.)

Why the confidence is not higherCity's Electrical Permit Application header ('Projects utilizing Private Provider require submittal and application via our Private Provider application service page.'); Solar Plan Review Checklist inspections table.

department page / permit form checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/2/departments/edv/permitting-services-division/bld/electrical-permit-2024.pdf

Q54 Which inspections are required, and in what order? Core Stages & sequence

Photovoltaic: Electrical – Rough, then Electrical – Final. (For comparison: Solar Thermal = Plumbing Final only; Hybrid = Electrical Rough+Final AND Plumbing Final; Solar Shingles = Building Final AND Electrical Rough+Final; Solar Attic Fan = Building Final only.)

Why the confidence is not higherSolar Plan Review Checklist, 'Inspections' section.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Yes — an Electrical Rough inspection is required for photovoltaic systems, in addition to the Electrical Final.

Why the confidence is not higherSolar Plan Review Checklist, 'Inspections' section: 'Photovoltaic: Electrical - Rough and Final.'

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedSolar Plan Review Checklist and Schedule-or-Cancel-an-Inspection page — neither explicitly states that the field inspector checks labels/listings as part of the Electrical Final; the checklist only requires labels to be shown on the submitted DESIGN documents, which is a plan-review item, not a documented field-inspection practice.

https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedSearched for a dedicated field-inspection checklist distinct from the Solar Plan Review Checklist (which is primarily a submittal/plan-review document that also lists required inspection stages by name); no separate inspector-facing checklist document was found published on orlando.gov.

https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q58 What must be on site at inspection? Core Documents on site

An approved set of plans (and any revisions), a valid permit and permit card, a copy of the recorded Notice of Commencement (where the job exceeds $5,000), and any engineering documents for the project must be visible/accessible at the job site for inspection.

Why the confidence is not higherCity's Schedule-or-Cancel-an-Inspection page.

department page checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Schedule-or-Cancel-an-Inspection

Q59 Is there a re-inspection fee? Corrections & re-inspection

$150 re-inspection fee. (Related: a $50 Inspection Cancellation Fee applies if an inspection is cancelled within 24 hours or less of the scheduled time.)

Why the confidence is not higherCity fee schedule, ELE section: 'Re-inspection Fee $150' and 'Inspection Cancelation Fee $50.'

fee schedule checked 2026-09-11 https://www.orlando.gov/files/sharedassets/public/v/3/departments/edv/permitting-services-division/bld/fee-schedule-residential-development-05.22.23.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

For PLAN corrections: reviewers post comments in ProjectDox; the applicant uploads corrected files under the SAME file name (system auto-appends 'V2'), clouds all revisions, attaches a narrative response on company letterhead, and completes the 'Applicant Resubmit Task'; the cycle repeats until all disciplines approve. A $50 Plan Revision Fee applies from the third submittal onward. The process for clearing FIELD/inspection corrections specifically is not separately documented on the pages checked.

Why the confidence is not higherSolar Plan Review Checklist, 'Revisions' section; City fee schedule, Plan Revision Fee line.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q61 What is issued on pass? Core Final sign-off & PTO

An approved Final inspection closes out the permit — the checklist states 'The permit(s) are considered completed upon receiving an approved final inspection.' No separate Certificate of Occupancy, green tag, or letter is described for a retrofit residential PV installation on an existing dwelling.

Why the confidence is not higherSolar Plan Review Checklist, 'Inspections' section closing note.

department checklist checked 2026-09-11 https://www.orlando.gov/Building-Development/Permits-Inspections/Get-a-Permit/Permitting-Checklists/Solar-Plan-Review-Checklist

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/customer — OUC requires the contractor or customer to submit the Solar Interconnection Application themselves (through OUC's online portal), including proof of the passed City permit inspection; the City does not notify OUC on the applicant's behalf.

Why the confidence is not higherOUC 'Step-by-Step to Installing Solar' guide, Step 3 ('Submit Solar Interconnection Application' — contractor submits) and Required Documents list (includes proof of passed City inspection).

utility DG manual checked 2026-09-11 https://ouc.com/wp-content/uploads/2025/04/OUC-RooftopSolar04_07_25.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 85%

No — checked the City's Solar Plan Review Checklist and all three of OUC's current solar-specific PDFs (combined interconnection requirements, contractor sign-up guide, and rooftop solar step-by-step guide); none specify placard WORDING of their own (they reference code sections like 'FFPC NFPA 1' rather than quoting label text). Positive control ('disconnect'/'meter' — multiple hits in each document) and negative control ('zzqqx' — zero hits) confirm the searches were working.

Size, colour & material 85%

No — none of the checked documents (City Solar Plan Review Checklist; OUC's combined interconnection requirements, contractor guide, or rooftop solar guide) specify letter height, color, or material for placards, unlike neighboring municipal utilities (e.g., JEA's 6x6in white-on-red spec).

Where they go 75%

Per code default rather than a City/utility-specific rule: labels go at each PV disconnecting means/service equipment location per NEC 690/705 and FFPC/NFPA 1. Separately, OUC dictates PLACEMENT of the physical Tier 2/3 disconnect device itself (not a label) — 'located separate from, but adjacent to, the meter base,' visible and accessible to OUC personnel and lockable with a single OUC lock; for Tier 1 (≤10kW, most residential) an external disconnect is recommended but not required.

What the utility wants on top 85%

No — OUC does not publish placard specifications beyond the AHJ's own code references. Checked OUC's combined interconnection requirements (Appendix A), its contractor sign-up guide, its rooftop solar step-by-step guide, and its 2025 Development Services Guide (general electric-service standards) — none contain the words 'placard' or any letter-height/color/material spec; the Development Services Guide doesn't even mention 'solar' or 'photovoltaic' (confirmed with a positive control of 128 hits for 'meter' and a negative control of 0 hits for 'zzqqx' in that document).

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.