City of Pembroke Pines is a city authority in the State of Florida, serving 171,178 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Pembroke Pines against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Pembroke Pines is the authority having jurisdiction 88% confidence
Holds
Building and Electrical (plus in-house Fire plan review) for residential rooftop PV. The City is a self-permitting municipality; Broward County's Building Code Services only serves the unincorporated Broward Municipal Services District plus the airport, not incorporated cities like Pembroke Pines.
Overridden by
Broward County's Board of Rules and Appeals (BORA) amends and formally interprets the Florida Building Code/Fire Prevention Code countywide (currently 8th Edition, 2023) in ways binding on Pembroke Pines' Building Official — most importantly a countywide 'Uniform Permit Submittal Matrix for Solar Thermal and Solar Electric Installations in the HVHZ' that sets structural-PE-stamp, electrical-PE/FSEC-certification, and HVHZ product-approval requirements, plus Formal Interpretation FI-31 exempting rooftop PV from the general rooftop-equipment clearance rule (FBC 1522.3). Separately, FPL (the investor-owned utility, confirmed via the City's own water/sewer-only Utilities Division page) controls interconnection and Permission-to-Operate and independently requires its own manual disconnect switch (or a location plaque) at the meter under Florida PSC Rule 25-6.065, F.A.C. — the City's own permit approval does not authorize grid interconnection.
Why not higher
Building Department's mission page states it enforces 'Florida Statutes, the Florida Building Code, Broward County ordinances, City of Pembroke Pines ordinances'; the City publishes and operates its own Solar Panel/Voltaic Permit Checklist and EnerGov 'Development Hub' portal rather than routing through the county. One caution flagged for the record: the Building Department's plan reviewers and inspectors carry @cgasolutions.com email addresses, meaning day-to-day staffing of the department is contracted to CGA Solutions (a private building-department staffing firm) — similar in spirit to the Alameda-CDA/PWA correction pattern, this is a staffing detail, not a delegation of AHJ status, since permits are still issued and finaled under the City's own name and portal.

https://www.ppines.com/164/Building-Department

Permit required
Yes, a permit is required for residential rooftop PV95%
Permit cost
Valuation-based, not flat: minimum $124.42 for construction cost up to $2,500, then 3.79% of construction cost from $2,500 up to $1,000,000 (Sec.85%
Plan review
Not published as a fixed day-count for the City's own standard review. The only stated clock is in the Private-Provider alternate-review SOP: a 10-business-day review clock (or 5 business…55%
Portal
Development Hub — a Tyler Technologies EnerGov self-service portal at pembrokepinesfl-energovweb.tylerhost.net, live since April 4, 202295%
Electrical code
NEC 2020 (NFPA 70, 2020), as adopted via the Florida Building Code 8th Edition (2023), Chapter 2780%
Own placard wording
No — no evidence the City or Broward BORA specifies its own custom placard wording distinct from the NEC baseline65%
Booking an inspection
Portal (Development Hub account) or Phone — both offered; phone is (954) 435-650290%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes, a permit is required for residential rooftop PV Q3 Electrical and building permits — Either — the Electrical application is the primary vehicle for rooftop PV, with a Building application added 'if applicable' (e.g., Q4 Plan review — Not published as a fixed day-count for the City's own standard review. The only stated clock is in the Private-Provider alternate-review SOP: a 10-business-day… Q18 Where you file — Development Hub — a Tyler Technologies EnerGov self-service portal at pembrokepinesfl-energovweb.tylerhost.net, live since April 4, 2022 Q20

Permit required
Yes, a permit is required for residential rooftop PV95% source
What it costs
Valuation-based, not flat: minimum $124.42 for construction cost up to $2,500, then 3.79% of construction cost from $2,500 up to $1,000,000 (Sec.85% source
Plan review turnaround
Not published as a fixed day-count for the City's own standard review. The only stated clock is in the Private-Provider alternate-review SOP: a 10-business-day review clock (or 5 business days if the…55% source
Key document
published permit checklist, revised 02/19/2026 cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes — City of Pembroke Pines Building Department is the AHJ for residential solar 95% · department page
    • What does this authority permit itself, and what does it delegate? Both — Building and Electrical (plus in-house Fire plan review); not delegated to the county 90% · published permit checklist
    • Is a permit required for a residential rooftop PV system? Yes, a permit is required for residential rooftop PV 95% · published permit checklist
    • Is there a separate electrical permit, or is it combined? Either — the Electrical application is the primary vehicle for rooftop PV, with a Building application added 'if applicable' (e.g., structural attachment/racking work) 80% · published permit checklist
    • Is a HOA or architectural approval required first? No — HOA approval is not a precondition. Only a Homeowners Association Affidavit of Awareness must be submitted, and it is explicitly required 'even if you do not belong to an Association' — i.e., it's a disclosure affidavit, not an approval gate. 88% · published permit checklist
    • Is there a historic-district review? No — no evidence of a historic-district review process for Pembroke Pines was found 55% · City site search results
    • Is a wind or windstorm certification required? No dedicated 'windstorm certification' process (Texas TDI-style) exists in Florida. Wind-load compliance for rooftop PV is instead demonstrated through the PE/RA-sealed structural calculations required by the BORA Uniform Permit Submittal Matrix (ASCE 7-22 wind loads per FBC 1605/1620/1621), which is mandatory at every job. 65% · Broward County BORA countywide guideline
    • Is a Specific Use Permit or Council approval ever required? No evidence that a residential rooftop PV permit requires Specific Use Permit or Commission approval — the Fee Schedule's Zoning review fees (Sec. XIV) are flat administrative fees ($89.86 residential accessory / $138.24 residential new construction), consistent with staff-level administrative zoning sign-off rather than a discretionary Council item 60% · published fee schedule, adopted 10/1/2025
    • Is there a system-size cap on residential generation? No city-specific kW cap found. At the state/utility level, Florida PSC Rule 25-6.065, F.A.C. (Net Metering, implemented by FPL) defines Tier 1 as systems ≤10 kW AC (the category nearly all residential rooftop systems fall into), Tier 2 as >10–100 kW, and Tier 3 as >100 kW–2 MW, which is the outer ceiling for net-metered customer-owned generation on FPL's system. 70% · Florida PSC rule / order (statewide, implemented by FPL)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either — a licensed contractor (qualifier with license number) or the property owner as Owner-Builder 75% · issued permit application form (rev. 3-9-2026)
    • Must the contractor be registered with this authority before applying? Yes — a contractor must register/verify credentials with the City (state or Broward County license, GL insurance, Workers' Comp) before permits will be processed 85% · department page
    • Is a homeowner permitted to self-install and self-permit? Yes — Owner-Builder self-permitting is available 80% · issued permit application form (rev. 3-9-2026)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Required Permitting Documents: Broward County Uniform Permit Electrical Application (rev. 01/08/2026), Building Application if applicable, signed and sealed drawings, Special Inspector Form (for plan review, if applicable), Homeowners Association Affidavit of Awareness (mandatory even with no HOA), Notice of Commencement if job value > $5,000. Required Plan Review: Building, Electrical, Fire. Additional: PV System Rapid Shutdown Affidavit (required prior to Final Inspection, if applicable), Special Inspector Report. 92% · published permit checklist, revised 02/19/2026
    • How many copies, and in what format? #2 sets of plans required for in-person submittal; for online submittal, all trade plans must be digitally signed/sealed and uploaded as one combined PDF per trade (Structural/Mechanical/Electrical/Plumbing each in one file) at the time of initial submission — the portal closes after submission and will not accept added documents mid-review 88% · published permit checklist + department page
    • Is a site plan required, and what must it show? Not itemized specifically for rooftop PV beyond 'signed and sealed drawings' in the Solar checklist. For a ground-mounted array, the City's closest analog (Accessory Structures checklist) requires a 'Property Survey showing Setbacks and Location.' No dedicated 'what a site plan must show' list for solar was published. 60% · published permit checklist (accessory structures)
    • Is a one-line / three-line diagram required? Yes — an electrical diagram is required, showing component interconnections, conductor types/sizes, conduit types/sizes, disconnects, and the point of interconnection 88% · Broward County BORA countywide guideline
    • Are string and conductor calculations required? Yes — conductor type/size documentation is required as part of the electrical diagram 80% · Broward County BORA countywide guideline
    • Is a structural PE stamp required, and at what threshold? Yes, at every size — no minimum threshold. Signed and sealed structural drawings and design calculations by a licensed Florida PE or Registered Architect are required for roof-mounted PV panel structural design (wind loads, framing uplift/lateral forces, connection design, dead-load accommodation) under FBC Building 1522.2, 1616.1.2, 1605, 1620.1-3, 1621. 88% · Broward County BORA countywide guideline
    • Is an electrical PE stamp required, and at what threshold? Yes, at every size. Photovoltaic system plans must be signed and sealed by a Florida Professional Engineer, OR certified by the Florida Solar Energy Center (FSEC), which then issues a signed/sealed System Certification Approval Form (F.S. 471.025; F.S. 377.705(4)(d)). 85% · Broward County BORA countywide guideline
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Development Hub — a Tyler Technologies EnerGov self-service portal at pembrokepinesfl-energovweb.tylerhost.net, live since April 4, 2022 95% · department page
    • Can the whole application be completed online? Yes — the whole application (including plan uploads, corrections, inspection scheduling, and viewing approved/issued documents) can be completed through the Development Hub online 85% · department page
    • What does a residential solar permit cost? Valuation-based, not flat: minimum $124.42 for construction cost up to $2,500, then 3.79% of construction cost from $2,500 up to $1,000,000 (Sec. 150.16), plus required state/county add-ons: Board of Rules & Appeals fee $0.52 per $1,000 of construction cost, DCA Homeowner Recovery Fund 1.5% of permit fee (min $2), DBPR Building Code Admin & Inspectors Fund 1.0% of permit fee (min $2). A residential rooftop-PV submittal deposit of $100 (accessory) may apply at intake. 85% · published fee schedule, adopted 10/1/2025
    • How is the fee calculated? Valuation (percentage of stated construction cost) 90% · published fee schedule, adopted 10/1/2025
    • Is there a separate plan-check fee? No separate stand-alone plan-check fee for a standard first-submittal — plan review is bundled into the single valuation-based permit fee. A distinct review fee only appears for post-issuance deferred/sub-permit submittals (Sec. 150.16, via the Sub-Permits Cover Sheet). 70% · published fee schedule, adopted 10/1/2025
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Not published as a fixed day-count for the City's own standard review. The only stated clock is in the Private-Provider alternate-review SOP: a 10-business-day review clock (or 5 business days if the application is for a single- or two-family dwelling), which under F.S. 553.791(8)(b) does not start until required outside agencies (Engineering, Fire, Planning/Zoning) have returned their approvals. 55% · City SOP referencing F.S. 553.791(8)(b)
    • How long is an issued permit valid before it expires? Not explicitly published by the City as a fixed number of days. The Fee Schedule implies a de facto ~90-day informal marker (renewal of an expired permit is 50% of the fee if renewed within 90 days, 100% if later), which is consistent with (but does not restate) the statewide FBC default of 180 days of inactivity before expiration (FBC 105.4.1). 55% · published fee schedule, adopted 10/1/2025
    • Which utility handles interconnection here? Florida Power & Light (FPL) 85% · City utilities department page (confirms no municipal electric utility)
    • Where does the utility sit in the sequence? After permit / Parallel-but-independent — the City permits, inspects and finals the installation on its own timeline; FPL's interconnection agreement and net-metering/PTO process is a separate application the customer/installer submits to FPL and is not a precondition the City enforces before issuing a building/electrical permit 65% · utility interconnection agreement (Tier 1)

28 questions answered against City of Pembroke Pines’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes — City of Pembroke Pines Building Department is the AHJ for residential solar

Why the confidence is not higherBuilding Department's own mission page states it 'enforces Florida Statutes, the Florida Building Code, Broward County ordinances, City of Pembroke Pines ordinances' and the City issues its own Solar Panel/Voltaic Permit Checklist and operates its own EnerGov permit portal ('Development Hub'), confirming Pembroke Pines self-permits rather than routing through Broward County's Building Code Services (which serves only the unincorporated Broward Municipal Services District, not incorporated cities).

department page checked 2026-09-11 https://www.ppines.com/164/Building-Department

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both — Building and Electrical (plus in-house Fire plan review); not delegated to the county

Why the confidence is not higherThe Solar Panel/Voltaic Permit Checklist lists 'Required Plan Review: Building, Electrical, Fire' all performed by the City's own reviewers/inspectors. Note: the Building Department's plan reviewers and inspectors carry @cgasolutions.com email addresses (CGA Solutions is a private staffing/consulting firm) — the City contracts OUT THE STAFFING of its Building Department, but the City itself remains the AHJ of record; permits are issued through the City's own EnerGov portal, not delegated to any outside agency.

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes, a permit is required for residential rooftop PV

Why the confidence is not higherThe City publishes a dedicated 'Solar Panel / Voltaic Permit Checklist' with a required application, plan review by Building/Electrical/Fire, and a Rapid Shutdown Affidavit prior to final inspection — this is a positive, direct statement of a permit requirement, not an absence claim.

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Either — the Electrical application is the primary vehicle for rooftop PV, with a Building application added 'if applicable' (e.g., structural attachment/racking work)

Why the confidence is not higherChecklist requires 'Broward County Uniform Permit Electrical Application' as the lead document and 'Building Application, if applicable' as conditional — the City's single Uniform Building Permit Application form has a 'Select One Trade: Building / Electrical / Plumbing / Mechanical' checkbox, so the same form serves either trade or both under one permit number.

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either — a licensed contractor (qualifier with license number) or the property owner as Owner-Builder

Why the confidence is not higherThe Broward County Uniform Building Permit Application (the same form used for the Electrical trade per the solar checklist) has a 'Qualifier's Name: ___ Owner-Builder ___ License Number' field, i.e. owner-builder is a built-in option on the actual form used for solar permits. Confidence is not higher because this is the general application form, not solar-specific guidance, and Florida's owner-builder electrical exemption (F.S. 489.103(7)) was not independently verified against this specific system type.

issued permit application form (rev. 3-9-2026) checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26410/Broward-County-Uniform-Building-Permit-Application-3-9-2026

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — a contractor must register/verify credentials with the City (state or Broward County license, GL insurance, Workers' Comp) before permits will be processed

Why the confidence is not higher'Apply For a Building Permit' page: 'If you are a contractor registering to do work in the city or updating your State or Broward County license, General Liability Insurance, or Workers' Compensation Insurance, please submit those documents ... to the Building Department.' The City's inspection-scheduling page separately lists 'License or insurance updates required' as a reason an inspection cannot be scheduled, confirming registration is a gating step.

department page checked 2026-09-11 https://www.ppines.com/1827/Apply-For-a-Building-Permit

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes — Owner-Builder self-permitting is available

Why the confidence is not higherThe Broward County Uniform Building Permit Application (used for the Electrical trade permit under the solar checklist) has a dedicated Owner-Builder checkbox in the Qualifier field. Confidence held below 90 because no solar-specific city statement addresses owner-builder installation of PV.

issued permit application form (rev. 3-9-2026) checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26410/Broward-County-Uniform-Building-Permit-Application-3-9-2026

Q8 What documents make up a complete submittal? Core Submittal package

Required Permitting Documents: Broward County Uniform Permit Electrical Application (rev. 01/08/2026), Building Application if applicable, signed and sealed drawings, Special Inspector Form (for plan review, if applicable), Homeowners Association Affidavit of Awareness (mandatory even with no HOA), Notice of Commencement if job value > $5,000. Required Plan Review: Building, Electrical, Fire. Additional: PV System Rapid Shutdown Affidavit (required prior to Final Inspection, if applicable), Special Inspector Report.

Why the confidence is not higherVerbatim from the City's current Solar Panel/Voltaic Permit Checklist, revised 02/19/2026 per the footer stamp on the PDF itself (not inferred from the URL/filename).

published permit checklist, revised 02/19/2026 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q9 How many copies, and in what format? Submittal package

#2 sets of plans required for in-person submittal; for online submittal, all trade plans must be digitally signed/sealed and uploaded as one combined PDF per trade (Structural/Mechanical/Electrical/Plumbing each in one file) at the time of initial submission — the portal closes after submission and will not accept added documents mid-review

Why the confidence is not higherSolar checklist header states '#2 Sets of Plans required.' The Apply-For-a-Permit page separately spells out the online-submittal format rules ('Construction plans must be digitally signed/sealed and uploaded by trade in separate PDF files... all sheets in one PDF file') and the in-person rule ('Two (2) sets of construction plans (Office Copy & Job Copy)... must be physically signed and sealed').

published permit checklist + department page checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q10 Is a site plan required, and what must it show? Core Submittal package

Not itemized specifically for rooftop PV beyond 'signed and sealed drawings' in the Solar checklist. For a ground-mounted array, the City's closest analog (Accessory Structures checklist) requires a 'Property Survey showing Setbacks and Location.' No dedicated 'what a site plan must show' list for solar was published.

Why the confidence is not higherThe Solar Panel/Voltaic Permit Checklist does not have a separate site-plan line item (only 'signed and sealed drawings' + Building Application if applicable); the Accessory Structures Permit Checklist — the closest published analog for a freestanding structure — requires a signed survey showing setbacks. Confidence is capped because no document explicitly ties the survey requirement to a ground-mounted PV array.

published permit checklist (accessory structures) checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26290/Accessory-Structures-Permit-Checklist

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — an electrical diagram is required, showing component interconnections, conductor types/sizes, conduit types/sizes, disconnects, and the point of interconnection

Why the confidence is not higherBroward County Board of Rules and Appeals 'Uniform Permit Submittal Matrix for Solar Thermal and Solar Electric Installations in the HVHZ, FBC 8th Edition (2023)' — a countywide document binding on all Broward building officials including Pembroke Pines — lists under System Components: 'Electrical Diagram — Submit an electrical diagram including components interconnects, conductor types and sizes, conduit types and sizes, disconnects, and point of interconnection' citing NEC Art. 690 and 705.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q12 Are string and conductor calculations required? Drawings & calculations

Yes — conductor type/size documentation is required as part of the electrical diagram

Why the confidence is not higherSame BORA Uniform Permit Submittal Matrix entry as Q11 explicitly requires 'conductor types and sizes' in the submitted electrical diagram.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Yes, at every size — no minimum threshold. Signed and sealed structural drawings and design calculations by a licensed Florida PE or Registered Architect are required for roof-mounted PV panel structural design (wind loads, framing uplift/lateral forces, connection design, dead-load accommodation) under FBC Building 1522.2, 1616.1.2, 1605, 1620.1-3, 1621.

Why the confidence is not higherDirectly stated in the BORA Uniform Permit Submittal Matrix's 'Structural Design' row, which cites the specific FBC Building sections and requires PE/RA-sealed calculations for every rooftop PV/solar thermal installation regardless of size.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Yes, at every size. Photovoltaic system plans must be signed and sealed by a Florida Professional Engineer, OR certified by the Florida Solar Energy Center (FSEC), which then issues a signed/sealed System Certification Approval Form (F.S. 471.025; F.S. 377.705(4)(d)).

Why the confidence is not higherDirectly stated in the BORA Uniform Permit Submittal Matrix, 'System Components' row for 'Photovoltaic System.' This is an unusual and specific finding — most jurisdictions require only structural PE stamps, not an electrical PE/FSEC certification — so it is worth double-checking against a live BORA staff confirmation before treating as certain across all Broward cities.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q15 What does a residential solar permit cost? Core Fees

Valuation-based, not flat: minimum $124.42 for construction cost up to $2,500, then 3.79% of construction cost from $2,500 up to $1,000,000 (Sec. 150.16), plus required state/county add-ons: Board of Rules & Appeals fee $0.52 per $1,000 of construction cost, DCA Homeowner Recovery Fund 1.5% of permit fee (min $2), DBPR Building Code Admin & Inspectors Fund 1.0% of permit fee (min $2). A residential rooftop-PV submittal deposit of $100 (accessory) may apply at intake.

Why the confidence is not higherBuilding Department Fee Schedule adopted October 1, 2025 (current cycle), Sections I, II and IV. The schedule does not carry a separate solar/PV-specific line — it uses the general valuation formula, so an actual solar permit fee will vary with the contractor's stated job value.

published fee schedule, adopted 10/1/2025 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26445/Building-Department-Fee-Schedule-2025

Q16 How is the fee calculated? Core Fees

Valuation (percentage of stated construction cost)

Why the confidence is not higherFee Schedule Section II.B: 'The Building Permit Fee shall be based upon the cost of construction as attested to by the applicant' with tiered percentage rates; no per-kW or per-panel line exists for solar.

published fee schedule, adopted 10/1/2025 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26445/Building-Department-Fee-Schedule-2025

Q17 Is there a separate plan-check fee? Fees

No separate stand-alone plan-check fee for a standard first-submittal — plan review is bundled into the single valuation-based permit fee. A distinct review fee only appears for post-issuance deferred/sub-permit submittals (Sec. 150.16, via the Sub-Permits Cover Sheet).

Why the confidence is not higherThe Fee Schedule's Sections I–III contain a single valuation-based fee with no separate 'plan review' line; the Sub-Permits Cover Sheet (used only for deferred submittals to an already-approved permit) is the only document that describes plan-review fees as a distinct collectible item.

published fee schedule, adopted 10/1/2025 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26445/Building-Department-Fee-Schedule-2025

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Not published as a fixed day-count for the City's own standard review. The only stated clock is in the Private-Provider alternate-review SOP: a 10-business-day review clock (or 5 business days if the application is for a single- or two-family dwelling), which under F.S. 553.791(8)(b) does not start until required outside agencies (Engineering, Fire, Planning/Zoning) have returned their approvals.

Why the confidence is not higher'Private Provider Permitting Guidelines' (S.O.P. for Alternative Plan Review, rev. 07/21/26) states the 10/5-business-day clock explicitly, but this document governs the alternate private-provider track under F.S. 553.791, not the City's own standard (non-private-provider) review — no separate turnaround commitment for standard review was found on the Building Department's own pages.

City SOP referencing F.S. 553.791(8)(b) checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/27310/Private-Provider-Permitting-Guidelines

Q19 How long is an issued permit valid before it expires? Timeline & validity

Not explicitly published by the City as a fixed number of days. The Fee Schedule implies a de facto ~90-day informal marker (renewal of an expired permit is 50% of the fee if renewed within 90 days, 100% if later), which is consistent with (but does not restate) the statewide FBC default of 180 days of inactivity before expiration (FBC 105.4.1).

Why the confidence is not higherNo City document states a permit validity period in days; the 90-day renewal-fee threshold in the Fee Schedule (Sec. V.E/F) is the only numeric marker found. Per the brief's caution, HB 803's 1-year floor (F.S. 125.56(4)(d)) is textually limited to COUNTY-issued permits and was not applied here since Pembroke Pines is a self-permitting city, not the county.

published fee schedule, adopted 10/1/2025 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26445/Building-Department-Fee-Schedule-2025

Q20 Which permit portal does this authority use? Core Portal & process

Development Hub — a Tyler Technologies EnerGov self-service portal at pembrokepinesfl-energovweb.tylerhost.net, live since April 4, 2022

Why the confidence is not higher'Apply For a Building Permit' page: 'Our new permitting software, Energov, went live on April 4, 2022. You can access through the Pembroke Pines Development HUB' with a direct link to the tylerhost.net EnerGov self-service application assistant.

department page checked 2026-09-11 https://www.ppines.com/1827/Apply-For-a-Building-Permit

Q21 Can the whole application be completed online? Core Portal & process

Yes — the whole application (including plan uploads, corrections, inspection scheduling, and viewing approved/issued documents) can be completed through the Development Hub online

Why the confidence is not higherApply-For-a-Permit page describes a full 'Online Permit Submittal' path including initial submittal, correction submittal, and download of approved documents entirely through the Development Hub; physical in-person submittal is offered as an alternative, not a requirement.

department page checked 2026-09-11 https://www.ppines.com/1827/Apply-For-a-Building-Permit

Q22 Which utility handles interconnection here? Core Utility interconnection

Florida Power & Light (FPL)

Why the confidence is not higherThe City's own Utilities Division page (Chapter 50, water/sewer rate tables, backflow, water quality reports) shows Pembroke Pines' municipal utility covers WATER AND SEWER ONLY — there is no municipal electric utility. FPL is the investor-owned utility serving essentially all of Broward County including Pembroke Pines. This was checked against the City's own utility-scope page rather than taken from PowerToChoose, per this project's utility-verification rule.

City utilities department page (confirms no municipal electric utility) checked 2026-09-11 https://www.ppines.com/461/utilities-division

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit / Parallel-but-independent — the City permits, inspects and finals the installation on its own timeline; FPL's interconnection agreement and net-metering/PTO process is a separate application the customer/installer submits to FPL and is not a precondition the City enforces before issuing a building/electrical permit

Why the confidence is not higherInferred from FPL's Net Metering interconnection agreements (Tier 1/2/3), which frame interconnection as a customer-FPL contractual process distinct from municipal permitting, and from the City's solar checklist, which contains no FPL-approval prerequisite for permit issuance. No single document states the sequence explicitly, hence moderate confidence.

utility interconnection agreement (Tier 1) checked 2026-09-11 https://web.archive.org/web/20260711082052/https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — HOA approval is not a precondition. Only a Homeowners Association Affidavit of Awareness must be submitted, and it is explicitly required 'even if you do not belong to an Association' — i.e., it's a disclosure affidavit, not an approval gate.

Why the confidence is not higherVerbatim requirement on the Solar Panel/Voltaic Permit Checklist: 'Homeowners Association Affidavit of Awareness. IMPORTANT: Must be submitted even if you do not belong to an Association.'

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q25 Is there a historic-district review? Overlays & special cases

No — no evidence of a historic-district review process for Pembroke Pines was found

Why the confidence is not higherSearched the City's own site search (1,291 results) for 'historic district' and found only generic National Historic Preservation Act boilerplate in an unrelated environmental review document, with no dedicated historic-preservation board, ordinance or district page for Pembroke Pines (a city incorporated in 1960, built out mostly after 1970). Confidence held at 55 because this is a site-search absence, not a direct read of the zoning code's overlay-district list.

City site search results checked 2026-09-11 https://www.ppines.com/Search/Results?searchPhrase=historic%20district

Q26 Is a wind or windstorm certification required? Overlays & special cases

No dedicated 'windstorm certification' process (Texas TDI-style) exists in Florida. Wind-load compliance for rooftop PV is instead demonstrated through the PE/RA-sealed structural calculations required by the BORA Uniform Permit Submittal Matrix (ASCE 7-22 wind loads per FBC 1605/1620/1621), which is mandatory at every job.

Why the confidence is not higherNo Pembroke Pines or Broward BORA document uses the term 'wind certification'; the closest analog is the mandatory sealed wind-load structural package described in Q13's source, plus BORA Formal Interpretation FI-24's wind-pressure charts (a retrofit-openings interpretation, not solar-specific, included only as evidence Broward's wind-compliance route is PE-sealed calculations/charts rather than a separate certificate).

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No evidence that a residential rooftop PV permit requires Specific Use Permit or Commission approval — the Fee Schedule's Zoning review fees (Sec. XIV) are flat administrative fees ($89.86 residential accessory / $138.24 residential new construction), consistent with staff-level administrative zoning sign-off rather than a discretionary Council item

Why the confidence is not higherInferred from the Fee Schedule's Zoning Building Permit Review Fee structure, which prices zoning review as a flat administrative fee under Sec. 155.800(B)(13) with no SUP/Council-hearing fee line for residential solar; the City's zoning code itself was not directly opened to confirm the absence of any SUP trigger.

published fee schedule, adopted 10/1/2025 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26445/Building-Department-Fee-Schedule-2025

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No city-specific kW cap found. At the state/utility level, Florida PSC Rule 25-6.065, F.A.C. (Net Metering, implemented by FPL) defines Tier 1 as systems ≤10 kW AC (the category nearly all residential rooftop systems fall into), Tier 2 as >10–100 kW, and Tier 3 as >100 kW–2 MW, which is the outer ceiling for net-metered customer-owned generation on FPL's system.

Why the confidence is not higherFlorida PSC Order No. PSC-08-0161-FOF-EI adopting Rule 25-6.065, F.A.C., sections defining Tier 1/2/3 thresholds up to a 2 MW net-metering ceiling. This is a state PSC/utility-level answer, not a Pembroke Pines zoning cap — no city ordinance imposing its own residential system-size limit was found.

Florida PSC rule / order (statewide, implemented by FPL) checked 2026-09-11 https://web.archive.org/web/20241126225532/https://www.fpl.com/clean-energy/pdf/net-metering-rule.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    • What ridge setback and access pathways are required? No ridge-setback or fire-access-pathway rule was found for rooftop PV in Broward/Pembroke Pines documents. In fact, BORA Formal Interpretation FI-31 explicitly states the opposite of a setback: the general Rooftop Clearance Requirements for Permanently Mounted Equipment (FBC 1522.3, 1522.3.1) are 'not intended to be applied to rooftop-mounted photovoltaic panels and solar thermal installations.' 75% · Broward County BORA Formal Interpretation #31 (within current index, downloaded live)
  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes — rapid shutdown is required. The City's Solar Panel/Voltaic Permit Checklist requires a 'PV System Rapid Shutdown Affidavit' prior to Final Inspection. The governing edition is NEC 2020 Art. 690.12, as adopted via FBC 8th Edition (2023) Ch. 27. 85% · published permit checklist
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Adjacent to (but separate from) the meter socket — FPL requires the customer to install, at the customer's expense, a manual disconnect switch of the visible load-break type 'mounted separate from, but adjacent to, the FPL meter socket,' readily accessible to FPL and lockable in the open position 90% · utility interconnection agreement (Tier 1, confirmed current via matching content digest)
    • Must equipment be on a specific approved list? Yes — HVHZ-qualified product approval (a Florida Product Approval evaluated for HVHZ, or a Miami-Dade NOA) is required for PV racking/BIPV systems under FBC 1512.2.1 and 1512.3 75% · Broward County BORA countywide guideline
    • Is a ground mount treated as a structure? Likely yes, by inference — no dedicated ground-mount PV checklist exists; the closest published analog (Accessory Structures Permit Checklist) requires Building/Zoning/Engineering plan review, a signed property survey showing setbacks, and an HOA affidavit, consistent with treating a freestanding array as an accessory structure 60% · published permit checklist (accessory structures) — inference, no PV-specific ground-mount document exists
    • Is there a local rule on service upgrades or busbar sizing? No Pembroke Pines/Broward-specific local rule on service-upgrade sizing or busbar rating was found beyond requiring a Service Riser Diagram and Load Calculations on the Electrical Service/Panel Change checklist. Absent a local amendment, the statewide-adopted NEC 705.12(B) 120% rule (2020 edition, via FBC Ch. 27) governs. 60% · published permit checklist
    • Is a specific mounting system or attachment spacing required? No fixed attachment-spacing number specified locally; instead, connection design for wind uplift and lateral forces must be individually engineered and PE/RA-sealed per FBC 1620.1-1620.3 and 1621, per project 70% · Broward County BORA countywide guideline

20 questions answered against City of Pembroke Pines’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020 (NFPA 70, 2020), as adopted via the Florida Building Code 8th Edition (2023), Chapter 27

Why the confidence is not higherBroward BORA Formal Interpretation FI-35 ('Modification of NFPA 70, 2020, Section 555.5 and 555.9, Marina Voltages') explicitly identifies 'NFPA 70, 2020' as the electrical code volume within the FBC 8th Edition (2023) currently in force countywide, confirmed still current via a Jan 2025-dated FI-24 that still cites the '8th Edition (2023).' Confidence not higher because no direct FBC Chapter 27 adoption clause text was independently opened.

Broward County BORA Formal Interpretations index (current, downloaded live) checked 2026-09-11 https://www.browardcdn.org/api/public/content/c756fd30ac2b45daa56bef35f20fda74?v=75c14cfd

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023), effective December 31, 2023 — still current as of the check date

Why the confidence is not higherHeader of Broward County BORA's own current 'Florida Building Code, 8th Edition Formal Interpretations (2023)' index states 'Effective Date: December 31, 2023,' and a Jan. 9, 2025-dated interpretation within the same compilation (FI-24) still references the '8th Edition (2023),' confirming no newer edition had superseded it as of that date. A 9th Edition (2026) update process was found in progress at the Florida Building Commission (2024 model-code review cycle) but no effective date for it was located, so it was not assumed to be in force yet.

Broward County BORA Formal Interpretations index (current, downloaded live) checked 2026-09-11 https://www.browardcdn.org/api/public/content/c756fd30ac2b45daa56bef35f20fda74?v=75c14cfd

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023)

Why the confidence is not higherSame BORA Formal Interpretations index header: 'Florida Fire Prevention Code, 8th Edition Formal Interpretations (2023).' The specific underlying NFPA 1/101 edition numbers referenced by the 8th-Edition Fire Prevention Code were not independently confirmed.

Broward County BORA Formal Interpretations index (current, downloaded live) checked 2026-09-11 https://www.browardcdn.org/api/public/content/c756fd30ac2b45daa56bef35f20fda74?v=75c14cfd

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — Broward County's Board of Rules and Appeals (BORA) issues countywide technical amendments and formal interpretations to the FBC/Fire code that bind every Broward building official, including Pembroke Pines' Building Official

Why the confidence is not higherBORA publishes 'FBC (2023) Building Technical Amendments, 8th Edition,' 'Residential Technical Amendments,' 'Mechanical' and 'Plumbing' Technical Amendments, plus a running series of Formal Interpretations (FI-1 through FI-39+) that are binding countywide and are directed to 'All Building Officials.' Note: the Building/Residential Technical Amendments documents themselves, when opened, contain NO solar/PV-specific amendment (only pool-electrical GFCI language) — the local PV-specific rules instead live in the separate Uniform Permit Submittal Matrix and Formal Interpretations FI-4/FI-31 (see Q34-36).

Broward County BORA countywide technical amendments checked 2026-09-11 https://www.browardcdn.org/api/public/content/9fab064d9d7f47f5829dfc5be0f57d91?v=ba7f22e9

Q33 What is the installation judged against? Core Electrical

Florida Building Code 8th Edition (2023) — Building, Residential and Existing Building volumes — plus NEC 2020 (Ch. 27), Broward County's countywide BORA technical amendments and Formal Interpretations (notably FI-4 and FI-31, both solar-specific), and BORA's 'Uniform Permit Submittal Matrix for Solar Thermal and Solar Electric Installations in the HVHZ'

Why the confidence is not higherComposite of Q29-32 and Q11-14 sources; the Submittal Matrix is the single most solar-specific standard the installation is judged against in Broward.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No Pembroke Pines/Broward-specific local rule on service-upgrade sizing or busbar rating was found beyond requiring a Service Riser Diagram and Load Calculations on the Electrical Service/Panel Change checklist. Absent a local amendment, the statewide-adopted NEC 705.12(B) 120% rule (2020 edition, via FBC Ch. 27) governs.

Why the confidence is not higherChecked both the City's Electrical Service/Panel Change Permit Checklist (requires only Riser Diagram + Load Calcs, no busbar-specific line) and BORA's Building/Residential Technical Amendments PDFs (positive control 'electrical' hits present in both, confirming the search worked; no busbar/service-upgrade content found in either) — a genuine, controlled absence of a LOCAL amendment on this point.

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26300/Electrical-ServicePanel-Change-Permit-Checklist

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No fixed attachment-spacing number specified locally; instead, connection design for wind uplift and lateral forces must be individually engineered and PE/RA-sealed per FBC 1620.1-1620.3 and 1621, per project

Why the confidence is not higherBORA Uniform Permit Submittal Matrix, Structural Design row: 'Design of connections for the wind loads' and 'Documentation/verification structural supports will accommodate additional dead loads' — a performance requirement (engineered per site), not a prescriptive spacing table.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

No ridge-setback or fire-access-pathway rule was found for rooftop PV in Broward/Pembroke Pines documents. In fact, BORA Formal Interpretation FI-31 explicitly states the opposite of a setback: the general Rooftop Clearance Requirements for Permanently Mounted Equipment (FBC 1522.3, 1522.3.1) are 'not intended to be applied to rooftop-mounted photovoltaic panels and solar thermal installations.'

Why the confidence is not higherFI-31, Broward County BORA, effective Dec. 31, 2023, read in full from the current Formal Interpretations index — a direct, on-point exemption rather than an inference. No separate fire-code ridge-setback/pathway provision for PV was found in the Fire Prevention Code technical amendments checked.

Broward County BORA Formal Interpretation #31 (within current index, downloaded live) checked 2026-09-11 https://www.browardcdn.org/api/public/content/c756fd30ac2b45daa56bef35f20fda74?v=75c14cfd

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes — rapid shutdown is required. The City's Solar Panel/Voltaic Permit Checklist requires a 'PV System Rapid Shutdown Affidavit' prior to Final Inspection. The governing edition is NEC 2020 Art. 690.12, as adopted via FBC 8th Edition (2023) Ch. 27.

Why the confidence is not higherChecklist line item is explicit about the affidavit requirement; the NEC 2020 edition attribution follows from Q29's sourcing (BORA FI-35's 'NFPA 70, 2020' citation) rather than a direct citation of Art. 690.12 itself.

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

No Pembroke Pines- or Broward-specific placard beyond the NEC 2020-baseline labels (e.g., Art. 690/705 disconnect and multiple-power-source markings) was found; conditionally, FPL requires its own location-indicating plaque at the meter (see Q42/43).

Why the confidence is not higherNeither the Solar Panel/Voltaic Permit Checklist, the BORA Uniform Submittal Matrix, nor the Formal Interpretations index specify a placard beyond referencing NEC Art. 690/705 generally; no city-specific placard document was located.

published permit checklist (absence checked against the checklist, BORA matrix, and formal interpretations) checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No — no evidence the City or Broward BORA specifies its own custom placard wording distinct from the NEC baseline

Why the confidence is not higherChecked the Solar Panel/Voltaic Permit Checklist, the BORA Uniform Permit Submittal Matrix, and the current BORA Formal Interpretations index (39 entries) for placard-wording language — none exists; FI-37 (the number flagged as a possible placard interpretation) is actually titled 'Exhaust Openings' and has no solar content, settling that this specific rumor is false for the 8th Edition cycle.

Broward County BORA Formal Interpretations index (current, downloaded live) — confirms FI-37 is NOT about solar disconnect placards checked 2026-09-11 https://www.browardcdn.org/api/public/content/c756fd30ac2b45daa56bef35f20fda74?v=75c14cfd

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No — no city/county-specified letter height, colour, or material for solar placards/labels was found

Why the confidence is not higherSame absence as Q39: none of the Pembroke Pines or BORA documents reviewed specify placard letter height/colour/material; the default would be whatever the NEC 2020 label sections (e.g., 690.56/705.10) require, none of which were locally elaborated on.

published permit checklist (absence checked against the checklist, BORA matrix, and formal interpretations) checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedChecked the Solar Panel/Voltaic Permit Checklist (26291), the BORA Uniform Permit Submittal Matrix, and the BORA Formal Interpretations index (39 entries) for any facility-map/site-plan placard requirement beyond the NEC 705.10 baseline (multiple sources of power placard) — none of the three documents elaborates on what a 705.10-style facility map must show locally.

https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes — FPL requires its own manual disconnect switch adjacent to the meter socket for every net-metering tier (1, 2, and 3), and where the switch cannot practically be adjacent to the meter, FPL requires 'a permanent weather-proof plaque adjacent to FPL's meter socket indicating the location of the manual disconnect switch'

Why the confidence is not higherFPL's own Tier 1 and Tier 3 Interconnection Agreements (Section 5, identical language across tiers) — downloaded and cross-checked: the live Wayback capture of Tier 1 (11 Jul 2026) carries the identical content digest as the 2022 capture, confirming this text is still current, and Tier 3's most recent distinct-content capture (18 Jan 2025) contains the same plaque clause.

utility interconnection agreement (Tier 1, confirmed current via matching content digest) checked 2026-09-11 https://web.archive.org/web/20260711082052/https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

At/adjacent to the FPL meter socket — FPL requires the manual (external AC) disconnect switch to be 'mounted separate from, but adjacent to, the FPL meter socket,' readily accessible and lockable in the open position; if not adjacent, a location-indicating plaque must be placed at the meter socket instead

Why the confidence is not higherSame FPL interconnection agreement source as Q42. No Pembroke-Pines-specific overlay on label placement beyond the NEC's own default placement rules (main service equipment) was found.

utility interconnection agreement (Tier 1, confirmed current via matching content digest) checked 2026-09-11 https://web.archive.org/web/20260711082052/https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes — HVHZ-qualified product approval (a Florida Product Approval evaluated for HVHZ, or a Miami-Dade NOA) is required for PV racking/BIPV systems under FBC 1512.2.1 and 1512.3

Why the confidence is not higherBORA Uniform Permit Submittal Matrix, 'Roof Design' row for Building Integrated Photovoltaic (BIPV): 'Submit a Uniform HVHZ Permit Application' citing FBCB 1512.3 and 1512.2.1 (Product Approval). Confidence not higher because the matrix does not spell out, in so many words, 'Miami-Dade NOA acceptable' vs. 'statewide approval insufficient' — that HVHZ-vs-statewide distinction is drawn from the general HVHZ rule for Broward/Miami-Dade rather than from PV-specific text.

Broward County BORA countywide guideline checked 2026-09-11 https://www.browardcdn.org/api/public/content/b45674b3605b4b60be3d0d2c72aa9362?v=215a9e75

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedChecked the Solar Panel/Voltaic Permit Checklist, the Generator Permit Checklist, and the BORA Building/Residential Technical Amendments PDFs for battery/ESS-specific permitting language — none of the four documents mentions batteries or Energy Storage Systems at all.

https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSame documents as Q45 checked for a separate ESS permit/inspection type — none found. Statewide, the Florida Fire Prevention Code 8th Edition (2023) would carry an NFPA 855 reference for ESS, but this was not independently confirmed from a Broward/Pembroke Pines source within this run.

https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q47 Is a ground mount treated as a structure? Core Ground mount

Likely yes, by inference — no dedicated ground-mount PV checklist exists; the closest published analog (Accessory Structures Permit Checklist) requires Building/Zoning/Engineering plan review, a signed property survey showing setbacks, and an HOA affidavit, consistent with treating a freestanding array as an accessory structure

Why the confidence is not higherThe City publishes checklists for rooftop solar (26291) and generic Accessory Structures (26290) but no separate 'ground-mount solar' checklist; the inference that a ground-mount array is processed like other freestanding accessory structures is reasonable but not directly stated for PV specifically.

published permit checklist (accessory structures) — inference, no PV-specific ground-mount document exists checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26290/Accessory-Structures-Permit-Checklist

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Adjacent to (but separate from) the meter socket — FPL requires the customer to install, at the customer's expense, a manual disconnect switch of the visible load-break type 'mounted separate from, but adjacent to, the FPL meter socket,' readily accessible to FPL and lockable in the open position

Why the confidence is not higherFPL Tier 1/2/3 Interconnection Agreements, Section 5 (identical language, confirmed current via matching content digest against a July 2026 Wayback capture).

utility interconnection agreement (Tier 1, confirmed current via matching content digest) checked 2026-09-11 https://web.archive.org/web/20260711082052/https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (Development Hub account) or Phone — both offered; phone is (954) 435-6502 90% · department page
    • How much notice is required? Effectively less than 1 business day — requests submitted before 3:00 PM are scheduled for the next business day; after 3:00 PM, for the following business day (and after 3:00 PM Thursday, for Tuesday, since the department is closed Fri/weekends on a 4-day M-Th week) 90% · department page
    • Are same-day or AM/PM windows offered? No AM/PM choice is offered at booking; instead, a same-day estimated arrival window becomes available online or by phone after 8:00 AM on the day of the scheduled inspection, and inspection routes/timeframes may shift before that time 85% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the City's own Building Department performs its final solar inspection in-house (though its inspectors/reviewers are staffed under a contract with CGA Solutions, a private firm; the City remains the AHJ of record) 85% · department page (staff directory)
    • If delegated, to whom? N/A — not delegated to an outside AHJ. Inspections are performed by the City's own Building Department, whose day-to-day staffing (reviewers/inspectors) is contracted to CGA Solutions, a private building-department staffing firm, but permits remain issued and finaled in the City's name via its own EnerGov portal 80% · department page (staff directory)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for City of Pembroke Pines on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No — not published online as a standalone document; the inspection checklist exists only on the physical permit card issued at permit approval ('For Inspection List, please see back of Permit Card') 75% · published permit checklist
    • What must be on site at inspection? A printed copy of the permit card and the approved plans must be kept on-site and available at the time of inspection (for both online-approved and in-person-approved permits) 85% · department page
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (final inspection approval / permit closed) — not a Certificate of Occupancy. The Solar checklist frames the endpoint as 'Final Inspection' (with the Rapid Shutdown Affidavit due prior to Final); the City's CO/Close-Out Document checklist — which requires elevation certificates, termite certification, water/sewer certification, etc. — governs new construction and full building projects, not a PV retrofit permit on an existing single-family dwelling. 70% · published permit checklist, cross-checked against the CO/Close-Out checklist scope
    • Who notifies the utility for PTO? Installer/customer — FPL's net-metering interconnection process is a separate application the customer or their installer submits directly to FPL; FPL performs its own review and grants Permission to Operate independently of the City's building-permit finalization 65% · utility interconnection agreement (Tier 1)
    • Is there a re-inspection fee? $121.29 for partial approval/1st disapproval of a mandatory inspection; $181.94 (1.5x) for the 2nd disapproval; $363.88 (3x) for the 3rd and subsequent disapprovals 92% · published fee schedule, adopted 10/1/2025
    • How are corrections issued and cleared? The inspector documents deficiencies at the failed inspection; the applicant/contractor must correct the work and schedule a re-inspection (subject to the escalating re-inspection fees in Q59). After a 3rd failed review cycle (online or in-person), a hold is placed on the permit and a mandatory meeting with the Building Department and the Contractor Qualifier is required before the process can continue. 85% · department page

14 questions answered against City of Pembroke Pines’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (Development Hub account) or Phone — both offered; phone is (954) 435-6502

Why the confidence is not higherBuilding Department Inspections page: 'Inspections can be scheduled using any of the following options: By Phone ... Through the City Website ... Through your Development Hub Account.'

department page checked 2026-09-11 https://www.ppines.com/951/Inspections

Q50 How much notice is required? Core Booking & scheduling

Effectively less than 1 business day — requests submitted before 3:00 PM are scheduled for the next business day; after 3:00 PM, for the following business day (and after 3:00 PM Thursday, for Tuesday, since the department is closed Fri/weekends on a 4-day M-Th week)

Why the confidence is not higherVerbatim from the Inspections page's Step 3 scheduling-deadline rules. Department hours are Monday-Thursday 7:00 AM-6:00 PM.

department page checked 2026-09-11 https://www.ppines.com/951/Inspections

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No AM/PM choice is offered at booking; instead, a same-day estimated arrival window becomes available online or by phone after 8:00 AM on the day of the scheduled inspection, and inspection routes/timeframes may shift before that time

Why the confidence is not higherInspections page: 'Inspection timeframes are available on the morning of your scheduled inspection after 8:00 AM... Inspection routes are finalized at 8:00 AM each day.'

department page checked 2026-09-11 https://www.ppines.com/951/Inspections

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the City's own Building Department performs its final solar inspection in-house (though its inspectors/reviewers are staffed under a contract with CGA Solutions, a private firm; the City remains the AHJ of record)

Why the confidence is not higherInspections page lists named inspectors under 'ELECTRICAL CHIEF, REVIEWER AND INSPECTORS' and 'STRUCTURAL CHIEF, REVIEWER AND INSPECTORS' with @cgasolutions.com emails and direct phone numbers, operating under the Pembroke Pines Building Department's own inspection-scheduling process — not routed to Broward County or any outside jurisdiction.

department page (staff directory) checked 2026-09-11 https://www.ppines.com/951/Inspections

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated to an outside AHJ. Inspections are performed by the City's own Building Department, whose day-to-day staffing (reviewers/inspectors) is contracted to CGA Solutions, a private building-department staffing firm, but permits remain issued and finaled in the City's name via its own EnerGov portal

Why the confidence is not higherSame source as Q52 — the @cgasolutions.com staff directory sits entirely within the City's own Inspections page under the City's own department structure, distinguishing this from a true jurisdictional delegation (e.g., to Broward County).

department page (staff directory) checked 2026-09-11 https://www.ppines.com/951/Inspections

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedSolar checklist explicitly defers the inspection sequence to 'the back of your Permit Card,' which is not published online; the Information & Forms page (26+ documents reviewed) contains no separate published inspection-sequence document for solar.

https://www.ppines.com/1665/Information-Forms

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedNo City document states whether a rough-in or mid-roof inspection is required specifically for rooftop PV; the Inspections page describes general scheduling/booking mechanics but not a stage-by-stage list for any specific permit type.

https://www.ppines.com/951/Inspections

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNo City document states whether the field inspector specifically verifies equipment labels/listings during a solar final inspection; the Inspections page describes the booking/correction process but not what is checked at the inspection itself.

https://www.ppines.com/951/Inspections

Q57 Is there a published inspection checklist? Core What is checked

No — not published online as a standalone document; the inspection checklist exists only on the physical permit card issued at permit approval ('For Inspection List, please see back of Permit Card')

Why the confidence is not higherSolar Panel/Voltaic Permit Checklist's own text under 'Additional Documents' directs applicants to the back of the physical permit card for the inspection list, and no separate published inspection-sequence document was found on the Information & Forms page.

published permit checklist checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q58 What must be on site at inspection? Core Documents on site

A printed copy of the permit card and the approved plans must be kept on-site and available at the time of inspection (for both online-approved and in-person-approved permits)

Why the confidence is not higher'Apply For a Building Permit' page: 'A printed copy of the permit card and approved plans must be kept on-site and available at the time of inspection' — stated for both Online and In-Person approved-permit tracks.

department page checked 2026-09-11 https://www.ppines.com/1827/Apply-For-a-Building-Permit

Q59 Is there a re-inspection fee? Corrections & re-inspection

$121.29 for partial approval/1st disapproval of a mandatory inspection; $181.94 (1.5x) for the 2nd disapproval; $363.88 (3x) for the 3rd and subsequent disapprovals

Why the confidence is not higherBuilding Department Fee Schedule, Section VI 'Re-Inspection Fees,' adopted 10/1/2025.

published fee schedule, adopted 10/1/2025 checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26445/Building-Department-Fee-Schedule-2025

Q60 How are corrections issued and cleared? Corrections & re-inspection

The inspector documents deficiencies at the failed inspection; the applicant/contractor must correct the work and schedule a re-inspection (subject to the escalating re-inspection fees in Q59). After a 3rd failed review cycle (online or in-person), a hold is placed on the permit and a mandatory meeting with the Building Department and the Contractor Qualifier is required before the process can continue.

Why the confidence is not higherCombination of the Inspections page ('If an inspection fails, the inspector will provide notes identifying the corrections that must be made... a re-inspection must be scheduled') and the Apply-For-a-Permit page's '3rd Failed Review Cycle' section describing the mandatory meeting requirement.

department page checked 2026-09-11 https://www.ppines.com/951/Inspections

Q61 What is issued on pass? Core Final sign-off & PTO

Final (final inspection approval / permit closed) — not a Certificate of Occupancy. The Solar checklist frames the endpoint as 'Final Inspection' (with the Rapid Shutdown Affidavit due prior to Final); the City's CO/Close-Out Document checklist — which requires elevation certificates, termite certification, water/sewer certification, etc. — governs new construction and full building projects, not a PV retrofit permit on an existing single-family dwelling.

Why the confidence is not higherSolar checklist's own wording ('Required prior to Final Inspection') versus the CO/Close-Out checklist's scope (explicitly 'For ALL OCCUPANCIES' new-construction-style closeout items like FEMA elevation certificates and termite treatment, none of which apply to a rooftop PV retrofit).

published permit checklist, cross-checked against the CO/Close-Out checklist scope checked 2026-09-11 https://www.ppines.com/DocumentCenter/View/26291/Solar-Panel-Permit-Checklist

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/customer — FPL's net-metering interconnection process is a separate application the customer or their installer submits directly to FPL; FPL performs its own review and grants Permission to Operate independently of the City's building-permit finalization

Why the confidence is not higherInferred from FPL's Tier 1/2/3 Interconnection Agreements, which are framed throughout as a direct FPL-customer contractual relationship with no reference to the municipality submitting or triggering the interconnection request. No single Pembroke Pines or FPL document states in as many words 'the installer notifies FPL for PTO,' hence moderate confidence.

utility interconnection agreement (Tier 1) checked 2026-09-11 https://web.archive.org/web/20260711082052/https://www.fpl.com/content/dam/fplgp/us/en/clean-energy/net-metering/pdfs/net-metering-tier1.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 65%

No — no evidence the City or Broward BORA specifies its own custom placard wording distinct from the NEC baseline

Size, colour & material 60%

No — no city/county-specified letter height, colour, or material for solar placards/labels was found

Where they go 70%

At/adjacent to the FPL meter socket — FPL requires the manual (external AC) disconnect switch to be 'mounted separate from, but adjacent to, the FPL meter socket,' readily accessible and lockable in the open position; if not adjacent, a location-indicating plaque must be placed at the meter socket instead

What the utility wants on top 85%

Yes — FPL requires its own manual disconnect switch adjacent to the meter socket for every net-metering tier (1, 2, and 3), and where the switch cannot practically be adjacent to the meter, FPL requires 'a permanent weather-proof plaque adjacent to FPL's meter socket indicating the location of the manual disconnect switch'

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Required placards
Welcome to The Building Department! | Pembroke Pines, FL - Official Website Skip to Main Content Create a Website Account - Manage notification subscriptions, save form progress and more. Website Sign In Search Home City Departments The Building Department Welcome to The Building Department! Mission of the Pembroke Pines Building Department Our Mission The mission of the Pembroke Pines Building De
Separate roof inspection
A building permit is an official approval issued by the City that allows you or your contractor to begin construction, renovation, or improvement work on a property in Pembroke Pines. Building permits help ensure that all work complies with: Florida Building Code Local zoning regulations Safety stan
Reinspection fee
Issue Type Responsible Staff What They Handle Customer Should Contact This Role When... Permit status / application received Permit Technician Application intake, routing, missing documents, basic per
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.