City of Temple Terrace

Hillsborough County · Florida ← All authorities

City of Temple Terrace

Hillsborough County

Verified Aug. 5, 2026

City of Temple Terrace is a city authority in the State of Florida, serving 26,690 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Temple Terrace against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Temple Terrace is the authority having jurisdiction 90% confidence
Holds
Both building and electrical, in-house, not delegated to Hillsborough County. The City's own Building and Permitting page states the Building & Permitting Department 'provides permitting, inspection services, zoning reviews, construction and site plan reviews, contractor registration, and private provider registration' for the community, and the Community Development Building Division issues a separate Electric Permit Application distinct from the Building Permit Application. Fire is held by a wholly separate CITY department — the Temple Terrace Fire Department (own Fire Chief, own Station No. 1, ISO Class 1 rated, CFAI-accredited since 2006) — not county fire rescue, not a special district, and not a city-to-city contract; this is the 'city department' shape of the five seen in this survey. Zoning/Land Development Code review (Planning & Zoning Division) and historic-preservation review (a Historic Preservation Board under LDC Art. XI) also sit inside the same Community Development umbrella. The FS 553.80(7)(b) Building Permit & Inspection Utilization Report for FY ending 9/30/2024 confirms genuine in-house operation: 10 employees, $622,738 in personnel costs, 2,710 permits issued, 7,120 inspections conducted — this is NOT a SAFEbuilt/PDCS-style private-firm operation. It also shows 2,898 of those 7,120 inspections (41%) were 'Inspections by Private Provider' — i.e., substantial use of the FS 553.791 owner-elected private-provider route on individual jobs, not agency-wide outsourcing; the City's own Building Permit Application form lets the applicant choose 'CITY STAFF' or 'PRIVATE PROVIDER' for plan review and/or inspection per job. Contractor licensing is split from permitting: the City's own 'Choosing a Contractor' page directs verification of contractor licenses to both the Temple Terrace Permit Office AND the Hillsborough County Licensing Office (813-635-7308) — a licensing/permitting split, not delegation — and the City separately requires its own Contractor Registration Form before a contractor can pull permits.
Overridden by
FS 471.003(2)(h) sets the statewide electrical PE-stamp exemption at $125,000/600A for licensed contractors; no stricter local amendment was found in Code of Ordinances Ch. 8 (Buildings and Fire Prevention) after Municode searches for 'engineer seal threshold' and related terms, though the full text of Sec. 8-28 (Permits) was not read line-by-line. Tampa Electric Company (TECO)'s own filed Standard Interconnection Agreement for Tier 1 Renewable Generator Systems requires that 'the Customer shall have the completed RGS inspected and approved by the appropriate code authorities having jurisdiction' before the Company will execute the interconnection agreement — i.e., the City's inspection gates energization, the utility does not override the City's authority, it sits downstream of it.
Why not higher
Direct evidence: the City's own Building and Permitting page, Permitting Services page, Electric Permit Application FormCenter form, Building Permit Application FormCenter form, and the FY2024 FS 553.80(7)(b) Utilization Report PDF (extracted with pdftotext, not summarized) all point to the same in-house Community Development Building Division for both trades, with no county involvement anywhere in city-limits material. Fire confirmed as a separate but still City department from the Fire Department's own pages (Fire Station No. 1, own Chief, own budget/ISO rating). Held at 90 rather than higher because I could not fully verify whether the Land Development Code sets any residential system-size cap or ground-mount-as-structure rule (Municode 'solar'/'photovoltaic' searches returned zero results, a genuine absence proven with passing positive ('electrical') and fabricated ('zzqqx') controls on clientId 4604, confirmed via Municode's own Clients API to be Temple Terrace, not a stale ID).

https://www.templeterrace.gov/123/Building-and-Permitting

Permit required
Yes85%
Permit cost
No PV-specific fee line exists. A PV job would be billed under the general Electrical fee schedule: Residential minimum fee $50, 'Renovations' $0.07 per gross sq ft,60%
Portal
Two systems in parallel: Click2GovBP (temp-egov.aspgov.com/Click2GovBP) for permit status lookup, fee payment and inspection scheduling;80%
Electrical code
NEC 2020, effective 31 Dec 2023 (statewide floor) — the City does not name a year itself70%
Booking an inspection
By phone (24/7 request line) or online78%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Separate Q4 Where you file — Two systems in parallel: Click2GovBP (temp-egov.aspgov.com/Click2GovBP) for permit status lookup, fee payment and inspection scheduling; Q20

Permit required
Yes85% source
What it costs
No PV-specific fee line exists. A PV job would be billed under the general Electrical fee schedule: Residential minimum fee $50, 'Renovations' $0.07 per gross sq ft,60% source
Key document
City permit application form + codified ordinance (Sec. 12-829) cited by 3 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes — the City of Temple Terrace Building and Permitting Division (Community Development) is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV 90% · department page
    • What does this authority permit itself, and what does it delegate? The City permits and inspects both building and electrical itself, in-house (confirmed by its own FY2024 utilization report: 10 employees, $622,738 personnel cost). It delegates nothing to Hillsborough County. It DOES let an individual applicant elect FS 553.791 private-provider plan review and/or inspection per job (41% of FY2024 inspections were by private provider) and requires county-issued contractor licensing be verified separately from city permitting. 85% · FS 553.80(7)(b) utilization report
    • Is a permit required for a residential rooftop PV system? Yes 85% · City exemption request form
    • Is there a separate electrical permit, or is it combined? Separate 90% · City permit application form
    • Is a HOA or architectural approval required first? No — the City does not condition permit issuance on HOA/architectural approval, but every FormCenter permit application requires the applicant to initial a 'NOTICE OF DEED RESTRICTIONS' clause acknowledging deed restrictions may be more restrictive than City regulations and that compliance is the applicant's responsibility 75% · City permit application form
    • Is there a historic-district review? Yes, potentially — the LDC (Ch. 12, Art. XI, 'Historic Preservation') establishes a Historic Preservation Board and requires a Certificate of Appropriateness (Sec. 12-1161) for changes to landmarks, landmark sites, or property within a designated historic district. No PV-specific carve-out or exemption from COA review was found, so an installation on a locally designated historic property would likely need COA review; ordinary residential parcels outside any designated district would not. 65% · codified Land Development Code, Art. XI
    • Is a wind or windstorm certification required? Not published as a distinct 'wind/windstorm certification' — Hillsborough County is NOT in the HVHZ (Miami-Dade/Broward only), so standard statewide Florida Product Approval governs. The Required Submittals matrix lists 'FL PRODUCT APPROVAL NUMBERS' as required for most permit types but has no PV/racking-specific column. 58% · City requirements table
    • Is a Specific Use Permit or Council approval ever required? No evidence found that rooftop residential PV triggers a Special/Conditional Use Permit or Council approval — the LDC's conditional-use process (Sec. 12-259) exists generally, but zero Municode hits for 'solar' or 'photovoltaic' (with passing positive/fabricated controls) means no PV-specific SUP trigger is codified. 55% · Municode search (absence, controls passed)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor — the Electric Permit Application requires 'Qualifier/License Holder Name' and 'State License Number' as required (*) fields under Contractor Information, with no homeowner-only path on that form 75% · City permit application form
    • Must the contractor be registered with this authority before applying? Yes — the City publishes its own 'Contractor Registration Form' (FormCenter, Community-Development-6, Form 80) separate from state licensure and the county's Certificate of Competency 62% · City registration form
    • Is a homeowner permitted to self-install and self-permit? Unclear — no Temple Terrace-specific Owner-Builder Affidavit form was found on the Applications and Forms page (unlike neighboring Ocoee, which publishes one), and the Electric Permit Application's State License Number field is marked required with no visible owner-exception option. Florida's statewide owner-builder exemption (FS 489.103/489.503) exists independent of any city form and may still apply. 42% · City forms page (absence)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    Nothing recorded for City of Temple Terrace on this step yet — 7 questions checked and found unpublished. The guidance above is general.

  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Two systems in parallel: Click2GovBP (temp-egov.aspgov.com/Click2GovBP) for permit status lookup, fee payment and inspection scheduling; and CivicPlus FormCenter web forms (templeterrace.gov/FormCenter/...) for submitting the permit applications themselves, which the City also accepts by email for over-the-counter trades including electrical. 80% · portal landing page + department page
    • Can the whole application be completed online? Partially — the application itself is submitted via a FormCenter web form or email (not a unified online intake-to-issuance workflow), but once a permit number exists, status checks, fee payment, and inspection scheduling/results can all be completed online through Click2GovBP. 68% · department page
    • What does a residential solar permit cost? No PV-specific fee line exists. A PV job would be billed under the general Electrical fee schedule: Residential minimum fee $50, 'Renovations' $0.07 per gross sq ft, or 'Service Upgrade' $100 flat if a service change is involved — plus the Building side if racking/structural work triggers a building permit (Residential 'Renovations and Remodels' $0.26/gross sq ft, minimum $75). Processing fee $8.50/permit, 1% Certification Maintenance Fee (min $2), 1.5% FBC Administrators/Inspectors surcharge (min $2). 60% · City fee schedule
    • How is the fee calculated? Mixed — Electrical fees are mostly per-gross-square-foot or flat-fee by work type (not generally valuation-based), while Building fees for anything not on the specific list are computed 'using the valuation schedule.' A PV job with no clear square-footage basis would likely fall to the Building side's valuation schedule or the Electrical 'Service Upgrade'/minimum-fee flat rates. 55% · City fee schedule
    • Is there a separate plan-check fee? A 1% 'Certification Maintenance Fee' (minimum $2/permit) and a 1.5% Building Code Administrators and Inspectors Fund surcharge (minimum $2/permit) apply on top of the base permit fee to every permit; these read as statutory pass-throughs (FS 468.631) rather than a discretionary plan-review fee, and no separate residential plan-review line was found. 55% · City fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • Which utility handles interconnection here? Tampa Electric Company (TECO) 88% · City permit application form + codified ordinance (Sec. 12-829)
    • Where does the utility sit in the sequence? After permit, before energization — TECO's own filed Standard Interconnection Agreement for Tier 1 Renewable Generator Systems (Sheet No. 8.1005, ¶4) requires: 'The Customer shall have the completed RGS inspected and approved by the appropriate code authorities having jurisdiction. The Customer shall provide proof of this inspection and approval to the Company' before the Company will execute the agreement and allow parallel operation. 90% · utility's own filed tariff (Standard Interconnection Agreement)

28 questions answered against City of Temple Terrace’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes — the City of Temple Terrace Building and Permitting Division (Community Development) is the AHJ for residential building and electrical permitting inside city limits, including rooftop PV

Why the confidence is not higherDepartment page states its function is regulation of building construction through permitting and inspection for the community; both Building and Electric Permit Applications are the City's own FormCenter forms; no county involvement found anywhere in city-limits material.

department page checked 2026-09-12 https://www.templeterrace.gov/123/Building-and-Permitting

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

The City permits and inspects both building and electrical itself, in-house (confirmed by its own FY2024 utilization report: 10 employees, $622,738 personnel cost). It delegates nothing to Hillsborough County. It DOES let an individual applicant elect FS 553.791 private-provider plan review and/or inspection per job (41% of FY2024 inspections were by private provider) and requires county-issued contractor licensing be verified separately from city permitting.

Why the confidence is not higherUtilization report PDF (extracted via pdftotext, not the fetch tool's summary) plus the Building Permit Application's own 'CITY STAFF / PRIVATE PROVIDER' plan-review election field.

FS 553.80(7)(b) utilization report checked 2026-09-12 https://templeterrace.gov/DocumentCenter/View/7313/Building-Permit-and-Inspection-Utilization-Report---Year-End-2024

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherNo PV/solar exemption exists anywhere in the City's material (zero Municode hits for 'solar'/'photovoltaic', controls passing). The City's own HB 803 Permit Exemption Request form (No. CDD-BD-PO-26-EXEMPT-V3, eff. 2026-07-21) makes a project statutorily ineligible for the exemption if the scope 'involve[s] any regulated trade components, including electrical...' — a PV system is inherently electrical work, so it cannot use the exemption and needs a standard permit.

City exemption request form checked 2026-09-12 https://www.templeterrace.gov/DocumentCenter/View/7967/HB-803-Permit-Exemption-Request-Form

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate

Why the confidence is not higherThe City publishes a distinct 'Electric Permit Application' FormCenter form separate from the 'Building Permit Application' form, and both forms state verbatim: 'I understand that a separate permit must be secured for ELECTRICAL, PLUMBING, SIGNS, WELLS, POOLS...'

City permit application form checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Electric-Permit-Application-68

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor — the Electric Permit Application requires 'Qualifier/License Holder Name' and 'State License Number' as required (*) fields under Contractor Information, with no homeowner-only path on that form

Why the confidence is not higherRead directly from the live FormCenter form fields; this is the general electrical permit form, not solar-specific.

City permit application form checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Electric-Permit-Application-68

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — the City publishes its own 'Contractor Registration Form' (FormCenter, Community-Development-6, Form 80) separate from state licensure and the county's Certificate of Competency

Why the confidence is not higherForm exists and is listed among the Building Division's 'Forms, Affidavits, and Downloads'; the Building and Permitting department page also lists 'contractor registration' among its core functions. I could not extract explicit 'must register before applying' policy language from the form itself (dynamic FormCenter page, fields only).

City registration form checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Contractor-Registration-Form-80

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Unclear — no Temple Terrace-specific Owner-Builder Affidavit form was found on the Applications and Forms page (unlike neighboring Ocoee, which publishes one), and the Electric Permit Application's State License Number field is marked required with no visible owner-exception option. Florida's statewide owner-builder exemption (FS 489.103/489.503) exists independent of any city form and may still apply.

Why the confidence is not higherAbsence of a city-specific form is suggestive but not conclusive — I checked the Applications and Forms page document list directly and found no Owner-Builder Affidavit, but could not rule out that it is offered informally at the counter.

City forms page (absence) checked 2026-09-12 https://www.templeterrace.gov/355/Applications-and-Forms

Q8 What documents make up a complete submittal? Core Submittal package

Nothing published by this authority.

Where we lookedRequired Submittals table (all permit-type columns read directly) has no 'Solar/PV' column at all; the Electric Permit Application FormCenter form only offers a free-text 'Detailed Description of Work' and generic document upload, no PV-specific checklist

https://www.templeterrace.gov/699/Required-Submittals

Q9 How many copies, and in what format? Submittal package

Nothing published by this authority.

Where we lookedRequired Submittals table specifies 'HARD COPY + THUMB DRIVE, RES=2 COMM=3' for signed/sealed plans on larger permit-type columns (new construction, additions, etc.), but the Electric Permit Application FormCenter form is a pure web upload with no copy-count language — the two regimes were not reconciled for a simple PV/electrical-alteration permit

https://www.templeterrace.gov/699/Required-Submittals

Q10 Is a site plan required, and what must it show? Core Submittal package

Nothing published by this authority.

Where we lookedRequired Submittals table — 'survey showing proposed work' is required for several permit-type columns but PV/rooftop-retrofit has no column of its own to check against

https://www.templeterrace.gov/699/Required-Submittals

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedElectric Permit Application form fields and Required Submittals table — neither mentions a one-line/riser diagram requirement by name

https://www.templeterrace.gov/FormCenter/Community-Development-6/Electric-Permit-Application-68

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame as q11 — no string/conductor calculation requirement stated anywhere found

https://www.templeterrace.gov/FormCenter/Community-Development-6/Electric-Permit-Application-68

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedMunicode search for 'engineer seal threshold' (Ch. 8 and Ch. 12 hits reviewed) found seal/signature requirements for engineers of record but no explicit dollar threshold; full text of Sec. 8-28 (Permits) was not read end-to-end

https://library.municode.com/search?stateId=9&clientId=4604&searchText=engineer%20seal%20threshold&searchMode=CLIENTMODE&contentTypeId=CODES

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSame search as q13 — no electrical-specific PE-stamp threshold distinct from the structural one was found; FS 471.003(2)(h) state floor used for q13's overridden_by note applies here too but was not independently reproved as a Temple Terrace-specific rule

https://library.municode.com/search?stateId=9&clientId=4604&searchText=engineer%20seal%20threshold&searchMode=CLIENTMODE&contentTypeId=CODES

Q15 What does a residential solar permit cost? Core Fees

No PV-specific fee line exists. A PV job would be billed under the general Electrical fee schedule: Residential minimum fee $50, 'Renovations' $0.07 per gross sq ft, or 'Service Upgrade' $100 flat if a service change is involved — plus the Building side if racking/structural work triggers a building permit (Residential 'Renovations and Remodels' $0.26/gross sq ft, minimum $75). Processing fee $8.50/permit, 1% Certification Maintenance Fee (min $2), 1.5% FBC Administrators/Inspectors surcharge (min $2).

Why the confidence is not higherFee schedule read directly from the City's Code and Land Development Orders page; searched for 'solar'/'photovoltaic' with zero hits (fabricated-control-equivalent absence), so this is inference from the closest general fee categories, not a confirmed PV line.

City fee schedule checked 2026-09-12 https://www.templeterrace.gov/700/Code-and-Development-Orders

Q16 How is the fee calculated? Core Fees

Mixed — Electrical fees are mostly per-gross-square-foot or flat-fee by work type (not generally valuation-based), while Building fees for anything not on the specific list are computed 'using the valuation schedule.' A PV job with no clear square-footage basis would likely fall to the Building side's valuation schedule or the Electrical 'Service Upgrade'/minimum-fee flat rates.

Why the confidence is not higherQuoted from the same fee-schedule page; the referenced 'valuation schedule' percentage table itself was not located as extractable text (may be a separate linked table/graphic).

City fee schedule checked 2026-09-12 https://www.templeterrace.gov/700/Code-and-Development-Orders

Q17 Is there a separate plan-check fee? Fees

A 1% 'Certification Maintenance Fee' (minimum $2/permit) and a 1.5% Building Code Administrators and Inspectors Fund surcharge (minimum $2/permit) apply on top of the base permit fee to every permit; these read as statutory pass-throughs (FS 468.631) rather than a discretionary plan-review fee, and no separate residential plan-review line was found.

Why the confidence is not higherQuoted verbatim from the fee schedule; unlike Ocoee, no explicit 'plan review fee = 1/2 permit fee' clause was found for Temple Terrace.

City fee schedule checked 2026-09-12 https://www.templeterrace.gov/700/Code-and-Development-Orders

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedPermitting Services, Inspections Information, and Code and Development Orders pages (all read in full) — none states a plan-review turnaround time for any permit type, residential or commercial

https://www.templeterrace.gov/273/Permitting-Services

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedPermit fee schedule and Permitting Services page — neither states a permit validity/expiration period; Ch. 8's full construction-code text (where an FBC-adopted-by-reference expiration clause would live) was not read section-by-section on Municode

https://www.templeterrace.gov/584/Building-Permit-Fees-Schedule

Q20 Which permit portal does this authority use? Core Portal & process

Two systems in parallel: Click2GovBP (temp-egov.aspgov.com/Click2GovBP) for permit status lookup, fee payment and inspection scheduling; and CivicPlus FormCenter web forms (templeterrace.gov/FormCenter/...) for submitting the permit applications themselves, which the City also accepts by email for over-the-counter trades including electrical.

Why the confidence is not higherBoth linked directly from the City's own Inspections Information and Permitting Services pages.

portal landing page + department page checked 2026-09-12 https://temp-egov.aspgov.com/Click2GovBP/index.html

Q21 Can the whole application be completed online? Core Portal & process

Partially — the application itself is submitted via a FormCenter web form or email (not a unified online intake-to-issuance workflow), but once a permit number exists, status checks, fee payment, and inspection scheduling/results can all be completed online through Click2GovBP.

Why the confidence is not higherPermitting Services page: 'We will accept permit applications by email... Applications processed by email are those that would typically be issued over-the-counter... Electrical Rewire, Electric Service Rehab/Rebuild, Electric Service Upgrade' are listed as email-track permits; the same page separately touts online status/payment/inspection scheduling — two different systems, not one seamless online application.

department page checked 2026-09-12 https://www.templeterrace.gov/273/Permitting-Services

Q22 Which utility handles interconnection here? Core Utility interconnection

Tampa Electric Company (TECO)

Why the confidence is not higherTwo independent first-party confirmations: (1) the City's own codified Land Development Code, Sec. 12-829 ('Street lights'), states the City pays 'Tampa Electric Company' for city street lighting — a dated, codified reference; (2) the City's own Electric Permit Application FormCenter form has a dedicated field labeled 'TECO Control Number' for every electrical permit, the same tell used to confirm TECO in Plant City. No Table of Franchises exists in Temple Terrace's Code (Municode search for 'franchise' returned only rights-of-way/communications-franchise provisions in Ch. 22 and a Charter franchise-granting power, no dedicated franchise appendix), and searches for 'Florida Power' / FPL in the code returned zero utility-relevant hits, ruling out FPL.

City permit application form + codified ordinance (Sec. 12-829) checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Electric-Permit-Application-68

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit, before energization — TECO's own filed Standard Interconnection Agreement for Tier 1 Renewable Generator Systems (Sheet No. 8.1005, ¶4) requires: 'The Customer shall have the completed RGS inspected and approved by the appropriate code authorities having jurisdiction. The Customer shall provide proof of this inspection and approval to the Company' before the Company will execute the agreement and allow parallel operation.

Why the confidence is not higherQuoted directly from TECO's own filed tariff (Section 8, extracted with pdftotext -layout after a plain fetch returned the same PDF cleanly — no OCR needed), which is authority-specific and outranks the generic PSC Rule 25-6.065 floor used in the Ocoee baseline record.

utility's own filed tariff (Standard Interconnection Agreement) checked 2026-09-12 https://www.tampaelectric.com/49f775/siteassets/files/tariff/tariffsection8.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — the City does not condition permit issuance on HOA/architectural approval, but every FormCenter permit application requires the applicant to initial a 'NOTICE OF DEED RESTRICTIONS' clause acknowledging deed restrictions may be more restrictive than City regulations and that compliance is the applicant's responsibility

Why the confidence is not higherQuoted verbatim from both the Building and Electric Permit Application FormCenter forms; this is a disclaimer, not a submittal requirement — no HOA letter appears among required documents anywhere found.

City permit application form checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Building-Permit-Application-73

Q25 Is there a historic-district review? Overlays & special cases

Yes, potentially — the LDC (Ch. 12, Art. XI, 'Historic Preservation') establishes a Historic Preservation Board and requires a Certificate of Appropriateness (Sec. 12-1161) for changes to landmarks, landmark sites, or property within a designated historic district. No PV-specific carve-out or exemption from COA review was found, so an installation on a locally designated historic property would likely need COA review; ordinary residential parcels outside any designated district would not.

Why the confidence is not higherSections 12-1156 through 12-1165 read directly via Municode search/positive control; I did not confirm the geographic extent of any designated historic district or whether COA review reaches roof-mounted equipment specifically versus only exterior walls/massing.

codified Land Development Code, Art. XI checked 2026-09-12 https://library.municode.com/fl/temple_terrace/codes/code_of_ordinances

Q26 Is a wind or windstorm certification required? Overlays & special cases

Not published as a distinct 'wind/windstorm certification' — Hillsborough County is NOT in the HVHZ (Miami-Dade/Broward only), so standard statewide Florida Product Approval governs. The Required Submittals matrix lists 'FL PRODUCT APPROVAL NUMBERS' as required for most permit types but has no PV/racking-specific column.

Why the confidence is not higherRequired Submittals table read directly from the City's own page; Hillsborough HVHZ status confirmed from the standing Florida baseline (Miami-Dade/Broward only), not re-derived locally this run.

City requirements table checked 2026-09-12 https://www.templeterrace.gov/699/Required-Submittals

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No evidence found that rooftop residential PV triggers a Special/Conditional Use Permit or Council approval — the LDC's conditional-use process (Sec. 12-259) exists generally, but zero Municode hits for 'solar' or 'photovoltaic' (with passing positive/fabricated controls) means no PV-specific SUP trigger is codified.

Why the confidence is not higherAbsence proven with controls, not merely assumed; could not rule out that some other accessory-structure or accessory-use provision (Sec. 12-508) incidentally reaches ground-mount PV.

Municode search (absence, controls passed) checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=4604&searchText=special%20use%20permit&searchMode=CLIENTMODE&contentTypeId=CODES

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedMunicode search for 'photovoltaic' and 'solar' (zero hits, controls passed) and the LDC zoning-district sections generally — no residential generation system-size cap document or ordinance section found

https://library.municode.com/search?stateId=9&clientId=4604&searchText=photovoltaic&searchMode=CLIENTMODE&contentTypeId=CODES

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020, effective 31 Dec 2023 (statewide floor) — the City does not name a year itself 70% · City code-reference page (linking to state adoption)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) 92% · City permit application form
    • Which fire code edition is in force? Florida Fire Prevention Code — current edition (8th Ed., 2023 per statewide adoption); the City's own Adopted and Referenced Codes page links out to floridabuilding.org rather than stating a year itself 60% · City code-reference page
    • Are there local amendments to any of the above? Yes, at least on fees and administration — Code of Ordinances Chapter 8, Art. II ('Construction Code') carries the City's own permitting, penalty and re-inspection-fee provisions (e.g., Sec. 8-22 violations/penalties, Sec. 8-28 permits) layered on top of the state-adopted Florida Building Code base. 62% · codified ordinance, Ch. 8
    • What is the installation judged against? Florida Building Code 8th Edition (2023) for structural/general construction; NEC 2020 (state floor, city does not name a year) for electrical 70% · City permit application form
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Temple Terrace on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Not stated locally by name, but required as a function of the state-floor NEC edition — NEC 2020 (effective 31 Dec 2023) contains the current NEC 690.12 rapid-shutdown requirements; Municode search for 'rapid shutdown' returned zero hits 55% · City code-reference page + inference from state NEC edition
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    Nothing recorded for City of Temple Terrace on this step yet — 6 questions checked and found unpublished. The guidance above is general.

  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? TECO territory: a manual disconnect switch (visible load-break type) IS required even at Tier 1 (<=10kW) — 'mounted separate from the meter socket on an exterior surface adjacent to the meter,' readily accessible to the Company and capable of being locked open with a Company padlock. Distinctively, TECO's own Tier 1 agreement states the Customer shall install it 'at the Company's expense and subject to the approval of the cost by the Company' — i.e., mandatory hardware, but Company-funded, not merely Company-optional as at some municipal utilities. 90% · utility's own filed tariff (Standard Interconnection Agreement, Sheet 8.1010)

20 questions answered against City of Temple Terrace’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020, effective 31 Dec 2023 (statewide floor) — the City does not name a year itself

Why the confidence is not higherThe City's Adopted and Referenced Codes page links 'National Electrical Code' straight out to floridabuilding.org rather than stating a local year, so this is the state floor (confirmed by 70+ prior Florida runs and floridabuilding.org itself), not an independently reproved city-specific fact. The Building/Electric Permit Application forms likewise do not name an NEC year.

City code-reference page (linking to state adoption) checked 2026-09-12 https://www.templeterrace.gov/354/Adopted-and-Referenced-Codes

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023)

Why the confidence is not higherStated verbatim in the Building and Electric Permit Application forms' applicant certification: 'ALL WORK WILL BE DONE IN COMPLIANCE WITH FLORIDA BUILDING CODE EIGHTH EDITION (2023)'.

City permit application form checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Building-Permit-Application-73

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code — current edition (8th Ed., 2023 per statewide adoption); the City's own Adopted and Referenced Codes page links out to floridabuilding.org rather than stating a year itself

Why the confidence is not higherPage lists 'Florida Fire Prevention Code' linking to the state's own page with no local year stated; Ch. 8 (Buildings and Fire Prevention) full text was not read for a possibly stale local citation.

City code-reference page checked 2026-09-12 https://www.templeterrace.gov/354/Adopted-and-Referenced-Codes

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, at least on fees and administration — Code of Ordinances Chapter 8, Art. II ('Construction Code') carries the City's own permitting, penalty and re-inspection-fee provisions (e.g., Sec. 8-22 violations/penalties, Sec. 8-28 permits) layered on top of the state-adopted Florida Building Code base.

Why the confidence is not higherConfirmed the existence and structure of Ch. 8 Art. II via Municode search/positive control; did not do a section-by-section diff against the unamended state FBC to catalogue every technical amendment.

codified ordinance, Ch. 8 checked 2026-09-12 https://library.municode.com/fl/temple_terrace/codes/code_of_ordinances

Q33 What is the installation judged against? Core Electrical

Florida Building Code 8th Edition (2023) for structural/general construction; NEC 2020 (state floor, city does not name a year) for electrical

Why the confidence is not higherCombines the Building/Electric Permit Application's explicit FBC 8th Ed. (2023) certification with the Adopted and Referenced Codes page's undated NEC link.

City permit application form checked 2026-09-12 https://www.templeterrace.gov/FormCenter/Community-Development-6/Building-Permit-Application-73

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedCode and Development Orders fee schedule (Electrical section read in full, 'Service Upgrades $100/$175' is the only amperage-adjacent line) — no explicit busbar-sizing or service-upgrade technical rule beyond the fee amount

https://www.templeterrace.gov/700/Code-and-Development-Orders

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedRequired Submittals table and Municode 'solar'/'photovoltaic' search (zero hits) — no mounting-system or attachment-spacing document or ordinance found

https://www.templeterrace.gov/699/Required-Submittals

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedFire Department Applications & Forms and Risk Reduction Division pages (both read in full, only AED/burn/fireworks/Knox-Box/residential-checklist forms listed) — no ridge-setback or fire-access-pathway rule for rooftop PV found; Ch. 8 fire-prevention text not read section-by-section

https://www.templeterrace.gov/276/Applications-Forms

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Not stated locally by name, but required as a function of the state-floor NEC edition — NEC 2020 (effective 31 Dec 2023) contains the current NEC 690.12 rapid-shutdown requirements; Municode search for 'rapid shutdown' returned zero hits

Why the confidence is not higherInference from the NEC-2020 state floor rather than a city-specific statement; zero Municode hits confirmed with the same passing-control search method used elsewhere in this run.

City code-reference page + inference from state NEC edition checked 2026-09-12 https://www.templeterrace.gov/354/Adopted-and-Referenced-Codes

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedRequired Submittals table, Applications and Forms page, and Municode 'solar'/'photovoltaic' search (zero hits) — no placard requirement of any kind published by the City

https://www.templeterrace.gov/355/Applications-and-Forms

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38 — no placard wording published

https://www.templeterrace.gov/355/Applications-and-Forms

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38 — no letter height/colour/material spec published

https://www.templeterrace.gov/355/Applications-and-Forms

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38 — no facility/site-plan placard spec published by the City

https://www.templeterrace.gov/355/Applications-and-Forms

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedTECO's own filed tariff Section 8 (full text extracted and searched for 'placard'/'label'/'plaque' — zero hits) and TECO's public Solar Solutions / Connecting Your Solar web page (read in full, no placard spec); TECO does not appear to publish a separate 'Electric Service Standards' document at a stable public URL the way FPL does

https://www.tampaelectric.com/49f775/siteassets/files/tariff/tariffsection8.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame sources as q38/q42 — no City or TECO document specifies label placement beyond the AC-disconnect physical-placement rule covered under q48

https://www.templeterrace.gov/355/Applications-and-Forms

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedElectric and Building Permit Application forms and Required Submittals table — no equipment-approved-list requirement beyond the general FL Product Approval process (Product Approval Number field appears on the Building Permit Application for window/door applications specifically, not for PV modules/inverters)

https://www.templeterrace.gov/FormCenter/Community-Development-6/Building-Permit-Application-73

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedFire Department Applications & Forms and Risk Reduction pages (read in full) — no battery/ESS-specific permitting language; TECO's tariff Section 8 does carry separate Battery Subsystem interconnection agreements (Sheets referencing 'BAT') but their City-side building/fire permitting treatment was not confirmed

https://www.templeterrace.gov/276/Applications-Forms

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSame as q45 — no separate ESS permit or inspection type named on the City's Fire Department or Building Division pages

https://www.templeterrace.gov/123/Building-and-Permitting

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedMunicode search for 'structure definition accessory' (reviewed Sec. 12-508 Accessory uses/buildings/structures, Sec. 12-40 Definitions) — general accessory-structure setback rules exist but no ground-mount-PV-specific classification as a 'structure' was found

https://library.municode.com/search?stateId=9&clientId=4604&searchText=structure%20definition%20accessory&searchMode=CLIENTMODE&contentTypeId=CODES

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

TECO territory: a manual disconnect switch (visible load-break type) IS required even at Tier 1 (<=10kW) — 'mounted separate from the meter socket on an exterior surface adjacent to the meter,' readily accessible to the Company and capable of being locked open with a Company padlock. Distinctively, TECO's own Tier 1 agreement states the Customer shall install it 'at the Company's expense and subject to the approval of the cost by the Company' — i.e., mandatory hardware, but Company-funded, not merely Company-optional as at some municipal utilities.

Why the confidence is not higherQuoted directly from TECO's own filed Standard Interconnection Agreement for Tier 1 Renewable Generator Systems, Sheet No. 8.1010 ¶11 (First Revised Sheet 8.1000, effective June 6, 2000; continuation sheets effective Oct 1, 2008), extracted with pdftotext -layout from the utility's own PDF, not a summary. This CONFIRMS and REFINES the standing baseline note ('TECO requires a manual disconnect even at Tier 1') by adding the cost allocation, which the baseline did not capture.

utility's own filed tariff (Standard Interconnection Agreement, Sheet 8.1010) checked 2026-09-12 https://www.tampaelectric.com/49f775/siteassets/files/tariff/tariffsection8.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? By phone (24/7 request line) or online 78% · department page
    • How much notice is required? Requests received before 4pm are scheduled for the next business day; requests after 4pm go to the second business day. Same-day inspection is possible case-by-case/emergency, at the inspector's or building official's discretion. 85% · department page
    • Are same-day or AM/PM windows offered? No AM/PM window is offered — all requested inspections are scheduled generically between 9am and 4pm the following business day 72% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes, primarily — City building inspectors perform final inspections, though the applicant may elect (per-job, via the Building Permit Application's own checkbox) to have plan review and/or inspection performed by a private provider under FS 553.791. 75% · FS 553.80(7)(b) utilization report
    • If delegated, to whom? Not delegated to another government; delegable per-job to a registered FS 553.791 private provider at the applicant's election 70% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for City of Temple Terrace on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    Nothing recorded for City of Temple Terrace on this step yet — 3 questions checked and found unpublished. The guidance above is general.

  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • Who notifies the utility for PTO? Installer/customer — TECO's own Tier 1 Standard Interconnection Agreement places the burden on the Customer to obtain AHJ inspection/approval and 'provide proof of this inspection and approval to the Company,' after which the Company executes the agreement and permits parallel operation 78% · utility's own filed tariff
    • Is there a re-inspection fee? $75 for the first re-inspection occurrence, $150 for each occurrence thereafter 88% · City fee schedule
    • How are corrections issued and cleared? Not fully published for solar specifically — general policy: corrections/violations noted at inspection trigger the re-inspection-fee list (technical code violations, plans not on site, work not ready, etc.); no described online/portal correction-comment workflow was found comparable to Ocoee's for Temple Terrace specifically. 45% · department page (partial)

14 questions answered against City of Temple Terrace’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

By phone (24/7 request line) or online

Why the confidence is not higherInspections Information page: 'Option 1 – Online Inspection Scheduling... Option 2 – By Phone... You will be connected to our inspection request line, which is available 24 hours a day, 7 days a week.'

department page checked 2026-09-12 https://www.templeterrace.gov/125/Inspections-Information

Q50 How much notice is required? Core Booking & scheduling

Requests received before 4pm are scheduled for the next business day; requests after 4pm go to the second business day. Same-day inspection is possible case-by-case/emergency, at the inspector's or building official's discretion.

Why the confidence is not higherQuoted verbatim from the Inspections Information page.

department page checked 2026-09-12 https://www.templeterrace.gov/125/Inspections-Information

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No AM/PM window is offered — all requested inspections are scheduled generically between 9am and 4pm the following business day

Why the confidence is not higherQuoted from the Inspections Information page; no window-selection option is described.

department page checked 2026-09-12 https://www.templeterrace.gov/125/Inspections-Information

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes, primarily — City building inspectors perform final inspections, though the applicant may elect (per-job, via the Building Permit Application's own checkbox) to have plan review and/or inspection performed by a private provider under FS 553.791.

Why the confidence is not higherFY2024 utilization report shows 7,120 City-recorded inspections of which 2,898 (41%) were 'Inspections by Private Provider' — a real, substantial minority, not a rare exception. The 'CITY STAFF / PRIVATE PROVIDER' election is on the Building Permit Application's own Step One.

FS 553.80(7)(b) utilization report checked 2026-09-12 https://templeterrace.gov/DocumentCenter/View/7313/Building-Permit-and-Inspection-Utilization-Report---Year-End-2024

Q53 If delegated, to whom? Core Who inspects

Not delegated to another government; delegable per-job to a registered FS 553.791 private provider at the applicant's election

Why the confidence is not higherFollows from Q52; no government-to-government delegation (e.g., to Hillsborough County) exists.

department page checked 2026-09-12 https://www.templeterrace.gov/900/Private-Provider-Resources

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedInspections Information page (read in full) — states inspections occur 9am-4pm the next business day but does not enumerate an inspection sequence (rough-in, mid-roof, final) for any trade

https://www.templeterrace.gov/125/Inspections-Information

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame as q54 — no rough-in/mid-roof inspection requirement stated for PV or roofing generally

https://www.templeterrace.gov/125/Inspections-Information

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedInspections Information page — does not state that the inspector verifies equipment labels/listings as a discrete checked item

https://www.templeterrace.gov/125/Inspections-Information

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedInspections Information, Applications and Forms, and Required Submittals pages (all read in full) — no published inspection checklist of any kind (PV or general) found on the City's site

https://www.templeterrace.gov/125/Inspections-Information

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedInspections Information and Required Submittals pages — neither states what documents must be physically on site at the time of a PV/electrical inspection

https://www.templeterrace.gov/125/Inspections-Information

Q59 Is there a re-inspection fee? Corrections & re-inspection

$75 for the first re-inspection occurrence, $150 for each occurrence thereafter

Why the confidence is not higherStated identically on both the Building Permit Fees Schedule page and the Inspections Information page, and repeated in the Code and Development Orders fee schedule — three consistent City sources.

City fee schedule checked 2026-09-12 https://www.templeterrace.gov/584/Building-Permit-Fees-Schedule

Q60 How are corrections issued and cleared? Corrections & re-inspection

Not fully published for solar specifically — general policy: corrections/violations noted at inspection trigger the re-inspection-fee list (technical code violations, plans not on site, work not ready, etc.); no described online/portal correction-comment workflow was found comparable to Ocoee's for Temple Terrace specifically.

Why the confidence is not higherInferred from the re-inspection fee trigger list on the Inspections Information and fee-schedule pages; did not find an explicit 'how corrections are issued and cleared' procedural statement.

department page (partial) checked 2026-09-12 https://www.templeterrace.gov/125/Inspections-Information

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedInspections Information, Permitting Services, and Building and Permitting pages — none states what document (CO, final card, green tag) is issued specifically on passing a PV/electrical-alteration final inspection

https://www.templeterrace.gov/125/Inspections-Information

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/customer — TECO's own Tier 1 Standard Interconnection Agreement places the burden on the Customer to obtain AHJ inspection/approval and 'provide proof of this inspection and approval to the Company,' after which the Company executes the agreement and permits parallel operation

Why the confidence is not higherQuoted directly from TECO's own filed tariff (Sheet 8.1005 ¶4), an authority-specific source, stronger than the PSC-rule-only sourcing used at Ocoee.

utility's own filed tariff checked 2026-09-12 https://www.tampaelectric.com/49f775/siteassets/files/tariff/tariffsection8.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Separate roof inspection
Permitting Services | Temple Terrace, FL - Official Website Skip to Main Content Search Home Departments & City Services Community Development Building Division Permitting Services Permitting Services Online Permit Services For online permit inquiries and inspection options, visit Community Developm
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
City
County
Hillsborough County
Regions covered
Authority Contact
Building Department
Direct Phone
813.506.6470
Booking & Scheduling