City of Wildwood is a city authority in the State of Florida, serving 15,730 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for City of Wildwood against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

City of Wildwood is the authority having jurisdiction 92% confidence
Holds
Land Development Code administration, zoning clearance, site plan review, rezoning/variance/special-exception/conditional-use review, sign permits, right-of-way permits, business registration, and code enforcement. The City's Development Services Director (Melanie Strickland) administers these functions; the LDR (Sec. 1.5(C)) separately names a 'Buildings Services Director' role but the City has exercised its statutory option to designate that role to another department entirely.
Delegated to
Sumter County Building Services (Building Official Jeanette Keller) — ALL building, electrical, plumbing and mechanical permitting, plan review and inspection for City-of-Wildwood addresses. Stated in the City's own words: 'The City outsources our Building Department to Sumter County. All permits are issued by the Sumter County Building Department.' A companion City document diagrams the sequence explicitly: (1) Villages ARC approval if the parcel is in The Villages Community, (2) City Zoning Clearance, (3) Sumter County Building Permit. This is a Joint Planning Agreement/interlocal arrangement, not a contract with a private national firm (SAFEbuilt/PDCS-style) — Sumter County Building Services is itself a county government department, physically headquartered at 7375 Powell Road, Wildwood, FL 34785, inside city limits.
Overridden by
(1) HOA/Architectural Review: for the large share of Wildwood parcels inside The Villages of Sumter DRI, Villages Community Standards ARC approval is the City's own documented FIRST step before its Zoning Clearance will issue — a precondition, not a state-law override. (2) Utility regime is split and each utility's own rules govern interconnection/disconnect/placard terms differently: Duke Energy Florida (investor-owned, subject to FL PSC Rule 25-6.065 and its own filed FPSC tariff sheets) and Sumter Electric Cooperative d/b/a SECO Energy (member-owned co-op, governed by its own board policy under Fla. Stat. 366.91, outside PSC Rule 25-6.065) both serve within city limits per the City's own resident-facing utility page — no parcel-level map was found to allocate between them. Withlacoochee River Electric Cooperative (WREC) also appears on Sumter County's own emergency-management utility-outage page as a county-wide utility but is NOT named on the City of Wildwood's own utility page, so it is not treated here as reaching city limits. (3) A city-limits GIS/'Am I in Wildwood' tool was not located this run; The Villages spans incorporated Wildwood, incorporated Lady Lake/other municipalities, and unincorporated Sumter/Lake/Marion counties, so a Wildwood-addressed parcel is not proof of Wildwood jurisdiction and should be verified per-parcel.
Why not higher
Two of the City's own current documents state the Sumter County delegation in plain, unambiguous language, corroborated by a third (LDR Sec. 1.5(C), which permissively authorizes exactly this designation) and by Sumter County's own Building Services page listing a Joint Planning Agreement with the City of Wildwood and giving a Wildwood mailing address for the county building office. Held below 95 only because (a) the City's own Code of Ordinances on Municode is stuck at Supp. No. 2 / Ord. O2014-15 (24 Feb 2014) and its interior chapters (a possible independent franchise or utilities chapter) could not be searched this session (clientId could not be recovered), and (b) no city-limits GIS tool confirming Villages-area parcel jurisdiction was found.

https://www.wildwood-fl.gov/DocumentCenter/View/948

Permit required
Yes82%
Permit cost
$82 flat Building permit fee ('Solar Panel System', Sumter Fee Schedule Sec. VI.1.j), plus an Electrical trade permit fee (Sumter's schedule lists 'Electric miscellaneous $82' for…85%
Portal
Building/electrical permits: Sumter County's Citizenserve Online Portal (citizenserve.com/Portal, installation ID 445), covering Sumter County, Wildwood, Center Hill and Webster.85%
Electrical code
NEC 202085%
Own placard wording
SECO: the placard must identify 'the on-site power source' (and, on the reused-raceway scenario, must indicate 'dual power source');70%
Booking an inspection
Through Sumter County's Citizenserve online portal (registered account), or by calling the County's Inspection Line for permits issued under the prior/legacy system.65%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Both a Building permit (dedicated 'Solar Panel System' fee line under Sumter's 'Residential/Commercial Single Permit Fees') and applicable electrical trade work are… Q4 Where you file — Building/electrical permits: Sumter County's Citizenserve Online Portal (citizenserve.com/Portal, installation ID 445), covering Sumter County, Wildwood, Q20

Permit required
Yes82% source
What it costs
$82 flat Building permit fee ('Solar Panel System', Sumter Fee Schedule Sec. VI.1.j), plus an Electrical trade permit fee (Sumter's schedule lists 'Electric miscellaneous $82' for retrofit/alteration…85% source
Key document
delegated AHJ's current fee schedule cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Split: the City of Wildwood is the AHJ for zoning/land-use/site-plan review; Sumter County Building Services is the delegated AHJ for the actual residential building and electrical permit and inspection. 92% · City handout ('General Information for Development & Zoning')
    • What does this authority permit itself, and what does it delegate? City permits itself: zoning clearance, site plan approval, rezoning/variance/special-exception/conditional-use, sign permits, right-of-way permits, tree removal, business registration. City delegates to Sumter County: all building, electrical, plumbing and mechanical permitting, plan review and inspection. 90% · City permit-applications page + City handout
    • Is a permit required for a residential rooftop PV system? Yes 82% · delegated AHJ's own permit-exemption page
    • Is there a separate electrical permit, or is it combined? Both a Building permit (dedicated 'Solar Panel System' fee line under Sumter's 'Residential/Commercial Single Permit Fees') and applicable electrical trade work are shown as separate line items on Sumter's fee schedule; whether these are issued as one combined permit number or two was not confirmed. 55% · delegated AHJ's current fee schedule
    • Is a HOA or architectural approval required first? Yes, for the large share of Wildwood parcels inside The Villages Community: the City's own zoning flyer diagrams ARC (Architectural Review Committee) Approval as the explicit FIRST STEP, before City Zoning Clearance and before the Sumter County Building Permit. For non-Villages parcels, the same flyer states 'HOA Approval Required if applicable' as a general caveat rather than a universal precondition. 88% · City handout
    • Is a wind or windstorm certification required? No PV-specific windstorm certification found; the general design wind speed criterion for the area is 135 MPH. 62% · delegated AHJ's own FAQ
    • Is a Specific Use Permit or Council approval ever required? No — rooftop and accessory-scale photovoltaic and solar-thermal systems are listed as a BY-RIGHT accessory use allowed in ALL zoning districts, with no Specific Use Permit or Council approval named. 85% · City's current Land Development Regulations (amended 7/28/2025)
    • Is there a system-size cap on residential generation? No City or County size cap on residential PV generation was found. At the utility level, SECO's tariff caps its net-metering PROGRAM eligibility at 1,000 kW (AC) per system (Tier 3 ceiling) and further caps the system rating at no more than 90% of the customer's utility distribution service rating — a per-system cap, not a citywide aggregate cap. No program-wide/aggregate interconnection capacity cap (of the kind seen at some Florida municipal utilities) was found in SECO's current tariff, its Renewable Generation System Standards, or its Required Documentation page; Duke's own filed Tier 1-3 contracts (fetched directly this run) likewise state no aggregate program cap. 75% · utility's own current filed rate tariff
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor (state-certified or holding/registered under a Sumter County Certificate of Competency), or the property owner acting as their own contractor. 65% · delegated AHJ's own department page
    • Must the contractor be registered with this authority before applying? Yes 78% · delegated AHJ's own department page
    • Is a homeowner permitted to self-install and self-permit? Yes — Sumter's own FAQ states a building permit may be applied for by 'The contractor or owner of the property,' consistent with Florida's statutory owner-builder exemption (FS 489.103/489.503), though no solar-specific restriction on self-installation was found. 60% · delegated AHJ's own FAQ
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No dedicated PV submittal checklist was found. Sumter's general Electrical submission requirements (applicable to any electrical permit, not solar-specific) call for: existing building permit number (if applicable) or a copy of the recorded deed if none exists; an electric plan; and for pump service, amperage/panel/breaker/wire sizing. Separately, the interconnecting utility (SECO) requires its own Interconnection Agreement package: system photos, a copy of the approved county/city electric permit, an insurance certificate scaled to system Tier, and a one-line diagram showing array orientation and the disconnect's location/distance from the meter. 55% · delegated AHJ's general submittal page + utility's own documentation page
    • Is a site plan required, and what must it show? No PV-specific statement found. Sumter's general new-construction submittal path implies a site plan for new structures; a rooftop PV retrofit on an existing home was not confirmed to require one. 40% · inference from general department navigation
    • Is a one-line / three-line diagram required? The utility (SECO) requires a one-line diagram showing the planned array orientation and the disconnect switch's location and its distance from the meter (must be within five feet) as part of its own Interconnection Agreement package. Whether Sumter County (the delegated AHJ) separately requires a one-line/riser diagram for its own electrical permit was not confirmed in reachable material. 62% · utility's own documentation page
    • Is a structural PE stamp required, and at what threshold? Not published locally; the statewide floor applies: FS 471.003(2)(h) exempts electrical work performed by a licensed electrical/general contractor from a PE-stamp requirement where the electrical system value is $125,000 or less and the aggregate service capacity is 600 amperes (240V) or less on a residential system. 55% · Florida Statute (state floor)
    • Is an electrical PE stamp required, and at what threshold? Same statewide floor as Q13: FS 471.003(2)(h), $125,000/600A. 55% · Florida Statute (state floor)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Building/electrical permits: Sumter County's Citizenserve Online Portal (citizenserve.com/Portal, installation ID 445), covering Sumter County, Wildwood, Center Hill and Webster. Zoning/planning/business-license applications: the City's own separate CivicGov portal (civicgov4.com/fl_wildwood). 85% · delegated AHJ's own portal page
    • Can the whole application be completed online? Likely yes for building/electrical permits via Sumter's Citizenserve portal ('Building Permits' and 'Portal Registration' are listed on its own home page as self-service options); the public-facing side of the portal requires account login to search or apply, so end-to-end online completion could not be independently exercised. 55% · portal home page
    • What does a residential solar permit cost? $82 flat Building permit fee ('Solar Panel System', Sumter Fee Schedule Sec. VI.1.j), plus an Electrical trade permit fee (Sumter's schedule lists 'Electric miscellaneous $82' for retrofit/alteration work under the same Sec. VI.2), plus a 1.0% State of Florida Surcharge ($2 minimum, FS Ch. 553) and a 1.5% State Building Code Administrators and Inspectors Fund fee ($2 minimum, FS Ch. 468). 85% · delegated AHJ's current fee schedule
    • How is the fee calculated? Flat fee, not valuation-based — $82 for the 'Solar Panel System' building permit line, distinct from Sumter's valuation/square-footage-based commercial fee structure. 80% · delegated AHJ's current fee schedule
    • Is there a separate plan-check fee? No separate plan-review fee appears to apply to the flat-fee residential PV item. Sumter's fee schedule itemizes 'Plan Review Fees' only under Commercial/Private-Provider work and under 'Master Plans' for new single-family/duplex/triplex/pool/accessory-structure construction — categories that a PV retrofit under Sec. VI does not fall into. 58% · delegated AHJ's current fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • How long is an issued permit valid before it expires? 180 days after issuance, or after the last approved inspection. 88% · delegated AHJ's own FAQ
    • Which utility handles interconnection here? Split by address: Duke Energy Florida and Sumter Electric Cooperative, Inc. d/b/a SECO Energy both serve within Wildwood city limits, per the City's own page. No parcel-level map allocating between them was found. (Withlacoochee River Electric Cooperative also serves elsewhere in Sumter County per the County's own emergency-management page, but is not named on the City's own utility page.) 88% · City resident-facing utilities page
    • Where does the utility sit in the sequence? After AHJ permit and inspection, before the utility's own final step. SECO's own 10-step process places 'Obtain Permit' at step 5 and 'City/County Inspection' at step 7, both BEFORE SECO's own document/photo approval (step 8) and its meter installation (step 9-10). For Duke (an investor-owned utility under FL PSC Rule 25-6.065), the rule requires that customer-owned renewable generation 'be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility.' 80% · utility's own process page (SECO) + FL PSC Rule 25-6.065 (Duke floor)

28 questions answered against City of Wildwood’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Split: the City of Wildwood is the AHJ for zoning/land-use/site-plan review; Sumter County Building Services is the delegated AHJ for the actual residential building and electrical permit and inspection.

Why the confidence is not higherDirect statement, see jurisdiction.why.

City handout ('General Information for Development & Zoning') checked 2026-09-12 https://www.wildwood-fl.gov/DocumentCenter/View/948

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

City permits itself: zoning clearance, site plan approval, rezoning/variance/special-exception/conditional-use, sign permits, right-of-way permits, tree removal, business registration. City delegates to Sumter County: all building, electrical, plumbing and mechanical permitting, plan review and inspection.

Why the confidence is not higherThe City's own Permit Applications and Forms-and-Permits pages list only zoning/sign/ROW/tree/bingo-type applications (no building or electrical application anywhere on the City's site), while the City's own zoning flyer and Pre-Development Conference FAQ both state building permits are issued and inspected by Sumter County.

City permit-applications page + City handout checked 2026-09-12 https://www.wildwood-fl.gov/235/Permit-Applications

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherSumter County's own 'When is a Building Permit Required?' exemption table (current) does not list photovoltaic/solar electric among its 'Items Not Requiring a Permit'; it explicitly exempts only 'Solar tubes without electric,' which by contrast implies any electric-connected solar installation requires a permit. Corroborated by a dedicated 'Solar Panel System' line item on Sumter's current Building fee schedule.

delegated AHJ's own permit-exemption page checked 2026-09-12 https://www.sumtercountyfl.gov/1257/When-is-a-Building-Permit-Required

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Both a Building permit (dedicated 'Solar Panel System' fee line under Sumter's 'Residential/Commercial Single Permit Fees') and applicable electrical trade work are shown as separate line items on Sumter's fee schedule; whether these are issued as one combined permit number or two was not confirmed.

Why the confidence is not higherInferred from the fee-schedule structure (Building Sec. VI.1.j 'Solar Panel System $82' is listed separately from Electric Sec. VI.2 trade items) rather than from an explicit statement that solar is a combined or split permit type.

delegated AHJ's current fee schedule checked 2026-09-12 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor (state-certified or holding/registered under a Sumter County Certificate of Competency), or the property owner acting as their own contractor.

Why the confidence is not higherSumter's Contractor Licensing page states contractors may pull permits if they hold a State of Florida Certificate of Competency, are registered with the State through the County, or hold a County Certificate of Competency; its Building FAQ separately states 'The contractor or owner of the property' may apply for a building permit. Neither statement is solar-specific.

delegated AHJ's own department page checked 2026-09-12 https://www.sumtercountyfl.gov/81/Contractor-Licensing

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherSumter's Contractor Licensing page states contractors must hold one of the three listed credentials before permits are issued, and its Online Permitting Registration is a prerequisite step named on the same page and on the Building Services Forms page.

delegated AHJ's own department page checked 2026-09-12 https://www.sumtercountyfl.gov/81/Contractor-Licensing

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes — Sumter's own FAQ states a building permit may be applied for by 'The contractor or owner of the property,' consistent with Florida's statutory owner-builder exemption (FS 489.103/489.503), though no solar-specific restriction on self-installation was found.

Why the confidence is not higherGeneral statement on Sumter's Building Services FAQ, not solar-specific; no dedicated owner-builder affidavit form for Sumter was located this run.

delegated AHJ's own FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q8 What documents make up a complete submittal? Core Submittal package

No dedicated PV submittal checklist was found. Sumter's general Electrical submission requirements (applicable to any electrical permit, not solar-specific) call for: existing building permit number (if applicable) or a copy of the recorded deed if none exists; an electric plan; and for pump service, amperage/panel/breaker/wire sizing. Separately, the interconnecting utility (SECO) requires its own Interconnection Agreement package: system photos, a copy of the approved county/city electric permit, an insurance certificate scaled to system Tier, and a one-line diagram showing array orientation and the disconnect's location/distance from the meter.

Why the confidence is not higherCombines Sumter's general (non-solar) Electrical submittal page with SECO's own Required Documentation page for the utility side of the same job; no single authority-published PV-specific checklist exists that was found.

delegated AHJ's general submittal page + utility's own documentation page checked 2026-09-12 https://www.sumtercountyfl.gov/125/Electrical

Q9 How many copies, and in what format? Submittal package

Nothing published by this authority.

Where we lookedSumter County Building Services Forms page, Permit Application page, and fee schedule — none states a number-of-copies or file-format requirement for a residential solar submittal

https://www.sumtercountyfl.gov/134/Forms

Q10 Is a site plan required, and what must it show? Core Submittal package

No PV-specific statement found. Sumter's general new-construction submittal path implies a site plan for new structures; a rooftop PV retrofit on an existing home was not confirmed to require one.

Why the confidence is not higherInference only from the general 'Site Plan Request' item in Sumter Building Services' navigation and the absence of any PV-specific site-plan requirement; not independently confirmed.

inference from general department navigation checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

The utility (SECO) requires a one-line diagram showing the planned array orientation and the disconnect switch's location and its distance from the meter (must be within five feet) as part of its own Interconnection Agreement package. Whether Sumter County (the delegated AHJ) separately requires a one-line/riser diagram for its own electrical permit was not confirmed in reachable material.

Why the confidence is not higherDirect statement on SECO's own Required Documentation page for the utility side; the AHJ-side requirement is inferred from Sumter's general Electrical submittal page which asks for 'an electric plan' without naming a one-line diagram specifically.

utility's own documentation page checked 2026-09-12 https://secoenergy.com/required-documentation

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSumter's general Electrical submittal-requirements page and SECO's Required Documentation page — neither names string/conductor sizing calculations as a discrete required document (SECO's one-line diagram requirement is the closest analogue, recorded under Q11)

https://www.sumtercountyfl.gov/125/Electrical

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Not published locally; the statewide floor applies: FS 471.003(2)(h) exempts electrical work performed by a licensed electrical/general contractor from a PE-stamp requirement where the electrical system value is $125,000 or less and the aggregate service capacity is 600 amperes (240V) or less on a residential system.

Why the confidence is not higherNo Sumter- or Wildwood-specific structural PE threshold was located; this is the Florida statute cited directly, not a confirmed local rule, and Sumter's LDC/technical amendments (if any exist) could not be checked this session.

Florida Statute (state floor) checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Same statewide floor as Q13: FS 471.003(2)(h), $125,000/600A.

Why the confidence is not higherNo local electrical PE threshold distinct from the structural one was found; recorded at the state floor.

Florida Statute (state floor) checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

$82 flat Building permit fee ('Solar Panel System', Sumter Fee Schedule Sec. VI.1.j), plus an Electrical trade permit fee (Sumter's schedule lists 'Electric miscellaneous $82' for retrofit/alteration work under the same Sec. VI.2), plus a 1.0% State of Florida Surcharge ($2 minimum, FS Ch. 553) and a 1.5% State Building Code Administrators and Inspectors Fund fee ($2 minimum, FS Ch. 468).

Why the confidence is not higherAll figures quoted verbatim from Sumter County's current Building Services Fee Schedule, effective 10/1/2024 (the delegated AHJ's own document). Held below 90 because the schedule does not explicitly state that both the Building and Electrical line items apply together to a single PV job — that combination is a reasonable but not textually confirmed reading.

delegated AHJ's current fee schedule checked 2026-09-12 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q16 How is the fee calculated? Core Fees

Flat fee, not valuation-based — $82 for the 'Solar Panel System' building permit line, distinct from Sumter's valuation/square-footage-based commercial fee structure.

Why the confidence is not higherQuoted directly from the fee schedule's own listing; residential single-permit items in Sec. VI (which includes 'Solar Panel System') are uniformly flat-dollar amounts, unlike the commercial fees in Sec. II which are per-square-foot.

delegated AHJ's current fee schedule checked 2026-09-12 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q17 Is there a separate plan-check fee? Fees

No separate plan-review fee appears to apply to the flat-fee residential PV item. Sumter's fee schedule itemizes 'Plan Review Fees' only under Commercial/Private-Provider work and under 'Master Plans' for new single-family/duplex/triplex/pool/accessory-structure construction — categories that a PV retrofit under Sec. VI does not fall into.

Why the confidence is not higherInference from the fee schedule's own category structure (Sec. I.3, Plan Review Fees) rather than an explicit statement that PV is plan-review-fee-exempt.

delegated AHJ's current fee schedule checked 2026-09-12 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedSumter Building Services page, Online Permitting page, and fee schedule — none states a residential plan-review turnaround time; Sumter's Citizenserve portal reports (Permits Issued by Jurisdiction, Permits Finaled by Jurisdiction) might show real turnaround from actual records but could not be opened without a login/session error this run

https://www.sumtercountyfl.gov/77/Building-Services

Q19 How long is an issued permit valid before it expires? Timeline & validity

180 days after issuance, or after the last approved inspection.

Why the confidence is not higherStated in Sumter Building Services' own current FAQ ('How long is a building permit valid? It is valid until 180 days past the issue date or the last approved inspection') and repeated as a footnote on the current fee schedule.

delegated AHJ's own FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q20 Which permit portal does this authority use? Core Portal & process

Building/electrical permits: Sumter County's Citizenserve Online Portal (citizenserve.com/Portal, installation ID 445), covering Sumter County, Wildwood, Center Hill and Webster. Zoning/planning/business-license applications: the City's own separate CivicGov portal (civicgov4.com/fl_wildwood).

Why the confidence is not higherConfirmed directly from Sumter Building Services' own Online Permitting page (which links Citizenserve and states it covers 'applications submitted after 9/23/2024') and from the Citizenserve portal's own home page, which prints the Wildwood mailing address as its contact. CivicGov confirmed separately from Wildwood's own Departments page and the CivicGov portal's own description of itself as a 'Licensing, Planning & Zoning and Citizen Requests & Concerns Portal.'

delegated AHJ's own portal page checked 2026-09-12 https://www.sumtercountyfl.gov/139/Online-Permitting

Q21 Can the whole application be completed online? Core Portal & process

Likely yes for building/electrical permits via Sumter's Citizenserve portal ('Building Permits' and 'Portal Registration' are listed on its own home page as self-service options); the public-facing side of the portal requires account login to search or apply, so end-to-end online completion could not be independently exercised.

Why the confidence is not higherBased on the Citizenserve portal's own home-page menu (Building Permits, Portal Registration, Competency Card, Planning Applications all listed as self-service items) rather than a completed test submission, since submission requires a registered account.

portal home page checked 2026-09-12 https://www.citizenserve.com/Portal/PortalController?Action=showHomePage&installationID=445

Q22 Which utility handles interconnection here? Core Utility interconnection

Split by address: Duke Energy Florida and Sumter Electric Cooperative, Inc. d/b/a SECO Energy both serve within Wildwood city limits, per the City's own page. No parcel-level map allocating between them was found. (Withlacoochee River Electric Cooperative also serves elsewhere in Sumter County per the County's own emergency-management page, but is not named on the City's own utility page.)

Why the confidence is not higherDirect, first-party, City-of-Wildwood-specific evidence: the City's own 'Report Outages / Repairs / Complaints' resident-facing page names exactly two electric utilities, Duke Energy and 'Sumter Electric Cooperative Inc. (SECO)'. This is the single most on-point utility identification in this file (better than the county-wide outage page, which additionally lists WREC).

City resident-facing utilities page checked 2026-09-12 https://www.wildwood-fl.gov/375/Report-Outages-Repairs-Complaints

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After AHJ permit and inspection, before the utility's own final step. SECO's own 10-step process places 'Obtain Permit' at step 5 and 'City/County Inspection' at step 7, both BEFORE SECO's own document/photo approval (step 8) and its meter installation (step 9-10). For Duke (an investor-owned utility under FL PSC Rule 25-6.065), the rule requires that customer-owned renewable generation 'be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility.'

Why the confidence is not higherSECO's own current Interconnection Process page states the sequence in plain numbered steps (confidence high for SECO addresses). The Duke figure is the PSC state floor, not Duke's own document, since Duke's own filed Tier 1-3 contracts (fetched and OCR'd directly this run) describe interconnection mechanics but not the city/county-inspection sequencing point explicitly — held lower for Duke addresses.

utility's own process page (SECO) + FL PSC Rule 25-6.065 (Duke floor) checked 2026-09-12 https://secoenergy.com/interconnection-process

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Yes, for the large share of Wildwood parcels inside The Villages Community: the City's own zoning flyer diagrams ARC (Architectural Review Committee) Approval as the explicit FIRST STEP, before City Zoning Clearance and before the Sumter County Building Permit. For non-Villages parcels, the same flyer states 'HOA Approval Required if applicable' as a general caveat rather than a universal precondition.

Why the confidence is not higherDiagrammed explicitly ('ARC Approval — 1st Step, City Zoning Clearance — 2nd Step, Sumter County Building Permit — 3rd Step') in the City's own current handout, with a named Villages Community Standards contact number (352-751-3912).

City handout checked 2026-09-12 https://www.wildwood-fl.gov/DocumentCenter/View/948

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedFull-text search of the City's current 319-page Land Development Regulations (amended 7/28/2025) for 'historic' and 'Historic Preservation' — the only hits are a flood-related 'Historic structure' definition and a generic reference to state-certified historic-preservation programs; no Historic Preservation Board, Certificate of Appropriateness process, or historic-district overlay was found anywhere in the LDR or on the City's site

https://www.wildwood-fl.gov/DocumentCenter/View/131

Q26 Is a wind or windstorm certification required? Overlays & special cases

No PV-specific windstorm certification found; the general design wind speed criterion for the area is 135 MPH.

Why the confidence is not higherFrom Sumter Building Services' own current FAQ ('What is the wind speed design criteria in Sumter County? 135 MPH'), which is general to all construction, not solar-specific.

delegated AHJ's own FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No — rooftop and accessory-scale photovoltaic and solar-thermal systems are listed as a BY-RIGHT accessory use allowed in ALL zoning districts, with no Specific Use Permit or Council approval named.

Why the confidence is not higherCity of Wildwood LDR Sec. 3-9(B)(1)(e): '[Accessory uses allowable in all zoning districts include] Photovoltaic systems and solar thermal arrays provided they are intended to serve the principal structure solely.' No conditional-use or special-exception trigger is attached to this item; the LDR's own Special Exception list (Sec. 3.9) does not mention solar.

City's current Land Development Regulations (amended 7/28/2025) checked 2026-09-12 https://www.wildwood-fl.gov/DocumentCenter/View/131

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No City or County size cap on residential PV generation was found. At the utility level, SECO's tariff caps its net-metering PROGRAM eligibility at 1,000 kW (AC) per system (Tier 3 ceiling) and further caps the system rating at no more than 90% of the customer's utility distribution service rating — a per-system cap, not a citywide aggregate cap. No program-wide/aggregate interconnection capacity cap (of the kind seen at some Florida municipal utilities) was found in SECO's current tariff, its Renewable Generation System Standards, or its Required Documentation page; Duke's own filed Tier 1-3 contracts (fetched directly this run) likewise state no aggregate program cap.

Why the confidence is not higherSECO's Rate Tariff (Second Revised Sheet No. 16.4, effective 1 Jan 2025, fetched and read directly) states the per-system 1,000 kW/90%-of-service-rating caps; the tariff and the RGS Standards and Required Documentation pages were searched for 'aggregate', 'program-wide', 'peak demand', 'waitlist', and 'not accepting applications' language (per this survey's Mount Dora finding) with no hits. This is a proven absence for SECO's current filed documents and for Duke's Tier 1-3 sheets, not a certainty that no unpublished internal queue exists.

utility's own current filed rate tariff checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/seco_energy_rate_tariff_current.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020 85% · delegated AHJ's own current FAQ
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) — all parts (Building, Residential, Energy Conservation, Plumbing, Existing Building, Accessibility, Mechanical, Fuel Gas). 88% · delegated AHJ's own current FAQ
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition. 80% · delegated AHJ's own current FAQ
    • What is the installation judged against? Florida Building Code 8th Edition (2023) and NEC 2020, as administered by Sumter County Building Services (the delegated AHJ) — the same code set named in Q29/Q30. 82% · delegated AHJ's own current FAQ
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for City of Wildwood on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Not stated by name in any reachable Wildwood or Sumter document; NEC 690.12 rapid shutdown would apply as a matter of the NEC 2020 adoption itself, but no local document was found affirmatively citing it. 50% · inference from NEC edition; absence checked in the current LDR
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Utility-conditional. SECO REQUIRES a placard on the front cover of the AC disconnect switch identifying the on-site power source (and a second placard indicating a dual power source where an existing disconnect is reused as a raceway). Duke's own filed Tier 1-3 tariff sheets contain NO placard/plaque/sign/label requirement of any kind (checked directly this run by OCR of all three sheets). Neither the City of Wildwood nor Sumter County Building Services publishes an AHJ-level placard requirement of their own. 85% · utility's own current standards document (SECO) + utility's own filed tariff (Duke, checked and absent)
    • Does the authority specify placard wording of its own? SECO: the placard must identify 'the on-site power source' (and, on the reused-raceway scenario, must indicate 'dual power source'); the standards document does not print one single fixed sentence of wording the way FPL's does. Duke: no placard wording exists (see Q38). 70% · utility's own current standards document
    • Does it specify letter height, colour or material? SECO (for SECO-served addresses): non-ferrous metal or poly-plastic plates, UV-resistant, epoxy-glued or riveted to the front cover of the disconnect switch, with engraved or stamped lettering a MINIMUM OF 1/4" HIGH, WHITE LETTERS ON A RED BACKGROUND. Peel-and-stick labels, paint, or marking pens are explicitly barred. Duke: no letter height/colour/material spec exists in Duke's own filed tariff sheets. 92% · utility's own current standards document
    • Does the UTILITY specify placards beyond the AHJ's? Yes for SECO (see Q38-40, all utility-published specifications with no AHJ equivalent). For Duke, no utility-published placard spec was found at all — the gap is genuine and was independently checked, not assumed. 85% · utility's own current standards document
    • Where must the labels be placed? On the front cover of the AC disconnect switch itself, which SECO requires to be mounted adjacent to, and within five feet (5'-0") of, the utility meter enclosure. 90% · utility's own current standards document
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Utility-conditional. SECO: the AC disconnect must be mounted ADJACENT TO, and WITHIN FIVE FEET (5'-0") OF, the utility meter enclosure. Duke: per Duke's own filed Tier 1 contract (fetched and OCR'd directly this run), a manual disconnect switch — DISCRETIONARY at Tier 1 (≤10kW) and installed at DUKE'S OWN EXPENSE if Duke elects to require one — must be 'mounted separate from, but adjacent to, the Company's meter socket,' with NO distance figure given (only 'adjacent to'). Tier 2/3 disconnects are mandatory, at the customer's expense, with the same 'adjacent to' language and no distance figure. 88% · utility's own current standards document (SECO) + utility's own filed FPSC tariff (Duke)
    • Must equipment be on a specific approved list? UL 1741 / IEEE 1547 certified equipment is required by SECO for interconnection. No separate AHJ-level (City or County) approved-equipment list was found. 68% · utility's own documentation page
    • Are batteries permitted, and under what conditions? Likely yes, under the same interconnection framework as PV alone — SECO's own Renewable Generation System Standards document includes a dedicated disconnect/placard diagram for an RGS combined with battery STORAGE, applying the identical 5-foot/placard requirements. Wildwood's own LDR is silent on batteries/ESS by name (its accessory-use list names only 'photovoltaic systems and solar thermal arrays'). 62% · utility's own current standards document
    • Is a ground mount treated as a structure? Likely yes — ground-mounted PV falls under the LDR's 'Specified accessory uses and structures' section alongside other accessory structures, subject to the generic accessory-structure setback: a minimum of 5 feet from the property line, with the option to encroach into side/rear setbacks per Table 3-4 (except along roadway-adjacent lines, which must meet full Table 3-4 setbacks). 70% · City's current Land Development Regulations

20 questions answered against City of Wildwood’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020

Why the confidence is not higherStated plainly on Sumter County Building Services' own current FAQ, which lists all currently enforced code editions including 'National Electric Code 2020' — Sumter being the delegated AHJ that actually administers the electrical code for Wildwood addresses. Consistent with the statewide baseline (NEC 2020, effective 31 Dec 2023).

delegated AHJ's own current FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023) — all parts (Building, Residential, Energy Conservation, Plumbing, Existing Building, Accessibility, Mechanical, Fuel Gas).

Why the confidence is not higherSumter Building Services' own current FAQ lists each FBC volume by name as 'Eighth Edition 2023'.

delegated AHJ's own current FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition.

Why the confidence is not higherNamed on the same Sumter Building Services FAQ list of currently enforced codes.

delegated AHJ's own current FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q32 Are there local amendments to any of the above? Core Code editions in force

Nothing published by this authority.

Where we lookedWildwood's own Code of Ordinances on Municode, which states on its landing page that it is codified only through Ordinance No. O2014-15 (adopted 24 Feb 2014, Supp. No. 2, 'online content updated on October 30, 2014') — a Municode clientId could not be recovered this session (API calls returned 400/404, and the site's JS bundle did not expose it to inspection), so the interior electrical/building chapters could not be searched for local technical amendments. Sumter County's own current FAQ presents unamended state-edition code years, suggesting no material county-level amendment, but this was not independently verified against codified county ordinance text.

https://library.municode.com/fl/wildwood/codes/code_of_ordinances

Q33 What is the installation judged against? Core Electrical

Florida Building Code 8th Edition (2023) and NEC 2020, as administered by Sumter County Building Services (the delegated AHJ) — the same code set named in Q29/Q30.

Why the confidence is not higherSame source as Q29/Q30.

delegated AHJ's own current FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedSumter's Electrical submittal page and fee schedule — neither states a service-upgrade or busbar-sizing rule beyond the generic 'Electric upgrade $82' fee line, which does not describe a technical standard

https://www.sumtercountyfl.gov/125/Electrical

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedWildwood's LDR (full text search for 'mounting', 'attachment', 'racking') and Sumter's Building Services forms/checklists pages — no mounting-system or attachment-spacing document was found

https://www.sumtercountyfl.gov/134/Forms

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedSumter County Fire & EMS page and Fire Prevention Library, and Wildwood's LDR — no ridge-setback or fire-access-pathway rule for rooftop PV was found in either

https://www.sumtercountyfl.gov/1377/Fire-Prevention-Library

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Not stated by name in any reachable Wildwood or Sumter document; NEC 690.12 rapid shutdown would apply as a matter of the NEC 2020 adoption itself, but no local document was found affirmatively citing it.

Why the confidence is not higherInference only from the confirmed NEC 2020 adoption (Q29); neither Sumter's Building Services pages, its fee schedule, nor Wildwood's LDR mention 'rapid shutdown' or '690.12' by name (checked with a full-text search of the LDR, zero hits).

inference from NEC edition; absence checked in the current LDR checked 2026-09-12 https://www.wildwood-fl.gov/DocumentCenter/View/131

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Utility-conditional. SECO REQUIRES a placard on the front cover of the AC disconnect switch identifying the on-site power source (and a second placard indicating a dual power source where an existing disconnect is reused as a raceway). Duke's own filed Tier 1-3 tariff sheets contain NO placard/plaque/sign/label requirement of any kind (checked directly this run by OCR of all three sheets). Neither the City of Wildwood nor Sumter County Building Services publishes an AHJ-level placard requirement of their own.

Why the confidence is not higherSECO figure from its own current Renewable Generation System Standards document (ModDate 14 Apr 2025), read directly. Duke absence proven by direct fetch and OCR of Duke's own Tier 1 (and confirmed structurally identical Tier 2/3) filed FPSC contract sheets, searching for 'placard/plaque/sign/label' with zero hits outside the disconnect clause itself.

utility's own current standards document (SECO) + utility's own filed tariff (Duke, checked and absent) checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

SECO: the placard must identify 'the on-site power source' (and, on the reused-raceway scenario, must indicate 'dual power source'); the standards document does not print one single fixed sentence of wording the way FPL's does. Duke: no placard wording exists (see Q38).

Why the confidence is not higherRead directly from SECO's Renewable Generation System Standards notes 2-3 on each of its three disconnect-scenario diagrams.

utility's own current standards document checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

SECO (for SECO-served addresses): non-ferrous metal or poly-plastic plates, UV-resistant, epoxy-glued or riveted to the front cover of the disconnect switch, with engraved or stamped lettering a MINIMUM OF 1/4" HIGH, WHITE LETTERS ON A RED BACKGROUND. Peel-and-stick labels, paint, or marking pens are explicitly barred. Duke: no letter height/colour/material spec exists in Duke's own filed tariff sheets.

Why the confidence is not higherQuoted verbatim from SECO's own current Renewable Generation System Standards (dated by internal ModDate 14 Apr 2025), matching the identical spec independently found at two other Florida SECO-territory authorities earlier in this survey (Tavares, Groveland) — a third independent confirmation, now for a Wildwood-specific fetch. Duke's absence independently proven this run by OCR of its own filed sheets.

utility's own current standards document checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSECO's Renewable Generation System Standards document (read in full) and Required Documentation page — neither specifies a separate site-plan/facility-map placard beyond the disconnect-switch placard covered under Q38-40; Duke's filed tariff sheets were checked directly and contain no placard content of any kind

https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes for SECO (see Q38-40, all utility-published specifications with no AHJ equivalent). For Duke, no utility-published placard spec was found at all — the gap is genuine and was independently checked, not assumed.

Why the confidence is not higherSame sourcing as Q38.

utility's own current standards document checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

On the front cover of the AC disconnect switch itself, which SECO requires to be mounted adjacent to, and within five feet (5'-0") of, the utility meter enclosure.

Why the confidence is not higherQuoted directly from SECO's current Renewable Generation System Standards; the 5-foot figure matches two prior independent readings of the same document elsewhere in this survey.

utility's own current standards document checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

UL 1741 / IEEE 1547 certified equipment is required by SECO for interconnection. No separate AHJ-level (City or County) approved-equipment list was found.

Why the confidence is not higherStated on SECO's Net Metering Explained and Required Documentation pages ('Equipment must be UL 1741 / IEEE 1547 certified').

utility's own documentation page checked 2026-09-12 https://secoenergy.com/required-documentation

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Likely yes, under the same interconnection framework as PV alone — SECO's own Renewable Generation System Standards document includes a dedicated disconnect/placard diagram for an RGS combined with battery STORAGE, applying the identical 5-foot/placard requirements. Wildwood's own LDR is silent on batteries/ESS by name (its accessory-use list names only 'photovoltaic systems and solar thermal arrays').

Why the confidence is not higherInferred from a labelled 'STORAGE' disconnect diagram inside SECO's current Standards document; no explicit City or County statement on battery permitting was found, and the LDR's silence on batteries specifically was confirmed by a full-text search.

utility's own current standards document checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedWildwood's LDR (silent on ESS/batteries by name) and Sumter's Building Services fee schedule/forms pages — no separate ESS-specific permit type or inspection was found; SECO's Standards document folds battery/storage disconnect requirements into the same RGS framework rather than a distinct permit

https://www.sumtercountyfl.gov/459/Permitting-Fees

Q47 Is a ground mount treated as a structure? Core Ground mount

Likely yes — ground-mounted PV falls under the LDR's 'Specified accessory uses and structures' section alongside other accessory structures, subject to the generic accessory-structure setback: a minimum of 5 feet from the property line, with the option to encroach into side/rear setbacks per Table 3-4 (except along roadway-adjacent lines, which must meet full Table 3-4 setbacks).

Why the confidence is not higherPhotovoltaic systems are listed under LDR Sec. 3-9(B)(1), 'Specified accessory uses and structures... provided they satisfy the general criteria set forth above' (Sec. 3-9(A)), which is the section defining accessory STRUCTURE setback and encroachment rules generally — but no PV-specific ground-mount dimensional standard (height cap, lot-coverage rule) was found distinct from the generic accessory-structure rule.

City's current Land Development Regulations checked 2026-09-12 https://www.wildwood-fl.gov/DocumentCenter/View/131

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Utility-conditional. SECO: the AC disconnect must be mounted ADJACENT TO, and WITHIN FIVE FEET (5'-0") OF, the utility meter enclosure. Duke: per Duke's own filed Tier 1 contract (fetched and OCR'd directly this run), a manual disconnect switch — DISCRETIONARY at Tier 1 (≤10kW) and installed at DUKE'S OWN EXPENSE if Duke elects to require one — must be 'mounted separate from, but adjacent to, the Company's meter socket,' with NO distance figure given (only 'adjacent to'). Tier 2/3 disconnects are mandatory, at the customer's expense, with the same 'adjacent to' language and no distance figure.

Why the confidence is not higherSECO figure from its own current Standards document. Duke's Tier 1 language quoted directly from Duke's own filed FPSC tariff sheet (Third Revised Sheet No. 7.310, effective 29 April 2013), fetched at duke-energy.com/-/media/pdfs/for-your-business/generate-your-own-renewable/florida/tier-1-contract.pdf and OCR'd with pdftoppm+tesseract because the PDF (Aspose-generated) defeats pdftotext — independently reproducing this survey's own earlier finding on Duke's tariff.

utility's own current standards document (SECO) + utility's own filed FPSC tariff (Duke) checked 2026-09-12 https://secoenergy.com/sites/default/files/2025-10/renewable-generation-system-standards-april-2025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Through Sumter County's Citizenserve online portal (registered account), or by calling the County's Inspection Line for permits issued under the prior/legacy system. 65% · delegated AHJ's own FAQ
    • How much notice is required? Inspections requested online before 7:00 PM of the preceding business day are scheduled for the following business day; phone requests must be in before 4:00 PM of the preceding business day. 78% · delegated AHJ's own FAQ
    • Are same-day or AM/PM windows offered? No AM/PM or same-day scheduling window is offered; the County's FAQ states an estimated time can only be given if the applicant calls the office on the day of the inspection. 70% · delegated AHJ's own FAQ
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes, but performed by the delegated AHJ (Sumter County Building Services), not by any City of Wildwood staff. 85% · delegated AHJ's own department page
    • If delegated, to whom? Sumter County Building Services (Building Official Jeanette Keller), under a Joint Planning Agreement/interlocal arrangement with the City of Wildwood — a government-to-government delegation, not a private-firm outsourcing (no SAFEbuilt/PDCS-style firm identified). 88% · City's own Pre-Development Conference FAQ
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for City of Wildwood on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    Nothing recorded for City of Wildwood on this step yet — 3 questions checked and found unpublished. The guidance above is general.

  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • Who notifies the utility for PTO? For SECO-served addresses: the member/contractor uploads all required documents and system photos through SECO's own online process; a qualified SECO employee reviews and approves them, after which SECO itself installs the required bi-directional net meter before the system may be energized (SECO's own 10-step process, steps 8-10). For Duke-served addresses (state floor, FL PSC Rule 25-6.065): the customer/installer executes the Standard Interconnection Agreement and must notify Duke at least 10 days before placing the system in parallel operation. 68% · utility's own process page (SECO) + FL PSC Rule 25-6.065 (Duke floor)
    • Is there a re-inspection fee? $82 (Sumter's fee schedule line 'Inspection (Partial and Re-Inspection) $82'); the County's FAQ separately notes re-inspection fees must be paid before a final inspection will be scheduled. 80% · delegated AHJ's current fee schedule

14 questions answered against City of Wildwood’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Through Sumter County's Citizenserve online portal (registered account), or by calling the County's Inspection Line for permits issued under the prior/legacy system.

Why the confidence is not higherSumter Building Services' own FAQ: 'How do I schedule an inspection? Click here to schedule an inspection online. Or call 352-569-1529...' — general to all trades, not solar-specific.

delegated AHJ's own FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q50 How much notice is required? Core Booking & scheduling

Inspections requested online before 7:00 PM of the preceding business day are scheduled for the following business day; phone requests must be in before 4:00 PM of the preceding business day.

Why the confidence is not higherQuoted from Sumter Building Services' own current FAQ ('When will the building inspection be set?').

delegated AHJ's own FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No AM/PM or same-day scheduling window is offered; the County's FAQ states an estimated time can only be given if the applicant calls the office on the day of the inspection.

Why the confidence is not higherQuoted from Sumter Building Services' own current FAQ ('Can I find out when during the day my building inspection will be done? We can only provide an estimated time if you contact the office on the day of the inspection').

delegated AHJ's own FAQ checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes, but performed by the delegated AHJ (Sumter County Building Services), not by any City of Wildwood staff.

Why the confidence is not higherFollows directly from the confirmed delegation (jurisdiction.why): Sumter's own Building Services page lists 'Inspections' among its core department services and gives the named Building Official (Jeanette Keller) as the escalation contact for service issues.

delegated AHJ's own department page checked 2026-09-12 https://www.sumtercountyfl.gov/77/Building-Services

Q53 If delegated, to whom? Core Who inspects

Sumter County Building Services (Building Official Jeanette Keller), under a Joint Planning Agreement/interlocal arrangement with the City of Wildwood — a government-to-government delegation, not a private-firm outsourcing (no SAFEbuilt/PDCS-style firm identified).

Why the confidence is not higherSame sourcing as jurisdiction.why.

City's own Pre-Development Conference FAQ checked 2026-09-12 https://www.wildwood-fl.gov/DocumentCenter/View/160

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedSumter Building Services page and fee schedule — no published inspection-sequence list (rough-in, mid-roof, final, etc.) specific to solar or general electrical work was found

https://www.sumtercountyfl.gov/77/Building-Services

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame as Q54 — no rough-in/mid-roof inspection requirement stated for roofing or PV specifically

https://www.sumtercountyfl.gov/77/Building-Services

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedSumter Building Services page and FAQ — no statement that the inspector specifically verifies equipment labels/listings as a discrete checked item

https://www.sumtercountyfl.gov/77/Building-Services

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedSumter Building Services Forms page (full listing reviewed) and Checklists — no published PV or general inspection checklist document was found

https://www.sumtercountyfl.gov/134/Forms

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedSumter Building Services page and fee schedule — no statement of what documents must be physically on site at the time of a PV inspection

https://www.sumtercountyfl.gov/77/Building-Services

Q59 Is there a re-inspection fee? Corrections & re-inspection

$82 (Sumter's fee schedule line 'Inspection (Partial and Re-Inspection) $82'); the County's FAQ separately notes re-inspection fees must be paid before a final inspection will be scheduled.

Why the confidence is not higherQuoted from Sumter's current Building Services Fee Schedule (Sec. I.4.a), corroborated by the FAQ note on the same fee-schedule page ('Re-inspections will generate an inspection fee which must be paid prior to requesting final inspection').

delegated AHJ's current fee schedule checked 2026-09-12 https://www.sumtercountyfl.gov/459/Permitting-Fees

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedSumter Building Services page and Citizenserve portal home page (Building Permits / correction-related items) — no described corrections/resubmittal workflow was found beyond the general re-inspection fee (Q59)

https://www.citizenserve.com/Portal/PortalController?Action=showHomePage&installationID=445

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedSumter Building Services page and fee schedule — no statement of what document (Certificate of Occupancy, Final approval letter, 'green tag,' etc.) is issued specifically on passing a PV/electrical-alteration final inspection

https://www.sumtercountyfl.gov/77/Building-Services

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

For SECO-served addresses: the member/contractor uploads all required documents and system photos through SECO's own online process; a qualified SECO employee reviews and approves them, after which SECO itself installs the required bi-directional net meter before the system may be energized (SECO's own 10-step process, steps 8-10). For Duke-served addresses (state floor, FL PSC Rule 25-6.065): the customer/installer executes the Standard Interconnection Agreement and must notify Duke at least 10 days before placing the system in parallel operation.

Why the confidence is not higherSECO figure from its own current Interconnection Process page. Duke figure from the PSC state-floor rule rather than a Duke-specific document; Duke's own filed Tier 1 contract (fetched this run) does not itself specify who makes the PTO notification.

utility's own process page (SECO) + FL PSC Rule 25-6.065 (Duke floor) checked 2026-09-12 https://secoenergy.com/interconnection-process

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 70%

SECO: the placard must identify 'the on-site power source' (and, on the reused-raceway scenario, must indicate 'dual power source'); the standards document does not print one single fixed sentence of wording the way FPL's does. Duke: no placard wording exists (see Q38).

Size, colour & material 92%

SECO (for SECO-served addresses): non-ferrous metal or poly-plastic plates, UV-resistant, epoxy-glued or riveted to the front cover of the disconnect switch, with engraved or stamped lettering a MINIMUM OF 1/4" HIGH, WHITE LETTERS ON A RED BACKGROUND. Peel-and-stick labels, paint, or marking pens are explicitly barred. Duke: no letter height/colour/material spec exists in Duke's own filed tariff sheets.

Where they go 90%

On the front cover of the AC disconnect switch itself, which SECO requires to be mounted adjacent to, and within five feet (5'-0") of, the utility meter enclosure.

What the utility wants on top 85%

Yes for SECO (see Q38-40, all utility-published specifications with no AHJ equivalent). For Duke, no utility-published placard spec was found at all — the gap is genuine and was independently checked, not assumed.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.wildwood-fl.gov/building
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.