Clay County

Clay County

State of Florida

Verified Aug. 5, 2026

Clay County is a county authority in the State of Florida, serving 218,245 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Clay County against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Clay County is the authority having jurisdiction 80% confidence
Holds
Building and Electrical, for the unincorporated area of Clay County only (Chapter 6 Art. II Permits/Inspections; Chapter 7 contractor/craftsman certification incl. electrical craftsmen). Planning & Zoning is a separate County division handling LDC/zoning review, not building/electrical permitting.
Overridden by
FS 163.04 bars HOA/deed-restriction denial of solar collectors statewide. FS 125.56(4)(d) (as amended by 2026 HB 803, in force 1 Jul 2026) sets a 1-year minimum permit-validity floor for county-issued SFD permits, superseding the County's own stale 90-day Sec. 6-43. FS 553.792 (as amended) sets the state review-turnaround clock (30 business days for most residential PV; 5 for existing-SFD electrical work under $15,000). Clay Electric Cooperative and, for part of the unincorporated county (Ord. 93-31, codified Code App. D Art. IV), JEA each control interconnection/PTO as gatekeepers outside the County's authority.
Why not higher
Clay County is the AHJ for the unincorporated area, evidenced by its own Building Division (477 Houston St, Green Cove Springs) issuing/inspecting Building and Electrical permits under Code Ch. 6-7 and its own fee schedule. It is NOT the AHJ inside the City of Green Cove Springs or the Town of Orange Park, both of which run independent building divisions confirmed from each municipality's own page (Green Cove Springs' own FAQ distinguishes tax-jurisdiction codes '001' County vs '002' City; Orange Park's Building Inspection and Permitting Division states it operates its own permitting for in-town properties). The brief's warning that 'city = self-permits' is not universal held partially true here but needed checking: the Town of Keystone Heights' own Building Department page states permits are reviewed by the Town's Public Works Director FIRST but then 'must be submitted to Clay County' for actual issuance — i.e. Keystone Heights delegates the AHJ role to the County even though it is incorporated, the same pattern as the Everglades City/Collier interlocal example in the brief (though I found no separate interlocal agreement document, only the Town's own process description). The Town of Penney Farms lists its own Town Hall 'Building Department' but I could not independently verify (this run) whether it truly self-permits or, like Keystone Heights, ultimately routes to the County — left unresolved rather than asserted either way.

https://greencovesprings.com/FAQ.aspx?QID=73

Permit required
Yes — a permit is required for construction/alteration of a structure, which a licensed installer would treat a PV mount and its electrical work as falling under (Sec. 6-36 'Required').75%
Permit cost
No dedicated PV fee line exists. Building the general fee schedule: Building Permit minimum $100 (§208.1, includes amendments) plus, for larger jobs,55%
Plan review
30 business days for a typical residential PV permit. The County's own ordinance (Sec. 6-41) commits to examining applications 'within a reasonable time...70%
Portal
Citizens Access Portal (CAP), running on Tyler Technologies EnerGov 'EPL' self-service software, at claycountyfl-energovpub.tylerhost.net/apps/SelfService.90%
Electrical code
2020 NEC — adopted statewide via the Florida Building Code, 8th Edition (2023), Chapter 27 (Electrical). Clay County's own Code (Sec.60%
Booking an inspection
Portal — inspections are booked via the same Tyler EnerGov Citizens Access Portal (CAP) used for permitting;60%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes — a permit is required for construction/alteration of a structure, which a licensed installer would treat a PV mount and its electrical work as falling under… Q3 Electrical and building permits — Separate — the fee schedule prices Building Permits (§208.1, $100 minimum) and Electrical Permits (§208.2, $50 minimum) as distinct line items, Q4 Plan review — 30 business days for a typical residential PV permit. The County's own ordinance (Sec. 6-41) commits to examining applications 'within a reasonable time... Q18 Where you file — Citizens Access Portal (CAP), running on Tyler Technologies EnerGov 'EPL' self-service software, at claycountyfl-energovpub.tylerhost.net/apps/SelfService. Q20

Permit required
Yes — a permit is required for construction/alteration of a structure, which a licensed installer would treat a PV mount and its electrical work as falling under (Sec. 6-36 'Required').75% source
What it costs
No dedicated PV fee line exists. Building the general fee schedule: Building Permit minimum $100 (§208.1, includes amendments) plus, for larger jobs,55% source
Plan review turnaround
30 business days for a typical residential PV permit. The County's own ordinance (Sec. 6-41) commits to examining applications 'within a reasonable time...70% source
Key document
department page cited by 3 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes, for the unincorporated area of Clay County (and, via delegation, for the Town of Keystone Heights). NOT the AHJ for the City of Green Cove Springs or the Town of Orange Park, which run their own building divisions. 90% · City/county pages, cross-checked by name
    • What does this authority permit itself, and what does it delegate? Both — the Building Division issues and inspects both Building and Electrical permits itself for unincorporated Clay County (fee schedule Sections 208.1 Building Permits and 208.2 Electrical Permits are both County-collected fees; Chapter 7 maintains a County Construction Trades Licensing Board and County electrical-craftsman certification). Not delegated to a separate agency; Planning & Zoning (a different County division) handles zoning/LDC review, not building/electrical. 85% · adopting ordinance + fee schedule
    • Is a permit required for a residential rooftop PV system? Yes — a permit is required for construction/alteration of a structure, which a licensed installer would treat a PV mount and its electrical work as falling under (Sec. 6-36 'Required'). 75% · adopting ordinance
    • Is there a separate electrical permit, or is it combined? Separate — the fee schedule prices Building Permits (§208.1, $100 minimum) and Electrical Permits (§208.2, $50 minimum) as distinct line items, and Chapter 7 certifies 'Building Contractors' (Div. 4) and 'Electrical Craftsman' (Div. 7) as separate trades. 60% · fee schedule + current how-to-guides list (inference)
    • Is a HOA or architectural approval required first? No — not required as a legal matter. Florida Statute 163.04 bars any 'deed restriction, covenant, declaration, or similar binding agreement' (which includes HOA architectural-control documents) from denying a property owner permission to install solar collectors; an HOA/ACC may only regulate placement/orientation within limits that don't impair performance. 80% · state statute
    • Is there a historic-district review? No — Clay County's Land Development Code, Article III (Zoning and Land Use), has no historic-district overlay provision at all; searching its full text (19,876 lines) for 'historic' returns only incidental uses of the word (comprehensive-plan cross-references), not a zoning overlay district. 70% · Land Development Code, Article III (zoning)
    • Is a wind or windstorm certification required? No separate windstorm-certification submittal exists (this is not a Texas-TDI-style state); wind design is handled through the Florida Building Code's Figure 1609 wind-speed-line map, which Clay County has itself localized: Sec. 6-6 sets a 110 mph line along US-17/SR-15 and a 100 mph line along the county's west boundary, per Ch. 2000-141, Laws of Florida. 65% · adopting ordinance
    • Is a Specific Use Permit or Council approval ever required? Generally no for rooftop or small accessory-scale ground-mount PV. The LDC's only solar-specific approval trigger is for a 'Solar Facility (Solar Farm)' — a distinct, larger-scale use requiring conditional/special-use review in specified districts — not applicable to a residential accessory PV installation. 60% · Land Development Code, Article III (zoning)
    • Is there a system-size cap on residential generation? No County zoning cap specific to residential PV was found. The practical governing cap comes from the utility side: Clay Electric Cooperative's tariff limits an RGS to no more than 90% of the member's utility service-entrance rating or 90% of the co-op's transformer kVA rating at that location (whichever is less), and systems of 20 kW DC or more require Clay Electric pre-approval. 70% · utility interconnection agreement + LDC (zoning)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either — application must come from a certified/licensed contractor or master craftsman (Sec. 6-38(b), Ch. 7 Div. 7 Electrical Craftsman), or the property owner may apply as owner ('the owner, lessee, or builder' — Sec. 6-38(a)), consistent with Florida's statewide owner-builder exemption (F.S. 489.103(7)). 60% · adopting ordinance (general permit chapter)
    • Must the contractor be registered with this authority before applying? Yes — the contractor must hold a Clay County Certificate of Competency (local trade licensing board, Ch. 7) or, if state-certified, must at minimum register with the County and supply proof of liability insurance before pulling permits. 80% · adopting ordinance
    • Is a homeowner permitted to self-install and self-permit? Yes, in principle — Sec. 6-38(a) lets 'the owner' apply for a building/other permit, and Florida's statewide owner-builder statute (F.S. 489.103(7)) lets a homeowner permit and perform work on their own residence. No PV-specific owner-builder statement was found. 55% · adopting ordinance (general)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar-specific checklist is published. The general building-permit application (Sec. 6-37) requires: plans/drawings showing the plumbing and electrical layout; a site plan showing the building/structure location, distances to property lines and other structures, and off-street parking; a legal description of the property; and (for lots under 1 acre) a foundation survey by a registered surveyor before final inspection (waivable). All applications go through the Tyler Technologies EPL Citizens Access Portal (CAP). 55% · adopting ordinance (general) + how-to-guides page
    • How many copies, and in what format? Electronic, through the Citizens Access Portal (CAP) — a Tyler Technologies EnerGov 'EPL' self-service instance; the Building Division's own page states 'All permit applications must be submitted through the Citizens Access Portal (CAP)'. 75% · department page
    • Is a site plan required, and what must it show? Yes, per the general application requirement (Sec. 6-37(a)(2)): a site plan showing the location of the building/structure on the property, distances to property lines and other buildings/structures, and off-street parking spaces with adequate access/maneuvering space. 55% · adopting ordinance (general)
    • Is a structural PE stamp required, and at what threshold? No PV-specific threshold is published. General provision: Sec. 6-37(b) requires signed/approved 'construction plans and specifications' only for 'commercial, industrial, or similar uses'; residential work is not named, so a structural PE stamp is not routinely required for a standard residential roof PV attachment under the County's general provision. 50% · adopting ordinance (general, inference)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Citizens Access Portal (CAP), running on Tyler Technologies EnerGov 'EPL' self-service software, at claycountyfl-energovpub.tylerhost.net/apps/SelfService. 90% · department page
    • Can the whole application be completed online? Yes — apply, search records, and check permit status are all listed as available online through CAP; new users must register an account first. 80% · department page
    • What does a residential solar permit cost? No dedicated PV fee line exists. Building the general fee schedule: Building Permit minimum $100 (§208.1, includes amendments) plus, for larger jobs, valuation-based fee per the current ICC Building Valuation Table; Electrical Permit minimum $50 (§208.2.2, Existing Residential Units). A typical straightforward residential PV job would run at least $150 (Building $100 + Electrical $50) before any ampere-service-upgrade or reinspection add-ons. A 25% discount applies to the building-permit fee when a private provider plan reviewer/inspector is used. 55% · fee schedule (Resolution 2023/2024-97)
    • How is the fee calculated? Tiered/mixed — Building Permit fee is valuation-based above the $100 minimum (per current ICC Building Valuation Table); Electrical Permit fee is a flat minimum ($50) unless the job matches one of the itemized ampere-service or sub-feed categories. 55% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 30 business days for a typical residential PV permit. The County's own ordinance (Sec. 6-41) commits to examining applications 'within a reasonable time... not to exceed thirty (30) days'; state law (F.S. 553.792, as most recently amended by 2026's HB 803) separately requires a decision within 30 business days for residential/accessory structures under 7,500 sq ft (the bracket almost all residential PV falls in), or 5 business days only for existing single-family electrical work under $15,000 (rare for a full PV system). 70% · state statute + local ordinance
    • How long is an issued permit valid before it expires? The County's own codified text (Sec. 6-43) says 90 days from issuance, renewable in further 90-day increments 'for just cause' — but this is now superseded, for single-family dwellings, by the state-law floor: F.S. 125.56(4)(d) (as amended by 2026's HB 803, in force 1 Jul 2026) provides 'a building permit issued by a county for a single-family dwelling expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' Sec. 6-43 has not been amended since Ord. 2015-4, so it has not caught up with the new state floor. 75% · adopting ordinance (stale) + superseding state statute
    • Which utility handles interconnection here? Split. Clay Electric Cooperative, Inc. (member-owned co-op headquartered in Keystone Heights, in the county) serves most of the county and is the co-op whose own interconnection tariff this survey pulled from. JEA (Jacksonville Electric Authority) separately holds a nonexclusive electric-utility franchise for the unincorporated area of Clay County under Ordinance 93-31 (still codified as Code Appendix D, Article IV — 'Electric Utility Franchise' — granted to JEA, 'its successors and assigns'), so parts of the county (generally areas nearer the Duval County line) are JEA territory, not co-op territory. I did not independently verify JEA's residential-PV interconnection rules this run. 75% · adopting ordinance (franchise) + co-op's own site
    • Where does the utility sit in the sequence? After permit (with the application to the utility able to run in parallel to permitting, but energization gated on it) — Clay Electric's Interconnection Agreement requires the member to certify, before the RGS is put into service, that 'the RGS installation has been inspected by the local code official who has certified that the installation was permitted and has been approved and has met all electrical and mechanical requirements.' 75% · utility interconnection agreement (tariff sheet)

28 questions answered against Clay County’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes, for the unincorporated area of Clay County (and, via delegation, for the Town of Keystone Heights). NOT the AHJ for the City of Green Cove Springs or the Town of Orange Park, which run their own building divisions.

Why the confidence is not higherGreen Cove Springs' own FAQ says a parcel coded '002' pulls its permit with the City and '001' with the County; the Town of Orange Park's Building Inspection and Permitting Division states it 'operates its own permitting division for commercial and residential properties within town limits' (904-264-2635). Keystone Heights' own Building Department page: 'All building permits for properties located within the city limits of Keystone Heights must first be reviewed and approved by the City's Public Works Director. Once approved, permits must be submitted to Clay County' — i.e. the town does zoning/PW review but Clay County is the actual issuing/inspecting AHJ. Penney Farms' Town Hall lists its own 'Building Department' (904-529-9078) but I could not independently verify whether it self-permits or, like Keystone Heights, routes to the County — flagged, not asserted.

City/county pages, cross-checked by name checked 2026-09-11 https://greencovesprings.com/FAQ.aspx?QID=73

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both — the Building Division issues and inspects both Building and Electrical permits itself for unincorporated Clay County (fee schedule Sections 208.1 Building Permits and 208.2 Electrical Permits are both County-collected fees; Chapter 7 maintains a County Construction Trades Licensing Board and County electrical-craftsman certification). Not delegated to a separate agency; Planning & Zoning (a different County division) handles zoning/LDC review, not building/electrical.

Why the confidence is not higherClay County Code Ch. 6 Art. II Div. 2 (permits) and Ch. 7 (contractor/craftsman certification, incl. Div. 7 Electrical Craftsman) are both County ordinances; FY24/25 Schedule of Fees & Services (Resolution 2023/2024-97) prices Building Permits (§208.1) and Electrical Permits (§208.2) as separate County fee lines. No solar-specific record type was found (see q4/q8), so this is the general Building/Electrical structure, not a PV-specific confirmation.

adopting ordinance + fee schedule checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes — a permit is required for construction/alteration of a structure, which a licensed installer would treat a PV mount and its electrical work as falling under (Sec. 6-36 'Required').

Why the confidence is not higherSec. 6-36: 'It shall be unlawful to construct, alter, repair, remove, place or demolish... a building or structure... without first filing an application with, and obtaining a permit from the building department', with only a $1,000-and-under agricultural-structure exemption. No solar-specific exemption exists (confirmed absent, see not_found on q-checklist items); Wayback's full-text index of claycountygov.com (230+ building pages, 1,376 PDFs) returns zero hits for 'solar', 'photovoltaic', or 'renewable' while 'electrical' and 'setback' return dozens — so the exemption search itself was working.

adopting ordinance checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-36RE

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate — the fee schedule prices Building Permits (§208.1, $100 minimum) and Electrical Permits (§208.2, $50 minimum) as distinct line items, and Chapter 7 certifies 'Building Contractors' (Div. 4) and 'Electrical Craftsman' (Div. 7) as separate trades.

Why the confidence is not higherNo dedicated solar/PV record type is published (confirmed: the current Permit Applications How-To Guides list — carport, demolition, detached garage, mobile home, new commercial, pre-fab shed, shed owner-builder, single-family dwelling, register as contractor — has no solar entry as of the 15 Apr 2026 crawl), so which permit(s) a residential PV job actually needs is inferred from the general fee structure, not stated for solar specifically.

fee schedule + current how-to-guides list (inference) checked 2026-09-11 https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either — application must come from a certified/licensed contractor or master craftsman (Sec. 6-38(b), Ch. 7 Div. 7 Electrical Craftsman), or the property owner may apply as owner ('the owner, lessee, or builder' — Sec. 6-38(a)), consistent with Florida's statewide owner-builder exemption (F.S. 489.103(7)).

Why the confidence is not higherSec. 6-38 is the general building-permit eligibility provision, not solar-specific; its explicit owner-builder carve-out (twenty-five thousand dollar cap, Sec. 6-38(c)) is written for commercial/agricultural structures, not residential PV, so the residential owner-builder route is inferred from Sec. 6-38(a)'s plain 'owner' language plus state law rather than stated for solar.

adopting ordinance (general permit chapter) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH7BUCOCRET_ARTIIICECO_DIV1GE_S7-56SATACECO

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — the contractor must hold a Clay County Certificate of Competency (local trade licensing board, Ch. 7) or, if state-certified, must at minimum register with the County and supply proof of liability insurance before pulling permits.

Why the confidence is not higherSec. 6-38(b): permits accepted 'only from a contractor or master craftsman holding an active certificate required by Chapter 7'; Sec. 7-56: 'State-certified contractors must supply the building department with a copy of liability insurance not less than one hundred thousand dollars ($100,000.00)'; FY24/25 fee schedule prices a $35 Contractor License Fee and $25 License Registration fee.

adopting ordinance checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH7BUCOCRET_ARTIIICECO_DIV1GE_S7-56SATACECO

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes, in principle — Sec. 6-38(a) lets 'the owner' apply for a building/other permit, and Florida's statewide owner-builder statute (F.S. 489.103(7)) lets a homeowner permit and perform work on their own residence. No PV-specific owner-builder statement was found.

Why the confidence is not higherThis is inferred from the general permit-eligibility section, not a solar-specific county statement; the County's owner-builder carve-out named explicitly in Sec. 6-38(c) is scoped to agricultural/commercial construction, not residential PV.

adopting ordinance (general) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH7BUCOCRET_ARTIIICECO_DIV1GE_S7-56SATACECO

Q8 What documents make up a complete submittal? Core Submittal package

No solar-specific checklist is published. The general building-permit application (Sec. 6-37) requires: plans/drawings showing the plumbing and electrical layout; a site plan showing the building/structure location, distances to property lines and other structures, and off-street parking; a legal description of the property; and (for lots under 1 acre) a foundation survey by a registered surveyor before final inspection (waivable). All applications go through the Tyler Technologies EPL Citizens Access Portal (CAP).

Why the confidence is not higherConfirmed absence of a solar-specific list: the current (15 Apr 2026) Permit Applications How-To Guides page lists 9 project types and none is solar; the domain-wide Wayback URL index (230+ building pages, 1,376 PDFs) has zero 'solar'/'photovoltaic' hits against dozens of 'electrical' hits in the same index, so the general Sec. 6-37 list is the best available evidence, not a PV-specific one.

adopting ordinance (general) + how-to-guides page checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-37APGE

Q9 How many copies, and in what format? Submittal package

Electronic, through the Citizens Access Portal (CAP) — a Tyler Technologies EnerGov 'EPL' self-service instance; the Building Division's own page states 'All permit applications must be submitted through the Citizens Access Portal (CAP)'.

Why the confidence is not higherFrom the County's current Building Division page (15 Jul 2026 crawl): 'Clay County uses Tyler Technologies EPL as its online permitting system.' No PV-specific copy-count/format statement exists beyond the general online-submission requirement.

department page checked 2026-09-11 https://web.archive.org/web/20260715192924/https://www.claycountygov.com/government/building

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes, per the general application requirement (Sec. 6-37(a)(2)): a site plan showing the location of the building/structure on the property, distances to property lines and other buildings/structures, and off-street parking spaces with adequate access/maneuvering space.

Why the confidence is not higherGeneral building-permit provision, not solar-specific; no PV site-plan checklist is published (see q8).

adopting ordinance (general) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-37APGE

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedSearched the current how-to-guides list, the general Sec. 6-37 application requirements, and the full domain-wide Wayback index of claycountygov.com for 'one-line', 'single-line', 'diagram' — no County-published PV electrical-plan requirement exists. (Clay Electric Cooperative's own interconnection packet separately requires 'a line diagram of electrical connections and system specifications' as a utility, not AHJ, submittal — see q22/q42.)

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame search as q11 — no County-published string/conductor calculation requirement found; no PV checklist exists to specify it.

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No PV-specific threshold is published. General provision: Sec. 6-37(b) requires signed/approved 'construction plans and specifications' only for 'commercial, industrial, or similar uses'; residential work is not named, so a structural PE stamp is not routinely required for a standard residential roof PV attachment under the County's general provision.

Why the confidence is not higherInferred from the general (non-solar) permit-application section; Clay's zoning/building code has no PV-specific engineering threshold, and FBC engineering requirements (attachment uplift/shear) would still apply as a matter of state code regardless of this local text.

adopting ordinance (general, inference) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-37APGE

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSearched Ch. 6 Art. II (permits) and the current how-to-guides/fee schedule for an electrical-PE threshold specific to PV — none published.

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE

Q15 What does a residential solar permit cost? Core Fees

No dedicated PV fee line exists. Building the general fee schedule: Building Permit minimum $100 (§208.1, includes amendments) plus, for larger jobs, valuation-based fee per the current ICC Building Valuation Table; Electrical Permit minimum $50 (§208.2.2, Existing Residential Units). A typical straightforward residential PV job would run at least $150 (Building $100 + Electrical $50) before any ampere-service-upgrade or reinspection add-ons. A 25% discount applies to the building-permit fee when a private provider plan reviewer/inspector is used.

Why the confidence is not higherFY24/25 Schedule of Fees & Services (Resolution 2023/2024-97, effective 1 Oct 2024, most line items further updated 1 Jan 2025) has no 'solar', 'photovoltaic', or 'renewable' line (confirmed: 0 hits against 11 'electrical' hits and 0 'zzqqx' fabricated-control hits in the same PDF) — so this figure is constructed from the general Building + Electrical minimums, not a stated PV fee.

fee schedule (Resolution 2023/2024-97) checked 2026-09-11 https://web.archive.org/web/20260120092249/https://www.claycountygov.com/home/showpublisheddocument/7858/638664151775500000

Q16 How is the fee calculated? Core Fees

Tiered/mixed — Building Permit fee is valuation-based above the $100 minimum (per current ICC Building Valuation Table); Electrical Permit fee is a flat minimum ($50) unless the job matches one of the itemized ampere-service or sub-feed categories.

Why the confidence is not higherRead directly off the FY24/25 fee schedule's Building Permits (§208.1) and Electrical Permits (§208.2) sections; no PV-specific per-kW or per-panel rate exists.

fee schedule checked 2026-09-11 https://web.archive.org/web/20260120092249/https://www.claycountygov.com/home/showpublisheddocument/7858/638664151775500000

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedFee schedule has no separate 'plan review' line for residential PV specifically; commercial plan-review fees exist for commercial buildings only, and no PV plan-review fee is itemized.

https://web.archive.org/web/20260120092249/https://www.claycountygov.com/home/showpublisheddocument/7858/638664151775500000

Q18 What is the stated plan-review turnaround? Core Timeline & validity

30 business days for a typical residential PV permit. The County's own ordinance (Sec. 6-41) commits to examining applications 'within a reasonable time... not to exceed thirty (30) days'; state law (F.S. 553.792, as most recently amended by 2026's HB 803) separately requires a decision within 30 business days for residential/accessory structures under 7,500 sq ft (the bracket almost all residential PV falls in), or 5 business days only for existing single-family electrical work under $15,000 (rare for a full PV system).

Why the confidence is not higherLocal ordinance figure (30 days, not specified as business days) corroborates but does not exactly match the state statutory 30-business-day standard; I am reporting the state figure as controlling because it post-dates and is more specific than the 1978-vintage local text.

state statute + local ordinance checked 2026-09-11 https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0500-0599/0553/Sections/0553.792.html

Q19 How long is an issued permit valid before it expires? Timeline & validity

The County's own codified text (Sec. 6-43) says 90 days from issuance, renewable in further 90-day increments 'for just cause' — but this is now superseded, for single-family dwellings, by the state-law floor: F.S. 125.56(4)(d) (as amended by 2026's HB 803, in force 1 Jul 2026) provides 'a building permit issued by a county for a single-family dwelling expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' Sec. 6-43 has not been amended since Ord. 2015-4, so it has not caught up with the new state floor.

Why the confidence is not higherDirect read of the codified local ordinance (current through Supp. 86, Ord. 2026-12, 14 Apr 2026) shows no update to Sec. 6-43 reflecting the new one-year state floor — this is exactly the kind of local/state mismatch the brief warned to check for (the '180-day trap' pattern, here a '90-day' local figure). I am reporting the state floor as controlling for SFD PV permits going forward.

adopting ordinance (stale) + superseding state statute checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-43EXEX

Q20 Which permit portal does this authority use? Core Portal & process

Citizens Access Portal (CAP), running on Tyler Technologies EnerGov 'EPL' self-service software, at claycountyfl-energovpub.tylerhost.net/apps/SelfService.

Why the confidence is not higherCounty's own Building Division page (crawled 15 Jul 2026): 'Clay County uses Tyler Technologies EPL as its online permitting system... All permit applications must be submitted through the Citizens Access Portal (CAP)', linking directly to the tylerhost.net URL.

department page checked 2026-09-11 https://web.archive.org/web/20260715192924/https://www.claycountygov.com/government/building

Q21 Can the whole application be completed online? Core Portal & process

Yes — apply, search records, and check permit status are all listed as available online through CAP; new users must register an account first.

Why the confidence is not higherSame County Building Division page: 'This system allows you to: Apply for permits, Search permit records, Check the status of permit applications... If you are a new user, you will need to register for an account before submitting an application.'

department page checked 2026-09-11 https://web.archive.org/web/20260715192924/https://www.claycountygov.com/government/building

Q22 Which utility handles interconnection here? Core Utility interconnection

Split. Clay Electric Cooperative, Inc. (member-owned co-op headquartered in Keystone Heights, in the county) serves most of the county and is the co-op whose own interconnection tariff this survey pulled from. JEA (Jacksonville Electric Authority) separately holds a nonexclusive electric-utility franchise for the unincorporated area of Clay County under Ordinance 93-31 (still codified as Code Appendix D, Article IV — 'Electric Utility Franchise' — granted to JEA, 'its successors and assigns'), so parts of the county (generally areas nearer the Duval County line) are JEA territory, not co-op territory. I did not independently verify JEA's residential-PV interconnection rules this run.

Why the confidence is not higherClay Electric's own HQ address and 'Solar Power' section is on clayelectric.com (Keystone Heights, FL); the JEA franchise is Clay County's own codified ordinance, not a secondary source — this directly confirms the brief's flag that JEA also serves part of the county, and specifically avoids the PowerToChoose trap since both facts come from the utility/county sides, not an aggregator.

adopting ordinance (franchise) + co-op's own site checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_APXDFR_ARTIVELUTFR_S2GR

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit (with the application to the utility able to run in parallel to permitting, but energization gated on it) — Clay Electric's Interconnection Agreement requires the member to certify, before the RGS is put into service, that 'the RGS installation has been inspected by the local code official who has certified that the installation was permitted and has been approved and has met all electrical and mechanical requirements.'

Why the confidence is not higherVerbatim from Clay Electric Cooperative's own tariff-sheet 'Interconnection Agreement for Customer-Owned Renewable Generation Systems' (Form IGRG-1), Item 1, current version effective 30 Apr 2026 (Second Revised Sheet No. 21.0). The application/paperwork itself (Net Meter Application, Interconnection Agreement) can be assembled and submitted alongside the county permit process, but the utility will not energize/net-meter until permit finalization is certified.

utility interconnection agreement (tariff sheet) checked 2026-09-11 https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No — not required as a legal matter. Florida Statute 163.04 bars any 'deed restriction, covenant, declaration, or similar binding agreement' (which includes HOA architectural-control documents) from denying a property owner permission to install solar collectors; an HOA/ACC may only regulate placement/orientation within limits that don't impair performance.

Why the confidence is not higherText of F.S. 163.04 itself: 'A property owner may not be denied permission to install solar collectors or other energy devices by any entity granted the power or right in any deed restriction, covenant, declaration, or similar binding agreement.' This is a state preemption that applies regardless of what any specific Clay County HOA declaration says; I did not find (or need) a Clay-specific statement repeating this.

state statute checked 2026-09-11 https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0163/Sections/0163.04.html

Q25 Is there a historic-district review? Overlays & special cases

No — Clay County's Land Development Code, Article III (Zoning and Land Use), has no historic-district overlay provision at all; searching its full text (19,876 lines) for 'historic' returns only incidental uses of the word (comprehensive-plan cross-references), not a zoning overlay district.

Why the confidence is not higherFull-text read of the current LDC Article III (screen-reader-accessible PDF, crawled 16 May 2026); positive control 'setback' returns 403 hits and fabricated control 'zzqqx' returns 0 in the same document, so the search itself was working.

Land Development Code, Article III (zoning) checked 2026-09-11 https://web.archive.org/web/20260516050801/https://www.claycountygov.com/home/showpublisheddocument/1266/638760966051830000

Q26 Is a wind or windstorm certification required? Overlays & special cases

No separate windstorm-certification submittal exists (this is not a Texas-TDI-style state); wind design is handled through the Florida Building Code's Figure 1609 wind-speed-line map, which Clay County has itself localized: Sec. 6-6 sets a 110 mph line along US-17/SR-15 and a 100 mph line along the county's west boundary, per Ch. 2000-141, Laws of Florida.

Why the confidence is not higherSec. 6-6 is the County's own local wind-speed-line ordinance; it functions as a structural design input at permit review, not a separate pre-permit certification document, which is what the question is really probing for.

adopting ordinance checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIINGE_S6-6WISPLI

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Generally no for rooftop or small accessory-scale ground-mount PV. The LDC's only solar-specific approval trigger is for a 'Solar Facility (Solar Farm)' — a distinct, larger-scale use requiring conditional/special-use review in specified districts — not applicable to a residential accessory PV installation.

Why the confidence is not higherConfirmed by reading all 5 'Solar Farm[s]' hits in the current LDC Article III in context — every one defines/regulates utility-scale ground-mount solar farms with acreage-based standards, not residential rooftop or small ground-mount PV; no SUP trigger exists for the residential case.

Land Development Code, Article III (zoning) checked 2026-09-11 https://web.archive.org/web/20260516050801/https://www.claycountygov.com/home/showpublisheddocument/1266/638760966051830000

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No County zoning cap specific to residential PV was found. The practical governing cap comes from the utility side: Clay Electric Cooperative's tariff limits an RGS to no more than 90% of the member's utility service-entrance rating or 90% of the co-op's transformer kVA rating at that location (whichever is less), and systems of 20 kW DC or more require Clay Electric pre-approval.

Why the confidence is not higherLDC Article III's only system-size language is for utility-scale 'Solar Farms', not residential; the 90%/20kW figures are verbatim from Clay Electric's current Interconnection Agreement (Form IGRG-1, Item 10, and the 'Solar Getting Started' page), which functions as the real-world cap for a Clay Electric member even though the County itself does not zone for it.

utility interconnection agreement + LDC (zoning) checked 2026-09-11 https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2020 NEC — adopted statewide via the Florida Building Code, 8th Edition (2023), Chapter 27 (Electrical). Clay County's own Code (Sec. 6-40) still names only 'National Electrical Code' without an edition (last touched by Ord. 2022-1), so the edition-in-force is the statewide-adopted one, not a locally stated figure. 60% · adopting ordinance (names the document, not the edition) + redirect to state-published code
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023). Clay's own ordinance lists 'Clay County Building Code' and (stale) 'Standard Building Code' by name (Sec. 6-40(a)(1)-(2)) but the operative statewide code is the FBC, which the County's own 'Florida Building Codes' page redirects straight to (ICC's public Florida code collection) rather than hosting a local copy. 55% · adopting ordinance (stale list) + state mandate
    • Which fire code edition is in force? Florida Fire Prevention Code, 8th Edition (2023, based on NFPA 1 2021) governs statewide — but Clay County's own local Fire chapter (Ch. 6, Art. VI, 'Life Safety') explicitly does not apply to single-family residential property at all: 'This article shall apply to all property within the unincorporated areas of the county with the exception of single-family residential property' (Sec. 6-106). 65% · adopting ordinance
    • Are there local amendments to any of the above? Yes, but the local amendments on file (Ch. 6, Art. VII, 'Local Amendments to the Florida Building Code', Sec. 6-141 to 6-143) are all flood-hazard/coastal-construction related (affidavit permits in flood zones, Section 117 flood-hazard variances, and Residential R322.2.1 elevation requirements) — none amend anything solar/PV/electrical-specific. 90% · adopting ordinance
    • What is the installation judged against? The Florida Building Code (8th ed., 2023) and NEC (2020, via FBC Ch. 27), plus Clay's own local flood-hazard amendments (Sec. 6-141–6-143) where a site sits in a flood zone; no solar-specific local standard exists. 55% · adopting ordinance (inference)
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Clay County on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Yes, by state-code default — the 2020 NEC (adopted via FBC 8th ed., 2023, Ch. 27) requires rapid shutdown under NEC 690.12 for PV systems on or in buildings. No Clay-specific rapid-shutdown statement was found; this is a statewide-code inference, not a County-published rule. 55% · adopting ordinance (edition) + NEC 690.12 (inference)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? The AHJ (County) publishes no PV placard/signage requirement of its own (confirmed absent — see q39/q40/q41). The utility side is split: Clay Electric Cooperative requires only an unlabeled 'manual, single-throw, lockable disconnect' between inverter and the home's electrical service (no specific wording mandated) plus, if a battery is installed, a label reading exactly 'Battery storage utilized in this facility' permanently affixed to the meter enclosure. JEA separately holds an electric franchise for part of unincorporated Clay County (see q22) but I did not independently verify JEA's own placard spec this run. 65% · ordinance (absent) + utility interconnection agreement
    • Does the UTILITY specify placards beyond the AHJ's? Yes, in part — Clay Electric Cooperative specifies exact wording for a battery-storage label ('Battery storage utilized in this facility,' permanently affixed to the meter enclosure) though not for the PV disconnect switch itself, which it requires but does not word. JEA also franchises part of the county but its placard practice was not independently checked this run. 70% · utility interconnection agreement
    • Where must the labels be placed? Per Clay Electric: the manual RGS disconnect switch must be 'mounted separately from the meter socket,' located outside, and 'readily accessible at all times to the Cooperative' (preferably next to the utility meter); the battery-storage label must be affixed to the meter enclosure itself. No AHJ-level placement rule beyond this was found. 75% · utility page + interconnection agreement
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Outside, mounted separately from the meter socket, and readily accessible to Clay Electric — the co-op's stated preference is immediately next to the utility meter. 85% · utility interconnection agreement + utility page
    • Are batteries permitted, and under what conditions? Batteries are permitted by the utility subject to conditions, not separately addressed by the County: Clay Electric requires UL 1741-certified battery equipment, a permanent 'Battery storage utilized in this facility' label on the meter enclosure, no export of stored energy to the grid, and (per Fla. Admin. Code R. 25-6.065(2)(d), which the co-op cites) a UL-listed automatic transfer switch since batteries are not themselves defined as renewable energy under that rule. No Clay County ordinance addresses ESS/battery permitting for residential PV specifically. 65% · utility interconnection agreement
    • Is a ground mount treated as a structure? Likely yes, by default — the LDC has no PV-specific carve-out, so a ground-mounted array would fall under the general 'accessory structure' framework (with its own front/rear/side setback tables, e.g. 30 ft front / 7.5 ft rear-side in several districts) rather than being treated as an unregulated appliance. 55% · Land Development Code, Article III (inference)

20 questions answered against Clay County’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2020 NEC — adopted statewide via the Florida Building Code, 8th Edition (2023), Chapter 27 (Electrical). Clay County's own Code (Sec. 6-40) still names only 'National Electrical Code' without an edition (last touched by Ord. 2022-1), so the edition-in-force is the statewide-adopted one, not a locally stated figure.

Why the confidence is not higherThe 2020 NEC-via-8th-edition-FBC figure is the established statewide adoption (not independently re-derived from a Clay-specific document this run); Clay's own Sec. 6-40 names the document but not an edition year, and directs readers to the state-published code rather than hosting its own copy (the County's 'Florida Building Codes' page 302-redirects straight to codes.iccsafe.org's Florida collection).

adopting ordinance (names the document, not the edition) + redirect to state-published code checked 2026-09-11 https://web.archive.org/web/20220727082528/https://www.claycountygov.com/government/building/florida-building-codes

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023). Clay's own ordinance lists 'Clay County Building Code' and (stale) 'Standard Building Code' by name (Sec. 6-40(a)(1)-(2)) but the operative statewide code is the FBC, which the County's own 'Florida Building Codes' page redirects straight to (ICC's public Florida code collection) rather than hosting a local copy.

Why the confidence is not higherSec. 6-40's document list is visibly stale (pre-2002 SBCCI-era 'Standard Building/Plumbing/Gas/Mechanical/Fire Prevention Code' names, last touched 2022 only to correct another line) alongside a still-current 'International Property Maintenance Code, 2018 edition' cite — a genuine code-staleness finding, similar to the Osceola pattern flagged in the brief; state law (FBC mandatory statewide since 2002, F.S. 553.73) controls regardless of the stale local list.

adopting ordinance (stale list) + state mandate checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-40PERECOCETESTAPPEOTAG

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, 8th Edition (2023, based on NFPA 1 2021) governs statewide — but Clay County's own local Fire chapter (Ch. 6, Art. VI, 'Life Safety') explicitly does not apply to single-family residential property at all: 'This article shall apply to all property within the unincorporated areas of the county with the exception of single-family residential property' (Sec. 6-106).

Why the confidence is not higherSec. 6-106 is read verbatim from the current Code; it means a residential PV job in unincorporated Clay County is not routed through a separate County Fire Marshal review — fire-code compliance (e.g. NEC 690.12 rapid shutdown, NFPA 1 rooftop access pathways) is folded into the ordinary Building/Electrical permit review, not a distinct Fire Prevention Code submittal, for single-family homes specifically.

adopting ordinance checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTVILISA_S6-106SC

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, but the local amendments on file (Ch. 6, Art. VII, 'Local Amendments to the Florida Building Code', Sec. 6-141 to 6-143) are all flood-hazard/coastal-construction related (affidavit permits in flood zones, Section 117 flood-hazard variances, and Residential R322.2.1 elevation requirements) — none amend anything solar/PV/electrical-specific.

Why the confidence is not higherRead verbatim, all three sections of Article VII in full; each cites Ord. No. 2014-4 and F.S. 553.73(5) and concerns flood elevation/variance procedure only.

adopting ordinance checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTVIILOAMFLBUCO

Q33 What is the installation judged against? Core Electrical

The Florida Building Code (8th ed., 2023) and NEC (2020, via FBC Ch. 27), plus Clay's own local flood-hazard amendments (Sec. 6-141–6-143) where a site sits in a flood zone; no solar-specific local standard exists.

Why the confidence is not higherInference from q29/q30/q32 findings; no PV-specific 'installation is judged against X' statement is published by the County.

adopting ordinance (inference) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTVIILOAMFLBUCO

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedSearched Ch. 6 Art. VII (the only 'Local Amendments to the Florida Building Code' article the County has) in full — all three sections are flood-hazard/coastal only; no service-upgrade or busbar-sizing amendment exists anywhere in the codified Building chapter.

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTVIILOAMFLBUCO

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedNo PV-specific mounting/attachment-spacing standard is published by the County (confirmed absent from the how-to-guides list, the general Sec. 6-37 application requirements, and the Art. VII local amendments); this would default to manufacturer engineering plus FBC structural review with no local overlay.

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedNo local fire-code amendment on rooftop PV access pathways/ridge setbacks exists — and single-family residential property is expressly excluded from the County's own local Fire chapter altogether (Sec. 6-106, see q31), so there is no County-level fire-pathway rule to find for a house; whatever applies would come from the statewide Florida Fire Prevention Code/NFPA 1 default tables, not a Clay amendment.

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTVILISA_S6-106SC

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Yes, by state-code default — the 2020 NEC (adopted via FBC 8th ed., 2023, Ch. 27) requires rapid shutdown under NEC 690.12 for PV systems on or in buildings. No Clay-specific rapid-shutdown statement was found; this is a statewide-code inference, not a County-published rule.

Why the confidence is not higherConsistent with q29's finding that the 2020 NEC is the statewide-adopted edition; no County document was found stating this for PV specifically.

adopting ordinance (edition) + NEC 690.12 (inference) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-40PERECOCETESTAPPEOTAG

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

The AHJ (County) publishes no PV placard/signage requirement of its own (confirmed absent — see q39/q40/q41). The utility side is split: Clay Electric Cooperative requires only an unlabeled 'manual, single-throw, lockable disconnect' between inverter and the home's electrical service (no specific wording mandated) plus, if a battery is installed, a label reading exactly 'Battery storage utilized in this facility' permanently affixed to the meter enclosure. JEA separately holds an electric franchise for part of unincorporated Clay County (see q22) but I did not independently verify JEA's own placard spec this run.

Why the confidence is not higherClay Electric's current Interconnection Agreement (Form IGRG-1, Items 8 and 12(a)), effective 30 Apr 2026, is the only placard-relevant text found; the County's own Building Division publishes nothing on this topic (checked how-to guides, LDC Art. III, and Ch. 6 Art. VII local amendments, all silent).

ordinance (absent) + utility interconnection agreement checked 2026-09-11 https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedAHJ: searched the how-to-guides list, LDC Article III (zoning), and Ch. 6 Articles II and VII (permits and local FBC amendments) in full for any placard-wording requirement — none exists. (The utility, Clay Electric, does specify exact wording for a battery-storage label only — 'Battery storage utilized in this facility' — but not for the PV/RGS disconnect itself; see q38.)

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTVIILOAMFLBUCO

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame search as q39 — no AHJ-published letter-height/colour/material spec exists; Clay Electric's own tariff does not specify colour, size, or material for either the RGS disconnect or the battery-storage label, only that the battery label be 'permanently affixed.'

https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo NEC 705.10 facility/site-plan placard requirement is published locally — checked the how-to-guides list and Ch. 6 Arts. II/VII; silent on this.

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, in part — Clay Electric Cooperative specifies exact wording for a battery-storage label ('Battery storage utilized in this facility,' permanently affixed to the meter enclosure) though not for the PV disconnect switch itself, which it requires but does not word. JEA also franchises part of the county but its placard practice was not independently checked this run.

Why the confidence is not higherClay Electric Interconnection Agreement, Item 12(a), current version effective 30 Apr 2026.

utility interconnection agreement checked 2026-09-11 https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Per Clay Electric: the manual RGS disconnect switch must be 'mounted separately from the meter socket,' located outside, and 'readily accessible at all times to the Cooperative' (preferably next to the utility meter); the battery-storage label must be affixed to the meter enclosure itself. No AHJ-level placement rule beyond this was found.

Why the confidence is not higherClay Electric Interconnection Agreement Item 8 and the 'Solar Getting Started' page ('a manual single-throw, lockable disconnect between the inverter and the home's electrical service, located outside and accessible to Clay Electric (preferably next to the utility meter)').

utility page + interconnection agreement checked 2026-09-11 https://www.clayelectric.com/solar-getting-started

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedNo County-published approved-equipment list exists for PV (checked how-to guides and Ch. 6 permit sections); Clay Electric requires UL-1741/IEEE-1547-listed inverters and NRTL-certified battery equipment as a condition of interconnection, but that is a utility interconnection standard, not an AHJ equipment list.

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries are permitted by the utility subject to conditions, not separately addressed by the County: Clay Electric requires UL 1741-certified battery equipment, a permanent 'Battery storage utilized in this facility' label on the meter enclosure, no export of stored energy to the grid, and (per Fla. Admin. Code R. 25-6.065(2)(d), which the co-op cites) a UL-listed automatic transfer switch since batteries are not themselves defined as renewable energy under that rule. No Clay County ordinance addresses ESS/battery permitting for residential PV specifically.

Why the confidence is not higherVerbatim from Clay Electric's current Interconnection Agreement, Item 12(a)-(c); the County's own Building/Fire chapters are silent on residential ESS (and single-family residential is expressly excluded from the local Fire chapter altogether, Sec. 6-106).

utility interconnection agreement checked 2026-09-11 https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedNo separate ESS permit/inspection type is published by the County (checked the how-to-guides list and the general Building/Electrical permit sections); a battery would most likely be added to the same electrical permit, but this is not stated anywhere found.

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q47 Is a ground mount treated as a structure? Core Ground mount

Likely yes, by default — the LDC has no PV-specific carve-out, so a ground-mounted array would fall under the general 'accessory structure' framework (with its own front/rear/side setback tables, e.g. 30 ft front / 7.5 ft rear-side in several districts) rather than being treated as an unregulated appliance.

Why the confidence is not higherInference: LDC Article III defines detailed accessory-structure setbacks throughout (dozens of hits, confirmed via full-text read) but has no 'solar panel' or 'PV' exemption from that framework — only 'Solar Farm' (utility-scale) is separately defined and regulated. No County document states residential ground-mount PV is or isn't a 'structure' in so many words.

Land Development Code, Article III (inference) checked 2026-09-11 https://web.archive.org/web/20260516050801/https://www.claycountygov.com/home/showpublisheddocument/1266/638760966051830000

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Outside, mounted separately from the meter socket, and readily accessible to Clay Electric — the co-op's stated preference is immediately next to the utility meter.

Why the confidence is not higherClay Electric Interconnection Agreement (Form IGRG-1), Item 8: 'The Member shall... install and maintain a manual disconnect switch... The manual disconnect switch shall be mounted separately from the meter socket and shall be readily accessible at all times to the Cooperative'; 'Solar Getting Started' page: 'located outside and accessible to Clay Electric (preferably next to the utility meter)'.

utility interconnection agreement + utility page checked 2026-09-11 https://www.clayelectric.com/sites/default/files/documents/solar/PhotovoltaicInterconnectionAgreement.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal — inspections are booked via the same Tyler EnerGov Citizens Access Portal (CAP) used for permitting; the Building Division's own site links its 'Schedule an Inspection' button straight into the CAP system rather than to a phone-only process. 60% · department page (inference from portal migration)
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes, for unincorporated Clay County — the Building Department performs its own inspections at intervals through completion, per Ch. 6 Art. II Div. 3 (Sec. 6-56 to 6-59). (Not Yes for Green Cove Springs or Orange Park, which perform their own; see jurisdiction note.) 75% · adopting ordinance
    • If delegated, to whom? Not delegated for the County's own unincorporated jurisdiction — the County Building Department inspects itself (see q52). Note the reverse relationship for the Town of Keystone Heights: its own Building Department page states permits (and, by implication, the associated inspections) are routed to Clay County after the Town's Public Works Director review, i.e. the Town delegates TO the County, not the other way around. 60% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? General sequence per Ch. 6 Art. II Div. 3: inspections 'at various intervals' through construction, then a mandatory final inspection before the structure may be occupied, followed by a Certificate of Occupancy on request. No solar-specific stage order (e.g. rough-in electrical vs. mounting/racking) is published. 50% · adopting ordinance (general)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • What must be on site at inspection? General requirement: 'A copy of all permits shall be kept on the premises open to public inspection during the prosecuting of the work and until the completion of same, and final inspection has been made' (Sec. 6-44). No PV-specific on-site document list (e.g. approved plans, equipment spec sheets) is published. 60% · adopting ordinance (general)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Final (final inspection approval) for a retrofit PV install on an already-occupied home; a Certificate of Occupancy is issued only where one is separately requested/applicable (e.g. new construction) — 'When requested, the department will issue a certificate of occupancy as proof of final inspection approval' (Sec. 6-59). 60% · adopting ordinance (general, inference)
    • Who notifies the utility for PTO? Installer — Clay Electric's process has the member/contractor submit the signed Interconnection Agreement, Net Meter Application, and code-official inspection certification directly to the co-op's Energy Services team, who then install the net meter and finalize service; the AHJ does not itself notify the utility. 70% · utility page + interconnection agreement
    • Is there a re-inspection fee? $50 flat, rising to four times that ($200) after a second failed reinspection, per F.S. 553.80(2)(c). 85% · fee schedule

14 questions answered against Clay County’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal — inspections are booked via the same Tyler EnerGov Citizens Access Portal (CAP) used for permitting; the Building Division's own site links its 'Schedule an Inspection' button straight into the CAP system rather than to a phone-only process.

Why the confidence is not higherThe County's current Building Division landing page (15 Jul 2026 crawl) lists 'Schedule an Inspection' as a top-level button pointing at /government/building/inspections, which by 2024-2026 had become a redirect target consistent with the CAP/EnerGov migration described on the same page ('Clay County uses Tyler Technologies EPL... Apply for permits, Search permit records, Check the status of permit applications'); I could not capture the live post-redirect inspections page itself to confirm phone booking is not also offered.

department page (inference from portal migration) checked 2026-09-11 https://web.archive.org/web/20260715192924/https://www.claycountygov.com/government/building

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedNo stated notice-period ('X business days before') was found on any captured version of the Building Division's inspections page; the 2021-era Wayback capture is nav-only and the live page is behind the Akamai block described in q49.

https://web.archive.org/web/20210413001451/https://www.claycountygov.com/government/building/inspections

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedSame — no same-day/AM-PM window statement found on any captured inspections page.

https://web.archive.org/web/20210413001451/https://www.claycountygov.com/government/building/inspections

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes, for unincorporated Clay County — the Building Department performs its own inspections at intervals through completion, per Ch. 6 Art. II Div. 3 (Sec. 6-56 to 6-59). (Not Yes for Green Cove Springs or Orange Park, which perform their own; see jurisdiction note.)

Why the confidence is not higherSec. 6-56: 'The building official or his designated representative shall inspect at various intervals... and a final inspection shall be made on all construction or work upon completion'; Sec. 6-57 commits to dispatching 'an inspector... to the job site within a reasonable time after the request for inspection is received at the county building department.'

adopting ordinance checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV3INCEOC_S6-56GE

Q53 If delegated, to whom? Core Who inspects

Not delegated for the County's own unincorporated jurisdiction — the County Building Department inspects itself (see q52). Note the reverse relationship for the Town of Keystone Heights: its own Building Department page states permits (and, by implication, the associated inspections) are routed to Clay County after the Town's Public Works Director review, i.e. the Town delegates TO the County, not the other way around.

Why the confidence is not higherSec. 6-56/6-57 (County self-performs); Keystone Heights Building Department page ('Once approved, permits must be submitted to Clay County').

department page checked 2026-09-11 https://www.keystoneheights.us/building-department

Q54 Which inspections are required, and in what order? Core Stages & sequence

General sequence per Ch. 6 Art. II Div. 3: inspections 'at various intervals' through construction, then a mandatory final inspection before the structure may be occupied, followed by a Certificate of Occupancy on request. No solar-specific stage order (e.g. rough-in electrical vs. mounting/racking) is published.

Why the confidence is not higherSec. 6-56, 6-59 read verbatim; this is the general building-inspection sequence, not a PV-specific one — no PV checklist exists to specify a different order.

adopting ordinance (general) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV3INCEOC_S6-59FIINCEOC

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedNo PV-specific rough-in/mid-roof inspection requirement is published; the general ordinance only speaks of inspections 'at various intervals' without naming stages, and no solar checklist exists to specify one.

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV3INCEOC_S6-56GE

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNo published statement that the inspector verifies labels/listings for PV specifically; general Sec. 6-56 does not itemize what is checked at inspection.

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV3INCEOC_S6-56GE

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedConfirmed absent — no PV inspection checklist is published anywhere found (how-to-guides list, LDC, Ch. 6 Art. II/VII all silent; domain-wide Wayback index returns 0 'solar'/'photovoltaic' hits against dozens of 'electrical'/'setback' hits in the same index, so the absence search itself is sound).

https://web.archive.org/web/20260415225845/https://www.claycountygov.com/government/building-division/permit-applications-how-to-guides

Q58 What must be on site at inspection? Core Documents on site

General requirement: 'A copy of all permits shall be kept on the premises open to public inspection during the prosecuting of the work and until the completion of same, and final inspection has been made' (Sec. 6-44). No PV-specific on-site document list (e.g. approved plans, equipment spec sheets) is published.

Why the confidence is not higherSec. 6-44 verbatim; general building-permit provision, not solar-specific.

adopting ordinance (general) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV2PE_S6-44PO

Q59 Is there a re-inspection fee? Corrections & re-inspection

$50 flat, rising to four times that ($200) after a second failed reinspection, per F.S. 553.80(2)(c).

Why the confidence is not higherFY24/25 Schedule of Fees & Services: 'Reinspection Fee - Effective January 1, 2025: $50.00' and 'Reinspection Fee after 2nd Inspection (F.S. 553.80(2)(c)): Four times cost of the Reinspection Fee.' Not solar-specific but a general Building Department fee applicable to any permit type including PV.

fee schedule checked 2026-09-11 https://web.archive.org/web/20260120092249/https://www.claycountygov.com/home/showpublisheddocument/7858/638664151775500000

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedNo published corrections-and-clearance process specific to PV or otherwise beyond the bare fact that additional inspection trips can be charged (Sec. 6-58); no document describes how a correction notice is issued/documented or cleared.

https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV3INCEOC_S6-58READIN

Q61 What is issued on pass? Core Final sign-off & PTO

Final (final inspection approval) for a retrofit PV install on an already-occupied home; a Certificate of Occupancy is issued only where one is separately requested/applicable (e.g. new construction) — 'When requested, the department will issue a certificate of occupancy as proof of final inspection approval' (Sec. 6-59).

Why the confidence is not higherSec. 6-59 verbatim; general building-code provision, read for what a PV retrofit (not new construction) would actually receive.

adopting ordinance (general, inference) checked 2026-09-11 https://library.municode.com/fl/clay_county/codes/code_of_ordinances?nodeId=CO_CH6BUBURE_ARTIIPEINCEOC_DIV3INCEOC_S6-59FIINCEOC

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer — Clay Electric's process has the member/contractor submit the signed Interconnection Agreement, Net Meter Application, and code-official inspection certification directly to the co-op's Energy Services team, who then install the net meter and finalize service; the AHJ does not itself notify the utility.

Why the confidence is not higherClay Electric 'Solar Getting Started' page process diagram: 'Interconnect Agreement Complete and sign both forms and submit to Clay Electric Energy Services... Contractor Installs System... Net Meter Request/Documents Submitted... Review and process Interconnection... System Install Net Meter'; Interconnection Agreement Item 1 places the burden of certifying permit/inspection approval on 'the Member.'

utility page + interconnection agreement checked 2026-09-11 https://www.clayelectric.com/solar-getting-started

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go 75%

Per Clay Electric: the manual RGS disconnect switch must be 'mounted separately from the meter socket,' located outside, and 'readily accessible at all times to the Cooperative' (preferably next to the utility meter); the battery-storage label must be affixed to the meter enclosure itself. No AHJ-level placement rule beyond this was found.

What the utility wants on top 70%

Yes, in part — Clay Electric Cooperative specifies exact wording for a battery-storage label ('Battery storage utilized in this facility,' permanently affixed to the meter enclosure) though not for the PV disconnect switch itself, which it requires but does not word. JEA also franchises part of the county but its placard practice was not independently checked this run.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://www.claycountygov.com/government/building
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
County
County
Clay County
Regions covered
Authority Contact
Building Department
Direct Phone
(904) 284-6307
Booking & Scheduling