Franklin County

Franklin County

State of Florida

Verified Aug. 5, 2026

Franklin County is a county authority in the State of Florida, serving 12,451 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Franklin County against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Franklin County is the authority having jurisdiction 75% confidence
Holds
Building AND Electrical (plus plumbing, mechanical, roofing) permitting and inspection, held directly by the Franklin County Building Department itself — but ONLY for UNINCORPORATED Franklin County (Eastpoint, St. George Island, Bald Point, Alligator Point, Lanark Village, St. Teresa). The County's own Solar Panel Permit Application and Electrical Permit Application both route through this one department at '34 Forbes Street, Suite 1, Apalachicola' with no other agency named. The County does NOT hold jurisdiction inside the two incorporated cities that sit inside county lines: the City of Apalachicola (the county seat itself) runs its own fully independent Building Department (own Interim Building Official, Garry Millender; own Permitting Clerk, Ron Nippe; own forms, fee schedule and Land Development Code) with zero county involvement, and the City of Carrabelle lists its own City Hall, 'Community Development' (850-697-3307) and 'Planning & Zoning' (850-697-2727) telephone lines separate from the county's, though no independently working Carrabelle city government website could be found (five domain variants — cityofcarrabelle.com/.org, carrabellefl.gov, carrabelle-fl.gov, carrabellegov.com — all failed DNS; carrabelle.org is the Chamber of Commerce/tourism site, not city government). So for a residential solar address described only as 'Franklin County,' the County is the AHJ only if the parcel is NOT inside Apalachicola or Carrabelle city limits.
Overridden by
A Coastal Construction Control Line under F.S. 161.053 is a real, separate FDEP permitting layer here: the County's own Coastal Construction Code (LDC/Code of Ordinances Sec. 5.5-25) defines the 'coastal building zone' as land seaward of the CCCL on the barrier islands (named: St. George Island, Dog Island, St. Vincent Island) and on Alligator Point out to Alligator Harbor — this reaches the two named 'significant unincorporated communities' in the brief. FS 471.003(2)(h) exempts electrical work valued at $125,000 or less with 600A or less service from the PE-stamp requirement statewide. FS 553.791 gives a 30% fee discount to permits processed through a private provider (the County's own fee schedule states this verbatim). FL PSC Rule 25-6.065 governs the investor-owned utility handling interconnection if that utility is confirmed to be Duke Energy Florida (see Q22 — not established with full confidence this run).
Why not higher
Two structural findings anchor this: (1) the briefed URL, building.franklincountyflorida.gov, is NOT the county's main site — it is a separate TownCloud/'Tipi' SvelteKit micro-site built for the Building Department alone (its own /documents and /news routes, its own footer 'Made with... by TownCloud'), fully distinct from the county's real WordPress site at www.franklincountyflorida.com. Confirmed by curl: the .gov apex domain (www.franklincountyflorida.gov) 301-redirects to https://www.tidemarkmarketing.com/, an unrelated marketing company's site with no Franklin County content at all — the .gov domain is dead/expired for general browsing even though the building.franklincountyflorida.gov subdomain still resolves and serves real content. (2) Apalachicola and Carrabelle are both incorporated and both show direct, current evidence of running independent permitting apart from the county (Apalachicola's own city site, dated 2026; Carrabelle's own listed municipal phone lines on the Chamber's area-info page), matching the 'Port St. Joe carve-out' pattern seen in neighbouring Gulf County. Held below 90 because Franklin's own Zoning Code appears to be numbered independently (Sec. 5.5-2(c)(2) of the Code of Ordinances cites 'section 220.23 of the Franklin County Zoning Code' — a 220-series numbering scheme that does not appear anywhere in the Code of Ordinances' own Municode table of contents, meaning the Zoning Code is very likely a separate, uncodified document I could not reach), and because the interconnecting utility is not confirmed with high confidence.

https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Permit required
Yes.80%
Permit cost
No dedicated solar fee line exists. A residential PV job most likely falls under either the flat 'ELECTRICAL UPGRADE PERMITS — $100.00' line, or, if not explicitly listed,55%
Plan review
No solar-specific figure is published. The County's New Residential Building Permit Application states a GENERAL turnaround: 'the standard permit processing time is 7-10 business days.'55%
Portal
CitizenServe — the County's Solar Panel and Electrical Permit Applications point to https://www4.citizenserve.com/Portal/PortalController,75%
Electrical code
NEC 2020 (effective 31 Dec 2023), notwithstanding that the County's own codified text at Sec. 5.5-11(a) still literally reads 'National Electrical Code of 1987' — because Sec.78%
Booking an inspection
By phone, email, or through the applicant's CitizenServe account.80%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. Q3 Electrical and building permits — Separate — a distinct Electrical Permit is required in addition to the Building Permit. Q4 Plan review — No solar-specific figure is published. The County's New Residential Building Permit Application states a GENERAL turnaround: 'the standard permit processing time is… Q18 Where you file — CitizenServe — the County's Solar Panel and Electrical Permit Applications point to https://www4.citizenserve.com/Portal/PortalController, Q20

Permit required
Yes.80% source
What it costs
No dedicated solar fee line exists. A residential PV job most likely falls under either the flat 'ELECTRICAL UPGRADE PERMITS — $100.00' line, or, if not explicitly listed,55% source
Plan review turnaround
No solar-specific figure is published. The County's New Residential Building Permit Application states a GENERAL turnaround: 'the standard permit processing time is 7-10 business days.'55% source
Key document
county permit application (solar-specific) cited by 7 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes, for unincorporated Franklin County only (see jurisdiction block) — the County Building Department is the AHJ for residential rooftop PV there; it is NOT the AHJ inside Apalachicola or Carrabelle city limits, each of which permits independently. 80% · county permit application
    • What does this authority permit itself, and what does it delegate? The County permits and inspects Building, Electrical, Plumbing, Mechanical and Roofing itself for unincorporated territory; it delegates nothing to the state or to a private provider by default (a private provider may be hired by the applicant for a 30% fee discount under FS 553.791, which is an applicant option, not a County delegation). It has no jurisdiction at all — not a delegation, a carve-out — inside Apalachicola or Carrabelle. 75% · county ordinance
    • Is a permit required for a residential rooftop PV system? Yes. 80% · county permit application
    • Is there a separate electrical permit, or is it combined? Separate — a distinct Electrical Permit is required in addition to the Building Permit. 88% · county ordinance
    • Is there a historic-district review? No historic-district review under the County's OWN code for unincorporated Franklin County — I found no historic-preservation chapter among the County Code of Ordinances chapters I was able to browse (Ch. 1 through Ch. 15, plus Ch. 6.5 Flood and Ch. 5.5 Buildings). Apalachicola's HEADLINE historic district (one of Florida's largest and oldest, a 19th-century cotton port) is governed entirely by the CITY of Apalachicola's own Land Development Code, not the County's — see the separate note below on Apalachicola's historic review, since that city is where almost all of Franklin's historic building stock sits. 55% · county code table of contents
    • Is a wind or windstorm certification required? No single codified county-wide wind-speed minimum was found (unlike neighbouring Gulf County's 140 mph or Calhoun County's 130 mph flat figures). Instead, Code of Ordinances Sec. 5.5-27(d) ties major-structure wind design to 'Ord. No. 2012-03, adopting the 2010 Florida Building Code and Wind Speed Maps' — i.e., the geographically-varying ASCE 7 wind-speed maps incorporated by the Florida Building Code, not a flat number. The County's own New Residential Building Permit Application does require a 'Wind Load Analysis — Engineered' as a submittal item for new construction (general, not solar-specific). 65% · county ordinance
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor holding a State license number (or a licensed contractor operating within their license classification). 70% · county permit application
    • Must the contractor be registered with this authority before applying? Yes — the contractor must be registered with the Franklin County Construction Industry Licensing Board. 80% · county ordinance
    • Is a homeowner permitted to self-install and self-permit? Likely yes for the building-permit side under the statewide owner-builder exemption (FS 489.103/489.503), implemented via the County's own 'Owner/Builder Affidavit' and 'Owner Builder Packet' forms — but the electrical sub-permit would still need a licensed electrical contractor per Q5/Q6 unless the owner separately qualifies. 55% · county form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Per the County's own dedicated Solar Panel Permit Application: (1) the completed Application itself, (2) a Schematic/Electrical diagram, (3) a Recorded Notice of Commencement, and (4) a Site Plan — required ONLY 'FOR GROUND SYSTEMS' (i.e., not required for a straightforward rooftop retrofit). 88% · county permit application (solar-specific)
    • How many copies, and in what format? No stated copy count; electronic filing is the County's preferred route via its CitizenServe portal, with a paper option available but explicitly slower. 55% · county permit application
    • Is a site plan required, and what must it show? A site plan is required only for ground-mounted systems ('SITE PLAN FOR GOURND [sic] SYSTEMS'); the form does not specify what the site plan must show, and no site plan appears to be required for a rooftop-only system. 70% · county permit application (solar-specific)
    • Is a one-line / three-line diagram required? Yes — a schematic/electrical diagram is a required attachment. 82% · county permit application (solar-specific)
    • Are string and conductor calculations required? Not stated as a discrete requirement; presumably folded into the required 'Schematic/Electrical' submittal, but the County publishes no explicit call-out for string or conductor sizing calculations. 40% · county permit application (solar-specific)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? CitizenServe — the County's Solar Panel and Electrical Permit Applications point to https://www4.citizenserve.com/Portal/PortalController, while the main county website's 'Public permits search portal' link points to https://www7.citizenserve.com/Portal/PortalController?...installationID=389 — two different CitizenServe subdomains for what appears to be the same underlying system (an inconsistency worth a follow-up check, not resolved this run). 75% · county department page + permit application footers
    • Can the whole application be completed online? Likely yes — the County directs applicants to CitizenServe as the faster, preferred route over paper, implying full online application capability, though this was not live-tested to completion. 55% · county permit application
    • What does a residential solar permit cost? No dedicated solar fee line exists. A residential PV job most likely falls under either the flat 'ELECTRICAL UPGRADE PERMITS — $100.00' line, or, if not explicitly listed, the catch-all clause 'PERMIT FEES NOT EXPLICITLY LISTED ABOVE SHALL BE BASED ON CONTRACT COST.' 55% · county fee schedule (Board of County Commissioners resolution)
    • How is the fee calculated? Contract cost, for anything not explicitly listed on the fee schedule (which includes PV) — or the flat $100 'Electrical Upgrade' fee if the reviewing clerk treats a PV interconnection as a service/electrical upgrade rather than a new, uncategorized item. 50% · county fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

28 questions answered against Franklin County’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes, for unincorporated Franklin County only (see jurisdiction block) — the County Building Department is the AHJ for residential rooftop PV there; it is NOT the AHJ inside Apalachicola or Carrabelle city limits, each of which permits independently.

Why the confidence is not higherDirectly evidenced by the County's own Solar Panel Permit Application (naming only the County Building Department and CitizenServe portal) plus Apalachicola's and Carrabelle's own separate municipal permitting/contact evidence.

county permit application checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

The County permits and inspects Building, Electrical, Plumbing, Mechanical and Roofing itself for unincorporated territory; it delegates nothing to the state or to a private provider by default (a private provider may be hired by the applicant for a 30% fee discount under FS 553.791, which is an applicant option, not a County delegation). It has no jurisdiction at all — not a delegation, a carve-out — inside Apalachicola or Carrabelle.

Why the confidence is not higherSec. 5.5-11 and Sec. 5.5-14 of the County Code of Ordinances place administration of all these codes with 'the Franklin County Building Official'; no other agency is named. The private-provider discount is stated on the County's own fee schedule.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes.

Why the confidence is not higherThe County publishes a dedicated 'Solar Panel Permit Application' as one of its standard permit-application forms, and Sec. 5.5-14 requires a separate electrical permit for any electrical work in addition to a building permit — no solar exemption is stated anywhere in the County's material.

county permit application checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate — a distinct Electrical Permit is required in addition to the Building Permit.

Why the confidence is not higherCode of Ordinances Sec. 5.5-14(a): 'In addition to a building permit, no construction, repair or renovation in the following categories of construction shall commence prior to the issuance of a permit for: (1) Electrical...' The Solar Panel Permit Application itself also separately lists 'SCHEMATIC/ELECTRICAL' as a required attachment rather than folding electrical into one combined form.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-14SEPEREADBUPE

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor holding a State license number (or a licensed contractor operating within their license classification).

Why the confidence is not higherBoth the County's Electrical Permit Application and Solar Panel Permit Application require a 'Contractor Name / Business Name / State License Number' field with no option for an unlicensed applicant; the County Code (Sec. 5.5-41(14)) separately defines 'Electrical contractor or unlimited electrical contractor' formally.

county permit application checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/electrical-permit-application.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes — the contractor must be registered with the Franklin County Construction Industry Licensing Board.

Why the confidence is not higherCode of Ordinances Ch. 5.5, Art. IV (Sec. 5.5-41 through 5.5-56), 'Licensing of Contractors,' establishes the Franklin County Construction Industry Licensing Board (Ord. No. 93-5) and defines 'Registrant' as 'a person who has registered with the board' — this is a County-level registration layered on top of the State CILB/DBPR license, not solar-specific but applying to every contractor category defined in the chapter, including electrical.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIVLICO_S5.5-41DE

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Likely yes for the building-permit side under the statewide owner-builder exemption (FS 489.103/489.503), implemented via the County's own 'Owner/Builder Affidavit' and 'Owner Builder Packet' forms — but the electrical sub-permit would still need a licensed electrical contractor per Q5/Q6 unless the owner separately qualifies.

Why the confidence is not higherThe County publishes both an 'Owner / Builder Affidavit' and an 'Owner Builder Packet' among its standard forms, implementing the general statewide owner-builder mechanism; this is not solar-specific and the County's material does not separately state whether an owner-builder may self-pull the electrical sub-permit for a PV interconnection.

county form checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/owner-builder-packet.pdf

Q8 What documents make up a complete submittal? Core Submittal package

Per the County's own dedicated Solar Panel Permit Application: (1) the completed Application itself, (2) a Schematic/Electrical diagram, (3) a Recorded Notice of Commencement, and (4) a Site Plan — required ONLY 'FOR GROUND SYSTEMS' (i.e., not required for a straightforward rooftop retrofit).

Why the confidence is not higherRead verbatim off the County's own current Solar Panel Permit Application checklist ('REQUIRED DOCUMENTS: ___ APPLICATION ___SCHEMATIC/ELECTRICAL ___ RECORDED NOTICE OF COMMENCEMENT ___ SITE PLAN FOR GOURND [sic] SYSTEMS'). This is the best solar-specific submittal list found — it distinguishes rooftop from ground mount on its face, similar to the dedicated form found in neighbouring Gulf County.

county permit application (solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q9 How many copies, and in what format? Submittal package

No stated copy count; electronic filing is the County's preferred route via its CitizenServe portal, with a paper option available but explicitly slower.

Why the confidence is not higherBoth the Solar Panel and Electrical Permit Applications state: 'Please note paper applications will have a longer processing time. For a faster processing time please use the link above to apply via CitizenServe' — no copy count is given for the paper route.

county permit application checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

A site plan is required only for ground-mounted systems ('SITE PLAN FOR GOURND [sic] SYSTEMS'); the form does not specify what the site plan must show, and no site plan appears to be required for a rooftop-only system.

Why the confidence is not higherDirect from the Solar Panel Permit Application's required-documents checklist; no separate site-plan content specification (setbacks, easements, etc.) was found anywhere in the County's material for this checklist item.

county permit application (solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes — a schematic/electrical diagram is a required attachment.

Why the confidence is not higherSolar Panel Permit Application required-documents line: '______SCHEMATIC/ELECTRICAL'. Not further specified as one-line vs. three-line.

county permit application (solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Not stated as a discrete requirement; presumably folded into the required 'Schematic/Electrical' submittal, but the County publishes no explicit call-out for string or conductor sizing calculations.

Why the confidence is not higherInference only from the general electrical-schematic requirement; not confirmed as a named, separate deliverable anywhere in the County's material.

county permit application (solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedSolar Panel Permit Application, Electrical Permit Application, New Residential Building Permit Application, Fee Schedule — none states a numeric structural PE-stamp threshold; the County's separately-numbered Zoning Code (220-series, apparently uncodified/off Municode) was not reached and might address this

https://building.franklincountyflorida.gov/documents

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSame set of County forms as Q13 — no County-specific electrical PE-stamp threshold found; only the statewide FS 471.003(2)(h) floor is available (recorded as an answer at reduced confidence would require restating the state floor without any County-specific corroboration, so left here as not confirmed at County level)

https://building.franklincountyflorida.gov/documents

Q15 What does a residential solar permit cost? Core Fees

No dedicated solar fee line exists. A residential PV job most likely falls under either the flat 'ELECTRICAL UPGRADE PERMITS — $100.00' line, or, if not explicitly listed, the catch-all clause 'PERMIT FEES NOT EXPLICITLY LISTED ABOVE SHALL BE BASED ON CONTRACT COST.'

Why the confidence is not higherFee-schedule PDF searched with controls in the same run: 'electrical' = 2 hits (positive control passed — 'ELECTRICAL UPGRADE PERMITS' line and a private-provider clause), 'zzqqx' = 0 hits (fabricated control passed), 'solar'/'photovoltaic' = 0 hits — confirms genuine absence of a dedicated PV fee line, but leaves ambiguous which of the two general mechanisms actually applies to a given PV job.

county fee schedule (Board of County Commissioners resolution) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/fee-schedule.pdf

Q16 How is the fee calculated? Core Fees

Contract cost, for anything not explicitly listed on the fee schedule (which includes PV) — or the flat $100 'Electrical Upgrade' fee if the reviewing clerk treats a PV interconnection as a service/electrical upgrade rather than a new, uncategorized item.

Why the confidence is not higherDirect quote from the fee schedule: 'PERMIT FEES NOT EXPLICITLY LISTED ABOVE SHALL BE BASED ON CONTRACT COST. A COPY OF CONTRACT/PROPOSAL REQUIRED WITH PERMIT APPLICATION.' New-construction fees separately use an ICC valuation-table/regional-modifier method, which would not normally apply to a retrofit PV permit.

county fee schedule checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/fee-schedule.pdf

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedCounty Fee Schedule PDF (full text read, controls run) — no separate plan-review fee line exists for any permit type, unlike Ocoee's Ch. 51 half-fee plan-review clause

https://building.franklincountyflorida.gov/uploads/fee-schedule.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

No solar-specific figure is published. The County's New Residential Building Permit Application states a GENERAL turnaround: 'the standard permit processing time is 7-10 business days.'

Why the confidence is not higherThis is the County's only stated review-turnaround figure and it appears on the general new-residential-construction application, not a solar or electrical-specific document — a same-authority, different-permit-class inference, flagged the same way the Ocoee baseline record flagged its commercial-only figure.

county permit application (general, not solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/new-residential-building.pdf

Q19 How long is an issued permit valid before it expires? Timeline & validity

One year from date of issuance; construction/work must commence within six months of the issue date.

Why the confidence is not higherStated verbatim on the County's own current Electrical Permit Application: 'THIS PERMIT IS VALID FOR ONE YEAR FROM THE DATE OF ISSUANCE. CONSTRUCTION MUST COMMENCE WITHIN SIX MONTHS OF DATE ISSUED.' Not solar-specific, but is the general permit-validity rule applied to every County permit type including electrical.

county permit application checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/electrical-permit-application.pdf

Q20 Which permit portal does this authority use? Core Portal & process

CitizenServe — the County's Solar Panel and Electrical Permit Applications point to https://www4.citizenserve.com/Portal/PortalController, while the main county website's 'Public permits search portal' link points to https://www7.citizenserve.com/Portal/PortalController?...installationID=389 — two different CitizenServe subdomains for what appears to be the same underlying system (an inconsistency worth a follow-up check, not resolved this run).

Why the confidence is not higherBoth the Building Department micro-site's forms and the main county WordPress site's Building Department page converge on CitizenServe as the vendor, but cite different front-end subdomains (www4 vs. www7), which was not reconciled in this run.

county department page + permit application footers checked 2026-09-12 https://www.franklincountyflorida.com/county-government/building-department/

Q21 Can the whole application be completed online? Core Portal & process

Likely yes — the County directs applicants to CitizenServe as the faster, preferred route over paper, implying full online application capability, though this was not live-tested to completion.

Why the confidence is not higherBoth permit-application PDFs state 'For a faster processing time please use the link above to apply via CitizenServe' as the alternative to a paper submission; I did not attempt to create a live CitizenServe account/application to confirm every step works end-to-end online.

county permit application checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/electrical-permit-application.pdf

Q22 Which utility handles interconnection here? Core Utility interconnection

Most likely Duke Energy Florida, LLC, but NOT established with high confidence.

Why the confidence is not higherThe only direct evidence found on the County's own site is a 2024 'Agreement for Exchange of Real Property' between 'Duke Energy Florida, LLC' and Franklin County (a land-swap, not a franchise or interconnection instrument — weak corroboration by the same logic the brief applies to principal-taxpayer listings). Talquin Electric Cooperative's own territory page lists only Gadsden, Leon, Liberty and Wakulla counties (ruling Talquin OUT, per prior baseline verification). Gulf Coast Electric Cooperative's own site could not be checked for its county list in this run (JS-heavy homepage defeated a quick text extraction). No County permit form (Electrical or Solar) carries a utility-selection checkbox the way some neighbouring counties' forms do, so the County's own material does not name a utility at all.

county site search result (land-exchange agreement, weak corroboration) checked 2026-09-12 https://www.franklincountyflorida.com/?s=duke+energy

Q23 Where does the utility sit in the sequence? Core Utility interconnection

State floor (assuming Duke Energy Florida, an investor-owned utility under PSC jurisdiction): the utility will not allow parallel operation until the local AHJ has inspected and approved the system.

Why the confidence is not higherFL PSC Rule 25-6.065(5)(a) requires the Standard Interconnection Agreement to state that customer-owned renewable generation 'must be inspected and approved by local code officials prior to its operation in parallel with the investor-owned utility.' A prior GovBot utility-only run obtained Duke Energy Florida's own filed tariff sheets describing local Building Code Official inspection preceding Duke's own processing, consistent with this state-floor sequencing — carried forward from that prior run at reduced confidence since it was not independently re-fetched in this run, and since Franklin's own utility identity is itself not fully confirmed (see Q22).

Florida Administrative Code rule text (state floor) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedSolar Panel Permit Application, Electrical Permit Application, New Residential Building Permit Application — none mentions HOA or architectural-committee approval as a submittal precondition

https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q25 Is there a historic-district review? Overlays & special cases

No historic-district review under the County's OWN code for unincorporated Franklin County — I found no historic-preservation chapter among the County Code of Ordinances chapters I was able to browse (Ch. 1 through Ch. 15, plus Ch. 6.5 Flood and Ch. 5.5 Buildings). Apalachicola's HEADLINE historic district (one of Florida's largest and oldest, a 19th-century cotton port) is governed entirely by the CITY of Apalachicola's own Land Development Code, not the County's — see the separate note below on Apalachicola's historic review, since that city is where almost all of Franklin's historic building stock sits.

Why the confidence is not higherBased on browsing the County Code of Ordinances' rendered table of contents (Chapters 1 through 15 plus 5.5, 5.7 and 6.5) without finding a historic-preservation or architectural-review chapter; I did not open Chapter 14 ('Planning and Development') in full, so a historic-overlay provision buried there cannot be fully ruled out.

county code table of contents checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances

Q26 Is a wind or windstorm certification required? Overlays & special cases

No single codified county-wide wind-speed minimum was found (unlike neighbouring Gulf County's 140 mph or Calhoun County's 130 mph flat figures). Instead, Code of Ordinances Sec. 5.5-27(d) ties major-structure wind design to 'Ord. No. 2012-03, adopting the 2010 Florida Building Code and Wind Speed Maps' — i.e., the geographically-varying ASCE 7 wind-speed maps incorporated by the Florida Building Code, not a flat number. The County's own New Residential Building Permit Application does require a 'Wind Load Analysis — Engineered' as a submittal item for new construction (general, not solar-specific).

Why the confidence is not higherA dedicated Municode search for 'wind speed' inside the County's Code of Ordinances (with 'electrical' run as a positive control returning many hits, confirming the search engine works) returned exactly one result, Sec. 5.5-27, and it points to a wind-speed MAP-based standard rather than a single figure — the opposite pattern from Gulf and Calhoun Counties, so their figures must not be carried across the county line.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIIICOCOCO_S5.5-27STREMASTR

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty Code of Ordinances table of contents (Chapters 1-15, 5.5, 5.7, 6.5) browsed on Municode; the Zoning chapter/Special-Use-Permit process itself sits in the separately-numbered (220-series) Zoning Code that could not be reached

https://library.municode.com/fl/franklin_county/codes/code_of_ordinances

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedSame as Q27 — a residential generation system-size cap would most likely sit in the Zoning Code (220-series), which could not be reached; nothing in the Code of Ordinances chapters browsed addresses it

https://library.municode.com/fl/franklin_county/codes/code_of_ordinances

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020 (effective 31 Dec 2023), notwithstanding that the County's own codified text at Sec. 5.5-11(a) still literally reads 'National Electrical Code of 1987' — because Sec. 5.5-11(c) is a FLOATING-ADOPTION clause: 'Any later edition or amendments of the ... National Electrical Code shall be the Franklin County ... Electrical Code[], including all schedules, references, appendices, etc.' This is a 'fossil base floating forward' pattern, not a genuinely stale 1987 rule. 78% · county ordinance (floating-adoption clause)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) — again via the Sec. 5.5-11(c) floating-adoption clause, even though the same section's literal codified text at 5.5-11(a) still names 'The 2010 Florida Building Code.' 75% · county ordinance (floating-adoption clause)
    • Are there local amendments to any of the above? Yes — Sec. 5.5-13 ('Amendments to the building code') locally amends the Florida Building Code's definition of 'SUBSTANTIAL IMPROVEMENT' (both the general FBC and the FBC-Existing Building volume) to add an explicit historic-structure carve-out from the 50%-cost substantial-improvement trigger. 85% · county ordinance
    • What is the installation judged against? The Florida Building Code (floating to the current, 8th Ed./2023) for structural/building work, and the National Electrical Code (floating to the current, 2020) for electrical work, per the Sec. 5.5-11 adoption mechanism described at Q29/Q30. 72% · county ordinance
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Franklin County on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    Nothing recorded for Franklin County on this step yet — 1 question checked and found unpublished. The guidance above is general.

  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    Nothing recorded for Franklin County on this step yet — 6 questions checked and found unpublished. The guidance above is general.

  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? State floor (assuming Duke Energy Florida, not independently reconfirmed this run): where the utility elects to require a manual AC disconnect switch, it must be mounted separate from, but adjacent to, the meter socket, visible/load-break type and lockable by the utility. Duke's own filed Tier-1 (<=10kW, the typical residential case) tariff sheet — per a prior GovBot utility-only run, carried forward at reduced confidence — makes the Tier-1 disconnect DISCRETIONARY and installed AT DUKE'S OWN EXPENSE if the utility elects to require it, rather than a flat exemption; Tier 2/3 are mandatory at the customer's expense. No County document addresses AC-disconnect placement at all. 48% · Florida Administrative Code rule text (state floor) + carried-forward utility tariff detail
    • Must equipment be on a specific approved list? Not stated as a solar-specific requirement anywhere in the County's material. 40% · county permit application (solar-specific)
    • Is a ground mount treated as a structure? Possibly — the County's Solar Panel Permit Application requires a site plan specifically 'FOR GROUND SYSTEMS' (not for roof systems), implying the County treats a ground-mounted array as something closer to a sited structure than a simple roof retrofit, but the underlying Franklin County Zoning Code definition of 'structure' (cited elsewhere in the Code of Ordinances at the independent '§220.xx' numbering scheme, e.g. Sec. 5.5-2(c)(2) references 'section 220.23 of the Franklin County Zoning Code') could not be reached — it does not appear inside the Code of Ordinances' own Municode chapters and is very likely a separate, uncodified zoning document. 45% · county permit application (solar-specific), cross-referenced against county ordinance

20 questions answered against Franklin County’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020 (effective 31 Dec 2023), notwithstanding that the County's own codified text at Sec. 5.5-11(a) still literally reads 'National Electrical Code of 1987' — because Sec. 5.5-11(c) is a FLOATING-ADOPTION clause: 'Any later edition or amendments of the ... National Electrical Code shall be the Franklin County ... Electrical Code[], including all schedules, references, appendices, etc.' This is a 'fossil base floating forward' pattern, not a genuinely stale 1987 rule.

Why the confidence is not higherCombines the County's own floating-adoption clause (Sec. 5.5-11(c), directly read from Municode) with the statewide NEC-2020 floor established across 70+ prior GovBot Florida runs (NFPA state adoption map). No County document states the year in plain numerals, so this is an inference from the adoption mechanism rather than a document that prints '2020.'

county ordinance (floating-adoption clause) checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023) — again via the Sec. 5.5-11(c) floating-adoption clause, even though the same section's literal codified text at 5.5-11(a) still names 'The 2010 Florida Building Code.'

Why the confidence is not higherSame floating-adoption reasoning as Q29; the County's local building-code amendment (Sec. 5.5-13, discussed at Q32) refers simply to 'the Florida Building Code' without a year, consistent with the code automatically tracking the current statewide edition rather than being frozen at a fixed year.

county ordinance (floating-adoption clause) checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Q31 Which fire code edition is in force? Code editions in force

Nothing published by this authority.

Where we lookedCounty Code of Ordinances table of contents — no Fire Prevention/Fire Code chapter was found among Chapters 1 through 15 (5.5, 5.7, 6.5) that I opened; Franklin County's fire service appears to be organized as independent volunteer fire districts (the pattern already confirmed in neighbouring Gulf County), and no county-level Fire Marshal or fire-code adoption ordinance was located

https://library.municode.com/fl/franklin_county/codes/code_of_ordinances

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes — Sec. 5.5-13 ('Amendments to the building code') locally amends the Florida Building Code's definition of 'SUBSTANTIAL IMPROVEMENT' (both the general FBC and the FBC-Existing Building volume) to add an explicit historic-structure carve-out from the 50%-cost substantial-improvement trigger.

Why the confidence is not higherRead directly from Code of Ordinances Sec. 5.5-13, most recently touched by Ord. No. 2021-12 (7-6-21); this is a real, on-the-books local technical amendment, not merely a fee amendment.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-13AMBUCO

Q33 What is the installation judged against? Core Electrical

The Florida Building Code (floating to the current, 8th Ed./2023) for structural/building work, and the National Electrical Code (floating to the current, 2020) for electrical work, per the Sec. 5.5-11 adoption mechanism described at Q29/Q30.

Why the confidence is not higherDirect reading of Sec. 5.5-11(a)-(c); no solar-specific standard (e.g., a PV-specific inspection standard) is named anywhere in the County's material.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedElectrical Permit Application, Fee Schedule Sec. 5.5-11/5.5-12/5.5-14 — no service-upgrade or busbar-sizing rule beyond the general fee tiers ('ELECTRICAL UPGRADE PERMITS $100.00')

https://building.franklincountyflorida.gov/uploads/electrical-permit-application.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedSolar Panel Permit Application and all other County forms — no mounting-system or attachment-spacing specification published for the County (the flat-mount rule found in this run applies only inside the City of Apalachicola's historic district, a different jurisdiction)

https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedCounty Code of Ordinances chapters browsed — no Fire Prevention Code chapter was found (see Q31), so no ridge-setback/fire-pathway rule for rooftop PV could be checked at the County level

https://library.municode.com/fl/franklin_county/codes/code_of_ordinances

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Nothing published by this authority.

Where we lookedSolar Panel Permit Application, Electrical Permit Application, Code of Ordinances Sec. 5.5-11 through 5.5-14 — rapid shutdown (NEC 690.12) is not named anywhere in the County's material

https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedAll County Building Department documents listed on /documents (30+ forms, full listing read) — no placard/sign requirement of any kind is published by the County for solar

https://building.franklincountyflorida.gov/documents

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as Q38 — no placard wording published

https://building.franklincountyflorida.gov/documents

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as Q38 — no letter-height/colour/material spec published

https://building.franklincountyflorida.gov/documents

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as Q38 — no facility/site-plan placard spec published by the County (the ground-mount site plan at Q10 is not framed as a placard)

https://building.franklincountyflorida.gov/documents

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedDuke Energy Florida's own current interconnection/DG web pages were not reached in this run (known from a prior GovBot utility-only run to be geofenced and behind an authenticated content API); the utility's own filed tariff sheets that WERE previously OCR'd by that prior run found the placard question 'genuinely absent, proved by enumeration' across all three Duke tariff sheets — carried forward, not independently re-verified this run, and Franklin's utility identity itself is unconfirmed (Q22)

https://www.duke-energy.com/

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as Q38/Q42 — no County or (independently reached) utility document specifies label placement beyond the disconnect-location language at Q48

https://building.franklincountyflorida.gov/documents

Q44 Must equipment be on a specific approved list? Equipment listing

Not stated as a solar-specific requirement anywhere in the County's material.

Why the confidence is not higherNo County document (fee schedule, solar application, electrical application) names an approved-equipment list for PV modules, inverters or racking.

county permit application (solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedAll County Building Department documents listed on /documents — no battery/ESS-specific permitting language exists anywhere; no Fire Prevention Code chapter was found to check against (see Q31)

https://building.franklincountyflorida.gov/documents

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSame as Q45 — no separate ESS permit or inspection type is named

https://building.franklincountyflorida.gov/documents

Q47 Is a ground mount treated as a structure? Core Ground mount

Possibly — the County's Solar Panel Permit Application requires a site plan specifically 'FOR GROUND SYSTEMS' (not for roof systems), implying the County treats a ground-mounted array as something closer to a sited structure than a simple roof retrofit, but the underlying Franklin County Zoning Code definition of 'structure' (cited elsewhere in the Code of Ordinances at the independent '§220.xx' numbering scheme, e.g. Sec. 5.5-2(c)(2) references 'section 220.23 of the Franklin County Zoning Code') could not be reached — it does not appear inside the Code of Ordinances' own Municode chapters and is very likely a separate, uncodified zoning document.

Why the confidence is not higherInference from the ground-vs-roof site-plan distinction on the Solar Panel Permit Application, combined with the discovery that the County's Zoning Code uses an entirely different section-numbering convention (220-series) than the Code of Ordinances (chapter-and-dash numbering) I was able to browse on Municode — a structural finding worth flagging for the next run rather than a confirmed answer.

county permit application (solar-specific), cross-referenced against county ordinance checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/solar-panel-permit-application.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

State floor (assuming Duke Energy Florida, not independently reconfirmed this run): where the utility elects to require a manual AC disconnect switch, it must be mounted separate from, but adjacent to, the meter socket, visible/load-break type and lockable by the utility. Duke's own filed Tier-1 (<=10kW, the typical residential case) tariff sheet — per a prior GovBot utility-only run, carried forward at reduced confidence — makes the Tier-1 disconnect DISCRETIONARY and installed AT DUKE'S OWN EXPENSE if the utility elects to require it, rather than a flat exemption; Tier 2/3 are mandatory at the customer's expense. No County document addresses AC-disconnect placement at all.

Why the confidence is not higherPSC Rule 25-6.065(6)(a) is the independently-verifiable state floor; the Duke Tier-1/2/3 detail is carried forward from a prior GovBot Duke Energy Florida utility-only run's OCR of Duke's own filed FPSC tariff sheets and was not re-fetched in this run, and Franklin's utility identity itself is only at 50% confidence (Q22) — both reasons this sits below 60.

Florida Administrative Code rule text (state floor) + carried-forward utility tariff detail checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes — the County Building Department performs its own inspections; no delegation to a third party is stated anywhere. 70% · county ordinance
    • If delegated, to whom? N/A — not delegated; see Q52. 65% · county ordinance
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For new construction generally (NOT solar-specific), the County's own checklist lists, in order: Temporary Power Pole -> Footer -> Slab -> Sheathing -> Framing -> Electrical/Mechanical/Plumbing (Rough) -> Roofing -> Insulation -> Drywall -> Temporary/Permanent Power -> Electrical/Mechanical/Plumbing (Final) -> Final Inspection. A straightforward rooftop-PV retrofit on an existing house would not go through this full new-construction sequence; the County publishes no separate, shorter sequence naming which of these stages a retrofit solar permit actually uses. 55% · county inspection checklist (general, not solar-specific)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? For new construction, a Certificate of Occupancy — the County publishes a 'Final Inspection and CO Request Form' with its own checklist of required attachments. For a stand-alone electrical/solar permit not tied to new construction, no document states what is issued on a passed final inspection (likely just a passed/closed permit record in CitizenServe, but this is not confirmed). 50% · county form (general, not solar-specific)
    • Who notifies the utility for PTO? The customer/installer, per the state floor — not the AHJ. 50% · Florida Administrative Code rule text (state floor)
    • Is there a re-inspection fee? A per-job 'inspection fine' (functionally a re-inspection fee) applies if the site is called in but not ready: $50 first offense, $100 second offense, $200 third offense plus the inspection is delayed two weeks. 85% · county fee/fine resolution (OCR'd, canvas-only PDF)

14 questions answered against Franklin County’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

By phone, email, or through the applicant's CitizenServe account.

Why the confidence is not higherThe County's own 'New Construction Requirements' inspection checklist states verbatim: '3 Ways To Schedule Inspections: 1) Via your CitizenServe account 2) Email: permits@franklincountyflorida.com 3) Phone: (850)653-9783 ext. 3 - DO NOT LEAVE INSPECTION REQUESTS ON VOICE MAIL.' Not solar-specific, but is the County's one general scheduling process for every trade including electrical/solar.

county inspection checklist (general, not solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedNew Construction Requirements inspection checklist (full text read) and the Building Inspections contact material — no required notice period for scheduling an inspection is stated (only 'do not leave requests on voicemail')

https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedSame as Q50 — no AM/PM or same-day scheduling window is described anywhere

https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the County Building Department performs its own inspections; no delegation to a third party is stated anywhere.

Why the confidence is not higherSec. 5.5-11(d): 'The Franklin County Building, Plumbing and Electrical Codes shall be administered by the Franklin County Building Official' — no outside inspection agency is named in any County document reviewed.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated; see Q52.

Why the confidence is not higherFollows directly from Q52.

county ordinance checked 2026-09-12 https://library.municode.com/fl/franklin_county/codes/code_of_ordinances?nodeId=COLAOR_CH5.5BUBURE_ARTIITECO_S5.5-11BUPLELCO

Q54 Which inspections are required, and in what order? Core Stages & sequence

For new construction generally (NOT solar-specific), the County's own checklist lists, in order: Temporary Power Pole -> Footer -> Slab -> Sheathing -> Framing -> Electrical/Mechanical/Plumbing (Rough) -> Roofing -> Insulation -> Drywall -> Temporary/Permanent Power -> Electrical/Mechanical/Plumbing (Final) -> Final Inspection. A straightforward rooftop-PV retrofit on an existing house would not go through this full new-construction sequence; the County publishes no separate, shorter sequence naming which of these stages a retrofit solar permit actually uses.

Why the confidence is not higherRead verbatim (OCR'd from a Word document, not a scanned PDF, so no OCR uncertainty) off the County's 'New Construction Requirements' inspection checklist; explicitly a general new-construction document, not a solar-specific one, so the confidence reflects that gap.

county inspection checklist (general, not solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedNew Construction Requirements inspection checklist (full text read) — the general sequence includes a 'Rough' electrical/mechanical/plumbing inspection for NEW CONSTRUCTION, but no document states whether a rooftop-PV retrofit on an existing home requires any rough-in/mid-roof inspection distinct from a single final

https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNew Construction Requirements inspection checklist and all Building Department pages — none states that the inspector verifies equipment labels/listings as a discrete checked item

https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q57 Is there a published inspection checklist? Core What is checked

Yes — a general 'New Construction Requirements' inspection checklist is published (Word document), though it is not solar-specific.

Why the confidence is not higherThe document itself, downloaded and read directly (a native .docx, not a scanned image, so this is a clean-text read): title 'New Construction Requirements,' listing the full inspection sequence and required supporting documents for a Certificate of Occupancy.

county inspection checklist (general, not solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedNew Construction Requirements inspection checklist and all permit applications — no PV-specific on-site document requirement is published; the general checklist implies a permit card and prior-stage sign-offs must be on file, but nothing solar-specific

https://building.franklincountyflorida.gov/uploads/new-construction-inspection-list.docx

Q59 Is there a re-inspection fee? Corrections & re-inspection

A per-job 'inspection fine' (functionally a re-inspection fee) applies if the site is called in but not ready: $50 first offense, $100 second offense, $200 third offense plus the inspection is delayed two weeks.

Why the confidence is not higherOCR'd directly from the County's own 'Fine Schedule' resolution (a canvas-only PDF; text layer absent, extracted via pdftoppm + tesseract): 'INSPECTION FINE SCHEDULE: If you call for an inspection and it is not ready: PER JOB: FIRST OFFENSE: $50.00 SECOND OFFENSE: $100.00 THIRD OFFENSE: $200.00 Delayed Inspection For 2 Weeks.' Not solar-specific, but is the County's one general re-inspection/no-show fee schedule applying to every trade.

county fee/fine resolution (OCR'd, canvas-only PDF) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/fine-schedule.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedNew Construction Requirements checklist, Fine Schedule, Fee Schedule, CitizenServe portal description — no document describes how plan-review or inspection corrections are issued and cleared (only the re-inspection fine amounts at Q59 were found)

https://building.franklincountyflorida.gov/uploads/fine-schedule.pdf

Q61 What is issued on pass? Core Final sign-off & PTO

For new construction, a Certificate of Occupancy — the County publishes a 'Final Inspection and CO Request Form' with its own checklist of required attachments. For a stand-alone electrical/solar permit not tied to new construction, no document states what is issued on a passed final inspection (likely just a passed/closed permit record in CitizenServe, but this is not confirmed).

Why the confidence is not higherThe 'Final Inspection and CO Request Form' and the 'New Construction Requirements' checklist both describe the CO route for new construction; neither addresses a stand-alone electrical/PV permit's final sign-off document by name.

county form (general, not solar-specific) checked 2026-09-12 https://building.franklincountyflorida.gov/uploads/final-inspection-and-co-request-form.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The customer/installer, per the state floor — not the AHJ.

Why the confidence is not higherFL PSC Rule 25-6.065(7)(d) places the obligation to execute the Standard Interconnection Agreement and give the utility at least 10 days' notice before placing equipment in service on the customer, not the local building department; no County document states that the County itself notifies the utility.

Florida Administrative Code rule text (state floor) checked 2026-09-12 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
County
County
Franklin County
Regions covered
Authority Contact
Building Department
Booking & Scheduling