Glades County

Glades County

State of Florida

Verified Aug. 6, 2026

Glades County is a county authority in the State of Florida, serving 12,126 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Glades County against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Glades County is the authority having jurisdiction 85% confidence
Holds
Building, electrical, mechanical, plumbing, mobile-home, and zoning/planning permitting and inspection for UNINCORPORATED Glades County only, performed in-house by the County's own Community Development Department (Building Division + Planning & Zoning Division). The County's own Community Development page states plainly: 'The County's Land Development Regulations and Comprehensive Plan only apply within unincorporated Glades County. If the property is located within the City of Moore Haven, please call City Hall at (863) 946-0711.' Moore Haven is NOT a delegate or absorbed town — it is a genuinely separate incorporated AHJ: Moore Haven's own Code of Ordinances (Municode clientId 3381) names a City 'Building and Zoning Official' at Sec. 125-41 and has its own Chapter 34 'Building Construction' with its own permit-fee schedule (Sec. 34-3), so Moore Haven runs its own building department rather than relying on the County. This is the 'town runs its own department' county-to-town shape (same shape as Quincy, Live Oak, Clewiston, LaBelle in this survey), the OPPOSITE of the DeSoto/Arcadia shape where the town has no department at all. Fire is a County-run division (Glades County Fire Rescue) under the County's own Public Safety department, in-house, not delegated to a special district or the Sheriff.
Overridden by
Two things bear on County-issued permits: (1) FS 471.003(2)(h) statewide exempts a licensed electrical contractor from a PE-stamp requirement for electrical work valued at $125,000 or less with aggregate service capacity of 600A (240V) or less on a residential system. (2) For the investor-owned utility (FPL), FL PSC Rule 25-6.065 requires the County's own inspection and approval BEFORE FPL will operate the system in parallel — the County's inspection gates FPL's energization, not the reverse. Glades Electric Cooperative, the other utility present in the County, is a member-owned rural electric cooperative and is NOT bound by PSC Rule 25-6.065 (co-ops sit under Fla. Stat. 366.91 and their own filed tariffs/policies instead).
Why not higher
Direct evidence: the County's own Community Development page (myglades.com), Building Division page, the current Building Permit Application (rev. 08/09/2023), the Contractor Registration process, and the FY2023-2024 FS 553.80(7)(b) Building Permit and Inspection Utilization Report (3 dedicated personnel, $94,659 personnel cost, ZERO private-provider inspections/audits — a clean in-house signature) all point to the County performing building/electrical/mechanical/plumbing/zoning work itself for unincorporated area only. Held at 85 rather than higher because (a) Moore Haven's own building-fee ordinance and permit process were only spot-checked, not read in full, and (b) whether any additional small settlement (e.g., Buckhead Ridge, which has its own County 'Annex' office) has a materially different building-permit workflow from the main Moore Haven office was not separately confirmed.

https://www.myglades.com/departments/community_development/index.php

Permit required
Yes, a permit is required.78%
Portal
The County's iWorq Citizen Portal ('Citizen Portal'), at https://gladescounty.portal.iworq.net/portalhome/gladescounty — covering Existing Permits (Feb 2014-current) and Historical Permits…90%
Electrical code
NEC 2020 (the statewide floor), reached in Glades County via a FLOATING/silent local adoption: County Code Sec.78%
Booking an inspection
Two routes: the County's iWorq Citizen Portal ('Request an Inspection' function on an existing permit record), or by phone/email directly to the Building Division (863-946-6018,82%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes, a permit is required. Q3 Electrical and building permits — Combined — one 'Building Permit Application' covers all trades (including Electrical) via a single 'Contractor Assignment and Authorization' sheet listing Building, Q4 Where you file — The County's iWorq Citizen Portal ('Citizen Portal'), at https://gladescounty.portal.iworq.net/portalhome/gladescounty — covering Existing Permits (Feb… Q20

Permit required
Yes, a permit is required.78% source
Key document
building permit application cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes, for unincorporated Glades County. The Community Development Department (Building Division) is the AHJ for residential rooftop PV outside Moore Haven's city limits. 88% · county department page
    • What does this authority permit itself, and what does it delegate? The County permits and inspects itself: Building, Mobile Home, Electrical, Plumbing, Mechanical, Aluminum, Gas, Roofing, Drywall, Carpentry, Masonry, and Concrete trades (per the Contractor Assignment & Authorization Sheet on the Building Permit Application), plus Planning/Zoning. It delegates nothing to another government for unincorporated-area work; fire is a separate in-house County division (Glades County Fire Rescue), not a delegated special district. 80% · building permit application
    • Is a permit required for a residential rooftop PV system? Yes, a permit is required. 78% · county department page (general permit-exemption list)
    • Is there a separate electrical permit, or is it combined? Combined — one 'Building Permit Application' covers all trades (including Electrical) via a single 'Contractor Assignment and Authorization' sheet listing Building, Mobile Home, Electrical, Plumbing, Mechanical, Aluminum, Gas, Roofing, Drywall, Carpentry, Masonry, Concrete as line items requiring separate contractor sign-off, rather than a wholly separate electrical-permit application/portal record. 78% · building permit application
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor (or the owner-builder, see Q7) signs the 'Electrical' line of the Contractor Assignment and Authorization Sheet with their license number. 68% · building permit application
    • Must the contractor be registered with this authority before applying? Yes. Contractors must register with the County before applying — a Contractor Registration Form with a $50.00 initial registration fee is required. 88% · county department page / forms list
    • Is a homeowner permitted to self-install and self-permit? Yes. A homeowner may self-install/self-permit as an owner-builder by completing the County's Owner-Builder Affidavit Form and checking 'Owner-Builder' on the Building Permit Application. 78% · county owner-builder affidavit form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar-specific checklist is published. The general Building Permit Application (rev. 08/09/2023) lists 16 required-document categories: (1) plan set (1 paper+digital residential / 2 paper+1 digital commercial), (2) a scaled site plan, (3) a property survey (with 3 stated exemptions), (4) potable-water/well or sewer/septic verification, (5) right-of-way construction approval, (6) Florida Energy Code form (Central Zone 7) with load-sizing calcs, (7) truss layout/engineering, (8) mobile-home installation workbook (if applicable), (9) aluminum-structure engineering (if applicable), (10) contract/cost-to-build documentation, (11) Florida Product Approval/NOA for roofing/doors/windows, (12) proof of ownership (if recently purchased), (13) stormwater pollution prevention plan (commercial only), (14) commercial landscape/buffer plan, (15) SHIP-approval documentation (if applicable), (16) E911 address verification (new construction). 82% · building permit application
    • How many copies, and in what format? One paper copy plus one digital copy for residential projects (two paper plus one digital for commercial). Plans over 11x17 must additionally be emailed as a digital copy to named staff before submittal. 78% · building permit application
    • Is a site plan required, and what must it show? Yes, a site plan is required for all structural permits. It must be drawn to scale (may use the property survey as a base), show actual lot dimensions/shape, exact size/location of existing structures, location/dimensions of the proposed structure or alteration, distances between structures, adjacent roads and distance to property lines, and well/septic locations where present. 85% · building permit application
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? The County's iWorq Citizen Portal ('Citizen Portal'), at https://gladescounty.portal.iworq.net/portalhome/gladescounty — covering Existing Permits (Feb 2014-current) and Historical Permits (2005-Jan 2014). 90% · portal landing page (live-tested)
    • Can the whole application be completed online? No — the application itself is not completed end-to-end online. Building Permit Applications and required forms (Short Form, full Building Permit Application, Owner-Builder Affidavit) are downloadable PDFs, and the Community Development Department's own page instructs applicants to 'Provide one hard copy and an electric copy to the Community Development Office Manager for the initial submittal.' Once a permit exists in the system, the portal DOES support online functions: checking status, viewing inspection results, requesting inspections, uploading additional documents, making payments, and sending messages. 78% · county department page + live portal test
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • Which utility handles interconnection here? Two utilities are present: Florida Power & Light (FPL, investor-owned) and Glades Electric Cooperative, Inc. (GEC, a member-owned rural electric cooperative headquartered in Moore Haven). 78% · county department page
    • Where does the utility sit in the sequence? For FPL-served parcels: FL PSC Rule 25-6.065(5)(a) requires the County's own building/electrical inspection and approval BEFORE FPL will operate the system in parallel with its grid — the AHJ inspects first, utility connects after. For GEC-served parcels: GEC's own 'Considering Solar?' page directs the member to contact GEC's Engineering Department BEFORE signing with a contractor (for a transformer load analysis and to execute GEC's Net Metering Agreement) — GEC involvement precedes and runs parallel to the County's permit process rather than strictly following it. Separately, for utility RECONNECTION after a service outage (not a new PV interconnect), the County's own 'Information You Should Know' page describes a distinct sequence: the County's Community Development Department sends a 'Power Release Request' to Glades Electric after receiving a licensed electrician's affidavit. 65% · Florida Administrative Code rule text + utility's own member page

28 questions answered against Glades County’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes, for unincorporated Glades County. The Community Development Department (Building Division) is the AHJ for residential rooftop PV outside Moore Haven's city limits.

Why the confidence is not higherCounty's own Community Development page states its Land Development Regulations/Comprehensive Plan 'only apply within unincorporated Glades County' and directs City-of-Moore-Haven properties to City Hall; the Building Division page, current Building Permit Application, and FY2023-24 FS 553.80(7)(b) utilization report all confirm the County performs building/electrical permitting and inspection itself.

county department page checked 2026-09-13 https://www.myglades.com/departments/community_development/index.php

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

The County permits and inspects itself: Building, Mobile Home, Electrical, Plumbing, Mechanical, Aluminum, Gas, Roofing, Drywall, Carpentry, Masonry, and Concrete trades (per the Contractor Assignment & Authorization Sheet on the Building Permit Application), plus Planning/Zoning. It delegates nothing to another government for unincorporated-area work; fire is a separate in-house County division (Glades County Fire Rescue), not a delegated special district.

Why the confidence is not higherDirectly enumerated on the current (rev. 08/09/2023) Building Permit Application's 'Contractor Assignment and Authorization' table, corroborated by the Building Division page's list of its own responsibilities (reviewing plans, issuing permits, inspecting building/mechanical/plumbing/electrical work, mobile-home permitting, issuing COs) and the Public Safety page listing Fire as a County division.

building permit application checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes, a permit is required.

Why the confidence is not higherThe 'What Doesn't Need A Building Permit?' page — the County's own exhaustive, State-Fla.-Stat.-derived exemption list — does not include solar/PV or renewable-energy equipment anywhere in it; general electrical/structural work requires a permit under Sec. 109-1/109-2 of the County Code and the fee ordinance's per-application fee (Sec. 109-19). No solar-specific statement exists (a Municode search of the full Code for 'solar' and 'photovoltaic' returns zero substantive hits, confirmed with passing positive ('electrical') and fabricated ('zzqqx') controls), so this is inferred from the general permitting requirement rather than a solar-specific County statement.

county department page (general permit-exemption list) checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/what_needs_a_permit.php

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined — one 'Building Permit Application' covers all trades (including Electrical) via a single 'Contractor Assignment and Authorization' sheet listing Building, Mobile Home, Electrical, Plumbing, Mechanical, Aluminum, Gas, Roofing, Drywall, Carpentry, Masonry, Concrete as line items requiring separate contractor sign-off, rather than a wholly separate electrical-permit application/portal record.

Why the confidence is not higherRead directly from the current (rev. 08/09/2023) County Building Permit Application; the County publishes no stand-alone 'Electrical Permit Application' document (checked the full Building Applications document list).

building permit application checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor (or the owner-builder, see Q7) signs the 'Electrical' line of the Contractor Assignment and Authorization Sheet with their license number.

Why the confidence is not higherDirectly from the Contractor Assignment and Authorization Sheet embedded in the current Building Permit Application, which requires 'Contractor Print Name,' 'License Number,' and 'Contractor's Signature' for each trade including Electrical; not solar-specific.

building permit application checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes. Contractors must register with the County before applying — a Contractor Registration Form with a $50.00 initial registration fee is required.

Why the confidence is not higherBuilding Applications page states verbatim: 'Contractor Registration Form - No faxes allowed. Please email ajones@myglades.com and/or sbuchans@myglades.com the required documents. There is also an initial fee of $50.00 to register with the County.' Not solar-specific, this is the general registration requirement.

county department page / forms list checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/building_fees.php

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. A homeowner may self-install/self-permit as an owner-builder by completing the County's Owner-Builder Affidavit Form and checking 'Owner-Builder' on the Building Permit Application.

Why the confidence is not higherThe Building Permit Application has a 'Check if Owner-Builder' box, and the County separately publishes a stand-alone Owner-Builder Affidavit (Owner_Builder_Aff_9-17-19.pdf, internally titled 'OWNER BUILDER DISCLOSURE STATEMENT') implementing the FS 489.103/489.503 exemption. Not solar-specific and does not separately clarify whether an owner-builder may self-perform the Electrical trade line item versus needing a licensed EC's signature for that specific trade.

county owner-builder affidavit form checked 2026-09-13 https://www.myglades.com/Community%20Development/Building/BuildingDocuments/Owner_Builder_Aff_9-17-19.pdf?t=20230403142738157

Q8 What documents make up a complete submittal? Core Submittal package

No solar-specific checklist is published. The general Building Permit Application (rev. 08/09/2023) lists 16 required-document categories: (1) plan set (1 paper+digital residential / 2 paper+1 digital commercial), (2) a scaled site plan, (3) a property survey (with 3 stated exemptions), (4) potable-water/well or sewer/septic verification, (5) right-of-way construction approval, (6) Florida Energy Code form (Central Zone 7) with load-sizing calcs, (7) truss layout/engineering, (8) mobile-home installation workbook (if applicable), (9) aluminum-structure engineering (if applicable), (10) contract/cost-to-build documentation, (11) Florida Product Approval/NOA for roofing/doors/windows, (12) proof of ownership (if recently purchased), (13) stormwater pollution prevention plan (commercial only), (14) commercial landscape/buffer plan, (15) SHIP-approval documentation (if applicable), (16) E911 address verification (new construction).

Why the confidence is not higherEnumerated directly, item-by-item, from the current County Building Permit Application. None of the 16 items is solar-specific — no dedicated PV submittal checklist exists on the site (Building Applications page's full document list and a Municode-wide search for 'solar'/'photovoltaic' both returned nothing PV-specific).

building permit application checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q9 How many copies, and in what format? Submittal package

One paper copy plus one digital copy for residential projects (two paper plus one digital for commercial). Plans over 11x17 must additionally be emailed as a digital copy to named staff before submittal.

Why the confidence is not higherItem 1 of the Building Permit Application's 'Required Documents Descriptions' states this verbatim; the Building Applications page separately instructs '* Any permits that have plans 11x17 or larger needs to provide us with a digital copy... before submitting the permit packet.' Not solar-specific.

building permit application checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes, a site plan is required for all structural permits. It must be drawn to scale (may use the property survey as a base), show actual lot dimensions/shape, exact size/location of existing structures, location/dimensions of the proposed structure or alteration, distances between structures, adjacent roads and distance to property lines, and well/septic locations where present.

Why the confidence is not higherQuoted directly (item 2, 'SITE PLAN REQUIREMENTS') from the current County Building Permit Application. Not solar-specific — this is the general site-plan standard applied to any structural permit, which a ground-mount or roof-mount retrofit would fall under.

building permit application checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedBuilding Permit Application's 16-item 'Required Documents Descriptions' (read in full) — no line item names a one-line/three-line/riser electrical diagram; item 6 only covers the Florida Energy Code (HVAC load-sizing) form

https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame Building Permit Application document list — no item requires string or conductor calculations by name; Building Applications and FAQ pages checked for a PV-specific supplement, none found

https://www.myglades.com/departments/community_development/building_department/building_fees.php

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedBuilding Permit Application, fee ordinance (OCR'd in full), Building Applications forms list — none states a numeric structural PE-stamp threshold; the Code of Ordinances Chapter 109 (Article I, In General, and Article II, Technical Codes) does not codify one either

https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedChapter 109 of the Code (read in full) and the fee ordinance — no local electrical PE-stamp threshold is codified; the state floor (FS 471.003(2)(h), $125,000/600A) was not confirmed at fewer-than-40 confidence to record as a full answer given no direct County citation, so it is placed here rather than answered outright

https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q15 What does a residential solar permit cost? Core Fees

Nothing published by this authority.

Where we lookedOCR'd fee ordinance (Ord. No. 2020-16) — no line item is named 'solar' or 'photovoltaic'; the closest candidate is a generic 'Energy Generator' line ($50 residential/$150 commercial minimum) that is genuinely ambiguous — it could mean a solar array OR a standby/backup generator, and nothing in the document disambiguates it, so it was not recorded as a scored answer at or above 40 confidence

https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q16 How is the fee calculated? Core Fees

Nothing published by this authority.

Where we lookedSame OCR'd fee ordinance — Building permits are valuation-based ($50 min. + tiered $/$1,000), Electrical alteration/service-change permits are amperage-based ($60 + $0.85/amp for a service change) per the ordinance's own tables, but which formula a PV job is billed under is not stated because no dedicated PV/solar line exists

https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedOCR'd fee ordinance's Building Permits section — 'Plan Review Fee 15% permit fee ($35 min.)' is stated as a general line covering all building permits, but is not separately confirmed as applying identically to a PV-only electrical alteration versus a full building permit

https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedBuilding Division page, Permitting-related pages, FAQ page, and the fee ordinance — none states a stated plan-review turnaround time

https://www.myglades.com/departments/community_development/building_department/index.php

Q19 How long is an issued permit valid before it expires? Timeline & validity

Nothing published by this authority.

Where we lookedBuilding Permit Application, fee ordinance, Building Division page — none states a permit-validity/expiration period; the model FBC administrative provision (180 days) is not locally amended per Chapter 109 Article I but is also not restated by the County anywhere checked

https://www.myglades.com/departments/community_development/building_department/index.php

Q20 Which permit portal does this authority use? Core Portal & process

The County's iWorq Citizen Portal ('Citizen Portal'), at https://gladescounty.portal.iworq.net/portalhome/gladescounty — covering Existing Permits (Feb 2014-current) and Historical Permits (2005-Jan 2014).

Why the confidence is not higherConfirmed by direct navigation and live use of the portal; the underlying vendor (iWorq) is stated in the portal's own footer ('Powered by iWorq').

portal landing page (live-tested) checked 2026-09-13 https://gladescounty.portal.iworq.net/portalhome/gladescounty

Q21 Can the whole application be completed online? Core Portal & process

No — the application itself is not completed end-to-end online. Building Permit Applications and required forms (Short Form, full Building Permit Application, Owner-Builder Affidavit) are downloadable PDFs, and the Community Development Department's own page instructs applicants to 'Provide one hard copy and an electric copy to the Community Development Office Manager for the initial submittal.' Once a permit exists in the system, the portal DOES support online functions: checking status, viewing inspection results, requesting inspections, uploading additional documents, making payments, and sending messages.

Why the confidence is not higherThe 'provide one hard copy AND an electric copy' instruction is quoted directly from the Community Development Department's main page; the portal's own home page separately lists downloadable (not web-form) application icons for 'Short Form for Building Projects,' 'Building Permit Application,' and 'Demolition Permit Application,' each with a 'Click to Download'/'Click to Apply' icon rather than an in-browser wizard, live-tested directly.

county department page + live portal test checked 2026-09-13 https://www.myglades.com/departments/community_development/index.php

Q22 Which utility handles interconnection here? Core Utility interconnection

Two utilities are present: Florida Power & Light (FPL, investor-owned) and Glades Electric Cooperative, Inc. (GEC, a member-owned rural electric cooperative headquartered in Moore Haven).

Why the confidence is not higherThe County's own 'Information You Should Know' page (Building Division) states directly: 'Electrical Reconnect: If your service is with Florida Power and Light, please contact them directly... If your service is with Glades Electric and the power has been disconnected for less than two years, please contact them directly...' — naming both utilities as the two the County recognizes for Glades County service. GEC's own 'Our Story' page independently confirms its service area 'spans portions of Glades, Hendry, Highlands, and Okeechobee counties,' HQ'd at 26733 US Hwy 27, Moore Haven, FL. No County document states which parcels/areas fall to which utility, so the exact geographic split within the county is not established.

county department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/information_you_should_know.php

Q23 Where does the utility sit in the sequence? Core Utility interconnection

For FPL-served parcels: FL PSC Rule 25-6.065(5)(a) requires the County's own building/electrical inspection and approval BEFORE FPL will operate the system in parallel with its grid — the AHJ inspects first, utility connects after. For GEC-served parcels: GEC's own 'Considering Solar?' page directs the member to contact GEC's Engineering Department BEFORE signing with a contractor (for a transformer load analysis and to execute GEC's Net Metering Agreement) — GEC involvement precedes and runs parallel to the County's permit process rather than strictly following it. Separately, for utility RECONNECTION after a service outage (not a new PV interconnect), the County's own 'Information You Should Know' page describes a distinct sequence: the County's Community Development Department sends a 'Power Release Request' to Glades Electric after receiving a licensed electrician's affidavit.

Why the confidence is not higherFPL sequencing is the statewide PSC-rule floor for investor-owned utilities (source below). GEC sequencing is read from GEC's own 'Considering Solar?' member page. The 'Power Release Request' pattern is confirmed for RECONNECTION only, not shown to apply identically to a brand-new PV interconnection, so that part is not fully confirmed for the PV case specifically.

Florida Administrative Code rule text + utility's own member page checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedBuilding Permit Application, Building Applications forms list, FAQ page — no HOA/architectural-approval submittal requirement or disclaimer found (unlike Ocoee's explicit disclaimer, Glades publishes nothing on this topic at all)

https://www.myglades.com/departments/community_development/building_department/building_fees.php

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedFull Municode search for 'historic' (controls passed) — no historic-preservation district, board, or dedicated review process exists in the County's Code; only incidental historic-building references inside the Floodplain Management chapter's variance provisions (Sec. 117-7) and a generic definition at Sec. 125-1

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Q26 Is a wind or windstorm certification required? Overlays & special cases

Nothing published by this authority.

Where we lookedBuilding Permit Application, fee ordinance, Product Approval-related material — no wind/windstorm certification distinct from the standard Florida Product Approval/NOA process (item 11 of the required-documents list) was found; the County appears to rely on the FBC's ASCE 7 wind-speed map with no local minimum stated

https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedPlanning & Zoning Applications and Forms page and Chapter 125 (Land Development Regulations) definitions/special-exception provisions (Article V, Division 3) — a general Special Exception Use process exists for land uses generally, but no solar-specific Specific Use Permit or Council-approval trigger was found

https://www.myglades.com/departments/community_development/planning_and_zoning/planning_and_zoning_applications_and_forms.php

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedFull Municode search across the Code for 'solar,' 'photovoltaic,' and 'renewable energy' (positive control 'electrical' passed with many hits; fabricated control 'zzqqx' returned zero) — no residential generation system-size cap exists anywhere in the Code

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020 (the statewide floor), reached in Glades County via a FLOATING/silent local adoption: County Code Sec. 109-2 incorporates 'the National Electrical Code, as adopted by the Florida Building Commissioner, and all subsequent amendments' by reference, with no year printed in the ordinance text itself. 78% · county code (floating adoption)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) — the statewide floor, reached via a FLOATING local adoption: County Code Sec. 109-1 incorporates 'the Florida Building Code, including all volumes, and all subsequent amendments, and all local technical and administrative amendments' with no edition year printed. 70% · county code (floating adoption) + conflicting current permit-application masthead
    • Which fire code edition is in force? Florida Fire Prevention Code, current edition (state floor: 8th Ed., 2023) — reached via a FLOATING local adoption: County Code Sec. 109-3 incorporates 'the Florida Fire Prevention Code, as adopted by the Florida State Fire Marshall, and all subsequent amendments,' with no year printed. 70% · county code (floating adoption)
    • Are there local amendments to any of the above? No codified local technical or administrative amendments to the FBC, NEC, or Fire Prevention Code exist in the current Code — Secs. 109-4 through 109-18 (where such amendments would sit) are marked 'Reserved,' and Ord. No. 2022-5 (2022) affirmatively REPEALED the two local amendment sections that had existed (107.6.1 permits-by-affidavit and 117.1 flood hazard areas). This is a clean silent/floating adoption, not a stale one. 75% · county code
    • What is the installation judged against? The Florida Building Code (floating to current 8th Ed., 2023 per Sec. 109-1) and the National Electrical Code (floating to current 2020 per Sec. 109-2), both incorporated by reference county-wide with no local technical amendments. 78% · county code
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Glades County on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? No County-specific rapid-shutdown statement exists; rapid shutdown (NEC Art. 690.12) applies only by inheritance through the floating adoption of NEC 2020 (state floor) at Sec. 109-2 — the County's Code, fee ordinance, and permit forms do not mention 'rapid shutdown,' 'solar,' or 'photovoltaic' anywhere (confirmed by a Municode-wide search with passing positive/fabricated controls). 60% · inference from floating code adoption
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Does the UTILITY specify placards beyond the AHJ's? Yes, for FPL-served parcels: FPL's own Net Metering Guidelines require (a) for Tier 2/3 systems (>10 kW), a manual visible load-break disconnect switch mounted separate from but adjacent to the meter socket, lockable by FPL, with a sign at the meter noting the disconnect's location and a warning sign that both sides may be energized (FPL must approve sign wording/location); (b) for ANY battery-storage installation, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility,' with the battery certified to UL 1741. For GEC-served parcels: NO placard or exterior-disconnect specification is published anywhere on GEC's site — GEC's own Net Metering Guide states only that inverters 'are required to have an automatic shut-off to avoid back-feeding electricity onto the grid,' with no exterior placard or manual-disconnect-switch requirement stated. This absence was proven, not assumed: GEC's full public document set (5 pages / ~415 items of its WordPress media library, including its Tariffs Volume II, Fee Schedule, and Net Metering Guide) was enumerated and none specifies a placard. 78% · utility's own current guidelines page + utility's own filed tariff/media enumeration
    • Where must the labels be placed? FPL: the disconnect switch must be mounted separate from, but adjacent to, the FPL meter socket, readily accessible to FPL at all times, and capable of being locked open with a single FPL padlock; a sign noting its location must be installed at the meter. GEC: no label-placement rule is published (see Q42). 75% · utility's own current guidelines page
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? FPL: Tier 1 systems (≤10 kW, the great majority of residential rooftop PV) require NO AC disconnect at all. Tier 2/3 systems require a manual visible load-break disconnect mounted separate from, but adjacent to, the FPL meter socket. GEC: no manual exterior AC-disconnect switch is specified in any of GEC's published material — GEC's Net Metering Guide states only that the customer's inverter itself 'must have an automatic shut-off to avoid back-feeding electricity onto the grid,' with no separate physical disconnect switch or meter-relative placement rule published. 65% · utility's own current guidelines/tariff + county absence
    • Are batteries permitted, and under what conditions? Batteries/ESS are not addressed anywhere in the County's own Code or permit forms (a Municode search for 'battery' across the full Code returns zero solar/ESS-relevant hits — only cemetery-lighting, junkyard, and unrelated criminal-statute references, confirmed with passing controls). At the utility level: FPL requires battery-storage equipment to carry NRTL certification to the current UL 1741 standard and a placard reading 'Battery storage utilized in this facility'; export of stored energy back to the grid is not currently allowed on FPL's system. GEC publishes no battery-specific policy. 65% · county code search (absence) + utility's own guidelines

20 questions answered against Glades County’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020 (the statewide floor), reached in Glades County via a FLOATING/silent local adoption: County Code Sec. 109-2 incorporates 'the National Electrical Code, as adopted by the Florida Building Commissioner, and all subsequent amendments' by reference, with no year printed in the ordinance text itself.

Why the confidence is not higherSec. 109-2 (Ord. No. 2016-12, 5-10-2016) is a clean floating adoption with no year — a SILENT, not stale, adoption (confirmed no local amendment exists at Secs. 109-4—109-18, which are 'Reserved'). The statewide floor is NEC 2020, effective 31 Dec 2023, per prior corroboration from floridabuilding.org (the Florida Building Commission's own site) across many Florida AHJ runs in this survey. Held below 90 because the County's own standalone 'State Construction Rules and Regulations' resource page still separately lists '2008 National Electric Code (NEC), otherwise known as NFPA 70 5th Edition' as a linked reference document — a stale resource link, not the operative adoption ordinance, but a real discrepancy on the County's own site worth flagging.

county code (floating adoption) checked 2026-09-13 https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023) — the statewide floor, reached via a FLOATING local adoption: County Code Sec. 109-1 incorporates 'the Florida Building Code, including all volumes, and all subsequent amendments, and all local technical and administrative amendments' with no edition year printed.

Why the confidence is not higherSec. 109-1 (Ord. No. 2016-12, 5-10-2016) floats with no year, so the current statewide cycle (8th Ed., 2023) applies by reference. Held at only 70, notably lower than the NEC answer, because the County's OWN current-use Building Permit Application (rev. 08/09/2023, the same one used to answer most of this survey) prints on its masthead 'FBC 2020 7th Edition' — a document actively in use today that names the edition BEFORE the 8th Edition (2023) took effect (31 Dec 2023). That is a real, dated document discrepancy on the County's own current form, not a hypothetical staleness risk.

county code (floating adoption) + conflicting current permit-application masthead checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, current edition (state floor: 8th Ed., 2023) — reached via a FLOATING local adoption: County Code Sec. 109-3 incorporates 'the Florida Fire Prevention Code, as adopted by the Florida State Fire Marshall, and all subsequent amendments,' with no year printed.

Why the confidence is not higherSec. 109-3 (Ord. No. 2016-12, 5-10-2016), same floating/silent pattern as Sec. 109-1/109-2, no local amendment found. The County's Code has no separately codified fire-prevention chapter with its own year to go stale, so unlike several other Florida authorities in this survey there is no separate fire-chapter staleness trap here — but also no independent County confirmation of the specific edition beyond the state floor.

county code (floating adoption) checked 2026-09-13 https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q32 Are there local amendments to any of the above? Core Code editions in force

No codified local technical or administrative amendments to the FBC, NEC, or Fire Prevention Code exist in the current Code — Secs. 109-4 through 109-18 (where such amendments would sit) are marked 'Reserved,' and Ord. No. 2022-5 (2022) affirmatively REPEALED the two local amendment sections that had existed (107.6.1 permits-by-affidavit and 117.1 flood hazard areas). This is a clean silent/floating adoption, not a stale one.

Why the confidence is not higherDirectly from Chapter 109, Article I ('In General') and the editor's note at Secs. 109-20—109-21 describing Ord. No. 2022-5's repeal. Distinct from the document-level discrepancy noted at Q30 (the current Building Permit Application masthead still prints '7th Edition' — that is a form-vintage issue, not a codified local amendment).

county code checked 2026-09-13 https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q33 What is the installation judged against? Core Electrical

The Florida Building Code (floating to current 8th Ed., 2023 per Sec. 109-1) and the National Electrical Code (floating to current 2020 per Sec. 109-2), both incorporated by reference county-wide with no local technical amendments.

Why the confidence is not higherCombines Sec. 109-1 and Sec. 109-2 of County Code Chapter 109, Article I.

county code checked 2026-09-13 https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedChapter 109 (Buildings) and the OCR'd fee ordinance's Electrical Permits fee table — no service-upgrade or busbar-sizing rule beyond the generic per-amperage fee tiers

https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedFull Municode search for 'solar'/'photovoltaic' (zero hits beyond the cemetery-lighting reference) and the Building Applications forms list — no mounting-system or attachment-spacing document or code provision exists

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedChapter 109 Article I (fire code floating adoption, Sec. 109-3) and Fire/Public Safety pages — no ridge-setback or fire-access-pathway rule for rooftop PV is stated anywhere in the County's material

https://www.myglades.com/departments/public_safety/fire.php

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

No County-specific rapid-shutdown statement exists; rapid shutdown (NEC Art. 690.12) applies only by inheritance through the floating adoption of NEC 2020 (state floor) at Sec. 109-2 — the County's Code, fee ordinance, and permit forms do not mention 'rapid shutdown,' 'solar,' or 'photovoltaic' anywhere (confirmed by a Municode-wide search with passing positive/fabricated controls).

Why the confidence is not higherInference only, from the floating NEC 2020 adoption established for Q29; no County document affirmatively states a rapid-shutdown requirement or names the 2020 (vs. any other) NEC edition for this specific purpose.

inference from floating code adoption checked 2026-09-13 https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH109BUBURE_ARTIINGE

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedFull Municode search for 'solar'/'photovoltaic' with passing positive/fabricated controls, plus the complete Building Applications document list and FAQ page — no AHJ placard requirement of any kind is published by the County

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38 — no placard wording is published by the County

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38 — no letter-height/colour/material spec is published by the County

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame as q38 — no facility/site-plan placard spec is published by the County

https://library.municode.com/fl/glades_county/codes/code_of_ordinances

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, for FPL-served parcels: FPL's own Net Metering Guidelines require (a) for Tier 2/3 systems (>10 kW), a manual visible load-break disconnect switch mounted separate from but adjacent to the meter socket, lockable by FPL, with a sign at the meter noting the disconnect's location and a warning sign that both sides may be energized (FPL must approve sign wording/location); (b) for ANY battery-storage installation, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility,' with the battery certified to UL 1741. For GEC-served parcels: NO placard or exterior-disconnect specification is published anywhere on GEC's site — GEC's own Net Metering Guide states only that inverters 'are required to have an automatic shut-off to avoid back-feeding electricity onto the grid,' with no exterior placard or manual-disconnect-switch requirement stated. This absence was proven, not assumed: GEC's full public document set (5 pages / ~415 items of its WordPress media library, including its Tariffs Volume II, Fee Schedule, and Net Metering Guide) was enumerated and none specifies a placard.

Why the confidence is not higherFPL requirements quoted directly from fpl.com's own current net-metering guidelines page. GEC's absence is a proven negative from a full media-library enumeration plus a read of its current (ModDate 2 Mar 2026) 33-page combined tariff document, which contains a filed Net Metering Rider ('NM', Original Sheet No. 20.0, effective 1 Jan 2019) with no placard language. GEC's actual member-specific Interconnection Agreement is executed directly with members and is NOT published online, so a genuinely more detailed disconnect/placard spec could exist there unpublished — flagged, not assumed absent beyond what was checked.

utility's own current guidelines page + utility's own filed tariff/media enumeration checked 2026-09-13 https://www.fpl.com/clean-energy/net-metering/guidelines.html

Q43 Where must the labels be placed? Core Labels Signage & labelling

FPL: the disconnect switch must be mounted separate from, but adjacent to, the FPL meter socket, readily accessible to FPL at all times, and capable of being locked open with a single FPL padlock; a sign noting its location must be installed at the meter. GEC: no label-placement rule is published (see Q42).

Why the confidence is not higherFPL text quoted directly from FPL's own net-metering guidelines. GEC absence corroborated the same way as Q42.

utility's own current guidelines page checked 2026-09-13 https://www.fpl.com/clean-energy/net-metering/guidelines.html

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedBuilding Permit Application's Product Approval requirement (item 11, generic to roofing/doors/windows) and GEC/FPL solar pages — no County-published PV-equipment approved-list requirement exists; UL 1741 is required by both utilities for inverters/battery equipment (utility-level, not AHJ-level), which was recorded qualitatively in the answers for Q45 rather than as its own scored answer here to avoid double-counting

https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries/ESS are not addressed anywhere in the County's own Code or permit forms (a Municode search for 'battery' across the full Code returns zero solar/ESS-relevant hits — only cemetery-lighting, junkyard, and unrelated criminal-statute references, confirmed with passing controls). At the utility level: FPL requires battery-storage equipment to carry NRTL certification to the current UL 1741 standard and a placard reading 'Battery storage utilized in this facility'; export of stored energy back to the grid is not currently allowed on FPL's system. GEC publishes no battery-specific policy.

Why the confidence is not higherCounty absence proven by Municode search with controls. FPL text quoted directly from its own net-metering guidelines page. GEC's silence is the same proven-absence method as Q42.

county code search (absence) + utility's own guidelines checked 2026-09-13 https://www.fpl.com/clean-energy/net-metering/guidelines.html

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedOCR'd fee ordinance (full 8-page schedule read) and Fire/Public Safety pages — no separate ESS permit or inspection category exists; battery/ESS is not named anywhere in County material

https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedChapter 125 Sec. 125-1 definitions (read in full) — 'Accessory uses and structures' is defined generically ('customarily accessory and clearly incidental and subordinate to permitted... uses and structures') with NO solar/PV example given (unlike some other Florida counties in this survey that name 'solar energy equipment' explicitly); whether a ground-mounted PV array is treated as an accessory structure subject to the Setbacks document's dimensional standards is a plausible but unconfirmed inference, not a County statement

https://library.municode.com/fl/glades_county/codes/code_of_ordinances?nodeId=PTIILADE_CH125LADERE_ARTIINGE_S125-1DE

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

FPL: Tier 1 systems (≤10 kW, the great majority of residential rooftop PV) require NO AC disconnect at all. Tier 2/3 systems require a manual visible load-break disconnect mounted separate from, but adjacent to, the FPL meter socket. GEC: no manual exterior AC-disconnect switch is specified in any of GEC's published material — GEC's Net Metering Guide states only that the customer's inverter itself 'must have an automatic shut-off to avoid back-feeding electricity onto the grid,' with no separate physical disconnect switch or meter-relative placement rule published.

Why the confidence is not higherFPL text quoted from FPL's own current guidelines. The GEC finding is a proven absence from GEC's own published Net Metering Guide and 33-page current tariff document (no manual-disconnect clause found), though GEC's actual member Interconnection Agreement is not published and could add a requirement not captured here — flagged as an open gap, consistent with the pattern seen at GCEC elsewhere in this survey where the real interconnection agreement is executed privately and not posted.

utility's own current guidelines/tariff + county absence checked 2026-09-13 https://www.fpl.com/clean-energy/net-metering/guidelines.html

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Two routes: the County's iWorq Citizen Portal ('Request an Inspection' function on an existing permit record), or by phone/email directly to the Building Division (863-946-6018, kfischer@myglades.com or ajones@myglades.com). 82% · county department page + live portal test
    • How much notice is required? Inspection requests must be called in by 4:00 pm the day before to be scheduled for the next day. 88% · county department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for Glades County on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • What must be on site at inspection? No PV-specific on-site document requirement is published. The general Building Permit Application states the retained approved plan set 'must be retained at the construction site and made accessible to the building inspector.' 55% · building permit application (general)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • Who notifies the utility for PTO? For a standard net-metering PTO, the CUSTOMER/INSTALLER notifies the utility directly — GEC's own 'Considering Solar?' page instructs the member to contact GEC directly (before AND to complete the Net Metering Agreement); FPL's PSC-filed interconnection process places the notification obligation on the customer. The County's own documented 'Power Release Request' duty (Community Development Department notifying Glades Electric) was found ONLY in the context of restoring power after a long service disconnection, not confirmed as the same mechanism used for a brand-new PV interconnection. 55% · utility's own member page
    • Is there a re-inspection fee? Not directly published in the current documents reviewed for solar; the County's Building Department Schedule of Permit Fees (Ordinance No. 2020-16, effective for permits filed 10/1/2020 or after, corrected for a scrivener's error 7/7/2021) sets general re-inspection penalty fees: $50 for the 1st re-inspection, $100 for the 2nd, and $200 for the 3rd or more (2nd/3rd apply only to the same noncompliance). 70% · county fee ordinance (OCR'd scanned document)

14 questions answered against Glades County’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Two routes: the County's iWorq Citizen Portal ('Request an Inspection' function on an existing permit record), or by phone/email directly to the Building Division (863-946-6018, kfischer@myglades.com or ajones@myglades.com).

Why the confidence is not higherPortal function confirmed live-tested on gladescounty.portal.iworq.net/portalhome/gladescounty; phone/email route quoted directly from the Building Division page.

county department page + live portal test checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/index.php

Q50 How much notice is required? Core Booking & scheduling

Inspection requests must be called in by 4:00 pm the day before to be scheduled for the next day.

Why the confidence is not higherQuoted verbatim from the Building Division page: 'You must have your inspection request called in by 4 pm the day before in order for it to be put on the schedule the next day.'

county department page checked 2026-09-13 https://www.myglades.com/departments/community_development/building_department/index.php

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedBuilding Division page (read in full) — no AM/PM or same-day scheduling-window option is described beyond the '4pm day-before' call-in deadline

https://www.myglades.com/departments/community_development/building_department/index.php

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes — the County performs its own final inspections in-house; there is no private-provider outsourcing.

Why the confidence is not higherThe County's own FS 553.80(7)(b) FY2023-2024 Building Permit and Inspection Utilization Report states: 3 personnel dedicated to enforcing the FBC/issuing permits/conducting inspections, $94,659 in personnel costs, and explicitly ZERO (0) building inspections conducted by a private provider and ZERO (0) audits of private-provider inspections — a clean in-house signature. The named Building Official is Judson Dulany (jdulany@myglades.com), on the County's own @myglades.com domain, with a local (863) area code.

FS 553.80(7)(b) statutory utilization report checked 2026-09-13 https://www.myglades.com/Permit%20%20Inspection%20Utilization%2023-24.pdf?t=20250910154737136

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated to anyone; the County's own Building Division performs the inspection.

Why the confidence is not higherFollows directly from Q52's utilization-report evidence.

FS 553.80(7)(b) statutory utilization report checked 2026-09-13 https://www.myglades.com/Permit%20%20Inspection%20Utilization%2023-24.pdf?t=20250910154737136

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedBuilding Division page, Building Permit Application, fee ordinance — no published inspection sequence (rough-in, mid-roof, final, etc.) for any trade including electrical/PV

https://www.myglades.com/departments/community_development/building_department/index.php

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame as q54 — no rough-in/mid-roof inspection requirement stated for PV or roofing generally

https://www.myglades.com/departments/community_development/building_department/index.php

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedBuilding Division page and FAQ page — neither states that the inspector verifies equipment labels/listings as a discrete checked item

https://www.myglades.com/departments/community_development/building_department/index.php

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedBuilding Division page, complete Building Applications forms document list, and FAQ page (all read in full) — no published inspection checklist of any kind (PV or general) exists on the County's site; a live-tested iWorq Citizen Portal search is by Permit #/Owner/Parcel Address/Primary Contractor ONLY — it has no keyword, permit-type, or description search field, so it could not be used to pull a checklist or a real solar permit record either (a genuine portal limitation, distinct from an absence of solar permits)

https://gladescounty.portal.iworq.net/GLADESCOUNTY/permits/600

Q58 What must be on site at inspection? Core Documents on site

No PV-specific on-site document requirement is published. The general Building Permit Application states the retained approved plan set 'must be retained at the construction site and made accessible to the building inspector.'

Why the confidence is not higherQuoted from the general Required Documents Description item 1 of the Building Permit Application; not solar-specific and no dedicated PV inspection-day checklist exists (see Q57).

building permit application (general) checked 2026-09-13 https://www.myglades.com/2022%20BuildingPermitApplication_10-20-2020.pdf?t=20230814172833852

Q59 Is there a re-inspection fee? Corrections & re-inspection

Not directly published in the current documents reviewed for solar; the County's Building Department Schedule of Permit Fees (Ordinance No. 2020-16, effective for permits filed 10/1/2020 or after, corrected for a scrivener's error 7/7/2021) sets general re-inspection penalty fees: $50 for the 1st re-inspection, $100 for the 2nd, and $200 for the 3rd or more (2nd/3rd apply only to the same noncompliance).

Why the confidence is not higherExtracted by OCR (the fee-schedule PDF is a scanned/canvas-only document with no text layer — tesseract used per this project's standing rule) from the County's current fee ordinance, a general re-inspection fee applying to all trades including electrical, not solar-specific.

county fee ordinance (OCR'd scanned document) checked 2026-09-13 https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedBuilding Division page and fee ordinance — a 'Plan Review revisions $35 + $35/hr after 1st hour' fee line exists, implying a revision process, but no document describes HOW corrections are issued or cleared (portal-based, letter, phone) at a confidence at or above 40

https://www.myglades.com/Community%20Development/Building/BuildingDocuments/2020-16%20%20Building%20Permit%20Fees_correct%20scrivener%20error7.7.2021.pdf?t=20230403142634502

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedBuilding Division page (states it issues 'Certificates of Occupancy' as a general function) and fee ordinance (Temporary CO fees) — neither states specifically what document is issued on passing an electrical-alteration/PV-only final inspection (as opposed to new construction requiring a CO)

https://www.myglades.com/departments/community_development/building_department/index.php

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

For a standard net-metering PTO, the CUSTOMER/INSTALLER notifies the utility directly — GEC's own 'Considering Solar?' page instructs the member to contact GEC directly (before AND to complete the Net Metering Agreement); FPL's PSC-filed interconnection process places the notification obligation on the customer. The County's own documented 'Power Release Request' duty (Community Development Department notifying Glades Electric) was found ONLY in the context of restoring power after a long service disconnection, not confirmed as the same mechanism used for a brand-new PV interconnection.

Why the confidence is not higherCombines GEC's own member-facing solar page, the FL PSC rule's customer-notification framework (state floor for FPL), and the County's own 'Information You Should Know' page (which describes the Power Release Request only for reconnection, not new PV service) — the gap between those two scenarios is real and not resolved by any single document.

utility's own member page checked 2026-09-13 https://www.gladeselectric.com/member-services/considering-solar/

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go 75%

FPL: the disconnect switch must be mounted separate from, but adjacent to, the FPL meter socket, readily accessible to FPL at all times, and capable of being locked open with a single FPL padlock; a sign noting its location must be installed at the meter. GEC: no label-placement rule is published (see Q42).

What the utility wants on top 78%

Yes, for FPL-served parcels: FPL's own Net Metering Guidelines require (a) for Tier 2/3 systems (>10 kW), a manual visible load-break disconnect switch mounted separate from but adjacent to the meter socket, lockable by FPL, with a sign at the meter noting the disconnect's location and a warning sign that both sides may be energized (FPL must approve sign wording/location); (b) for ANY battery-storage installation, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility,' with the battery certified to UL 1741. For GEC-served parcels: NO placard or exterior-disconnect specification is published anywhere on GEC's site — GEC's own Net Metering Guide states only that inverters 'are required to have an automatic shut-off to avoid back-feeding electricity onto the grid,' with no exterior placard or manual-disconnect-switch requirement stated. This absence was proven, not assumed: GEC's full public document set (5 pages / ~415 items of its WordPress media library, including its Tariffs Volume II, Fee Schedule, and Net Metering Guide) was enumerated and none specifies a placard.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
County
County
Glades County
Regions covered
Authority Contact
Building Department
Booking & Scheduling