Holmes County

Holmes County

State of Florida

Verified Aug. 5, 2026

Holmes County is a county authority in the State of Florida, serving 19,653 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Holmes County against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Holmes County is the authority having jurisdiction 82% confidence
Holds
Building and Electrical. The Holmes County Building Department (107 E. Virginia Ave., Bonifay) is a SINGLE, CONSOLIDATED department that issues and inspects building and electrical permits for the unincorporated county AND, per the county's own material, for the incorporated towns as well -- the county's own Building/Planning/Zoning webpage runs its FAQ under the joint headings 'HOLMES COUNTY/BONIFAY PLANNING FAQs' and 'HOLMES COUNTY/BONIFAY BUILDING DEPARTMENT FAQs', and the county's own Residential Construction Requirements handout tells every applicant 'If constructing within city limits a letter is required from them for city compliance' and lists direct phone numbers for all five towns (Bonifay 850-547-4238, Esto 850-263-6521, Noma 850-263-3449, Ponce De Leon 850-836-4361, Westville 850-548-5858). That is a two-desk sequence, town first: the municipality issues a compliance/zoning letter, then the County Building Department issues and inspects the actual building and electrical permit. This was independently confirmed from the town side for two of the five towns: Esto's own 'Helpful Resources' page refers residents straight to 'Holmes County Building / Planning / Zoning' at the county's own address and phone number and lists no Esto building department of its own (only a Public Works Department), and Bonifay's own Forms page lists no building-permit forms at all under its 'Planning and Zoning' department (only an agenda-request form and an employment application) while Bonifay independently runs its OWN municipal Fire-Rescue department -- so Bonifay's own department structure separates fire (municipal) from building/electrical (county). Noma's own current Code of Ordinances (adopted by Ordinance 2026-02, 5/4/2026) Sec. 5-1 says fees for FBC permits 'shall be established by resolution of the Town Council', which reads as if Noma could run its own permitting, but no Noma building official, building department, or building fee resolution could be found anywhere on Noma's site, and Noma's own Helpful-Resources-style town-council actions (Ordinance 2026-02, rescinding Noma's own status as Local Planning Agency and returning that role to the County -- see Esto's parallel action below) point the same direction; recorded as likely-same-pattern but NOT independently confirmed for Noma the way it was for Esto and Bonifay. Ponce de Leon and Westville could not be reached on the town side at all (see below), so their side of the relationship rests solely on the County's own compliance-letter instruction. Zoning/Future Land Use is administered by the County's own Planning function (a Planner and Planning Tech are county-listed staff, but the Planner, John Feeney, uses an @aldayhowell.com email -- Alday-Howell Engineering, Inc. of Marianna, FL, a private civil-engineering firm offering 'land use planning' among its services -- indicating the County's PLANNING function specifically is run through a contracted private firm, while the Building Official and permit techs are on the county's own @holmescountyfl.org domain, indicating BUILDING/ELECTRICAL itself is in-house, not contracted). Esto's own Ordinance 2026-02 (17 Feb 2026) formally rescinded Esto's Town Council as the town's Local Planning Agency and returned that function to Holmes County, confirming Esto's planning is county-run by the town's own dated action.
Overridden by
FS 471.003(2)(h) sets the statewide electrical PE-stamp exemption at $125,000/600A (no stricter local threshold found). FL PSC Rule 25-6.065 governs interconnection only for the investor-owned utility presence in the county (FPL); Fla. Stat. 366.91 governs the two cooperatives present (West Florida Electric Cooperative and Choctawhatchee Electric Cooperative/CHELCO), which are NOT PSC-rule-bound and run their own interconnection agreements. Which utility governs a given disconnect/placard answer therefore depends on the parcel, not on the County (see utility answers below).
Why not higher
Primary evidence is the County's own Building/Planning/Zoning page and its Residential Construction Requirements handout (both current), corroborated from the town side for Esto (Helpful Resources page refers to the County) and Bonifay (Forms page has no building forms; Bonifay's separate Fire-Rescue page shows the town DOES run its own fire department, proving Bonifay's site is complete enough that the absence of building forms is meaningful, not just an unfinished website). Held below 90 because Noma's side of the relationship is inferred rather than directly confirmed (no Noma building department page found, but also no explicit Noma statement that the County does its building/electrical), and because Ponce de Leon and Westville could not be reached at all, so the relationship for those two towns rests on the County's compliance-letter instruction alone, not on anything from the towns themselves.

https://holmescountyfla.com/building-planning-zoning/

Permit required
Yes. Holmes County's own FAQ states 'FBC 102.2 A building permit is needed to construct, enlarge, modification, change of occupancy, alter, repair, move,88%
Permit cost
No PV-specific fee exists. A residential PV job would be billed under the County's general Building Permit valuation table (e.g., $100 for the first $1,000 of value,78%
Plan review
Up to seven (7) days for a complete residential submittal ('A complete submittal for a residential permit may take up to seven days for plan review and permitting').88%
Portal
No online permitting portal was found. The County's own material describes an in-person/paper process: 'Apply at the Holmes County Building Department located within the Holmes County Board…70%
Electrical code
The County's own documents never name an NEC edition -- the Residential Construction Requirements handout says only 'Electrical requirements are from the National Electrical Code' (no…58%
Booking an inspection
By phone call or email to the Building Department. 'Inspection requests may be called in or emailed.'82%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. Holmes County's own FAQ states 'FBC 102.2 A building permit is needed to construct, enlarge, modification, change of occupancy, alter, repair, move, Q3 Electrical and building permits — Separate. The County's Building Permit Application states verbatim 'a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS...'. Q4 Plan review — Up to seven (7) days for a complete residential submittal ('A complete submittal for a residential permit may take up to seven days for plan review and… Q18 Where you file — No online permitting portal was found. The County's own material describes an in-person/paper process: 'Apply at the Holmes County Building Department located… Q20

Permit required
Yes. Holmes County's own FAQ states 'FBC 102.2 A building permit is needed to construct, enlarge, modification, change of occupancy, alter, repair, move,88% source
What it costs
No PV-specific fee exists. A residential PV job would be billed under the County's general Building Permit valuation table (e.g., $100 for the first $1,000 of value, plus $8/$1,000 up to $10,000,78% source
Plan review turnaround
Up to seven (7) days for a complete residential submittal ('A complete submittal for a residential permit may take up to seven days for plan review and permitting').88% source
Key document
trade permit application (OCR'd) + county webpage + town franchise ordinance cited by 7 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes -- the Holmes County Building Department is the AHJ for residential building and electrical permitting, including for addresses inside Bonifay, Esto and (per the County's own instruction) the other incorporated towns, subject to a town-level compliance letter first where the property is in city limits. 85% · department FAQ page
    • What does this authority permit itself, and what does it delegate? The County Building Department itself issues and inspects Building and Electrical permits county-wide, including inside the towns. It does NOT delegate building/electrical to a private firm (staff are on the county's own @holmescountyfl.org domain), but its PLANNING function specifically is run through a contracted private civil-engineering firm, Alday-Howell Engineering, Inc. of Marianna FL (the county Planner's listed email is @aldayhowell.com). Municipalities retain their own zoning/compliance sign-off and (Bonifay, Noma) their own fire departments. 75% · staff directory + firm's own website
    • Is a permit required for a residential rooftop PV system? Yes. Holmes County's own FAQ states 'FBC 102.2 A building permit is needed to construct, enlarge, modification, change of occupancy, alter, repair, move, remove or demolish...every public and private building, structure, facility'. No solar/PV permit exemption is published anywhere in the County's material, and the County's own current Building Permit Application (rev. 02/2025) lists 'Solar System' as one of its building-type checkboxes, confirming solar jobs are processed as ordinary permitted work. 88% · building permit application (OCR'd, image-only PDF)
    • Is there a separate electrical permit, or is it combined? Separate. The County's Building Permit Application states verbatim 'a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS...'. Electrical work is applied for on the County's own Trade Permit Application, which has a distinct 'ELECTRIC' section with its own utility checkboxes (WFEC / FPL / CHELCO), separate from the general Building Permit Application that carries the 'Solar System' building-type box. 85% · building permit application + trade permit application (OCR'd)
    • Is there a historic-district review? No historic-district design-review board or process exists for buildings. The County's Land Development Regulations do contain a countywide 'Historical and Archaeological Resource Protection' provision (Sec. 4.08.00), but it is a SITE/RESOURCE test, not a building-design review: it only triggers a survey requirement if the parcel is listed on the Florida Master Site File or the County's own Comprehensive Listing of Historical and Archaeological Resources, and it separately protects housing over 75 years old from demolition. It is not a rooftop-PV-relevant design-review gate in the way a historic-district overlay is in other Florida cities. 75% · land development regulations
    • Is a Specific Use Permit or Council approval ever required? No Specific Use Permit or Council-approval requirement for residential solar was found. The LDR's only building-height-triggered Board of County Commissioners approval is for structures over three stories, unrelated to solar. A full-text search of the 236-page LDR for 'solar' and 'photovoltaic' returned zero hits with a passing positive control ('setback', 10 hits) and fabricated control ('zzqqx', 0 hits) -- a genuine, verified absence of any solar-specific zoning provision at all, not a missed search. 80% · land development regulations
    • Is there a system-size cap on residential generation? No AHJ-level system-size cap on residential generation was found (same LDR search as Q27 -- genuine, control-verified absence). A size limit does exist at the UTILITY level, not the AHJ level: WFECA's Member-Owned Generation program caps eligible systems at 25 kW AC, and FPL/CHELCO define net-metering Tiers (Tier 1 <=10kW) that affect fees and disconnect requirements but do not by themselves prohibit larger systems. 72% · land development regulations + utility interconnection documents
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A licensed electrical contractor pulls the electrical (Trade Permit) sub-permit; a homeowner may self-permit under the owner-builder exemption (see Q7). 68% · contractor packet (OCR'd)
    • Must the contractor be registered with this authority before applying? Yes for contractors working under a Holmes County Certificate of Competency -- the County publishes a dedicated 'Certified Contractor Packet' (Contractor's Competency Card Checklist, Application, and Permit Authorization) as a prerequisite set of forms distinct from the job-specific permit packets. 72% · contractor packet (OCR'd)
    • Is a homeowner permitted to self-install and self-permit? Yes. Holmes County publishes a dedicated Owner/Builder Permit Affidavit implementing the FS 489.103 owner-builder exemption (one- or two-family residence, owner-occupied, direct on-site supervision, no unlicensed hires). It is bundled in the Residential Building Packet as a required document. 88% · owner/builder affidavit form (OCR'd)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? County's Residential Construction Checklist lists, as applicable: Land Development Approval; 911 Address; Septic Tank Permit; Driveway Permit; Legal Description/Deed; two (2) sets of signed & sealed plans; Fire-resistant construction/fire-suppression info (if required); Florida Product Approval codes; Elevation Certificate (flood zone only); Letter of Compliance (if within a town's city limits); Residential Application for Building Permit; Notice of Commencement (jobs >$5,000); Disclosure Statement; Owner-Builder Permit Affidavit (if self-permitting); Authorization Form for Permit Application; Florida Energy Efficiency Code form; Product Approval Specification Sheet; a Trade Permit Application per trade (electrical, mechanical, plumbing, roofing); Electrical Affidavit; Roofing Inspection Affidavit. This is the County's general residential checklist -- it is not solar-specific and there is no separate PV checklist. 82% · residential construction checklist (OCR'd)
    • How many copies, and in what format? Two (2) sets of signed & sealed plans, drawn to scale. No electronic/portal submission option was found -- the County appears to take paper submittals in person or by mail (see Q20/Q21). 80% · residential construction requirements handout (OCR'd)
    • Is a site plan required, and what must it show? A site plan is implied as part of the required plan set (site requirements including setback/separation from assumed property lines and septic tank location are named as minimum plan-review criteria for residential building), but the County publishes no PV-specific or stand-alone site-plan specification. 55% · residential plan-review requirements (OCR'd)
    • Is a one-line / three-line diagram required? Not stated as a general county requirement, but WFEC's and CHELCO's own interconnection paperwork both require an electrical one-line diagram (with inverter/module/battery specification and, per CHELCO, the physical location of the visual manual load-break disconnect) as part of the UTILITY-side application, submitted after the county inspection. 58% · utility interconnection instructions
    • Is a structural PE stamp required, and at what threshold? No PV-specific structural PE-stamp threshold is published. The County does have one relevant LOCAL structural rule stricter than a simple dollar threshold: effective 1 Aug 2022, 'All trusses need to be engineered. Truss plans and layout are required to be submitted at the time of application for the building permit' -- a blanket truss-engineering requirement with no dollar/size exemption, which would reach any roof truss system a rooftop PV array attaches to, though it is not solar-specific. 62% · county policy notice
    • Is an electrical PE stamp required, and at what threshold? Statewide floor only: FS 471.003(2)(h) exempts electrical work from a PE-stamp requirement where the electrical system value is $125,000 or less and aggregate service capacity is 600 amperes (240V) or less on a residential system. No stricter Holmes County rule was found (and none of the County's packets or fee schedule mention a PE-stamp threshold at all). 58% · Florida Statute
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? No online permitting portal was found. The County's own material describes an in-person/paper process: 'Apply at the Holmes County Building Department located within the Holmes County Board of County Commissioners office 107 E. Virginia Ave. Bonifay Fl. 32425... Or call 850.547.1119 x3', and inspection requests are 'called in or emailed'. No EnerGov/CitizenServe/MyGovernmentOnline/Cloudpermit branding or portal link appears anywhere on the county site. 70% · department FAQ page + site sitemap
    • Can the whole application be completed online? No -- consistent with Q20, there is no online application system; permits are applied for in person, and inspections are requested by phone or email. 72% · department FAQ page
    • What does a residential solar permit cost? No PV-specific fee exists. A residential PV job would be billed under the County's general Building Permit valuation table (e.g., $100 for the first $1,000 of value, plus $8/$1,000 up to $10,000, tapering to $3/$1,000 above $500,000) PLUS a separate flat Electrical fee ('Residential: New electrical: $100.00'), plus a 3% (or $4, whichever greater) state surcharge on all permits, plus a residential Plan Review fee (currently the greater of $25 or 25% of the building permit fee). Note: the County's own homepage currently announces a change effective 1 Oct 2026: 'residential plan review fees will be $300...due at submittal' -- a dated, imminent, first-party fee change that supersedes the 25%/$25 plan-review line above for permits reviewed on or after that date. 78% · fee schedule + current homepage notice
    • How is the fee calculated? Valuation for the Building permit (tiered $/$1,000 table); flat fee ($100) for the residential electrical sub-permit; plan review fee is the greater of a flat $25 or 25% of the building permit fee (changing to a flat $300 for permits submitted on/after 1 Oct 2026 per the County's own current notice). 75% · fee schedule
    • Is there a separate plan-check fee? Yes -- a residential Plan Review fee is charged in addition to the permit fee: 'Residential: Minimum is $25.00, or 25% of the Building Permit Fee', changing to a flat $300 effective 1 Oct 2026 per the County's current homepage announcement. 80% · fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Up to seven (7) days for a complete residential submittal ('A complete submittal for a residential permit may take up to seven days for plan review and permitting'). Commercial projects may take fourteen days or longer. 88% · department FAQ page
    • How long is an issued permit valid before it expires? A permit remains valid as long as an approved inspection is recorded at least every 180 days (6 months); if 180 days elapse with no approved inspection the permit expires. One 90-day extension may be requested. 90% · department FAQ page + trade permit application
    • Which utility handles interconnection here? THREE utilities serve Holmes County, confirmed directly from the County's own current (2026) Trade Permit Application, which has an 'ELECTRIC' checkbox row of exactly '[ ] WFEC [ ] FPL [ ] CHELCO': West Florida Electric Cooperative (WFECA), Florida Power & Light (FPL), and Choctawhatchee Electric Cooperative (CHELCO). This is corroborated for specific areas: the County's own Building/Planning/Zoning page links West Florida Electric Cooperative directly as a resource, and the Town of Esto's own Ordinance 2025-02 (a dated, codified franchise ordinance) grants WFECA a 5-year electric franchise specifically inside Esto town limits. Which of the three actually serves a given parcel is not resolved by any single document -- the permit form itself proves the county recognizes all three as live possibilities, i.e., the utility regime varies by address within the county, and the applicant/installer must identify it per-parcel (the permit form is in fact how the County itself makes that determination on each job). 88% · trade permit application (OCR'd) + county webpage + town franchise ordinance
    • Where does the utility sit in the sequence? After the county's permit and inspection, before energization. Both cooperatives' own current documents say so explicitly: WFECA's Interconnection Agreement (Sec. 2.e) requires 'documentation showing the MOG has been inspected and approved by local code officials PRIOR TO its operation'; CHELCO's own current Tier 1 instructions state 'Once your system has been inspected by the county building department, submit [the interconnect agreement, fees, and diagrams]' to CHELCO, and CHELCO performs its own inspection and installs a programmed meter only after that. FPL's guidelines likewise require 'a copy of the approved permit' as part of the interconnection application. The utility sits downstream of the County: county inspection/approval first, utility interconnection and meter reprogramming second. 85% · utility interconnection instructions (cross-utility)

28 questions answered against Holmes County’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes -- the Holmes County Building Department is the AHJ for residential building and electrical permitting, including for addresses inside Bonifay, Esto and (per the County's own instruction) the other incorporated towns, subject to a town-level compliance letter first where the property is in city limits.

Why the confidence is not higherCounty's own joint 'Holmes County/Bonifay Building Department' FAQ and Residential Construction Requirements handout naming the county department and, separately, requiring a city-compliance letter for all five towns before the county permit is issued.

department FAQ page checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

The County Building Department itself issues and inspects Building and Electrical permits county-wide, including inside the towns. It does NOT delegate building/electrical to a private firm (staff are on the county's own @holmescountyfl.org domain), but its PLANNING function specifically is run through a contracted private civil-engineering firm, Alday-Howell Engineering, Inc. of Marianna FL (the county Planner's listed email is @aldayhowell.com). Municipalities retain their own zoning/compliance sign-off and (Bonifay, Noma) their own fire departments.

Why the confidence is not higherCounty's Building/Planning/Zoning staff listing (Planner's email domain vs. Building Official/permit techs' county domain) cross-checked against Alday-Howell Engineering's own site describing itself as a Marianna-based civil engineering firm offering land-use planning services.

staff directory + firm's own website checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. Holmes County's own FAQ states 'FBC 102.2 A building permit is needed to construct, enlarge, modification, change of occupancy, alter, repair, move, remove or demolish...every public and private building, structure, facility'. No solar/PV permit exemption is published anywhere in the County's material, and the County's own current Building Permit Application (rev. 02/2025) lists 'Solar System' as one of its building-type checkboxes, confirming solar jobs are processed as ordinary permitted work.

Why the confidence is not higherCounty FAQ quoting FBC 102.2 directly, corroborated by the 'Solar System' checkbox on the County's own current Building Permit Application form.

building permit application (OCR'd, image-only PDF) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate. The County's Building Permit Application states verbatim 'a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS...'. Electrical work is applied for on the County's own Trade Permit Application, which has a distinct 'ELECTRIC' section with its own utility checkboxes (WFEC / FPL / CHELCO), separate from the general Building Permit Application that carries the 'Solar System' building-type box.

Why the confidence is not higherVerbatim text of the County's current Building Permit Application (page 2 of 2, rev. current) plus the separate Trade Permit Application form bundled in the same packet.

building permit application + trade permit application (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A licensed electrical contractor pulls the electrical (Trade Permit) sub-permit; a homeowner may self-permit under the owner-builder exemption (see Q7).

Why the confidence is not higherInferred from the Certified Contractor Packet's Contractor's Competency Card materials and the Trade Permit Application's contractor-name/FL-license fields; the County's packets do not state this as a single explicit sentence.

contractor packet (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/CERTIFIED-CONTRACTOR-PACKET-1.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes for contractors working under a Holmes County Certificate of Competency -- the County publishes a dedicated 'Certified Contractor Packet' (Contractor's Competency Card Checklist, Application, and Permit Authorization) as a prerequisite set of forms distinct from the job-specific permit packets.

Why the confidence is not higherCounty's own Certified Contractor Packet document, listed as a standalone packet alongside the Residential/Commercial/Mobile Home packets on the Building/Planning/Zoning page.

contractor packet (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/CERTIFIED-CONTRACTOR-PACKET-1.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. Holmes County publishes a dedicated Owner/Builder Permit Affidavit implementing the FS 489.103 owner-builder exemption (one- or two-family residence, owner-occupied, direct on-site supervision, no unlicensed hires). It is bundled in the Residential Building Packet as a required document.

Why the confidence is not higherFull text of the County's own Owner/Builder Permit Affidavit form (2 pages), which tracks FS 489.103 verbatim and requires notarized owner signature.

owner/builder affidavit form (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q8 What documents make up a complete submittal? Core Submittal package

County's Residential Construction Checklist lists, as applicable: Land Development Approval; 911 Address; Septic Tank Permit; Driveway Permit; Legal Description/Deed; two (2) sets of signed & sealed plans; Fire-resistant construction/fire-suppression info (if required); Florida Product Approval codes; Elevation Certificate (flood zone only); Letter of Compliance (if within a town's city limits); Residential Application for Building Permit; Notice of Commencement (jobs >$5,000); Disclosure Statement; Owner-Builder Permit Affidavit (if self-permitting); Authorization Form for Permit Application; Florida Energy Efficiency Code form; Product Approval Specification Sheet; a Trade Permit Application per trade (electrical, mechanical, plumbing, roofing); Electrical Affidavit; Roofing Inspection Affidavit. This is the County's general residential checklist -- it is not solar-specific and there is no separate PV checklist.

Why the confidence is not higherCounty's own current 'Residential Construction Checklist' (office-use form, part of the Residential Building Packet).

residential construction checklist (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q9 How many copies, and in what format? Submittal package

Two (2) sets of signed & sealed plans, drawn to scale. No electronic/portal submission option was found -- the County appears to take paper submittals in person or by mail (see Q20/Q21).

Why the confidence is not higherCounty's own Residential Construction Requirements handout, item: 'Two (2) sets of signed & sealed plans drawn to scale.'

residential construction requirements handout (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

A site plan is implied as part of the required plan set (site requirements including setback/separation from assumed property lines and septic tank location are named as minimum plan-review criteria for residential building), but the County publishes no PV-specific or stand-alone site-plan specification.

Why the confidence is not higherCounty's 'Additional Requirements for Residential House Plans' handout, Sec. 106.3.5 minimum plan review criteria, item 1 (Site requirements: set back/separation, location of septic tanks).

residential plan-review requirements (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Not stated as a general county requirement, but WFEC's and CHELCO's own interconnection paperwork both require an electrical one-line diagram (with inverter/module/battery specification and, per CHELCO, the physical location of the visual manual load-break disconnect) as part of the UTILITY-side application, submitted after the county inspection.

Why the confidence is not higherWFECA MOG Agreement Exhibit references and CHELCO Tier 1 instructions, both requiring 'electrical one-line diagram and specification sheets for inverter, renewable energy source and other installed equipment'.

utility interconnection instructions checked 2026-09-12 https://chelco.com/sites/default/files/Net%20Metering%20Tier%201%20Instructions_2026.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedCounty's Residential Construction Checklist, Building Permit Application, and Trade Permit Application (none names string/conductor calculations); no PV-specific submittal document exists to check separately

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No PV-specific structural PE-stamp threshold is published. The County does have one relevant LOCAL structural rule stricter than a simple dollar threshold: effective 1 Aug 2022, 'All trusses need to be engineered. Truss plans and layout are required to be submitted at the time of application for the building permit' -- a blanket truss-engineering requirement with no dollar/size exemption, which would reach any roof truss system a rooftop PV array attaches to, though it is not solar-specific.

Why the confidence is not higherCounty's own Building/Planning/Zoning page, dated policy notice ('EFFECTIVE AUGUST 1, 2022. All trusses need to be engineered...').

county policy notice checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Statewide floor only: FS 471.003(2)(h) exempts electrical work from a PE-stamp requirement where the electrical system value is $125,000 or less and aggregate service capacity is 600 amperes (240V) or less on a residential system. No stricter Holmes County rule was found (and none of the County's packets or fee schedule mention a PE-stamp threshold at all).

Why the confidence is not higherFlorida Statute text (state floor); County's own current documents are silent on any electrical PE-stamp threshold.

Florida Statute checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

No PV-specific fee exists. A residential PV job would be billed under the County's general Building Permit valuation table (e.g., $100 for the first $1,000 of value, plus $8/$1,000 up to $10,000, tapering to $3/$1,000 above $500,000) PLUS a separate flat Electrical fee ('Residential: New electrical: $100.00'), plus a 3% (or $4, whichever greater) state surcharge on all permits, plus a residential Plan Review fee (currently the greater of $25 or 25% of the building permit fee). Note: the County's own homepage currently announces a change effective 1 Oct 2026: 'residential plan review fees will be $300...due at submittal' -- a dated, imminent, first-party fee change that supersedes the 25%/$25 plan-review line above for permits reviewed on or after that date.

Why the confidence is not higherCounty's own current 'Construction Permit Fees' schedule (effective 02/08/2021) for the valuation table and $100 electrical fee, cross-checked with the County's own current homepage notice announcing the 1 Oct 2026 plan-review fee change.

fee schedule + current homepage notice checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q16 How is the fee calculated? Core Fees

Valuation for the Building permit (tiered $/$1,000 table); flat fee ($100) for the residential electrical sub-permit; plan review fee is the greater of a flat $25 or 25% of the building permit fee (changing to a flat $300 for permits submitted on/after 1 Oct 2026 per the County's own current notice).

Why the confidence is not higherSame fee schedule document as Q15.

fee schedule checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q17 Is there a separate plan-check fee? Fees

Yes -- a residential Plan Review fee is charged in addition to the permit fee: 'Residential: Minimum is $25.00, or 25% of the Building Permit Fee', changing to a flat $300 effective 1 Oct 2026 per the County's current homepage announcement.

Why the confidence is not higherCounty fee schedule (Plan Review Fees section) plus the County's own current homepage notice.

fee schedule checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Up to seven (7) days for a complete residential submittal ('A complete submittal for a residential permit may take up to seven days for plan review and permitting'). Commercial projects may take fourteen days or longer.

Why the confidence is not higherCounty's own Building Department FAQ, direct quote.

department FAQ page checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q19 How long is an issued permit valid before it expires? Timeline & validity

A permit remains valid as long as an approved inspection is recorded at least every 180 days (6 months); if 180 days elapse with no approved inspection the permit expires. One 90-day extension may be requested.

Why the confidence is not higherCounty's own Building Department FAQ, direct quote; corroborated by the Trade Permit Application's own 'VOID after six (6) months from issuance' clause.

department FAQ page + trade permit application checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q20 Which permit portal does this authority use? Core Portal & process

No online permitting portal was found. The County's own material describes an in-person/paper process: 'Apply at the Holmes County Building Department located within the Holmes County Board of County Commissioners office 107 E. Virginia Ave. Bonifay Fl. 32425... Or call 850.547.1119 x3', and inspection requests are 'called in or emailed'. No EnerGov/CitizenServe/MyGovernmentOnline/Cloudpermit branding or portal link appears anywhere on the county site.

Why the confidence is not higherCounty's own Building Department FAQ ('Where and how do I apply for a building permit?'); confirmed absence checked against the full 30-URL county sitemap and the Building/Planning/Zoning page's own document list, neither of which names or links a portal.

department FAQ page + site sitemap checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q21 Can the whole application be completed online? Core Portal & process

No -- consistent with Q20, there is no online application system; permits are applied for in person, and inspections are requested by phone or email.

Why the confidence is not higherSame as Q20.

department FAQ page checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q22 Which utility handles interconnection here? Core Utility interconnection

THREE utilities serve Holmes County, confirmed directly from the County's own current (2026) Trade Permit Application, which has an 'ELECTRIC' checkbox row of exactly '[ ] WFEC [ ] FPL [ ] CHELCO': West Florida Electric Cooperative (WFECA), Florida Power & Light (FPL), and Choctawhatchee Electric Cooperative (CHELCO). This is corroborated for specific areas: the County's own Building/Planning/Zoning page links West Florida Electric Cooperative directly as a resource, and the Town of Esto's own Ordinance 2025-02 (a dated, codified franchise ordinance) grants WFECA a 5-year electric franchise specifically inside Esto town limits. Which of the three actually serves a given parcel is not resolved by any single document -- the permit form itself proves the county recognizes all three as live possibilities, i.e., the utility regime varies by address within the county, and the applicant/installer must identify it per-parcel (the permit form is in fact how the County itself makes that determination on each job).

Why the confidence is not higherCounty's own current Trade Permit Application electric-utility checkbox row (most authoritative -- a live, dated, first-party document that resolves the question directly, in the manner the FL baseline calls the 'Table of Franchises' technique), corroborated by the County's own webpage link to WFECA and by Esto's own 2025 franchise ordinance.

trade permit application (OCR'd) + county webpage + town franchise ordinance checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After the county's permit and inspection, before energization. Both cooperatives' own current documents say so explicitly: WFECA's Interconnection Agreement (Sec. 2.e) requires 'documentation showing the MOG has been inspected and approved by local code officials PRIOR TO its operation'; CHELCO's own current Tier 1 instructions state 'Once your system has been inspected by the county building department, submit [the interconnect agreement, fees, and diagrams]' to CHELCO, and CHELCO performs its own inspection and installs a programmed meter only after that. FPL's guidelines likewise require 'a copy of the approved permit' as part of the interconnection application. The utility sits downstream of the County: county inspection/approval first, utility interconnection and meter reprogramming second.

Why the confidence is not higherWFECA's own current MOG Interconnection Agreement, CHELCO's own current Tier 1 net-metering instructions, and FPL's own current net-metering guidelines page -- all three pulled and read directly this run.

utility interconnection instructions (cross-utility) checked 2026-09-12 https://chelco.com/sites/default/files/Net%20Metering%20Tier%201%20Instructions_2026.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty's Building Permit Application (only a disclaimer that a permit does not override deed restrictions -- no HOA-approval submittal requirement), Residential Construction Checklist, and Land Development Regulations (no HOA/architectural-review requirement found)

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q25 Is there a historic-district review? Overlays & special cases

No historic-district design-review board or process exists for buildings. The County's Land Development Regulations do contain a countywide 'Historical and Archaeological Resource Protection' provision (Sec. 4.08.00), but it is a SITE/RESOURCE test, not a building-design review: it only triggers a survey requirement if the parcel is listed on the Florida Master Site File or the County's own Comprehensive Listing of Historical and Archaeological Resources, and it separately protects housing over 75 years old from demolition. It is not a rooftop-PV-relevant design-review gate in the way a historic-district overlay is in other Florida cities.

Why the confidence is not higherFull text of LDR Sec. 4.08.00-4.08.02, read directly; searched the 236-page LDR for 'historic' with a passing positive control ('setback', 10 hits) and fabricated control ('zzqqx', 0 hits).

land development regulations checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty's Residential Construction Requirements, Additional Requirements for Residential House Plans, Product Approval Specification Sheet, and fee schedule -- none names a wind/windstorm CERTIFICATION distinct from the standard Florida Product Approval process (wind loads are folded into ordinary structural plan review, 'Wind requirements' item 6.d)

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No Specific Use Permit or Council-approval requirement for residential solar was found. The LDR's only building-height-triggered Board of County Commissioners approval is for structures over three stories, unrelated to solar. A full-text search of the 236-page LDR for 'solar' and 'photovoltaic' returned zero hits with a passing positive control ('setback', 10 hits) and fabricated control ('zzqqx', 0 hits) -- a genuine, verified absence of any solar-specific zoning provision at all, not a missed search.

Why the confidence is not higherFull-text search of the County's own current Land Development Regulations PDF with positive/fabricated controls.

land development regulations checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No AHJ-level system-size cap on residential generation was found (same LDR search as Q27 -- genuine, control-verified absence). A size limit does exist at the UTILITY level, not the AHJ level: WFECA's Member-Owned Generation program caps eligible systems at 25 kW AC, and FPL/CHELCO define net-metering Tiers (Tier 1 <=10kW) that affect fees and disconnect requirements but do not by themselves prohibit larger systems.

Why the confidence is not higherLDR full-text search (control-verified) plus WFECA's and CHELCO's own current interconnection documents defining their size tiers/caps.

land development regulations + utility interconnection documents checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? The County's own documents never name an NEC edition -- the Residential Construction Requirements handout says only 'Electrical requirements are from the National Electrical Code' (no year), a floating reference. Florida's statewide adoption is NEC 2020, effective 31 Dec 2023, under the Florida Building Code 8th Edition (2023) -- this is the state floor and, absent any county-specific statement, is the best available answer for Holmes County, but it has NOT been independently reproved from a Holmes County document naming a year. 58% · county requirements handout (floating reference)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023). The County's own current Building Permit Application masthead states 'Code in effect 8th Edition Florida Building Code', and the County's Building Department FAQ separately says 'A simple google search for 2023, 8th edition of The Florida Building Code can be found'. 92% · building permit application (OCR'd) + department FAQ
    • Which fire code edition is in force? Florida Fire Prevention Code, current edition -- the County does not publish a specific edition year for fire code anywhere in its material. Statewide, the current edition is the 8th Edition (2023). The County's FAQ separately cites 'Chapter 43, NFPA 101' (undated) for existing structures. 55% · department FAQ page
    • Are there local amendments to any of the above? Yes, at least two local amendments/additions beyond the base floating code adoption: (1) effective 1 Aug 2022, a blanket truss-engineering requirement with no exemption ('All trusses need to be engineered'); (2) effective 1 Oct 2026, a new flat $300/$500 residential/commercial plan-review fee replacing the percentage-based fee. Ordinance 23-01 (21 Feb 2023) itself adopts 'The Florida Building Code, including all updates or amendments' as a FLOATING reference with no fixed year named in the ordinance text. 75% · adopting ordinance (full text)
    • What is the installation judged against? Florida Building Code 8th Edition (2023) for construction generally, and 'the National Electrical Code' (no year stated locally; statewide floor is NEC 2020) for electrical work -- see Q29/Q30. 68% · building permit application (OCR'd)
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Holmes County on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Not mentioned by name in any County document, and not mentioned in either cooperative's own current interconnection paperwork. WFECA's Interconnection Agreement cites only IEEE-1547 (2003), IEEE-1547.1 (2005) and UL-1741 (2005); CHELCO's Technical Requirements document is dated 2016 and its current Tier instructions cite only IEEE 1547 compliance -- none references NEC 690.12. Because Florida's statewide-adopted NEC edition is 2020 (which contains Article 690.12 rapid-shutdown requirements), rapid shutdown IS legally required as a matter of the adopted electrical code even though no Holmes County or utility document mentions it by name -- this is a real installer risk: the county's and both cooperatives' own paperwork read as if written for a pre-rapid-shutdown era. 58% · utility interconnection agreement (silence on 690.12)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Does the UTILITY specify placards beyond the AHJ's? Yes, but only where FPL is the serving utility. FPL's own current Net Metering Guidelines page states verbatim: a 'placard must be permanently affixed to the meter enclosure stating "Battery storage utilized in this facility."' -- confirmed directly from fpl.com this run. Neither WFECA's MOG Agreement/Compliance Form nor CHELCO's Interconnect Agreement/Technical Requirements/Tier instructions specify any placard at all -- a genuine difference between utilities inside the same county, not a gap in the research. 82% · utility's own published guidelines
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Depends on the serving utility, all confirmed from each utility's OWN current document, not from the PSC floor: WFECA -- manual disconnect switch of the visible load-break type, mounted SEPARATE from the meter socket, readily accessible to the cooperative and lockable with a utility padlock, on every Member-Owned Generation system up to its 25kW program cap, NO size exemption (MOG Agreement Sec. 3.a, footer literally reads 'Revised 06/2021' even though the file is currently linked/served as 'MOG Agreement Revised May 2025' -- the May-2025 date is a re-publish/metadata date, not a content-revision date; the substantive terms have not changed since 2021). CHELCO -- DISCRETIONARY: 'The Member maybe required to install a visible, open, lockable disconnect capable of isolating the Member's generator near the Member's service entrance and meter panel' (Interconnection Agreement Sec. 4.c, current as of its own July-2025 modification date) -- CHELCO does NOT unconditionally require a disconnect, though its own Tier 1 instructions ask installers to show 'the physical location of the visual manual load break disconnect switch' on the one-line diagram, an internal tension between the discretionary agreement text and the assumption baked into the instructions. FPL -- Tier 1 (<=10kW, most residential rooftop PV) needs NO AC disconnect; Tier 2/3 (>10kW) require a manual visible load-break disconnect mounted separate from but adjacent to the meter socket, FPL-lockable (fpl.com net-metering guidelines, read directly this run). 85% · utility interconnection agreement (cross-utility)
    • Must equipment be on a specific approved list? No PV-specific equipment-listing requirement is published by the County. At the utility level: WFECA requires UL 1741 (2005)/IEEE-1547/1547.1 certification; CHELCO's compliance form requires UL 1741 and UL 1703 (flat-plate PV module) listing plus IEEE 1262-1995 and IEEE 929 compliance; FPL requires a UL-1741-listed inverter (or DC-coupled battery behind one). All are utility, not county, requirements. 65% · utility interconnection compliance form
    • Are batteries permitted, and under what conditions? Batteries/ESS are not addressed at all in the County's own material (no county document mentions batteries or ESS). At the utility level, FPL's own guidelines permit battery storage but require it be UL 1741-listed or DC-coupled behind a UL-1741-listed device, and require the meter-enclosure placard noted at Q42. WFECA's Interconnection Application form has a 'Batteries' manufacturer/model field, implying batteries are contemplated but not separately conditioned in the agreement text itself. CHELCO's documents do not mention batteries specifically. 55% · utility's own published guidelines
    • Is a ground mount treated as a structure? Not addressed. A full-text search of the County's current Land Development Regulations for 'ground mount' and 'ground-mount' returned zero hits (with the same passing positive/fabricated controls as Q27/Q28) -- a genuine, verified absence of any ground-mount-as-structure classification. 70% · land development regulations
    • Is a specific mounting system or attachment spacing required? No PV-specific mounting/attachment-spacing spec is published by the County. The one relevant county-wide structural rule is the truss-engineering requirement noted at Q13 -- it is a general roof-structural rule (applies to all trusses, not solar racking specifically), not a PV attachment-spacing spec. 50% · county policy notice

20 questions answered against Holmes County’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

The County's own documents never name an NEC edition -- the Residential Construction Requirements handout says only 'Electrical requirements are from the National Electrical Code' (no year), a floating reference. Florida's statewide adoption is NEC 2020, effective 31 Dec 2023, under the Florida Building Code 8th Edition (2023) -- this is the state floor and, absent any county-specific statement, is the best available answer for Holmes County, but it has NOT been independently reproved from a Holmes County document naming a year.

Why the confidence is not higherCounty's own Residential Construction Requirements handout (floating reference, no year) plus the statewide NEC adoption record (NFPA enforcement map / floridabuilding.org, per this survey's established Florida baseline).

county requirements handout (floating reference) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023). The County's own current Building Permit Application masthead states 'Code in effect 8th Edition Florida Building Code', and the County's Building Department FAQ separately says 'A simple google search for 2023, 8th edition of The Florida Building Code can be found'.

Why the confidence is not higherCounty's own current Building Permit Application form masthead, corroborated by the Building Department's own FAQ page.

building permit application (OCR'd) + department FAQ checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, current edition -- the County does not publish a specific edition year for fire code anywhere in its material. Statewide, the current edition is the 8th Edition (2023). The County's FAQ separately cites 'Chapter 43, NFPA 101' (undated) for existing structures.

Why the confidence is not higherCounty's own Building Department FAQ ('When is a fire safety review or fire inspection required?'), which names the Florida Fire Prevention Code and NFPA 101 Chapter 43 without a year.

department FAQ page checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, at least two local amendments/additions beyond the base floating code adoption: (1) effective 1 Aug 2022, a blanket truss-engineering requirement with no exemption ('All trusses need to be engineered'); (2) effective 1 Oct 2026, a new flat $300/$500 residential/commercial plan-review fee replacing the percentage-based fee. Ordinance 23-01 (21 Feb 2023) itself adopts 'The Florida Building Code, including all updates or amendments' as a FLOATING reference with no fixed year named in the ordinance text.

Why the confidence is not higherCounty's own dated policy notices on its Building/Planning/Zoning page, and the full text of Ordinance 23-01 (the FBC adoption ordinance) read directly.

adopting ordinance (full text) checked 2026-09-12 https://holmesclerk.com/uploads/2025/08/ordinance-23-01_tagged.pdf

Q33 What is the installation judged against? Core Electrical

Florida Building Code 8th Edition (2023) for construction generally, and 'the National Electrical Code' (no year stated locally; statewide floor is NEC 2020) for electrical work -- see Q29/Q30.

Why the confidence is not higherSame sources as Q29/Q30.

building permit application (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedCounty's Trade Permit Application (Electric section only has service-change/new-construction/rewire checkboxes with amperage blanks, no busbar-sizing rule stated) and fee schedule (amperage-tiered fees only, no technical service-upgrade rule)

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No PV-specific mounting/attachment-spacing spec is published by the County. The one relevant county-wide structural rule is the truss-engineering requirement noted at Q13 -- it is a general roof-structural rule (applies to all trusses, not solar racking specifically), not a PV attachment-spacing spec.

Why the confidence is not higherCounty's Building/Planning/Zoning page policy notice (truss engineering), cross-checked against the Residential Construction Checklist and Additional Requirements handout, neither of which mentions racking or attachment spacing.

county policy notice checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedCounty's Building Department FAQ (fire section) and the 'Florida Building Code Significant Issues' handout (a Big Bend BOAF termite-focused document with no ridge-setback or fire-pathway content) -- neither states a ridge setback or fire-access-pathway rule for rooftop PV

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Not mentioned by name in any County document, and not mentioned in either cooperative's own current interconnection paperwork. WFECA's Interconnection Agreement cites only IEEE-1547 (2003), IEEE-1547.1 (2005) and UL-1741 (2005); CHELCO's Technical Requirements document is dated 2016 and its current Tier instructions cite only IEEE 1547 compliance -- none references NEC 690.12. Because Florida's statewide-adopted NEC edition is 2020 (which contains Article 690.12 rapid-shutdown requirements), rapid shutdown IS legally required as a matter of the adopted electrical code even though no Holmes County or utility document mentions it by name -- this is a real installer risk: the county's and both cooperatives' own paperwork read as if written for a pre-rapid-shutdown era.

Why the confidence is not higherAbsence verified across the County's Residential Construction Checklist/Requirements/Building Permit Application, WFECA's MOG Agreement and Compliance Form, and CHELCO's Technical Requirements and Tier 1 instructions -- none names NEC 690.12 or 'rapid shutdown'; reasoning from the statewide NEC 2020 adoption per the Florida baseline for this survey.

utility interconnection agreement (silence on 690.12) checked 2026-09-12 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedCounty's Building Permit Application, Trade Permit Application, Residential Construction Checklist/Requirements, and fee schedule -- none specifies any placard at the service equipment; WFECA's and CHELCO's own interconnection documents likewise specify no placard

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no placard wording specified by the County or by WFECA/CHELCO

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no letter height/colour/material spec by the County or by WFECA/CHELCO

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no site-plan/facility-map placard spec by the County; the utilities' documents ask for a one-line diagram (Q11) but not a posted facility map

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, but only where FPL is the serving utility. FPL's own current Net Metering Guidelines page states verbatim: a 'placard must be permanently affixed to the meter enclosure stating "Battery storage utilized in this facility."' -- confirmed directly from fpl.com this run. Neither WFECA's MOG Agreement/Compliance Form nor CHELCO's Interconnect Agreement/Technical Requirements/Tier instructions specify any placard at all -- a genuine difference between utilities inside the same county, not a gap in the research.

Why the confidence is not higherFPL's own current net-metering guidelines page (fpl.com), read directly this run; WFECA and CHELCO's own current documents checked and confirmed silent on placards.

utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as Q38 -- no label-placement spec from the County; FPL's placard rule (Q42) does specify the meter enclosure as the location, but that is utility- not AHJ-sourced

https://www.fpl.com/clean-energy/net-metering/guidelines.html

Q44 Must equipment be on a specific approved list? Equipment listing

No PV-specific equipment-listing requirement is published by the County. At the utility level: WFECA requires UL 1741 (2005)/IEEE-1547/1547.1 certification; CHELCO's compliance form requires UL 1741 and UL 1703 (flat-plate PV module) listing plus IEEE 1262-1995 and IEEE 929 compliance; FPL requires a UL-1741-listed inverter (or DC-coupled battery behind one). All are utility, not county, requirements.

Why the confidence is not higherWFECA MOG Agreement/Compliance Form, CHELCO's Interconnection Application and Compliance Form, and FPL's net-metering guidelines, all read directly.

utility interconnection compliance form checked 2026-09-12 https://www.westflorida.coop/content/393/Interconnection%20App%20compliance%20form%202025_docx.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries/ESS are not addressed at all in the County's own material (no county document mentions batteries or ESS). At the utility level, FPL's own guidelines permit battery storage but require it be UL 1741-listed or DC-coupled behind a UL-1741-listed device, and require the meter-enclosure placard noted at Q42. WFECA's Interconnection Application form has a 'Batteries' manufacturer/model field, implying batteries are contemplated but not separately conditioned in the agreement text itself. CHELCO's documents do not mention batteries specifically.

Why the confidence is not higherCounty material (silent, checked); FPL guidelines (battery/placard language) and WFECA's Interconnection Application form (Batteries field), both read directly.

utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedCounty's Building Permit Application, Trade Permit Application, and fee schedule -- none names a separate ESS permit or inspection type; the Fire Department function could not be reached to confirm or rule this out (see fire answers below)

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Not addressed. A full-text search of the County's current Land Development Regulations for 'ground mount' and 'ground-mount' returned zero hits (with the same passing positive/fabricated controls as Q27/Q28) -- a genuine, verified absence of any ground-mount-as-structure classification.

Why the confidence is not higherFull-text, control-verified search of the County's own current LDR PDF.

land development regulations checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Depends on the serving utility, all confirmed from each utility's OWN current document, not from the PSC floor: WFECA -- manual disconnect switch of the visible load-break type, mounted SEPARATE from the meter socket, readily accessible to the cooperative and lockable with a utility padlock, on every Member-Owned Generation system up to its 25kW program cap, NO size exemption (MOG Agreement Sec. 3.a, footer literally reads 'Revised 06/2021' even though the file is currently linked/served as 'MOG Agreement Revised May 2025' -- the May-2025 date is a re-publish/metadata date, not a content-revision date; the substantive terms have not changed since 2021). CHELCO -- DISCRETIONARY: 'The Member maybe required to install a visible, open, lockable disconnect capable of isolating the Member's generator near the Member's service entrance and meter panel' (Interconnection Agreement Sec. 4.c, current as of its own July-2025 modification date) -- CHELCO does NOT unconditionally require a disconnect, though its own Tier 1 instructions ask installers to show 'the physical location of the visual manual load break disconnect switch' on the one-line diagram, an internal tension between the discretionary agreement text and the assumption baked into the instructions. FPL -- Tier 1 (<=10kW, most residential rooftop PV) needs NO AC disconnect; Tier 2/3 (>10kW) require a manual visible load-break disconnect mounted separate from but adjacent to the meter socket, FPL-lockable (fpl.com net-metering guidelines, read directly this run).

Why the confidence is not higherWFECA's own current MOG Interconnection Agreement, CHELCO's own current (July 2025) Interconnection Agreement and Tier 1 instructions, and FPL's own current net-metering guidelines page -- all three utilities' primary documents pulled and read directly this run, not carried over from any other authority's file.

utility interconnection agreement (cross-utility) checked 2026-09-12 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? By phone call or email to the Building Department. 'Inspection requests may be called in or emailed.' 82% · department FAQ page
    • How much notice is required? Requests must be received before 2:00 p.m. to be scheduled for the next business day (so effectively next-business-day notice). 82% · department FAQ page
    • Are same-day or AM/PM windows offered? Not AM/PM windows as such, but the Residential Construction Checklist names two fixed inspection days per week: 'INSPECTIONS: (Mondays + Thursdays)'. 72% · residential construction checklist (OCR'd)
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes, for the building/electrical permit -- the County's own Building Department performs its own inspections (named inspectors/permit techs on the county's own staff list; no third-party inspection firm is named on any county form). Separately, the interconnecting utility (WFECA/FPL/CHELCO) also performs its own post-permit inspection before energization (see Q23) -- that utility inspection is not a substitute for, and comes after, the county's. 75% · staff directory
    • If delegated, to whom? N/A for the county permit itself -- not delegated (see Q52). The utility performs a separate, later inspection of the interconnection specifically (WFECA, CHELCO, and FPL each inspect before energizing/reprogramming the meter). 70% · staff directory + utility documents
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? From the Residential Construction Checklist's inspection list: Temporary Construction Pole; Footings; Sheathing (Nailing); Dry-In; Rough-In Electrical; Rough-In Mechanical (Heating/Cooling); Plumbing Rough-In; Pre-Treat for Termites; Install Doors/Windows (checked at final); Call-Back for Plumbing/Electrical/Heating-Cooling contractors; Final Inspection. This is the County's general residential sequence -- no PV-specific sequence (e.g. a distinct 'PV rough' or 'PV final') is published. 72% · residential construction checklist (OCR'd)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • What must be on site at inspection? The Product Approval Specification Sheet requires that, at inspection, the following be available on the jobsite for any product listed on the sheet: (1) a copy of the product approval, (2) the performance characteristics the product was tested/certified to, and (3) a copy of the manufacturer's installation requirements. This is the County's general on-site documentation rule (applies to any Florida-Product-Approval item, which could include PV racking/attachment hardware); it is not a PV-specific document list. 68% · product approval specification sheet (OCR'd)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Not explicitly named by the County beyond 'Final Inspection' as the last item on the Residential Construction Checklist. No Certificate of Occupancy / Certificate of Completion / 'green tag' terminology is used anywhere in the County's packets for a standalone electrical-alteration/PV job (a CO is more relevant to new-construction occupancy than to a PV retrofit on an existing home); on pass, the record is a passed final inspection in the County's own permit file. 55% · residential construction checklist + trade permit application (OCR'd)
    • Who notifies the utility for PTO? The installer/customer, per each utility's own current interconnection paperwork -- not the County. WFECA's Agreement requires the Member to notify the cooperative and submit compliance documentation before parallel operation; CHELCO's Tier 1 instructions have the member mail the signed interconnect agreement plus proof of county inspection directly to CHELCO's Energy Services Department; FPL's guidelines have the customer submit a copy of the approved permit as part of completing the interconnection application. None of the three utility documents describes the County itself notifying the utility. 72% · utility interconnection instructions (cross-utility)
    • How are corrections issued and cleared? Not stated as a formal process beyond the general permit-void rule. The Trade Permit Application's own language implies corrections are handled through re-inspection under the existing permit ('all REQUIRED INSPECTIONS will be requested of the work permitted herein... this permit is VOID after six (6) months...if there has been any false statement or misrepresentation'), i.e. failed items are corrected and reinspected within the permit's active window; no separate written corrections-notice process is published. 50% · trade permit application (OCR'd)

14 questions answered against Holmes County’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

By phone call or email to the Building Department. 'Inspection requests may be called in or emailed.'

Why the confidence is not higherCounty's own Building Department FAQ, direct quote.

department FAQ page checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q50 How much notice is required? Core Booking & scheduling

Requests must be received before 2:00 p.m. to be scheduled for the next business day (so effectively next-business-day notice).

Why the confidence is not higherCounty's own Building Department FAQ, direct quote: 'They must be in before 2 p.m. to be scheduled for the next business day.'

department FAQ page checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Not AM/PM windows as such, but the Residential Construction Checklist names two fixed inspection days per week: 'INSPECTIONS: (Mondays + Thursdays)'.

Why the confidence is not higherCounty's own Residential Construction Checklist (OCR'd), header line.

residential construction checklist (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes, for the building/electrical permit -- the County's own Building Department performs its own inspections (named inspectors/permit techs on the county's own staff list; no third-party inspection firm is named on any county form). Separately, the interconnecting utility (WFECA/FPL/CHELCO) also performs its own post-permit inspection before energization (see Q23) -- that utility inspection is not a substitute for, and comes after, the county's.

Why the confidence is not higherCounty staff listing (Building Official + permit techs on @holmescountyfl.org) and the absence of any private-provider/contracted-firm letterhead on any county form; utility inspection confirmed from WFECA/CHELCO/FPL documents at Q23.

staff directory checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q53 If delegated, to whom? Core Who inspects

N/A for the county permit itself -- not delegated (see Q52). The utility performs a separate, later inspection of the interconnection specifically (WFECA, CHELCO, and FPL each inspect before energizing/reprogramming the meter).

Why the confidence is not higherSame as Q52/Q23.

staff directory + utility documents checked 2026-09-12 https://holmescountyfla.com/building-planning-zoning/

Q54 Which inspections are required, and in what order? Core Stages & sequence

From the Residential Construction Checklist's inspection list: Temporary Construction Pole; Footings; Sheathing (Nailing); Dry-In; Rough-In Electrical; Rough-In Mechanical (Heating/Cooling); Plumbing Rough-In; Pre-Treat for Termites; Install Doors/Windows (checked at final); Call-Back for Plumbing/Electrical/Heating-Cooling contractors; Final Inspection. This is the County's general residential sequence -- no PV-specific sequence (e.g. a distinct 'PV rough' or 'PV final') is published.

Why the confidence is not higherCounty's own Residential Construction Checklist (OCR'd), Inspections section.

residential construction checklist (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedCounty's Residential Construction Checklist -- lists a general 'Rough-In Electrical' step but no rooftop/mid-roof-specific inspection distinct from ordinary roof sheathing/dry-in inspections

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedCounty's Residential Construction Checklist and Product Approval Specification Sheet -- neither states that the inspector specifically verifies equipment labels/listings as a discrete checked item (the Product Approval Sheet does require product-approval documentation to be available on-site at inspection, which is adjacent but not the same thing)

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q57 Is there a published inspection checklist? Core What is checked

Nothing published by this authority.

Where we lookedCounty's Building/Planning/Zoning page document list and Residential/Commercial/Mobile Home packets -- no published PV-specific inspection checklist exists; only the general Residential Construction Checklist (already answered at Q54) was found

https://holmescountyfla.com/building-planning-zoning/

Q58 What must be on site at inspection? Core Documents on site

The Product Approval Specification Sheet requires that, at inspection, the following be available on the jobsite for any product listed on the sheet: (1) a copy of the product approval, (2) the performance characteristics the product was tested/certified to, and (3) a copy of the manufacturer's installation requirements. This is the County's general on-site documentation rule (applies to any Florida-Product-Approval item, which could include PV racking/attachment hardware); it is not a PV-specific document list.

Why the confidence is not higherCounty's own current Product Approval Specification Sheet, full text read (bottom of form).

product approval specification sheet (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

Nothing published by this authority.

Where we lookedCounty's own current fee schedule (effective 02/08/2021), reviewed in full -- it has no re-inspection fee line item of any kind, and no other County document publishes one

https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Not stated as a formal process beyond the general permit-void rule. The Trade Permit Application's own language implies corrections are handled through re-inspection under the existing permit ('all REQUIRED INSPECTIONS will be requested of the work permitted herein... this permit is VOID after six (6) months...if there has been any false statement or misrepresentation'), i.e. failed items are corrected and reinspected within the permit's active window; no separate written corrections-notice process is published.

Why the confidence is not higherCounty's own current Trade Permit Application, full text.

trade permit application (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q61 What is issued on pass? Core Final sign-off & PTO

Not explicitly named by the County beyond 'Final Inspection' as the last item on the Residential Construction Checklist. No Certificate of Occupancy / Certificate of Completion / 'green tag' terminology is used anywhere in the County's packets for a standalone electrical-alteration/PV job (a CO is more relevant to new-construction occupancy than to a PV retrofit on an existing home); on pass, the record is a passed final inspection in the County's own permit file.

Why the confidence is not higherCounty's own Residential Construction Checklist (final line item) and Trade Permit Application (no CO/PTO terminology anywhere in either form).

residential construction checklist + trade permit application (OCR'd) checked 2026-09-12 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The installer/customer, per each utility's own current interconnection paperwork -- not the County. WFECA's Agreement requires the Member to notify the cooperative and submit compliance documentation before parallel operation; CHELCO's Tier 1 instructions have the member mail the signed interconnect agreement plus proof of county inspection directly to CHELCO's Energy Services Department; FPL's guidelines have the customer submit a copy of the approved permit as part of completing the interconnection application. None of the three utility documents describes the County itself notifying the utility.

Why the confidence is not higherWFECA MOG Agreement, CHELCO Tier 1 instructions, and FPL net-metering guidelines, all read directly.

utility interconnection instructions (cross-utility) checked 2026-09-12 https://chelco.com/sites/default/files/Net%20Metering%20Tier%201%20Instructions_2026.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top 82%

Yes, but only where FPL is the serving utility. FPL's own current Net Metering Guidelines page states verbatim: a 'placard must be permanently affixed to the meter enclosure stating "Battery storage utilized in this facility."' -- confirmed directly from fpl.com this run. Neither WFECA's MOG Agreement/Compliance Form nor CHELCO's Interconnect Agreement/Technical Requirements/Tier instructions specify any placard at all -- a genuine difference between utilities inside the same county, not a gap in the research.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Separate roof inspection
All new Single-Family Dwellings require Florida energy forms at the time of application. All TEMP power poles require ONE ground rod and TWO separate GFIs. All other power poles require TWO ground rods. BUILDING PERMIT APPLICATIONS + FORMS BUILDING PERMIT APPLICATIONS + FORMS Building Department Fee
Separate fire inspection
An approved floating alarm apparatus. Every window and door leading to the pool must be equipped with an approved alarm. The Department of Health website also has valuable information. When is a fire safety review or fire inspection required? All new structures other than one- and two-family dwellin
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority