Madison County
Madison County
State of Florida
Madison County is a county authority in the State of Florida, serving 17,968 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for Madison County against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
Madison County is the authority having jurisdiction 80% confidence
- Holds
- Building, electrical, mechanical, plumbing permitting/inspection, and contractor Certificate-of-Competency licensing for unincorporated Madison County. The County's own homepage states plainly: 'Residents of the City of Madison must obtain permits and inspections at City Hall... All other residents in Madison County can visit... the Madison County Annex Building... for permits and inspections.' That 'all other residents' line, combined with confirmed evidence from each town's own site, establishes FOUR different relationships inside one county, not one: (1) CITY OF MADISON (the county seat, pop. ~3,000) runs its OWN Building, Planning & Development department and its OWN Fire Department (Madison Fire Rescue) — it is a wholly separate AHJ, not covered by the answers below except where noted; (2) TOWN OF LEE's own website (leeflorida.org) lists 'County Building Dept.' as one of its own department links, pointing directly at madisoncountyfl.com/building-department/ — Lee delegates building/electrical to the County — but Lee retains its OWN Town Planner (Renee Demps) for zoning/subdivision regulations AND its OWN Lee Volunteer Fire Department; that is a fourth pattern in this survey, distinct from Holmes/Hardee/Washington/Taylor: building delegated to the county while BOTH zoning and fire are retained locally; (3) TOWN OF GREENVILLE publishes its own 241-page Land Development Code (2020) for zoning, but lists no building, fire, or planning department of its own anywhere on its site (mygreenvillefl.com) — its own LDC assumes a 'Building Official' exists without naming who holds that role. Combined with the County's 'all other residents' language, Greenville's building/electrical function is inferred (not confirmed) to be the County's; (4) unincorporated county residents use the County desk outright. Madison County does NOT publish a standard codified 'Code of Ordinances' — the County's own site links Municode's raw 'MuniDocs' document repository (library.municode.com/fl/madison_county/munidocs/munidocs), which is a JS-only Angular shell with no franchise table, chapter structure, or searchable ordinance text reachable by curl or WebFetch; a rendered-browser session was not available in this run to explore it further, so its franchise/electrical-chapter content is recorded as could-not-reach, not as an absence.
- Delegated to
- Town of Lee: building/electrical delegated to Madison County (confirmed from Lee's own site). Town of Greenville: building/electrical inferred to be the County's by absence of any Town building department and the County's own 'all other residents' statement (NOT independently confirmed by Greenville's own site).
- Overridden by
- FL PSC Rule 25-6.065 governs interconnection for Duke Energy Florida (an investor-owned utility) wherever it serves in the county; it does NOT bind Tri-County Electric Cooperative (TCEC, headquartered in Madison), which sits outside PSC jurisdiction under Fla. Stat. 366.91 and instead runs its own Interconnection Agreement. FS 471.003(2)(h) sets the statewide $125,000/600A electrical PE-stamp exemption floor; no Madison-specific stricter local threshold was found or ruled out (Municode unreachable).
- Why not higher
- Direct evidence: the County's own Building Department homepage (address split for City of Madison vs. everyone else); the Town of Lee's own website naming 'County Building Dept.' as its own department link; the Town of Greenville's own website (department list has no Building/Fire/Planning entries, but does link its own 241-page LDC PDF); the City of Madison's own website (own Building, Planning & Development department, own Fire Department, own Cloudpermit portal, address matching the County's 'City Hall' reference exactly: 321 SW Rutledge Street). Held at 80 rather than higher because Greenville's building-department relationship is an inference from absence rather than a Greenville statement, and because the County's own codified ordinances (MuniDocs) could not be reached to check for an interlocal agreement that would make any of this explicit rather than inferred.
https://madisoncountyfl.com/departments-services/building-department/
- Permit required
- Yes90%
- Permit cost
- The residential electrical PV System line is billed 'by valuation' (see Q16), plus a $55 minimum permit fee and a $5 processing fee (all permits) and applicable DCA/plan-review fees;82%
- Portal
- Cloudpermit (us.cloudpermit.com)90%
- Electrical code
- 2020 National Electrical Code (NFPA 70 2020), per the County's own Building Codes page, which states it was 'adopted statewide and effective on work permitted after January 1, 2021.'85%
- Booking an inspection
- By phone: call (850) 973-6785.90%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes Q3 Electrical and building permits — Effectively combined through one form: the County uses a single 'Building Permit Application' for the base permit; Q4 Where you file — Cloudpermit (us.cloudpermit.com) Q20
- Permit required
- Yes90% source
- What it costs
- The residential electrical PV System line is billed 'by valuation' (see Q16), plus a $55 minimum permit fee and a $5 processing fee (all permits) and applicable DCA/plan-review fees;82% source
- Key document
- county building permit application (general, not solar-specific) cited by 5 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes for unincorporated Madison County, the Town of Lee (building/electrical only), and — on present evidence, though unconfirmed by Greenville itself — the Town of Greenville. NO for the City of Madison, which runs its own Building, Planning & Development department and is a separate AHJ. 88% · department page
- What does this authority permit itself, and what does it delegate? The County permits and inspects building, electrical, mechanical and plumbing itself, and licenses contractors countywide through its own Competency Licensing Board. It delegates NOTHING outward. Town of Lee's own site delegates building/electrical IN to the County while keeping its own Town Planner and its own Volunteer Fire Department. Town of Greenville is inferred (not confirmed) to delegate building/electrical to the County while keeping its own 2020 Land Development Code for zoning. 78% · department page
- Is a permit required for a residential rooftop PV system? Yes 90% · county fee resolution
- Is there a separate electrical permit, or is it combined? Effectively combined through one form: the County uses a single 'Building Permit Application' for the base permit; the 'Electrical Permit Package' download is that SAME Building Permit Application with an additional cover page (service size/voltage selection) and an Electrical Disclosure Statement attached, rather than a wholly distinct electrical-only application. 68% · county permit form
- Is there a historic-district review? A mechanism exists but has not been shown to apply to any actual designated district. County LDC Sec. 4.6-7 establishes an Historic Design Review Board and defines criteria for 'Historic Property' and 'Historic District' designation, but a full-code search (positive control 'electrical' passed; fabricated control 'zzqqx' returned zero) found ZERO mentions of solar/photovoltaic anywhere in the seven-chapter LDC, and no evidence any historic district has actually been designated in unincorporated Madison County. 55% · county Land Development Code chapter
- Is a wind or windstorm certification required? A 'Wind Load Analysis (2)' is a required checklist item on the general Building Permit Application for new construction/additions; this is not solar-specific and not a distinct 'windstorm certification.' Madison County is inland north Florida (not coastal), so it is very unlikely to sit in HVHZ (Miami-Dade/Broward only, statewide) or a mapped Wind-Borne Debris Region, but no County document was found stating this explicitly. 55% · county building permit application (general, not solar-specific)
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed electrical contractor (DBPR-licensed, with a County Certificate of Competency), OR the property owner personally, under the FS 489.503(6) owner exemption, for a single-family/duplex residence or farm outbuilding they occupy. 85% · county disclosure form
- Must the contractor be registered with this authority before applying? Yes, in practice — the Building Department states it licenses contractors 'registered through the Department of Business and Professional Regulation within Madison County... through the Competency Licensing Board,' and the Building Permit Application itself requires a DBPR license number field at submission. 72% · department page
- Is a homeowner permitted to self-install and self-permit? Yes — via the FS 489.103 owner-builder exemption (Owner Builder Affidavit/Statement, County's own form) for the building permit generally, and via the FS 489.503(6) exemption (Electrical Disclosure Statement) specifically for self-installed electrical wiring on a single-family/duplex residence or farm outbuilding. 85% · county owner-builder affidavit (OCR'd, image-only PDF)
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? No PV-specific checklist is published. For a general building/electrical permit, the County's Building Permit Application checklist calls for: two sets of plans (four for commercial), a site plan, a wind load analysis, a Florida Energy Form, a truss layout (as applicable), Notice of Commencement, Warranty Deed, Zoning Compliance, and (commercial only) Lease Agreement/Utility Agreement. The Electrical Permit Package additionally requires service size/voltage selection and an Electrical Disclosure Statement if owner-installed. 60% · county building permit application (general, not solar-specific)
- How many copies, and in what format? Two (2) sets of plans for residential/general work; four (4) sets for commercial projects. Both a print/paper route (mail or in-person to the Annex Building) and an online route via Cloudpermit are offered. 65% · county building permit application
- Is a site plan required, and what must it show? A site plan is a required checklist item on the general Building Permit Application ('Site Plan (2)'); no PV-specific statement of what it must show for a rooftop retrofit was found. 55% · county building permit application (general, not solar-specific)
- Is a structural PE stamp required, and at what threshold? Statewide floor only: no PE stamp required for electrical work by a licensed contractor where the value is $125,000 or less and aggregate service capacity is 600A (240V) or less on a residential system (FS 471.003(2)(h)). No structural-PE threshold statement of any kind was found in County material. 55% · Florida Statute (state floor)
- Is an electrical PE stamp required, and at what threshold? Same statewide floor as Q13: FS 471.003(2)(h), $125,000/600A. 55% · Florida Statute (state floor)
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Cloudpermit (us.cloudpermit.com) 90% · department page
- Can the whole application be completed online? Yes, an online application is offered via Cloudpermit; the County also still accepts a printed/paper Building Permit Application as an alternative route. 70% · department page
- What does a residential solar permit cost? The residential electrical PV System line is billed 'by valuation' (see Q16), plus a $55 minimum permit fee and a $5 processing fee (all permits) and applicable DCA/plan-review fees; there is no separate flat PV fee. 82% · county fee resolution (OCR'd, image-only PDF)
- How is the fee calculated? Valuation (project value of the PV system) 82% · county fee resolution (OCR'd, image-only PDF)
- Is there a separate plan-check fee? Yes — a separate Plan Review Fee, tiered by valuation (e.g. $25 for 0-50k, $50 for 50-100k, up to $400 for 5m and up), in addition to the permit fee. 82% · county fee resolution (OCR'd, image-only PDF)
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- Which utility handles interconnection here? Split by address: Duke Energy Florida and Tri-County Electric Cooperative (TCEC), headquartered in the City of Madison. No parcel map was found allocating between them. 85% · county building permit application (current, checkbox field)
- Where does the utility sit in the sequence? For TCEC: County inspection and approval come FIRST — TCEC's own Interconnection Process states 'Inspection by County Inspector — The installation of the system must be inspected and approved by the county' as step 8, before the customer notifies TCEC (step 9) and TCEC performs its own site verification (step 10) and written approval (step 11). For Duke-served parcels: the state floor (PSC Rule 25-6.065) similarly requires the AHJ's inspection and approval before parallel operation. 78% · utility interconnection process document
28 questions answered against Madison County’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes for unincorporated Madison County, the Town of Lee (building/electrical only), and — on present evidence, though unconfirmed by Greenville itself — the Town of Greenville. NO for the City of Madison, which runs its own Building, Planning & Development department and is a separate AHJ.
Why the confidence is not higherCounty's own Building Department page: 'Residents of the City of Madison must obtain permits and inspections at City Hall... All other residents in Madison County can visit... the Madison County Annex Building.' City of Madison's own site independently confirms its own building department at that same City Hall address (321 SW Rutledge Street).
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
The County permits and inspects building, electrical, mechanical and plumbing itself, and licenses contractors countywide through its own Competency Licensing Board. It delegates NOTHING outward. Town of Lee's own site delegates building/electrical IN to the County while keeping its own Town Planner and its own Volunteer Fire Department. Town of Greenville is inferred (not confirmed) to delegate building/electrical to the County while keeping its own 2020 Land Development Code for zoning.
Why the confidence is not higherCounty homepage: 'The building department is also responsible for the licensing of contractors registered through the Department of Business and Professional Regulation within Madison County; this is done through the Competency Licensing Board.' Lee's and Greenville's own sites as described in jurisdiction.why.
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes
Why the confidence is not higherThe County's own current Schedule of Building Permit Fees (Resolution No. 2021-07-28, still linked as the live fee document) carries a dedicated line item under 'New Construction - Residential Electrical': 'PV System (Solar) — by valuation' — direct proof a residential PV permit is a recognized, fee-bearing permit type. No PV exemption of any kind was found anywhere in County material.
county fee resolution checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/05/19101545/20260519091231386.pdf
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Effectively combined through one form: the County uses a single 'Building Permit Application' for the base permit; the 'Electrical Permit Package' download is that SAME Building Permit Application with an additional cover page (service size/voltage selection) and an Electrical Disclosure Statement attached, rather than a wholly distinct electrical-only application.
Why the confidence is not higherDirect comparison of the two County PDF downloads: 'Electrical Permit Package' pages 2-3 are a verbatim copy of the standalone 'Building Permit Application' PDF, with an added electrical service-size cover sheet and disclosure statement.
county permit form checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27130434/Electrical-Permit-Package-1.pdf
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed electrical contractor (DBPR-licensed, with a County Certificate of Competency), OR the property owner personally, under the FS 489.503(6) owner exemption, for a single-family/duplex residence or farm outbuilding they occupy.
Why the confidence is not higherThe County's own 'Electrical Disclosure Statement (489.503-6)' form states verbatim: 'State law requires electrical contracting to be done by licensed electrical contractors. You have applied for a permit under an exemption to that law... You may install electrical wiring for a farm outbuilding or a single-family or duplex residence.' The Building Permit Application requires a DBPR License No. field for contractor applicants.
county disclosure form checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27130435/Electrical-Disclosure-1.pdf
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes, in practice — the Building Department states it licenses contractors 'registered through the Department of Business and Professional Regulation within Madison County... through the Competency Licensing Board,' and the Building Permit Application itself requires a DBPR license number field at submission.
Why the confidence is not higherCounty Building Department homepage narrative plus the DBPR License No. field on the Building Permit Application; no separate 'contractor registration' portal or explicit pre-registration statement (of the kind seen at Ocoee) was found on the County site.
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Yes — via the FS 489.103 owner-builder exemption (Owner Builder Affidavit/Statement, County's own form) for the building permit generally, and via the FS 489.503(6) exemption (Electrical Disclosure Statement) specifically for self-installed electrical wiring on a single-family/duplex residence or farm outbuilding.
Why the confidence is not higherBoth are the County's own current forms citing the exact statutory sections; neither is solar-specific, but a PV system on an owner-occupied single-family home falls squarely within the described exemption scope.
county owner-builder affidavit (OCR'd, image-only PDF) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/08/21165640/Owner-Builder-Affidavit.pdf
Q8 What documents make up a complete submittal? Core Submittal package
No PV-specific checklist is published. For a general building/electrical permit, the County's Building Permit Application checklist calls for: two sets of plans (four for commercial), a site plan, a wind load analysis, a Florida Energy Form, a truss layout (as applicable), Notice of Commencement, Warranty Deed, Zoning Compliance, and (commercial only) Lease Agreement/Utility Agreement. The Electrical Permit Package additionally requires service size/voltage selection and an Electrical Disclosure Statement if owner-installed.
Why the confidence is not higherAssembled from the County's own current Building Permit Application and Electrical Permit Package forms, neither of which names solar/PV; no PV-specific submittal checklist was found anywhere on the site (Forms page read in full, 20+ items, none solar-named).
county building permit application (general, not solar-specific) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27123653/Building-Permit-Application-1.pdf
Q9 How many copies, and in what format? Submittal package
Two (2) sets of plans for residential/general work; four (4) sets for commercial projects. Both a print/paper route (mail or in-person to the Annex Building) and an online route via Cloudpermit are offered.
Why the confidence is not higherBuilding Permit Application checklist text: '__ Two Sets of Plans (2)** ... **For Commercial Projects Submit Four (4) Sets of Plans.' Format is not solar-specific.
county building permit application checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27123653/Building-Permit-Application-1.pdf
Q10 Is a site plan required, and what must it show? Core Submittal package
A site plan is a required checklist item on the general Building Permit Application ('Site Plan (2)'); no PV-specific statement of what it must show for a rooftop retrofit was found.
Why the confidence is not higherInferred from the general new-construction/addition checklist; the County publishes no reduced or PV-specific site-plan requirement.
county building permit application (general, not solar-specific) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27123653/Building-Permit-Application-1.pdf
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Nothing published by this authority.
Where we lookedElectrical Permit Package (5 pages, full text), Building Permit Application, Forms page (20+ items) — no one-line/three-line diagram requirement stated anywhere
https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27130434/Electrical-Permit-Package-1.pdf
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedSame as Q11 — no string/conductor calculation requirement stated
https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27130434/Electrical-Permit-Package-1.pdf
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Statewide floor only: no PE stamp required for electrical work by a licensed contractor where the value is $125,000 or less and aggregate service capacity is 600A (240V) or less on a residential system (FS 471.003(2)(h)). No structural-PE threshold statement of any kind was found in County material.
Why the confidence is not higherCounty's Code of Ordinances (where a stricter local threshold might be codified) sits on Municode's unreachable 'MuniDocs' JS shell; this is the Florida Statute floor, not a County-confirmed figure.
Florida Statute (state floor) checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Same statewide floor as Q13: FS 471.003(2)(h), $125,000/600A.
Why the confidence is not higherSame reasoning and same unreachable local ordinance text as Q13.
Florida Statute (state floor) checked 2026-09-12 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html
Q15 What does a residential solar permit cost? Core Fees
The residential electrical PV System line is billed 'by valuation' (see Q16), plus a $55 minimum permit fee and a $5 processing fee (all permits) and applicable DCA/plan-review fees; there is no separate flat PV fee.
Why the confidence is not higherCounty's own current Schedule of Building Permit Fees (Resolution 2021-07-28): 'PV System (Solar) — by valuation' under New Construction - Residential Electrical; 'Minimum Permit Fee $55 plus DCA and processing'; 'Processing Fee (all permits) $5 each permit.' Extracted by OCR from a canvas-only PDF (no text layer) — figures should be spot-checked against the live document.
county fee resolution (OCR'd, image-only PDF) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/05/19101545/20260519091231386.pdf
Q16 How is the fee calculated? Core Fees
Valuation (project value of the PV system)
Why the confidence is not higherSame Resolution 2021-07-28 line item: 'PV System (Solar) — by valuation', distinct from the per-device flat fees used for most other residential electrical items (fans, motors, switches, etc.) in the same schedule.
county fee resolution (OCR'd, image-only PDF) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/05/19101545/20260519091231386.pdf
Q17 Is there a separate plan-check fee? Fees
Yes — a separate Plan Review Fee, tiered by valuation (e.g. $25 for 0-50k, $50 for 50-100k, up to $400 for 5m and up), in addition to the permit fee.
Why the confidence is not higherResolution 2021-07-28, 'Plan Review Fees by valuation (Residential and Commercial)' table, distinct from the permit-fee table.
county fee resolution (OCR'd, image-only PDF) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/05/19101545/20260519091231386.pdf
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedBuilding Department pages (Inspections, Permit Applications, Contact Information, Building Codes, Forms) — no plan-review turnaround time is published anywhere on the site
https://madisoncountyfl.com/departments-services/building-department/
Q19 How long is an issued permit valid before it expires? Timeline & validity
Nothing published by this authority.
Where we lookedSame Building Department pages and all downloaded permit forms — no permit-validity/expiration period is stated; the County's Code of Ordinances (where an FBC-administrative adoption might set this) is on the unreachable Municode 'MuniDocs' JS shell
https://madisoncountyfl.com/departments-services/building-department/
Q20 Which permit portal does this authority use? Core Portal & process
Cloudpermit (us.cloudpermit.com)
Why the confidence is not higherCounty's Permit Applications page: 'Click the button below to fill out an online permit application at US.CLOUDPERMIT.COM'; the City of Madison's own Planning & Development page uses the identical portal ('To submit a Building Permit Application on-line, click here: https://us.cloudpermit.com/login').
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/permit-applications/
Q21 Can the whole application be completed online? Core Portal & process
Yes, an online application is offered via Cloudpermit; the County also still accepts a printed/paper Building Permit Application as an alternative route.
Why the confidence is not higherSame Permit Applications page offers both 'Online Permit Application' (Cloudpermit) and 'Print a Permit Application' as parallel options.
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/permit-applications/
Q22 Which utility handles interconnection here? Core Utility interconnection
Split by address: Duke Energy Florida and Tri-County Electric Cooperative (TCEC), headquartered in the City of Madison. No parcel map was found allocating between them.
Why the confidence is not higherThe County's own CURRENT Building Permit Application carries the checkbox 'Utility Company: [ ] DUKE [ ] TCEC' — the permit-form checkbox is the highest-quality utility route available here because no reachable franchise table exists (County's Code of Ordinances sits on an unreachable Municode 'MuniDocs' JS shell). Independently corroborated by the County's own Flood Information page, which tells residents to 'Report downed power lines to your Power Company Duke Energy or Tri County Electric.'
county building permit application (current, checkbox field) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27123653/Building-Permit-Application-1.pdf
Q23 Where does the utility sit in the sequence? Core Utility interconnection
For TCEC: County inspection and approval come FIRST — TCEC's own Interconnection Process states 'Inspection by County Inspector — The installation of the system must be inspected and approved by the county' as step 8, before the customer notifies TCEC (step 9) and TCEC performs its own site verification (step 10) and written approval (step 11). For Duke-served parcels: the state floor (PSC Rule 25-6.065) similarly requires the AHJ's inspection and approval before parallel operation.
Why the confidence is not higherTCEC's own current 'Interconnection Process' one-pager, a first-party document. The Duke-side answer is the PSC state floor, since Duke's own interconnection pages returned 404 on every route tried.
utility interconnection process document checked 2026-09-12 https://tcec.com/sites/default/files/PDF/Interconnection%20Process.pdf
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding Permit Application, Forms page (20+ items), Land Development Code (7 chapters, controlled search) — no HOA/architectural-approval requirement or disclaimer of the Ocoee kind was found anywhere
Q25 Is there a historic-district review? Overlays & special cases
A mechanism exists but has not been shown to apply to any actual designated district. County LDC Sec. 4.6-7 establishes an Historic Design Review Board and defines criteria for 'Historic Property' and 'Historic District' designation, but a full-code search (positive control 'electrical' passed; fabricated control 'zzqqx' returned zero) found ZERO mentions of solar/photovoltaic anywhere in the seven-chapter LDC, and no evidence any historic district has actually been designated in unincorporated Madison County.
Why the confidence is not higherDirect text of LDC Chapter 4, Section 4.6-7 (Historic Preservation), read in full; absence of solar language confirmed with passing controls across all 7 LDC chapters.
county Land Development Code chapter checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/28151409/Chapter-4-Land-Use-Districts-and-Development-Standards.pdf
Q26 Is a wind or windstorm certification required? Overlays & special cases
A 'Wind Load Analysis (2)' is a required checklist item on the general Building Permit Application for new construction/additions; this is not solar-specific and not a distinct 'windstorm certification.' Madison County is inland north Florida (not coastal), so it is very unlikely to sit in HVHZ (Miami-Dade/Broward only, statewide) or a mapped Wind-Borne Debris Region, but no County document was found stating this explicitly.
Why the confidence is not higherWind Load Analysis line item read directly off the Building Permit Application; the HVHZ/WBDR statement is a geographic inference (Madison Co. has no coastline), not sourced to a County document, so held at moderate confidence.
county building permit application (general, not solar-specific) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27123653/Building-Permit-Application-1.pdf
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Nothing published by this authority.
Where we lookedLand Development Code (7 chapters, controlled search, zero 'solar'/'photovoltaic' hits) and the Planning & Zoning fee schedules (both the 2016 and 2021 versions list a general 'Special Exception' fee of ~$2,000) — whether rooftop or ground-mount PV specifically would trigger a Special Exception/Council approval could not be confirmed either way
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Nothing published by this authority.
Where we lookedLand Development Code (7 chapters, controlled search) — zero mentions of solar/photovoltaic anywhere, so no system-size cap language exists to find
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? 2020 National Electrical Code (NFPA 70 2020), per the County's own Building Codes page, which states it was 'adopted statewide and effective on work permitted after January 1, 2021.' 85% · county building department webpage
- Which building code edition is in force? The statewide-adopted edition is the Florida Building Code, 8th Edition (2023), effective Dec 31, 2023. HOWEVER, the County's own current Building Codes webpage states only that 'the current Florida Building codes' are 'effective on work permitted after December 31, 2017' — the effective date of the PRIOR (6th Edition, 2017) cycle. This is a local staleness finding: the County's own live page has not been updated to reflect the 8th Edition (2023) cycle's effective date, even though it presumably enforces the current code in practice. 65% · county building department webpage (dated/stale text)
- Which fire code edition is in force? Statewide floor only: Florida Fire Prevention Code, 8th Edition (2023). No County or Fire Rescue document names any fire-code edition or year at all. 45% · state floor; county fire rescue page silent on code edition
- What is the installation judged against? Florida Building Code (current statewide 8th Ed. 2023, though the County's own page still cites a 2017-cycle effective date — see Q30) and the 2020 NEC (per the County's own Building Codes page, see Q29). 65% · county building department webpage
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for Madison County on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Not locally confirmed. No County, Fire Rescue, or TCEC document mentions NEC 690.12 or 'rapid shutdown' by name anywhere. Recorded as an INFERENCE from the adopted 2020 NEC (which carries full array-boundary and module-level rapid-shutdown requirements), not as a confirmed local fact, per this run's standing instruction. 50% · inference from adopted NEC edition; not a confirmed local fact
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Does the UTILITY specify placards beyond the AHJ's? TCEC requires 'warning/safety labels' as part of construction, in general terms, with no specified wording, colour, or lettering height: its own Interconnection Process states the member must 'Construct the power generating installation and install a disconnect switch, warning/safety labels, and other protective equipment as may be required by the Cooperative.' No numeric or material spec (of the kind found at SECO or WFECA in this survey) was found in TCEC's Interconnection Agreement or its 2018 Service Rules and Regulations (25 pages, searched directly for sign/placard/label/plaque/lettering terms — zero technical-spec hits). 55% · utility interconnection process document
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? For TCEC: the manual AC disconnect must be mounted SEPARATELY from the meter socket, readily accessible at all times to the Cooperative, and capable of being locked in the open position by TCEC — no size/tier exemption stated. For Duke-served parcels: state floor only (PSC Rule 25-6.065) — mounted separate from, but adjacent to, the meter socket; Tier 1 (<=10kW) systems are exempt from the switch requirement unless the utility elects to install one at its own expense. 78% · utility interconnection agreement
- Must equipment be on a specific approved list? TCEC requires the RGS, inverters and associated equipment to adhere to IEEE-1547, UL-1741, the National Electrical Code, and — if applicable — Florida Solar Energy Center certification (FSEC Std 203-05). 80% · utility interconnection agreement
20 questions answered against Madison County’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
2020 National Electrical Code (NFPA 70 2020), per the County's own Building Codes page, which states it was 'adopted statewide and effective on work permitted after January 1, 2021.'
Why the confidence is not higherCounty's own current Building Codes webpage, direct quote. Note this page cites a Jan 1, 2021 effective date rather than the Dec 31, 2023 date associated with the current FBC 8th Edition (2023) cycle elsewhere in this survey; both may be legitimate references to different points in the same NEC 2020 adoption's history (initial 7th-edition-cycle effective date vs. the later 8th-edition-cycle carry-forward), and the County's page does not distinguish them. The edition named (2020) matches the statewide baseline either way.
county building department webpage checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/building-codes/
Q30 Which building code edition is in force? Core Code editions in force
The statewide-adopted edition is the Florida Building Code, 8th Edition (2023), effective Dec 31, 2023. HOWEVER, the County's own current Building Codes webpage states only that 'the current Florida Building codes' are 'effective on work permitted after December 31, 2017' — the effective date of the PRIOR (6th Edition, 2017) cycle. This is a local staleness finding: the County's own live page has not been updated to reflect the 8th Edition (2023) cycle's effective date, even though it presumably enforces the current code in practice.
Why the confidence is not higherCounty's own Building Codes webpage text quoted directly for the stale portion; the FBC 8th Ed. (2023) statewide adoption is corroborated across many other Florida authorities and floridabuilding.org (the Florida Building Commission's own site), not independently re-verified against Madison's ordinance text this run since the County's codified ordinances are unreachable (Municode 'MuniDocs' JS shell).
county building department webpage (dated/stale text) checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/building-codes/
Q31 Which fire code edition is in force? Code editions in force
Statewide floor only: Florida Fire Prevention Code, 8th Edition (2023). No County or Fire Rescue document names any fire-code edition or year at all.
Why the confidence is not higherThe County Fire Rescue page (read in full) contains only contact/staff information and no code-edition statement of any kind; this is the statewide adoption used as the floor, not a County-confirmed fact.
state floor; county fire rescue page silent on code edition checked 2026-09-12 https://madisoncountyfl.com/departments-services/fire-rescue/
Q32 Are there local amendments to any of the above? Core Code editions in force
Nothing published by this authority.
Where we lookedCounty Building Codes webpage (full text) and Land Development Code — neither states whether local amendments exist to the FBC/NEC/Fire code; the County's Code of Ordinances, where such amendments would be codified, sits on the unreachable Municode 'MuniDocs' JS shell (library.municode.com/fl/madison_county/munidocs/munidocs returns only an Angular shell to curl/WebFetch; no rendered browser was available this run)
https://library.municode.com/fl/madison_county/munidocs/munidocs
Q33 What is the installation judged against? Core Electrical
Florida Building Code (current statewide 8th Ed. 2023, though the County's own page still cites a 2017-cycle effective date — see Q30) and the 2020 NEC (per the County's own Building Codes page, see Q29).
Why the confidence is not higherCombines Q29 and Q30 findings.
county building department webpage checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/building-codes/
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedElectrical Permit Package, Building Permit Fee Schedule — no service-upgrade or busbar-sizing rule beyond the standard per-item fee list ('Service replacement/upgrade $55 each')
https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/05/19101545/20260519091231386.pdf
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedLand Development Code (7 chapters, controlled search), Forms page, Accessory Structure Application — no mounting-system or attachment-spacing document or clause found
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedCounty Fire Rescue page (full text, contact/staff info only) and Land Development Code — no ridge-setback or fire-access-pathway rule for rooftop PV found anywhere
https://madisoncountyfl.com/departments-services/fire-rescue/
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Not locally confirmed. No County, Fire Rescue, or TCEC document mentions NEC 690.12 or 'rapid shutdown' by name anywhere. Recorded as an INFERENCE from the adopted 2020 NEC (which carries full array-boundary and module-level rapid-shutdown requirements), not as a confirmed local fact, per this run's standing instruction.
Why the confidence is not higherFull-text search of County Building Codes page, Fire Rescue page, Land Development Code (7 chapters), and all three TCEC documents (Interconnection Agreement, Process, Service Rules & Regulations) found zero mentions of '690.12' or 'rapid shutdown.'
inference from adopted NEC edition; not a confirmed local fact checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/building-codes/
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedLand Development Code (7 chapters), Building Permit Fee Schedule, Forms page (20+ items), Building Codes page — no AHJ-specified placard requirement of any kind found
https://madisoncountyfl.com/departments-services/building-department/forms/
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as Q38 — no placard wording specified by the County
https://madisoncountyfl.com/departments-services/building-department/forms/
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as Q38, plus TCEC's Service Rules and Regulations (2018, 25 pages) and Interconnection Agreement — no letter height/colour/material spec published by either the County or TCEC
https://madisoncountyfl.com/departments-services/building-department/forms/
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as Q38 — no facility/site-plan placard spec published by the County
https://madisoncountyfl.com/departments-services/building-department/forms/
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
TCEC requires 'warning/safety labels' as part of construction, in general terms, with no specified wording, colour, or lettering height: its own Interconnection Process states the member must 'Construct the power generating installation and install a disconnect switch, warning/safety labels, and other protective equipment as may be required by the Cooperative.' No numeric or material spec (of the kind found at SECO or WFECA in this survey) was found in TCEC's Interconnection Agreement or its 2018 Service Rules and Regulations (25 pages, searched directly for sign/placard/label/plaque/lettering terms — zero technical-spec hits).
Why the confidence is not higherTCEC's own current Interconnection Process one-pager for the requirement; TCEC's own Service Rules and Regulations (2018) and Interconnection Agreement (2018) for the confirmed absence of a technical placard spec. The absence of a spec is itself recorded as the finding, per this survey's standing practice.
utility interconnection process document checked 2026-09-12 https://tcec.com/sites/default/files/PDF/Interconnection%20Process.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedCounty material (same as Q38) plus TCEC's documents (Q42) — beyond the AC-disconnect placement itself (Q48), no label-placement rule from either the County or TCEC was found; Duke Energy Florida's own pages returned 404 on every route tried
https://www.duke-energy.com/home/products/renewable-energy/net-metering
Q44 Must equipment be on a specific approved list? Equipment listing
TCEC requires the RGS, inverters and associated equipment to adhere to IEEE-1547, UL-1741, the National Electrical Code, and — if applicable — Florida Solar Energy Center certification (FSEC Std 203-05).
Why the confidence is not higherTCEC's own Interconnection Agreement (Exhibit A), item 3, quoted directly. Document is dated 2018; not re-confirmed as TCEC's current agreement beyond it being the version presently linked on tcec.com.
utility interconnection agreement checked 2026-09-12 https://tcec.com/sites/default/files/PDF/TCEC%20Interconnection%20Agreement.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Nothing published by this authority.
Where we lookedLand Development Code (controlled search), TCEC's three documents (Interconnection Agreement, Process, Service Rules and Regulations) — zero mentions of battery/ESS anywhere
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Nothing published by this authority.
Where we lookedSame as Q45 — no separate ESS permit or inspection type named anywhere
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedLand Development Code (7 chapters, controlled search, zero solar/photovoltaic hits) and the County's Accessory Structure Application (which addresses using an accessory structure itself as a dwelling or storage shed, not a ground-mounted PV array) — whether a ground-mount rack is treated as a 'structure' under the LDC could not be confirmed either way
https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/10/13084440/access-struc.pdf
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
For TCEC: the manual AC disconnect must be mounted SEPARATELY from the meter socket, readily accessible at all times to the Cooperative, and capable of being locked in the open position by TCEC — no size/tier exemption stated. For Duke-served parcels: state floor only (PSC Rule 25-6.065) — mounted separate from, but adjacent to, the meter socket; Tier 1 (<=10kW) systems are exempt from the switch requirement unless the utility elects to install one at its own expense.
Why the confidence is not higherTCEC's own current Interconnection Agreement (Exhibit A), item 9, quoted directly (dated 2018). The Duke-side answer is the PSC state floor because Duke's own DG/interconnection pages returned 404 on every route tried, consistent with the systematic block on Duke documents seen across this survey.
utility interconnection agreement checked 2026-09-12 https://tcec.com/sites/default/files/PDF/TCEC%20Interconnection%20Agreement.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? By phone: call (850) 973-6785. 90% · department page
- How much notice is required? The County calls it 'Next Day' inspection: the request must be received before 8:00 AM on the working day before the inspection is wanted; requests received after 8:00 AM go onto the following working day's schedule. 90% · department page
- Are same-day or AM/PM windows offered? No AM/PM or same-day window option is described anywhere on the Inspections page — only the 'next working day' scheduling described in Q50. 60% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes, in-house, for the County's own jurisdiction (unincorporated county, Lee, and inferred Greenville). 78% · department contact page (staff-domain fallback test)
- If delegated, to whom? N/A for the County's own territory — not delegated, per Q52. For the Town of Lee, building/electrical IS delegated outward, to the County (see jurisdiction.why). For the City of Madison, its own in-house staff perform its inspections (separate AHJ, not otherwise researched in this run). 78% · department contact page
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? Not fully specified. The one documented sequencing fact: 'Temporary and permanent power for new construction will only be granted when the required inspections have been passed and final septic and final driveway approvals have been received by the building department' — implying septic and driveway final approvals are preconditions to any power release, alongside unspecified 'required inspections.' No PV-specific stage sequence (rough-in, mid-roof, final, etc.) is published. 55% · department page
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- What must be on site at inspection? A recorded Notice of Commencement must be posted at the job site before the first inspection (general requirement, not PV-specific). No PV-specific on-site document list (e.g., equipment spec sheets, listings) was found. 60% · county building permit application (general, not solar-specific)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- Who notifies the utility for PTO? For TCEC-served parcels: the customer/installer notifies TCEC directly — TCEC's own Interconnection Process step 9 states 'Notify TCEC of Completion... Upon completion of installation, please notify TCEC by sending an email to engineering@tcec.com,' at least 10 business days before energizing per the Interconnection Agreement. For Duke-served parcels: the state floor (PSC Rule 25-6.065) places the same notification duty on the customer. No Madison County document assigns this duty to the County's own electrical inspector (unlike Lynn Haven, FL, elsewhere in this survey). 75% · utility interconnection process document
- Is there a re-inspection fee? $35 for the first re-inspection; $50 for a second re-inspection of the same item. 85% · county fee resolution (OCR'd, image-only PDF)
14 questions answered against Madison County’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
By phone: call (850) 973-6785.
Why the confidence is not higherCounty's own Inspections page: 'To request an inspection, call (850) 973-6785 and provide the following information: Permit Number, Inspection Type Requested, Gate Codes (If Applicable), Contact Name and Phone Number.'
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/inspections/
Q50 How much notice is required? Core Booking & scheduling
The County calls it 'Next Day' inspection: the request must be received before 8:00 AM on the working day before the inspection is wanted; requests received after 8:00 AM go onto the following working day's schedule.
Why the confidence is not higherCounty's Inspections page, quoted directly: 'It's not really "24-hour notice required," but we do need to receive the inspection request before 8:00 AM on the day the inspection is to be done... Requests after 8:00 AM will be placed on the next working day's schedule.'
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/inspections/
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
No AM/PM or same-day window option is described anywhere on the Inspections page — only the 'next working day' scheduling described in Q50.
Why the confidence is not higherThe Inspections page (read in full) contains no mention of a time-of-day window option; this is an absence confirmed by reading the entire (short) page, not a search failure.
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/inspections/
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes, in-house, for the County's own jurisdiction (unincorporated county, Lee, and inferred Greenville).
Why the confidence is not higherNamed County staff — Dennis Pitts (Building Official), Pat O'Brian (Single Family Dwelling Inspector) — both on @madisoncountyfl.com email addresses (decoded from the site's Cloudflare email-obfuscation), with no private firm named anywhere on the site and none of the eight private building-department operator firms tracked in this survey (SAFEbuilt, PDCS, CAP Government, JPI, M.T. Causley, Bureau Veritas, CGA Solutions) appearing. No FS 553.80(7)(b) utilization report was found anywhere on the County site (sitemap fully enumerated, Finance page read), so the call rests on the staff-domain fallback test alone, consistent with this survey's pattern that small rural Florida counties often publish no such report.
department contact page (staff-domain fallback test) checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/contact-information/
Q53 If delegated, to whom? Core Who inspects
N/A for the County's own territory — not delegated, per Q52. For the Town of Lee, building/electrical IS delegated outward, to the County (see jurisdiction.why). For the City of Madison, its own in-house staff perform its inspections (separate AHJ, not otherwise researched in this run).
Why the confidence is not higherFollows from Q52 and the jurisdiction section.
department contact page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/contact-information/
Q54 Which inspections are required, and in what order? Core Stages & sequence
Not fully specified. The one documented sequencing fact: 'Temporary and permanent power for new construction will only be granted when the required inspections have been passed and final septic and final driveway approvals have been received by the building department' — implying septic and driveway final approvals are preconditions to any power release, alongside unspecified 'required inspections.' No PV-specific stage sequence (rough-in, mid-roof, final, etc.) is published.
Why the confidence is not higherCounty's own Inspections page, quoted directly; the general statement is not solar-specific and does not enumerate the inspection stages themselves.
department page checked 2026-09-12 https://madisoncountyfl.com/departments-services/building-department/inspections/
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Nothing published by this authority.
Where we lookedCounty Inspections page (full text) — no rough-in/mid-roof inspection requirement stated for PV or roofing generally
https://madisoncountyfl.com/departments-services/building-department/inspections/
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedSame as Q55 — no statement that the inspector verifies equipment labels/listings as a discrete checked item
https://madisoncountyfl.com/departments-services/building-department/inspections/
Q57 Is there a published inspection checklist? Core What is checked
Nothing published by this authority.
Where we lookedCounty Inspections and Forms pages (full document listing) — no published inspection checklist of any kind (PV or general) found anywhere on the site
https://madisoncountyfl.com/departments-services/building-department/forms/
Q58 What must be on site at inspection? Core Documents on site
A recorded Notice of Commencement must be posted at the job site before the first inspection (general requirement, not PV-specific). No PV-specific on-site document list (e.g., equipment spec sheets, listings) was found.
Why the confidence is not higherBuilding Permit Application affidavit text: 'A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION.'
county building permit application (general, not solar-specific) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2025/05/27123653/Building-Permit-Application-1.pdf
Q59 Is there a re-inspection fee? Corrections & re-inspection
$35 for the first re-inspection; $50 for a second re-inspection of the same item.
Why the confidence is not higherCounty's own current Schedule of Building Permit Fees (Resolution 2021-07-28): 'Re-inspection fee first time $35 each; Re-inspection fee 2nd time for same item $50 each.'
county fee resolution (OCR'd, image-only PDF) checked 2026-09-12 https://madiscon-county-fl.s3.amazonaws.com/uploads/2026/05/19101545/20260519091231386.pdf
Q60 How are corrections issued and cleared? Corrections & re-inspection
Nothing published by this authority.
Where we lookedCounty Inspections and Permit Applications pages — no documented corrections/re-submittal process found beyond the re-inspection fee schedule itself (Q59)
https://madisoncountyfl.com/departments-services/building-department/inspections/
Q61 What is issued on pass? Core Final sign-off & PTO
Nothing published by this authority.
Where we lookedCounty Inspections page, Building Permit Application, Building Codes page — no named final document (CO, Certificate of Completion, Green Tag, etc.) is described anywhere; only the general statement that 'permanent power... will only be granted when the required inspections have been passed'
https://madisoncountyfl.com/departments-services/building-department/inspections/
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
For TCEC-served parcels: the customer/installer notifies TCEC directly — TCEC's own Interconnection Process step 9 states 'Notify TCEC of Completion... Upon completion of installation, please notify TCEC by sending an email to engineering@tcec.com,' at least 10 business days before energizing per the Interconnection Agreement. For Duke-served parcels: the state floor (PSC Rule 25-6.065) places the same notification duty on the customer. No Madison County document assigns this duty to the County's own electrical inspector (unlike Lynn Haven, FL, elsewhere in this survey).
Why the confidence is not higherTCEC's own current Interconnection Process and Interconnection Agreement, both first-party documents; the Duke-side answer is the PSC state floor since Duke's own documents are unreachable.
utility interconnection process document checked 2026-09-12 https://tcec.com/sites/default/files/PDF/Interconnection%20Process.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording None%
Size, colour & material None%
Where they go None%
What the utility wants on top 55%
TCEC requires 'warning/safety labels' as part of construction, in general terms, with no specified wording, colour, or lettering height: its own Interconnection Process states the member must 'Construct the power generating installation and install a disconnect switch, warning/safety labels, and other protective equipment as may be required by the Cooperative.' No numeric or material spec (of the kind found at SECO or WFECA in this survey) was found in TCEC's Interconnection Agreement or its 2018 Service Rules and Regulations (25 pages, searched directly for sign/placard/label/plaque/lettering terms — zero technical-spec hits).
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.