Putnam County

Putnam County

State of Florida

Verified Aug. 5, 2026

Putnam County is a county authority in the State of Florida, serving 73,321 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Putnam County against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Putnam County is the authority having jurisdiction 78% confidence
Holds
Building and Electrical for the unincorporated county, and — critically — the ELECTRICAL permit specifically for solar even inside the City of Palatka (a split, proved from Palatka's own checklist, not inferred). Outside that: Crescent City, Interlachen, Pomona Park and Welaka each run their own building permitting picture, and the county's own page and a city's own page do not agree on Crescent City.
Overridden by
Within city limits, a municipality's own zoning/site-plan process runs first per the municipality's own site.
Why not higher
PUTNAM COUNTY (unincorporated): county Building Department issues both building and electrical permits and performs its own inspections (5 named in-house inspectors) — https://www.putnam-fl.gov/departments/development-services/building-department/. PALATKA (largest city, pop ~10,500): Palatka's own 'Small Structure Permit Checklist' (2024) has a dedicated section — 'SOLAR PERMITS ONLY: Separate Electrical Permits required with Putnam County' — i.e. the City handles the structural/site-plan side of a solar 'small structure' permit but the electrical permit for that same solar job is pulled with PUTNAM COUNTY, not the City. Palatka's Planning Dept page separately lists 'Solar panels' among items requiring a City permit, with the caveat 'Some will be passed directly to the County. Others will require City permits' (https://palatka-fl.gov/131/Planning-Department, https://palatka-fl.gov/DocumentCenter/View/5152). CRESCENT CITY — CONFLICT: Crescent City's own Planning & Zoning page states in plain terms 'Crescent City contracts with Putnam County to provide Building Department Services' (https://crescentcity-fl.com/planning-zoning/, copyright 2026) — i.e. the county is the AHJ there. But Putnam County's OWN Building Department page states the opposite: 'The following cities and Putnam County Planning & Development Services currently have no inter-local agreements for services. Please contact the relevant city offices...' and lists Crescent City by name with its own phone/email (dateModified 2026-08-13). Two current, authority-side documents disagree; I could not resolve which is stale. Confidence on Crescent City specifically should be read as ~50, not the block confidence above. INTERLACHEN: town's own site says 'All building permitting and zoning applications will be issued at Town Hall' (https://www.interlachen-fl.gov/building-zoning/) — self-permits, consistent with the county's 'no inter-local agreement' list. WELAKA: welaka-fl.gov 403s every fetch tool tried (curl UA variants, WebFetch) so this is sourced via Wayback (captured 2026-08-31): the Town has its own 'Building Department' and contracts plan review to Universal Engineering Sciences, LLC (PlanReviewDaytona@UniversalEngineering.com) — self-permits with a private provider, consistent with the county's list. POMONA PARK: unresolved — the town's own site (department list: Administration, Finance, HR, Mayor, Parks & Rec, Planning, Public Works, Town Clerk) has no Building department and no building-permit forms at all, only Planning 'Zoning Letters'; the county's page nonetheless lists Pomona Park among the 'no inter-local agreement' cities with its own contact info. Neither source affirmatively states who issues Pomona Park building/electrical permits. FS 553.80 does not permit a municipality to simply have no arrangement, so one almost certainly exists but is not published by either side.

https://www.putnam-fl.gov/departments/development-services/building-department/

Permit required
Yes85%
Permit cost
Likely $50 (one inspection trip) or $80 (two-or-more inspection trips) as a residential 'Small Scope Project' single-trade Electrical permit,55%
Portal
Citizenserve — named consistently across the county's Building Dept page and Palatka's own checklist ('application for this type of permit must be made through CitizenServe on the Putnam…55%
Electrical code
Not specified by year in any Putnam document found — the county's own 2026 Generator Installation guide cites 'National Electric Code (NEC) Article 702' with no edition year,65%
Own placard wording
No65%
Booking an inspection
Portal (CitizenServe, primary) with email as a stated fallback if the portal cannot be used75%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Separate Q4 Where you file — Citizenserve — named consistently across the county's Building Dept page and Palatka's own checklist ('application for this type of permit must be made through… Q20

Permit required
Yes85% source
What it costs
Likely $50 (one inspection trip) or $80 (two-or-more inspection trips) as a residential 'Small Scope Project' single-trade Electrical permit,55% source
Key document
county fee resolution, FY2025-2026, adopted 26 Aug 2025 cited by 4 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? Yes for the unincorporated county and for the electrical-permit leg of a Palatka solar job. Ambiguous/contested for Crescent City; self-permitting for Interlachen and Welaka; unresolved for Pomona Park. 78% · county department page
    • What does this authority permit itself, and what does it delegate? Both (Building and Electrical) for the unincorporated county and for Palatka's electrical leg; Delegated (to the county) for Crescent City per Crescent City's own statement (contested by the county's own page); self-run for Interlachen and Welaka 70% · city permit checklist (2024)
    • Is a permit required for a residential rooftop PV system? Yes 85% · city department page
    • Is there a separate electrical permit, or is it combined? Separate 78% · city permit checklist (2024)
    • Is there a system-size cap on residential generation? No county zoning-level cap was found; Clay Electric applies its OWN utility-level cap: 'RGS/Solar systems are allowed to be sized up to 90 percent of the member's Utility Service Entrance rating or the Cooperative's transformer kVA rating, whichever is less'; systems ≥20kW require Clay's pre-approval/engineering review 60% · utility interconnection process page
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either — but the county's own Residential Electric Service Standards drawing states categorically that interactive solar systems 'must be installed by a Florida registered Solar or Electrical Contractor', while the general Building Permit Application and checklist grid still carry an Owner-Builder Affidavit as an item against the ELECTRICAL permit row 60% · county standard detail drawing, last edited 11/2019, re-hosted 2026
    • Must the contractor be registered with this authority before applying? Yes, in practice — a $100 non-refundable application fee and county authorization/registration process applies to obtain an 'Authorized Contractor License' in Putnam, though state-certified contractors (which would include a state-certified Solar/Electrical contractor) may only need to file their state license with the county rather than sit the local exam 55% · county licensing procedure document
    • Is a homeowner permitted to self-install and self-permit? Yes, generally — the county publishes a standard 'Owner/Builder Disclosure Statement' (FS 489.103(7) exemption) letting an owner build or improve a one- or two-family residence they occupy without a licensed contractor 60% · county owner-builder disclosure form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? For the ELECTRICAL permit row on the county's own Residential Permit Checklist grid: a completed Application, Proof of Ownership, Notice of Commencement, an Owner-Builder Affidavit (if applicable), Site Drawing, a Prime & Subcontractor list, and Manufacturers' Specifications, plus conditionally a FEMA Elevation Certificate / Public Works Site Work Permit / Floodplain Development permit depending on flood zone. For a solar job routed through Palatka specifically, add: homeowner's insurance declaration page, and a site plan showing utility service locations and the percentage of roof covered by PV panels 65% · county residential permit checklist, Dec 2025
    • How many copies, and in what format? 3 copies for Site Drawing where the general checklist grid requires it; the county's forms/applications page is otherwise silent on electronic-only submittal for solar specifically 55% · county residential permit checklist, Dec 2025
    • Is a site plan required, and what must it show? Yes. Putnam's general Site Plan Checklist requires all existing/proposed structures, easements, driveways, flood zone classification, finished floor elevation and setbacks. For a solar-specific submittal in Palatka: 'Show relationship to property lines and indicate all utility service locations. Percentage of roof covered by PV panels must be indicated' 80% · city permit checklist (2024)
    • Is a one-line / three-line diagram required? Yes, in practice — Clay Electric's own interconnection process requires the applicant to submit 'a line diagram of electrical connections and system specifications (panels, inverters, etc.)' before it will process a net-meter application 60% · utility interconnection process page
    • Is an electrical PE stamp required, and at what threshold? Yes, with no stated size threshold — the county's own Residential Electric Service Standards states 'Interactive solar systems installed in conjunction with or added to residential electrical service must be designed by a Florida registered Engineer' 75% · county standard detail drawing, last edited 11/2019
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Citizenserve — named consistently across the county's Building Dept page and Palatka's own checklist ('application for this type of permit must be made through CitizenServe on the Putnam County Website'), but the live link the county itself publishes (citizenserve.com/putnam) currently 404s on Citizenserve's own vendor site 55% · county department page (dead outbound portal link)
    • What does a residential solar permit cost? Likely $50 (one inspection trip) or $80 (two-or-more inspection trips) as a residential 'Small Scope Project' single-trade Electrical permit, plus a $35 minimum plan-review fee — there is no dedicated solar/PV fee line 55% · county fee resolution, FY2025-2026, adopted 26 Aug 2025
    • How is the fee calculated? Flat 55% · county fee resolution, FY2025-2026
    • Is there a separate plan-check fee? Yes — $35.00 minimum review fee for 'Small Scope/Incidental' work (or 10% of the permit fee), per Section VI Plan Review Fees 70% · county fee resolution, FY2025-2026
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • How long is an issued permit valid before it expires? Not clearly stated as a fixed term — the fee resolution instead runs a 180-day-without-inspection model ('Permit Renewal: reactivation of a permit expired for 180 days or less'; extensions beyond that require Building Official approval; 365 days without inspection disqualifies from extension). This appears to sit alongside, not necessarily replace, the new statewide floor: FS 553.79(1)(c)/FS 125.56(4)(d) (HB 803, eff. 1 Jul 2026) require permits issued by a county to remain valid at least ONE YEAR 60% · county fee resolution, Section IX
    • Which utility handles interconnection here? Multiple — Florida Power & Light (FPL) and Clay Electric Cooperative both serve parts of Putnam County. Clay Electric's own Palatka and Keystone Heights district offices sit inside the county (not separate utilities). No evidence found of a separate municipal electric utility for the City of Palatka itself 85% · county form (Power Request Affidavit)
    • Where does the utility sit in the sequence? After permit (Clay Electric territory) — Clay Electric's own interconnection process lists 'a county permit' as one of the items the member/contractor must supply alongside the Interconnection Agreement and Net Meter Application, i.e. before Clay will process the interconnection request. FPL territory follows FPL's own settled sequence (tariff §3.4: proof of local permit FINAL approval before energization) which was not independently re-derived here 70% · utility interconnection process page

28 questions answered against Putnam County’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes for the unincorporated county and for the electrical-permit leg of a Palatka solar job. Ambiguous/contested for Crescent City; self-permitting for Interlachen and Welaka; unresolved for Pomona Park.

Why the confidence is not higherSee jurisdiction block — built from the county's own Building Dept page, Palatka's own Small Structure Permit Checklist and Planning Dept page, Crescent City's own page (which conflicts with the county's), and Interlachen's/Welaka's own pages.

county department page checked 2026-09-12 https://www.putnam-fl.gov/departments/development-services/building-department/

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both (Building and Electrical) for the unincorporated county and for Palatka's electrical leg; Delegated (to the county) for Crescent City per Crescent City's own statement (contested by the county's own page); self-run for Interlachen and Welaka

Why the confidence is not higherComposite of county building-dept page, Palatka's Small Structure Permit Checklist ('Separate Electrical Permits required with Putnam County'), and Crescent City's page ('Crescent City contracts with Putnam County to provide Building Department Services')

city permit checklist (2024) checked 2026-09-12 https://palatka-fl.gov/documentcenter/view/5152

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherPalatka's Planning Dept page lists 'Solar panels' explicitly among work requiring a permit; the county's general 'When is a Permit Required' brochure requires a permit for any new wiring/fixtures/devices (ELECTRICAL section), and no permit-exemption document lists solar. Controls run on the county's own OCR'd FY2025-26 fee resolution (51pp): positive 'electrical'=2 (low but present), fabricated 'zzqqx'=0, 'solar'/'photovoltaic'=0 hits — schedule doesn't name solar at all, consistent with it falling under the generic Electrical trade permit rather than getting its own line

city department page checked 2026-09-12 https://palatka-fl.gov/131/Planning-Department

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate

Why the confidence is not higherPalatka's Small Structure Permit Checklist states verbatim under 'SOLAR PERMITS ONLY': 'Separate Electrical Permits required with Putnam County.' The county's own Residential Permit Checklist grid also carries 'ELECTRICAL' as its own permit-type row distinct from 'SFD', 'SFD-ADDITION', etc.

city permit checklist (2024) checked 2026-09-12 https://palatka-fl.gov/documentcenter/view/5152

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either — but the county's own Residential Electric Service Standards drawing states categorically that interactive solar systems 'must be installed by a Florida registered Solar or Electrical Contractor', while the general Building Permit Application and checklist grid still carry an Owner-Builder Affidavit as an item against the ELECTRICAL permit row

Why the confidence is not higherTension between two of the county's own documents: Residential-Electric-Service2019.pdf (contractor-only language, 'Last edited 11/2019' but still linked from the live 2026 Building Dept page) vs. the general permit-application owner-builder path. Sec. 8-90 of the county's own Code of Ordinances also separately defines a 'Solar contractor' license class

county standard detail drawing, last edited 11/2019, re-hosted 2026 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes, in practice — a $100 non-refundable application fee and county authorization/registration process applies to obtain an 'Authorized Contractor License' in Putnam, though state-certified contractors (which would include a state-certified Solar/Electrical contractor) may only need to file their state license with the county rather than sit the local exam

Why the confidence is not higherInferred from 'Procedures for Obtaining an Authorized Contractor License in Putnam' — this document covers the county's own (Class I/II) local licensing scheme; it does not explicitly state whether a Florida-state-certified Electrical/Solar contractor must additionally register locally before pulling a permit

county licensing procedure document checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/Procedures-for-Reciprocity-.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes, generally — the county publishes a standard 'Owner/Builder Disclosure Statement' (FS 489.103(7) exemption) letting an owner build or improve a one- or two-family residence they occupy without a licensed contractor

Why the confidence is not higherCounty's own OB.pdf disclosure form is the statutory owner-builder exemption text used statewide; it is not solar-specific, and the Residential Electric Service Standards doc's 'must be installed by a...Contractor' language creates some tension with using this route for a PV interconnection specifically

county owner-builder disclosure form checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2025/05/OB.pdf

Q8 What documents make up a complete submittal? Core Submittal package

For the ELECTRICAL permit row on the county's own Residential Permit Checklist grid: a completed Application, Proof of Ownership, Notice of Commencement, an Owner-Builder Affidavit (if applicable), Site Drawing, a Prime & Subcontractor list, and Manufacturers' Specifications, plus conditionally a FEMA Elevation Certificate / Public Works Site Work Permit / Floodplain Development permit depending on flood zone. For a solar job routed through Palatka specifically, add: homeowner's insurance declaration page, and a site plan showing utility service locations and the percentage of roof covered by PV panels

Why the confidence is not higherRead off the county's 'Putnam-Res-Permit-Check-List-2025.pdf' 21-column X-grid for the ELECTRICAL row — column alignment in the pdftotext extraction is imprecise (narrow-column X-clusters vs. wide header-number spacing) so the exact item list carries real uncertainty; Palatka's own 'SOLAR PERMITS ONLY' section is verbatim and precise

county residential permit checklist, Dec 2025 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2025/12/Putnam-Res-Permit-Check-List-2025.pdf

Q9 How many copies, and in what format? Submittal package

3 copies for Site Drawing where the general checklist grid requires it; the county's forms/applications page is otherwise silent on electronic-only submittal for solar specifically

Why the confidence is not higherThe '(3)' notation appears against Site Drawing, Construction Plans and Energy Calculations column headers on the 2025 checklist; whether this still applies once routed through CitizenServe (an online portal) is not stated anywhere I could find

county residential permit checklist, Dec 2025 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2025/12/Putnam-Res-Permit-Check-List-2025.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes. Putnam's general Site Plan Checklist requires all existing/proposed structures, easements, driveways, flood zone classification, finished floor elevation and setbacks. For a solar-specific submittal in Palatka: 'Show relationship to property lines and indicate all utility service locations. Percentage of roof covered by PV panels must be indicated'

Why the confidence is not higherThe Palatka language is verbatim from a current (2024) city checklist and is solar-specific; it is a city document, not the county's, though the county's site-plan requirements for other trades are structurally similar

city permit checklist (2024) checked 2026-09-12 https://palatka-fl.gov/documentcenter/view/5152

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes, in practice — Clay Electric's own interconnection process requires the applicant to submit 'a line diagram of electrical connections and system specifications (panels, inverters, etc.)' before it will process a net-meter application

Why the confidence is not higherThis is a utility (Clay Electric) requirement for interconnection, not a Putnam Building Department requirement stated on its own checklist — I found no county document that states this directly for the building/electrical permit itself

utility interconnection process page checked 2026-09-12 https://www.clayelectric.com/solar-getting-started

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedCounty Residential Permit Checklist, Residential Plans Review Check List, and the county's Building Forms page — no mention of string/conductor calculation requirements for electrical/solar permits

https://www.putnam-fl.gov/wp-content/uploads/2025/12/Residential-Plans-Review-Check-List.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedCounty Residential Permit Checklist and Residential Plans Review Check List — no structural PE-stamp threshold stated for roof-mounted or ground-mount arrays; municode (Land Development Code, where a structural provision might sit) is disallowed to ClaudeBot by its own robots.txt

https://library.municode.com/robots.txt

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Yes, with no stated size threshold — the county's own Residential Electric Service Standards states 'Interactive solar systems installed in conjunction with or added to residential electrical service must be designed by a Florida registered Engineer'

Why the confidence is not higherVerbatim from the county's standard detail sheet; the document is a general electric-service standards drawing (last edited 11/2019) rather than a solar-specific ordinance, and it states the requirement applies to all interactive solar systems with no kW/amperage carve-out

county standard detail drawing, last edited 11/2019 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q15 What does a residential solar permit cost? Core Fees

Likely $50 (one inspection trip) or $80 (two-or-more inspection trips) as a residential 'Small Scope Project' single-trade Electrical permit, plus a $35 minimum plan-review fee — there is no dedicated solar/PV fee line

Why the confidence is not higherSolar has no named fee line in the FY2025-2026 fee resolution (Res. 2025-070, eff. 1 Oct 2025) — I OCR'd all 51 pages (image-only PDF, no text layer per pdffonts) and ran controls: positive 'electrical'=2, fabricated 'zzqqx'=0, 'solar'/'photovoltaic'=0. A standalone electrical retrofit falls under Section III 'Small Scope Projects,' and PV would plausibly need 2+ inspections (rough + final), making $80 the likelier figure, but this is inference, not a stated line

county fee resolution, FY2025-2026, adopted 26 Aug 2025 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q16 How is the fee calculated? Core Fees

Flat

Why the confidence is not higherThe applicable category (Small Scope Project, single trade) is a flat per-inspection-trip fee ($50/$80), not valuation-based; the resolution's percentage-of-value formula (Section II) applies only to new construction/additions, not a standalone electrical/PV retrofit

county fee resolution, FY2025-2026 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q17 Is there a separate plan-check fee? Fees

Yes — $35.00 minimum review fee for 'Small Scope/Incidental' work (or 10% of the permit fee), per Section VI Plan Review Fees

Why the confidence is not higherOCR'd from the FY2025-2026 fee resolution; not solar-specific, but is the applicable minor-scope plan-review line

county fee resolution, FY2025-2026 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Nothing published by this authority.

Where we lookedCounty Building Department page and Building Forms & Applications page — no stated plan-review turnaround time in business days found anywhere on the site

https://www.putnam-fl.gov/departments/development-services/building-department/

Q19 How long is an issued permit valid before it expires? Timeline & validity

Not clearly stated as a fixed term — the fee resolution instead runs a 180-day-without-inspection model ('Permit Renewal: reactivation of a permit expired for 180 days or less'; extensions beyond that require Building Official approval; 365 days without inspection disqualifies from extension). This appears to sit alongside, not necessarily replace, the new statewide floor: FS 553.79(1)(c)/FS 125.56(4)(d) (HB 803, eff. 1 Jul 2026) require permits issued by a county to remain valid at least ONE YEAR

Why the confidence is not higherThe county's own document (FY2025-2026 fee resolution, adopted 26 Aug 2025 — before HB 803's 1 Jul 2026 effective date) describes a 180-day inspection-gap/renewal mechanic, not a flat validity term; I did not find a Putnam document updated post-1 Jul 2026 reconciling this with the new statutory 1-year floor. Recording both per the brief's instruction rather than picking one

county fee resolution, Section IX checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q20 Which permit portal does this authority use? Core Portal & process

Citizenserve — named consistently across the county's Building Dept page and Palatka's own checklist ('application for this type of permit must be made through CitizenServe on the Putnam County Website'), but the live link the county itself publishes (citizenserve.com/putnam) currently 404s on Citizenserve's own vendor site

Why the confidence is not higherConfirmed the 404 directly: citizenserve.com/putnam returns Citizenserve's own 'Page not found' page, not a tenant portal, so I could not verify the current working URL or what the portal actually lets an applicant do online

county department page (dead outbound portal link) checked 2026-09-12 https://www.putnam-fl.gov/departments/development-services/building-department/

Q21 Can the whole application be completed online? Core Portal & process

Nothing published by this authority.

Where we lookedAttempted to reach the county's published Citizenserve portal link directly (citizenserve.com/putnam) to check what can be completed online — it 404s on Citizenserve's own vendor site (confirmed genuine 404 page, not a soft-404), and I could not locate the current working tenant URL by guessing (per the brief's warning against guessing portal tenant IDs)

https://www.citizenserve.com/putnam

Q22 Which utility handles interconnection here? Core Utility interconnection

Multiple — Florida Power & Light (FPL) and Clay Electric Cooperative both serve parts of Putnam County. Clay Electric's own Palatka and Keystone Heights district offices sit inside the county (not separate utilities). No evidence found of a separate municipal electric utility for the City of Palatka itself

Why the confidence is not higherConfirmed from two of the county's own permit forms, not PowerToChoose: the county's Building Permit Application electric-company checkbox reads 'FP&L / Clay Palatka / Lake Kerr / Keystone' and the county's 'Power Request Affidavit' reads 'FP&L / Clay-Palatka / Clay-Keystone'; the county's own Residential Electric Service Standards drawing lists both 'Clay Electric' and 'F.P.L' phone numbers as the two service-drop authorities to call

county form (Power Request Affidavit) checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2025/05/PowerRequest_v2.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

After permit (Clay Electric territory) — Clay Electric's own interconnection process lists 'a county permit' as one of the items the member/contractor must supply alongside the Interconnection Agreement and Net Meter Application, i.e. before Clay will process the interconnection request. FPL territory follows FPL's own settled sequence (tariff §3.4: proof of local permit FINAL approval before energization) which was not independently re-derived here

Why the confidence is not higherClay Electric's own 'Solar Getting Started' page lists the submittal package required from the member/contractor and 'a county permit' is on that list, alongside PV/inverter info and a line diagram — this is the co-op's own published sequence, not inferred from a pattern

utility interconnection process page checked 2026-09-12 https://www.clayelectric.com/solar-getting-started

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty comprehensive plan (Conservation element, Policies E.1.6.1-E.1.6.6 on solar) and the county's ordinance-name search — no HOA/architectural-approval requirement for residential solar found at the county level; municode (LDC) itself is disallowed by robots.txt

https://library.municode.com/robots.txt

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty Future Land Use maps (flu_map_2_historic_district.pdf exists, confirming historic districts exist in the unincorporated county) but no ordinance text found requiring historic-district review specifically for solar; municode disallowed. Note: Palatka's own city checklist DOES carry a 'Historic District (Y/N)' field on its site-plan checklist, but that is a city-level, not county-level, finding

https://www.putnam-fl.gov/wp-content/uploads/2025/05/flu_map_2_historic_district.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty Building Forms page (Wind-Borne-Debris.pdf, Wind-Speed-Cat-II.pdf — both are the standard statewide FBC wind-speed maps, OCR'd, no Putnam-specific wind-certification requirement text found beyond the map itself) and comprehensive plan

https://www.putnam-fl.gov/wp-content/uploads/2026/03/Wind-Borne-Debris.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedCounty ordinance-name search (searched 'SOLAR' by title, zero hits) and comprehensive plan — no Special Use Permit or Council-approval trigger for residential solar found; this is a title-only search of the ordinance index, so it does not rule out an LDC provision under a different heading (e.g. inside the Zoning article), which I could not check because municode is disallowed

https://apps.putnam-fl.com/bocc/putImagingOrdinances/main.php

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No county zoning-level cap was found; Clay Electric applies its OWN utility-level cap: 'RGS/Solar systems are allowed to be sized up to 90 percent of the member's Utility Service Entrance rating or the Cooperative's transformer kVA rating, whichever is less'; systems ≥20kW require Clay's pre-approval/engineering review

Why the confidence is not higherThis is a utility interconnection cap, not a Putnam County ordinance limit — I could not check the county's Land Development Code for a separate zoning-based system-size cap because library.municode.com/robots.txt disallows ClaudeBot ('User-agent: ClaudeBot / Disallow: /') and I found no standalone county solar ordinance (name-searched the county's own ordinance index for 'SOLAR', zero hits, though that is a title-search only and does not prove no LDC provision exists)

utility interconnection process page checked 2026-09-12 https://www.clayelectric.com/solar-getting-started

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? Not specified by year in any Putnam document found — the county's own 2026 Generator Installation guide cites 'National Electric Code (NEC) Article 702' with no edition year, and the county's Building Permit Application has a blank fillable 'Code Edition: ___' field rather than a stated year 65% · county installation guide, 2026
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023) 75% · county energy-code form, current cycle
    • Are there local amendments to any of the above? Yes, at least for flood — the county's own Residential Electric Service Standards imposes a local freeboard rule beyond the base FBC minimum: services in an 'AE' special flood hazard area must be installed 1' above Base Flood Elevation, and in an 'A' zone 3' above highest adjacent grade 60% · county standard detail drawing
    • What is the installation judged against? The Florida Building Code (8th Edition) and the National Electrical Code (edition not specified by the county), plus the interconnecting utility's own standards (Clay Electric's 'Standards for Electric Service', or FPL's tariff/Electric Service Standards in FPL territory) 65% · utility standards document
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Putnam County on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Presumably required under NEC 690.12, but the applicable NEC edition itself is not stated by the county (see q29), so which rapid-shutdown text (2017/2020/2023 differ materially) governs cannot be confirmed 45% · inference from absent NEC-edition finding
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Does the authority specify placard wording of its own? No 65% · absence proven with controls across county documents
    • Does the UTILITY specify placards beyond the AHJ's? No — Clay Electric's own 3,659-line 'Standards for Electric Service' document has zero occurrences of 'placard'; it requires only that the AC disconnect itself be labelled (generic 'Source side' labelling for a specific voltage class), not a dedicated PV placard 70% · utility standards document, controls run directly
    • Where must the labels be placed? In Clay Electric territory: the manual disconnect must be 'located outside and accessible to Clay Electric (preferably next to the utility meter)'. FPL territory would follow FPL's own settled placement rules (not independently re-derived here) 70% · utility interconnection process page
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? A manual, single-throw, lockable AC disconnect must sit between the inverter and the home's electrical service, located outside and accessible to Clay Electric, preferably next to the utility meter 78% · utility interconnection process page

20 questions answered against Putnam County’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

Not specified by year in any Putnam document found — the county's own 2026 Generator Installation guide cites 'National Electric Code (NEC) Article 702' with no edition year, and the county's Building Permit Application has a blank fillable 'Code Edition: ___' field rather than a stated year

Why the confidence is not higherThis is a genuine absence, not a search failure — checked the two cheapest places per the brief (permit-application masthead, and any 'Codes Enforced'-type page) and found no county document naming a specific NEC year. Statewide, FS 553.73 also names the NEC with no year and Rule 61G20-1.001 F.A.C. adopts the FBC 8th Edition without naming an NFPA 70 edition, so Putnam floats along with several other Florida counties documented in this project

county installation guide, 2026 checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/2026-Generator-Installation.pdf

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023)

Why the confidence is not higherInferred from the county's own current form filenames on the live Building Forms page ('8th-FBCE-EPL.pdf', '8th-FBCE-Blower-Door-Test.pdf', '8th-FBCE-Duct-Leakage-Test-Report.pdf', '8th-FBCE-Prescriptive-Energy-Form.pdf', all uploaded Dec 2025) rather than a single explicit sentence stating the edition; this is the same statewide FBC cycle adopted by Rule 61G20-1.001 F.A.C.

county energy-code form, current cycle checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2025/12/8th-FBCE-EPL.pdf

Q31 Which fire code edition is in force? Code editions in force

Nothing published by this authority.

Where we lookedCounty Fire Rescue department page and the FY2025-2026 fee resolution (Fire Prevention fee section) — neither states a Florida Fire Prevention Code / NFPA 1 edition

https://www.putnam-fl.gov/departments/emergency-services/fire-rescue/

Q32 Are there local amendments to any of the above? Core Code editions in force

Yes, at least for flood — the county's own Residential Electric Service Standards imposes a local freeboard rule beyond the base FBC minimum: services in an 'AE' special flood hazard area must be installed 1' above Base Flood Elevation, and in an 'A' zone 3' above highest adjacent grade

Why the confidence is not higherThis is one confirmed local amendment (flood-related); I could not access the Land Development Code itself (municode disallowed) to check for other local amendments relevant to solar specifically (setbacks, mounting, ground-mount status), so this should be read as a partial 'yes,' not exhaustive

county standard detail drawing checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q33 What is the installation judged against? Core Electrical

The Florida Building Code (8th Edition) and the National Electrical Code (edition not specified by the county), plus the interconnecting utility's own standards (Clay Electric's 'Standards for Electric Service', or FPL's tariff/Electric Service Standards in FPL territory)

Why the confidence is not higherComposite of the FBC-edition finding (q30), the NEC non-finding (q29), and Clay Electric's own 33-page Standards for Electric Service document (§8.06 Interconnection Guidelines, citing IEEE 1547-style 'Interconnecting Distributed Resources with Electric Power Systems')

utility standards document checked 2026-09-12 https://www.clayelectric.com/sites/default/files/documents/StandardsforElectric%20Service_0426.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedResidential Electric Service Standards drawing and county fee resolution — no local rule on service-upgrade sizing or busbar limits beyond standard NEC Table 310.15(B)(16)/83% feeder-reduction language, which is itself just a restatement of NEC, not a local amendment

https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedCounty Building Forms page and comprehensive plan — no mounting-system or attachment-spacing standard found; the LDC itself (where this would most likely sit) is on municode, disallowed by robots.txt

https://library.municode.com/robots.txt

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedCounty Fire Rescue page and fee resolution — no ridge-setback or fire-access-pathway standard found for rooftop PV; the Florida Fire Prevention Code edition itself is also unconfirmed (q31)

https://www.putnam-fl.gov/departments/emergency-services/fire-rescue/

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Presumably required under NEC 690.12, but the applicable NEC edition itself is not stated by the county (see q29), so which rapid-shutdown text (2017/2020/2023 differ materially) governs cannot be confirmed

Why the confidence is not higherThis is downstream of an unresolved absence (no NEC year stated anywhere in county documents); flagging at low confidence rather than not_found because rapid shutdown itself is virtually certain to be required in some form

inference from absent NEC-edition finding checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/2026-Generator-Installation.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedCounty fee resolution, Residential Electric Service Standards, and Clay Electric's Standards for Electric Service — no AHJ-specific placard list found beyond the general NEC-required labeling implied by 'installation judged against' NEC/FBC compliance (see q39/q42 for the specific proven absence of a dedicated placard spec)

https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No

Why the confidence is not higherChecked the county's own fee schedule, residential permit checklist, and Residential Electric Service Standards drawing — zero occurrences of 'placard' across all of them (positive control 'electrical'/'meter' hits present in the same documents, fabricated control 'zzqqx' = 0), so the county publishes no placard wording of its own for PV

absence proven with controls across county documents checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame documents as q38/q39 — zero occurrences of letter-height, color, or material specification for any placard

https://www.putnam-fl.gov/wp-content/uploads/2026/03/Residential-Electric-Service2019.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedCounty Residential Permit Checklist and Site Plan Example — no facility-map/site-plan placard (NEC 705.10-style) requirement found distinct from the general site-plan submittal

https://www.putnam-fl.gov/wp-content/uploads/2025/12/Putnam-Res-Permit-Check-List-2025.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

No — Clay Electric's own 3,659-line 'Standards for Electric Service' document has zero occurrences of 'placard'; it requires only that the AC disconnect itself be labelled (generic 'Source side' labelling for a specific voltage class), not a dedicated PV placard

Why the confidence is not higherControls run directly on the PDF text: positive control 'disconnect' = 19 hits, fabricated control 'zzqqx' = 0 hits, 'placard' = 0 hits. This puts Clay Electric in the same camp as CHELCO (no placard spec beyond disconnect wording) rather than the JEA/SECO/GRU/TECO camp

utility standards document, controls run directly checked 2026-09-12 https://www.clayelectric.com/sites/default/files/documents/StandardsforElectric%20Service_0426.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

In Clay Electric territory: the manual disconnect must be 'located outside and accessible to Clay Electric (preferably next to the utility meter)'. FPL territory would follow FPL's own settled placement rules (not independently re-derived here)

Why the confidence is not higherVerbatim from Clay Electric's own 'Solar Getting Started' page — this is a utility-level answer, not a Putnam County ordinance requirement, and only covers the Clay Electric portion of the county

utility interconnection process page checked 2026-09-12 https://www.clayelectric.com/solar-getting-started

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedCounty fee resolution and Residential Electric Service Standards — no equipment-approved-list requirement found beyond generic FBC product-approval requirements applicable to all trades (Product Approval Form is a generic checklist item, not solar-specific)

https://www.putnam-fl.gov/wp-content/uploads/2025/05/Product.Approval.Fillable.2016.msg_.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedThe county's own building-department page links an 'ess.pdf' document at main.putnam-fl.com — that domain no longer hosts the file and instead soft-redirects to a generic WordPress 404-shell page (HTTP 200, but 'Page not found' content, no PDF). Also checked the 2026 Generator Installation guide (covers standby generators/NEC 702 only, not batteries) and the fee resolution — no battery/ESS permitting text found anywhere

https://main.putnam-fl.com/wp-content/uploads/2020/05/ess.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSame dead-link/absence as q45 — no separate ESS permit or inspection requirement found

https://main.putnam-fl.com/wp-content/uploads/2020/05/ess.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedCounty ordinance-name search and comprehensive plan — no statement on whether a ground-mounted array is treated as an accessory structure; the LDC provision that would answer this sits on municode, disallowed by robots.txt

https://library.municode.com/robots.txt

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

A manual, single-throw, lockable AC disconnect must sit between the inverter and the home's electrical service, located outside and accessible to Clay Electric, preferably next to the utility meter

Why the confidence is not higherVerbatim from Clay Electric's own current solar getting-started page; this is Clay Electric territory only — FPL territory follows FPL's own tariff-based placement rules

utility interconnection process page checked 2026-09-12 https://www.clayelectric.com/solar-getting-started

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal (CitizenServe, primary) with email as a stated fallback if the portal cannot be used 75% · county department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes 85% · county department page
    • If delegated, to whom? N/A — not delegated for the unincorporated county; the county's own Building Department performs its own inspections in-house 78% · county department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for Putnam County on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No dedicated PV inspection checklist found published on the county's Building Forms & Applications page 55% · county forms page
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • Who notifies the utility for PTO? Installer — Clay Electric's own process has the member/contractor complete and submit both the Interconnection Agreement and Net Meter Application to Clay Electric Energy Services; Clay then installs the net meter and sends a finalization letter 65% · utility interconnection process page
    • Is there a re-inspection fee? $30.00, may be waived by the Director or Building Official if deemed excessive 90% · county fee resolution, Section V

14 questions answered against Putnam County’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal (CitizenServe, primary) with email as a stated fallback if the portal cannot be used

Why the confidence is not higherCounty Building Dept page: 'If you are unable to request inspection through your online permit portal, you may request inspection through email. Please provide permit number, address, inspection type, and date requested.' Five named inspectors with direct cell numbers are also published, suggesting phone contact is workable in practice even though not listed as a formal booking channel

county department page checked 2026-09-12 https://www.putnam-fl.gov/departments/development-services/building-department/

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedCounty Building Department page (inspection-request instructions) — no stated minimum notice period (e.g. '24 hours' or 'by 4pm the prior business day') found anywhere on the page or in the fee resolution

https://www.putnam-fl.gov/departments/development-services/building-department/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedCounty Building Department page — no mention of same-day or AM/PM inspection windows for the unincorporated county (note: Welaka, a separate municipality, does publish 'Inspections only take place on Wednesdays' via Wayback, but that is not a Putnam County answer)

https://www.putnam-fl.gov/departments/development-services/building-department/

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherThe county's own Building Department page names five in-house inspectors with direct office and cell numbers, and states inspectors are 'available 8:30 am – 9:00 am' for contact — this is an in-house, self-performed inspection function for the unincorporated county (and per Crescent City's own statement, for Crescent City as well, though that is contested by the county's own municipality-services list)

county department page checked 2026-09-12 https://www.putnam-fl.gov/departments/development-services/building-department/

Q53 If delegated, to whom? Core Who inspects

N/A — not delegated for the unincorporated county; the county's own Building Department performs its own inspections in-house

Why the confidence is not higherSame source as q52. For Welaka specifically, plan review (not final field inspection) is contracted to Universal Engineering Sciences, LLC, per the town's own site (via Wayback, live site 403s all fetch tools)

county department page checked 2026-09-12 https://www.putnam-fl.gov/departments/development-services/building-department/

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedCounty fee resolution (only distinguishes '1 inspection trip' vs '2+ inspection trips' pricing tiers, does not name the actual inspection stages/sequence) and the Building Forms page — no named PV inspection sequence found

https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame documents as q54 — no explicit statement on whether a rough-in or mid-roof inspection is required for PV

https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedCounty Building Department page — no published statement of what an inspector checks (labels/listings) at a solar final; no PV-specific inspection checklist exists to confirm this practice one way or the other

https://www.putnam-fl.gov/departments/development-services/building-department/

Q57 Is there a published inspection checklist? Core What is checked

No dedicated PV inspection checklist found published on the county's Building Forms & Applications page

Why the confidence is not higherReviewed the full list of documents linked from https://www.putnam-fl.gov/departments/development-services/building-department/building-forms-applications/ (approximately 45 PDFs) — none is titled or contains a solar/PV inspection checklist; general checklists (Residential Plans Review Check List, Site Work Permit Application) exist but do not mention solar. This is a real absence within the scope of that one page, not a claim that no such document exists anywhere in the county's systems

county forms page checked 2026-09-12 https://www.putnam-fl.gov/departments/development-services/building-department/building-forms-applications/

Q58 What must be on site at inspection? Core Documents on site

Nothing published by this authority.

Where we lookedCounty Building Department page and fee resolution — no stated list of documents required to be on site at inspection (e.g. approved plans, permit card) specific to solar or electrical work

https://www.putnam-fl.gov/departments/development-services/building-department/

Q59 Is there a re-inspection fee? Corrections & re-inspection

$30.00, may be waived by the Director or Building Official if deemed excessive

Why the confidence is not higherVerbatim from the FY2025-2026 fee resolution, Section V: 'A fee of thirty dollars ($30.00) may be charged for excessive inspections and/or re-inspections pursuant to Chapter 553.80.2(c) F.S. This fee may be waived by the Director or the Building Official if deemed excessive.' Also checked this same 51-page OCR'd resolution for a FS 553.80 fee-abatement/fund-balance provision like Walton County's — found none; the standard fee schedule appears to be in force with no abatement

county fee resolution, Section V checked 2026-09-12 https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedCounty Building Department page and fee resolution — no description of how corrections are issued or cleared found

https://www.putnam-fl.gov/departments/development-services/building-department/

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedCounty fee resolution (mentions 'Temporary Certificate of Occupancy' as a line item, which is for new construction, not a retrofit) and Building Department page — no explicit statement of what document is issued on a passed solar/electrical final (e.g. 'Final' card vs green tag) for an existing-home retrofit

https://www.putnam-fl.gov/wp-content/uploads/2026/02/2025_permit_fees.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer — Clay Electric's own process has the member/contractor complete and submit both the Interconnection Agreement and Net Meter Application to Clay Electric Energy Services; Clay then installs the net meter and sends a finalization letter

Why the confidence is not higherRead off Clay Electric's own 'How To Get Started' interconnection-process graphic/text; FPL territory would follow FPL's own settled process (installer/contractor submits proof of permit final approval per FPL tariff §3.4) which was not independently re-derived here

utility interconnection process page checked 2026-09-12 https://www.clayelectric.com/solar-getting-started

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 65%

No

Size, colour & material None%

Where they go 70%

In Clay Electric territory: the manual disconnect must be 'located outside and accessible to Clay Electric (preferably next to the utility meter)'. FPL territory would follow FPL's own settled placement rules (not independently re-derived here)

What the utility wants on top 70%

No — Clay Electric's own 3,659-line 'Standards for Electric Service' document has zero occurrences of 'placard'; it requires only that the AC disconnect itself be labelled (generic 'Source side' labelling for a specific voltage class), not a dedicated PV placard

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
County
County
Putnam County
Regions covered
Authority Contact
Building Department
Direct Phone
(386) 329-0307
Booking & Scheduling