Town of Malone

Jackson County · Florida ← All authorities

Town of Malone

Jackson County

Verified Aug. 5, 2026

Town of Malone is a town authority in the State of Florida, serving 1,959 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Malone against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Malone is not the permitting authority for residential solar here 90% confidence
Holds
Zoning/land-use status unconfirmed (no ordinance found); the Town appears to run its own volunteer Fire Department (one photo, no code). Building and Electrical are NOT held by the Town.
Delegated to
Jackson County Building Services (4979 Healthy Way, Suite B, Marianna FL 32446; 850-482-9805) holds Building and Electrical inside the Malone town limits, observed via four County-issued permits at Malone addresses (Aug-Sep 2026) geocoding inside 'Malone town' GEOID 1242650.
Overridden by
FS 553.79/553.792 fee and timer limits; FS 163.04(1) solar preemption if any local approval gate exists; FAC 25-6.065 or FS 366.11(1)+366.91(6) depending on which utility is confirmed to serve the parcel (see q22, bounded confidence).
Why not higher
See q1. Proved via (1) Malone's absence from the floridabuilding.org 392-entry permit-issuer register (controls passed both directions), (2) Malone's absence from Municode's 416-entry FL client list (Jackson County present as a positive control), (3) a complete enumeration of Malone's own WordPress site (11/11 pages, 10/10 application-type documents) showing zero building/permitting content, and (4) geocoding five County-issued, Malone-addressed permits from the live iWorQ ledger through the keyless Census geocoder: four fall inside 'Malone town', one falls outside (unincorporated), matching Malone Town Hall's own address as a positive control and a fabricated address returning no match. Capped at 90 (not higher) because the underlying interlocal agreement (County Code Sec. 10-28) is unpublished and no Malone document concedes the arrangement in its own words. This corrects the FL-jackson-county-jackson-fl.json file's blanket 'the County is not the AHJ, each city is its own jurisdiction' claim, which explicitly listed Malone among ten municipalities never individually checked before generalising from Marianna alone.

https://www.floridabuilding.org/sc/sc_org_srch.aspx

Permit required
Yes. A permit is required for a residential rooftop PV system, issued by Jackson County. 'Solar' is a named checkbox on the County's New Single Family Residence permit-process flowchart…80%
Permit cost
General formula, verified byte-identical to run 255's copy this run (md5 d47c7cec9d6c169360065c1b31814730): CONSTRUCTION PERMIT = $46.00 for the first $1,000 of valuation + $8.00 per…82%
Plan review
No locally published turnaround for Malone or for the County generally. FS 553.792(1)(a) governs by state law: a typical PV job (roughly $20,000-$55,000) is over the $15,000 value limb and…82%
Portal
iWorQ Citizen Portal -- jacksoncounty.portal.iworq.net/portalhome/jacksoncounty.82%
Own placard wording
No. Neither Jackson County nor (so far as found) Malone specifies placard wording; any wording requirement would come entirely from whichever utility serves the parcel (q38).62%
Booking an inspection
Phone (Jackson County Building Services, 850-482-9805) or online through the iWorQ portal with a contractor Access Code.74%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. A permit is required for a residential rooftop PV system, issued by Jackson County. Q3 Electrical and building permits — Either. The same County process has produced both patterns for residential PV within one month elsewhere in the county: a single Building (Construction) permit, Q4 Plan review — No locally published turnaround for Malone or for the County generally. FS 553.792(1)(a) governs by state law: a typical PV job (roughly $20,000-$55,000) is over… Q18 Where you file — iWorQ Citizen Portal -- jacksoncounty.portal.iworq.net/portalhome/jacksoncounty. Q20

Permit required
Yes. A permit is required for a residential rooftop PV system, issued by Jackson County. 'Solar' is a named checkbox on the County's New Single Family Residence permit-process flowchart ('Modular /…80% source
What it costs
General formula, verified byte-identical to run 255's copy this run (md5 d47c7cec9d6c169360065c1b31814730): CONSTRUCTION PERMIT = $46.00 for the first $1,000 of valuation + $8.00 per additional…82% source
Plan review turnaround
No locally published turnaround for Malone or for the County generally. FS 553.792(1)(a) governs by state law: a typical PV job (roughly $20,000-$55,000) is over the $15,000 value limb and under the…82% source
Key document
county permit-process document (verified first-hand) cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? No. The Town of Malone is NOT the AHJ for residential solar. Jackson County Building Services (4979 Healthy Way, Suite B, Marianna FL 32446; 850-482-9805) is the AHJ for building and electrical inside the town limits. 90% · statewide permit-issuer register + Census geocoder on live county permit ledger
    • What does this authority permit itself, and what does it delegate? Building and Electrical: delegated entirely to Jackson County Building Services (also Mechanical and Plumbing, per the County's general practice). Zoning/land-use and fire could not be confirmed as Malone's own function versus the County's -- no Malone zoning ordinance, land development code, or zoning map was found published anywhere, which is itself unusual (every other Jackson County town checked in this survey, e.g. Graceville, Marianna, Trenton's sibling counties' towns, has SOME reachable code). The Town does appear to run its own Fire Department -- a captioned photograph 'Fire Department' is posted on the Town's own Community Planning page -- but no fire code adoption, district, or scope document was found. 60% · town website (complete document/page enumeration) + county department page
    • Is a permit required for a residential rooftop PV system? Yes. A permit is required for a residential rooftop PV system, issued by Jackson County. 'Solar' is a named checkbox on the County's New Single Family Residence permit-process flowchart ('Modular / Pool / Sign / Solar / Roofing'), and the County has issued residential solar permits elsewhere in the county within the last month (run 255, three solar permits in 29 days at Graceville/Alford addresses). 80% · county permit-process document (verified first-hand)
    • Is there a separate electrical permit, or is it combined? Either. The same County process has produced both patterns for residential PV within one month elsewhere in the county: a single Building (Construction) permit, and a Building + Electrical pair pulled separately. 66% · county fee schedule + sibling-run permit ledger evidence
    • Is a wind or windstorm certification required? Yes, indirectly: a local design wind speed of 130 mph 3-second gust at 33 ft (Risk Category I and II) applies across the ENTIRE county, including Malone, under Jackson County Code Secs. 10-26/10-27 -- not a separate 'windstorm certification' but a design criterion the FBC-governed permit is checked against. 72% · county code (via sibling run, county-wide scope)
    • Is there a system-size cap on residential generation? No AHJ-side size cap found. If WFEC serves Malone (q22), its Member-Owned Generation agreement caps interconnection at no more than the member's own service size (run 255's reading); this is conditional on the utility identification, not independently confirmed for Malone. 52% · utility agreement (via sibling run)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A contractor licensed and registered with Jackson County (state-certified contractors file a Certified License Registration Form; state-registered contractors hold a County Competency Card), OR the homeowner under the owner-builder exemption. 78% · county department page
    • Must the contractor be registered with this authority before applying? Yes for state-registered (non-state-certified) contractors, who need a Jackson County Competency Card before the County will issue a permit to them. 75% · county department page
    • Is a homeowner permitted to self-install and self-permit? Yes. FS 489.103(7)'s owner-builder exemption is printed verbatim on the County's own permit-process document: an owner may act as their own contractor on a one- or two-family residence for their own occupancy, provided they personally appear and sign the building permit application. 78% · county permit-process document (verified first-hand)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? For a solar retrofit the County publishes no solar-specific checklist. Its general 'Permit Application - All Trades' asks for owner name/address/phone, parcel ID, contractor licence and competency-card numbers, class of work, and an Energy Form signed by the preparer and owner or contractor. 65% · county permit-process document
    • How many copies, and in what format? Online through the iWorQ citizen portal (uploads, e-signature, no paper) or on paper as a one-page notarised application. 68% · county online permit portal
    • Is a one-line / three-line diagram required? Not required by any published Jackson County document. 62% · county permit-process document
    • Are string and conductor calculations required? Not required by any published Jackson County document. 62% · county permit-process document
    • Is a structural PE stamp required, and at what threshold? No published structural PE threshold specific to solar. The County adopts the Florida Building Code in total with no local amendment, so FBC/FS 471.003 governs by default; the County does separately set a 130 mph 3-second-gust design wind speed county-wide (see q26). 68% · county code (via sibling run)
    • Is an electrical PE stamp required, and at what threshold? No published local electrical PE threshold; FS 471.003(2)(h) applies unstated. 60% · county code (via sibling run)
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? iWorQ Citizen Portal -- jacksoncounty.portal.iworq.net/portalhome/jacksoncounty. 82% · county online permit portal (verified first-hand)
    • Can the whole application be completed online? Application yes (property/contractor lookups, all project fields, uploads, e-signature). Payment: no online payment confirmed this run; a meaningful share of the live ledger's rows sit at non-final statuses consistent with fee collection happening outside the portal (inherited from run 255's 'PENDING FEE' finding, not independently re-counted by me). 65% · county online permit portal
    • What does a residential solar permit cost? General formula, verified byte-identical to run 255's copy this run (md5 d47c7cec9d6c169360065c1b31814730): CONSTRUCTION PERMIT = $46.00 for the first $1,000 of valuation + $8.00 per additional $1,000 or fraction (minimum $46), PLUS a state surcharge of 2.5% or $4.00, whichever is greater. On a $37,016 job (the real Alford solar receipt run 255 found on this same schedule) that reconciles to $342.00 + $8.55 = $350.55. If the electrical work is pulled as a separate permit, add a flat $111.00 (Residential New Dwelling/Per Unit) or the applicable Additional-Services line. 82% · county fee schedule (verified first-hand, byte-identical to sibling run)
    • How is the fee calculated? Valuation-based (tiered per $1,000 of construction cost) for the Building/Construction permit; flat ($111 residential) if the electrical permit is pulled separately. 80% · county fee schedule
    • Is there a separate plan-check fee? No for residential. 'Plan Review Fees/Commercial Only is 1/2 permit fee' is printed on the fee schedule I downloaded; nothing charges residential plan review separately. 80% · county fee schedule (verified first-hand)
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? No locally published turnaround for Malone or for the County generally. FS 553.792(1)(a) governs by state law: a typical PV job (roughly $20,000-$55,000) is over the $15,000 value limb and under the 7,500 sq ft size limb of an existing single-family dwelling, so the 30-BUSINESS-DAY limb applies; a job under $15,000 gets 5 business days. 82% · Florida Statute (verified first-hand)
    • How long is an issued permit valid before it expires? One year under FS 553.79(1)(c) for a single-family-dwelling permit, plus a LOCAL activity rule printed on the County's own process document: 'To keep permit active be sure to have an inspection at least every 6 months.' 80% · county permit-process document (verified first-hand)
    • Which utility handles interconnection here? Most likely ONE retail electric seller inside Malone town limits: West Florida Electric Cooperative (WFEC). This could NOT be confirmed by a town-side instrument -- no franchise ordinance, budget, or utility-tax line is published anywhere on Malone's own site (it publishes no budget/financial document of any kind). The inference rests on WFEC's own 'about us' statement that it serves 'Calhoun, Holmes, Jackson and Washington Counties' as a rural cooperative headquartered in Graceville (17 road miles south of Malone) with a second district office in Sneads, both inside Jackson County, and on Malone's own profile as an isolated, sparsely built rural town abutting Alabama -- the classic WFEC service pattern, and geographically distant from FPU's historical Marianna-centred territory and from Gulf Coast Electric Cooperative's Bay/Calhoun-side territory. 58% · EIA-861 (county-level) + utility's own territory statement
    • Where does the utility sit in the sequence? If WFEC (see q22): before parallel operation. WFEC's Member-Owned Generation process requires the member to give the co-op at least 10 business days' notice before parallel operation and the co-op up to 10 business days to approve; the AHJ (Jackson County) has no role in that utility-side sequence. 55% · utility interconnection agreement (via sibling run)

28 questions answered against Town of Malone’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

No. The Town of Malone is NOT the AHJ for residential solar. Jackson County Building Services (4979 Healthy Way, Suite B, Marianna FL 32446; 850-482-9805) is the AHJ for building and electrical inside the town limits.

Why the confidence is not higherProved four independent ways. (1) floridabuilding.org's 392-entry statewide register of permit-issuing local governments does NOT contain Malone (fuzzy-matched against all 392 names); positive controls Polk City/Frostproof/Eagle Lake/Dade City all present, negative controls Bowling Green/Wauchula/Zolfo Springs/St. Leo/San Antonio all absent, and County of Jackson / City of Marianna / City of Alford ARE present -- Malone patterns with the absent group. (2) api.municode.com/Clients/stateAbbr?stateAbbr=FL (416 FL clients) has no ClientName matching Malone; Jackson County (11547) is present as a positive control. (3) Malone's own website (malonefl.net, WordPress) publishes ZERO building/permitting content -- full denominator enumerated via wp-json/wp/v2/pages (11/11) and wp-json/wp/v2/media?media_type=application (10/10): no permit application, no fee schedule, no zoning/building code, no FS 553.80(7) report; its 'Policy' and 'Forms & Publications' nav categories both return 'No Results Found'. (4) THE STRONGEST PROOF: I pulled Jackson County's live iWorQ permit ledger (paginated 11 pages/permits/600, since the ledger's Search box is an invisible reCAPTCHA per run 255) and found five COUNTY-issued permits at Malone street addresses in the last 30 days (05/09/08/09 Sep 2026), then geocoded each through the keyless Census endpoint (layers=Incorporated%20Places). FOUR of five -- 5356 10th St (electrical, closed), 5137 7th Ave (electrical, issued), 5271 11th Ave (roofing, issued), 5321 13th St (building, issued) -- geocode to 'Malone town' GEOID 1242650; the fifth (5240 Friendship Church Rd) returns no Incorporated Places match at all, i.e. unincorporated county, which is exactly the same in-city/out-of-city split run 255 found for Graceville. Positive control: Malone Town Hall, 5182 9th Avenue, geocodes to 'Malone town'. Fabricated control: '99999 Zzqqxplorp Rd, Malone, FL' returns NO MATCH. This is the county exercising the building/electrical function inside the town limits, observed, this month. 90 rather than higher because (a) the underlying interlocal agreement (County Code Sec. 10-28) is filed with the Clerk of the Circuit Court and is unpublished, same as at Graceville, and (b) unlike Graceville, no Malone-side document concedes the delegation in its own words, because Malone appears to publish no code at all. THIS CORRECTS the FL-jackson-county-jackson-fl.json file, which explicitly listed Malone among '10 municipalities NOT individually checked' before generalising 'the County is not the AHJ, each city is its own jurisdiction under Ch. 553' from Marianna alone -- that assumption is wrong for Malone.

statewide permit-issuer register + Census geocoder on live county permit ledger checked 2026-09-13 https://www.floridabuilding.org/sc/sc_org_srch.aspx

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Building and Electrical: delegated entirely to Jackson County Building Services (also Mechanical and Plumbing, per the County's general practice). Zoning/land-use and fire could not be confirmed as Malone's own function versus the County's -- no Malone zoning ordinance, land development code, or zoning map was found published anywhere, which is itself unusual (every other Jackson County town checked in this survey, e.g. Graceville, Marianna, Trenton's sibling counties' towns, has SOME reachable code). The Town does appear to run its own Fire Department -- a captioned photograph 'Fire Department' is posted on the Town's own Community Planning page -- but no fire code adoption, district, or scope document was found.

Why the confidence is not higherBuilding/Electrical from the q1 proof chain. Zoning/fire status is a genuine capability limit: Malone's WordPress site was enumerated in full (11 pages, 10 application-type media files) and contains no code, no ordinance, no zoning map, and no fire-department page beyond one photo caption; Municode and floridabuilding.org (a permits-only register, not dispositive for zoning) do not help either. Docked from Graceville's 88 because Graceville's LDR let the split be proved in the town's own words; Malone's could not.

town website (complete document/page enumeration) + county department page checked 2026-09-13 https://malonefl.net/

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. A permit is required for a residential rooftop PV system, issued by Jackson County. 'Solar' is a named checkbox on the County's New Single Family Residence permit-process flowchart ('Modular / Pool / Sign / Solar / Roofing'), and the County has issued residential solar permits elsewhere in the county within the last month (run 255, three solar permits in 29 days at Graceville/Alford addresses).

Why the confidence is not higherCounty-wide process (same AHJ that holds jurisdiction over Malone under q1); the 'Solar' checkbox is on the SFR process PDF I downloaded and OCR'd myself this run (uploads/2022/02/new-single-family-residence-permit-process.pdf, page with the trade checkboxes). No Malone-specific solar permit has yet appeared in the ledger (the five Malone-address permits found this run are electrical/roofing/building, not solar), so this is inference from the same AHJ's general practice, not a Malone specimen.

county permit-process document (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Either. The same County process has produced both patterns for residential PV within one month elsewhere in the county: a single Building (Construction) permit, and a Building + Electrical pair pulled separately.

Why the confidence is not higherInherited from run 255 (Graceville/Alford solar permits, same AHJ, same county-wide fee schedule I independently re-verified this run); not a Malone specimen.

county fee schedule + sibling-run permit ledger evidence checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/05/fee-scheduletagged.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A contractor licensed and registered with Jackson County (state-certified contractors file a Certified License Registration Form; state-registered contractors hold a County Competency Card), OR the homeowner under the owner-builder exemption.

Why the confidence is not higherCounty's own Contractor Licensing forms list (Building Services page I fetched this run) plus FS 489.103(7) verbatim on the County's own SFR process document, which I downloaded and OCR'd myself.

county department page checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes for state-registered (non-state-certified) contractors, who need a Jackson County Competency Card before the County will issue a permit to them.

Why the confidence is not higherCounty Building Services forms list: 'Competency Card Application - For State Registered Contractors' and 'Competency Card Renewal Form' are published, distinct from the state-certified contractor route.

county department page checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. FS 489.103(7)'s owner-builder exemption is printed verbatim on the County's own permit-process document: an owner may act as their own contractor on a one- or two-family residence for their own occupancy, provided they personally appear and sign the building permit application.

Why the confidence is not higherQuoted first-hand from the County's New Single Family Residence Permit Process document, pages naming the owner-builder exemption and the 'Disclosures Signed for Homeowners Pulling Permits' section, which I downloaded and OCR'd this run.

county permit-process document (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q8 What documents make up a complete submittal? Core Submittal package

For a solar retrofit the County publishes no solar-specific checklist. Its general 'Permit Application - All Trades' asks for owner name/address/phone, parcel ID, contractor licence and competency-card numbers, class of work, and an Energy Form signed by the preparer and owner or contractor.

Why the confidence is not higherCounty SFR process document I downloaded myself (Energy Form line item, owner-information fields); the full Permit Application - All Trades PDF itself was not re-downloaded this run (inherited from run 255's read of the same live document).

county permit-process document checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q9 How many copies, and in what format? Submittal package

Online through the iWorQ citizen portal (uploads, e-signature, no paper) or on paper as a one-page notarised application.

Why the confidence is not higheriWorQ portal re-confirmed live and reachable by me this run (jacksoncounty.portal.iworq.net, paginated permits/600 ledger, 200 OK); notarisation requirement inherited from run 255's read of the application form, not re-verified.

county online permit portal checked 2026-09-13 https://jacksoncounty.portal.iworq.net/portalhome/jacksoncounty

Q10 Is a site plan required, and what must it show? Core Submittal package

Nothing published by this authority.

Where we lookedWhether a site plan is required for a solar retrofit specifically, and what it must show. The County's own SFR checklist requires a site plan for a NEW single-family residence, not stated for a retrofit. Whether Malone itself layers on a separate site-plan/development-order requirement (as Graceville's LDR does) could not be checked: no Malone zoning/land-development ordinance was found published anywhere (WordPress site fully enumerated, Municode absent, web search inconclusive after DuckDuckGo challenge-gated my session and the shared session's WebSearch budget was exhausted by other concurrent runs).

https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Not required by any published Jackson County document.

Why the confidence is not higherCounty SFR checklist (this run's download) has no one-line/three-line diagram line item; same reading as run 255 for the same AHJ. Malone-side requirement unknown (no zoning code found).

county permit-process document checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Not required by any published Jackson County document.

Why the confidence is not higherSame basis as q11.

county permit-process document checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No published structural PE threshold specific to solar. The County adopts the Florida Building Code in total with no local amendment, so FBC/FS 471.003 governs by default; the County does separately set a 130 mph 3-second-gust design wind speed county-wide (see q26).

Why the confidence is not higherInherited from run 255's read of Jackson County Code Sec. 10-24 (FBC adopted 'in total') and Secs. 10-26/10-27 (county-wide wind speed), not re-fetched by me this run.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

No published local electrical PE threshold; FS 471.003(2)(h) applies unstated.

Why the confidence is not higherSame basis as q13.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q15 What does a residential solar permit cost? Core Fees

General formula, verified byte-identical to run 255's copy this run (md5 d47c7cec9d6c169360065c1b31814730): CONSTRUCTION PERMIT = $46.00 for the first $1,000 of valuation + $8.00 per additional $1,000 or fraction (minimum $46), PLUS a state surcharge of 2.5% or $4.00, whichever is greater. On a $37,016 job (the real Alford solar receipt run 255 found on this same schedule) that reconciles to $342.00 + $8.55 = $350.55. If the electrical work is pulled as a separate permit, add a flat $111.00 (Residential New Dwelling/Per Unit) or the applicable Additional-Services line.

Why the confidence is not higherI downloaded fee-scheduletagged.pdf myself this run from jacksoncountyfl.gov/uploads/2022/05/ and confirmed its md5 matches run 255's citation exactly (byte-identical), and independently re-read the Construction Permit and Electrical Permit tables with pdftotext -layout. Not docked to Graceville's level because I have not found a MALONE-address solar receipt to reconcile against (the five Malone permits found this run are electrical/roofing/building, not solar) -- the formula and surcharge line are directly verified, the reconciliation to a live Malone receipt is not.

county fee schedule (verified first-hand, byte-identical to sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/05/fee-scheduletagged.pdf

Q16 How is the fee calculated? Core Fees

Valuation-based (tiered per $1,000 of construction cost) for the Building/Construction permit; flat ($111 residential) if the electrical permit is pulled separately.

Why the confidence is not higherSame fee schedule, verified first-hand this run.

county fee schedule checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/05/fee-scheduletagged.pdf

Q17 Is there a separate plan-check fee? Fees

No for residential. 'Plan Review Fees/Commercial Only is 1/2 permit fee' is printed on the fee schedule I downloaded; nothing charges residential plan review separately.

Why the confidence is not higherRead directly off my own pdftotext extraction of the fee schedule this run.

county fee schedule (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/05/fee-scheduletagged.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

No locally published turnaround for Malone or for the County generally. FS 553.792(1)(a) governs by state law: a typical PV job (roughly $20,000-$55,000) is over the $15,000 value limb and under the 7,500 sq ft size limb of an existing single-family dwelling, so the 30-BUSINESS-DAY limb applies; a job under $15,000 gets 5 business days.

Why the confidence is not higherFS 553.792(1)(a) read first-hand from leg.state.fl.us and quoted verbatim in the standing brief (verified 13 Sep 2026); no County or Malone document restates a shorter turnaround.

Florida Statute (verified first-hand) checked 2026-09-13 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0500-0599/0553/Sections/0553.792.html

Q19 How long is an issued permit valid before it expires? Timeline & validity

One year under FS 553.79(1)(c) for a single-family-dwelling permit, plus a LOCAL activity rule printed on the County's own process document: 'To keep permit active be sure to have an inspection at least every 6 months.'

Why the confidence is not higherThe '6 months' line is quoted directly from the SFR process PDF I downloaded and OCR'd myself this run (line 169 of my extraction) -- an independent re-confirmation of run 255's identical finding on the identical live document.

county permit-process document (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/02/new-single-family-residence-permit-process.pdf

Q20 Which permit portal does this authority use? Core Portal & process

iWorQ Citizen Portal -- jacksoncounty.portal.iworq.net/portalhome/jacksoncounty.

Why the confidence is not higherRe-confirmed live by me this run: created my own request (no shared tab), fetched the portal home and the paginated permits/600 ledger across all 11 pages, HTTP 200 throughout.

county online permit portal (verified first-hand) checked 2026-09-13 https://jacksoncounty.portal.iworq.net/portalhome/jacksoncounty

Q21 Can the whole application be completed online? Core Portal & process

Application yes (property/contractor lookups, all project fields, uploads, e-signature). Payment: no online payment confirmed this run; a meaningful share of the live ledger's rows sit at non-final statuses consistent with fee collection happening outside the portal (inherited from run 255's 'PENDING FEE' finding, not independently re-counted by me).

Why the confidence is not higherMy own fetch of 11 pages / ~161 rows confirmed the ledger's live fields and statuses (ISSUED/CLOSED etc.); I did not re-tally the PENDING FEE share myself.

county online permit portal checked 2026-09-13 https://jacksoncounty.portal.iworq.net/portalhome/jacksoncounty

Q22 Which utility handles interconnection here? Core Utility interconnection

Most likely ONE retail electric seller inside Malone town limits: West Florida Electric Cooperative (WFEC). This could NOT be confirmed by a town-side instrument -- no franchise ordinance, budget, or utility-tax line is published anywhere on Malone's own site (it publishes no budget/financial document of any kind). The inference rests on WFEC's own 'about us' statement that it serves 'Calhoun, Holmes, Jackson and Washington Counties' as a rural cooperative headquartered in Graceville (17 road miles south of Malone) with a second district office in Sneads, both inside Jackson County, and on Malone's own profile as an isolated, sparsely built rural town abutting Alabama -- the classic WFEC service pattern, and geographically distant from FPU's historical Marianna-centred territory and from Gulf Coast Electric Cooperative's Bay/Calhoun-side territory.

Why the confidence is not higherEIA-861 Service_Territory_2024.xlsx lists FOUR retail sellers registered against Jackson County overall: Florida Power & Light Co, Florida Public Utilities Co, Gulf Coast Electric Coop and West Florida El Coop Assn -- the county-wide denominator is proved, but EIA-861 does not resolve which reach inside any one town. No permit-application utility checkbox, franchise ordinance, or budget franchise/utility-tax line for Malone specifically was reachable to settle it further. This resolves (not eliminates) the open conflict the brief flagged: run 255 found FPL+WFEC serving Graceville and run 172 found FPU alone serving Marianna -- both are correct for THEIR towns; Jackson County simply has (at least) four overlapping-territory sellers, and Malone's is a fifth, separately-reasoned data point, not a contradiction of either.

EIA-861 (county-level) + utility's own territory statement checked 2026-09-13 https://www.eia.gov/electricity/data/eia861/zip/f8612024.zip

Q23 Where does the utility sit in the sequence? Core Utility interconnection

If WFEC (see q22): before parallel operation. WFEC's Member-Owned Generation process requires the member to give the co-op at least 10 business days' notice before parallel operation and the co-op up to 10 business days to approve; the AHJ (Jackson County) has no role in that utility-side sequence.

Why the confidence is not higherInherited from run 255's addendum reading of WFEC's MOG agreement, conditional on WFEC being confirmed as Malone's seller (q22, itself at bounded confidence).

utility interconnection agreement (via sibling run) checked 2026-09-13 https://westflorida.coop/about-us

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedWhether a Malone-specific HOA or architectural-review ordinance exists. Jackson County Code creates no county-wide architectural review or HOA-approval regime (run 255's finding, same AHJ). Whether the Town itself layers one on top could not be checked because no Malone zoning/land-use ordinance was found anywhere online.

https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedWhether a historic-district or certificate-of-appropriateness regime applies in Malone. No Malone zoning code, historic register, or zoning map is published online to check; the town's own WordPress site (fully enumerated) has no historic-preservation page.

https://malonefl.net/

Q26 Is a wind or windstorm certification required? Overlays & special cases

Yes, indirectly: a local design wind speed of 130 mph 3-second gust at 33 ft (Risk Category I and II) applies across the ENTIRE county, including Malone, under Jackson County Code Secs. 10-26/10-27 -- not a separate 'windstorm certification' but a design criterion the FBC-governed permit is checked against.

Why the confidence is not higherExplicitly county-WIDE language ('across the entire county'), established at run 255 from Jackson County Code Secs. 10-26/10-27 (Ord. 2026-03); not re-fetched by me this run but the scope language makes it apply to Malone without needing a town-specific instrument.

county code (via sibling run, county-wide scope) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedWhether a Specific Use Permit or Town Council approval is ever required for residential PV. Jackson County's only solar-specific regime (Code Sec. 42-74, 'Solar farms') is expressly unincorporated-only and utility-scale, so it does not reach Malone; whether Malone's own (unfound) zoning ordinance imposes anything is unknown.

https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No AHJ-side size cap found. If WFEC serves Malone (q22), its Member-Owned Generation agreement caps interconnection at no more than the member's own service size (run 255's reading); this is conditional on the utility identification, not independently confirmed for Malone.

Why the confidence is not higherInherited utility-cap language, conditional on q22.

utility agreement (via sibling run) checked 2026-09-13 https://westflorida.coop/about-us

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which building code edition is in force? Florida Building Code, 8th Edition (2023), as updated by the Florida Building Commission through the most recent 2025 amendment cycle, adopted 'in total' by Jackson County Code Sec. 10-24 (Ord. 2026-03). 78% · state rule + county code (via sibling run)
    • Which fire code edition is in force? Florida Fire Prevention Code, by state operation of law (FS 633.202). Jackson County adopts no fire code of its own countywide (0 hits for 'NFPA', 1 incidental hit for 'fire code' in the County Code, per run 255). Whether Malone's own volunteer Fire Department follows the FFPC and to what edition could not be confirmed -- no Malone fire-department document beyond a single photo caption was found. 62% · county code (via sibling run) + Florida Statute
    • Are there local amendments to any of the above? No local amendments to the building code found. Jackson County adopts the FBC 'in total' with no textual amendment; its one local addition (the wind-speed table, q26) is a free-standing ordinance, not a code amendment. 70% · county code (via sibling run)
    • What is the installation judged against? The Florida Building Code 8th Edition (2023) as adopted in total by Jackson County, with no local amendment and no independent electrical-code adoption. 68% · county code (via sibling run)
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Town of Malone on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Rapid shutdown applies through whichever NEC edition is incorporated by the FBC 8th Edition (2023) that Jackson County adopts in total; neither the County nor (so far as found) Malone states a rapid-shutdown rule of its own. 62% · county code (via sibling run)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? Conditional on the utility (q22, bounded confidence). If WFEC: the co-op requires no placards at all on a Tier-1-style residential interconnection -- placard/label/warning sign/signage/decal/sticker/lettering were all 0 hits across WFEC's four solar documents at run 255. If FPL or FPU instead serve the parcel, FPL's ESS Section XIII engraved meter-can and DER placards, or FPU's placard-free tariff (run 172, zero hits across 247,000 characters), would apply instead. 55% · utility tariff/agreement (via sibling runs, conditional on utility identity)
    • Does the authority specify placard wording of its own? No. Neither Jackson County nor (so far as found) Malone specifies placard wording; any wording requirement would come entirely from whichever utility serves the parcel (q38). 62% · county code (via sibling run)
    • Does it specify letter height, colour or material? Depends on utility (q38). WFEC specifies none. FPL requires 'permanent and weatherproof/UV resistant' placards with ENGRAVED letters but no letter height or colour. Neither the County nor Malone specifies letter height, colour, or material of its own. 52% · utility tariff (via sibling run, conditional)
    • Is a site plan / facility map placard required, and what must it show? Not restated by any authority or utility found in this county so far (the brief notes this is the seventh-plus consecutive Jackson County run at which neither the AHJ nor the utility restates NEC 705.10's site-plan/facility-map placard). NEC 705.10 itself governs by incorporation once the NEC edition is settled (q29, not_found). 55% · absence pattern across sibling runs
    • Does the UTILITY specify placards beyond the AHJ's? Conditional on utility (q22). If WFEC: yes, and it is effectively the entire placard answer for that half of any split, because WFEC's Member-Owned Generation agreement is the only document specifying anything about the interconnection at all (disconnect, insurance, certifications) even though it specifies zero placards. 50% · utility agreement (via sibling run, conditional)
    • Where must the labels be placed? Conditional on utility (q22). WFEC requires no labels anywhere. FPL, if applicable, places labels at the meter can and DER disconnect switch. 48% · utility agreement (via sibling run, conditional)
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Conditional on utility (q22). WFEC requires a manual visible-load-break disconnect, MANDATORY at the member's expense, mounted separate from the meter socket, lockable with a utility padlock -- with NO inverter-based exemption (unlike the state IOU rule). FPL/FPU, if applicable instead, would follow FAC 25-6.065's inverter-exemption regime. 52% · utility agreement (via sibling run, conditional)
    • Must equipment be on a specific approved list? Yes, by two routes regardless of which utility applies. Jackson County requires a Florida Product Approval Spec Sheet for FBC-regulated products (this is on the County's own published forms list, which I fetched this run). The interconnecting utility separately requires listed/certified equipment (WFEC: IEEE 1547 (2003)/1547.1 (2005)/UL 1741 (2005), per run 255). 70% · county forms page (verified first-hand) + utility agreement (via sibling run)
    • Are batteries permitted, and under what conditions? Permitted, with no local rule found. Neither the County Code nor (so far as found) Malone mentions batteries or energy storage in a solar-specific way. Whichever utility applies may impose its own restriction (WFEC's agreement is silent on storage; FPL restricts export from a battery-equipped system per run 255). 58% · county code (via sibling run)
    • Is there a separate ESS permit or inspection? No separate ESS permit type identified on the County's forms list. 60% · county forms (via sibling run)
    • Is there a local rule on service upgrades or busbar sizing? No local rule on busbar sizing. There is a local rule on service work generally: a service upgrade is separately priced on the fee schedule (see below) with its own inspection. 70% · county fee schedule (verified first-hand)
    • Is a specific mounting system or attachment spacing required? No mounting system or attachment spacing specified locally; the FBC governs, checked against the 130 mph county-wide design wind speed (q26). 65% · county code (via sibling run)

20 questions answered against Town of Malone’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

Nothing published by this authority.

Where we lookedWhich NEC edition is in force. Jackson County Code Sec. 10-24 adopts the FBC 'in total' with no independent electrical-code adoption; FAC Rule 61G20-1.001 names the FBC edition (8th, 2023) but not its referenced NEC year, and codes.iccsafe.org returns a JavaScript shell to a plain fetch (run 255's finding, not re-tested by me this run). Unread means unreached.

https://codes.iccsafe.org/content/FLBC2023P1/chapter-27-electrical

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023), as updated by the Florida Building Commission through the most recent 2025 amendment cycle, adopted 'in total' by Jackson County Code Sec. 10-24 (Ord. 2026-03).

Why the confidence is not higherFAC Rule 61G20-1.001 read first-hand from flrules.org at run 255 (not re-fetched by me this run); the county-wide adoption clause applies to Malone the same way it applies to Graceville, since building/electrical is delegated identically.

state rule + county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code, by state operation of law (FS 633.202). Jackson County adopts no fire code of its own countywide (0 hits for 'NFPA', 1 incidental hit for 'fire code' in the County Code, per run 255). Whether Malone's own volunteer Fire Department follows the FFPC and to what edition could not be confirmed -- no Malone fire-department document beyond a single photo caption was found.

Why the confidence is not higherCounty-level absence inherited from run 255; Malone-side is a genuine capability limit.

county code (via sibling run) + Florida Statute checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q32 Are there local amendments to any of the above? Core Code editions in force

No local amendments to the building code found. Jackson County adopts the FBC 'in total' with no textual amendment; its one local addition (the wind-speed table, q26) is a free-standing ordinance, not a code amendment.

Why the confidence is not higherInherited from run 255's read of Jackson County Code Sec. 10-24.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q33 What is the installation judged against? Core Electrical

The Florida Building Code 8th Edition (2023) as adopted in total by Jackson County, with no local amendment and no independent electrical-code adoption.

Why the confidence is not higherSame basis as q30.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

No local rule on busbar sizing. There is a local rule on service work generally: a service upgrade is separately priced on the fee schedule (see below) with its own inspection.

Why the confidence is not higherI read the Electrical Permit table on my own fee-schedule download this run: 'Service Upgrade $66.00' is a distinct line item.

county fee schedule (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/05/fee-scheduletagged.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No mounting system or attachment spacing specified locally; the FBC governs, checked against the 130 mph county-wide design wind speed (q26).

Why the confidence is not higherInherited from run 255.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedFire ridge setbacks and access pathways. The Florida Fire Prevention Code is paywalled and stayed unread; Jackson County adopts no fire code of its own; and no Malone fire-department scope document was found to check for a local variant.

https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Rapid shutdown applies through whichever NEC edition is incorporated by the FBC 8th Edition (2023) that Jackson County adopts in total; neither the County nor (so far as found) Malone states a rapid-shutdown rule of its own.

Why the confidence is not higherInherited from run 255; NEC year itself is not_found (q29).

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Conditional on the utility (q22, bounded confidence). If WFEC: the co-op requires no placards at all on a Tier-1-style residential interconnection -- placard/label/warning sign/signage/decal/sticker/lettering were all 0 hits across WFEC's four solar documents at run 255. If FPL or FPU instead serve the parcel, FPL's ESS Section XIII engraved meter-can and DER placards, or FPU's placard-free tariff (run 172, zero hits across 247,000 characters), would apply instead.

Why the confidence is not higherUtility identity for Malone specifically is bounded (q22); all three placard regimes cited are from sibling runs, not re-verified by me this run.

utility tariff/agreement (via sibling runs, conditional on utility identity) checked 2026-09-13 https://westflorida.coop/about-us

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. Neither Jackson County nor (so far as found) Malone specifies placard wording; any wording requirement would come entirely from whichever utility serves the parcel (q38).

Why the confidence is not higherCounty-side absence inherited from run 255 (same AHJ); Malone-side unconfirmed but consistent with its total absence of published code.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Depends on utility (q38). WFEC specifies none. FPL requires 'permanent and weatherproof/UV resistant' placards with ENGRAVED letters but no letter height or colour. Neither the County nor Malone specifies letter height, colour, or material of its own.

Why the confidence is not higherInherited from sibling runs, conditional on utility identity.

utility tariff (via sibling run, conditional) checked 2026-09-13 https://westflorida.coop/about-us

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Not restated by any authority or utility found in this county so far (the brief notes this is the seventh-plus consecutive Jackson County run at which neither the AHJ nor the utility restates NEC 705.10's site-plan/facility-map placard). NEC 705.10 itself governs by incorporation once the NEC edition is settled (q29, not_found).

Why the confidence is not higherInherited pattern from run 255 and prior Jackson County runs; not independently re-tested.

absence pattern across sibling runs checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Conditional on utility (q22). If WFEC: yes, and it is effectively the entire placard answer for that half of any split, because WFEC's Member-Owned Generation agreement is the only document specifying anything about the interconnection at all (disconnect, insurance, certifications) even though it specifies zero placards.

Why the confidence is not higherInherited from run 255's addendum; conditional on q22.

utility agreement (via sibling run, conditional) checked 2026-09-13 https://westflorida.coop/about-us

Q43 Where must the labels be placed? Core Labels Signage & labelling

Conditional on utility (q22). WFEC requires no labels anywhere. FPL, if applicable, places labels at the meter can and DER disconnect switch.

Why the confidence is not higherSame basis as q42.

utility agreement (via sibling run, conditional) checked 2026-09-13 https://westflorida.coop/about-us

Q44 Must equipment be on a specific approved list? Equipment listing

Yes, by two routes regardless of which utility applies. Jackson County requires a Florida Product Approval Spec Sheet for FBC-regulated products (this is on the County's own published forms list, which I fetched this run). The interconnecting utility separately requires listed/certified equipment (WFEC: IEEE 1547 (2003)/1547.1 (2005)/UL 1741 (2005), per run 255).

Why the confidence is not higher'Product Approval Spec Sheet' is a form I confirmed live on the County Building Services page myself this run; the utility-side listing requirement is inherited from run 255.

county forms page (verified first-hand) + utility agreement (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Permitted, with no local rule found. Neither the County Code nor (so far as found) Malone mentions batteries or energy storage in a solar-specific way. Whichever utility applies may impose its own restriction (WFEC's agreement is silent on storage; FPL restricts export from a battery-equipped system per run 255).

Why the confidence is not higherCounty-level absence inherited from run 255; Malone-side consistent with its total absence of published code.

county code (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separate ESS permit type identified on the County's forms list.

Why the confidence is not higherInherited from run 255's read of the County's permit-type/Purpose list; not independently re-enumerated by me this run.

county forms (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedWhether a ground mount is treated as a zoning 'structure' in Malone (setback, coverage, or accessory-use rules). For PERMITTING it takes a County building permit on valuation like any other structure (not in dispute); the ZONING question needs Malone's own land-use ordinance, which was not found published anywhere.

https://malonefl.net/

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Conditional on utility (q22). WFEC requires a manual visible-load-break disconnect, MANDATORY at the member's expense, mounted separate from the meter socket, lockable with a utility padlock -- with NO inverter-based exemption (unlike the state IOU rule). FPL/FPU, if applicable instead, would follow FAC 25-6.065's inverter-exemption regime.

Why the confidence is not higherInherited from run 255's addendum reading of WFEC's Member-Owned Generation agreement, conditional on q22.

utility agreement (via sibling run, conditional) checked 2026-09-13 https://westflorida.coop/about-us

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone (Jackson County Building Services, 850-482-9805) or online through the iWorQ portal with a contractor Access Code. 74% · county department page (verified first-hand)
    • How much notice is required? Not independently re-verified for this run; run 255 found a 2:30 PM cut-off for next-business-day inspection at the same County office ('All inspections must be called in by 2:30 PM for the following day inspections'). 55% · county document (via sibling run)
    • Are same-day or AM/PM windows offered? No AM/PM windows and no set times, per run 255's finding on the same County document ('THERE ARE NO SET TIMES FOR INSPECTIONS'). 52% · county document (via sibling run)
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes -- Jackson County Building Services performs the final inspection, and the County's 101-entry inspection-type catalogue (run 255) includes a named 'SOLAR FINAL' type. A private provider may be used instead under FS 553.791. 68% · county portal (inspection-type catalogue, via sibling run)
    • If delegated, to whom? Not delegated as a matter of course -- Jackson County keeps inspection in house. The applicant may elect a private provider under FS 553.791 instead. 62% · county practice (via sibling run)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For a solar retrofit, essentially one: SOLAR FINAL, plus any service-related inspection the specific work triggers (e.g. Service Upgrade). 62% · county portal (via sibling run)
    • Is a rough-in or mid-roof inspection required? No rough-in inspection for a solar retrofit -- the County's catalogue has SOLAR FINAL and no solar rough-in (run 255). 60% · county portal (via sibling run)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No inspection checklist published for solar specifically. The County publishes an inspection-by-inspection checklist for NEW SINGLE-FAMILY DWELLINGS only (run 255). 62% · county document (via sibling run)
    • What must be on site at inspection? The permit, the inspection card, and the recorded Notice of Commencement (required over $2,500) must be posted/available on site, per the County's general practice documented at run 255. 60% · county practice (via sibling run)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? For a solar retrofit, an approved SOLAR FINAL on the permit record; the ledger's terminal statuses are ISSUED then CLOSED (run 255's reading of the live iWorQ ledger, which I independently re-confirmed shows the same ISSUED/CLOSED vocabulary on the Malone-address rows I pulled this run). 66% · county portal (verified first-hand, this run's rows)
    • Who notifies the utility for PTO? The installer/customer notifies the utility; the AHJ (Jackson County) has no PTO notification role. If WFEC applies (q22), the member must supply the co-op with documentation before parallel operation per its Member-Owned Generation agreement. 55% · utility agreement (via sibling run, conditional)
    • Is there a re-inspection fee? Yes, and it is a ladder, per the fee schedule I downloaded and re-verified myself this run: $40.00 for the 1st re-inspection, $80.00 for the 2nd, $120.00 for the 3rd and any additional, payable before the re-inspection is made. 80% · county fee schedule (verified first-hand)

14 questions answered against Town of Malone’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone (Jackson County Building Services, 850-482-9805) or online through the iWorQ portal with a contractor Access Code.

Why the confidence is not higherContact number and portal re-confirmed live by me this run (County Building Services page fetch; iWorQ portal fetch).

county department page (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q50 How much notice is required? Core Booking & scheduling

Not independently re-verified for this run; run 255 found a 2:30 PM cut-off for next-business-day inspection at the same County office ('All inspections must be called in by 2:30 PM for the following day inspections').

Why the confidence is not higherInherited from run 255's reading of the County's inspection-scheduling document, which I did not re-download this run.

county document (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No AM/PM windows and no set times, per run 255's finding on the same County document ('THERE ARE NO SET TIMES FOR INSPECTIONS').

Why the confidence is not higherInherited from run 255, not re-verified this run.

county document (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes -- Jackson County Building Services performs the final inspection, and the County's 101-entry inspection-type catalogue (run 255) includes a named 'SOLAR FINAL' type. A private provider may be used instead under FS 553.791.

Why the confidence is not higherInspection-type catalogue enumeration is inherited from run 255 (not re-pulled by me this run); the AHJ identity itself (Jackson County) is this run's own q1 proof.

county portal (inspection-type catalogue, via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q53 If delegated, to whom? Core Who inspects

Not delegated as a matter of course -- Jackson County keeps inspection in house. The applicant may elect a private provider under FS 553.791 instead.

Why the confidence is not higherInherited from run 255; consistent with q52.

county practice (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q54 Which inspections are required, and in what order? Core Stages & sequence

For a solar retrofit, essentially one: SOLAR FINAL, plus any service-related inspection the specific work triggers (e.g. Service Upgrade).

Why the confidence is not higherInherited from run 255's read of the County's inspection catalogue.

county portal (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

No rough-in inspection for a solar retrofit -- the County's catalogue has SOLAR FINAL and no solar rough-in (run 255).

Why the confidence is not higherInherited, not re-verified this run.

county portal (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedWhether the inspector verifies labels and listings at SOLAR FINAL. Could not be established rather than proved absent -- the County publishes no inspection scope for this inspection type.

https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q57 Is there a published inspection checklist? Core What is checked

No inspection checklist published for solar specifically. The County publishes an inspection-by-inspection checklist for NEW SINGLE-FAMILY DWELLINGS only (run 255).

Why the confidence is not higherInherited from run 255.

county document (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q58 What must be on site at inspection? Core Documents on site

The permit, the inspection card, and the recorded Notice of Commencement (required over $2,500) must be posted/available on site, per the County's general practice documented at run 255.

Why the confidence is not higherInherited, not re-verified this run.

county practice (via sibling run) checked 2026-09-13 https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q59 Is there a re-inspection fee? Corrections & re-inspection

Yes, and it is a ladder, per the fee schedule I downloaded and re-verified myself this run: $40.00 for the 1st re-inspection, $80.00 for the 2nd, $120.00 for the 3rd and any additional, payable before the re-inspection is made.

Why the confidence is not higherRead directly off my own pdftotext extraction of fee-scheduletagged.pdf this run ('Reinspection Fee (Must be paid prior to reinspection being made): 1st $40.00, 2nd $80.00, 3rd $120.00').

county fee schedule (verified first-hand) checked 2026-09-13 https://www.jacksoncountyfl.gov/uploads/2022/05/fee-scheduletagged.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedHow corrections are issued and cleared. No corrections-procedure document, correction- notice form, or re-inspection request form is published by Jackson County or by Malone.

https://www.jacksoncountyfl.gov/services/community-development/building-services/

Q61 What is issued on pass? Core Final sign-off & PTO

For a solar retrofit, an approved SOLAR FINAL on the permit record; the ledger's terminal statuses are ISSUED then CLOSED (run 255's reading of the live iWorQ ledger, which I independently re-confirmed shows the same ISSUED/CLOSED vocabulary on the Malone-address rows I pulled this run).

Why the confidence is not higherStatus vocabulary (ISSUED, CLOSED) independently confirmed by me this run on the five Malone-address permit rows.

county portal (verified first-hand, this run's rows) checked 2026-09-13 https://jacksoncounty.portal.iworq.net/portalhome/jacksoncounty

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The installer/customer notifies the utility; the AHJ (Jackson County) has no PTO notification role. If WFEC applies (q22), the member must supply the co-op with documentation before parallel operation per its Member-Owned Generation agreement.

Why the confidence is not higherInherited from run 255's addendum reading of WFEC's agreement, conditional on q22.

utility agreement (via sibling run, conditional) checked 2026-09-13 https://westflorida.coop/about-us

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 62%

No. Neither Jackson County nor (so far as found) Malone specifies placard wording; any wording requirement would come entirely from whichever utility serves the parcel (q38).

Size, colour & material 52%

Depends on utility (q38). WFEC specifies none. FPL requires 'permanent and weatherproof/UV resistant' placards with ENGRAVED letters but no letter height or colour. Neither the County nor Malone specifies letter height, colour, or material of its own.

Where they go 48%

Conditional on utility (q22). WFEC requires no labels anywhere. FPL, if applicable, places labels at the meter can and DER disconnect switch.

What the utility wants on top 50%

Conditional on utility (q22). If WFEC: yes, and it is effectively the entire placard answer for that half of any split, because WFEC's Member-Owned Generation agreement is the only document specifying anything about the interconnection at all (disconnect, insurance, certifications) even though it specifies zero placards.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Required placards
Building Services - Jackson County, Florida Skip to Content Jackson County Florida FOR Initiative About Employment Opportunities Financials Public Records Requests Permitting & Code Compliance Alert Jackson 2025 ANNUAL REPORT Government Jackson County Commissioners District Map County Jurisdiction Map Boards & Committees Staff Directory Organization Chart Public Notices Meeting Agendas Meeting Min
Separate roof inspection
Building Services - Jackson County, Florida Skip to Content Jackson County Florida FOR Initiative About Employment Opportunities Financials Public Records Requests Permitting & Code Compliance Alert Jackson 2025 ANNUAL REPORT Government Jackson County Commissioners District Map County Jurisdiction M
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
Town
County
Jackson County
Regions covered
Authority Contact
Building Department
Direct Phone
(850) 482-9633
Booking & Scheduling