Town of Noma

Holmes County · Florida ← All authorities

Town of Noma

Holmes County

Verified Aug. 5, 2026

Town of Noma is a town authority in the State of Florida, serving 208 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Noma against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Noma is not the permitting authority for residential solar here 92% confidence
Holds
One narrow, retained step: a town-issued 'Letter of Compliance' before Holmes County will issue a building permit for construction within Noma's corporate limits, per the county's own Residential Construction Requirements checklist ('If constructing within city limits a letter is required from them for city compliance... Noma: 850-263-3449') and the matching 'Letter of Compliance (if in the City Limits)' line on the county's office-use Residential Construction Checklist. Beyond that letter, Noma holds nothing relevant to residential rooftop PV of its own: no building official, no plans examiner, no inspector, no permits, no fee schedule, and no adopted construction codes of its own -- its current Town Code (recodified May 2026) contains only a permissive fee-authorization clause (Sec. 5-1) that is not matched by any actual town intake process. It is genuinely unresolved from the documents in this run whether that letter, framed on the county's checklist as part of 'RESIDENTIAL CONSTRUCTION REQUIREMENTS -- NEW HOUSES & ADDITIONS', extends to a pure electrical/PV retrofit on an existing dwelling filed via the county's separate, simpler Trade Permit Application (RESIDENTIAL / EXISTING BUILDING checkboxes, no city-letter line item on that form) -- flagged rather than assumed either way.
Delegated to
Holmes County. Holmes County Building Department (Building Official Keith Bennett, 107 E. Virginia Ave, Bonifay FL 32425, 850-547-1119, hcbd@holmescountyfl.org) issues all building, electrical, mechanical, plumbing, gas and roofing permits and performs all inspections inside Noma's corporate limits, under the county's Unified Land Development Code (2009) Sec. 1.02.01, which names Noma by name ('the provisions of this Code shall apply to all development within the unincorporated areas of Holmes County and the corporate limits of the Towns of Esto, Noma, Ponce de Leon, and Westville'), and under County Ordinance 23-01 (21 Feb 2023), which adopts the Florida Building Code 'including all updates or amendments... for use in Holmes County, Florida'. Noma is one of four towns named this way in the LDC; Bonifay (the county seat) is notably NOT in that four-town list, and the department's own FAQ page is separately captioned 'HOLMES COUNTY/BONIFAY PLANNING FAQs' -- suggesting Bonifay's relationship with the county on land-use matters differs from Esto/Noma/Ponce de Leon/Westville's, even though Bonifay shares the same County Building Department for construction permitting.
Overridden by
The Florida Building Code, 8th Edition (2023) -- confirmed as currently in effect from the county's own dated (08/2026) permit application form, which states 'Code in effect 8th Edition Florida ___ Code' -- and, per the state's general home-rule and building-code-preemption framework, the Florida Electrical Code (NFPA 70, 2020 edition) and Florida Fire Prevention Code (NFPA 1, 2021 edition / 8th edition FFPC), both in force statewide since 31 December 2023 per UpCodes' Florida jurisdiction table (the state's own rule text at flrules.org could not be reached in this run -- see the confidence notes on Q29/Q31). Holmes County's own FAQ states that one- and two-family dwellings (R-3, which covers a typical rooftop PV host) are carved OUT of the Fire Prevention Code's plan-review/inspection requirement, which otherwise applies only to 'structures other than one- and two-family dwellings'. At utility level, West Florida Electric Cooperative's own Interconnection Agreement caps a member-owned generation system at 25 kW AC and sets its own hardware-listing (UL 1741/1703, IEEE 1547) and AC-disconnect-placement requirements, independent of anything the AHJ requires.
Why not higher
Proved in this run from four independent first-party sources, none inherited from any neighbouring county or town survey (Holmes County, Bonifay, Esto, Ponce de Leon or Westville were not consulted as prior work; this run started cold from floridabuilding.org, holmescountyfla.com, holmesclerk.com and nomafl.com). (1) The Florida Building Code Information System's own surcharge/local-enforcement jurisdiction registry was pulled directly from the ASP.NET __VIEWSTATE of its Jurisdiction Search dropdown (sc_org_srch.aspx), base64-decoded and enumerated: 370 registered organisations statewide (65 counties, 305 cities/towns). 'County of Holmes' is present; no Holmes County municipality of any kind (Noma, Bonifay, Esto, Ponce de Leon, Caryville, Vernon, Wausau, Chipley) appears at all -- with 'City of Alford' (Jackson County, ~500 residents) present as a positive control proving the registry does list tiny towns that run their own department, so the absence is not a size artefact. (2) Holmes County's own Building Department publishes a 'RESIDENTIAL CONSTRUCTION REQUIREMENTS' handout (image-only PDF, OCR'd with tesseract in this run since it carries no text layer) that names Noma verbatim -- 'If constructing within city limits a letter is required from them for city compliance... Noma: 850-263-3449' -- alongside Bonifay, Esto, Ponce De Leon and Westville, with a matching 'Letter of Compliance (if in the City Limits)' line on the intake checklist form four pages later in the same packet. This independently confirms, rather than merely repeats, the possibility flagged in the brief. (3) Holmes County's own Unified Land Development Code (2009), pulled and text-extracted in full, states its own applicability outright in Sec. 1.02.01: 'the provisions of this Code shall apply to all development within the unincorporated areas of Holmes County and the corporate limits of the Towns of Esto, Noma, Ponce de Leon, and Westville' -- repeated by name at nine further points in the document (tree protection, historic/archaeological review, signage, flood provisions) -- and states elsewhere that 'Application for a building permit shall be made to the County pursuant to this Code'. (4) Noma's own current Town Code, freshly recodified via Ordinance 2026-02 (adopted 4 May 2026, four months before this survey), was pulled directly from the Town's own live website (nomafl.com) and read in full: it has no Building Official, no building department, no adopted edition of the Florida Building Code, and its Planning chapter (Ch. 16) is entirely permissive ('The Town MAY coordinate planning and development activities with Holmes County') rather than establishing its own function. Separately, a full search of Municode's own client API (api.municode.com/Clients/stateId/9, all 416 Florida clients) confirms neither Holmes County nor any of its municipalities publish through Municode at all -- ruling out a missed codified ordinance on that platform, though it does mean Holmes County's building-code adoption ordinance (23-01) had to be sourced from the Clerk's own archived-ordinance PDF library instead of a codified library. Held at 92 rather than higher for three honest gaps, consistent with the same caveats the brief anticipated: first, no single document is captioned 'interlocal agreement' by name -- the finding is a convergence of four documents rather than one signed agreement, and this run could not reach Holmes County's official-records index (myfloridacounty.com/orisearch/30) to search directly for a recorded interlocal instrument, since it sits behind a session-token search form that could not be driven without a headless browser, which this brief forbids. Second, County Ordinance 23-01 itself (the Building Code adoption) says only 'for use in Holmes County, Florida' with no territorial clause naming the towns -- unlike the LDC, which is explicit -- so the building-code half of the delegation rests on the checklist/practice evidence in (2) rather than on adopting-ordinance text the way the land-use half does in (3). Third, Noma's own Sec. 5-1 ('Fees for permits required under the Florida Building Code shall be established by resolution of the Town Council') is a live tension this run did not resolve: it reads as boilerplate carried over in a wholesale May-2026 recodification rather than an operative provision (no matching fee resolution, building official, or intake process exists anywhere on the Town's own site), but it was not explicitly repealed either, and is reported here rather than smoothed over.

http://floridabuilding.org/sc/sc_org_srch.aspx

Permit required
Yes. Holmes County's own Building/Planning/Zoning FAQ states plainly, citing FBC 102.2: a building permit is needed to construct, enlarge, or make a change to a structure or system,92%
Permit cost
Effective through 30 September 2026: tiered by valuation under 'Building Permits' (e.g. $100 for the first $1,000, plus $8/thousand to $10,000; $252 plus $6/thousand from $10,001-$50,000;78%
Plan review
Up to seven (7) business days for plan review and permitting on a complete residential submittal (commercial: fourteen days or longer depending on complexity);88%
Portal
No dedicated online permitting portal was found. Applications are filed in person or by mail at the Building Department, 107 E.68%
Electrical code
2020 NEC (as the Florida Electrical Code 2020, based on NFPA 70-2020), in force statewide since 31 December 2023 as part of the 8th Edition (2023) Florida Building Code cycle,68%
Own placard wording
No. Neither Holmes County's LDC nor its Residential Building Packet, fee schedule, or Trade Permit Application specifies placard wording of its own for solar installations.70%
Booking an inspection
Phone or email. The county's own FAQ states: 'Inspection requests may be called in or emailed.'85%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. Holmes County's own Building/Planning/Zoning FAQ states plainly, citing FBC 102.2: a building permit is needed to construct, enlarge, Q3 Electrical and building permits — Either. Holmes County runs two parallel intake forms: a full 'APPLICATION FOR BUILDING PERMIT' (which lists 'Solar System' as a structure type and requires a… Q4 Plan review — Up to seven (7) business days for plan review and permitting on a complete residential submittal (commercial: fourteen days or longer depending on complexity); Q18 Where you file — No dedicated online permitting portal was found. Applications are filed in person or by mail at the Building Department, 107 E. Q20

Permit required
Yes. Holmes County's own Building/Planning/Zoning FAQ states plainly, citing FBC 102.2: a building permit is needed to construct, enlarge, or make a change to a structure or system,92% source
What it costs
Effective through 30 September 2026: tiered by valuation under 'Building Permits' (e.g. $100 for the first $1,000, plus $8/thousand to $10,000; $252 plus $6/thousand from $10,001-$50,000;78% source
Plan review turnaround
Up to seven (7) business days for plan review and permitting on a complete residential submittal (commercial: fourteen days or longer depending on complexity);88% source
Key document
county building permit application + trade permit application cited by 10 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? No. The Town of Noma is not the AHJ for residential solar. Holmes County Building Department (Building Official Keith Bennett, hcbd@holmescountyfl.org, 850-547-1119, 107 E. Virginia Ave, Bonifay FL 32425) issues all building, electrical, mechanical, plumbing and roofing permits and performs all inspections within Noma's corporate limits. Noma retains exactly one step of its own: the County's own Residential Construction Requirements checklist states 'If constructing within city limits a letter is required from them for city compliance' and lists a direct phone number for Noma (850-263-3449) alongside Bonifay, Esto, Ponce De Leon and Westville; the matching office-use Residential Construction Checklist carries a line item 'Letter of Compliance (if in the City Limits)'. 92% · county building department handout + county LDC + FBC surcharge registry
    • What does this authority permit itself, and what does it delegate? Delegated. Holmes County Building Department performs both Building and Electrical (plan review, permitting, inspection) for all development inside Noma's corporate limits, under authority of the county's own Land Development Code Sec. 1.02.01 (which names Noma by name) and County Ordinance 23-01 (adopting the Florida Building Code countywide). Noma itself retains only a single compliance-letter sign-off step ('Letter of Compliance (if in the City Limits)') before the County will issue the permit; Noma has no building official, no plans examiner and no inspector of its own. 90% · county trade-permit application + department roster
    • Is a permit required for a residential rooftop PV system? Yes. Holmes County's own Building/Planning/Zoning FAQ states plainly, citing FBC 102.2: a building permit is needed to construct, enlarge, or make a change to a structure or system, and the current 'APPLICATION FOR BUILDING PERMIT' form (Revised 08/2026) carries 'Solar System' as its own structure-type checkbox alongside Single Family, Duplex, Garage/Carport etc., with 'New / Addition / Alter/Repair / Other' as the work-type checkboxes -- a rooftop PV retrofit on an existing dwelling would be filed as Alter/Repair + Solar System on this same form. 92% · county building permit application form
    • Is there a separate electrical permit, or is it combined? Either. Holmes County runs two parallel intake forms: a full 'APPLICATION FOR BUILDING PERMIT' (which lists 'Solar System' as a structure type and requires a separate sub-permit for 'ELECTRICAL WORK... and etc.' per its own printed notice), and a standalone 'Trade Permit Application' that covers ELECTRIC alone (with utility checkboxes for WFEC/FPL/CHELCO) for either NEW CONSTRUCTION or EXISTING BUILDING. In practice a rooftop PV retrofit is likely filed as a Building Permit (Alter/Repair, Solar System) with an accompanying electrical sub-permit at $10 flat per the fee schedule's 'all sub-permits will be assessed a base fee of $10.00' line, rather than a bare stand-alone trade permit -- but the County's own forms do not make this distinction explicit for solar specifically. 65% · county building permit application + trade permit application
    • Is a HOA or architectural approval required first? No. Neither Holmes County's Land Development Code (2009) nor Noma's own recodified Town Code (adopted May 2026) contains an HOA-style architectural-review requirement of the county's or town's own; nothing in either document conditions a building or electrical permit on association or design-review approval. 78% · county LDC + town code, both control-checked
    • Is there a historic-district review? No standing historic-district review board found for either Holmes County or Noma. Holmes County's LDC has a Historical and Archeological Resources Protection chapter (Sec. 4.08.00) requiring a case-by-case determination of whether a PROPOSED DEVELOPMENT sits on a site listed on the Florida Master Site File or the County's own historical listing, with construction required to pause if resources are unearthed -- but this is a site-specific screening step tied to ground disturbance, not a standing design-review gate that would apply to a roof-mount PV retrofit on an existing dwelling. Neither document contains a Board of Architectural Review, Historic Preservation Commission, or local historic-district ordinance. 72% · county LDC Sec. 4.08.00, control-checked
    • Is a wind or windstorm certification required? No separate windstorm certification requirement found. Holmes County is not within Florida's High-Velocity Hurricane Zone (that designation is limited to Miami-Dade and Broward Counties); wind-load compliance is handled through the ordinary Florida Building Code product-approval system, and the county's own Trade Permit Application has a 'FL PRODUCT APPROVAL CODE' field on its Roof section for exactly this purpose. 68% · county trade permit application (product-approval field)
    • Is there a system-size cap on residential generation? The Holmes County LDC and Noma's Town Code are both silent on any residential PV system-size cap (zero hits for 'solar' or 'photovoltaic' in either document, against a 223-hit 'building' control in the LDC and a 126-hit 'town' control in the Noma code). The only size limit found anywhere in this survey is the UTILITY's: WFEC's Interconnection Agreement caps a member-owned generation system at 'no more than 25 kW of alternating current power output', and its published solar-energy rate note separately references systems 'smaller than 25 kW' for its 5.2 cents/kWh export credit. 82% · utility's own interconnection agreement (AHJ code is silent)
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either a licensed electrical contractor, or the homeowner acting as owner-builder under Ch. 489, Florida Statutes. The Trade Permit Application requires a 'CONTRACTOR NAME' and licensing is enforced through the county's own 'Certified Contractor Packet' (Contractor's Competency Card required); the county's own Disclosure Statement, bound into the Residential Building Packet, explains the Ch. 489 owner-builder exemption verbatim: an owner 'may act as your own contractor... You must provide direct, onsite supervision of the construction yourself.' 80% · county disclosure statement + certified contractor packet
    • Must the contractor be registered with this authority before applying? Yes for a licensed contractor pulling the permit under license. The county's 'Certified Contractor Packet' requires a Contractor's Competency Card Application and Contractor's Permit Authorization before a licensed contractor may pull permits in Holmes County. 82% · county certified-contractor packet
    • Is a homeowner permitted to self-install and self-permit? Yes. Holmes County's Disclosure Statement expressly permits an owner to act as their own contractor on a one- or two-family residence they occupy, under the Ch. 489, F.S. owner-builder exemption, with direct onsite supervision required and hiring of unlicensed labor prohibited. 80% · county disclosure statement
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Per the county's own 'RESIDENTIAL CONSTRUCTION REQUIREMENTS' checklist: Land Development Approval; 911 Address verification; Florida Energy Form (new construction); legal description/deed; two (2) sets of signed & sealed plans drawn to scale; elevation certificate if in a flood zone; notarized owner authorization if building on someone else's property; the city-compliance letter if inside Noma's limits; Notice of Commencement (work over $5,000); owner-builder disclosure if applicable; and, per the actual Building Permit Application form, a completed Trade Permit Application for each separate trade (electrical, etc.). 88% · county residential construction requirements checklist
    • How many copies, and in what format? Two (2) sets of signed & sealed plans, drawn to scale, submitted in person or by mail/email to the Building Department at 107 E. Virginia Ave, Bonifay; no separate electronic-only submittal portal was found. 78% · county residential construction requirements checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? No dedicated online permitting portal was found. Applications are filed in person or by mail at the Building Department, 107 E. Virginia Ave, Bonifay, or by phone (850-547-1119); inspection requests may be phoned in or emailed to hcbd@holmescountyfl.org. 68% · county department page (no portal link found)
    • Can the whole application be completed online? No. No portion of the application can be completed online; forms are downloaded as PDFs, filled out, signed/notarized where required, and submitted in person, by mail, or by email. 65% · county forms requiring wet signature/notarization
    • What does a residential solar permit cost? Effective through 30 September 2026: tiered by valuation under 'Building Permits' (e.g. $100 for the first $1,000, plus $8/thousand to $10,000; $252 plus $6/thousand from $10,001-$50,000; etc.), plus a Residential Electrical sub-permit fee (a flat $10 base sub-permit fee applies, per the schedule's 'all sub-permits will be assessed a base fee of $10.00' line, on top of the Building Permit valuation fee) plus a Residential Plan Review fee of the greater of $25 or 25% of the Building Permit fee -- plus the mandatory 3%-or-$4 state surcharge on every permit. Effective 1 October 2026, the county's own Building/Planning/Zoning page states the Residential Plan Review fee changes to a flat $300 (commercial $500) due at submittal, superseding the 25%/$25 figure above. 78% · county fee schedule + current department webpage notice
    • How is the fee calculated? Valuation (tiered building-permit fee scaled to declared job cost), plus a flat per-sub-permit fee and a percentage-of-permit plan-review fee. 82% · county fee schedule
    • Is there a separate plan-check fee? Yes. Residential plan review is a minimum of $25 or 25% of the Building Permit fee (current schedule), rising to a flat $300 effective 1 October 2026 per the department's own webpage notice. 85% · county fee schedule + department webpage notice
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? Up to seven (7) business days for plan review and permitting on a complete residential submittal (commercial: fourteen days or longer depending on complexity); a life-safety plan review, where it applies (structures other than one- and two-family dwellings), gets the full 30 days the Florida Building Code allows. 88% · county department FAQ page
    • How long is an issued permit valid before it expires? 180 days (6 months) without an approved inspection voids the permit; a one-time extension of up to 90 additional days may be requested. 90% · county residential construction requirements + department FAQ
    • Which utility handles interconnection here? West Florida Electric Cooperative (WFEC), a member-owned distribution cooperative headquartered in Graceville with a district office in Bonifay (805 St. Johns Rd). 85% · utility's own board-district boundary description
    • Where does the utility sit in the sequence? Parallel intake with a hard gate before energizing: the Member submits WFEC's Interconnection Application and Compliance Form (Section A-C) at any point, but Paragraph 2(e) of WFEC's Interconnection Agreement requires the member to furnish 'documentation showing the MOG has been inspected and approved by local code officials PRIOR to its operation' at least 10 business days before parallel operation begins, and the compliance form's own Section F requires the AHJ inspector to sign off ('1. Satisfies Code Requirements') before the WFEC representative signs off ('2. Satisfies Utility Requirements') on the same document. 82% · utility's own interconnection agreement

28 questions answered against Town of Noma’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

No. The Town of Noma is not the AHJ for residential solar. Holmes County Building Department (Building Official Keith Bennett, hcbd@holmescountyfl.org, 850-547-1119, 107 E. Virginia Ave, Bonifay FL 32425) issues all building, electrical, mechanical, plumbing and roofing permits and performs all inspections within Noma's corporate limits. Noma retains exactly one step of its own: the County's own Residential Construction Requirements checklist states 'If constructing within city limits a letter is required from them for city compliance' and lists a direct phone number for Noma (850-263-3449) alongside Bonifay, Esto, Ponce De Leon and Westville; the matching office-use Residential Construction Checklist carries a line item 'Letter of Compliance (if in the City Limits)'.

Why the confidence is not higherProved from four independent first-party sources in this run, not inherited from any neighbouring survey. (1) The Florida Building Code Information System's surcharge/local-enforcement jurisdiction registry (the dropdown embedded in sc_org_srch.aspx's ASP.NET __VIEWSTATE, decoded and enumerated in full: 370 entries, 65 'County of' + 305 city/town) lists 'County of Holmes' but no Noma, Bonifay, Esto, Ponce de Leon, Caryville, Vernon, Wausau or Chipley entry at all -- with 'City of Alford' (a ~500-person Jackson County town) present as a positive control proving small towns DO appear when they run their own department, and a fabricated term returning nothing. (2) The Holmes County Building Department's own RESIDENTIAL CONSTRUCTION REQUIREMENTS handout (an image-only scan, OCR'd with tesseract at 200dpi in this run since pdftotext returned zero text) names Noma verbatim in the city-compliance-letter list, and the matching intake checklist form on page 4 of the same packet repeats the line item. (3) The Holmes County Unified Land Development Code (2009) Sec. 1.02.01 General Applicability states verbatim: 'the provisions of this Code shall apply to all development within the unincorporated areas of Holmes County and the corporate limits of the Towns of Esto, Noma, Ponce de Leon, and Westville' -- and Sec. 10.06.01-equivalent permit-procedure text elsewhere in the Code states 'Application for a building permit shall be made to the County pursuant to this Code'. (4) Noma's own Town Code (recodified May 2026, the town's current governing document) has no Building Official, no Building Department, no adopted edition of the Florida Building Code, and its Planning chapter (16) only permissively says the Town 'may coordinate planning and development activities with Holmes County' -- structurally consistent with delegation rather than self-performance. Held at 92 rather than higher because no single document is captioned 'interlocal agreement' by name; the finding rests on four converging documents rather than one signed agreement, and Noma's own Sec. 5-1 ('Fees for permits required under the Florida Building Code shall be established by resolution of the Town Council') is boilerplate that is not matched by any actual town fee schedule, building official, or intake process -- flagged as an unresolved tension rather than smoothed over.

county building department handout + county LDC + FBC surcharge registry checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Delegated. Holmes County Building Department performs both Building and Electrical (plan review, permitting, inspection) for all development inside Noma's corporate limits, under authority of the county's own Land Development Code Sec. 1.02.01 (which names Noma by name) and County Ordinance 23-01 (adopting the Florida Building Code countywide). Noma itself retains only a single compliance-letter sign-off step ('Letter of Compliance (if in the City Limits)') before the County will issue the permit; Noma has no building official, no plans examiner and no inspector of its own.

Why the confidence is not higherSame four sources as Q1. The County Building Department page lists Building Official Keith Bennett and Permit Techs Shawna Lumpkin and Gracie Slay as the only staff, with no Noma counterpart named anywhere; the Trade Permit Application (inside the Residential Building Packet, revised 08/2026) is issued on Holmes County Building Department letterhead and covers Electric/Mechanical/Plumbing/Gas/Roof/Security for both RESIDENTIAL and COMMERCIAL, NEW CONSTRUCTION and EXISTING BUILDING alike -- there is no parallel Noma-issued form of any kind.

county trade-permit application + department roster checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. Holmes County's own Building/Planning/Zoning FAQ states plainly, citing FBC 102.2: a building permit is needed to construct, enlarge, or make a change to a structure or system, and the current 'APPLICATION FOR BUILDING PERMIT' form (Revised 08/2026) carries 'Solar System' as its own structure-type checkbox alongside Single Family, Duplex, Garage/Carport etc., with 'New / Addition / Alter/Repair / Other' as the work-type checkboxes -- a rooftop PV retrofit on an existing dwelling would be filed as Alter/Repair + Solar System on this same form.

Why the confidence is not higherRead directly off the county's own current permit application, OCR'd from the Residential Building Packet in this run (pdftotext returned no text layer; tesseract at 200dpi recovered it).

county building permit application form checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Either. Holmes County runs two parallel intake forms: a full 'APPLICATION FOR BUILDING PERMIT' (which lists 'Solar System' as a structure type and requires a separate sub-permit for 'ELECTRICAL WORK... and etc.' per its own printed notice), and a standalone 'Trade Permit Application' that covers ELECTRIC alone (with utility checkboxes for WFEC/FPL/CHELCO) for either NEW CONSTRUCTION or EXISTING BUILDING. In practice a rooftop PV retrofit is likely filed as a Building Permit (Alter/Repair, Solar System) with an accompanying electrical sub-permit at $10 flat per the fee schedule's 'all sub-permits will be assessed a base fee of $10.00' line, rather than a bare stand-alone trade permit -- but the County's own forms do not make this distinction explicit for solar specifically.

Why the confidence is not higherBoth forms found in the same packet and read directly; the ambiguity is real and is flagged rather than resolved, since neither form states which one governs a PV-only retrofit.

county building permit application + trade permit application checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either a licensed electrical contractor, or the homeowner acting as owner-builder under Ch. 489, Florida Statutes. The Trade Permit Application requires a 'CONTRACTOR NAME' and licensing is enforced through the county's own 'Certified Contractor Packet' (Contractor's Competency Card required); the county's own Disclosure Statement, bound into the Residential Building Packet, explains the Ch. 489 owner-builder exemption verbatim: an owner 'may act as your own contractor... You must provide direct, onsite supervision of the construction yourself.'

Why the confidence is not higherBoth routes read directly from the county's own current forms; the Disclosure Statement is the county's standard owner-builder notice required statewide under Ch. 489, not solar-specific.

county disclosure statement + certified contractor packet checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes for a licensed contractor pulling the permit under license. The county's 'Certified Contractor Packet' requires a Contractor's Competency Card Application and Contractor's Permit Authorization before a licensed contractor may pull permits in Holmes County.

Why the confidence is not higherRead from the county's own Certified Contractor Packet, downloaded and text-extracted in this run (this one carried a native text layer).

county certified-contractor packet checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/CERTIFIED-CONTRACTOR-PACKET-1.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. Holmes County's Disclosure Statement expressly permits an owner to act as their own contractor on a one- or two-family residence they occupy, under the Ch. 489, F.S. owner-builder exemption, with direct onsite supervision required and hiring of unlicensed labor prohibited.

Why the confidence is not higherCounty's own Disclosure Statement form, bound into the Residential Building Packet and read directly (OCR).

county disclosure statement checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q8 What documents make up a complete submittal? Core Submittal package

Per the county's own 'RESIDENTIAL CONSTRUCTION REQUIREMENTS' checklist: Land Development Approval; 911 Address verification; Florida Energy Form (new construction); legal description/deed; two (2) sets of signed & sealed plans drawn to scale; elevation certificate if in a flood zone; notarized owner authorization if building on someone else's property; the city-compliance letter if inside Noma's limits; Notice of Commencement (work over $5,000); owner-builder disclosure if applicable; and, per the actual Building Permit Application form, a completed Trade Permit Application for each separate trade (electrical, etc.).

Why the confidence is not higherFull checklist OCR'd from page 1 of the county's Residential Building Packet in this run; it is written for 'NEW HOUSES & ADDITIONS' and the county does not publish a solar-specific variant, so some items (elevation certificate, driveway permit) may not apply to a pure retrofit -- noted as an open question rather than assumed away.

county residential construction requirements checklist checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q9 How many copies, and in what format? Submittal package

Two (2) sets of signed & sealed plans, drawn to scale, submitted in person or by mail/email to the Building Department at 107 E. Virginia Ave, Bonifay; no separate electronic-only submittal portal was found.

Why the confidence is not higherCounty checklist states 'Two (2) sets of signed & sealed plans drawn to scale' verbatim; format (paper vs PDF) is not stated explicitly, so the paper-count figure is higher confidence than the format inference.

county residential construction requirements checklist checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

Nothing published by this authority.

Where we lookedSearched the full Residential Building Packet (18 pages, OCR'd), the Commercial Construction Packet (not text-extractable, image-only, OCR attempted), the fee schedule, and the Building/Planning/Zoning FAQ page for a dedicated 'site plan' requirement specific to a rooftop PV retrofit. The checklist requires 'Land Development Approval' and (for new construction) elevation and driveway-related items, but does not spell out what a site/plot plan for a roof-mount PV array must show.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedChecked the Residential Building Packet, Trade Permit Application and Certified Contractor Packet for a one-line/three-line diagram requirement; none of the county's published forms mention electrical diagrams by name, though 'two (2) sets of signed & sealed plans' is a general requirement that would presumably include one for an electrical scope.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame documents checked as Q11; no mention of string or conductor calculations anywhere in the county's public permitting material.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Nothing published by this authority.

Where we lookedNo PE-stamp threshold specific to structural work was found in the Residential Building Packet, fee schedule, or Holmes County LDR (2009); the packet requires plans to be 'signed & sealed' without stating at what valuation or scope a professional engineer (as opposed to an architect or the manufacturer's engineered truss package already required) must stamp them.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSame search as Q13; no electrical PE-stamp threshold found in any county document reviewed.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q15 What does a residential solar permit cost? Core Fees

Effective through 30 September 2026: tiered by valuation under 'Building Permits' (e.g. $100 for the first $1,000, plus $8/thousand to $10,000; $252 plus $6/thousand from $10,001-$50,000; etc.), plus a Residential Electrical sub-permit fee (a flat $10 base sub-permit fee applies, per the schedule's 'all sub-permits will be assessed a base fee of $10.00' line, on top of the Building Permit valuation fee) plus a Residential Plan Review fee of the greater of $25 or 25% of the Building Permit fee -- plus the mandatory 3%-or-$4 state surcharge on every permit. Effective 1 October 2026, the county's own Building/Planning/Zoning page states the Residential Plan Review fee changes to a flat $300 (commercial $500) due at submittal, superseding the 25%/$25 figure above.

Why the confidence is not higherThe dollar figures come directly from the county's own 'Construction Permit Fees' schedule, effective 08 Feb 2021, still the only published fee PDF; the pending 1 Oct 2026 plan-review change comes from a dated notice on the department's own current webpage. No fee line names 'solar' or 'photovoltaic' specifically, so the total for a given system is inferred from the general Building Permit valuation table rather than read off a dedicated solar line -- flagged as an inference, not a quoted solar price.

county fee schedule + current department webpage notice checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q16 How is the fee calculated? Core Fees

Valuation (tiered building-permit fee scaled to declared job cost), plus a flat per-sub-permit fee and a percentage-of-permit plan-review fee.

Why the confidence is not higherRead directly from the fee schedule's own tier table.

county fee schedule checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q17 Is there a separate plan-check fee? Fees

Yes. Residential plan review is a minimum of $25 or 25% of the Building Permit fee (current schedule), rising to a flat $300 effective 1 October 2026 per the department's own webpage notice.

Why the confidence is not higherBoth figures read directly from first-party county sources, one PDF and one current webpage.

county fee schedule + department webpage notice checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Up to seven (7) business days for plan review and permitting on a complete residential submittal (commercial: fourteen days or longer depending on complexity); a life-safety plan review, where it applies (structures other than one- and two-family dwellings), gets the full 30 days the Florida Building Code allows.

Why the confidence is not higherCounty's own Building/Planning/Zoning FAQ, read directly from the live page in this run.

county department FAQ page checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q19 How long is an issued permit valid before it expires? Timeline & validity

180 days (6 months) without an approved inspection voids the permit; a one-time extension of up to 90 additional days may be requested.

Why the confidence is not higherStated in both the county's Residential Building Packet ('Permit becomes void if no inspection is called for within six months') and the department's own FAQ page ('If 180 days elapse without an approved inspection, your permit expires. You can ask for an one-time extension for up to 90 additional days.').

county residential construction requirements + department FAQ checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q20 Which permit portal does this authority use? Core Portal & process

No dedicated online permitting portal was found. Applications are filed in person or by mail at the Building Department, 107 E. Virginia Ave, Bonifay, or by phone (850-547-1119); inspection requests may be phoned in or emailed to hcbd@holmescountyfl.org.

Why the confidence is not higherThe full Building/Planning/Zoning page and every linked PDF were reviewed for a portal link (Accela, SolarAPP+, eTRAKiT, CitizenServe, etc.); none was found, and every form directs applicants to the physical office, phone or email -- an absence, not a failed search, though it rests on this one department page and its linked documents rather than an exhaustive site crawl.

county department page (no portal link found) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q21 Can the whole application be completed online? Core Portal & process

No. No portion of the application can be completed online; forms are downloaded as PDFs, filled out, signed/notarized where required, and submitted in person, by mail, or by email.

Why the confidence is not higherConsistent with Q20's finding; the notarization requirement on several forms (Notice of Commencement, Disclosure Statement) further indicates a paper-based process.

county forms requiring wet signature/notarization checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q22 Which utility handles interconnection here? Core Utility interconnection

West Florida Electric Cooperative (WFEC), a member-owned distribution cooperative headquartered in Graceville with a district office in Bonifay (805 St. Johns Rd).

Why the confidence is not higherWFEC's own 'About Us' page states it serves 'Calhoun, Holmes, Jackson and Washington Counties'; its Board of Trustees districts page defines Districts 7, 8 and 9 as partitioning the ENTIRETY of Holmes County by road/river boundaries (District 7 east of SR79; District 8 between SR177/SR79 and the Choctawhatchee River; District 9 west of the Choctawhatchee River) with no gap -- meaning WFEC's own district map leaves no part of Holmes County, including Noma in the county's rural north, outside its territory. Noma's own recodified Town Code (Ch. 13, public-service utility tax) confirms electric service is sold and taxed within town limits but does not name the seller. Held below 90 because Holmes County's own Trade Permit Application form offers WFEC, FPL and CHELCO as three separate utility checkboxes (evidence that at least some parcels elsewhere in the county are served by one of the other two), and no document names Noma's utility in so many words.

utility's own board-district boundary description checked 2026-09-14 https://www.westflorida.coop/board-of-trustees

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel intake with a hard gate before energizing: the Member submits WFEC's Interconnection Application and Compliance Form (Section A-C) at any point, but Paragraph 2(e) of WFEC's Interconnection Agreement requires the member to furnish 'documentation showing the MOG has been inspected and approved by local code officials PRIOR to its operation' at least 10 business days before parallel operation begins, and the compliance form's own Section F requires the AHJ inspector to sign off ('1. Satisfies Code Requirements') before the WFEC representative signs off ('2. Satisfies Utility Requirements') on the same document.

Why the confidence is not higherRead directly from WFEC's own Interconnection Agreement (Revised 06/2021) and Interconnection Application/Compliance Form (Revised 08/2019), both current documents linked from WFEC's live Solar Energy page.

utility's own interconnection agreement checked 2026-09-14 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

No. Neither Holmes County's Land Development Code (2009) nor Noma's own recodified Town Code (adopted May 2026) contains an HOA-style architectural-review requirement of the county's or town's own; nothing in either document conditions a building or electrical permit on association or design-review approval.

Why the confidence is not higherFull-text search of both the Holmes County LDC (223 hits on 'building' as a positive control, 0 on the fabricated control 'zzqqx') and the complete current Noma Town Code (126 hits on 'town', 0 on 'zzqqx') for 'architectural review', 'design review', 'HOA' and 'homeowners association' returned zero hits in both documents. This does not rule out a private subdivision covenant, which neither the County nor the Town enforces (Holmes County's own Building Permit Application states outright: 'Holmes County Building Department does not have the authority to enforce deed restrictions or covenants on Properties.').

county LDC + town code, both control-checked checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q25 Is there a historic-district review? Overlays & special cases

No standing historic-district review board found for either Holmes County or Noma. Holmes County's LDC has a Historical and Archeological Resources Protection chapter (Sec. 4.08.00) requiring a case-by-case determination of whether a PROPOSED DEVELOPMENT sits on a site listed on the Florida Master Site File or the County's own historical listing, with construction required to pause if resources are unearthed -- but this is a site-specific screening step tied to ground disturbance, not a standing design-review gate that would apply to a roof-mount PV retrofit on an existing dwelling. Neither document contains a Board of Architectural Review, Historic Preservation Commission, or local historic-district ordinance.

Why the confidence is not higherChapter 4.08.00 read in full from the Holmes County LDC; the same control-checked full-text search described in Q24 (223 'building' hits vs 0 fabricated) also returned zero hits for 'historic district', 'board of architectural review' or 'historic preservation board' in both the County LDC and Noma's Town Code, so the code is silent on a standing review body rather than merely undocumented.

county LDC Sec. 4.08.00, control-checked checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

No separate windstorm certification requirement found. Holmes County is not within Florida's High-Velocity Hurricane Zone (that designation is limited to Miami-Dade and Broward Counties); wind-load compliance is handled through the ordinary Florida Building Code product-approval system, and the county's own Trade Permit Application has a 'FL PRODUCT APPROVAL CODE' field on its Roof section for exactly this purpose.

Why the confidence is not higherInferred from Holmes County's inland Panhandle location (outside the two HVHZ counties defined in the Florida Building Code) plus the product-approval field present on the county's own current roofing trade-permit form; no county document uses the term 'windstorm certification' at all, so this is a reasoned negative rather than a quoted one.

county trade permit application (product-approval field) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedChecked the Holmes County LDC's Special Use Permit and Vested Rights provisions and the county's Building/Planning/Zoning FAQ; neither mentions a Special Use Permit or County Commission approval step tied to residential rooftop solar specifically, and no document confirms a threshold (size, zoning district) that would trigger one for a typical residential PV retrofit inside Noma.

https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

The Holmes County LDC and Noma's Town Code are both silent on any residential PV system-size cap (zero hits for 'solar' or 'photovoltaic' in either document, against a 223-hit 'building' control in the LDC and a 126-hit 'town' control in the Noma code). The only size limit found anywhere in this survey is the UTILITY's: WFEC's Interconnection Agreement caps a member-owned generation system at 'no more than 25 kW of alternating current power output', and its published solar-energy rate note separately references systems 'smaller than 25 kW' for its 5.2 cents/kWh export credit.

Why the confidence is not higherAHJ silence confirmed by control-checked full-text search of both codes; the 25 kW AC figure is read directly from WFEC's own current (2025) Interconnection Agreement.

utility's own interconnection agreement (AHJ code is silent) checked 2026-09-14 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2020 NEC (as the Florida Electrical Code 2020, based on NFPA 70-2020), in force statewide since 31 December 2023 as part of the 8th Edition (2023) Florida Building Code cycle, with no end date yet set. 68% · secondary code-tracking source (primary FAC rule text blocked by Cloudflare; IA offline)
    • Which building code edition is in force? 8th Edition (2023) Florida Building Code, based on the 2021 International Building Code. 90% · county's own current building-permit application form
    • Which fire code edition is in force? 8th Edition (2023) Florida Fire Prevention Code, based on NFPA 1 (2021 edition), in force statewide since 31 December 2023. Critically, per the county's own FAQ, one- and two-family dwellings are largely carved OUT of the plan-review/inspection side of this code: 'All new structures OTHER THAN one- and two-family dwellings must comply with the Florida Fire Prevention Code and be reviewed and inspected accordingly... A life-safety plan review is required for all structures OTHER THAN one- and two-family dwellings subject to the Residential Building Code.' 65% · county FAQ (R-3 exemption) + secondary code-tracking source (edition number)
    • Are there local amendments to any of the above? No local amendments found for the Building Code. Holmes County Ordinance 23-01 (adopted 21 Feb 2023) reads in full: 'The Florida Building Code, including all updates or amendments, is hereby adopted for use in Holmes County, Florida' -- a blanket adoption of the statewide code with no locally-added sections, wind-speed lines, or technical amendments of its own. 82% · county's own adopting ordinance, read in full
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Town of Noma on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Rapid shutdown is a National-Electrical-Code requirement (NEC 690.12) that applies by operation of the statewide-adopted 2020 NEC, but no Holmes County document specifically references '690.12' or 'rapid shutdown' by name -- the county's own material states only that installations must meet 'the current National Electrical Code' without elaboration, and WFEC's own interconnection compliance form cites IEEE 929 and the 'current National Electric Code' generally rather than NEC 690.12 specifically. 55% · inference from statewide NEC adoption; no local document names 690.12
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Does the authority specify placard wording of its own? No. Neither Holmes County's LDC nor its Residential Building Packet, fee schedule, or Trade Permit Application specifies placard wording of its own for solar installations. 70% · county LDC, control-checked absence
    • Does the UTILITY specify placards beyond the AHJ's? No placard specification beyond the baseline UL/IEEE hardware-compliance language on WFEC's own Interconnection Application and Compliance Form ('the system hardware is in compliance with... UL 1741... UL 1703... IEEE 1262-1995' and 'installed in compliance with IEEE Standard 929... and the current National Electric Code'); WFEC's form does specify where the AC disconnect must be located (see Q48) but does not prescribe placard wording, colour, or letter height of its own. 72% · utility's own interconnection compliance form
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? The manual AC disconnect must be mounted SEPARATE from the meter socket, must be readily accessible to the utility, and must be capable of being locked in the open position with a utility padlock. 88% · utility's own interconnection agreement, verbatim
    • Must equipment be on a specific approved list? Yes, at hardware-compliance level via the utility. WFEC's Interconnection Application and Compliance Form requires certification that 'the system hardware is in compliance with Underwriters Laboratories (UL) 1741... and UL 1703... and IEEE 1262-1995', and its companion Interconnection Agreement additionally requires certification to IEEE-1547 (2003) and IEEE-1547.1 (2005) before the MOG may operate in parallel with the grid. No Holmes County AHJ document states an equipment-listing requirement of its own beyond general NEC/FBC listed-equipment practice. 78% · utility's own interconnection documents
    • Is a ground mount treated as a structure? Likely yes, though not stated in solar-specific terms. The county's own current Building Permit Application lists 'Solar System' as a distinct structure-type checkbox in the same list as 'Storage/Pole Barn', 'Garage/Carport' and 'Swimming Pool' -- all of which are treated as structures requiring a Building Permit -- but the form does not distinguish a roof-mounted array from a ground-mounted one, so whether a ground mount specifically is reviewed as a 'structure' (setbacks, footings, wind load as a freestanding structure) rather than as an accessory to the dwelling is not stated outright. 58% · inference from county building-permit application layout

20 questions answered against Town of Noma’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2020 NEC (as the Florida Electrical Code 2020, based on NFPA 70-2020), in force statewide since 31 December 2023 as part of the 8th Edition (2023) Florida Building Code cycle, with no end date yet set.

Why the confidence is not higherThe primary Florida Administrative Code source (flrules.org, rule 61G20/69A-60 series) returned a Cloudflare interactive challenge to every fetch attempted in this run, and the Internet Archive's CDX and Wayback services were themselves reporting 'temporarily offline' at the time of this run, so neither could be used as the primary citation. This is instead read from UpCodes' own Florida jurisdiction code table, which lists 'NFPA 70, 2020' / 'Florida Electrical Code 2020' with effectiveStartDate 2023-12-31 and no effectiveEndDate (i.e., still current) -- a reliable secondary code-tracking source, not the state's own rule text, and no Holmes-County-specific document was found naming an NEC edition at all (the county's own Residential Building Packet says only 'Electrical requirements are from the National Electrical Code' without a year).

secondary code-tracking source (primary FAC rule text blocked by Cloudflare; IA offline) checked 2026-09-14 https://up.codes/codes/florida

Q30 Which building code edition is in force? Core Code editions in force

8th Edition (2023) Florida Building Code, based on the 2021 International Building Code.

Why the confidence is not higherThe county's own current 'APPLICATION FOR BUILDING PERMIT' form (Revised 08/2026, OCR'd in this run) states outright 'Code in effect 8th Edition Florida ___ Code' at the top of the form; independently corroborated by UpCodes' Florida jurisdiction listing, which titles the current building code '2023 FBC - Building, 8th edition based on the International Building Code 2021 (IBC 2021)'.

county's own current building-permit application form checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q31 Which fire code edition is in force? Code editions in force

8th Edition (2023) Florida Fire Prevention Code, based on NFPA 1 (2021 edition), in force statewide since 31 December 2023. Critically, per the county's own FAQ, one- and two-family dwellings are largely carved OUT of the plan-review/inspection side of this code: 'All new structures OTHER THAN one- and two-family dwellings must comply with the Florida Fire Prevention Code and be reviewed and inspected accordingly... A life-safety plan review is required for all structures OTHER THAN one- and two-family dwellings subject to the Residential Building Code.'

Why the confidence is not higherThe R-3 carve-out sentence is read directly from the county's own live FAQ page, high confidence. The specific '8th Edition / NFPA 1 2021' edition figure itself again rests on UpCodes' secondary jurisdiction table rather than the state's own rule text, for the same Cloudflare/Internet-Archive-outage reason given in Q29; no Holmes-County-specific fire-code adoption ordinance was found in the Clerk's own archived ordinance list (only Ordinance 23-01, which adopts the Building Code, not a separate fire code, and Ordinance 18-01, which only creates a fire-services MSBU for unincorporated areas).

county FAQ (R-3 exemption) + secondary code-tracking source (edition number) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q32 Are there local amendments to any of the above? Core Code editions in force

No local amendments found for the Building Code. Holmes County Ordinance 23-01 (adopted 21 Feb 2023) reads in full: 'The Florida Building Code, including all updates or amendments, is hereby adopted for use in Holmes County, Florida' -- a blanket adoption of the statewide code with no locally-added sections, wind-speed lines, or technical amendments of its own.

Why the confidence is not higherOrdinance 23-01 downloaded from the Clerk's own archived-ordinances page and read in full (4 short operative sections); no companion amendment ordinance was found in the Clerk's complete list back to 1990.

county's own adopting ordinance, read in full checked 2026-09-14 https://holmesclerk.com/uploads/2025/08/ordinance-23-01_tagged.pdf

Q33 What is the installation judged against? Core Electrical

Nothing published by this authority.

Where we lookedThis overlaps heavily with Q29-32 (edition + amendments); the county's own documents state only that 'Electrical requirements are from the National Electrical Code' and that construction is judged against 'the current Florida Building Codes' without a more specific standard for PV equipment (e.g. UL 1703/1741) being named at AHJ level -- those UL standards appear only in the UTILITY's interconnection compliance form (WFEC), not in a county document.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedNo service-upgrade or busbar-sizing rule specific to Holmes County was found in the Residential Building Packet, Trade Permit Application, fee schedule, or LDC; the Trade Permit form has a 'SERVICE CHANGE AMPS' checkbox but no accompanying technical standard is published.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedNo mounting-system or attachment-spacing specification was found in any Holmes County document reviewed (Residential Building Packet, LDC, fee schedule); 'Solar System' appears only as a permit-application checkbox with no attached technical standard.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedChecked the Holmes County LDC in full (no 'solar' or 'photovoltaic' hits, control-checked) and the county's fire-code FAQ text, which exempts one- and two-family dwellings from Fire Prevention Code plan review; no ridge-setback or roof-access-pathway figure specific to PV was found in any Holmes County document, and the underlying Florida Fire Prevention Code (NFPA 1, 2021) text itself could not be reached (flrules.org Cloudflare-blocked; Internet Archive offline during this run).

https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Rapid shutdown is a National-Electrical-Code requirement (NEC 690.12) that applies by operation of the statewide-adopted 2020 NEC, but no Holmes County document specifically references '690.12' or 'rapid shutdown' by name -- the county's own material states only that installations must meet 'the current National Electrical Code' without elaboration, and WFEC's own interconnection compliance form cites IEEE 929 and the 'current National Electric Code' generally rather than NEC 690.12 specifically.

Why the confidence is not higherFull-text search of the Residential Building Packet, fee schedule, and WFEC's MOG Agreement and Interconnection Application for '690.12' and 'rapid shutdown' returned zero hits in all three; this is recorded as an inference from the general statewide NEC adoption (Q29) rather than a locally-stated rule, and the edition figure itself carries the same sourcing caveat as Q29.

inference from statewide NEC adoption; no local document names 690.12 checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo placard specification of any kind (AHJ or utility) beyond the baseline NEC/UL labeling implied by 'current National Electrical Code' compliance was found in any Holmes County or WFEC document reviewed in this run.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. Neither Holmes County's LDC nor its Residential Building Packet, fee schedule, or Trade Permit Application specifies placard wording of its own for solar installations.

Why the confidence is not higherControl-checked absence: the same full-text passes described in Q24/Q36 (zero 'solar'/'photovoltaic' hits against a 223-hit 'building' positive control) cover this question too.

county LDC, control-checked absence checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedFollows from Q39 -- no placard exists to specify letter height, colour or material for.

https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo Holmes-County-specific site-plan/facility-map placard requirement beyond the baseline NEC 705.10 was found in any document reviewed.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

No placard specification beyond the baseline UL/IEEE hardware-compliance language on WFEC's own Interconnection Application and Compliance Form ('the system hardware is in compliance with... UL 1741... UL 1703... IEEE 1262-1995' and 'installed in compliance with IEEE Standard 929... and the current National Electric Code'); WFEC's form does specify where the AC disconnect must be located (see Q48) but does not prescribe placard wording, colour, or letter height of its own.

Why the confidence is not higherRead directly from WFEC's own current (2019-revised) Interconnection Application and Compliance Form.

utility's own interconnection compliance form checked 2026-09-14 https://www.westflorida.coop/content/393/Interconnection%20App%20compliance%20form%202025_docx.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo label-placement rule beyond the AC-disconnect location requirement in Q48 was found in any Holmes County or WFEC document reviewed.

https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Yes, at hardware-compliance level via the utility. WFEC's Interconnection Application and Compliance Form requires certification that 'the system hardware is in compliance with Underwriters Laboratories (UL) 1741... and UL 1703... and IEEE 1262-1995', and its companion Interconnection Agreement additionally requires certification to IEEE-1547 (2003) and IEEE-1547.1 (2005) before the MOG may operate in parallel with the grid. No Holmes County AHJ document states an equipment-listing requirement of its own beyond general NEC/FBC listed-equipment practice.

Why the confidence is not higherRead directly from WFEC's current Interconnection Agreement (Revised 06/2021) and Compliance Form (Revised 08/2019).

utility's own interconnection documents checked 2026-09-14 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedNo battery/ESS-specific permitting rule was found in Holmes County's LDC, Residential Building Packet, Trade Permit Application, or fee schedule (all control-checked for 'solar'/'photovoltaic' with zero hits, and separately checked for 'battery'/'energy storage' with zero hits); WFEC's Interconnection Application has a 'Batteries' field under system description but no separate ESS permitting or fire-review process is described anywhere in the documents reviewed.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedFollows from Q45 -- no ESS-specific permit or inspection step was found described anywhere in the Holmes County or WFEC material reviewed.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Likely yes, though not stated in solar-specific terms. The county's own current Building Permit Application lists 'Solar System' as a distinct structure-type checkbox in the same list as 'Storage/Pole Barn', 'Garage/Carport' and 'Swimming Pool' -- all of which are treated as structures requiring a Building Permit -- but the form does not distinguish a roof-mounted array from a ground-mounted one, so whether a ground mount specifically is reviewed as a 'structure' (setbacks, footings, wind load as a freestanding structure) rather than as an accessory to the dwelling is not stated outright.

Why the confidence is not higherInferred from the layout of the county's own current permit application form; no document was found that addresses ground-mount PV arrays as a distinct category from roof-mount.

inference from county building-permit application layout checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

The manual AC disconnect must be mounted SEPARATE from the meter socket, must be readily accessible to the utility, and must be capable of being locked in the open position with a utility padlock.

Why the confidence is not higherRead verbatim from WFEC's own current Interconnection Agreement (Revised 06/2021), Paragraph 3(a): 'Install a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the MOG and any Member wiring connected to Cooperative's system. The manual disconnect switch shall be mounted separate from the meter socket and shall be readily accessible to Cooperative and capable of being locked in the open position with a utility padlock.'

utility's own interconnection agreement, verbatim checked 2026-09-14 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone or email. The county's own FAQ states: 'Inspection requests may be called in or emailed.' 85% · county department FAQ
    • How much notice is required? Effectively one business day: requests called in or emailed 'must be in before 2 p.m. to be scheduled for the next business day' per the county's own FAQ. 85% · county department FAQ
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes, self-performed. Holmes County Building Department performs its own inspections; no delegation to a third-party firm, the fire district, or another agency was found anywhere in this run. 85% · county department page + FAQ
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? For a typical residential job the county's own checklist lists (in the order printed, not necessarily the mandatory sequence for every job type): Footings (Dig and Pour); Pre-Treat for Termites; Temporary Construction Pole; Install Doors/Windows; Sheathing (Nailing); Dry-In (Rough-In Electrical, Rough-In Mechanical/HVAC, Framing, Plumbing Stack-Out); Plumbing Rough-In; Insulation; Utilities Turned On; Final Inspection -- plus a 'Call Back' step for Plumbing/Electrical/Heating-Cooling contractors before Final. A rooftop PV-only retrofit would realistically only trigger a subset of these (Rough-In Electrical and/or Sheathing if roof penetrations are involved, then Final), but the county publishes no PV-specific sequence. 68% · county residential construction checklist
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, in the general sense: the county publishes a 'RESIDENTIAL CONSTRUCTION CHECKLIST' used for office intake and tracked through to final inspection, and the 'Building Department Fee Schedule' plus the four permit packets (Residential, Commercial, Mobile Home, Certified Contractor) function as its published requirement lists. No inspection checklist specific to solar/PV exists. 65% · county's general residential construction checklist (no PV-specific version)
    • What must be on site at inspection? A recorded Notice of Commencement (for work valued over $5,000) must be posted at the jobsite before the first inspection can be performed, per the form's own printed notice: 'A certified copy of the Notice of Commencement must be provided to Building Department and posted on the jobsite before the first inspection can be performed.' No other on-site document requirement (e.g., a general permit card) is stated in the material reviewed, though Florida practice generally expects the approved permit to be available on site. 70% · county building permit application, verbatim
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? A passed Final Inspection closes the permit; no document describes a separate Certificate of Occupancy being issued for an alteration/retrofit permit on an already-occupied existing dwelling (as opposed to new construction), and no 'green tag' or letter-based sign-off system was found described anywhere in the county's material. 62% · inference from county checklist's final-inspection stage
    • Who notifies the utility for PTO? The installer/member, functionally: WFEC's own process requires the Member to submit the completed Interconnection Application and Compliance Form (with the AHJ's Section F(1) code-compliance sign-off already obtained) to the Cooperative, which then evaluates and signs Section F(2) itself within 10 business days if approved -- i.e., the applicant/installer initiates and carries the paperwork to the utility rather than the utility or the AHJ doing so automatically. 68% · inference from utility's own interconnection agreement workflow

14 questions answered against Town of Noma’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone or email. The county's own FAQ states: 'Inspection requests may be called in or emailed.'

Why the confidence is not higherRead directly from the live Building/Planning/Zoning FAQ page.

county department FAQ checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q50 How much notice is required? Core Booking & scheduling

Effectively one business day: requests called in or emailed 'must be in before 2 p.m. to be scheduled for the next business day' per the county's own FAQ.

Why the confidence is not higherSame FAQ page, read directly.

county department FAQ checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedNo mention of same-day or AM/PM inspection windows was found on the department's FAQ page or in any of the county's published packets; the Residential Construction Checklist lists inspection days as 'Mondays + Thursdays' but does not state a time-window system.

https://holmescountyfla.com/building-planning-zoning/

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes, self-performed. Holmes County Building Department performs its own inspections; no delegation to a third-party firm, the fire district, or another agency was found anywhere in this run.

Why the confidence is not higherConsistent with the roster on the department's own page (Building Official + two Permit Techs, no outside firm named) and the FAQ's description of the inspection-request process going directly to this department.

county department page + FAQ checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q53 If delegated, to whom? Core Who inspects

Nothing published by this authority.

Where we lookedNot applicable given the 'No/self-performed' finding at Q52, but included here since the question is CORE: no delegation was found to record a delegate for.

https://holmescountyfla.com/building-planning-zoning/

Q54 Which inspections are required, and in what order? Core Stages & sequence

For a typical residential job the county's own checklist lists (in the order printed, not necessarily the mandatory sequence for every job type): Footings (Dig and Pour); Pre-Treat for Termites; Temporary Construction Pole; Install Doors/Windows; Sheathing (Nailing); Dry-In (Rough-In Electrical, Rough-In Mechanical/HVAC, Framing, Plumbing Stack-Out); Plumbing Rough-In; Insulation; Utilities Turned On; Final Inspection -- plus a 'Call Back' step for Plumbing/Electrical/Heating-Cooling contractors before Final. A rooftop PV-only retrofit would realistically only trigger a subset of these (Rough-In Electrical and/or Sheathing if roof penetrations are involved, then Final), but the county publishes no PV-specific sequence.

Why the confidence is not higherFull stage list read directly (OCR) from the county's own Residential Construction Checklist; the PV-specific subset is this run's inference, not a quoted county statement, and is flagged as such.

county residential construction checklist checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedNo PV-specific statement on whether a rough-in or mid-roof inspection is mandatory was found; the general checklist includes 'Sheathing (Nailing)' and 'Dry-In' stages that would apply to roof-penetrating racking, but the county does not say whether these are triggered for an existing-roof PV retrofit specifically.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNo document states the inspector's checklist for a solar inspection specifically (label/listing verification); the county publishes no PV-specific inspection checklist at all.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q57 Is there a published inspection checklist? Core What is checked

Yes, in the general sense: the county publishes a 'RESIDENTIAL CONSTRUCTION CHECKLIST' used for office intake and tracked through to final inspection, and the 'Building Department Fee Schedule' plus the four permit packets (Residential, Commercial, Mobile Home, Certified Contractor) function as its published requirement lists. No inspection checklist specific to solar/PV exists.

Why the confidence is not higherBased on the complete set of the county's own published packets and forms reviewed in this run; none is titled or scoped as a dedicated solar inspection checklist.

county's general residential construction checklist (no PV-specific version) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q58 What must be on site at inspection? Core Documents on site

A recorded Notice of Commencement (for work valued over $5,000) must be posted at the jobsite before the first inspection can be performed, per the form's own printed notice: 'A certified copy of the Notice of Commencement must be provided to Building Department and posted on the jobsite before the first inspection can be performed.' No other on-site document requirement (e.g., a general permit card) is stated in the material reviewed, though Florida practice generally expects the approved permit to be available on site.

Why the confidence is not higherNotice-of-Commencement posting requirement read verbatim from the county's own current Building Permit Application (page 2 of 2, Revised 08/2026).

county building permit application, verbatim checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

Nothing published by this authority.

Where we lookedThe county's own fee schedule has no line item for a re-inspection fee; its closing clause states 'Other fees not specifically addressed in this schedule shall be assigned by the Building Official with direction from the Chairman or Director', which leaves the amount, if any, to Building Official discretion rather than a published figure.

https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedNo document describes how corrections are issued to an applicant or how they are cleared (written notice, re-inspection request, etc.); only the general 24-hour-notice-for-inspection and phone/email booking process (Q49-50) was found.

https://holmescountyfla.com/building-planning-zoning/

Q61 What is issued on pass? Core Final sign-off & PTO

A passed Final Inspection closes the permit; no document describes a separate Certificate of Occupancy being issued for an alteration/retrofit permit on an already-occupied existing dwelling (as opposed to new construction), and no 'green tag' or letter-based sign-off system was found described anywhere in the county's material.

Why the confidence is not higherInferred from the checklist's own final stage being labelled simply 'Final Inspection' with no accompanying CO language for alteration work; the county's forms do reference a Certificate of Occupancy process for NEW construction generally but do not distinguish a retrofit permit's closeout document explicitly.

inference from county checklist's final-inspection stage checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

The installer/member, functionally: WFEC's own process requires the Member to submit the completed Interconnection Application and Compliance Form (with the AHJ's Section F(1) code-compliance sign-off already obtained) to the Cooperative, which then evaluates and signs Section F(2) itself within 10 business days if approved -- i.e., the applicant/installer initiates and carries the paperwork to the utility rather than the utility or the AHJ doing so automatically.

Why the confidence is not higherInferred from the document flow described in WFEC's own Interconnection Agreement Paragraph 8 ('The Member shall complete Sections A, B and C of Exhibit 1... and submit it with this signed Agreement... Cooperative shall evaluate the completed Exhibit 1, and shall approve or disapprove the Application within ten (10) business days') and the Compliance Form's own Section F sign-off sequence; no document uses the word 'PTO' or states the notification step in so many words.

inference from utility's own interconnection agreement workflow checked 2026-09-14 https://www.westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 70%

No. Neither Holmes County's LDC nor its Residential Building Packet, fee schedule, or Trade Permit Application specifies placard wording of its own for solar installations.

Size, colour & material None%

Where they go None%

What the utility wants on top 72%

No placard specification beyond the baseline UL/IEEE hardware-compliance language on WFEC's own Interconnection Application and Compliance Form ('the system hardware is in compliance with... UL 1741... UL 1703... IEEE 1262-1995' and 'installed in compliance with IEEE Standard 929... and the current National Electric Code'); WFEC's form does specify where the AC disconnect must be located (see Q48) but does not prescribe placard wording, colour, or letter height of its own.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Separate roof inspection
All new Single-Family Dwellings require Florida energy forms at the time of application. All TEMP power poles require ONE ground rod and TWO separate GFIs. All other power poles require TWO ground rods. BUILDING PERMIT APPLICATIONS + FORMS BUILDING PERMIT APPLICATIONS + FORMS Building Department Fee
Separate fire inspection
An approved floating alarm apparatus. Every window and door leading to the pool must be equipped with an approved alarm. The Department of Health website also has valuable information. When is a fire safety review or fire inspection required? All new structures other than one- and two-family dwellin
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
Town
County
Holmes County
Regions covered
Authority Contact
Building Department
Direct Phone
850-547-1119
Booking & Scheduling