Town of Ocean Ridge

Palm Beach County · Florida ← All authorities

Town of Ocean Ridge

Palm Beach County

Verified Aug. 5, 2026

Town of Ocean Ridge is a town authority in the State of Florida, serving 1,830 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Ocean Ridge against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Ocean Ridge is the authority having jurisdiction 95% confidence
Holds
building, electrical, plumbing, mechanical, and zoning/planning permitting and inspection for residential solar -- performed by the Town under a paid professional-services contract with Hy-Byrd Building Inspections, LLC (Building Official duties $75/hr, field inspections $50/each, plan review, zoning review, code enforcement, permit clerk services), not by town-employed inspectors. The Town's only in-house Building-department FTE is a Building Clerk (Lindsay Winters); the FY26 adopted budget's 'INSPECTIONS' department (GL 524.108) carries $60,938 in regular salary (the one Building Clerk) against $386,900 of 'PROFESSIONAL SERVICES' -- a ratio that is itself the budget fingerprint for this shape. Town of Ocean Ridge is independently listed on floridabuilding.org's 392-entry statewide register of local governments that actually issue building permits (option value 3189), confirming the Town -- not Palm Beach County -- is the AHJ of record.
Overridden by
Fire prevention/fire code enforcement is delegated to the City of Boynton Beach (Fire Rescue Station 5) -- named repeatedly in the Town's own permitting guidance as requiring separate approval for gas lines/tanks and gated multifamily work. Potable-water/utility plan approval requires Boynton Beach Utilities. Septic permitting requires the Palm Beach County Health Department. None of these three reach building or electrical, which the Town retains.
Why not higher
Three independent town-side sources agree: (1) floridabuilding.org's statewide register lists 'Town of Ocean Ridge' as an issuing local government in its own right; (2) the Town's current Fee Schedule PDF has, as its own page 4, a printed 'Professional Building Services Proposal' from Hy-Byrd Building Inspections, LLC addressed to the Town of Ocean Ridge, naming Building Official duties, field inspections, plan review, zoning review and code enforcement as contracted services with an explicit hourly rate card; (3) the adopted FY26 budget's staffing table lists exactly one Building-department FTE (a Building Clerk) against a $386,900 'Professional Services' line in the same department -- the two facts corroborate each other independently. This is the same shape and even the same named contractor (Hy-Byrd Building Inspections, LLC, 631 Lucerne Ave, Lake Worth Beach FL) previously confirmed for the Town of Hypoluxo in this survey, showing Hy-Byrd operates as a shared building-department-as-a-service vendor across multiple small Palm Beach County towns. Not scored higher because the Town's own Utilization Reports page promises an FS 553.80(7) annual report that does not actually exist in the document center behind it (proved by enumeration -- see extra_findings), so the one FS-mandated public accounting of this arrangement could not be checked, and because the Town's Building Official (Mike Crisafulle, named on the website) was not independently confirmed as a Hy-Byrd employee beyond the staffing-table inference.

https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Permit required
YES88%
Permit cost
Valuation-based: $150 plus 2.5% of the estimated job cost between $3,000 and $100,000 (2% above $100,000),85%
Plan review
'Permit processing timeframe may be from 2 weeks to 30 days' per the Town's own General Permitting Info sheet -- consistent with FS 553.792(1)(a)'s 30-business-day limb for a structure…80%
Portal
BS&A Online (bsaonline.com) -- the Town's own permit and inspection-request portal. (Fee/utility-bill payments route through a separate Point & Pay link, client.pointandpay.net,95%
Electrical code
NEC 2020 (as referenced within the Florida Building Code, 8th Edition (2023) cycle, currently in force statewide) -- inferred from Florida's statewide adoption cycle,45%
Booking an inspection
Portal -- 'ALL INSPECTIONS ARE TO BE REQUESTED THROUGH OUR ONLINE PORTAL', BS&A Online.90%
Permitting 5 steps · 28 questions

Whether a permit is needed — YES Q3 Electrical and building permits — Combined -- electrical for a rooftop PV job is filed as a linked electrical sub-permit under the same Universal County-Wide/Municipal Building Permit Application… Q4 Plan review — 'Permit processing timeframe may be from 2 weeks to 30 days' per the Town's own General Permitting Info sheet -- consistent with FS 553.792(1)(a)'s 30-business-day… Q18 Where you file — BS&A Online (bsaonline.com) -- the Town's own permit and inspection-request portal. (Fee/utility-bill payments route through a separate Point & Pay link, Q20

Permit required
YES88% source
What it costs
Valuation-based: $150 plus 2.5% of the estimated job cost between $3,000 and $100,000 (2% above $100,000),85% source
Plan review turnaround
'Permit processing timeframe may be from 2 weeks to 30 days' per the Town's own General Permitting Info sheet -- consistent with FS 553.792(1)(a)'s 30-business-day limb for a structure under 7,500 sq…80% source
Key document
town department information sheet, citing Town Code Sec. 67-52 cited by 5 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? YES 95% · statewide keyless registry + town permit pages
    • What does this authority permit itself, and what does it delegate? Both (Building and Electrical held by the Town; Fire delegated to City of Boynton Beach; potable-water plan approval delegated to Boynton Beach Utilities; septic delegated to Palm Beach County Health Dept.) 90% · town department information sheet
    • Is a permit required for a residential rooftop PV system? YES 88% · town-published inspection affidavit + fee schedule
    • Is there a separate electrical permit, or is it combined? Combined -- electrical for a rooftop PV job is filed as a linked electrical sub-permit under the same Universal County-Wide/Municipal Building Permit Application Form used for the building permit, not a separate application. 70% · town permit checklist
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? A State-licensed electrical contractor (FS 489) or a Palm Beach County Certificate-of-Competency (U-license) holder, registered with the Town before applying. 75% · town department information sheet
    • Must the contractor be registered with this authority before applying? YES 95% · town permit checklist
    • Is a homeowner permitted to self-install and self-permit? Likely yes for an owner-occupant of a single/two-family home -- the Town publishes a dedicated 'OWNER/BUILDER AFFIDAVIT' form in its permit forms library -- but I did not open that form's text this run, so this is inferred from its existence plus FS 489.103(7), not read directly. 50% · town forms library (title only, not opened)
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Contractor Registration (with State license/County Certificate of Competency, Business Tax Receipt, insurance certs naming the Town as certificate holder); notarized Universal County-Wide/Municipal Building Permit Application (signed by owner AND contractor); sub-permit application(s) if not covered by the primary permit; Scope of Work with an estimated total value of work per FBC 109.3; recorded/certified Notice of Commencement if job value > $5,000; Construction Site Management Handbook signature page if job value > $5,000; Palm Beach County Property Appraiser's Property Detail Record; signed & sealed plans; a current survey (dated within a year) if applicable; product approvals (NOAs); HOA/condo association approval letter if applicable. 90% · town permit checklist
    • How many copies, and in what format? Digital only, through the Town's BS&A Online portal -- no physical copies. The portal instructions say: 'When submitting a large construction plan set, do not upload each page separately. Upload the plans as one complete set or in appropriately grouped files.' 85% · town permit page
    • Is a structural PE stamp required, and at what threshold? Signed-and-sealed (PE- or RA-stamped) plans are required on every permit submittal per the Town's own General Permit Checklist ('Signed & sealed Plans for the project'), with no stated small-job/valuation threshold exemption. Separately, for solar specifically, the Town lets the installer self-certify structural attachment via a notarized 'Solar Panel Inspection Affidavit' (attachment per FSEC-IN-24-06, load not exceeding 5 lb/sq ft, into/around roof truss members) -- this affidavit supplements, but per its own text does not replace, the sealed-plans requirement ('All attachments have been installed per engineered & permitted documents'). 70% · town checklist + town inspection affidavit
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? BS&A Online (bsaonline.com) -- the Town's own permit and inspection-request portal. (Fee/utility-bill payments route through a separate Point & Pay link, client.pointandpay.net, not the permit portal.) 95% · town permit page
    • Can the whole application be completed online? YES -- application submittal and all inspection requests are both handled through BS&A Online; the General Info sheet states 'ALL INSPECTIONS ARE TO BE REQUESTED THROUGH OUR ONLINE PORTAL.' 85% · town department information sheet
    • What does a residential solar permit cost? Valuation-based: $150 plus 2.5% of the estimated job cost between $3,000 and $100,000 (2% above $100,000), plus a 0.5% technology charge and the 2.5% (min $4.00) BIF/DCA surcharge under FS 553.721 and FS 468.631. A typical $37,000 residential PV job: $150 + 2.5%x$34,000 = $1,000 base, + $5.00 technology charge, + surcharge of the greater of 2.5% or $4 minimum -- no separate 'solar' fee line exists; solar is priced under the general valuation schedule, with a Permit Fee Reduction Incentive of $50-$500 available on proof of a solar-panel or solar-water-heater installation. 85% · current town fee schedule
    • How is the fee calculated? Valuation (percentage of estimated cost of work), not flat/per-kW/per-panel/tiered. 90% · current town fee schedule
    • Is there a separate plan-check fee? YES, and it is separately priced: 'Plan Review -- Per contracted amount after official has reviewed plans' on the Fee Schedule, billed against Hy-Byrd Building Inspections LLC's posted plan-review rate card (minimum $250 for a $50,001-$100,000 job; $250 + $1.25/$1,000 over $100,000 -- printed as an attachment to the Town's own Fee Schedule, page 4). A residential PV job at $37k-55k would fall under Hy-Byrd's 'Building Plan Review/Building Official Duties -- Minor Projects up to $50,000' rate of $75/hour. 90% · current town fee schedule + contractor rate card
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? 'Permit processing timeframe may be from 2 weeks to 30 days' per the Town's own General Permitting Info sheet -- consistent with FS 553.792(1)(a)'s 30-business-day limb for a structure under 7,500 sq ft (the limb that governs a typical $37k-55k PV job, since it exceeds the $15,000 5-business-day threshold but the structure itself is far under 7,500 sq ft). 80% · town department information sheet
    • How long is an issued permit valid before it expires? 6 months to commence construction from issuance (or the permit expires); once commenced, all construction must complete within 1 year unless extended (one administrative 6-month extension by the Building Official for good cause; further extensions require Town Commission approval). Separately, inspections must be scheduled within 6 months of the issue date/last inspection or the permit expires; a permit not under active construction expires after 1 year. 90% · town department information sheet, citing Town Code Sec. 67-52
    • Which utility handles interconnection here? Florida Power & Light Company (FPL) -- the sole electric seller inside Town limits. 92% · town audited financial statements, Note 6
    • Where does the utility sit in the sequence? Parallel -- an FPL net-metering interconnection agreement is a separate track from the Town's building permit process; nothing in the Town's own documents makes FPL interconnection an explicit precondition of permit issuance or a step gated behind final inspection. 50% · inference; FPL DG manual not fetched this run

28 questions answered against Town of Ocean Ridge’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

YES

Why the confidence is not higherTown of Ocean Ridge is registered on floridabuilding.org's statewide register of local governments that actually issue building permits ('Town of Ocean Ridge', option value 3189 of 392), and the Town's own permits page/fee schedule/forms library show it running its own building permit process end to end (application, review, fee collection, inspection, CO). Not 100 because it does this through a paid professional-services contractor (Hy-Byrd Building Inspections, LLC) rather than town-employed inspectors -- see jurisdiction block for the staffing detail.

statewide keyless registry + town permit pages checked 2026-09-13 https://www.floridabuilding.org/sc/sc_org_srch.aspx

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both (Building and Electrical held by the Town; Fire delegated to City of Boynton Beach; potable-water plan approval delegated to Boynton Beach Utilities; septic delegated to Palm Beach County Health Dept.)

Why the confidence is not higherThe Town's 'General Permitting & Building Department Info' sheet and Fee Schedule show the Town issuing building AND electrical permits itself (electrical filed as a sub-permit under the same Universal County-Wide/Municipal Building Permit Application, not routed to the county). The same info sheet requires separate sign-off from 'Boynton Beach Fire Department Station Number 5' for fire-related work, and from 'Boynton Beach Utilities' for potable water -- both a neighbouring CITY, not the county. Palm Beach County Health Department signs off septic. Confidence not higher because I could not reach the zoning code's own delegation/definitions article (Municode is down, see extra_findings) to confirm this in ordinance text rather than practice documents.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

YES

Why the confidence is not higherNo line item is literally named 'solar' in the general list of work requiring a permit, but the Town publishes a standalone 'SOLAR PANEL INSPECTION AFFIDAVIT' (BD, rev 1/2025, citing FSEC-IN-24-06 and a 5 lb/sq ft limit) as part of its forms library, and the Fee Schedule's 'Permit Fee Reduction Incentive' names 'Solar Panels' and 'Solar Water Heater' explicitly as items needing 'proof of the installation' under a permit already issued.

town-published inspection affidavit + fee schedule checked 2026-09-13 https://www.oceanridge.gov/BD_Solar%20Panel%20Inspection%20Affidavit_1.2025%20FILL.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Combined -- electrical for a rooftop PV job is filed as a linked electrical sub-permit under the same Universal County-Wide/Municipal Building Permit Application Form used for the building permit, not a separate application.

Why the confidence is not higherThe General Permit Checklist lists a second copy of the Universal application marked '(Sub-Permit) -- If Fee & Value of a Sub-Permit are covered under a Primary Permit', i.e. electrical/plumbing/mechanical trades attach to the primary building permit rather than standing alone. Not higher because no solar-specific checklist exists to confirm this is exactly how a PV job is filed (the Town publishes checklists for Building/CO/Demo/Driveway/Fence/Lot-Clearing/Septic/Sign/Tree but none titled 'Solar' or 'Electrical').

town permit checklist checked 2026-09-13 https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

A State-licensed electrical contractor (FS 489) or a Palm Beach County Certificate-of-Competency (U-license) holder, registered with the Town before applying.

Why the confidence is not higherThe Town's contractor-registration requirement (General Info sheet) demands 'State License (F.S. 489.115) or Palm Beach County Certificate of Competency (U-License)' from every applying contractor; this is stated generally (not solar-specific), so applied to electrical/PV work by inference from FL licensing law rather than a town document naming solar electricians specifically.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

YES

Why the confidence is not higher'Contractor Registration with Town of Ocean Ridge' is listed as a required item on both the General Permit Checklist and the General Permitting Info sheet, with a dedicated Contractor Registration Form; State license/County Certificate of Competency, County Business Tax Receipt, and insurance certificates naming the Town as certificate holder must all be filed before a permit issues.

town permit checklist checked 2026-09-13 https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Likely yes for an owner-occupant of a single/two-family home -- the Town publishes a dedicated 'OWNER/BUILDER AFFIDAVIT' form in its permit forms library -- but I did not open that form's text this run, so this is inferred from its existence plus FS 489.103(7), not read directly.

Why the confidence is not higherConfidence capped below 55 deliberately: the form's existence proves the route exists, but I have not read its conditions (e.g. any exclusion of electrical/solar work, which FS 489.103(7)(a)3's now-lapsed 'SunShot Rooftop Solar Challenge' condition made relevant elsewhere in this survey) or whether it is honored for solar specifically.

town forms library (title only, not opened) checked 2026-09-13 https://www.oceanridge.gov/departments/building_zoning/permits.php

Q8 What documents make up a complete submittal? Core Submittal package

Contractor Registration (with State license/County Certificate of Competency, Business Tax Receipt, insurance certs naming the Town as certificate holder); notarized Universal County-Wide/Municipal Building Permit Application (signed by owner AND contractor); sub-permit application(s) if not covered by the primary permit; Scope of Work with an estimated total value of work per FBC 109.3; recorded/certified Notice of Commencement if job value > $5,000; Construction Site Management Handbook signature page if job value > $5,000; Palm Beach County Property Appraiser's Property Detail Record; signed & sealed plans; a current survey (dated within a year) if applicable; product approvals (NOAs); HOA/condo association approval letter if applicable.

Why the confidence is not higherDirectly enumerated on the Town's own 'General Permit Checklist' (Rev. 6/2026) and 'General Permitting & Building Department Information' sheet. Not higher because there is no solar-specific checklist -- this is the generic building-permit package, and a PV job may not need every item (e.g. HOA letter only 'if applicable').

town permit checklist checked 2026-09-13 https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q9 How many copies, and in what format? Submittal package

Digital only, through the Town's BS&A Online portal -- no physical copies. The portal instructions say: 'When submitting a large construction plan set, do not upload each page separately. Upload the plans as one complete set or in appropriately grouped files.'

Why the confidence is not higherVerbatim from the Town's own Permits page (verified in raw HTML, not just a page summary).

town permit page checked 2026-09-13 https://www.oceanridge.gov/departments/building_zoning/permits.php

Q10 Is a site plan required, and what must it show? Core Submittal package

Nothing published by this authority.

Where we lookedTown's General Permit Checklist and General Permitting Info sheet list 'signed & sealed plans' and 'a current survey' but do not use the term 'site plan' or specify what a site plan must show; no solar-specific checklist exists to check for a facility/site-plan requirement under NEC 705.10. The Building/New-Construction-specific checklist ('BD_Building Permit for new Structures, Additions, Remodels...CHECKLIST') was found in the forms list but not opened this run.

https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedNo solar-specific checklist exists on the Town's permits page to confirm a one-line/three-line diagram requirement by name; the Town's own zoning/building code (Municode) could not be reached this run to check any local amendment (see extra_findings) -- FBC/NEC universally requires this at the state level but I could not confirm town-specific language.

https://www.oceanridge.gov/departments/building_zoning/permits.php

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame limitation as Q11 -- no solar-specific checklist, and Municode unreachable this run.

https://www.oceanridge.gov/departments/building_zoning/permits.php

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Signed-and-sealed (PE- or RA-stamped) plans are required on every permit submittal per the Town's own General Permit Checklist ('Signed & sealed Plans for the project'), with no stated small-job/valuation threshold exemption. Separately, for solar specifically, the Town lets the installer self-certify structural attachment via a notarized 'Solar Panel Inspection Affidavit' (attachment per FSEC-IN-24-06, load not exceeding 5 lb/sq ft, into/around roof truss members) -- this affidavit supplements, but per its own text does not replace, the sealed-plans requirement ('All attachments have been installed per engineered & permitted documents').

Why the confidence is not higherBoth documents are the Town's own, but neither states a numeric PE-stamp valuation threshold, so this is read from the absence of an exemption rather than an explicit threshold statement.

town checklist + town inspection affidavit checked 2026-09-13 https://www.oceanridge.gov/BD_Solar%20Panel%20Inspection%20Affidavit_1.2025%20FILL.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedNo town document distinguishes an electrical-specific PE stamp threshold from the general signed-and-sealed-plans requirement in Q13; Municode unreachable this run to check for a local amendment.

https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q15 What does a residential solar permit cost? Core Fees

Valuation-based: $150 plus 2.5% of the estimated job cost between $3,000 and $100,000 (2% above $100,000), plus a 0.5% technology charge and the 2.5% (min $4.00) BIF/DCA surcharge under FS 553.721 and FS 468.631. A typical $37,000 residential PV job: $150 + 2.5%x$34,000 = $1,000 base, + $5.00 technology charge, + surcharge of the greater of 2.5% or $4 minimum -- no separate 'solar' fee line exists; solar is priced under the general valuation schedule, with a Permit Fee Reduction Incentive of $50-$500 available on proof of a solar-panel or solar-water-heater installation.

Why the confidence is not higherVerbatim from the Town's current Fee Schedule (effective 7/8/2026). Not higher because the schedule's own text is internally inconsistent for jobs over $100,000 (the 'greater than $100,000' row repeats the $3,000-$100,000 language verbatim rather than stating a clean marginal formula, likely a copy-paste/layout error in the source PDF) and because I could not reconcile the formula to an actual paid PV permit receipt this run.

current town fee schedule checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q16 How is the fee calculated? Core Fees

Valuation (percentage of estimated cost of work), not flat/per-kW/per-panel/tiered.

Why the confidence is not higherDirectly stated in the Fee Schedule's 'Permit Fees Schedule' table and confirmed in the General Info sheet: 'Permit fees are based on the total cost of the project.' NOTE: FS 553.79(1)(f) bars an INSPECTION fee (not a permit fee generally) from being based on total project cost -- the Fee Schedule's separate $50.00-per-inspection line for Building-Official/Inspector visits IS flat, not valuation-based, so this town's inspection fee itself appears (1)(f)-compliant even though its overall permit fee is valuation-based; flagged here rather than asserted as a violation because I have not tested this against FS 553.79(1)(f) case law.

current town fee schedule checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q17 Is there a separate plan-check fee? Fees

YES, and it is separately priced: 'Plan Review -- Per contracted amount after official has reviewed plans' on the Fee Schedule, billed against Hy-Byrd Building Inspections LLC's posted plan-review rate card (minimum $250 for a $50,001-$100,000 job; $250 + $1.25/$1,000 over $100,000 -- printed as an attachment to the Town's own Fee Schedule, page 4). A residential PV job at $37k-55k would fall under Hy-Byrd's 'Building Plan Review/Building Official Duties -- Minor Projects up to $50,000' rate of $75/hour.

Why the confidence is not higherBoth the Town's Fee Schedule and the attached Hy-Byrd rate card are the Town's own published documents (the rate card is literally printed as page 4 of the Fee Schedule PDF).

current town fee schedule + contractor rate card checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

'Permit processing timeframe may be from 2 weeks to 30 days' per the Town's own General Permitting Info sheet -- consistent with FS 553.792(1)(a)'s 30-business-day limb for a structure under 7,500 sq ft (the limb that governs a typical $37k-55k PV job, since it exceeds the $15,000 5-business-day threshold but the structure itself is far under 7,500 sq ft).

Why the confidence is not higherTown's own stated range is wide (2 weeks-30 days) rather than a single committed number, and does not itself cite FS 553.792 -- the statutory cross-reference is my own analysis, not the Town's statement.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q19 How long is an issued permit valid before it expires? Timeline & validity

6 months to commence construction from issuance (or the permit expires); once commenced, all construction must complete within 1 year unless extended (one administrative 6-month extension by the Building Official for good cause; further extensions require Town Commission approval). Separately, inspections must be scheduled within 6 months of the issue date/last inspection or the permit expires; a permit not under active construction expires after 1 year.

Why the confidence is not higherCites Town Code Sec. 67-52 by section number, taken directly from the Town's own General Permitting Info sheet.

town department information sheet, citing Town Code Sec. 67-52 checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q20 Which permit portal does this authority use? Core Portal & process

BS&A Online (bsaonline.com) -- the Town's own permit and inspection-request portal. (Fee/utility-bill payments route through a separate Point & Pay link, client.pointandpay.net, not the permit portal.)

Why the confidence is not higherStated repeatedly and consistently across the Permits page, General Info sheet, and site navigation ('Pay Fees Online' menu item), and it is the Town's OWN portal (not a contractor's separate system) -- unlike some of the batch's other 'AHJ of record with bought-in staff' towns, Hy-Byrd does not appear to operate its own separate intake portal for Ocean Ridge.

town permit page checked 2026-09-13 https://www.oceanridge.gov/departments/building_zoning/permits.php

Q21 Can the whole application be completed online? Core Portal & process

YES -- application submittal and all inspection requests are both handled through BS&A Online; the General Info sheet states 'ALL INSPECTIONS ARE TO BE REQUESTED THROUGH OUR ONLINE PORTAL.'

Why the confidence is not higherPayment can also be made in person/by other methods (cash, check, cards) per the Fee section, so 'online' is available but not the only channel for every step (e.g. fee payment).

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q22 Which utility handles interconnection here? Core Utility interconnection

Florida Power & Light Company (FPL) -- the sole electric seller inside Town limits.

Why the confidence is not higherThe Town's own FY2025 audited financial statements (Note 6, Long-Term Liabilities) name 'Florida Power and Light Franchise Tax revenue' by name as pledged revenue for a DEP Clean Water SRF loan -- a town-side instrument naming the utility, not an inference from a county-level file. The adopted FY26 budget carries exactly ONE electric franchise-fee line (GL 001-310.000-313.100, $240,000) and one electric utility-service-tax line (GL 001-310.000-314.100), consistent with a single seller; EIA-861 Service_Territory_2024.xlsx (filtered FL/Palm Beach) lists two sellers countywide -- FPL and the City of Lake Worth Beach's municipal electric utility -- but Lake Worth Beach's service territory is its own separate incorporated city several miles away and there is no Town-side evidence (no second franchise or utility-tax line, no utility-page mention) that it serves any part of Ocean Ridge; excluded per the standing rule that EIA-861 is county-level and can list a seller that does not reach the target town.

town audited financial statements, Note 6 checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Finance/Audits%20And%20Budgets/Annual%20Audits/2025%20ocean%20ridge.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel -- an FPL net-metering interconnection agreement is a separate track from the Town's building permit process; nothing in the Town's own documents makes FPL interconnection an explicit precondition of permit issuance or a step gated behind final inspection.

Why the confidence is not higherInferred from the general FAC 25-6.065 net-metering process for an FPL residential customer, not from a Town document that spells out the sequencing -- I did not fetch FPL's own DG/interconnection manual this run.

inference; FPL DG manual not fetched this run checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Nothing published by this authority.

Where we lookedNo HOA/architectural-review-specific town document was found or opened this run (no dedicated form in the permit forms library beyond 'Condo/Association HOA Approval Letter (if applicable)' on the General Permit Checklist, which is generic to all permit types, not solar-specific); Municode (zoning code) unreachable this run -- see extra_findings on FS 163.04, which would override any such requirement for solar specifically regardless of what the zoning code says.

https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedHistoric-district review not confirmed either way -- Municode (zoning/historic-preservation chapter) unreachable this run; no historic-district-specific form appears in the Town's permit forms library.

https://www.oceanridge.gov/departments/building_zoning/permits.php

Q26 Is a wind or windstorm certification required? Overlays & special cases

Nothing published by this authority.

Where we lookedWind/windstorm certification requirement not confirmed -- Municode unreachable this run; the Town's 'REROOF & HURRICANE MITIGATION FORMS' packet exists but was not opened, and it is roofing-specific rather than solar-specific.

https://www.oceanridge.gov/departments/building_zoning/permits.php

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Nothing published by this authority.

Where we lookedSpecific Use Permit / Council approval requirement for solar not confirmed -- Municode (zoning code) unreachable this run. The Fee Schedule shows a 'Development Plan Review by the Planning & Zoning Commission' fee ($1,500) but nothing ties it specifically to residential rooftop PV.

https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedNo system-size cap on residential generation found in any town document reached this run; Municode (zoning code) unreachable to check for a local amendment.

https://www.oceanridge.gov/departments/building_zoning/permits.php

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Town of Ocean Ridge on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    Nothing recorded for Town of Ocean Ridge on this step yet — 1 question checked and found unpublished. The guidance above is general.

  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? No town-specific placard/label list beyond FBC/NEC default requirements was found; the Town's own Solar Panel Inspection Affidavit and Electrical Torque Affidavit are POST-installation self-certifications signed under penalty of perjury (attachment method/load, and torque per NEC 110.14(D)) rather than placard specifications. 45% · town inspection affidavits (do not specify placards)
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    Nothing recorded for Town of Ocean Ridge on this step yet — 7 questions checked and found unpublished. The guidance above is general.

20 questions answered against Town of Ocean Ridge’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020 (as referenced within the Florida Building Code, 8th Edition (2023) cycle, currently in force statewide) -- inferred from Florida's statewide adoption cycle, not confirmed against an Ocean-Ridge-specific adoption ordinance.

Why the confidence is not higherThis is a STATEWIDE default, not town-verified: the Town's own Universal Building Permit Application form ('January 2024 Edition') has blank fields for 'FBC Version' and 'CODE EDITION/NOTES' filled in per-permit rather than a fixed printed edition, and Municode (where any Ocean Ridge local amendment would be codified) was unreachable this run. The Town's own Electrical Torque Affidavit cites NEC 110.14(D), which is stable across the 2017/2020/2023 NEC cycles and does not itself pin the edition.

town permit application form (edition field is blank, filled per-permit) checked 2026-09-13 https://www.oceanridge.gov/BD_UNIVERSAL%20COUNTY-WIDE%20MUNICIPAL%20BUILDING%20PERMIT%20APPLICATION%20FORM.pdf

Q30 Which building code edition is in force? Core Code editions in force

Nothing published by this authority.

Where we lookedFlorida Building Code edition in force locally not confirmed against a Town-specific adoption ordinance -- Municode unreachable this run; state-default would be FBC 8th Edition (2023).

https://www.oceanridge.gov/BD_UNIVERSAL%20COUNTY-WIDE%20MUNICIPAL%20BUILDING%20PERMIT%20APPLICATION%20FORM.pdf

Q31 Which fire code edition is in force? Code editions in force

Nothing published by this authority.

Where we lookedFire code edition in force not confirmed -- fire code enforcement is delegated to the City of Boynton Beach (Fire Rescue Station 5, per the Town's General Info sheet); Boynton Beach's own fire-code adoption ordinance was not fetched this run.

https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q32 Are there local amendments to any of the above? Core Code editions in force

Nothing published by this authority.

Where we lookedLocal amendments to NEC/FBC/fire code not confirmed either way -- Municode (where such amendments would be codified) unreachable this run, confirmed by a failed control (api.municode.com 404s on a known-good client, Jacksonville Beach/2757, as well as on Ocean Ridge; library.municode.com/api returns 401 on both).

Q33 What is the installation judged against? Core Electrical

Nothing published by this authority.

Where we looked"What is the installation judged against" not confirmed beyond the statewide NEC/FBC default -- Municode unreachable this run.

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedNo town-specific rule on service-upgrade/busbar sizing found; Municode unreachable this run.

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedNo town-specific mounting-system/attachment-spacing rule found beyond the general Solar Panel Inspection Affidavit's 5 lb/sq ft limit and FSEC-IN-24-06 reference (that affidavit is an inspection self-certification, not a design/spacing standard).

https://www.oceanridge.gov/BD_Solar%20Panel%20Inspection%20Affidavit_1.2025%20FILL.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedRidge setback / fire-access-pathway requirement not confirmed -- fire code enforcement is delegated to City of Boynton Beach and its own fire-prevention chapter was not fetched this run; the FFPC itself is paywalled.

https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Nothing published by this authority.

Where we lookedRapid-shutdown requirement and applicable NEC edition not confirmed against a Town-specific document -- Municode unreachable this run; NEC 690.12 rapid shutdown would apply by default under whichever NEC edition is in force (see Q29, itself unverified at town level).

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

No town-specific placard/label list beyond FBC/NEC default requirements was found; the Town's own Solar Panel Inspection Affidavit and Electrical Torque Affidavit are POST-installation self-certifications signed under penalty of perjury (attachment method/load, and torque per NEC 110.14(D)) rather than placard specifications.

Why the confidence is not higherRecorded at low-but-recordable confidence because the two town-published solar-adjacent forms ARE real evidence of what the Town collects at inspection, even though neither is a placard spec; Municode (where a local placard ordinance would live) is unreachable this run.

town inspection affidavits (do not specify placards) checked 2026-09-13 https://www.oceanridge.gov/BD_Solar%20Panel%20Inspection%20Affidavit_1.2025%20FILL.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo town-specified placard wording found; Municode unreachable this run.

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo town-specified letter height/colour/material for placards found; Municode unreachable this run.

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSite-plan/facility-map placard requirement (NEC 705.10) not confirmed at the town level -- no solar-specific checklist requires it explicitly; Municode unreachable this run.

https://www.oceanridge.gov/BD-GENERAL%20PERMIT%20CHECKLIST%20Rev.%206.2026.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedFPL's own DG interconnection manual/placard specification was not fetched this run.

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedLabel placement requirement not confirmed at the town level beyond the general NEC default; Municode unreachable this run.

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedApproved-equipment-list requirement not confirmed; Municode unreachable this run.

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedBattery/ESS conditions not confirmed; Municode (fire code, delegated to Boynton Beach) unreachable this run.

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedSeparate ESS permit/inspection requirement not confirmed; no dedicated ESS/battery form appears in the Town's permit forms library, but this is not a proved absence since the fire code (Boynton Beach's) was not checked.

https://www.oceanridge.gov/departments/building_zoning/permits.php

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedGround-mount-as-structure treatment not confirmed; Municode (zoning code) unreachable this run.

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedAC-disconnect placement relative to the meter not confirmed against FPL's own DG manual, which was not fetched this run.

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Portal -- 'ALL INSPECTIONS ARE TO BE REQUESTED THROUGH OUR ONLINE PORTAL', BS&A Online. 90% · town department information sheet
    • Are same-day or AM/PM windows offered? AM/PM window: inspections 'typically begin between 8AM-12PM', i.e. a morning window, with the caveat that 'inspectors may run late due to lengthy inspections.' 80% · town department information sheet
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? YES, self-performed (through its contracted Building Official/inspector, Hy-Byrd Building Inspections, LLC) -- not delegated to the county or to a neighbouring city for building/electrical. 85% · town fee schedule (Hy-Byrd rate card) + adopted budget
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for Town of Ocean Ridge on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No dedicated solar inspection checklist is published; general permit checklists (Building, CO, Demolition, Driveway, Fence, Lot Clearing, Septic, Sign, Tree) exist but none is titled or scoped to solar/PV/electrical. 75% · town permit forms library, enumerated in full
    • What must be on site at inspection? The complete approved permit application package must be posted and visible at the job site; a secured ladder must be left if the inspection requires roof/AC-unit access; someone must be present if the inspector needs interior/backyard access; for a multi-family unit, the unit number, building name and gate code must be provided. 85% · town department information sheet
    • Does the inspector verify labels and listings? Yes for structural attachment and torque, via two dedicated notarized inspection affidavits: the Solar Panel Inspection Affidavit (attachment method, 5 lb/sq ft load limit, FSEC-IN-24-06 compliance) and the Electrical Torque Affidavit (NEC 110.14(D) torque compliance). Neither directly states that the inspector personally verifies equipment LISTINGS (e.g. UL numbers) at the site visit. 70% · town inspection affidavits
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? For an existing single-family home with a rooftop PV addition (not new construction), the Town issues a passed FINAL inspection sign-off rather than a fresh Certificate of Occupancy; the Town does issue a 'Certificate of Occupancy/Completion' as a distinct, separately-priced product ($50 per the Fee Schedule) used for new construction, additions, and after Substantial Improvement/Substantial Damage work. 55% · town department information sheet
    • Is there a re-inspection fee? YES -- $50.00 general re-inspection fee after a failed inspection; a separate $150.00 fee applies for each Town-Engineer inspection after the first. 90% · current town fee schedule

14 questions answered against Town of Ocean Ridge’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Portal -- 'ALL INSPECTIONS ARE TO BE REQUESTED THROUGH OUR ONLINE PORTAL', BS&A Online.

Why the confidence is not higherVerbatim from the Town's General Permitting Info sheet.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedNo specific business-day advance-notice requirement for booking an inspection was stated in any Town document reached this run (only that inspections must be scheduled within 6 months of issuance/last inspection, which is a permit-expiry rule, not a booking-notice rule).

https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

AM/PM window: inspections 'typically begin between 8AM-12PM', i.e. a morning window, with the caveat that 'inspectors may run late due to lengthy inspections.'

Why the confidence is not higherVerbatim from the Town's General Permitting Info sheet; not stated as a formal guaranteed window, just typical practice.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

YES, self-performed (through its contracted Building Official/inspector, Hy-Byrd Building Inspections, LLC) -- not delegated to the county or to a neighbouring city for building/electrical.

Why the confidence is not higherSee jurisdiction block. Confidence capped below 90 because the exact allocation of WHICH inspections Hy-Byrd staff perform vs. any Town-employed staff was not independently confirmed beyond the budget/staffing evidence.

town fee schedule (Hy-Byrd rate card) + adopted budget checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q53 If delegated, to whom? Core Who inspects

Nothing published by this authority.

Where we lookedN/A in the ordinary case (see Q52 -- not delegated to the county); if this asks who WITHIN the contracted arrangement performs the inspection, that is Hy-Byrd Building Inspections, LLC's staff, per Q52's evidence -- recorded there rather than duplicated as a separate finding.

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedFull inspection sequence/order for a residential PV job not enumerated in any Town document reached this run -- the permit card is described as listing 'inspections required' but the card itself (or a solar-specific sequence list) was not obtained.

https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedRough-in/mid-roof inspection requirement for PV specifically not confirmed.

Q56 Does the inspector verify labels and listings? Core What is checked

Yes for structural attachment and torque, via two dedicated notarized inspection affidavits: the Solar Panel Inspection Affidavit (attachment method, 5 lb/sq ft load limit, FSEC-IN-24-06 compliance) and the Electrical Torque Affidavit (NEC 110.14(D) torque compliance). Neither directly states that the inspector personally verifies equipment LISTINGS (e.g. UL numbers) at the site visit.

Why the confidence is not higherBoth affidavits are the Town's own forms and are solar/electrical-relevant, but they are installer self-certifications under oath rather than a stated inspector checklist item, so this is a reasonable but not certain inference about what 'the inspector verifies.'

town inspection affidavits checked 2026-09-13 https://www.oceanridge.gov/BD_Solar%20Panel%20Inspection%20Affidavit_1.2025%20FILL.pdf

Q57 Is there a published inspection checklist? Core What is checked

No dedicated solar inspection checklist is published; general permit checklists (Building, CO, Demolition, Driveway, Fence, Lot Clearing, Septic, Sign, Tree) exist but none is titled or scoped to solar/PV/electrical.

Why the confidence is not higherProved by enumeration: the Town's permits/forms page lists every checklist and form title (55+ items were enumerated from the raw page HTML), and none is a solar-specific inspection checklist.

town permit forms library, enumerated in full checked 2026-09-13 https://www.oceanridge.gov/departments/building_zoning/permits.php

Q58 What must be on site at inspection? Core Documents on site

The complete approved permit application package must be posted and visible at the job site; a secured ladder must be left if the inspection requires roof/AC-unit access; someone must be present if the inspector needs interior/backyard access; for a multi-family unit, the unit number, building name and gate code must be provided.

Why the confidence is not higherVerbatim from the Town's General Permitting Info sheet's 'Inspections' section.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

YES -- $50.00 general re-inspection fee after a failed inspection; a separate $150.00 fee applies for each Town-Engineer inspection after the first.

Why the confidence is not higherStated in both the General Permitting Info sheet and the Fee Schedule.

current town fee schedule checked 2026-09-13 https://www.oceanridge.gov/Documents/Departments/Building%20and%20Zoning/Fee-Schedule-Rev%20July%201%202026v%20kd2.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedThe correction/clearance process for a failed inspection beyond re-scheduling with the $50 fee (e.g. a formal notice-of-violation/re-inspection-request procedure) was not found in any document reached this run.

https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q61 What is issued on pass? Core Final sign-off & PTO

For an existing single-family home with a rooftop PV addition (not new construction), the Town issues a passed FINAL inspection sign-off rather than a fresh Certificate of Occupancy; the Town does issue a 'Certificate of Occupancy/Completion' as a distinct, separately-priced product ($50 per the Fee Schedule) used for new construction, additions, and after Substantial Improvement/Substantial Damage work.

Why the confidence is not higherThe Town's documents describe CO/CC clearly for new construction/additions but do not use the word 'solar' anywhere near the CO/CC or Final-inspection sections, so which of the two applies to a standalone PV retrofit is my inference, not a stated Town rule.

town department information sheet checked 2026-09-13 https://www.oceanridge.gov/0_BD_General%20Permitting%20%26%20Building%20Department%20Information_5.2025.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedWho notifies the utility (FPL) for Permission to Operate was not confirmed -- FPL's own DG/interconnection manual was not fetched this run, and no Town document addresses PTO notification.

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Separate roof inspection
INFORMATION HOLD HARMLESS AGREEMENT document Header HOLD HARMLESS AGREEMENT HVAC FORM & A/C OR MECHANICAL CONTRACTOR AFFIDAVIT (A/C CHANGEOUT) document Header HVAC FORM & A/C OR MECHANICAL CONTRACTOR AFFIDAVIT (A/C CHANGEOUT) HVAC LIKE for LIKE CHANGEOUT FOR
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
Town
County
Palm Beach County
Regions covered
Authority Contact
Building Department
Direct Phone
561-732-2635
Booking & Scheduling