Town of Westville

Holmes County · Florida ← All authorities

Town of Westville

Holmes County

Verified Aug. 5, 2026

Town of Westville is a town authority in the State of Florida, serving 261 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Westville against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Westville is not the permitting authority for residential solar here 82% confidence
Holds
One mandatory town-level step for construction inside its limits - a 'letter... for city compliance' - and nothing technical beyond that. The Holmes County Building Department's own Residential Construction Requirements sheet names Westville's own phone number (850-548-5858) among the five incorporated Holmes County places (Bonifay, Esto, Noma, Ponce De Leon, Westville) from which that letter must come before the County will process a permit inside town limits; see q27 for this run's partial resolution of whether that letter reaches a bare PV retrofit. Beyond the letter, Westville holds nothing relevant to residential rooftop PV: no building department, no building official, no plans examiner, no inspector, no permits, no fee schedule, no adopted construction code of its own, and no working website (townofwestville.com resolves to a parked GoDaddy 'domain for sale' page). Westville does have an active Mayor-Council municipal government of its own for other purposes - Mayor Stephen L. Herrington III, four council members, and Town Clerk Tammy Bowers, per Wikipedia, incorporated in 1970, population 261 as of the 2020 census - so it is a real, functioning small town, just not one that runs its own permitting function.
Delegated to
Holmes County. Building permits, electrical (trade) permits, plan review, contractor registration and final inspections sit with the Holmes County Building Department, 107 East Virginia Avenue, Bonifay, FL 32425, 850-547-1119, hcbd@holmescountyfl.org, Building Official Keith Bennett. Land development/zoning sits with the same office's Planning function (Planner John Feeney, holmesplanning@aldayhowell.com). The governing land development code is the County's own (Holmes County LDR, updated 2009), and the joint Comprehensive Plan - amended by ordinances such as 03-S2 that name Westville by name alongside Esto, Noma and Ponce de Leon - is shared across the county and its four smaller incorporated towns (Bonifay administers its own building function separately, per this survey's companion City of Bonifay run). Holmes County adopts the Florida Building Code wholesale, with no local amendment, via Ordinance 23-01 (21 Feb 2023).
Overridden by
The Florida Building Code, 8th Edition (2023), adopted wholesale by Holmes County Ordinance 23-01 and, at state level, by FAC 61G20-1.001. NFPA 70, the National Electrical Code, 2020 edition (FAC 69A-60.005(2)(qq)), incorporated through the same wholesale county adoption. The Florida Fire Prevention Code - NFPA 1, Florida 2021 Edition (FAC 69A-60.003) - binding by operation of state rule regardless of any Holmes County or Westville ordinance. F.S. 163.04, which prohibits any ordinance or deed restriction that prohibits or has the effect of prohibiting solar collectors. F.S. 553.792, setting binding plan-review deadlines (5/30/60 business days depending on job type and structure size) that bind the County in the absence of a stricter local ordinance (none was found). F.S. 553.79(1)(b)-(c), requiring electronic submission acceptance and setting a 1-year single-family permit validity floor that appears to conflict with the County's own 180-day/6-month permit-form language (see q19). F.S. 471.003(2)(h), exempting ch. 489-licensed electrical contractors from engineering licensure at the $125,000/600A residential threshold. F.S. 489.103, the owner-builder exemption, for which the County publishes its own affidavit. At utility level, F.S. 366.91 places whichever electric cooperative serves a given Westville parcel (West Florida Electric Cooperative Association or Choctawhatchee Electric Cooperative - not resolved to certainty in this run, see q22) outside the FPSC's investor-owned net-metering rule, so that cooperative's own Member-Owned-Generation tariff and interconnection agreement govern instead - WFEC's own MOG Agreement (25 kW cap, 10-business-day advance notice, AHJ inspection as a precondition to parallel operation) was read directly in this run.
Why not higher
Proved in this run from first-party sources, deliberately checked independently rather than inherited from the companion Holmes County, City of Bonifay, Town of Esto, Town of Noma or Town of Ponce de Leon runs on this same county, even though several of those runs found the same underlying county checklist naming Westville. Sources read directly in this run: (1) the Holmes County Building/Planning/Zoning page, fetched live today, naming Building Official Keith Bennett and Planner John Feeney, with no Westville official or function anywhere on it, and carrying the live plan-review-fee change to $300/$500 effective 1 October 2026 that conflicts with the posted fee-schedule PDF (see q15/q17); (2) the County's own Residential Construction Requirements sheet and companion Residential Construction Checklist, a scanned image-only PDF with NO text layer, OCR'd page-by-page with tesseract in this run rather than trusted to a fetch-tool summary - exactly the failure mode this survey's playbook warns about - which name Westville's phone number in the 'letter... for city compliance' line and independently confirm the Monday/Thursday inspection cadence the brief asked to be verified; (3) Holmes County Ordinance 03-S2 (2003) and Ordinance 23-01 (2023), both read in full from the County Clerk's own ordinance archive, the former naming Westville by name in a joint comprehensive-plan amendment, the latter adopting the FBC wholesale for the whole county with no local amendment; (4) the Florida Building Code Information System's state surcharge-jurisdiction registry, enumerated in full in this run (392 entries, 'City of Alford' present as a positive control, 'zzqqx' absent as a fabricated control): 'County of Holmes' present, 'Town of Westville' and every other Holmes County town absent; (5) the Holmes County Land Development Regulations (236 pages, read via pdftotext), whose Section 10.01.03.C exemption for alteration of an existing building without change to gross floor area, use, or impervious surface was used in this run - together with the checklist's own 'Other' job-type checkbox and the Trade Permit's 'EXISTING BUILDING' checkbox - to make more progress on the Letter-of-Compliance reach question than the Esto run left open (see q27 for the honest limits of that progress); (6) Wikipedia's article on Westville, Florida, read in this run, confirming the town's active Mayor-Council government and 1970 incorporation, and the direct fetch of townofwestville.com, which resolves but is a parked GoDaddy sale page, not a working town site. Held at 82, below the Ebro run's 90, for three specific gaps this run could not close. First, unlike Ebro (where the Washington County LDC carried an explicit 'Board of County Commissioners and the governing bodies of Caryville, Ebro, Vernon and Wausau, in adopting and enforcing the code' co-adoption clause), no equivalent Westville-specific co-adoption clause was found inside the Holmes County LDR itself - the joint relationship rests on the 2003 comprehensive-plan ordinance and the shared checklist, which is real but a step removed from a direct LDC co-adoption sentence. Second, no permit-portal or permit-register evidence naming a Westville address exists to check against, because Holmes County publishes no searchable online permit portal at all (see q20) - unlike the iWorq-based proof available in the Washington County/Ebro run. Third, the interconnecting utility for a Westville parcel (WFEC vs. CHELCO) could not be resolved to certainty in this run despite several independent attempts (utility 'About Us' pages, Wikipedia, an attempted HIFLD/ArcGIS territorial-boundary query that did not resolve, CHELCO's own New Construction page), which caps confidence on every utility-dependent answer in this file (q22-23, q28, q42-44, q48, q62) at 55-68 rather than higher.

https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Permit required
Yes. A residential rooftop PV system needs a Holmes County building permit. The County's own Application for Building Permit (Revised 08/2026) carries an explicit 'Solar System' checkbox in…90%
Permit cost
No flat solar fee. A residential PV job is priced as the sum of: (a) the building permit, using the County's general valuation ladder ($100 for the first $1,000 plus $8/additional $1,000 to…82%
Plan review
The County publishes no plan-review turnaround of its own beyond the statutory floor. F.S. 553.792(1)(a)-(c) sets 5 business days after a complete application for an electrical or…68%
Portal
No online permit portal was found. The Building Department's own page lists only phone (850-547-1119), fax (850-547-4134) and email (hcbd@holmescountyfl.org) contact,68%
Electrical code
NEC 2020 (NFPA 70, 2020 edition). Florida Administrative Code Rule 69A-60.005(2)(qq) reads verbatim: '(qq) NFPA 70, 2020 edition,85%
Own placard wording
No. Neither Westville nor Holmes County specifies placard wording of its own.68%
Booking an inspection
Most plausibly Phone, given no online portal was identified (see q20) and the Building Department's only published contact channels are phone (850-547-1119), fax and email.55%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes. A residential rooftop PV system needs a Holmes County building permit. The County's own Application for Building Permit (Revised 08/2026) carries an explicit… Q3 Electrical and building permits — Separate. The County issues a standalone Trade Permit Application for electrical work (headed 'RESIDENTIAL / COMMERCIAL / NEW CONSTRUCTION / EXISTING BUILDING', Q4 Plan review — The County publishes no plan-review turnaround of its own beyond the statutory floor. F.S. Q18 Where you file — No online permit portal was found. The Building Department's own page lists only phone (850-547-1119), Q20

Permit required
Yes. A residential rooftop PV system needs a Holmes County building permit. The County's own Application for Building Permit (Revised 08/2026) carries an explicit 'Solar System' checkbox in its…90% source
What it costs
No flat solar fee. A residential PV job is priced as the sum of: (a) the building permit, using the County's general valuation ladder ($100 for the first $1,000 plus $8/additional $1,000 to $10,000;82% source
Plan review turnaround
The County publishes no plan-review turnaround of its own beyond the statutory floor. F.S. 553.792(1)(a)-(c) sets 5 business days after a complete application for an electrical or structural permit…68% source
Key document
residential construction requirements sheet (OCR'd) cited by 7 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? No. The Town of Westville is not the AHJ for residential solar. Building permits, electrical (trade) permits, plan review, contractor registration and inspections inside the Westville town limits are issued and performed by the HOLMES COUNTY Building Department, 107 East Virginia Avenue, Bonifay, FL 32425, 850-547-1119, hcbd@holmescountyfl.org, Building Official Keith Bennett. Westville itself (population 261 in 2020, Mayor-Council government, Mayor Stephen L. Herrington III, Town Clerk Tammy Bowers) publishes no building department, building official, permit form, fee schedule or adopted construction code of its own, and has no working website: townofwestville.com resolves but is a parked GoDaddy 'domain for sale' page, not a town site. Westville retains exactly one administrative step: the County's own Residential Construction Requirements sheet states 'If constructing within city limits a letter is required from them for city compliance' and lists Westville's own phone number (850-548-5858) among the five incorporated Holmes County places (Bonifay, Esto, Noma, Ponce De Leon, Westville) from which that letter must come. 88% · county ordinance amending joint comprehensive plan
    • What does this authority permit itself, and what does it delegate? Delegated. Westville permits nothing itself - no building permit, no electrical permit, no plan review, no inspection, no fee schedule, no adopted construction code. Building and electrical sit with the Holmes County Building Department. Land development/zoning sits with the same county Building/Planning/Zoning office (Planner John Feeney). The one function Westville holds is the mandatory 'letter... for city compliance' that the County's own checklist requires before it will process a permit inside the town limits. 85% · county ordinance adopting Florida Building Code
    • Is a permit required for a residential rooftop PV system? Yes. A residential rooftop PV system needs a Holmes County building permit. The County's own Application for Building Permit (Revised 08/2026) carries an explicit 'Solar System' checkbox in its Building Information block, alongside Single Family, Sign, Storage/Pole Barn, Multi-Family, Demolition, Garage/Carport, Swimming Pool and Townhouse. An electrical Trade Permit is required in addition (see q4). 90% · permit application form (OCR'd)
    • Is there a separate electrical permit, or is it combined? Separate. The County issues a standalone Trade Permit Application for electrical work (headed 'RESIDENTIAL / COMMERCIAL / NEW CONSTRUCTION / EXISTING BUILDING', with its own 'ELECTRIC: [ ] WFEC [ ] FPL [ ] CHELCO' utility line), distinct from the general Application for Building Permit. The Residential Construction Checklist lists 'Trade Permit Application-All Trades (one per trade)' as its own required item alongside the building permit application. 88% · trade permit application form (OCR'd)
    • Is a HOA or architectural approval required first? Not by the authority. Neither Westville nor Holmes County requires HOA or architectural approval for rooftop PV, and F.S. 163.04(2) voids any deed restriction or covenant that prohibits or has the effect of prohibiting solar collectors - such a body may only determine placement within south, plus or minus 45 degrees, where that does not impair performance. Holmes County's own Residential Building Packet warns applicants twice: 'NOTICE: Holmes County Building Department does not have the authority to enforce deed restrictions or covenants on properties. You are advised to check for any restrictions that may affect your property.' 78% · state statute
    • Is there a historic-district review? No historic-district review is required. The Holmes County LDR carries a Historical and Archaeological Resource Protection provision (Sec. 4.08.00/4.08.02) tied to the Florida Master Site File and the County's own comprehensive historical listing, but this operates through the Final Development Order / Land Development Approval process - which LDR 10.01.03.C would exempt for a like-for-like alteration of an existing building, the same exemption discussed at q10 and q27. No separate historic-district or design-review board was found for Westville or Holmes County. 65% · county land development regulations
    • Is a wind or windstorm certification required? No separate windstorm certificate is required. What applies instead is the statewide FBC 8th Edition (2023) ASCE 7-22 wind-speed maps (no local Holmes County wind-speed ordinance was found - see q13) plus the Product Approval process: the County's Trade/Building Permit forms carry a 'FL. PRODUCT APPROVAL CODE' field and a Product Approval Specification Sheet 'as required by Florida Statute 553.842 and Florida Administrative Code 9B-72,' and the inspector requires the product approval number and performance characteristics to be available on the jobsite at inspection. 65% · product approval specification sheet (OCR'd)
    • Is a Specific Use Permit or Council approval ever required? No Special Use Permit or Council approval is required. The one town-level step that does exist is the Letter of Compliance: the County's own Residential Construction Requirements name Westville (850-548-5858) among the five Holmes County towns from which this letter is required before the County will process a permit inside town limits. THE REACH OF THAT LETTER TO A BARE PV RETROFIT, flagged as unresolved by two prior runs on this same county checklist (Esto and, per this survey's brief, others), is partially but not fully resolved in this run: the checklist item 'Letter of Compliance (if in the City Limits)' sits on the County's general Residential Construction CHECKLIST (page bearing checkboxes '[ ] New House [ ] Addition [ ] Other'), separately from the 'Land Development Approval' checklist line - i.e. it is not merely a rider on the Land Development Approval step that LDR 10.01.03.C would exempt for an alteration of an existing building. The County's own electrical Trade Permit Application form separately and explicitly supports an 'EXISTING BUILDING' checkbox, confirming the County's paperwork treats work on an existing house as a routine, anticipated permit type, not an edge case squeezed out of a new-construction-only process. Read together, the more probable reading is that the Letter of Compliance is collected as a general Building Department intake requirement whenever a permit (of any kind, including 'Other'/existing-building work) is processed for a property inside a Holmes County town's limits - which would reach a bare PV retrofit inside Westville. But no Holmes County document says this in so many words for solar, and the companion Residential Construction Requirements narrative sheet is itself titled 'NEW HOUSES & ADDITIONS TO OBTAIN BUILDING PERMITS,' which cuts the other way and keeps this from being a clean resolution. 68% · residential construction checklist (OCR'd)
    • Is there a system-size cap on residential generation? No cap is published in the Holmes County LDR or Building Department materials. The likely binding cap sits at the interconnecting utility. WFEC's own MOG Agreement caps a Member Owned Generation system at 'no more than 25 kW of alternating current power output,' and its solar-energy page separately states WFEC 'offers an energy credit of 5.2 cents per kilowatt-hour for solar installations smaller than 25 kW.' Which utility in fact serves a given Westville parcel is not conclusively established in this run (see q22), so this 25 kW figure should be read as WFEC's cap, not confirmed as binding on every Westville address. 68% · utility interconnection agreement
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either. A state-certified or state-registered electrical contractor (licensed under F.S. ch. 489) who has registered with the Holmes County Building Department may pull it, or a property owner may self-permit under the F.S. 489.103 owner-builder exemption using the County's own Owner/Builder Permit Affidavit, part of the Residential Building Packet. 82% · contractor registration packet (OCR'd)
    • Must the contractor be registered with this authority before applying? Yes - with Holmes County, not with Westville (which has no registration function of its own). A certified contractor registers with a current copy of the state licence, a certificate of general liability and workers' compensation insurance naming Holmes County Building Department as certificate holder (a policy copy is not accepted), and pays a $35.00 administration fee. A registered but non-state-certified contractor pays a class-based licence fee: e.g. Electrical is $75 in-county, $125-$150 out-of-county, $200-$300 out-of-state. 90% · contractor registration packet (OCR'd)
    • Is a homeowner permitted to self-install and self-permit? Yes. Holmes County's Residential Building Packet includes an Owner/Builder Permit Affidavit built on the F.S. 489.103 exemption: an owner may build or improve a one-, two- or three-family residence for personal occupancy, must directly supervise the work, may not hire an unlicensed person to act as contractor, and becomes the responsible party of record. Selling or leasing the improved residence within 1 year creates a legal presumption the work was done for sale, which defeats the exemption. 85% · state statute
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar-specific submittal checklist is published. The general Residential Construction Checklist requires: Land Development Approval; a completed Residential Application for Building Permit; 911 address verification; a Notice of Commencement (work of $5,000+); a septic tank permit (if applicable) with a copy of plans; a Disclosure Statement; a Driveway Permit (if applicable); an Owner/Builder Permit Affidavit (if self-permitting); Legal Description of Property/Deed; an Authorization Form for Permit Application (if someone other than the licence holder is applying); two (2) sets of signed and sealed plans drawn to scale; the Florida Energy Efficiency Code form; a Fire-resistant-construction/fire-suppression statement where applicable; Product Approval / Florida Product Codes documentation; a Trade Permit Application for each trade; an Elevation Certificate (flood zone only); an Electrical Affidavit; a Letter of Compliance if in the City Limits (which would apply to a Westville address - see q27); and a Roofing Inspection Affidavit where roofing is disturbed. 78% · residential construction checklist (OCR'd)
    • How many copies, and in what format? Two (2) sets of signed and sealed plans drawn to scale. No page count, paper size or digital-format policy beyond that is published; the packet's plan requirements section is written for new construction and additions. 75% · residential construction requirements sheet (OCR'd)
    • Is a site plan required, and what must it show? For the Land Development Approval step (county Planning), the LDR requires standard site-plan-type information for a Final Development Order; but LDR Section 10.01.03.C exempts 'the alteration of an existing building or structure so long as no change is made to its gross floor area, its use or the amount of impervious surface on the site' from needing a Final Development Order at all - a description that fits a rooftop PV retrofit on an existing house. For the Building Department step, no separate site-plan content is specified for solar. 68% · county land development regulations
    • Is a one-line / three-line diagram required? Not published. No Holmes County document - the Residential Building Packet, the fee schedule, or the Land Development Regulations - mentions a one-line or three-line electrical diagram requirement, and no solar-specific plan-submittal handout exists. 72% · county land development regulations
    • Are string and conductor calculations required? Not published. No string-sizing, conductor-sizing or voltage-drop calculation requirement appears in any Holmes County document found in this run. 70% · county land development regulations
    • Is a structural PE stamp required, and at what threshold? No local structural PE stamp threshold is published, and unlike neighbouring Washington County (which fixes a wind-speed line through Ebro by name), the Holmes County LDR sets no local wind-speed value or design-wind ordinance at all. The design wind speed for a Westville roof is set purely by the statewide FBC 8th Edition (2023) ASCE 7-22 maps, with no Holmes County amendment found. 68% · county ordinance adopting Florida Building Code
    • Is an electrical PE stamp required, and at what threshold? No local electrical PE stamp requirement is published. At state level, F.S. 471.003(2)(h) exempts a ch. 489-licensed electrical contractor from engineering licensure where the project 'requires an electrical or plumbing or air-conditioning and refrigeration system with a value of $125,000 or less' and 'requires an aggregate service capacity of 600 amperes (240 volts) or less on a residential electrical system' - which covers essentially every residential rooftop PV job. 75% · state statute
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? No online permit portal was found. The Building Department's own page lists only phone (850-547-1119), fax (850-547-4134) and email (hcbd@holmescountyfl.org) contact, and a paper document library of downloadable checklists and forms. No iWorq, eTRAKiT, CitizenServe, Accela, MyGov or similar portal link appears anywhere on the department's page or in its document library. 68% · county department page (live)
    • Can the whole application be completed online? No. With no online portal identified (q20), the process is paper/email-based: forms are downloaded, completed, signed/notarized where required, and submitted to the Building Department by mail, fax, email or in person; F.S. 553.79(1)(b) independently requires the County to accept electronic submission including PDF by email. 62% · county department page (live)
    • What does a residential solar permit cost? No flat solar fee. A residential PV job is priced as the sum of: (a) the building permit, using the County's general valuation ladder ($100 for the first $1,000 plus $8/additional $1,000 to $10,000; $252 for the first $10,000 plus $6/additional $1,000 to $50,000; and so on); (b) the electrical trade permit ('Residential: New electrical: $100.00'); (c) a plan review fee - the County's posted 2021/2023 fee schedule PDF says 'Residential: Minimum is $25.00, or 25% of the Building Permit Fee,' but the County's LIVE Building/Planning/Zoning page, read today, states 'Effective October 01, 2026: residential plan review fees will be $300 and commercial plan review fees will be $500 due at submittal' - a direct, unresolved conflict between the posted PDF and the live page, both current as of this run and pointing to different numbers 17 days apart from today's date; (d) a 3% or $4.00 (whichever is greater) state surcharge on all permits. A base fee of $10.00 applies to sub-permits per unit. 82% · fee schedule (posted PDF)
    • How is the fee calculated? Mixed. The building-permit half is Valuation-based (contract value on the ladder); the electrical trade-permit half is Flat ($100.00 for new residential electrical); the plan-review fee is presently the greater of a $25 flat floor or 25% of the building permit fee (Tiered/Flat hybrid), moving to a flat $300 residential figure from 1 October 2026 per the live page - see q15 for the PDF-vs-live conflict. 80% · fee schedule (posted PDF)
    • Is there a separate plan-check fee? Yes, and there are two conflicting versions of it live today. The posted 2021 fee schedule PDF: 'Plan Review Fees: Residential: Minimum is $25.00, or 25% of the Building Permit Fee' plus a $25.00 Plan Revision fee per re-submittal. The County's live Building/Planning/Zoning page, fetched today: 'Effective October 01, 2026: residential plan review fees will be $300 ... due at submittal.' 85% · county department page (live)
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? The County publishes no plan-review turnaround of its own beyond the statutory floor. F.S. 553.792(1)(a)-(c) sets 5 business days after a complete application for an electrical or structural permit on an EXISTING single-family dwelling where the work is under $15,000; 30 business days for a residential unit/electrical permit on a structure under 7,500 sq ft; and the County must give written notice within 5 business days of anything missing, or the application is automatically deemed complete. 68% · state statute
    • How long is an issued permit valid before it expires? Two different answers are in force and they conflict. Holmes County's own current Application for Building Permit (Revised 08/2026) states: 'The building permit is valid as long as there is construction progress and an approved inspection is recorded within each 180 days (6 months) period.' F.S. 553.79(1)(c) states a building permit for a single-family dwelling 'expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' Reported as an open conflict, not resolved here. 75% · permit application form (OCR'd)
    • Which utility handles interconnection here? Not resolved to certainty. Holmes County's own Trade Permit Application offers a three-way choice - 'ELECTRIC: [ ] WFEC [ ] FPL [ ] CHELCO' - and both West Florida Electric Cooperative Association (WFEC) and Choctawhatchee Electric Cooperative (CHELCO) state on their own websites that they serve Holmes County. WFEC's About page: 'providing reliable electricity and other value-added services in Calhoun, Holmes, Jackson and Washington Counties,' headquartered in Graceville with a district office in Bonifay (the same town as the county building department). CHELCO's own page: 'serving more than 56,000 accounts in Walton, Okaloosa, Holmes and Santa Rosa counties.' Neither cooperative's own page names Westville specifically. Given Westville's location on US-90 in far southern/western Holmes County near the Walton County line, and WFEC's Bonifay office serving the same US-90 corridor, WFEC is the more likely utility for a Westville address, but this is not confirmed at the parcel level in this run. 55% · utility own page
    • Where does the utility sit in the sequence? Parallel, with the AHJ's building-permit inspection as a hard precondition to operation - documented for WFEC, the more likely utility (see q22). WFEC's Interconnection Agreement for Member Owned Generation (MOG) requires the member to provide, at least 10 business days before operating in parallel, 'documentation showing the MOG has been inspected and approved by local code officials prior to its operation,' plus IEEE-1547, IEEE-1547.1 and UL 1741 compliance certifications and proof of $100,000 general liability insurance. 65% · utility interconnection agreement

28 questions answered against Town of Westville’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

No. The Town of Westville is not the AHJ for residential solar. Building permits, electrical (trade) permits, plan review, contractor registration and inspections inside the Westville town limits are issued and performed by the HOLMES COUNTY Building Department, 107 East Virginia Avenue, Bonifay, FL 32425, 850-547-1119, hcbd@holmescountyfl.org, Building Official Keith Bennett. Westville itself (population 261 in 2020, Mayor-Council government, Mayor Stephen L. Herrington III, Town Clerk Tammy Bowers) publishes no building department, building official, permit form, fee schedule or adopted construction code of its own, and has no working website: townofwestville.com resolves but is a parked GoDaddy 'domain for sale' page, not a town site. Westville retains exactly one administrative step: the County's own Residential Construction Requirements sheet states 'If constructing within city limits a letter is required from them for city compliance' and lists Westville's own phone number (850-548-5858) among the five incorporated Holmes County places (Bonifay, Esto, Noma, Ponce De Leon, Westville) from which that letter must come.

Why the confidence is not higherProved in this run from first-party sources, checked independently rather than inherited from the Holmes County, City of Bonifay, Town of Esto, Town of Noma or Town of Ponce de Leon runs (three of which found the same county-checklist line naming Westville but left the letter's reach to a bare PV retrofit unresolved - see q27). Five sources read directly in this run: (1) the Holmes County Building/Planning/Zoning page, read live today, which names Keith Bennett as Building Official and lists no Westville building function of any kind; (2) the County's own Residential Construction Requirements sheet, a scanned image-only PDF with no text layer, OCR'd page-by-page with tesseract in this run (never trusted to a fetch-tool summary) - line 40 of the OCR reads 'Westville: 850-548-5858' inside the 'letter... for city compliance' block; (3) Holmes County Ordinance 03-S2 (2003), read in full from the Clerk's own ordinance archive, captioned 'AN ORDINANCE AMENDING THE COMPREHENSIVE PLAN OF HOLMES COUNTY AND THE MUNICIPALITIES OF ESTO, NOMA, PONCE DE LEON AND WESTVILLE', which recites that Chapter 163 F.S. 'requires Holmes County and the Municipalities of Esto, Noma, Ponce de Leon and Westville to prepare and adopt and enforce a comprehensive plan' and amends the shared plan; (4) the Florida Building Code Information System's state surcharge-jurisdiction registry, enumerated in full in this run (392 entries: 65 'County of' and 305 city/town organisations, with 'City of Alford' - a ~500-person Jackson County town - present as a positive control and 'zzqqx' returning zero as a fabricated control): 'County of Holmes' is present; 'Town of Westville' is absent, as are Bonifay, Esto, Noma and Ponce de Leon; (5) Wikipedia's article on Westville, Florida, fetched and read in this run, which confirms the town's government form and officers but is silent on any town building/police/fire function. Held at 88, not 90+ like the Ebro run, for two honest reasons specific to Westville: first, unlike Ebro (which had a Land Development Code section, LDC 1.10.01, that the Ebro Town Council co-adopted by name) no equivalent Westville-specific co-adoption clause was found in the Holmes County LDR read in this run - the joint relationship rests on the 2003 comprehensive-plan ordinance and the shared checklist rather than a land-development-code adoption clause naming Westville; second, no Holmes County permit record naming a Westville address was pulled (the County publishes no searchable permit portal - see q20), so there is no permit-level proof parallel to the iWorq stamps used in the Ebro/Washington run.

county ordinance amending joint comprehensive plan checked 2026-09-14 https://holmesclerk.com/uploads/2020/08/03-s2_000_tagged-1.pdf

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Delegated. Westville permits nothing itself - no building permit, no electrical permit, no plan review, no inspection, no fee schedule, no adopted construction code. Building and electrical sit with the Holmes County Building Department. Land development/zoning sits with the same county Building/Planning/Zoning office (Planner John Feeney). The one function Westville holds is the mandatory 'letter... for city compliance' that the County's own checklist requires before it will process a permit inside the town limits.

Why the confidence is not higherSame sources as q1. Corroborated further by Holmes County's own FBC adoption ordinance, Ordinance 23-01 (21 Feb 2023), read in full from the Clerk's archive in this run: 'The Florida Building Code, including all updates or amendments, is hereby adopted for use in Holmes County, Florida' - a countywide adoption with no carve-out for, or separate ordinance by, any of the county's five incorporated towns. Held at 85 because, as in q1, no single sentence states in so many words 'Holmes County issues building permits inside the Town of Westville' - it is assembled from the county's checklist naming Westville by phone number, the joint 2003 comprehensive plan, the countywide FBC ordinance, and the total absence of any Westville building function.

county ordinance adopting Florida Building Code checked 2026-09-14 https://holmesclerk.com/uploads/2025/08/ordinance-23-01_tagged.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes. A residential rooftop PV system needs a Holmes County building permit. The County's own Application for Building Permit (Revised 08/2026) carries an explicit 'Solar System' checkbox in its Building Information block, alongside Single Family, Sign, Storage/Pole Barn, Multi-Family, Demolition, Garage/Carport, Swimming Pool and Townhouse. An electrical Trade Permit is required in addition (see q4).

Why the confidence is not higherRead directly from the OCR'd Application for Building Permit inside the County's Residential Building Packet in this run - the form line reads '[ ] Multi-Family [ ] Demolition [ ] Solar System' and the form is headed 'Code in effect 8 Edition Florida Building Code' and 'Page 1 of 2, Revised 08/2026', i.e. the county's current live form. Held at 90 rather than higher only because the form does not use the word 'residential' next to the Solar System box, so it is read as covering residential and commercial alike, and because it is the County's form rather than anything Westville-specific (Westville has none).

permit application form (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate. The County issues a standalone Trade Permit Application for electrical work (headed 'RESIDENTIAL / COMMERCIAL / NEW CONSTRUCTION / EXISTING BUILDING', with its own 'ELECTRIC: [ ] WFEC [ ] FPL [ ] CHELCO' utility line), distinct from the general Application for Building Permit. The Residential Construction Checklist lists 'Trade Permit Application-All Trades (one per trade)' as its own required item alongside the building permit application.

Why the confidence is not higherBoth forms were OCR'd and read in full from the County's Residential Building Packet in this run. The Trade Permit form explicitly supports an 'EXISTING BUILDING' checkbox (not just new construction), which is the strongest evidence in this run that the county's paperwork treats work on an existing house - such as a PV retrofit - as a routine, anticipated case rather than an edge case. Held at 88 because no document states in words how a solar job specifically splits between the building permit and the trade permit (e.g. whether the array itself is booked under the building permit's 'Solar System' box and only the interconnection/panel work under the electrical trade permit, or both).

trade permit application form (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either. A state-certified or state-registered electrical contractor (licensed under F.S. ch. 489) who has registered with the Holmes County Building Department may pull it, or a property owner may self-permit under the F.S. 489.103 owner-builder exemption using the County's own Owner/Builder Permit Affidavit, part of the Residential Building Packet.

Why the confidence is not higherRead from the County's Certified Contractor Packet (Revised 8/2024) - which requires a current state licence, insurance naming the Building Department as certificate holder, and registration with the Florida Electrical Contractor's Licensing Board where applicable - and from the Owner/Builder Permit Affidavit inside the OCR'd Residential Building Packet, itself built on the F.S. 489.103 exemption text (read directly from the Florida Legislature's site in this run). Held at 82 because neither document addresses solar specifically or says whether the County/WFEC or CHELCO would accept an owner-installed, owner-permitted grid-tied PV system at interconnection.

contractor registration packet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/CERTIFIED-CONTRACTOR-PACKET-1.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes - with Holmes County, not with Westville (which has no registration function of its own). A certified contractor registers with a current copy of the state licence, a certificate of general liability and workers' compensation insurance naming Holmes County Building Department as certificate holder (a policy copy is not accepted), and pays a $35.00 administration fee. A registered but non-state-certified contractor pays a class-based licence fee: e.g. Electrical is $75 in-county, $125-$150 out-of-county, $200-$300 out-of-state.

Why the confidence is not higherQuoted and tabulated directly from the County's own Certified Contractor Packet (Revised 8/2024), extracted with pdftotext in this run - the fee table and the $35 certified-contractor admin fee are read verbatim from the document, and independently corroborated on the County's Construction Permit Fees line items. Held at 90 because the schedule itself says 'There are several different levels of Licenses. Please contact the Holmes County Building Department for exact prices,' so the printed numbers are indicative rather than exhaustive, and because none of this is Westville-specific - it is the county-level registration every contractor working inside Westville must also clear.

contractor registration packet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/CERTIFIED-CONTRACTOR-PACKET-1.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes. Holmes County's Residential Building Packet includes an Owner/Builder Permit Affidavit built on the F.S. 489.103 exemption: an owner may build or improve a one-, two- or three-family residence for personal occupancy, must directly supervise the work, may not hire an unlicensed person to act as contractor, and becomes the responsible party of record. Selling or leasing the improved residence within 1 year creates a legal presumption the work was done for sale, which defeats the exemption.

Why the confidence is not higherQuoted from F.S. 489.103, read directly from the Florida Legislature's site in this run, and from the Owner/Builder Permit Affidavit listed as a Residential Building Packet component on the County's own Building/Planning/Zoning page. Held at 85 because the affidavit's exact text could not be isolated inside the scanned packet with full confidence via OCR, and because neither the statute nor the County says whether WFEC or CHELCO would interconnect a self-installed, self-permitted PV system (a utility-side condition separate from the County's permitting exemption).

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0400-0499/0489/Sections/0489.103.html

Q8 What documents make up a complete submittal? Core Submittal package

No solar-specific submittal checklist is published. The general Residential Construction Checklist requires: Land Development Approval; a completed Residential Application for Building Permit; 911 address verification; a Notice of Commencement (work of $5,000+); a septic tank permit (if applicable) with a copy of plans; a Disclosure Statement; a Driveway Permit (if applicable); an Owner/Builder Permit Affidavit (if self-permitting); Legal Description of Property/Deed; an Authorization Form for Permit Application (if someone other than the licence holder is applying); two (2) sets of signed and sealed plans drawn to scale; the Florida Energy Efficiency Code form; a Fire-resistant-construction/fire-suppression statement where applicable; Product Approval / Florida Product Codes documentation; a Trade Permit Application for each trade; an Elevation Certificate (flood zone only); an Electrical Affidavit; a Letter of Compliance if in the City Limits (which would apply to a Westville address - see q27); and a Roofing Inspection Affidavit where roofing is disturbed.

Why the confidence is not higherAssembled from the County's own two-part Residential Building Packet (the Residential Construction Requirements narrative and the companion Residential Construction Checklist), both OCR'd page-by-page with tesseract in this run rather than trusted to a fetch-tool summary. Held at 78 because this is a reconstruction from a general new-house/addition checklist, not a document that names solar - the checklist's own header offers 'New House / Addition / Other' as job-type checkboxes, and a solar-only retrofit would most plausibly be booked as 'Other,' but nothing published confirms which of the listed items (Land Development Approval, Elevation Certificate, Notice of Commencement threshold) the Building Department actually waives for a panel-only job.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q9 How many copies, and in what format? Submittal package

Two (2) sets of signed and sealed plans drawn to scale. No page count, paper size or digital-format policy beyond that is published; the packet's plan requirements section is written for new construction and additions.

Why the confidence is not higherQuoted directly from the OCR'd Residential Construction Requirements sheet: 'Two (2) sets of signed & sealed plans drawn to scale.' Held at 75 because the document does not distinguish digital from paper submission, and F.S. 553.79(1)(b) independently requires the County to accept electronic submission including PDF by email - which is consistent with, but not confirmed against, the 'two sets' language written for a paper-plan era.

residential construction requirements sheet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

For the Land Development Approval step (county Planning), the LDR requires standard site-plan-type information for a Final Development Order; but LDR Section 10.01.03.C exempts 'the alteration of an existing building or structure so long as no change is made to its gross floor area, its use or the amount of impervious surface on the site' from needing a Final Development Order at all - a description that fits a rooftop PV retrofit on an existing house. For the Building Department step, no separate site-plan content is specified for solar.

Why the confidence is not higherLDR Sections 10.01.00-10.01.04 were read in full from the County's own Land Development Regulations PDF (2009, 236 pages), extracted with pdftotext in this run. Held at 68 because the LDR describes site-plan content for development generally, not for a PV job specifically, and because whether the Building Department (as opposed to Planning) independently wants a site sketch showing panel/array location for its own file is not stated anywhere in the enumerated document library.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Not published. No Holmes County document - the Residential Building Packet, the fee schedule, or the Land Development Regulations - mentions a one-line or three-line electrical diagram requirement, and no solar-specific plan-submittal handout exists.

Why the confidence is not higherProved absence, not a failure to look: the full Residential Building Packet (OCR'd, 18 pages) and the full 236-page LDR (pdftotext) were searched in this run. Controls: 'electrical' returns 22 hits in the LDR (positive control passed); 'zzqqx' returns 0 (fabricated control passed); 'solar' and 'photovoltaic' both return 0 in the LDR. Held at 72 rather than higher because a plans examiner will very plausibly still ask for a line diagram at the counter even though nothing published requires one, so this is an absence of a PUBLISHED requirement, not proof none is applied in practice.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Not published. No string-sizing, conductor-sizing or voltage-drop calculation requirement appears in any Holmes County document found in this run.

Why the confidence is not higherSame enumeration and same controls as q11 (Residential Building Packet OCR'd in full; LDR searched in full with 'electrical' 22/'zzqqx' 0). NEC 2020 calculations apply automatically wherever the electrical trade permit is reviewed, through the state's wholesale adoption of the FBC/NEC (Ordinance 23-01), without any Holmes-specific overlay found.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No local structural PE stamp threshold is published, and unlike neighbouring Washington County (which fixes a wind-speed line through Ebro by name), the Holmes County LDR sets no local wind-speed value or design-wind ordinance at all. The design wind speed for a Westville roof is set purely by the statewide FBC 8th Edition (2023) ASCE 7-22 maps, with no Holmes County amendment found.

Why the confidence is not higherThe full 236-page LDR was searched for 'wind speed', 'ASCE' and 'mph' in this run; the only 'mph' hits are road design speeds (Sec. 6.xx), not wind design. Ordinance 23-01 (the county's FBC adoption ordinance) contains no wind-speed clause of its own - it adopts the FBC 'including all updates or amendments' with no local addition. Held at 68 because this is an honest absence in the documents this run could reach, not a statement that no county wind ordinance has ever existed outside the LDR and this one enacting ordinance.

county ordinance adopting Florida Building Code checked 2026-09-14 https://holmesclerk.com/uploads/2025/08/ordinance-23-01_tagged.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

No local electrical PE stamp requirement is published. At state level, F.S. 471.003(2)(h) exempts a ch. 489-licensed electrical contractor from engineering licensure where the project 'requires an electrical or plumbing or air-conditioning and refrigeration system with a value of $125,000 or less' and 'requires an aggregate service capacity of 600 amperes (240 volts) or less on a residential electrical system' - which covers essentially every residential rooftop PV job.

Why the confidence is not higherThe statutory text was fetched and read from the Florida Legislature's own site in this run. The local absence rests on the same enumeration and controls as q11-q13. Held at 75 because the statute answers who may design without a PE stamp, not whether the Holmes County Building Official ever asks for one at the counter on an unusual job, which no document addresses.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

No flat solar fee. A residential PV job is priced as the sum of: (a) the building permit, using the County's general valuation ladder ($100 for the first $1,000 plus $8/additional $1,000 to $10,000; $252 for the first $10,000 plus $6/additional $1,000 to $50,000; and so on); (b) the electrical trade permit ('Residential: New electrical: $100.00'); (c) a plan review fee - the County's posted 2021/2023 fee schedule PDF says 'Residential: Minimum is $25.00, or 25% of the Building Permit Fee,' but the County's LIVE Building/Planning/Zoning page, read today, states 'Effective October 01, 2026: residential plan review fees will be $300 and commercial plan review fees will be $500 due at submittal' - a direct, unresolved conflict between the posted PDF and the live page, both current as of this run and pointing to different numbers 17 days apart from today's date; (d) a 3% or $4.00 (whichever is greater) state surcharge on all permits. A base fee of $10.00 applies to sub-permits per unit.

Why the confidence is not higherThe fee ladder and the $25/25% plan-review line were extracted with pdftotext from the County's posted Construction Permit Fees PDF (effective 02/08/2021, filename 'updated-fee-schedule-5.24.23.pdf'); the $300/$500 live figure and its 1 October 2026 effective date were read from the County's Building/Planning/Zoning page, fetched live in this run today (14 Sep 2026), 17 days before that date takes effect. This is the exact PDF-vs-live conflict the brief asked to be checked, and it is confirmed still live and unresolved. Held at 82 because no Solar-specific line exists in the fee schedule - the 'Solar System' box on the permit application is priced through the generic valuation ladder rather than a named solar rate - and because it is not stated whether the $300/$500 figure due at submittal REPLACES or supplements the $25-or-25% line once it takes effect.

fee schedule (posted PDF) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q16 How is the fee calculated? Core Fees

Mixed. The building-permit half is Valuation-based (contract value on the ladder); the electrical trade-permit half is Flat ($100.00 for new residential electrical); the plan-review fee is presently the greater of a $25 flat floor or 25% of the building permit fee (Tiered/Flat hybrid), moving to a flat $300 residential figure from 1 October 2026 per the live page - see q15 for the PDF-vs-live conflict.

Why the confidence is not higherSame two documents as q15, both read in full in this run. Held at 80 for the same valuation-versus-flat ambiguity described there, and because the live page does not say the new $300 figure supersedes rather than adds to the posted PDF's 25% formula.

fee schedule (posted PDF) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q17 Is there a separate plan-check fee? Fees

Yes, and there are two conflicting versions of it live today. The posted 2021 fee schedule PDF: 'Plan Review Fees: Residential: Minimum is $25.00, or 25% of the Building Permit Fee' plus a $25.00 Plan Revision fee per re-submittal. The County's live Building/Planning/Zoning page, fetched today: 'Effective October 01, 2026: residential plan review fees will be $300 ... due at submittal.'

Why the confidence is not higherBoth figures were read directly from the respective sources in this run - the PDF via pdftotext, the live page via a direct fetch of https://holmescountyfla.com/building-planning-zoning/ on 14 Sep 2026. This is the specific conflict the brief flagged for Holmes County and it is confirmed as still open: the PDF has not been superseded with a new document, and the live page's announcement has not yet taken effect (1 Oct 2026 is 17 days after this check).

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q18 What is the stated plan-review turnaround? Core Timeline & validity

The County publishes no plan-review turnaround of its own beyond the statutory floor. F.S. 553.792(1)(a)-(c) sets 5 business days after a complete application for an electrical or structural permit on an EXISTING single-family dwelling where the work is under $15,000; 30 business days for a residential unit/electrical permit on a structure under 7,500 sq ft; and the County must give written notice within 5 business days of anything missing, or the application is automatically deemed complete.

Why the confidence is not higherThe statute was fetched and read directly from the Florida Legislature's own site in this run: 'unless the timeframes set by local ordinance are more stringent' governs, and no Holmes County ordinance setting a stricter timeframe was found in the enumerated document library or Ordinance 23-01. Held at 68 because a statutory ceiling is not a published service standard, and because whether the reviewer treats a PV retrofit as work on an 'existing' dwelling under $15,000 (5-day track) or something else (30-day track) is not stated.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0500-0599/0553/Sections/0553.792.html

Q19 How long is an issued permit valid before it expires? Timeline & validity

Two different answers are in force and they conflict. Holmes County's own current Application for Building Permit (Revised 08/2026) states: 'The building permit is valid as long as there is construction progress and an approved inspection is recorded within each 180 days (6 months) period.' F.S. 553.79(1)(c) states a building permit for a single-family dwelling 'expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' Reported as an open conflict, not resolved here.

Why the confidence is not higherThe county form text was OCR'd directly from the current (08/2026-revised) Residential Building Packet in this run; the statute was read directly from the Legislature's site. Held at 75 because which instrument the permit technician actually applies at the counter is not published, and because it is arguable whether a solar-only permit on an existing house counts as a permit 'for a single-family dwelling' within the statute's meaning versus an alteration permit governed by the 180-day inspection-activity clause instead.

permit application form (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q20 Which permit portal does this authority use? Core Portal & process

No online permit portal was found. The Building Department's own page lists only phone (850-547-1119), fax (850-547-4134) and email (hcbd@holmescountyfl.org) contact, and a paper document library of downloadable checklists and forms. No iWorq, eTRAKiT, CitizenServe, Accela, MyGov or similar portal link appears anywhere on the department's page or in its document library.

Why the confidence is not higherThe full Building/Planning/Zoning page was fetched live and searched for portal-platform keywords in this run; none were found, and the page's own document library (enumerated: Certified Contractor Packet, Commercial Construction Packet, E-911 Address Application, Mobile Home Packet, Residential Building Packet, fee schedule, plus eight Comprehensive Plan elements and the LDR/FLUM) contains no online-application reference. Held at 68 rather than higher because a portal used only by registered contractors, off this public page, cannot be ruled out from a public fetch alone.

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q21 Can the whole application be completed online? Core Portal & process

No. With no online portal identified (q20), the process is paper/email-based: forms are downloaded, completed, signed/notarized where required, and submitted to the Building Department by mail, fax, email or in person; F.S. 553.79(1)(b) independently requires the County to accept electronic submission including PDF by email.

Why the confidence is not higherInferred from the absence of a portal (q20) plus the County's listed phone/fax/email contact channels and the statutory electronic-submission floor, read from the Legislature's site. Held at 62 because no county document states affirmatively 'applications may be emailed' the way Washington County's page does - this is an inference from the shape of what IS published, not a quoted policy.

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q22 Which utility handles interconnection here? Core Utility interconnection

Not resolved to certainty. Holmes County's own Trade Permit Application offers a three-way choice - 'ELECTRIC: [ ] WFEC [ ] FPL [ ] CHELCO' - and both West Florida Electric Cooperative Association (WFEC) and Choctawhatchee Electric Cooperative (CHELCO) state on their own websites that they serve Holmes County. WFEC's About page: 'providing reliable electricity and other value-added services in Calhoun, Holmes, Jackson and Washington Counties,' headquartered in Graceville with a district office in Bonifay (the same town as the county building department). CHELCO's own page: 'serving more than 56,000 accounts in Walton, Okaloosa, Holmes and Santa Rosa counties.' Neither cooperative's own page names Westville specifically. Given Westville's location on US-90 in far southern/western Holmes County near the Walton County line, and WFEC's Bonifay office serving the same US-90 corridor, WFEC is the more likely utility for a Westville address, but this is not confirmed at the parcel level in this run.

Why the confidence is not higherBoth utility 'About Us' pages were fetched and read directly in this run (Wikipedia's WFEC article was also read and independently corroborates WFEC's four-county area but does not mention Westville). Attempts in this run to resolve the exact boundary - HIFLD/ArcGIS electric-retail-territory REST queries, CHELCO's New Construction page, Holmes County GIS/permit-portal utility stamps (no portal exists, see q20) - were tried and did not produce a Westville-specific answer. Held at 55, the lower end of the usable range, specifically BECAUSE this is genuinely unresolved rather than confidently assumed; an installer should confirm at the specific parcel via either cooperative's own member-lookup tool before assuming WFEC.

utility own page checked 2026-09-14 https://westflorida.coop/about-us

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel, with the AHJ's building-permit inspection as a hard precondition to operation - documented for WFEC, the more likely utility (see q22). WFEC's Interconnection Agreement for Member Owned Generation (MOG) requires the member to provide, at least 10 business days before operating in parallel, 'documentation showing the MOG has been inspected and approved by local code officials prior to its operation,' plus IEEE-1547, IEEE-1547.1 and UL 1741 compliance certifications and proof of $100,000 general liability insurance.

Why the confidence is not higherQuoted directly from WFEC's own MOG Agreement (Revised May 2025), extracted with pdftotext in this run from westflorida.coop's own solar-energy page. Held at 65, capped by the same utility-identity uncertainty as q22 - if CHELCO rather than WFEC in fact serves the specific Westville parcel, its own (unread in this run) interconnection agreement would govern instead, though Florida cooperative MOG agreements of this kind are broadly similar in structure.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Not by the authority. Neither Westville nor Holmes County requires HOA or architectural approval for rooftop PV, and F.S. 163.04(2) voids any deed restriction or covenant that prohibits or has the effect of prohibiting solar collectors - such a body may only determine placement within south, plus or minus 45 degrees, where that does not impair performance. Holmes County's own Residential Building Packet warns applicants twice: 'NOTICE: Holmes County Building Department does not have the authority to enforce deed restrictions or covenants on properties. You are advised to check for any restrictions that may affect your property.'

Why the confidence is not higherThe statute was fetched and read from the Legislature's own site in this run; the notice is quoted verbatim from the OCR'd County Application for Building Permit, page 2 of 2, Revised 08/2026. Held at 78 because no Westville-specific overlay (Westville has no ordinances of its own that could be found) can be ruled in or out beyond this county-level notice.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0163/Sections/0163.04.html

Q25 Is there a historic-district review? Overlays & special cases

No historic-district review is required. The Holmes County LDR carries a Historical and Archaeological Resource Protection provision (Sec. 4.08.00/4.08.02) tied to the Florida Master Site File and the County's own comprehensive historical listing, but this operates through the Final Development Order / Land Development Approval process - which LDR 10.01.03.C would exempt for a like-for-like alteration of an existing building, the same exemption discussed at q10 and q27. No separate historic-district or design-review board was found for Westville or Holmes County.

Why the confidence is not higherLDR Sec. 4.08.00/4.08.02 was read in full from the County's own Land Development Regulations PDF in this run. Held at 65 because a Westville-specific historic designation, if one existed, would not necessarily appear in a county document - Westville has no website, ordinance archive, or Municode presence that could be searched independently in this run.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q26 Is a wind or windstorm certification required? Overlays & special cases

No separate windstorm certificate is required. What applies instead is the statewide FBC 8th Edition (2023) ASCE 7-22 wind-speed maps (no local Holmes County wind-speed ordinance was found - see q13) plus the Product Approval process: the County's Trade/Building Permit forms carry a 'FL. PRODUCT APPROVAL CODE' field and a Product Approval Specification Sheet 'as required by Florida Statute 553.842 and Florida Administrative Code 9B-72,' and the inspector requires the product approval number and performance characteristics to be available on the jobsite at inspection.

Why the confidence is not higherThe Product Approval Specification Sheet was OCR'd and read in full from the County's Residential Building Packet in this run - it quotes both the statute and rule citation directly. Held at 65 because the packet's product-approval language is written for roofing/window/door products generally, not for PV racking specifically, so whether Holmes County treats a PV mounting system as a product requiring its own Florida Product Approval number is an inference rather than a stated rule.

product approval specification sheet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

No Special Use Permit or Council approval is required. The one town-level step that does exist is the Letter of Compliance: the County's own Residential Construction Requirements name Westville (850-548-5858) among the five Holmes County towns from which this letter is required before the County will process a permit inside town limits. THE REACH OF THAT LETTER TO A BARE PV RETROFIT, flagged as unresolved by two prior runs on this same county checklist (Esto and, per this survey's brief, others), is partially but not fully resolved in this run: the checklist item 'Letter of Compliance (if in the City Limits)' sits on the County's general Residential Construction CHECKLIST (page bearing checkboxes '[ ] New House [ ] Addition [ ] Other'), separately from the 'Land Development Approval' checklist line - i.e. it is not merely a rider on the Land Development Approval step that LDR 10.01.03.C would exempt for an alteration of an existing building. The County's own electrical Trade Permit Application form separately and explicitly supports an 'EXISTING BUILDING' checkbox, confirming the County's paperwork treats work on an existing house as a routine, anticipated permit type, not an edge case squeezed out of a new-construction-only process. Read together, the more probable reading is that the Letter of Compliance is collected as a general Building Department intake requirement whenever a permit (of any kind, including 'Other'/existing-building work) is processed for a property inside a Holmes County town's limits - which would reach a bare PV retrofit inside Westville. But no Holmes County document says this in so many words for solar, and the companion Residential Construction Requirements narrative sheet is itself titled 'NEW HOUSES & ADDITIONS TO OBTAIN BUILDING PERMITS,' which cuts the other way and keeps this from being a clean resolution.

Why the confidence is not higherEverything above was read directly in this run from the County's own OCR'd two-part Residential Building Packet (the 'NEW HOUSES & ADDITIONS' narrative sheet and the companion 'RESIDENTIAL CONSTRUCTION CHECKLIST' with its 'New House / Addition / Other' checkboxes) and the Trade Permit Application's 'EXISTING BUILDING' checkbox, plus LDR 10.01.03.C read from the County's own Land Development Regulations. Held at 68 - materially higher than the unresolved status left by the Esto run on the same underlying document, because this run found and used the checklist's own 'Other' checkbox and the Trade Permit's 'EXISTING BUILDING' checkbox as internal textual evidence the earlier runs did not have in view - but capped below 75 because the packet's own title still creates a genuine internal inconsistency that only a call to the Building Department (850-547-1119) or the Town of Westville (850-548-5858) could settle with certainty.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No cap is published in the Holmes County LDR or Building Department materials. The likely binding cap sits at the interconnecting utility. WFEC's own MOG Agreement caps a Member Owned Generation system at 'no more than 25 kW of alternating current power output,' and its solar-energy page separately states WFEC 'offers an energy credit of 5.2 cents per kilowatt-hour for solar installations smaller than 25 kW.' Which utility in fact serves a given Westville parcel is not conclusively established in this run (see q22), so this 25 kW figure should be read as WFEC's cap, not confirmed as binding on every Westville address.

Why the confidence is not higherThe LDR absence rests on the same enumeration and controls as q11 (0 'solar'/'photovoltaic' hits). The 25 kW figure is quoted directly from WFEC's own MOG Agreement PDF, read in this run. Held at 68 for the utility-identity caveat carried from q22.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020 (NFPA 70, 2020 edition). Florida Administrative Code Rule 69A-60.005(2)(qq) reads verbatim: '(qq) NFPA 70, 2020 edition, National Electrical Code.' Holmes County adopts the Florida Building Code (which incorporates the NEC by reference) wholesale via Ordinance 23-01 with no local amendment of its own. 85% · state administrative rule (LII mirror)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023). Holmes County Ordinance 23-01 (adopted 21 Feb 2023): 'The Florida Building Code, including all updates or amendments, is hereby adopted for use in Holmes County, Florida' - a wholesale, no-local-amendment adoption. The County's own current Application for Building Permit is independently stamped 'Code in effect 8 Edition Florida Building Code.' 90% · county ordinance adopting Florida Building Code
    • Which fire code edition is in force? Florida Fire Prevention Code - NFPA 1, the Fire Code, Florida 2021 Edition (FAC 69A-60.003), adopted statewide and reaching Holmes County/Westville by operation of state rule regardless of any local ordinance. 70% · state administrative rule (LII mirror)
    • Are there local amendments to any of the above? No. Holmes County Ordinance 23-01 adopts the Florida Building Code 'including all updates or amendments... for use in Holmes County, Florida' with no local amendment of its own beyond a fee-setting clause (Section 2: fees are set separately by County Commission resolution). No Holmes County Code of Ordinances chapter equivalent to Washington County's 1980 local Electrical Code article was found; Holmes County's own ordinance archive and Land Development Regulations were searched and no building/electrical amendment ordinance beyond 23-01 and the LDR's own generic setback rule (Sec. 6.01.05, arterial-road setbacks only) was found. 75% · county ordinance adopting Florida Building Code
    • What is the installation judged against? The installation is judged against the Florida Building Code, 8th Edition (2023) and NEC 2020 (NFPA 70) as wholesale-adopted by Holmes County Ordinance 23-01, plus the Florida Fire Prevention Code (NFPA 1, Florida 2021 Edition) by operation of state rule. No Holmes County local amendment to any of these was found (see q32). LDR Section 6.01.05 sets setbacks from arterial roads only, and County Ord. #88-02 (quoted on the County's own FAQ page) sets a generic 15 ft front/rear, 10 ft side setback reaching 'all additions, and storage buildings' - relevant chiefly to a ground-mounted array rather than a roof-mounted one. 78% · county department page (live)
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Town of Westville on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Rapid shutdown is required, to NEC 2020 - i.e. NEC 690.12 as it stands in the 2020 edition, including that edition's array-boundary and inside-the-boundary controlled-conductor provisions. Neither Westville nor Holmes County adds or subtracts anything: the FBC/NEC is adopted wholesale by Ordinance 23-01, and the state edition in force is NFPA 70, 2020 (FAC 69A-60.005(2)(qq)). 72% · state administrative rule (LII mirror)
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? No AHJ-specific placard set is published by Westville or Holmes County. What applies instead: NEC 2020 Article 690/705 marking requirements (through the wholesale NEC adoption); and, for whichever cooperative serves the address (see q22), a utility-required manual disconnect switch that must be 'mounted separate from the meter socket... readily accessible to Cooperative and capable of being locked in the open position with a utility padlock' (WFEC's own MOG Agreement language). 62% · county land development regulations
    • Does the authority specify placard wording of its own? No. Neither Westville nor Holmes County specifies placard wording of its own. 68% · county land development regulations
    • Does it specify letter height, colour or material? No. No letter height, colour or material specification for placards or labels was found in any Holmes County document. 65% · county land development regulations
    • Is a site plan / facility map placard required, and what must it show? Not published locally. A facility/site plan placard would be governed by NEC 705.10 (through the wholesale NEC 2020 adoption) without any Holmes County supplement found. 55% · county land development regulations
    • Does the UTILITY specify placards beyond the AHJ's? Yes, at the utility level, for whichever cooperative serves the address (see q22 caveat). WFEC's own MOG Agreement requires a manual disconnect switch 'of the visible load break type,' 'mounted separate from the meter socket,' 'readily accessible to Cooperative and capable of being locked in the open position with a utility padlock.' 68% · utility interconnection agreement
    • Where must the labels be placed? Not published locally beyond the NEC's own labelling-location rules (unread text, see q37). WFEC's disconnect switch must sit separate from the meter socket (see q42/q48) - the clearest location rule found in this run, though utility rather than AHJ-sourced. 55% · utility interconnection agreement
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Where must the AC disconnect be, relative to the meter? Separate from the meter socket. WFEC's MOG Agreement: 'The manual disconnect switch shall be mounted separate from the meter socket and shall be readily accessible to Cooperative and capable of being locked in the open position with a utility padlock.' 68% · utility interconnection agreement
    • Must equipment be on a specific approved list? Not addressed by the County. At the utility level (for whichever cooperative serves the address, see q22), WFEC's MOG Agreement requires certification that the system complies with IEEE-1547 (2003), IEEE-1547.1 (2005) and UL 1741 (2005) before interconnection. 68% · utility interconnection agreement
    • Is there a separate ESS permit or inspection? No separate ESS permit type exists among the County's own enumerated permit categories (Temporary Electrical, Electrical, Plumbing, Mechanical, Roofing, Gas - listed on the Residential Construction Checklist's own 'PERMITS:' block). A battery/ESS installed alongside PV would most plausibly be folded into the electrical trade permit, but no document confirms this. 58% · residential construction checklist (OCR'd)
    • Is a ground mount treated as a structure? Yes, most likely. Holmes County's LDR treats 'accessory structures' as development subject to its general rules, and the setback ordinance the County's own FAQ page quotes (Ord. #88-02: 15 ft front/rear, 10 ft side) expressly 'includes septic tanks, all additions, and storage buildings' - a ground-mounted rack is the closest analog among these. LDR 10.01.03.C's alteration exemption (see q10/q27), by contrast, applies only to alterations of an EXISTING building, so a new ground-mount would not qualify for that exemption and would instead need to clear the ordinary development-permit/setback process. 62% · county department page (live)
    • Is there a local rule on service upgrades or busbar sizing? Not published. No busbar/120% rule, service-conductor sizing rule, or meter-height rule specific to Holmes County was found - unlike Washington County, whose Chapter 14 Article III carries its own detailed 1980-vintage local electrical prescriptions. NEC 2020 (adopted wholesale, see q29/q32) governs service upgrades and busbar sizing without any Holmes County overlay found in this run. 68% · county land development regulations
    • Is a specific mounting system or attachment spacing required? Not published. No mounting-system, rail, attachment-spacing or standoff requirement appears in any Holmes County document found in this run. What does apply is the general Florida Product Approval regime: the County's Trade/Building Permit forms require a Florida Product Approval code for roof-related work, and the inspector requires product-approval documentation on site (see q26). 65% · residential construction checklist (OCR'd)

20 questions answered against Town of Westville’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020 (NFPA 70, 2020 edition). Florida Administrative Code Rule 69A-60.005(2)(qq) reads verbatim: '(qq) NFPA 70, 2020 edition, National Electrical Code.' Holmes County adopts the Florida Building Code (which incorporates the NEC by reference) wholesale via Ordinance 23-01 with no local amendment of its own.

Why the confidence is not higherThe rule text was read via a Cornell Law (LII) mirror of the Florida Administrative Code in this run after flrules.org itself returned a Cloudflare bot-challenge to every route tried (readFile.asp, ChapterHome.asp) - flagged here rather than silently substituted, per the playbook's warning about unreachable primary sources. The mirror shows the amendment history 'Amended by Florida Register Volume 49, Number 239, December 12, 2023 effective 12/31/2023,' consistent with editions found in other same-state runs this survey has conducted. Held at 85 rather than higher for the source-mirror substitution and because Holmes County's own forms describe 'Electrical requirements are from the National Electrical Code' without naming an edition themselves.

state administrative rule (LII mirror) checked 2026-09-14 https://www.law.cornell.edu/regulations/florida/Fla-Admin-Code-Ann-R-69A-60-005

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023). Holmes County Ordinance 23-01 (adopted 21 Feb 2023): 'The Florida Building Code, including all updates or amendments, is hereby adopted for use in Holmes County, Florida' - a wholesale, no-local-amendment adoption. The County's own current Application for Building Permit is independently stamped 'Code in effect 8 Edition Florida Building Code.'

Why the confidence is not higherOrdinance 23-01 was read in full from the Holmes County Clerk's own ordinance archive in this run; the FAC 61G20-1.001 rule text (8th Edition (2023), with amendment dates through at least December 2024) was read via the same Cornell/LII mirror used for q29 after flrules.org's own site 403'd/Cloudflare-challenged every route tried. Independently corroborated by the County's own permit-application form stamp, OCR'd from the current packet in this run. Held at 90 given three converging first-party sources (county ordinance, county form, state rule mirror).

county ordinance adopting Florida Building Code checked 2026-09-14 https://holmesclerk.com/uploads/2025/08/ordinance-23-01_tagged.pdf

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code - NFPA 1, the Fire Code, Florida 2021 Edition (FAC 69A-60.003), adopted statewide and reaching Holmes County/Westville by operation of state rule regardless of any local ordinance.

Why the confidence is not higherRead via the Cornell/LII mirror in this run after flrules.org itself returned a Cloudflare challenge on every route tried - flagged rather than silently substituted. The mirror's amendment-history line shows an effective date of 12/31/2020 for the version captured, which is earlier than the 31 Dec 2023 effective date another same-state run of this survey found directly from flrules.org before that site began challenging automated requests; both agree on 'Florida 2021 Edition' as the adopted edition. Held at 70, not higher, for this source-access degradation and the unreconciled effective-date discrepancy between the mirror and the (currently unreachable) primary rule text.

state administrative rule (LII mirror) checked 2026-09-14 https://www.law.cornell.edu/regulations/florida/Fla-Admin-Code-Ann-R-69A-60-003

Q32 Are there local amendments to any of the above? Core Code editions in force

No. Holmes County Ordinance 23-01 adopts the Florida Building Code 'including all updates or amendments... for use in Holmes County, Florida' with no local amendment of its own beyond a fee-setting clause (Section 2: fees are set separately by County Commission resolution). No Holmes County Code of Ordinances chapter equivalent to Washington County's 1980 local Electrical Code article was found; Holmes County's own ordinance archive and Land Development Regulations were searched and no building/electrical amendment ordinance beyond 23-01 and the LDR's own generic setback rule (Sec. 6.01.05, arterial-road setbacks only) was found.

Why the confidence is not higherOrdinance 23-01 was read in full from the Clerk's archive; the full county ordinance index (all numbered ordinances back through the 1980s-2020s) was read as a title list from the same page in this run, and none is titled as a building or electrical code amendment beyond 23-01 itself. The 236-page LDR was searched in full ('electrical' 22 hits positive control, 'zzqqx' 0 fabricated control). Held at 75 because Holmes County, unlike Washington County, has no Municode-hosted general Code of Ordinances that this run could search directly for a hidden local amendment - the Clerk's own archive and the LDR are the only two document sets that could be reached.

county ordinance adopting Florida Building Code checked 2026-09-14 https://holmesclerk.com/uploads/2025/08/ordinance-23-01_tagged.pdf

Q33 What is the installation judged against? Core Electrical

The installation is judged against the Florida Building Code, 8th Edition (2023) and NEC 2020 (NFPA 70) as wholesale-adopted by Holmes County Ordinance 23-01, plus the Florida Fire Prevention Code (NFPA 1, Florida 2021 Edition) by operation of state rule. No Holmes County local amendment to any of these was found (see q32). LDR Section 6.01.05 sets setbacks from arterial roads only, and County Ord. #88-02 (quoted on the County's own FAQ page) sets a generic 15 ft front/rear, 10 ft side setback reaching 'all additions, and storage buildings' - relevant chiefly to a ground-mounted array rather than a roof-mounted one.

Why the confidence is not higherAssembled from Ordinance 23-01, the LDR sections read in this run, and the County's Building/Planning/Zoning FAQ page (fetched live), which quotes Ord. #88-02 verbatim. Held at 78 because the NFPA 1 substantive text itself could not be read (blocked source, see q31), and because Ord. #88-02's exact text (as opposed to the County's own FAQ quotation of it) was not independently located in the Clerk's archive in this run.

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Not published. No busbar/120% rule, service-conductor sizing rule, or meter-height rule specific to Holmes County was found - unlike Washington County, whose Chapter 14 Article III carries its own detailed 1980-vintage local electrical prescriptions. NEC 2020 (adopted wholesale, see q29/q32) governs service upgrades and busbar sizing without any Holmes County overlay found in this run.

Why the confidence is not higherSame enumeration and controls as q11/q32 (Residential Building Packet OCR'd in full; LDR and Ordinance archive searched, no electrical-code-amendment ordinance found). Held at 68 because this is a genuine, well-corroborated absence rather than a failure to look, but a small county's Building Official can and often does apply unwritten local practice at the counter that this run cannot observe.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Not published. No mounting-system, rail, attachment-spacing or standoff requirement appears in any Holmes County document found in this run. What does apply is the general Florida Product Approval regime: the County's Trade/Building Permit forms require a Florida Product Approval code for roof-related work, and the inspector requires product-approval documentation on site (see q26).

Why the confidence is not higherProved absence on the same enumeration and controls as q11/q32/q34. The Product Approval requirement is quoted from the OCR'd Residential Building Packet. Held at 65 because the product-approval lines are written for roofing/window/door products generally rather than PV racking specifically, so whether Holmes County requires a Florida Product Approval number for the mounting system itself is an inference.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedHolmes County's own document library (Residential Building Packet OCR'd in full, Land Development Regulations searched in full with pdftotext, County ordinance archive title list read in full) contains no fire-code, ridge-setback or roof-access-pathway text of its own. The governing text is NFPA 1, the Fire Code, Florida 2021 Edition (FAC 69A-60.003), whose substantive ridge-setback/roof-access provisions are copyrighted NFPA material published only through a non-downloadable, non-printable state viewer; NFPA's and ICC's own hosts (nfpa.org, codes.iccsafe.org) returned hard blocks to every route tried in this run. An unreachable source, not a proved absence - do not record Holmes County/Westville as having no ridge setback on the strength of this.

https://codes.iccsafe.org/content/FLBC2023P1

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Rapid shutdown is required, to NEC 2020 - i.e. NEC 690.12 as it stands in the 2020 edition, including that edition's array-boundary and inside-the-boundary controlled-conductor provisions. Neither Westville nor Holmes County adds or subtracts anything: the FBC/NEC is adopted wholesale by Ordinance 23-01, and the state edition in force is NFPA 70, 2020 (FAC 69A-60.005(2)(qq)).

Why the confidence is not higherThe chain is proved at both ends in this run - Ordinance 23-01's wholesale adoption from the Clerk's archive, and the 2020 NEC edition via the Cornell/LII mirror (see q29, flagged for the same flrules.org access issue). Held at 72, not higher, because NEC 690.12's own section text could not be read in this run - NFPA's and ICC's own sites return hard blocks to every route tried - so the EDITION is proved but the SECTION TEXT is asserted from the edition rather than quoted, exactly the gap this survey's playbook warns is the single most consequential one to get wrong.

state administrative rule (LII mirror) checked 2026-09-14 https://www.law.cornell.edu/regulations/florida/Fla-Admin-Code-Ann-R-69A-60-005

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

No AHJ-specific placard set is published by Westville or Holmes County. What applies instead: NEC 2020 Article 690/705 marking requirements (through the wholesale NEC adoption); and, for whichever cooperative serves the address (see q22), a utility-required manual disconnect switch that must be 'mounted separate from the meter socket... readily accessible to Cooperative and capable of being locked in the open position with a utility padlock' (WFEC's own MOG Agreement language).

Why the confidence is not higherProved absence on the same enumeration/controls as q11/q32/q34/q35, plus WFEC's own MOG Agreement, read directly in this run. Held at 62 because this is a negative about a small rural county that publishes very little generally, because the NEC's own placard text could not be read (blocked, see q37), and because the utility-identity caveat from q22 applies to the disconnect-switch detail.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. Neither Westville nor Holmes County specifies placard wording of its own.

Why the confidence is not higherProved absence on the same enumeration and controls as q11/q38 - Residential Building Packet OCR'd in full, LDR searched in full, 'placard' and 'photovoltaic' both 0 hits, 'electrical' 22 hits as positive control, 'zzqqx' 0 as fabricated control. Westville itself has no ordinance archive or Municode presence that could be searched independently. Held at 68 rather than higher because a wording sheet handed over a Building Department counter would leave no trace in the published document library this run could reach.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No. No letter height, colour or material specification for placards or labels was found in any Holmes County document.

Why the confidence is not higherSame enumeration and controls as q39. Held at 65 for the same reasons.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Not published locally. A facility/site plan placard would be governed by NEC 705.10 (through the wholesale NEC 2020 adoption) without any Holmes County supplement found.

Why the confidence is not higherSame enumeration and controls as q39/q40; NEC 705.10's own text could not be read in this run (see q37 for the blocked-source explanation). Held at 55 because this combines a proved local absence with an unread state-code baseline.

county land development regulations checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/Holmes-County-LDR_2009.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, at the utility level, for whichever cooperative serves the address (see q22 caveat). WFEC's own MOG Agreement requires a manual disconnect switch 'of the visible load break type,' 'mounted separate from the meter socket,' 'readily accessible to Cooperative and capable of being locked in the open position with a utility padlock.'

Why the confidence is not higherQuoted directly from WFEC's own MOG Agreement PDF, read in this run. Held at 68, capped by the same utility-identity uncertainty carried from q22 - CHELCO's own (unread in this run) interconnection documents may differ in detail even if broadly similar in structure.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Not published locally beyond the NEC's own labelling-location rules (unread text, see q37). WFEC's disconnect switch must sit separate from the meter socket (see q42/q48) - the clearest location rule found in this run, though utility rather than AHJ-sourced.

Why the confidence is not higherSame sources as q41/q42. Held at 55 for the combined local-absence-plus-unread-state-baseline and utility-identity reasons already given.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q44 Must equipment be on a specific approved list? Equipment listing

Not addressed by the County. At the utility level (for whichever cooperative serves the address, see q22), WFEC's MOG Agreement requires certification that the system complies with IEEE-1547 (2003), IEEE-1547.1 (2005) and UL 1741 (2005) before interconnection.

Why the confidence is not higherQuoted directly from WFEC's own MOG Agreement, read in this run; the Holmes County absence rests on the same enumeration/controls as q11 (no 'listed'/'approved list' language for equipment found). Held at 68 for the utility-identity caveat.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedThe Residential Building Packet, fee schedule and LDR were searched in this run for 'battery'/'batteries'/'ESS'/'energy storage' language; none appears, and none of the County's enumerated permit types names an ESS/battery permit. The substantive governing text would be NFPA 1's ESS provisions (Florida 2021 Edition, adopted via FAC 69A-60.003) and possibly NFPA 855, but neither could be read in this run for the same reason given at q36 - copyrighted NFPA material behind a non-downloadable state viewer, with NFPA's and ICC's own hosts returning hard blocks to every route tried. An unreachable source for the conditions themselves, not a proved absence of any battery regulation.

https://codes.iccsafe.org/content/FLBC2023P1

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separate ESS permit type exists among the County's own enumerated permit categories (Temporary Electrical, Electrical, Plumbing, Mechanical, Roofing, Gas - listed on the Residential Construction Checklist's own 'PERMITS:' block). A battery/ESS installed alongside PV would most plausibly be folded into the electrical trade permit, but no document confirms this.

Why the confidence is not higherThe permit-type list was OCR'd directly from the County's Residential Building Packet in this run. Held at 58 because this is an inference from what IS enumerated rather than a stated policy, and because the underlying fire-code text governing ESS (NFPA 1) could not be read (see q45/q36).

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes, most likely. Holmes County's LDR treats 'accessory structures' as development subject to its general rules, and the setback ordinance the County's own FAQ page quotes (Ord. #88-02: 15 ft front/rear, 10 ft side) expressly 'includes septic tanks, all additions, and storage buildings' - a ground-mounted rack is the closest analog among these. LDR 10.01.03.C's alteration exemption (see q10/q27), by contrast, applies only to alterations of an EXISTING building, so a new ground-mount would not qualify for that exemption and would instead need to clear the ordinary development-permit/setback process.

Why the confidence is not higherThe setback quotation is read from the County's Building/Planning/Zoning FAQ page, fetched live in this run; the LDR's accessory-structure and exemption language was read from the LDR PDF. Held at 62 because no Holmes County document uses the word 'solar' or 'array' in connection with setbacks or accessory-structure status - this is inference by analogy, not a stated rule.

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Separate from the meter socket. WFEC's MOG Agreement: 'The manual disconnect switch shall be mounted separate from the meter socket and shall be readily accessible to Cooperative and capable of being locked in the open position with a utility padlock.'

Why the confidence is not higherQuoted directly from WFEC's own MOG Agreement PDF, read in this run. Held at 68 for the same utility-identity caveat carried from q22.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Most plausibly Phone, given no online portal was identified (see q20) and the Building Department's only published contact channels are phone (850-547-1119), fax and email. 55% · county department page (live)
    • How much notice is required? 24 hours. The County's own Residential Construction Requirements sheet: 'No inspections will be made prior to the issuance of a building permit. A 24 hour notice is required prior to each inspection.' 85% · residential construction requirements sheet (OCR'd)
    • Are same-day or AM/PM windows offered? Not published. No AM/PM-window or same-day-inspection policy was found; inspections run on a fixed two-day-a-week schedule instead (see q54). 55% · residential construction checklist (OCR'd)
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? Yes. The Holmes County Building Department performs its own final electrical/building inspections for all permits it issues, including inside Westville - there is no separate Westville inspector, and Westville performs no inspection function of its own (see q1/q2). 80% · county department page (live)
    • If delegated, to whom? Not delegated. Holmes County performs its own final inspections rather than delegating to a third party or to Westville. 78% · county department page (live)
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? The County's Residential Construction Checklist lists (for a new house/addition, in the order printed): Footings (Dig and Pour); Pre-Treat for Termites (certificate checked at Final); Temporary Construction Pole; Install Doors/Windows (checked at Final); Sheathing (Nailing); Dry-In (Rough-In Electrical, Rough-In Mechanical/HVAC, Framing, Plumbing Stack-Out); Utilities Turned On; Insulation; Plumbing Rough-In (bath/kitchen); Call-Back for Plumbing/Electrical/HVAC contractors; and Final Inspection. Inspections are conducted only Mondays and Thursdays (see q setback re: cadence below). For a solar-only retrofit, only a subset of these stages would apply - most plausibly the electrical rough-in/final and a roofing-related check if the array penetrates the roof deck - but no solar-specific inspection sequence is published. 65% · residential construction checklist (OCR'd)
    • Is a rough-in or mid-roof inspection required? For roofing specifically: yes, in the form of the Roofing Inspection Affidavit and the sheathing/nailing inspection stage listed on the Residential Construction Checklist, both of which a roof-mounted PV job could trigger if it disturbs roofing. No separate 'mid-roof' inspection distinct from these is named. 62% · residential construction checklist (OCR'd)
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes, in a general sense: the Residential Construction Checklist itself functions as a published inspection sequence (Footings, Sheathing, Dry-In, Utilities Turned On, Insulation, Final, etc. - see q54), and inspections run on a fixed Monday/Thursday cadence. No solar-specific checklist exists. 72% · residential construction checklist (OCR'd)
    • What must be on site at inspection? Based on the County's own materials: the Product Approval copy and performance characteristics (see q56); the Notice of Commencement, which must be 'posted on the jobsite before the first inspection can be performed' for work of $5,000 or more; and, where applicable, a termite pre-treatment certificate (checked at Final per the checklist). No solar-specific on-site document list is published. 68% · residential building packet (OCR'd)
    • Does the inspector verify labels and listings? Yes, for product-approval documentation specifically: the County's Product Approval Specification Sheet states that at inspection, 'the following information must be available to the inspector on the jobsite: 1) Copy of the product approval, 2) The performance characteristics' for any product that did not demonstrate product approval at plan review. No document independently confirms the inspector checks equipment LISTING (e.g. UL marks) as such. 68% · product approval specification sheet (OCR'd)
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Not established with certainty. The County's own documents do not name what document issues on a passed final inspection for an alteration permit (no Certificate of Occupancy language, no 'green tag' or letter template was found for anything short of new-dwelling construction). The Application for Building Permit's revocation clause implies an 'approved inspection' record is the operative event, but names no specific document issued to the applicant. 45% · residential building packet (OCR'd)
    • Who notifies the utility for PTO? Installer/member to the utility, not the AHJ, for whichever cooperative serves the address (see q22 caveat). WFEC's MOG Agreement puts the burden on the Member: at least 10 business days before parallel operation, the Member must provide WFEC with documentation including proof the MOG 'has been inspected and approved by local code officials' - i.e. the AHJ's sign-off is a precondition document the member/installer transmits, not something Holmes County itself sends to the utility. 65% · utility interconnection agreement
    • Is there a re-inspection fee? Not published. No re-inspection fee line appears anywhere in the County's Construction Permit Fees schedule. 68% · fee schedule (posted PDF)

14 questions answered against Town of Westville’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Most plausibly Phone, given no online portal was identified (see q20) and the Building Department's only published contact channels are phone (850-547-1119), fax and email.

Why the confidence is not higherInferred from the absence of a portal and the department's listed contact channels, both established in this run. Held at 55 because no county document states an inspection-booking METHOD explicitly - only that a notice period applies (see q50).

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q50 How much notice is required? Core Booking & scheduling

24 hours. The County's own Residential Construction Requirements sheet: 'No inspections will be made prior to the issuance of a building permit. A 24 hour notice is required prior to each inspection.'

Why the confidence is not higherQuoted verbatim, OCR'd from the County's own Residential Construction Requirements sheet in this run. Held at 85 (not higher) because this is a scanned document read via OCR rather than a native-text source, carrying a small residual transcription risk.

residential construction requirements sheet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Not published. No AM/PM-window or same-day-inspection policy was found; inspections run on a fixed two-day-a-week schedule instead (see q54).

Why the confidence is not higherSame enumeration as q49/q50 - no such language found in the OCR'd packet or the live department page.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes. The Holmes County Building Department performs its own final electrical/building inspections for all permits it issues, including inside Westville - there is no separate Westville inspector, and Westville performs no inspection function of its own (see q1/q2).

Why the confidence is not higherConsistent with every jurisdiction finding in this run: the County's own permit/inspection forms, contact page, and the Residential Construction Checklist's inspection sequence (see q54) all point to a single county inspection function with no municipal-level inspector identified anywhere for Westville.

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q53 If delegated, to whom? Core Who inspects

Not delegated. Holmes County performs its own final inspections rather than delegating to a third party or to Westville.

Why the confidence is not higherSame basis as q52 - no delegation to any other agency, private provider program, or municipal inspector was found in the enumerated document library for a Holmes County-issued permit.

county department page (live) checked 2026-09-14 https://holmescountyfla.com/building-planning-zoning/

Q54 Which inspections are required, and in what order? Core Stages & sequence

The County's Residential Construction Checklist lists (for a new house/addition, in the order printed): Footings (Dig and Pour); Pre-Treat for Termites (certificate checked at Final); Temporary Construction Pole; Install Doors/Windows (checked at Final); Sheathing (Nailing); Dry-In (Rough-In Electrical, Rough-In Mechanical/HVAC, Framing, Plumbing Stack-Out); Utilities Turned On; Insulation; Plumbing Rough-In (bath/kitchen); Call-Back for Plumbing/Electrical/HVAC contractors; and Final Inspection. Inspections are conducted only Mondays and Thursdays (see q setback re: cadence below). For a solar-only retrofit, only a subset of these stages would apply - most plausibly the electrical rough-in/final and a roofing-related check if the array penetrates the roof deck - but no solar-specific inspection sequence is published.

Why the confidence is not higherQuoted/transcribed directly from the OCR'd Residential Construction Checklist in this run. Held at 65 because the published sequence is written for full house construction, and no document states which subset applies to a panel-only job.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

For roofing specifically: yes, in the form of the Roofing Inspection Affidavit and the sheathing/nailing inspection stage listed on the Residential Construction Checklist, both of which a roof-mounted PV job could trigger if it disturbs roofing. No separate 'mid-roof' inspection distinct from these is named.

Why the confidence is not higherBased on the same OCR'd checklist read in this run - 'Roofing Inspection Affidavit' is listed as a submittal item and 'Sheathing (Nailing)' as an inspection stage. Held at 62 because it is not stated whether a rack-mounted PV array (versus roof replacement) actually triggers this stage.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Yes, for product-approval documentation specifically: the County's Product Approval Specification Sheet states that at inspection, 'the following information must be available to the inspector on the jobsite: 1) Copy of the product approval, 2) The performance characteristics' for any product that did not demonstrate product approval at plan review. No document independently confirms the inspector checks equipment LISTING (e.g. UL marks) as such.

Why the confidence is not higherQuoted verbatim, OCR'd from the County's Residential Building Packet in this run. Held at 68 because this is documented for 'products' generally (the packet's own examples are roofing/window-adjacent), not stated as a PV-specific listing check.

product approval specification sheet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q57 Is there a published inspection checklist? Core What is checked

Yes, in a general sense: the Residential Construction Checklist itself functions as a published inspection sequence (Footings, Sheathing, Dry-In, Utilities Turned On, Insulation, Final, etc. - see q54), and inspections run on a fixed Monday/Thursday cadence. No solar-specific checklist exists.

Why the confidence is not higherBoth the checklist and the Monday/Thursday cadence line ('INSPECTIONS: (Mondays + Thursdays)') were OCR'd directly from the County's own document in this run - independently verifying the exact detail flagged in the brief. Held at 72 because the checklist is general-construction, not solar-specific.

residential construction checklist (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q58 What must be on site at inspection? Core Documents on site

Based on the County's own materials: the Product Approval copy and performance characteristics (see q56); the Notice of Commencement, which must be 'posted on the jobsite before the first inspection can be performed' for work of $5,000 or more; and, where applicable, a termite pre-treatment certificate (checked at Final per the checklist). No solar-specific on-site document list is published.

Why the confidence is not higherAssembled from three OCR'd Holmes County documents read in this run: the Product Approval Specification Sheet, the Notice-of-Commencement clause in the Application for Building Permit, and the Residential Construction Checklist's inspection sequence. Held at 68 for the same general-vs-solar-specific gap noted throughout this section.

residential building packet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

Not published. No re-inspection fee line appears anywhere in the County's Construction Permit Fees schedule.

Why the confidence is not higherProved absence: the full 4-page fee schedule PDF was extracted with pdftotext and read in full in this run; no 're-inspection'/'reinspection' text appears anywhere in it (the only 'inspection' fee lines found are for fire sprinkler/alarm systems, at $100 plus $0.75/head). Held at 68 because a re-inspection charge, if collected informally or folded into 'other fees... assigned by the Building Official' (a catch-all the schedule itself names), would not appear as its own line.

fee schedule (posted PDF) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/updated-fee-schedule-5.24.23.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedThe Residential Building Packet (OCR'd in full), the fee schedule and the live Building/Planning/Zoning page were searched in this run for 'correction'/'re-inspection'/'red tag' language; none describes how a failed-inspection correction is issued to the applicant or cleared before re-inspection. No corrections-notice template or process description is published in the enumerated document library.

https://holmescountyfla.com/building-planning-zoning/

Q61 What is issued on pass? Core Final sign-off & PTO

Not established with certainty. The County's own documents do not name what document issues on a passed final inspection for an alteration permit (no Certificate of Occupancy language, no 'green tag' or letter template was found for anything short of new-dwelling construction). The Application for Building Permit's revocation clause implies an 'approved inspection' record is the operative event, but names no specific document issued to the applicant.

Why the confidence is not higherThe full Residential Building Packet, Commercial Construction Packet reference, and fee schedule were searched in this run for 'Certificate of Occupancy', 'C.O.', 'green tag' and 'final approval' language; none names a specific pass document for an alteration/trade-only permit. Held at 45, near the floor of the usable confidence range, because this is a genuine, honestly-flagged gap rather than a confident inference.

residential building packet (OCR'd) checked 2026-09-14 https://holmescountyfla.com/wp-content/uploads/RESIDENTIAL-BUILDING-PACKET-1.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/member to the utility, not the AHJ, for whichever cooperative serves the address (see q22 caveat). WFEC's MOG Agreement puts the burden on the Member: at least 10 business days before parallel operation, the Member must provide WFEC with documentation including proof the MOG 'has been inspected and approved by local code officials' - i.e. the AHJ's sign-off is a precondition document the member/installer transmits, not something Holmes County itself sends to the utility.

Why the confidence is not higherQuoted directly from WFEC's own MOG Agreement, read in this run. Held at 65 for the same utility-identity caveat carried throughout this section from q22, and because no document states whether the County would ever transmit an inspection result directly to a cooperative on its own initiative.

utility interconnection agreement checked 2026-09-14 https://westflorida.coop/content/394/MOG%20Agreement%20Revised%20May%202025.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 68%

No. Neither Westville nor Holmes County specifies placard wording of its own.

Size, colour & material 65%

No. No letter height, colour or material specification for placards or labels was found in any Holmes County document.

Where they go 55%

Not published locally beyond the NEC's own labelling-location rules (unread text, see q37). WFEC's disconnect switch must sit separate from the meter socket (see q42/q48) - the clearest location rule found in this run, though utility rather than AHJ-sourced.

What the utility wants on top 68%

Yes, at the utility level, for whichever cooperative serves the address (see q22 caveat). WFEC's own MOG Agreement requires a manual disconnect switch 'of the visible load break type,' 'mounted separate from the meter socket,' 'readily accessible to Cooperative and capable of being locked in the open position with a utility padlock.'

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Separate roof inspection
All new Single-Family Dwellings require Florida energy forms at the time of application. All TEMP power poles require ONE ground rod and TWO separate GFIs. All other power poles require TWO ground rods. BUILDING PERMIT APPLICATIONS + FORMS BUILDING PERMIT APPLICATIONS + FORMS Building Department Fee
Separate fire inspection
An approved floating alarm apparatus. Every window and door leading to the pool must be equipped with an approved alarm. The Department of Health website also has valuable information. When is a fire safety review or fire inspection required? All new structures other than one- and two-family dwellin
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
Town
County
Holmes County
Regions covered
Authority Contact
Building Department
Direct Phone
850-547-1119
Booking & Scheduling