Town of Worthington Springs

Union County · Florida ← All authorities

Town of Worthington Springs

Union County

Verified Aug. 5, 2026

Town of Worthington Springs is a town authority in the State of Florida, serving 378 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Town of Worthington Springs against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Town of Worthington Springs is not the permitting authority for residential solar here 82% confidence
Holds
One retained instrument, and (per its own Finance page) its own municipal water/utility billing - nothing else building- or electrical-related. Union County's own 'Items Required to Obtain a Building or Addition Permit' and 'Items Required for a Swimming Pool Permit' checklists both require a 'Letter of Compliance/Flood Data' before the COUNTY will issue the permit, and both name the source of that letter as 'Union County Building Dept.' for unincorporated parcels or 'Town of Raiford, City of Lake Butler or Town of Worthington Springs' by name for parcels inside those municipalities. This is the RETAINED GATE: it is DOCUMENTED, not inferred, in two independent first-party County documents that name the Town specifically - the same evidentiary shape the brief's Shalimar example describes, one level less certain only because the instrument's REACH to a bare PV retrofit is inferred rather than documented. The letter is titled 'Letter of Compliance/FLOOD DATA' and is listed as item 6 unconditionally, ahead of item 7's conditional 'If in Flood Zone: base flood elevation and Flood Elevation Certification' - so it functions as this jurisdiction's general zoning/floodplain compliance sign-off, not a document limited to flood zones. Because it attaches to 'Building or Addition' and swimming-pool permits (both new-structure or footprint-changing work) and Florida's floodplain-administration practice generally treats re-roofing/equipment-only alterations that add no floor area as exempt from 'substantial improvement' review, a bare ROOFTOP PV retrofit likely does NOT require the Town's letter - but no document says so in words, so this is inference, not fact. A GROUND-MOUNT array is a new structure and would very likely re-trigger it, on the same 'Building or Addition' logic that requires the letter for any addition. Worthington Springs' own Finance page independently confirms the Town's Finance Department handles 'utility billing and collection' - i.e. it runs its own municipal utility (most likely water/sewer, not electric, since the County's own forms only ever offer FPL or Clay Electric as the electric-service checkbox options - see q22), which is unrelated to the building/electrical gate above.
Delegated to
Union County Building Department, 15 NE 1st Street, Lake Butler FL 32054, (386) 496-2676 / (386) 496-4241, fax (386) 496-4240, Building Inspector Wilson Whidden (also spelled 'Whiddon' on the City of Lake Butler's own building-department page). Building, electrical, plumbing, mechanical, roofing, swimming-pool and mobile-home permits, plan review, contractor registration and (per the County's own description) inspections are all administered through this office, since 2024-2025 via the Cloudpermit online portal (us.cloudpermit.com). Union County's Land Development Regulations (the zoning authority) are explicitly limited to the unincorporated area (LDR Section 1.3) and do NOT reach Worthington Springs - the Town's own zoning/land-use authority, if it has one, is entirely unpublished.
Overridden by
The Florida Building Code, 8th Edition (2023), adopted statewide by FAC 61G20-1.001, effective 18 March 2026 (re-verified fresh today), and in force over any local rule. NFPA 70, the National Electrical Code, 2020 edition (FAC 69A-60.005(2)(qq), re-verified fresh today). The Florida Fire Prevention Code - NFPA 1 and NFPA 101, Florida 2021 Editions (FAC 69A-60.003/.004, effective 31 December 2023, re-verified fresh today) - which binds Worthington Springs by operation of state rule whether or not the Town or County has ever passed anything of its own. F.S. 163.04, prohibiting any ordinance or deed restriction that effectively bans solar collectors. F.S. 553.792, setting binding plan-review deadlines (5 business days for an under-$15,000 electrical/structural permit on an existing single-family dwelling, 30 otherwise) absent a stricter local ordinance, none of which was found for Union County. F.S. 553.79(1)(c), the default one-year permit-validity floor. F.S. 471.003(2)(h), exempting a ch. 489-licensed electrical contractor from engineering licensure at 600A/240V residential or less. F.S. 489.103 and 489.503(6), the owner-builder exemptions the County's own Electrical Permit Application reproduces verbatim. At utility level, if Clay Electric Cooperative turns out to be the serving utility for a given parcel, F.S. 366.91 places it outside the FPSC's investor-owned net-metering rule (unresolved here - see q22).
Why not higher
Proved from Union County's own permit-checklist documents, which name Worthington Springs by name twice (independently, in the Residential/Commercial building checklist AND the swimming-pool checklist - both read as extracted PDF text in this run), corroborated sideways exactly as the brief's own Raiford precedent instructs: the City of Lake Butler's own building-department page, fetched live in this run, states outright that 'The City of Lake Butler's Building Department falls under the direction of the Union County Building Department,' naming the same inspector, address and phone number found on the County's own 2025 Building Department page (Internet Archive capture, since unioncounty-fl.gov 403s domain-wide to curl/WebFetch exactly as the brief describes). Worthington Springs' own site (worthingtonsprings.org, a live WordPress/MuniCreative site, NOT the same domain-wide-403 problem as the county) was read in full - all 11 pages from its own sitemap and all 75 items from its wp-json media listing - and contains zero building, permitting, zoning or code content; what exists is an unfinished template (a 'Test Agenda' page still reading Lorem Ipsum, stock 'Demo-Gallery' photography, a 'Placeholder-Logo'). The Florida Building Code Information System surcharge-jurisdiction registry (392 entries enumerated in full) contains 'County of Union' but no 'Town of Worthington Springs' entry, against the positive control 'City of Alford' (pop. ~500, proving small towns DO appear when self-administering) and the implicit fabricated-control absence of any nonsense entry. Union County's own Land Development Regulations state their own jurisdiction is unincorporated-area-only (LDR Section 1.3, read from the actual PDF), which is the same asymmetry-against-the-Building-Department-page argument used successfully in the Washington County/Ebro run: the LDR carries an explicit carve-out the Building Department's own page does not, which is evidence the building/electrical delegation is broader than the zoning delegation. Held at 82, below the Ebro run's 90, for three honest gaps. First, as in Ebro, no single sentence anywhere says in words 'Union County issues building permits inside Worthington Springs' - it is assembled from the checklists' naming the Town plus the absences above. Second, no public permit register was reachable to show an actual Worthington Springs-address permit processed by the County (Cloudpermit is login-gated, unlike Washington County's public iWorq register used in the Ebro run to clinch the same point). Third, Worthington Springs' own possible retained zoning/land-use authority is genuinely unknown rather than proved absent - the LDR's unincorporated-only clause tells us the COUNTY does not zone inside the Town, not what, if anything, the Town does instead.

https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Permit required
Yes, in substance. Nothing published exempts rooftop PV from the general Florida Building Code/NEC permit requirement,75%
Permit cost
No general building or electrical permit fee schedule is published anywhere in the County's 171-file upload history (enumerated in full, 2016-2026).55%
Plan review
The County publishes no plan-review turnaround of its own. What binds by state law is F.S. 553.792(1)(a): 5 business days after a complete application for an electrical or structural permit…65%
Portal
Cloudpermit. The Union County Building Department's own page states: 'Union County has partnered with Cloudpermit, a cloud-based software,90%
Electrical code
NEC 2020 (NFPA 70, 2020 edition), adopted statewide. Florida Administrative Code 69A-60.005(2)(qq) reads, verbatim: 'NFPA 70, 2020 edition,85%
Own placard wording
No. Neither Worthington Springs nor Union County specifies placard wording of its own, on the same 171-file enumeration.65%
Booking an inspection
Phone (386-496-2676 / 386-496-4241) and, since the 2024-2025 rollout, the Cloudpermit portal, which the County's own page says lets applicants 'Schedule or cancel building inspections' and…80%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes, in substance. Nothing published exempts rooftop PV from the general Florida Building Code/NEC permit requirement, Q3 Electrical and building permits — Separate as the default: the County issues its own standalone Electrical Permit Application distinct from the Building Permit Application, Q4 Plan review — The County publishes no plan-review turnaround of its own. What binds by state law is F.S. Q18 Where you file — Cloudpermit. The Union County Building Department's own page states: 'Union County has partnered with Cloudpermit, a cloud-based software, Q20

Permit required
Yes, in substance. Nothing published exempts rooftop PV from the general Florida Building Code/NEC permit requirement,75% source
What it costs
No general building or electrical permit fee schedule is published anywhere in the County's 171-file upload history (enumerated in full, 2016-2026).55% source
Plan review turnaround
The County publishes no plan-review turnaround of its own. What binds by state law is F.S. 553.792(1)(a): 5 business days after a complete application for an electrical or structural permit on an…65% source
Key document
county permit checklist cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

    • Is this authority the AHJ for residential solar at this address? No. The Town of Worthington Springs is not the AHJ for residential solar. Building and electrical permits, plan review and inspections for property inside the Town are performed by the UNION COUNTY Building Department, 15 NE 1st Street, Lake Butler FL 32054, (386) 496-2676 / (386) 496-4241, Building Inspector Wilson Whidden (also spelled 'Whiddon' on a neighbouring page - see jurisdiction.why). The Town retains one narrow step of its own: Union County's own 'Items Required to Obtain a Building or Addition Permit' and 'Items Required for a Swimming Pool Permit' checklists both require, as a condition of the COUNTY issuing the permit, a 'Letter of Compliance' that comes 'from Union County Building Dept.' only 'If in the unincorporated area' and otherwise 'from Town of Raiford, City of Lake Butler or Town of Worthington Springs' by name. Worthington Springs Town Hall: 11933 SW 36th Drive, Worthington Springs FL 32697, (386) 496-1006, Town Clerk Patricia Harrell. 90% · county permit checklist
    • What does this authority permit itself, and what does it delegate? Delegated. Worthington Springs permits nothing itself - no building department, no building official, no electrical inspector, no permit portal, no fee schedule, and no adopted construction code of its own were found anywhere. Building and electrical sit with the Union County Building Department; land development regulation (zoning) is explicitly NOT the County's inside municipal limits (Union County LDR Section 1.3: 'These land development regulations shall apply to the entire unincorporated area of the County'), so the Town's own zoning status is unpublished and unresolved (see q25, q27, q47). The one function the Town does retain is signing the 'Letter of Compliance/Flood Data' that the County's own checklists require before it will issue a building, addition or pool permit on Town-limits property. 85% · county land development regulations
    • Is a permit required for a residential rooftop PV system? Yes, in substance. Nothing published exempts rooftop PV from the general Florida Building Code/NEC permit requirement, and the County's own Electrical Permit Application requires a permit for any described electrical work with an affidavit that work 'will be done in compliance with the current edition of the FBC and NEC.' No solar-specific carve-out or solar-specific permit type was found in the County's 13-form permit-application library (enumerated in full in this run). 75% · permit application form
    • Is there a separate electrical permit, or is it combined? Separate as the default: the County issues its own standalone Electrical Permit Application distinct from the Building Permit Application, and the Mechanical/Plumbing/Sign form's own affidavit states 'I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air cond. etc.' But the County ALSO operates a combination-permit option for a single job site: 'Union County issues combination permits where one permit covers all trades doing work at one site,' with a Subcontractor Verification page naming the Electrical Contractor specifically as one of the trades folded into the General Contractor's single permit. 85% · permit application form
    • Is a HOA or architectural approval required first? Not by the authority. Neither Worthington Springs nor Union County was found to require HOA or architectural review for rooftop PV, and F.S. 163.04(2) voids any deed restriction or covenant that prohibits solar collectors, limiting such a body to fixing 'the specific location where solar collectors may be installed on the roof within an orientation to the south or within 45 degrees east or west of due south if such determination does not impair the effective operation of the solar collectors.' 62% · state statute
    • Is a wind or windstorm certification required? Yes, in the form of a minimum design wind speed rather than a separate certificate: the County's own 'State Minimum Plan Requirements', bound into both the Residential and Commercial Building Applications, requires 'Wind Load Calculations, for a minimum of 130 mph (Signed & Sealed)' and separately 'Truss Layout & Truss Details (Signed & Sealed).' No stand-alone windstorm certificate document was found. 75% · county permit checklist
    • Is a Specific Use Permit or Council approval ever required? Not for a residential rooftop retrofit. The only Special Exception process found anywhere in the County's Land Development Regulations that touches solar is Section 4.2.38 SOLAR FARMS, which requires Special Exception approval only within the 'A' Agricultural and 'I' Industrial zoning districts - a commercial/utility-scale use, not a residential accessory system, and in any case the LDR governs unincorporated land only (see q2), not property inside Worthington Springs. 60% · county land development regulations
    • Is there a system-size cap on residential generation? No residential generation cap was found. Union County's LDR has no kW or system-size limit for residential rooftop PV; its only size-shaped solar provision is the Section 4.2.38 Solar Farms height table (panels/modules capped at 15 feet), which is scoped to the commercial Special Exception use described in q27, not a residential accessory system, and does not apply inside Worthington Springs in any event. 60% · county land development regulations
  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

    • Who is allowed to pull the electrical permit? Either. A state-licensed electrical contractor who has first registered with the Union County Building Department may pull it, OR the property owner may act as his own electrical contractor under the F.S. 489.503(6) exemption quoted verbatim on the County's own Electrical Permit Application: 'You may install electrical wiring... for a single-family or duplex residence... The home or building must be for your own use and occupancy.' 85% · permit application form
    • Must the contractor be registered with this authority before applying? Yes - with Union County, not with the Town. A contractor must file either the combined Contractor Registration Form ($50.00 fee) or, on the County's newer split forms, the Florida Certified Contractor Application ($50.00; mobile-home installers $50.00 one-time) or the Florida Registered Contractor Application ($90.00 one-time plus a $40.00 annual renewal), each requiring a current state license, proof of general liability and workers' compensation insurance (or exemption) made out to 'Union County Building Department', and a copy of the applicant's driver's licence. The County states elsewhere that it 'does not currently issue or require Occupational Licenses or Business Tax Receipts to do business inside the County' - registration is a Building Department requirement, not a county business-licence requirement. 88% · contractor registration form
    • Is a homeowner permitted to self-install and self-permit? Yes, for electrical work specifically: the County's own Electrical Permit Application reproduces the F.S. 489.503(6) owner disclosure in full, allowing the owner to 'act as your own electrical contractor even though you do not have a license' for wiring in 'a single-family or duplex residence... for your own use and occupancy.' A parallel owner/builder path for the building side is implied by F.S. 489.103 (the general contracting exemption) but no Union County-specific owner-builder disclosure form was found among the 13 forms in the Building Department's document library - the Residential and Commercial checklists instead just say 'For owner/builder acting as his/her own contractor and claiming exemption, Owner must complete and sign a disclosure statement with this office,' without attaching that statement. 75% · permit application form
  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? No solar-specific submittal checklist is published. For a building/addition permit generally, the County's own 'Items Required to Obtain a Building or Addition Permit' lists: survey & legal description; 911 address; proof of special-assessment-tax payment; septic/sewer confirmation; culvert permit or non-requirement letter; the Letter of Compliance/Flood Data described in q1 (from the Town, for Worthington Springs property); Subcontractor Verification Form; owner-builder disclosure if applicable; Notice of Commencement (recorded); two sets of plans meeting the 'State Minimum Plan Requirements' (site plan, elevations, floor plan, foundation plan, wall sections, electrical layout, energy calculations, wind load calculations sealed for a minimum of 130 mph, truss details); and receipt for payment of all fees. For a stand-alone electrical permit (the more likely route for a bare PV retrofit), only the Electrical Permit Application itself, naming the contractor/owner, service size, utility (FPL or Clay Electric) and base job value, was found. 75% · county permit checklist
    • How many copies, and in what format? Two (2) sets of plans is the stated paper requirement: both the Residential and Commercial 'State Minimum Plan Requirements' pages say 'Two sets of drawings... provided to the Building Department.' That requirement sits awkwardly against the County's 2024-2025 move to Cloudpermit, whose own description says applicants can 'complete the entire building permit process online on any mobile device' - the two-sets paper instruction was not found removed or updated on the version of the checklist captured after that rollout. 62% · county permit checklist
    • Is a site plan required, and what must it show? Yes. The 'State Minimum Plan Requirements' bound into both the Residential and Commercial checklists requires a 'Site plan: Dimensions of lot, building setbacks, location of well & septic and all other buildings on the lot.' The separate 911 Address Application also asks for an accurate, to-scale site plan showing the point of entry/driveway and distances to roads and parcel lines. 80% · county permit checklist
    • Is a structural PE stamp required, and at what threshold? No solar-specific structural PE threshold is published. What IS required generally, per the County's own 'State Minimum Plan Requirements': 'Wind Load Calculations, for a minimum of 130 mph (Signed & Sealed)' and 'Truss Layout & Truss Details (Signed & Sealed)' - both written for new construction/additions, with no stated kW, weight, or attachment-count threshold that would trigger the same sign-off for a rooftop PV array. 65% · county permit checklist
    • Is an electrical PE stamp required, and at what threshold? No local electrical PE stamp requirement is published. At state level, F.S. 471.003(2)(h) exempts a ch. 489-licensed electrical contractor from engineering licensure for a residential electrical system with an aggregate service capacity of 600 amperes (240V) or less - which covers essentially every residential PV interconnection. 68% · state statute
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? Cloudpermit. The Union County Building Department's own page states: 'Union County has partnered with Cloudpermit, a cloud-based software, so you can complete the entire building permit process online on any mobile device,' with applicants creating an account at us.cloudpermit.com/login. This replaced whatever process the County ran before it; the rollout is recent enough that a 'Cloudpermit_logo' image first appears in the County's own upload history in September 2024. 90% · department page
    • Can the whole application be completed online? Yes, per the County's own description: 'Apply for building permits at any time, from anywhere... Check the status of your building permit or building inspection... Schedule or cancel building inspections... Pay for your building permit with a credit card.' This sits in tension with the Residential/Commercial checklists' still-current instruction to provide 'Two (2) sets of plans... provided to the Building Department' (see q9), which reads as a paper-counter holdover from before the Cloudpermit rollout. 75% · department page
    • What does a residential solar permit cost? No general building or electrical permit fee schedule is published anywhere in the County's 171-file upload history (enumerated in full, 2016-2026). What IS documented: contractor registration/licensing fees ($50 combined form; $50 state-certified / $90 initial + $40 annual state-registered on the newer split forms - see q6); and the Letter of Compliance fee that applies ONLY in the unincorporated area - and even that single line conflicts between two of the County's own current documents: the Residential/Commercial 'Items Required' checklist prices it at $60.00, while the separate 'Items Required for a Swimming Pool Permit' checklist prices the identical line at $50.00. Inside Worthington Springs neither figure applies - the Town, not the County, sets whatever it charges for its own compliance letter, and the Town publishes no fee information of any kind. 55% · county permit checklist
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

    • What is the stated plan-review turnaround? The County publishes no plan-review turnaround of its own. What binds by state law is F.S. 553.792(1)(a): 5 business days after a complete application for an electrical or structural permit on an EXISTING single-family dwelling where the work is valued under $15,000 (the most likely bracket for a rooftop PV retrofit); 30 business days otherwise for a structure under 7,500 sq ft. The County must give written notice within 5 business days of anything missing, or the application is automatically deemed complete. 65% · state statute
    • How long is an issued permit valid before it expires? Not stated locally. Every current Union County permit form checked in this run (Residential, Commercial, Electrical, Mechanical/Plumbing/Sign, Contractor Registration, Swimming Pool) was searched for an expiration/validity clause and none carries one - the only expiration language found anywhere in the form set is the Notice of Commencement's own '1 year from the date of recording' clause, which governs the NOC instrument, not the building permit itself. What binds by default is F.S. 553.79(1)(c): a single-family-dwelling building permit 'expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.' 62% · state statute
    • Which utility handles interconnection here? One of two utilities, and the County's own forms do not resolve which one applies to a given Worthington Springs parcel: every current Union County permit form that asks for the serving utility offers exactly two checkboxes, 'F.P.L' (Florida Power & Light) or 'CLAY' (Clay Electric Cooperative), and no other option. Which of the two actually serves the Town of Worthington Springs specifically was not established in this run. 50% · permit application form

28 questions answered against Town of Worthington Springs’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

No. The Town of Worthington Springs is not the AHJ for residential solar. Building and electrical permits, plan review and inspections for property inside the Town are performed by the UNION COUNTY Building Department, 15 NE 1st Street, Lake Butler FL 32054, (386) 496-2676 / (386) 496-4241, Building Inspector Wilson Whidden (also spelled 'Whiddon' on a neighbouring page - see jurisdiction.why). The Town retains one narrow step of its own: Union County's own 'Items Required to Obtain a Building or Addition Permit' and 'Items Required for a Swimming Pool Permit' checklists both require, as a condition of the COUNTY issuing the permit, a 'Letter of Compliance' that comes 'from Union County Building Dept.' only 'If in the unincorporated area' and otherwise 'from Town of Raiford, City of Lake Butler or Town of Worthington Springs' by name. Worthington Springs Town Hall: 11933 SW 36th Drive, Worthington Springs FL 32697, (386) 496-1006, Town Clerk Patricia Harrell.

Why the confidence is not higherProved from two independent first-party Union County documents that name the Town by name (not one, as in some prior runs), plus a sideways corroboration and a registry absence, deliberately not inherited from the Raiford run even though the brief describes that run's own method. (1) Union County Building Department's own 'Items Required to Obtain a Building or Addition Permit' (2026 revision, read as extracted text in this run): item 6, 'Letter of Compliance/Flood Data: If in the unincorporated area, from Union County Building Dept. (Fee of $60.00); If in municipality: from Town of Raiford, City of Lake Butler or Town of Worthington Springs.' (2) The County's separate 'Items Required for a Swimming Pool Permit' carries the identical clause at a different fee ($50.00 unincorporated - see q15 for the conflict). Both documents are headed 'Union County Building Department' and both list the building/addition or pool permit as something obtained FROM the County, with the Town's role confined to the compliance letter. (3) The sideways route the brief itself names for this county: the City of Lake Butler's own Building Department page states plainly 'The City of Lake Butler's Building Department falls under the direction of the Union County Building Department', naming the same inspector and address - proving the county-wide delegation shape this run then confirmed reaches Worthington Springs specifically via (1) and (2) above, rather than assuming it by analogy alone. (4) Worthington Springs' own site (worthingtonsprings.org) publishes nothing about building, permitting or codes at all: all 11 pages and all 75 enumerated media files were read/listed in this run, and what exists is an unfinished MuniCreative template (stock photography, a placeholder logo, and a 'Test Agenda' page still reading Lorem Ipsum) with zero building-department content. (5) The Florida Building Code Information System surcharge-jurisdiction registry (392 entries, enumerated in full) contains 'County of Union' and the positive control 'City of Alford' (pop. ~500, proving small towns DO appear when self-administering) but no 'Town of Worthington Springs', 'Town of Raiford' or 'City of Lake Butler' entry. Held at 90 rather than higher because no single sentence anywhere says in so many words 'Union County issues building permits inside Worthington Springs' - that is assembled from the two checklists' structure plus the absences above, the same evidentiary shape the brief's own Raiford precedent used.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Delegated. Worthington Springs permits nothing itself - no building department, no building official, no electrical inspector, no permit portal, no fee schedule, and no adopted construction code of its own were found anywhere. Building and electrical sit with the Union County Building Department; land development regulation (zoning) is explicitly NOT the County's inside municipal limits (Union County LDR Section 1.3: 'These land development regulations shall apply to the entire unincorporated area of the County'), so the Town's own zoning status is unpublished and unresolved (see q25, q27, q47). The one function the Town does retain is signing the 'Letter of Compliance/Flood Data' that the County's own checklists require before it will issue a building, addition or pool permit on Town-limits property.

Why the confidence is not higherSame two County checklists as q1, read as extracted text, plus the Union County LDR's own jurisdiction clause (Section 1.3, pulled from the actual PDF in this run) which is explicit that the LDR - the County's zoning and land-development authority - reaches unincorporated land only. That express carve-out, set against the Building Department's own page (unioncounty-fl.gov/building-department/, 2025 Wayback capture) which contains NO equivalent unincorporated-only limitation anywhere in its text, is itself the contrast used in the Ebro/Washington County run to establish the same delegated-building/retained-land-use split. Union County's own Board of County Commissioners page (2026 capture) was also checked and contains zero occurrences of the word 'ordinance', consistent with a county that administers building activity through permit-office checklists rather than a codified building chapter that could state the delegation in so many words.

county land development regulations checked 2026-09-14 https://web.archive.org/web/20260507231539/https://unioncounty-fl.gov/wp-content/uploads/LDR_Union_20_Canary.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes, in substance. Nothing published exempts rooftop PV from the general Florida Building Code/NEC permit requirement, and the County's own Electrical Permit Application requires a permit for any described electrical work with an affidavit that work 'will be done in compliance with the current edition of the FBC and NEC.' No solar-specific carve-out or solar-specific permit type was found in the County's 13-form permit-application library (enumerated in full in this run).

Why the confidence is not higherInferred from the general FBC/NEC permitting framework documented in the County's own Electrical Permit Application (read as extracted PDF text) rather than from a solar-specific statement, because none exists: 'solar' and 'photovoltaic' were searched across the County's Land Development Regulations (25 'electrical' hits as positive control, 0 'zzqqx' fabricated control, both passing) and the only 'solar' hits are Section 4.2.38 SOLAR FARMS, a commercial/agricultural zoning use, not residential rooftop PV. Held at 75 because the inference is standard Florida practice rather than a Union County statement naming solar.

permit application form checked 2026-09-14 https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate as the default: the County issues its own standalone Electrical Permit Application distinct from the Building Permit Application, and the Mechanical/Plumbing/Sign form's own affidavit states 'I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air cond. etc.' But the County ALSO operates a combination-permit option for a single job site: 'Union County issues combination permits where one permit covers all trades doing work at one site,' with a Subcontractor Verification page naming the Electrical Contractor specifically as one of the trades folded into the General Contractor's single permit.

Why the confidence is not higherBoth mechanisms are quoted verbatim from the County's own forms, read as extracted PDF text in this run: the standalone Electrical Permit Application, the Mechanical/Plumbing/Sign Application's separate-permit affidavit, and the Subcontractor Verification page bound into both the Residential and Commercial Building Applications. A bare rooftop PV retrofit with no other trade work would use the standalone Electrical Permit Application; a PV job bundled with a new build would ride the General Contractor's combination permit.

permit application form checked 2026-09-14 https://web.archive.org/web/20230401011548/https://unioncounty-fl.gov/wp-content/uploads/MechPlumb-Sign-Application.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Either. A state-licensed electrical contractor who has first registered with the Union County Building Department may pull it, OR the property owner may act as his own electrical contractor under the F.S. 489.503(6) exemption quoted verbatim on the County's own Electrical Permit Application: 'You may install electrical wiring... for a single-family or duplex residence... The home or building must be for your own use and occupancy.'

Why the confidence is not higherQuoted directly from the County's own Electrical Permit Application, extracted from the PDF in this run. The registration requirement is corroborated by the separate Contractor Registration Form and the two state-license-tier applications (Certified/Registered), all headed 'Union County Building Department'.

permit application form checked 2026-09-14 https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes - with Union County, not with the Town. A contractor must file either the combined Contractor Registration Form ($50.00 fee) or, on the County's newer split forms, the Florida Certified Contractor Application ($50.00; mobile-home installers $50.00 one-time) or the Florida Registered Contractor Application ($90.00 one-time plus a $40.00 annual renewal), each requiring a current state license, proof of general liability and workers' compensation insurance (or exemption) made out to 'Union County Building Department', and a copy of the applicant's driver's licence. The County states elsewhere that it 'does not currently issue or require Occupational Licenses or Business Tax Receipts to do business inside the County' - registration is a Building Department requirement, not a county business-licence requirement.

Why the confidence is not higherRead in full from three of the County's own current forms, extracted from PDF in this run: the Contractor Registration Form, the State Certified Contractor Application, and the State Registered Contractor Application. The $50/$90+$40 figures come from two different-vintage County forms that do not fully agree with each other on structure (one combined form vs. two split forms) - reported as found rather than reconciled.

contractor registration form checked 2026-09-14 https://web.archive.org/web/20260610125114/https://unioncounty-fl.gov/wp-content/uploads/Contractor-Registration-Form-fillable.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes, for electrical work specifically: the County's own Electrical Permit Application reproduces the F.S. 489.503(6) owner disclosure in full, allowing the owner to 'act as your own electrical contractor even though you do not have a license' for wiring in 'a single-family or duplex residence... for your own use and occupancy.' A parallel owner/builder path for the building side is implied by F.S. 489.103 (the general contracting exemption) but no Union County-specific owner-builder disclosure form was found among the 13 forms in the Building Department's document library - the Residential and Commercial checklists instead just say 'For owner/builder acting as his/her own contractor and claiming exemption, Owner must complete and sign a disclosure statement with this office,' without attaching that statement.

Why the confidence is not higherThe electrical half is quoted verbatim from the County's own Electrical Permit Application. The building half is corroborated by the Residential and Commercial checklists' own reference to an owner/builder disclosure statement 'with this office', but that statement itself was not found among the County's published forms (enumerated in full via Internet Archive across the whole unioncounty-fl.gov /wp-content/uploads/ path), so its content could not be read - held at 75 rather than higher for that gap.

permit application form checked 2026-09-14 https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Q8 What documents make up a complete submittal? Core Submittal package

No solar-specific submittal checklist is published. For a building/addition permit generally, the County's own 'Items Required to Obtain a Building or Addition Permit' lists: survey & legal description; 911 address; proof of special-assessment-tax payment; septic/sewer confirmation; culvert permit or non-requirement letter; the Letter of Compliance/Flood Data described in q1 (from the Town, for Worthington Springs property); Subcontractor Verification Form; owner-builder disclosure if applicable; Notice of Commencement (recorded); two sets of plans meeting the 'State Minimum Plan Requirements' (site plan, elevations, floor plan, foundation plan, wall sections, electrical layout, energy calculations, wind load calculations sealed for a minimum of 130 mph, truss details); and receipt for payment of all fees. For a stand-alone electrical permit (the more likely route for a bare PV retrofit), only the Electrical Permit Application itself, naming the contractor/owner, service size, utility (FPL or Clay Electric) and base job value, was found.

Why the confidence is not higherAssembled from the County's own current forms, read as extracted PDF text in this run: the Residential/Commercial 'Items Required' checklists and the standalone Electrical Permit Application. Held at 75 because the checklist is written for new construction/additions, not for a bare rooftop PV retrofit on an existing house, and the County publishes no solar-specific list to resolve which of the new-construction items (survey, culvert letter, Letter of Compliance) actually apply to a panel-only job.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q9 How many copies, and in what format? Submittal package

Two (2) sets of plans is the stated paper requirement: both the Residential and Commercial 'State Minimum Plan Requirements' pages say 'Two sets of drawings... provided to the Building Department.' That requirement sits awkwardly against the County's 2024-2025 move to Cloudpermit, whose own description says applicants can 'complete the entire building permit process online on any mobile device' - the two-sets paper instruction was not found removed or updated on the version of the checklist captured after that rollout.

Why the confidence is not higherThe 'two sets' language is quoted verbatim from the Residential and Commercial checklists (both captured in 2026, i.e. after the Cloudpermit rollout described on the Building Department page), and the Cloudpermit description is quoted from the Building Department's own 2025 page. Held at 62 because the two sources are in tension and neither explicitly resolves how a digital Cloudpermit submission satisfies a 'two sets of plans, provided to the Building Department' instruction that reads as written for a paper counter.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes. The 'State Minimum Plan Requirements' bound into both the Residential and Commercial checklists requires a 'Site plan: Dimensions of lot, building setbacks, location of well & septic and all other buildings on the lot.' The separate 911 Address Application also asks for an accurate, to-scale site plan showing the point of entry/driveway and distances to roads and parcel lines.

Why the confidence is not higherQuoted from two of the County's own current forms, extracted from PDF in this run. Written for new construction/additions; whether the same site-plan content is demanded for a bare rooftop PV retrofit is not stated.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Nothing published by this authority.

Where we lookedUnion County Building Department's full published permit-form library was enumerated across its entire upload history via the Internet Archive CDX index (171 distinct filenames on unioncounty-fl.gov/wp-content/uploads/, spanning 2016-2026) and every current building/electrical form was downloaded and read as extracted PDF text in this run (Residential, Commercial, Electrical, Mechanical/Plumbing/Sign, Contractor Registration x2, Notice of Commencement, 911 Address, Culvert, Swimming Pool). None mentions a one-line or three-line diagram, and none is solar-specific. Controls: 'electrical' returns 25 hits in the County's Land Development Regulations (positive control, passing) and 'zzqqx' returns 0 (fabricated control, passing). This is a genuine absence of a PUBLISHED requirement in the documents that exist - it is not proof the Building Inspector never asks for one at the counter.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSame 171-file enumeration and same controls as q11 - no county form or LDR section calls for string sizing, conductor sizing or voltage-drop calculations; the closest local text is the general 'Electrical Layout Sheet: Location of service panel, smoke detectors, ceiling fans, GFI outlets' item in the State Minimum Plan Requirements, which is not a calculation requirement.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

No solar-specific structural PE threshold is published. What IS required generally, per the County's own 'State Minimum Plan Requirements': 'Wind Load Calculations, for a minimum of 130 mph (Signed & Sealed)' and 'Truss Layout & Truss Details (Signed & Sealed)' - both written for new construction/additions, with no stated kW, weight, or attachment-count threshold that would trigger the same sign-off for a rooftop PV array.

Why the confidence is not higherQuoted from the County's own Residential and Commercial checklists, both read as extracted PDF text. Held at 65 because these are general new-construction structural sign-off items, not a solar-specific PE threshold, and no document states whether/when they apply to an array added to an existing roof.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

No local electrical PE stamp requirement is published. At state level, F.S. 471.003(2)(h) exempts a ch. 489-licensed electrical contractor from engineering licensure for a residential electrical system with an aggregate service capacity of 600 amperes (240V) or less - which covers essentially every residential PV interconnection.

Why the confidence is not higherThe statutory exemption was fetched fresh from the Florida Legislature's own site in this run. The local absence rests on the same 171-file enumeration and controls as q11/q12. Held at 68 because the statute answers who may design without a PE, not whether the Union County Building Department ever asks for a stamped electrical drawing on a PV job in practice.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0400-0499/0471/Sections/0471.003.html

Q15 What does a residential solar permit cost? Core Fees

No general building or electrical permit fee schedule is published anywhere in the County's 171-file upload history (enumerated in full, 2016-2026). What IS documented: contractor registration/licensing fees ($50 combined form; $50 state-certified / $90 initial + $40 annual state-registered on the newer split forms - see q6); and the Letter of Compliance fee that applies ONLY in the unincorporated area - and even that single line conflicts between two of the County's own current documents: the Residential/Commercial 'Items Required' checklist prices it at $60.00, while the separate 'Items Required for a Swimming Pool Permit' checklist prices the identical line at $50.00. Inside Worthington Springs neither figure applies - the Town, not the County, sets whatever it charges for its own compliance letter, and the Town publishes no fee information of any kind.

Why the confidence is not higherThe fee figures are quoted verbatim from the County's own current forms, extracted from PDF in this run - the $60/$50 conflict is a genuine finding, not a transcription error (both documents are dated to the same 2026 upload cycle). Held at 55 because the question asks for the residential SOLAR permit cost specifically, and no document - County or Town - states one; this answer reports what is knowable (fee conflict on the one line that does exist) rather than a solar permit price that was never published.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260516205258/https://unioncounty-fl.gov/wp-content/uploads/Swimming-Pool-Application-fillable.pdf

Q16 How is the fee calculated? Core Fees

Nothing published by this authority.

Where we lookedNo fee schedule exists to read a calculation basis from - see q15. The Building Department's 171-file upload history was enumerated in full and contains no 'fee schedule' document of any kind, unlike neighbouring Washington County's dedicated Schedule A.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q17 Is there a separate plan-check fee? Fees

Nothing published by this authority.

Where we lookedSame absence as q15/q16 - no fee schedule of any kind was found in the County's full upload history.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q18 What is the stated plan-review turnaround? Core Timeline & validity

The County publishes no plan-review turnaround of its own. What binds by state law is F.S. 553.792(1)(a): 5 business days after a complete application for an electrical or structural permit on an EXISTING single-family dwelling where the work is valued under $15,000 (the most likely bracket for a rooftop PV retrofit); 30 business days otherwise for a structure under 7,500 sq ft. The County must give written notice within 5 business days of anything missing, or the application is automatically deemed complete.

Why the confidence is not higherThe statute was fetched fresh from the Florida Legislature's site in this run - it is the operative deadline because F.S. 553.792(1)(b) applies unless local ordinance sets a stricter one, and no Union County ordinance was found (see q32). Held at 65 because a statutory ceiling is not a published service standard, and the County's own site states no turnaround figure of its own.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0500-0599/0553/Sections/0553.792.html

Q19 How long is an issued permit valid before it expires? Timeline & validity

Not stated locally. Every current Union County permit form checked in this run (Residential, Commercial, Electrical, Mechanical/Plumbing/Sign, Contractor Registration, Swimming Pool) was searched for an expiration/validity clause and none carries one - the only expiration language found anywhere in the form set is the Notice of Commencement's own '1 year from the date of recording' clause, which governs the NOC instrument, not the building permit itself. What binds by default is F.S. 553.79(1)(c): a single-family-dwelling building permit 'expires 1 year after the issuance of the permit or on the effective date of the next edition of the Florida Building Code, whichever is later.'

Why the confidence is not higherAll forms were read in full as extracted PDF text in this run; none states a permit validity period. The statutory fallback was fetched fresh from the Legislature's site. Held at 62 because it is arguable whether a stand-alone electrical/PV permit on an existing house counts as a permit 'for a single-family dwelling' within the statute's plain words.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0500-0599/0553/Sections/0553.79.html

Q20 Which permit portal does this authority use? Core Portal & process

Cloudpermit. The Union County Building Department's own page states: 'Union County has partnered with Cloudpermit, a cloud-based software, so you can complete the entire building permit process online on any mobile device,' with applicants creating an account at us.cloudpermit.com/login. This replaced whatever process the County ran before it; the rollout is recent enough that a 'Cloudpermit_logo' image first appears in the County's own upload history in September 2024.

Why the confidence is not higherQuoted from the Union County Building Department's own page, read via an Internet Archive capture in this run (the live unioncounty-fl.gov domain 403s to every direct fetch route available here, per the brief's known obstacle). The 2024 logo-upload date is independently confirmed from the Internet Archive CDX index of the site's own upload history.

department page checked 2026-09-14 https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q21 Can the whole application be completed online? Core Portal & process

Yes, per the County's own description: 'Apply for building permits at any time, from anywhere... Check the status of your building permit or building inspection... Schedule or cancel building inspections... Pay for your building permit with a credit card.' This sits in tension with the Residential/Commercial checklists' still-current instruction to provide 'Two (2) sets of plans... provided to the Building Department' (see q9), which reads as a paper-counter holdover from before the Cloudpermit rollout.

Why the confidence is not higherThe Cloudpermit description is quoted verbatim from the Building Department's own page (2025 Internet Archive capture). Held at 75 rather than higher because of the unresolved tension with the still-published two-sets-of-plans instruction described in q9 - the County's own document set has not been fully reconciled to the new online process.

department page checked 2026-09-14 https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q22 Which utility handles interconnection here? Core Utility interconnection

One of two utilities, and the County's own forms do not resolve which one applies to a given Worthington Springs parcel: every current Union County permit form that asks for the serving utility offers exactly two checkboxes, 'F.P.L' (Florida Power & Light) or 'CLAY' (Clay Electric Cooperative), and no other option. Which of the two actually serves the Town of Worthington Springs specifically was not established in this run.

Why the confidence is not higherThe two-utility structure is quoted directly from three of the County's own forms (Electrical Permit Application, Commercial Building Application, Mechanical/Plumbing/Sign Application), all read as extracted PDF text in this run - strong first-party evidence that these are the only two utilities operating anywhere in Union County. Neither Clay Electric Cooperative's own site (its About page and full site map were checked; neither names a county or territory list) nor a Florida PSC territorial-map page (fetched via WebFetch; returned no substantive territory content) resolved which utility actually serves Worthington Springs' 32697 ZIP specifically. Held at 50 - correct that it is one of these two, unresolved as to which.

permit application form checked 2026-09-14 https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Nothing published by this authority.

Where we lookedNeither utility's own interconnection/net-metering tariff was reachable and matched to Worthington Springs specifically within this run, because which of the two utilities named in q22 (FPL or Clay Electric Cooperative) actually serves the Town was not resolved. FPL is an investor-owned utility subject to FPSC net-metering rule 25-6.065; Clay Electric is a cooperative outside that rule under F.S. 366.91. Resolving the utility first (see q22) is a precondition for answering this reliably.

https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Not by the authority. Neither Worthington Springs nor Union County was found to require HOA or architectural review for rooftop PV, and F.S. 163.04(2) voids any deed restriction or covenant that prohibits solar collectors, limiting such a body to fixing 'the specific location where solar collectors may be installed on the roof within an orientation to the south or within 45 degrees east or west of due south if such determination does not impair the effective operation of the solar collectors.'

Why the confidence is not higherThe statute was fetched fresh from the Florida Legislature's site in this run. No Union County or Worthington Springs document addressing HOA/ARC review for PV was found - held at 62 because Worthington Springs publishes no zoning or subdivision-review material of its own at all (see q25), so a town-level HOA-referral practice, if one exists, would be invisible to this run.

state statute checked 2026-09-14 http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0163/Sections/0163.04.html

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedWorthington Springs' own site was enumerated in full (11 pages, 75 media files) and contains no zoning, historic-preservation or land-use content of any kind. Union County's Land Development Regulations - the only zoning-type document reachable in this run - are explicit (Section 1.3) that they apply to the unincorporated area only, so they cannot answer for property inside the Town. Whether Worthington Springs has ever adopted its own historic-district provision cannot be established from any source reachable in this run - the Town publishes no code, and no Municode/state registry presence for the Town was found.

https://worthingtonsprings.org/wp-sitemap-posts-page-1.xml

Q26 Is a wind or windstorm certification required? Overlays & special cases

Yes, in the form of a minimum design wind speed rather than a separate certificate: the County's own 'State Minimum Plan Requirements', bound into both the Residential and Commercial Building Applications, requires 'Wind Load Calculations, for a minimum of 130 mph (Signed & Sealed)' and separately 'Truss Layout & Truss Details (Signed & Sealed).' No stand-alone windstorm certificate document was found.

Why the confidence is not higherQuoted verbatim from the County's own current forms, read as extracted PDF text in this run. Held at 75 because the 130 mph figure is presented as a flat State Minimum rather than tied to an ASCE 7-22 risk category or exposure category, and because it is written for new construction/additions rather than stated as applying specifically to a roof-mounted PV array.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Not for a residential rooftop retrofit. The only Special Exception process found anywhere in the County's Land Development Regulations that touches solar is Section 4.2.38 SOLAR FARMS, which requires Special Exception approval only within the 'A' Agricultural and 'I' Industrial zoning districts - a commercial/utility-scale use, not a residential accessory system, and in any case the LDR governs unincorporated land only (see q2), not property inside Worthington Springs.

Why the confidence is not higherSection 4.2.38 was read in full from the County's Land Development Regulations PDF, extracted in this run, with the same 'electrical'/'zzqqx' controls described in q3 passing. Held at 60 because Worthington Springs' own zoning process, if any, is entirely unpublished (see q25), so a town-level Council-approval step cannot be ruled out from any source reachable here.

county land development regulations checked 2026-09-14 https://web.archive.org/web/20260507231539/https://unioncounty-fl.gov/wp-content/uploads/LDR_Union_20_Canary.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

No residential generation cap was found. Union County's LDR has no kW or system-size limit for residential rooftop PV; its only size-shaped solar provision is the Section 4.2.38 Solar Farms height table (panels/modules capped at 15 feet), which is scoped to the commercial Special Exception use described in q27, not a residential accessory system, and does not apply inside Worthington Springs in any event.

Why the confidence is not higherSame Section 4.2.38 text and the same positive/fabricated search controls as q3/q27. Held at 60 because Worthington Springs' own zoning code, if any exists, was not reachable to confirm or rule out a town-level cap.

county land development regulations checked 2026-09-14 https://web.archive.org/web/20260507231539/https://unioncounty-fl.gov/wp-content/uploads/LDR_Union_20_Canary.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? NEC 2020 (NFPA 70, 2020 edition), adopted statewide. Florida Administrative Code 69A-60.005(2)(qq) reads, verbatim: 'NFPA 70, 2020 edition, National Electrical Code.' No Union County or Worthington Springs amendment to this was found - neither jurisdiction was found to have a codified electrical chapter of its own at all (see q32). 85% · state administrative rule
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023), as most recently amended effective 18 March 2026 (FAC 61G20-1.001). No Union County-specific building-code amendment or edition lag was found - the County's own Electrical Permit Application affidavit simply requires compliance 'with the current edition of the FBC and NEC' rather than naming a fixed edition of its own. 85% · state administrative rule
    • Which fire code edition is in force? Florida Fire Prevention Code: NFPA 1, Fire Code, Florida 2021 Edition (FAC 69A-60.003) and NFPA 101, Life Safety Code, Florida 2021 Edition (FAC 69A-60.004), both effective 31 December 2023. No Union County fire-code chapter or amendment was found (see q32 and q36). 80% · state administrative rule
    • Are there local amendments to any of the above? Not established either way with confidence. No codified Union County ordinance chapter for building, electrical or fire was found reachable online: the County's own Board of County Commissioners page (2026 capture) contains zero occurrences of the word 'ordinance', Municode and amLegal/eCode360 routes either 403 or return an unconfirmable JS shell, and the County's 171-file upload history contains no 'Code of Ordinances' document. What IS clearly local, though not packaged as a numbered code amendment, is a set of County Building Department PROCESS requirements layered on top of the state code: the 130 mph wind-load minimum (q26), the Letter of Compliance/floodplain sign-off (q1), mandatory 911 addressing before power is authorised, culvert permitting, and County-specific contractor registration (q6). 55% · department page
    • What is the installation judged against? The installation is judged against the Florida Building Code 8th Edition (2023) and NEC 2020 as adopted statewide, plus the Union County Building Department's own process requirements: the State Minimum Plan Requirements (130 mph wind load, sealed truss details, energy calculations), the Subcontractor Verification/combination-permit system, and - for Worthington Springs property specifically - the Town's Letter of Compliance sign-off before the County will issue a building/addition or pool permit. 72% · county permit checklist
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Town of Worthington Springs on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

    • Is rapid shutdown required, and to which NEC edition? Rapid shutdown is required, to NEC 2020 - i.e. NEC 690.12 as it stands in the 2020 edition - because that is the statewide-adopted edition (q29) and no Union County or Worthington Springs amendment to it was found. 72% · state administrative rule
  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

    • Which placards does this authority require at the service equipment? No AHJ-specific placard set is published by either Worthington Springs or Union County. The only marking-adjacent text found anywhere in the County's forms is the general 911-addressing instruction ('911 address posted at the road and house numbers on home if more than 50 feet from road, number to be 3" minimum height'), which is a site-addressing rule, not a PV/service-equipment placard rule. 55% · department document library
    • Does the authority specify placard wording of its own? No. Neither Worthington Springs nor Union County specifies placard wording of its own, on the same 171-file enumeration. 65% · department document library
    • Does it specify letter height, colour or material? No. No letter height, colour, material or durability specification was found for either jurisdiction. 62% · department document library
    • Is a site plan / facility map placard required, and what must it show? Nothing beyond NEC 705.10 as it stands in the 2020 edition. No County or Town document addresses a site plan/facility map placard. 50% · department document library
  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

    • Are batteries permitted, and under what conditions? Batteries are not addressed by Worthington Springs or Union County. No local ESS provision exists in the Land Development Regulations, the Comprehensive Plan, or any of the 171 files enumerated from the Building Department's upload history. What governs is the Florida Fire Prevention Code (NFPA 1, Florida 2021 Edition) and the Florida Building Code 8th Edition, both applying by operation of state law regardless of anything the Town or County has passed. 58% · county land development regulations
    • Is there a separate ESS permit or inspection? No separate ESS permit or inspection is published. The County's own 'combination permit' framing - 'one permit covers all trades doing work at one site' - and the absence of any energy-storage line in the County's form set suggest a battery would ride on the electrical permit (and the building permit, if structural work is involved) rather than triggering a distinct ESS product. 55% · county permit checklist

20 questions answered against Town of Worthington Springs’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

NEC 2020 (NFPA 70, 2020 edition), adopted statewide. Florida Administrative Code 69A-60.005(2)(qq) reads, verbatim: 'NFPA 70, 2020 edition, National Electrical Code.' No Union County or Worthington Springs amendment to this was found - neither jurisdiction was found to have a codified electrical chapter of its own at all (see q32).

Why the confidence is not higherThe exact rule text was fetched fresh today from flrules.org (the live gateway page is now behind a Cloudflare JS challenge to a plain curl, but was retrieved successfully through WebFetch, which quoted the '(2)(qq)' line directly). This is a state fact identical to the one independently verified in the Washington County/Ebro run on the same date; re-verified here rather than carried forward.

state administrative rule checked 2026-09-14 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=27843285&type=1&file=69A-60.005.doc

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023), as most recently amended effective 18 March 2026 (FAC 61G20-1.001). No Union County-specific building-code amendment or edition lag was found - the County's own Electrical Permit Application affidavit simply requires compliance 'with the current edition of the FBC and NEC' rather than naming a fixed edition of its own.

Why the confidence is not higherConfirmed fresh today via WebFetch against flrules.org's rule page for 61G20-1.001 (8th Edition (2023), effective 3-18-26, with the 2025 legislative amendments listed) - the same state fact independently verified in the Washington County/Ebro run, re-checked here rather than inherited.

state administrative rule checked 2026-09-14 https://www.flrules.org/gateway/ruleNo.asp?id=61G20-1.001

Q31 Which fire code edition is in force? Code editions in force

Florida Fire Prevention Code: NFPA 1, Fire Code, Florida 2021 Edition (FAC 69A-60.003) and NFPA 101, Life Safety Code, Florida 2021 Edition (FAC 69A-60.004), both effective 31 December 2023. No Union County fire-code chapter or amendment was found (see q32 and q36).

Why the confidence is not higherConfirmed fresh today via WebFetch against flrules.org's Chapter 69A-60 listing, which itemises both rules and their effective dates. The substance of NFPA 1/101 itself could not be read (see not_found q36) - only the adopted edition is confirmed.

state administrative rule checked 2026-09-14 https://www.flrules.org/gateway/ChapterHome.asp?Chapter=69A-60

Q32 Are there local amendments to any of the above? Core Code editions in force

Not established either way with confidence. No codified Union County ordinance chapter for building, electrical or fire was found reachable online: the County's own Board of County Commissioners page (2026 capture) contains zero occurrences of the word 'ordinance', Municode and amLegal/eCode360 routes either 403 or return an unconfirmable JS shell, and the County's 171-file upload history contains no 'Code of Ordinances' document. What IS clearly local, though not packaged as a numbered code amendment, is a set of County Building Department PROCESS requirements layered on top of the state code: the 130 mph wind-load minimum (q26), the Letter of Compliance/floodplain sign-off (q1), mandatory 911 addressing before power is authorised, culvert permitting, and County-specific contractor registration (q6).

Why the confidence is not higherThe absence-of-ordinance finding rests on reading the BOCC page in full and on the inability to reach a codified Union County ordinance library by any route tried in this run (Municode SPA shell, amLegal 403, eCode360 403). Held at 55 because a codified chapter could exist through the Clerk of Court's official records without ever having been placed online - this is an absence of ONLINE evidence, not a proved absence of the ordinance itself.

department page checked 2026-09-14 https://web.archive.org/web/20260507231539/https://unioncounty-fl.gov/board-of-county-commissioners/

Q33 What is the installation judged against? Core Electrical

The installation is judged against the Florida Building Code 8th Edition (2023) and NEC 2020 as adopted statewide, plus the Union County Building Department's own process requirements: the State Minimum Plan Requirements (130 mph wind load, sealed truss details, energy calculations), the Subcontractor Verification/combination-permit system, and - for Worthington Springs property specifically - the Town's Letter of Compliance sign-off before the County will issue a building/addition or pool permit.

Why the confidence is not higherAssembled from the state rules confirmed in q29-q31 and the County's own forms read in this run. Held at 72 because no codified local amendment chapter could be confirmed to exist or not exist (q32), so this answer may be incomplete rather than exhaustive.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedUnion County's 171-file upload history and its Land Development Regulations were both searched (the same 'electrical'/'zzqqx' controls as q3 passing) with no result on service-upgrade sizing or busbar/120% rule language, and no codified electrical ordinance chapter could be reached (see q32) to check for one. NEC 2020 Section 705.12 would govern by default but its text could not be read (NFPA/ICC return hard 403s to every route tried here).

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

Nothing published by this authority.

Where we lookedSame 171-file enumeration as q11/q34 - no county form or reachable code mentions a mounting system, rail, standoff or attachment-spacing requirement, and unlike neighbouring Washington County's forms, no Florida Product Approval field for roofing/racking was found on any Union County form checked in this run.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedUnion County's Land Development Regulations and Comprehensive Plan (both full PDFs, extracted and read in this run) contain no fire code chapter language, and no codified Union County fire ordinance could be reached by any route tried (Municode SPA shell, amLegal 403, eCode360 403, BOCC page checked directly with zero 'ordinance' hits - see q32). The governing text, Florida Fire Prevention Code / NFPA 1 Florida 2021 Edition (FAC 69A-60.003), could not be read: NFPA and ICC return hard 403s to every route available in this environment, and the state publishes the adopted text only through a non-downloadable viewer. An unreachable source, not a proved absence - do not record Union County or Worthington Springs as having no ridge setback on the strength of this.

https://www.flrules.org/gateway/ChapterHome.asp?Chapter=69A-60

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Rapid shutdown is required, to NEC 2020 - i.e. NEC 690.12 as it stands in the 2020 edition - because that is the statewide-adopted edition (q29) and no Union County or Worthington Springs amendment to it was found.

Why the confidence is not higherThe edition chain is proved at the state level (q29, re-verified fresh today). Held at 72 rather than higher because the substance of NEC 690.12 itself could not be read in this environment (NFPA and ICC both 403 every route tried), so - as in the Washington County/Ebro run - the EDITION is proved and the SECTION TEXT is not independently verified here.

state administrative rule checked 2026-09-14 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=27843285&type=1&file=69A-60.005.doc

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

No AHJ-specific placard set is published by either Worthington Springs or Union County. The only marking-adjacent text found anywhere in the County's forms is the general 911-addressing instruction ('911 address posted at the road and house numbers on home if more than 50 feet from road, number to be 3" minimum height'), which is a site-addressing rule, not a PV/service-equipment placard rule.

Why the confidence is not higherBased on the full 171-file enumeration and the reading of every current Union County building/electrical form in this run - none contains placard, sign or marking language beyond the 911-number instruction quoted. Held at 55 because NEC 690/705's own marking requirements apply by default but could not be read here (q37).

department document library checked 2026-09-14 http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

No. Neither Worthington Springs nor Union County specifies placard wording of its own, on the same 171-file enumeration.

Why the confidence is not higherProved absence via full enumeration and reading of the County's current form set, as described in q38, with the same 'electrical'/'zzqqx' style controls passing on the LDR text (q3).

department document library checked 2026-09-14 http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

No. No letter height, colour, material or durability specification was found for either jurisdiction.

Why the confidence is not higherSame enumeration and reasoning as q39.

department document library checked 2026-09-14 http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing beyond NEC 705.10 as it stands in the 2020 edition. No County or Town document addresses a site plan/facility map placard.

Why the confidence is not higherProved absent locally on the same enumeration as q38-q40; the governing NEC text could not be read here (q37), so the local half is proved and the NEC half is named, not verified.

department document library checked 2026-09-14 http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedWhich utility serves Worthington Springs (FPL or Clay Electric Cooperative - see q22) was not resolved in this run, so its DG interconnection/marking manual could not be identified and checked.

https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSame 171-file enumeration as q38-41 - no document from either the County or a resolvable utility (see q22/q42) addresses label placement.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q44 Must equipment be on a specific approved list? Equipment listing

Nothing published by this authority.

Where we lookedNo approved-equipment list, UL/listing standard, or Florida Product Approval requirement specific to solar equipment was found in the County's 171-file upload history or in the Land Development Regulations (same controls as q3). Unlike Washington County's Sec. 14-79, no general equipment-listing ordinance clause could be located because no codified Union County electrical chapter could be reached (see q32).

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Batteries are not addressed by Worthington Springs or Union County. No local ESS provision exists in the Land Development Regulations, the Comprehensive Plan, or any of the 171 files enumerated from the Building Department's upload history. What governs is the Florida Fire Prevention Code (NFPA 1, Florida 2021 Edition) and the Florida Building Code 8th Edition, both applying by operation of state law regardless of anything the Town or County has passed.

Why the confidence is not higherThe local absence rests on the same full-corpus search as q34-q36 (LDR and Comp Plan both grepped for 'battery'/'energy storage'/'solar'/'photovoltaic', with only a Solar Farms zoning section and a generic 'battery reclamation' industrial-use exclusion turning up - neither is a residential ESS rule). The substantive state ESS rules (NFPA 1 Ch. 52 and its Florida amendments) could not be read here - see q36.

county land development regulations checked 2026-09-14 https://web.archive.org/web/20260507231539/https://unioncounty-fl.gov/wp-content/uploads/LDR_Union_20_Canary.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

No separate ESS permit or inspection is published. The County's own 'combination permit' framing - 'one permit covers all trades doing work at one site' - and the absence of any energy-storage line in the County's form set suggest a battery would ride on the electrical permit (and the building permit, if structural work is involved) rather than triggering a distinct ESS product.

Why the confidence is not higherInferred from the Subcontractor Verification/combination-permit language quoted in q4 and the absence established in q45 - no document states this explicitly for ESS.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260107002213/https://unioncounty-fl.gov/wp-content/uploads/Commercial-Building-Application-fillable.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Nothing published by this authority.

Where we lookedWorthington Springs' own zoning status is unpublished (q25/q27), and Union County's Land Development Regulations - the only reachable zoning-type text - apply to unincorporated land only (LDR Section 1.3, q2), so they cannot answer whether a ground-mounted array inside the Town is treated as an accessory structure. No Town-level document exists to check either way.

https://worthingtonsprings.org/wp-sitemap-posts-page-1.xml

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedResolving this needs the utility that actually serves a given Worthington Springs parcel (see q22, unresolved between FPL and Clay Electric Cooperative); neither utility's own DG interconnection specification was matched to the Town within this run's time budget. The County's own forms fix the service/meter location generally (see q26 context) but say nothing about the AC disconnect specifically.

https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

    • How is an inspection booked? Phone (386-496-2676 / 386-496-4241) and, since the 2024-2025 rollout, the Cloudpermit portal, which the County's own page says lets applicants 'Schedule or cancel building inspections' and 'Communicate with your building department with time-stamped messages.' 80% · department page
  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

    • Does this AHJ perform its own final solar inspection? No - Worthington Springs performs no inspections of its own. The Union County Building Department performs the final electrical/building inspection for property inside the Town, the same delegated shape the brief's own Raiford precedent established for this county via the City of Lake Butler's page, corroborated here specifically for Worthington Springs by the County's own 'Letter of Compliance' checklists (q1) which frame the building/addition and pool permit - and by extension its inspection - as something the COUNTY performs, with the Town's role limited to the compliance letter. 78% · county permit checklist
    • If delegated, to whom? Union County Building Department, 15 NE 1st Street, Lake Butler FL 32054. Phone (386) 496-2676 (or (386) 496-4241, the number used on the Planning & Development page and by County Coordinator James Williams); fax (386) 496-4240. Building Inspector Wilson Whidden per the County's own 2025 page - spelled 'Wilson Whiddon' on the City of Lake Butler's building-department page, a small first-party inconsistency worth flagging rather than resolving. 82% · department page
  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    Nothing recorded for Town of Worthington Springs on this step yet — 2 questions checked and found unpublished. The guidance above is general.

  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? No. No published inspection checklist of any kind was found in the County's 171-file upload history, unlike neighbouring Washington County's dedicated 'Building Inspection Procedures' document. 70% · department document library
    • What must be on site at inspection? Not stated as an inspection-day requirement specifically, but two things are documented as needing to be in place beforehand: the recorded Notice of Commencement (required 'in Clerk's Office' before work begins on jobs of qualifying value), and the 911 address, which must be 'posted at the road and house numbers on home if more than 50 feet from road, number to be 3" minimum height' before power is authorised. 58% · county permit checklist
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    Nothing recorded for Town of Worthington Springs on this step yet — 4 questions checked and found unpublished. The guidance above is general.

14 questions answered against Town of Worthington Springs’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone (386-496-2676 / 386-496-4241) and, since the 2024-2025 rollout, the Cloudpermit portal, which the County's own page says lets applicants 'Schedule or cancel building inspections' and 'Communicate with your building department with time-stamped messages.'

Why the confidence is not higherThe phone numbers are from the Building Department's own page and its forms; the scheduling/cancelling language is quoted from the same 2025 Building Department page capture used in q20-q21.

department page checked 2026-09-14 https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q50 How much notice is required? Core Booking & scheduling

Nothing published by this authority.

Where we lookedNo County or Town document states a minimum advance-notice period for booking an inspection - the full 171-file enumeration and the Building Department page (2025 capture) were both checked.

https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

Nothing published by this authority.

Where we lookedSame absence as q50 - no AM/PM window, same-day option, or arrival-window language was found in any reachable Union County or Worthington Springs document; Cloudpermit's own scheduling UI was not reachable without an account.

https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

No - Worthington Springs performs no inspections of its own. The Union County Building Department performs the final electrical/building inspection for property inside the Town, the same delegated shape the brief's own Raiford precedent established for this county via the City of Lake Butler's page, corroborated here specifically for Worthington Springs by the County's own 'Letter of Compliance' checklists (q1) which frame the building/addition and pool permit - and by extension its inspection - as something the COUNTY performs, with the Town's role limited to the compliance letter.

Why the confidence is not higherNo document states in so many words 'Union County inspectors cross into Worthington Springs' - this is assembled, as in q1, from the County's own checklists naming the Town, Worthington Springs' total absence of any building-department content on its own site, and the Lake Butler sideways-corroboration route the brief itself specifies for this county. Held at 78, slightly below the jurisdiction-block confidence because no Cloudpermit or public permit register was reachable to show an actual inspection record at a Worthington Springs address (Union County's forms could not be checked against a public register the way Washington County's iWorq register could in the Ebro run - Cloudpermit is login-gated).

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q53 If delegated, to whom? Core Who inspects

Union County Building Department, 15 NE 1st Street, Lake Butler FL 32054. Phone (386) 496-2676 (or (386) 496-4241, the number used on the Planning & Development page and by County Coordinator James Williams); fax (386) 496-4240. Building Inspector Wilson Whidden per the County's own 2025 page - spelled 'Wilson Whiddon' on the City of Lake Butler's building-department page, a small first-party inconsistency worth flagging rather than resolving.

Why the confidence is not higherAddress, phone and inspector name are from the Union County Building Department's own page (2025 Wayback capture); the alternate spelling is from the City of Lake Butler's own building-department page, fetched live in this run - both are first-party AHJ-adjacent sources naming the same individual differently.

department page checked 2026-09-14 https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q54 Which inspections are required, and in what order? Core Stages & sequence

Nothing published by this authority.

Where we lookedNo inspection-stage sequence document (comparable to Washington County's 'Building Inspection Procedures') was found anywhere in Union County's 171-file upload history or on the Building Department page (2025/2026 captures both checked). Only the general subcontractor/combination-permit framework (q4) and the Cloudpermit scheduling capability (q49) were found.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Nothing published by this authority.

Where we lookedSame absence as q54 - no rough-in/mid-roof inspection stage is published anywhere reachable in this run.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedNo document states whether the Union County inspector verifies labels or equipment listings - the full 171-file enumeration contains no inspection-checklist or inspection-procedures document at all (contrast with Washington County, which publishes one).

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q57 Is there a published inspection checklist? Core What is checked

No. No published inspection checklist of any kind was found in the County's 171-file upload history, unlike neighbouring Washington County's dedicated 'Building Inspection Procedures' document.

Why the confidence is not higherProved by the full enumeration of the Building Department's upload history via the Internet Archive CDX index in this run - no filename or captured page matching an inspection checklist/procedures document exists.

department document library checked 2026-09-14 http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q58 What must be on site at inspection? Core Documents on site

Not stated as an inspection-day requirement specifically, but two things are documented as needing to be in place beforehand: the recorded Notice of Commencement (required 'in Clerk's Office' before work begins on jobs of qualifying value), and the 911 address, which must be 'posted at the road and house numbers on home if more than 50 feet from road, number to be 3" minimum height' before power is authorised.

Why the confidence is not higherBoth items are quoted from the County's own Residential/Commercial checklists and Notice of Commencement form, read in this run. Held at 58 because no document frames these explicitly as 'what must be on site at inspection' - they are framed as pre-conditions of the permit/power-on process generally.

county permit checklist checked 2026-09-14 https://web.archive.org/web/20260610113743/https://unioncounty-fl.gov/wp-content/uploads/Residential-House-Application-fillable.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

Nothing published by this authority.

Where we lookedNo fee schedule of any kind was found (see q15-q17), so no re-inspection fee figure exists to report.

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q60 How are corrections issued and cleared? Corrections & re-inspection

Nothing published by this authority.

Where we lookedNo document describes how corrections are issued or cleared - the full 171-file enumeration contains no inspection-procedures or corrections-notice document (contrast q54-q57).

http://web.archive.org/cdx/search/cdx?url=unioncounty-fl.gov&matchType=domain&output=json&limit=3000&collapse=urlkey&filter=statuscode:200

Q61 What is issued on pass? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedNo document states what is issued on a passing inspection (CO, Final, green tag, or letter). Unlike the Washington County/Ebro run, no public permit register was reachable to read the pattern off actual records - Union County's Cloudpermit portal is login-gated rather than a public register like Washington County's iWorq system.

https://web.archive.org/web/20250224234201/https://unioncounty-fl.gov/building-department/

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Nothing published by this authority.

Where we lookedResolving who notifies the utility for PTO requires first resolving which utility serves a given Worthington Springs parcel (q22, unresolved between FPL and Clay Electric Cooperative); neither utility's interconnection tariff was reached and matched to the Town within this run's time budget.

https://web.archive.org/web/20260106230606/https://unioncounty-fl.gov/wp-content/uploads/Electrical-Applicaton-fillable.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording 65%

No. Neither Worthington Springs nor Union County specifies placard wording of its own, on the same 171-file enumeration.

Size, colour & material 62%

No. No letter height, colour, material or durability specification was found for either jurisdiction.

Where they go None%

What the utility wants on top None%

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://unioncounty-fl.gov/building-department/
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
Town
County
Union County
Regions covered
Authority Contact
Building Department
Direct Phone
(386) 496-2676
Booking & Scheduling