Village of El Portal

Miami-Dade County · Florida ← All authorities

Village of El Portal

Miami-Dade County

Verified Aug. 6, 2026

Village of El Portal is a village authority in the State of Florida, serving 1,986 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.

Jurisdiction & key facts

The standing 62-question set, answered for Village of El Portal against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.

Village of El Portal is the authority having jurisdiction 95% confidence
Holds
Building, Electrical, Mechanical, Plumbing, Roofing permitting and inspection; Planning & Zoning site-improvement review for solar. All self-administered by the Village (not delegated to Miami-Dade County), though Miami-Dade's countywide Building Code Compliance Office (BCCO) surcharge and CTQB contractor-licensing regime apply on top of every Village-issued permit, and the Village's own Building Department budget shows no payroll line, only outside 'Professional Fees,' suggesting day-to-day staffing is contracted out even though legal jurisdiction stays with the Village.
Overridden by
Miami-Dade County's countywide High-Velocity Hurricane Zone (HVHZ) product-approval/NOA regime for roof-attached equipment and wind-rated components (applies on top of, not instead of, Village permitting); FS 163.04's bar on any ordinance/HOA rule that prohibits or has the effect of prohibiting a residential solar installation, which qualifies the Village's own 'should be placed on rear instead of front-facing roof slopes' siting preference; FS 553.792(1)(a)'s 30-business-day statutory review ceiling, which the Village's own published 10-business-day solar-specific target already beats.
Why not higher
El Portal is present in the floridabuilding.org 392-entry statewide permit-issuer register (positive/fabricated controls both passed); the Village's own department page states plainly it issues its own building permits; a full 12-page fee schedule, a permit application, and a solar-specific submittal checklist are all published under the Village's own name; the FY2026 adopted/proposed budget carries a dedicated Building Department revenue/expense fund. No evidence anywhere (permit page, ordinance archive, budget) points to delegation to Miami-Dade County for permitting authority -- the county's role here is licensing (CTQB) and a piggy-back surcharge (BCCO), not AHJ substitution.

https://www.floridabuilding.org/sc/sc_org_srch.aspx

Permit required
Yes96%
Permit cost
Not a single published flat number -- fee is computed from job value. Worked example for a $30,000 residential rooftop PV job,68%
Plan review
Best efforts within 10 business days for one- and two-family dwelling solar PV applications (not guaranteed).88%
Portal
CAP portal (IDT Plans) -- cap.idtplans.com/secure92%
Electrical code
2020 NEC (NFPA 70-2020), incorporated by reference in the Florida Building Code, 8th Edition (2023).72%
Booking an inspection
Phone90%
Permitting 5 steps · 28 questions

Whether a permit is needed — Yes Q3 Electrical and building permits — Separate Q4 Plan review — Best efforts within 10 business days for one- and two-family dwelling solar PV applications (not guaranteed). Q18 Where you file — CAP portal (IDT Plans) -- cap.idtplans.com/secure Q20

Permit required
Yes96% source
What it costs
Not a single published flat number -- fee is computed from job value. Worked example for a $30,000 residential rooftop PV job,68% source
Plan review turnaround
Best efforts within 10 business days for one- and two-family dwelling solar PV applications (not guaranteed).88% source
Key document
authority's own fee schedule (OCR'd scanned PDF) cited by 6 open the document
  1. Confirm who has a say over your address

    A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.

  2. Check who is allowed to apply

    Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.

  3. Build the submittal package

    Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.

    • What documents make up a complete submittal? Completed & notarized permit application (all trades together with the master permit); Contractor's Registration package (CTQB/state cert, LBTR, driver's license, state registration, COI, workers' comp); proof of ownership (Property Appraiser printout or deed); a full set of plans; upfront processing fee (0.5% of job value, $125-127.86 minimum) at submittal. For solar PV specifically (Solar Submittal Checklist): trade permit application(s) (GC or solar contractor for building, plus electrical contractor); two signed-and-sealed sets of construction documents; properly scaled roof plan showing system location; complete electrical diagram/circulation; component specifications; attachment details with wind-loading calculations. 92% · authority's own published checklist
    • How many copies, and in what format? Electronic submission is preferred: one set of digitally/electronically signed and sealed drawings via the CAP (IDT Plans) online portal. Hardcopy drop-off is by appointment only and (per a generic plan-review/inspection requirements matrix hosted on the same department page) would require 2 sets of signed and sealed drawings. Email submission is explicitly discouraged. 75% · authority's own department page + hosted plan-review matrix
    • Is a site plan required, and what must it show? Yes. Rooftop: a properly scaled roof plan showing the location of the system. Ground-mount: a full site plan with existing/proposed setbacks, property lines, lot dimensions and grade elevation per survey, plus all other proposed structures on the lot. 90% · authority's own published checklist
    • Is a one-line / three-line diagram required? Yes 82% · authority's own published checklist
    • Is a structural PE stamp required, and at what threshold? Required for all PV jobs, no minimum-value threshold published for exemption. 80% · authority's own published checklist
  4. Apply and pay

    Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.

    • Which permit portal does this authority use? CAP portal (IDT Plans) -- cap.idtplans.com/secure 92% · authority's own department page
    • Can the whole application be completed online? Yes (electronic path); a hardcopy drop-off-by-appointment alternative also exists. 85% · authority's own department page
    • What does a residential solar permit cost? Not a single published flat number -- fee is computed from job value. Worked example for a $30,000 residential rooftop PV job, reading the fee schedule literally: Application Fee $30 + Upfront Fee (0.5% of job value, credited) $150 + Electrical New-Construction fee 2.5% = $750 + Building/Electrical/Misc. Plan Review Fee $85 (one trade) + Village Planning & Zoning 'Site Improvement' review fee for Zone 3 (low-density residential) $300 + DBPR surcharge (FS 553.721) 1.0% of base permit fee + BCAI surcharge (FS 468.631) 1.5% of base permit fee + Miami-Dade BCCO surcharge $0.60/$1,000 job value ($18) + Technology/Training/Preservation fee $0.40/$1,000 ($12). Total in the ~$1,300-1,400 range depending on whether the job is coded 'New Construction' (2.5%) or 'Remodel/Alteration' (3.0% electrical) and whether a separate Building sub-permit is also pulled. 68% · authority's own fee schedule (OCR'd scanned PDF)
    • How is the fee calculated? Tiered 95% · authority's own fee schedule
    • Is there a separate plan-check fee? Yes 90% · authority's own fee schedule
  5. Plan review — and start the utility in parallel

    Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.

28 questions answered against Village of El Portal’s own published documents

Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope

Yes

Why the confidence is not higherEl Portal appears in the floridabuilding.org 392-entry statewide register of governments that actually issue building permits (fuzzy-stem/dropdown parse confirmed 'Village of El Portal' present; positive controls Polk City/Frostproof/Eagle Lake/Dade City present, fabricated/negative controls Bowling Green/Wauchula/Zolfo Springs/St. Leo/San Antonio absent, per the survey's standard control set). Corroborated first-hand by the Village's own Code Enforcement & Building Department page, which names a Building Official (Pedro J Martinez) and trade inspectors, publishes its own 12-page fee schedule and permit application, and by the FY2026 budget carrying a dedicated 'Building Department Revenue'/'Building Department Expenses' fund (line 101-000-32220.000) balancing at $350,000 both sides for FY2026 proposed.

statewide keyless register + authority's own department page checked 2026-09-13 https://www.floridabuilding.org/sc/sc_org_srch.aspx

Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope

Both

Why the confidence is not higherThe Village self-issues Building, Electrical, Mechanical, Plumbing and Roofing permits (fee schedule Secs. 'BUILDING BASE PERMIT FEE' and 'ELECTRICAL, MECHANICAL, PLUMBING AND GAS PERMIT FEE' both billed by the Village; permit application form has stand-alone lines for Roofing/Windows-Doors/Railings/Electrical/Mechanical/Plumbing). Not delegated to Miami-Dade County for permitting authority, though Miami-Dade's countywide BCCO surcharge ($0.60/$1,000 job value) rides on every permit regardless of issuer, and contractors must hold Miami-Dade CTQB licensure to work in the Village. NOTE: the FY2026 budget's Building Department has NO payroll/salary line at all -- only 'Professional Fees - Building Permits' ($197,300 budgeted, $352,127 actual FY25 YTD) and 'Professional Fees - Building Official' ($7,200) -- so day-to-day staffing is very likely an outside professional-services contract even though the Village remains the legal AHJ. The specific contracting firm is not named in the budget, ordinances page, or department page (see not_found notes in extra_findings).

fee schedule + FY2026 adopted/proposed budget checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope

Yes

Why the confidence is not higherFee schedule page 1: 'No person shall erect or construct... any building or structure... without first obtaining a building permit.' The Village's own Solar Energy Zoning Regulations factsheet states residential PV requires both a building permit and zoning approval.

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope

Separate

Why the confidence is not higherThe permit application form lists Electrical as a distinct 'stand-alone and sub-permit' line item separate from Building cost, and the fee schedule prices 'ELECTRICAL, MECHANICAL, PLUMBING AND GAS PERMIT FEE' as its own schedule (2.5%/3.0% of job value) apart from the 'BUILDING BASE PERMIT FEE' schedule. A PV job pulls building and electrical as separate trade permits under one master/coordinated submittal.

authority's own permit application checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2022/09/Permit-Application-Revised-04-21-2022.pdf

Q5 Who is allowed to pull the electrical permit? Core Who may apply

Licensed electrician

Why the confidence is not higherPermit Application Requirements Sec. 2 'Contractor's Registration' requires State Certification/Certificate of Competency (Miami-Dade CTQB License), Local Business Tax Receipt, insurance and workers' comp for the trade contractor pulling a permit; the application itself has a 'Registered Contractor'/'Signature of Qualifier' block. A homeowner may alternatively self-permit as owner-builder (q7).

authority's own permit application requirements checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2023/01/PERMIT_APPLICATION_REQUIREMENTS.pdf

Q6 Must the contractor be registered with this authority before applying? Core Who may apply

Yes

Why the confidence is not higherPermit Application Requirements Sec. 2 requires, before submittal: State Certification/Certificate of Competency (Miami-Dade CTQB License), a Local Business Tax Receipt, driver's license copy, state registration, COI and workers' comp/exemption. The Village separately publishes its own Business Tax Receipt (BTR) application (VOEP2022_BUSINESS-TAX-RCPT-BTR-APPLICATION.pdf), i.e. a Village-level registration distinct from county licensure.

authority's own permit application requirements checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2023/01/PERMIT_APPLICATION_REQUIREMENTS.pdf

Q7 Is a homeowner permitted to self-install and self-permit? Who may apply

Yes

Why the confidence is not higherThe department page publishes 'OWNER-BUILDER-AFFIDAVIT-INSTRUCTIONS.pdf' and the Permit Application Requirements note 'If the owner will be applying for the permit as an owner/builder, the Owner-Builder Affidavit must be submitted along with the permit application.'

authority's own published form checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/OWNER-BUILDER-AFFIDAVIT-INSTRUCTIONS.pdf

Q8 What documents make up a complete submittal? Core Submittal package

Completed & notarized permit application (all trades together with the master permit); Contractor's Registration package (CTQB/state cert, LBTR, driver's license, state registration, COI, workers' comp); proof of ownership (Property Appraiser printout or deed); a full set of plans; upfront processing fee (0.5% of job value, $125-127.86 minimum) at submittal. For solar PV specifically (Solar Submittal Checklist): trade permit application(s) (GC or solar contractor for building, plus electrical contractor); two signed-and-sealed sets of construction documents; properly scaled roof plan showing system location; complete electrical diagram/circulation; component specifications; attachment details with wind-loading calculations.

Why the confidence is not higherCombined from the Village's general Permit Application Requirements and its Solar (Thermal/Photovoltaic) Submittal Checklist, both currently published on the department page.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q9 How many copies, and in what format? Submittal package

Electronic submission is preferred: one set of digitally/electronically signed and sealed drawings via the CAP (IDT Plans) online portal. Hardcopy drop-off is by appointment only and (per a generic plan-review/inspection requirements matrix hosted on the same department page) would require 2 sets of signed and sealed drawings. Email submission is explicitly discouraged.

Why the confidence is not higherThe Village's own department page states the two accepted submission formats (electronic via CAP portal, or hardcopy by appointment); the '1 set electronic / 2 sets in-person' copy count comes from a generic plan-review matrix on the same page whose body text refers to 'the City Code' rather than 'the Village Code,' so it may be a template not fully localized -- flagged, not fully village-verified.

authority's own department page + hosted plan-review matrix checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q10 Is a site plan required, and what must it show? Core Submittal package

Yes. Rooftop: a properly scaled roof plan showing the location of the system. Ground-mount: a full site plan with existing/proposed setbacks, property lines, lot dimensions and grade elevation per survey, plus all other proposed structures on the lot.

Why the confidence is not higherSolar Submittal Checklist requires 'properly scaled roof plans with the location of system'; the department's plan-review matrix requires a full dimensioned site plan for any ground-located PV equipment.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q11 Is a one-line / three-line diagram required? Core Drawings & calculations

Yes

Why the confidence is not higherSolar Submittal Checklist, Photovoltaic Systems drawing requirements: 'Complete electrical diagram and electrical circulation.'

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q12 Are string and conductor calculations required? Drawings & calculations

Nothing published by this authority.

Where we lookedSearched the Solar Submittal Checklist (full text) and the department's generic plan-review/inspection matrix for an enumerated 'string calculations' or 'conductor sizing calculations' submittal item. Neither document names string/conductor calculations specifically -- the checklist's 'specifications for all components' and 'electrical diagram' items may cover this in practice but it is not a named, separately-required document.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps

Required for all PV jobs, no minimum-value threshold published for exemption.

Why the confidence is not higherSolar Submittal Checklist requires 'two copies of construction documents signed and sealed by a [professional] designer' for all PV, plus 'attachment details with windloading calculations' -- consistent with Miami-Dade's High-Velocity Hurricane Zone (HVHZ) product-approval/NOA regime, which does not carve out a de-minimis threshold for roof attachment engineering.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps

Nothing published by this authority.

Where we lookedSearched the Solar Submittal Checklist and the fee schedule's plan-review section for a separate electrical (vs. structural) PE-stamp threshold. Both documents require a signed-and-sealed 'complete electrical diagram' but do not state a distinct engineering-stamp value/size threshold specific to the electrical (rather than structural) scope.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q15 What does a residential solar permit cost? Core Fees

Not a single published flat number -- fee is computed from job value. Worked example for a $30,000 residential rooftop PV job, reading the fee schedule literally: Application Fee $30 + Upfront Fee (0.5% of job value, credited) $150 + Electrical New-Construction fee 2.5% = $750 + Building/Electrical/Misc. Plan Review Fee $85 (one trade) + Village Planning & Zoning 'Site Improvement' review fee for Zone 3 (low-density residential) $300 + DBPR surcharge (FS 553.721) 1.0% of base permit fee + BCAI surcharge (FS 468.631) 1.5% of base permit fee + Miami-Dade BCCO surcharge $0.60/$1,000 job value ($18) + Technology/Training/Preservation fee $0.40/$1,000 ($12). Total in the ~$1,300-1,400 range depending on whether the job is coded 'New Construction' (2.5%) or 'Remodel/Alteration' (3.0% electrical) and whether a separate Building sub-permit is also pulled.

Why the confidence is not higherComputed directly from the Village's own 12-page fee schedule (OCR'd from the scanned PDF, psm4, eyeballed page-by-page). The schedule's cover page is marked '(Adopted Pending)' and a separately published 2023 requirements sheet quotes a slightly different upfront minimum ($127.86 vs. the schedule's $125), so treat this as the schedule's own math rather than a village-confirmed 'the number,' per the standing brief's fee-dating rule.

authority's own fee schedule (OCR'd scanned PDF) checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q16 How is the fee calculated? Core Fees

Tiered

Why the confidence is not higherFee schedule bases Building and Electrical base permit fees on 'Job Value' in six declining percentage tiers from 2.5% (<=$5M) down to 0.7% (>$45M), plus a 0.5% upfront fee (min $125) and flat plan-review/certificate/surcharge line items.

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q17 Is there a separate plan-check fee? Fees

Yes

Why the confidence is not higherFee schedule: 'Building, Electrical, Mechanical, Plumbing and Misc. Plan Review Fee: $85 per trade in addition to the base permit fee... will not be credited towards permit fee' (jobs <=$5,000,000); $120/trade above that.

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q18 What is the stated plan-review turnaround? Core Timeline & validity

Best efforts within 10 business days for one- and two-family dwelling solar PV applications (not guaranteed).

Why the confidence is not higherSolar Submittal Checklist, 'REVIEW PROCESS TIMELINE': 'Best efforts are made to review completed one and two-family dwelling solar permit applications within 10 business days. These turnaround times are typical, not guaranteed.' This is faster than the FS 553.792(1)(a) statutory ceiling (30 business days for structures <7,500 sq ft, which a typical PV-bearing single-family home falls under).

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q19 How long is an issued permit valid before it expires? Timeline & validity

180 days

Why the confidence is not higherFee schedule Sec. 'REFUNDS, TIME LIMITATION and CANCELLATIONS': 'A permit shall expire and become null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance... or if the work when commenced is suspended or abandoned... for a period of 180 days.'

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q20 Which permit portal does this authority use? Core Portal & process

CAP portal (IDT Plans) -- cap.idtplans.com/secure

Why the confidence is not higherDepartment page: electronic plan submission is via the 'CAP Portal,' linked directly to cap.idtplans.com/secure.

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q21 Can the whole application be completed online? Core Portal & process

Yes (electronic path); a hardcopy drop-off-by-appointment alternative also exists.

Why the confidence is not higherDepartment page states 'ONLY TWO FORMAT SUBMISSION PROCESS OPTIONS WILL BE ACCEPTABLE': hardcopy drop-off by appointment, or electronic submission via the CAP portal; email is discouraged.

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q22 Which utility handles interconnection here? Core Utility interconnection

Florida Power & Light Co. (FPL)

Why the confidence is not higherEIA-861 Service_Territory_2024.xlsx lists exactly two retail electric sellers with a Miami-Dade County presence: Florida Power & Light Co. (Utility No. 6452) and City of Homestead (FL) municipal utility (No. 8795). Homestead's municipal system serves only within the City of Homestead's own limits, roughly 25 miles south of El Portal near the peninsula's tip, with no service-territory overlap in northeast Miami-Dade. The Village's FY2026 budget carries a non-zero 'Franchise Fee - Electric' revenue line (acct. 001-000-31310.000, $135,000 budgeted FY2026), which by the survey's own rule proves the Village itself is NOT the electric seller (i.e., no municipal utility) and is consistent with an IOU franchise. The franchise ordinance itself naming FPL was not located in the Village's 178-item uncodified ordinance/resolution archive within this run's search time (see extra_findings) -- capped confidence accordingly.

EIA-861 Service_Territory_2024.xlsx + FY2026 adopted/proposed budget checked 2026-09-13 https://www.eia.gov/electricity/data/eia861/zip/f8612024.zip

Q23 Where does the utility sit in the sequence? Core Utility interconnection

Parallel, with a hard sequencing rule at the point of energization: the AHJ's final building/electrical inspection and approval must occur BEFORE the system may operate in parallel with the utility's grid; the utility-side interconnection application/agreement can be initiated and processed alongside the Village permit process.

Why the confidence is not higherFAC 25-6.065(5)(a) (Florida's statewide IOU interconnection rule, read first-hand from the current .doc rule text at flrules.org): the Standard Interconnection Agreement must contain 'a requirement that customer-owned renewable generation must be inspected and approved by local code officials PRIOR to its operation in parallel with the investor-owned utility.' Subsection (7)(d) allows the utility's own physical inspection to run within 30 days of the customer executing the agreement, i.e. concurrently with permitting.

Florida Administrative Code, verbatim rule text checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Q24 Is a HOA or architectural approval required first? Overlays & special cases

Yes -- Planning & Zoning 'Site Improvement' review and fee ($300 Zone 3 low-density residential / $800 Zone 4-5 mixed-use) is required for solar installations in addition to the building/electrical permit. Separately, under state law (FS 163.04), no HOA/deed restriction or governing-body ordinance may flatly prohibit a residential solar installation; the only discretion any such entity retains is siting within 45 degrees of due south on the roof, and only if that does not impair the system's effective operation.

Why the confidence is not higherVillage's own Solar Energy Zoning Regulations factsheet states the P&Z Site Improvement fee and that 'installation of equipment on the roof should be inconspicuous from the public right-of-way' and 'placed on rear instead of front-facing roof slopes' -- a siting PREFERENCE that must yield to FS 163.04(2)'s 45-degree-of-south floor if the two conflict, since FS 163.04(1) makes any ordinance with 'the effect of prohibiting' solar installation void.

authority's own published factsheet + FS 163.04 verbatim checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/20190521-PZD-11-Online-Factsheet-for-Solar.pdf

Q25 Is there a historic-district review? Overlays & special cases

Nothing published by this authority.

Where we lookedChecked the Village's full WordPress page-sitemap (52 pages) for a Historic Preservation Board / historic-district page; none exists. The Planning & Zoning page and the adopted Form-Based Code (Ch. 24, Appendix B) were searched for 'historic' -- the only related hit is a generic plan-review matrix (hosted on the department page, apparently a template referencing 'the City Code' rather than El Portal's own Village Code) which lists 'DRB, HPB, BOA recorded order' as a conditional supporting document -- too generic/unattributed to confirm a real, active El Portal Historic Preservation Board. The Village markets itself as 'a picturesque and historic village' but that is not evidence of a designated historic-district REVIEW requirement.

https://elportalvillage.com/page-sitemap.xml

Q26 Is a wind or windstorm certification required? Overlays & special cases

Yes

Why the confidence is not higherSolar Submittal Checklist requires 'attachment details with windloading calculations' for PV; the Village's separate Roofing Application form (HVZ1525-EP) is built entirely around Miami-Dade Notice-of-Acceptance (NOA)/Product Approval wind-pressure worksheets, confirming the countywide High-Velocity Hurricane Zone (HVHZ) wind-certification regime applies to roof-mounted work generally.

authority's own published checklist + roofing application worksheet checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases

Conditional: 'May require Land Use Board approval if visible from ROW' for photovoltaic work, per the department's plan-review/inspection matrix (residential and commercial PV alteration/new entries both carry this note).

Why the confidence is not higherSourced from a generic plan-review/inspection-requirements matrix hosted on El Portal's own department page; the document's body text refers to 'the City Code' rather than 'the Village Code' in places, so it may not be fully localized to El Portal -- confidence capped accordingly.

generic plan-review matrix hosted on authority's own department page checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2022/04/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf

Q28 Is there a system-size cap on residential generation? Overlays & special cases

Nothing published by this authority.

Where we lookedSearched the Solar Submittal Checklist and Solar Zoning Regulations factsheet for a Village-specific kW or system-size cap on residential generation; neither publishes one. The only size-linked ceiling found is the state interconnection rule's own self-limit (FAC 25-6.065(4)(a): gross power rating may not exceed 90% of the customer's utility distribution service rating, and Tier boundaries at 10kW/100kW/2MW), which is a utility-side qualification threshold, not a Village zoning cap.

https://elportalvillage.com/wp-content/uploads/2020/09/20190521-PZD-11-Online-Factsheet-for-Solar.pdf

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Install 5 steps · 20 questions
  1. Build to the code editions actually in force here

    The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.

    • Which NEC edition is in force? 2020 NEC (NFPA 70-2020), incorporated by reference in the Florida Building Code, 8th Edition (2023). 72% · secondary code-reference site (up.codes)
    • Which building code edition is in force? Florida Building Code, 8th Edition (2023), effective 31 Dec 2023 -- current statewide edition as of this survey date. 85% · statewide code-adoption cycle, FS 553.73
    • What is the installation judged against? Florida Building Code, 8th Edition (2023) plus the 2020 NEC as its referenced electrical code, both further overlaid by Miami-Dade County's countywide High-Velocity Hurricane Zone (HVHZ) product-approval/Notice-of-Acceptance (NOA) requirements for any roof-attached or wind-exposed equipment. 80% · authority's own documents + statewide/countywide code framework
  2. Fire access, setbacks and pathways

    Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.

    Nothing recorded for Village of El Portal on this step yet — 1 question checked and found unpublished. The guidance above is general.

  3. Rapid shutdown

    Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.

  4. Labels and placards

    The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.

  5. Disconnect, storage and listed equipment

    Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.

20 questions answered against Village of El Portal’s own published documents

Q29 Which NEC edition is in force? Core Code editions in force

2020 NEC (NFPA 70-2020), incorporated by reference in the Florida Building Code, 8th Edition (2023).

Why the confidence is not higherA code-viewer secondary source (up.codes) for the FBC 2023 (8th Edition) Chapter 27 states the chapter's Sec. 2701.1 governs electrical work in conjunction with 'NFPA 70,' identified there as the 2020 edition. Not independently confirmed against the Florida Building Commission's own (paywalled/portal-gated) code text this run -- floridabuilding.org's own code-viewing pages 404'd/redirect-looped on every route tried this session.

secondary code-reference site (up.codes) checked 2026-09-13 https://up.codes/viewer/florida/fl-building-code-2023/chapter/27/electrical

Q30 Which building code edition is in force? Core Code editions in force

Florida Building Code, 8th Edition (2023), effective 31 Dec 2023 -- current statewide edition as of this survey date.

Why the confidence is not higherFlorida's Building Code is a single state-mandated edition on a triennial cycle under FS 553.73; no local government (including El Portal) selects its own base edition. The 9th Edition does not take effect until 31 Dec 2026 (per this survey's own prior first-hand statutory verification, carried in fl_baseline.md from an earlier run's reading of FS 553.79(1)(c)'s 'next edition' clause), so the 8th Edition (2023) is the edition in force today, 13 Sep 2026.

statewide code-adoption cycle, FS 553.73 checked 2026-09-13 https://www.floridabuilding.org/

Q31 Which fire code edition is in force? Code editions in force

Nothing published by this authority.

Where we lookedTried floridabuilding.org and the State Fire Marshal's pages for the current Florida Fire Prevention Code edition/cycle; floridabuilding.org's own code pages 404'd or redirect-looped on every route attempted this run (home page meta-refresh, /c/default.aspx session-redirect loop), and NFPA 1/101 text is paywalled per the standing brief's warning ('the FFPC is paywalled; unread means unreached'). Did not find a village-specific fire-code adoption ordinance in the 178-item uncodified ordinance archive within this run's time budget.

https://www.floridabuilding.org/

Q32 Are there local amendments to any of the above? Core Code editions in force

Nothing published by this authority.

Where we lookedLooked for a Village 'local technical amendments' ordinance to the FBC (the pattern seen at other Miami-Dade/FL municipalities, e.g. NEC Art. 250.96(A) grounding amendments) in the 178-item uncodified ordinance/resolution archive and on the department/PZ pages; none was found by title within this run's search time. Miami-Dade County's countywide HVHZ product-approval/NOA overlay clearly applies on top of the base FBC (see q26, q44) but that is a county-level regime, not a confirmed Village-adopted local amendment ordinance.

https://elportalvillage.com/resolutions-and-ordinances/

Q33 What is the installation judged against? Core Electrical

Florida Building Code, 8th Edition (2023) plus the 2020 NEC as its referenced electrical code, both further overlaid by Miami-Dade County's countywide High-Velocity Hurricane Zone (HVHZ) product-approval/Notice-of-Acceptance (NOA) requirements for any roof-attached or wind-exposed equipment.

Why the confidence is not higherCombination of q29/q30 findings and the Village's own HVHZ-specific roofing/product-approval worksheets and solar wind-loading requirement.

authority's own documents + statewide/countywide code framework checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q34 Is there a local rule on service upgrades or busbar sizing? Electrical

Nothing published by this authority.

Where we lookedSearched the fee schedule, permit application, and plan-review matrix for a Village-specific rule on service-panel upgrades or busbar sizing (a common local amendment elsewhere in FL, e.g. NEC 705.12 120% rule variants). None is stated in any Village-published document found this run.

https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q35 Is a specific mounting system or attachment spacing required? Structural & mounting

No Village-specific attachment-spacing number published; the requirement is performance-based -- 'attachment details with windloading calculations' sized to the Miami-Dade HVHZ product-approval/NOA rating of the specific racking system used.

Why the confidence is not higherSolar Submittal Checklist requires 'attachment details with windloading calculations' rather than a prescriptive spacing table; Miami-Dade's HVHZ regime generally defers spacing/attachment-count to the manufacturer's own NOA-rated installation instructions.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks

Nothing published by this authority.

Where we lookedSearched the Village's solar checklist, fee schedule, and Form-Based Code for a specific ridge setback or fire-access-pathway dimension for rooftop PV (the kind of rule found in NFPA 1 Sec. 11.12/California-style access-pathway tables). None is published in any El Portal document located this run; Florida Fire Prevention Code / NFPA 1 text is paywalled (see q31) so the underlying state-level pathway rule was not independently confirmed either.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown

Rapid shutdown is required, per NEC 690.12 as incorporated by the 2020 NEC referenced in the FBC 8th Edition (2023).

Why the confidence is not higherInferred from the adopted code edition (q29) rather than read first-hand from NFPA 70 text, which is paywalled; no El Portal-specific document (checklist, fee schedule, or plan-review matrix) separately states a rapid-shutdown requirement or references NEC 690.12 by number.

inference from adopted NEC edition (paywalled primary text not reached) checked 2026-09-13 https://up.codes/viewer/florida/fl-building-code-2023/chapter/27/electrical

Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling

Not separately published by the Village; the applicable placard regime is set by the interconnecting utility, FPL.

Why the confidence is not higherNo El Portal document (checklist, fee schedule, plan-review matrix) specifies its own placard requirement for solar service equipment. Per this survey's prior first-hand-verified FPL tariff findings (not independently re-fetched this run -- FPL's own net-metering/interconnection pages returned 404s on every URL tried), FPL's DG tariff Sec. XIII.A.6 requires an engraved meter-can placard that is NOT tier-scoped, so it reaches even a Tier 1 (<=10kW) job.

authority's own department page (silent) + prior-verified utility tariff finding, not re-confirmed this run checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedSearched the Village's checklist, fee schedule and plan-review matrix for placard wording specified by the Village itself; none found. Placard wording, where it exists, appears to be set by FPL's own tariff rather than by El Portal.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo El Portal document specifies placard letter height, colour or material for solar service-equipment labeling.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo El Portal document requires a site plan / facility map placard under NEC 705.10; not addressed in the checklist, fee schedule or plan-review matrix.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling

Yes, per prior first-hand-verified findings in this survey for FPL (not independently re-confirmed this run): an engraved meter-can placard under FPL's DG tariff Sec. XIII.A.6 applies regardless of Tier, and Sec. A.5 imposes an additional requirement whenever the interconnection uses a line-side tap, regardless of tier.

Why the confidence is not higherCarried forward from this survey's standing brief, which describes FPL's tariff as independently fetched and rendered at 300dpi in earlier runs; FPL's own net-metering/interconnection URLs 404'd on every route attempted this run, so this is not a fresh first-hand confirmation for El Portal specifically -- flagged and capped.

prior-verified utility tariff finding (this run could not re-fetch FPL's own document) checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q43 Where must the labels be placed? Core Labels Signage & labelling

Nothing published by this authority.

Where we lookedNo El Portal document specifies exact label placement beyond the generic NEC/utility placard locations; not independently confirmed this run because FPL's own DG manual could not be re-fetched (see q38, q42).

https://elportalvillage.com/code-enforcement-building-department/

Q44 Must equipment be on a specific approved list? Equipment listing

Yes -- via Miami-Dade County's Notice of Acceptance (NOA) / Product Approval system (HVHZ), and/or the statewide Florida Product Approval system.

Why the confidence is not higherThe Village's own Roofing Application worksheet (HVZ1525-EP) is built entirely around NOA/Product Approval numbers and wind-pressure calculations for roof-attached components; the Solar Submittal Checklist requires 'specifications for all components' and wind-loading attachment details, consistent with requiring an approved/listed racking and mounting system in this HVHZ jurisdiction.

authority's own published roofing/product-approval worksheet checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2024/02/Roofing-Application-Form-2023-HVZ1525-EP.pdf

Q45 Are batteries permitted, and under what conditions? Core Battery / ESS

Nothing published by this authority.

Where we lookedNo Village document (checklist, fee schedule, plan-review matrix, or ordinance archive search) addresses battery/ESS-specific permitting conditions for residential solar-plus-storage.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q46 Is there a separate ESS permit or inspection? Battery / ESS

Nothing published by this authority.

Where we lookedNo Village document distinguishes a separate ESS permit or inspection from the standard electrical/building permit and inspection sequence.

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q47 Is a ground mount treated as a structure? Core Ground mount

Yes, treated as a structure/accessory improvement.

Why the confidence is not higherThe department's plan-review matrix requires a full site plan with setbacks, property lines, lot dimensions and other proposed structures 'if located on grade' for PV -- the same documentation demanded of any accessory structure -- and the Form-Based Code's outbuilding setback table (Zone 3: 5 ft. side/rear, max. 1 outbuilding per property) is the applicable framework for anything ground-mounted.

generic plan-review matrix hosted on authority's own department page + adopted Form-Based Code checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2022/04/PLAN-REVIEW-AND-INSPECTION-REQUIREMENTS-NBV-02-22.pdf

Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment

Nothing published by this authority.

Where we lookedThe Village's own documents are silent on AC-disconnect placement relative to the meter (this is set by the utility's own DG interconnection manual, not the AHJ); FPL's own manual could not be fetched this run (see q38).

https://elportalvillage.com/code-enforcement-building-department/

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

Inspection 5 steps · 14 questions
  1. Book it

    Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.

  2. Know who turns up

    Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.

  3. Work the stages in order

    A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.

    • Which inspections are required, and in what order? Structural final, Electrical rough, and Electrical final (photovoltaic systems); Plumbing rough and Plumbing final for solar-thermal systems. A copy of the recorded Notice of Commencement must be provided at the first inspection. 90% · authority's own published checklist
    • Is a rough-in or mid-roof inspection required? Yes -- an Electrical rough inspection is required before Electrical final for PV; no separately-named 'mid-roof' inspection is published. 80% · authority's own published checklist
  4. Have the paperwork on site

    The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.

    • Is there a published inspection checklist? Yes 95% · authority's own published checklist
    • What must be on site at inspection? A copy of the recorded Notice of Commencement must be on site at first inspection. The fee schedule's re-inspection-fee trigger list also implies approved permit documents must be on site at every inspection ('Approved permit documents are not on site' is one of the listed causes for a chargeable re-inspection). 85% · authority's own published checklist + fee schedule
  5. Sign-off, and permission to operate

    Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.

    • What is issued on pass? Certificate of Occupancy (new construction/mandatory at >=$15,000 job value) or Certificate of Completion (alteration to an existing structure, also mandatory at >=$15,000); a Temporary CO/CC (30-day) is also available. A typical residential PV retrofit on an existing home would receive a Certificate of Completion. 75% · authority's own fee schedule
    • Who notifies the utility for PTO? Installer/customer notifies FPL for permission to operate, using the Village's final approval as the trigger. 55% · Florida Administrative Code (state rule); FPL's own process page not reached this run
    • Is there a re-inspection fee? $75 (1st occurrence) / $100 (2nd occurrence) / $125 (3rd+ occurrence, qualifier must meet inspector on site) per trade, per re-inspection. 95% · authority's own fee schedule
    • How are corrections issued and cleared? Corrections are cleared by requesting and paying for a re-inspection (escalating $75/$100/$125 fee ladder by occurrence count); payment of the re-inspection fee is required before any further permits will be issued or further inspections performed. At the 3rd-and-subsequent occurrence, 'qualifier must meet inspector on job for re-inspection.' 88% · authority's own fee schedule

14 questions answered against Village of El Portal’s own published documents

Q49 How is an inspection booked? Core Booking & scheduling

Phone

Why the confidence is not higherDepartment page: 'You must call the day before by 4:00 PM to schedule an inspection.' No online/portal or email booking method is mentioned for inspections (the CAP portal is for plan submittal, not inspection scheduling).

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q50 How much notice is required? Core Booking & scheduling

1 business day (by 4:00 PM the day before the requested inspection date).

Why the confidence is not higherDepartment page, verbatim: 'You must call the day before by 4:00 PM to schedule an inspection.'

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q51 Are same-day or AM/PM windows offered? Booking & scheduling

No -- inspections are confined to a single fixed 4-hour window on two fixed days per week: Tuesdays and Thursdays, 10:00 AM-2:00 PM. No AM/PM sub-windows are offered.

Why the confidence is not higherDepartment page: 'All inspections are done on Tuesdays and Thursdays between 10:00 am and 2:00 pm.'

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q52 Does this AHJ perform its own final solar inspection? Core Who inspects

Yes

Why the confidence is not higherThe department page names the Village's own trade inspectors by role, including 'Electrical Inspector: Jose Dabul' and 'Building Inspector: Leonardo Ligouri' -- the Village performs its own final inspections rather than delegating to Miami-Dade County. (Note: per q2, the department's day-to-day staffing may itself be an outside professional-services contract, but inspections are performed under the Village's own jurisdiction and permit number, not the county's.)

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q53 If delegated, to whom? Core Who inspects

N/A -- not delegated. Inspections are performed by the Village's own named inspectors.

Why the confidence is not higherSame source as q52: the department page names in-house trade inspectors rather than a county or third-party delegate.

authority's own department page checked 2026-09-13 https://elportalvillage.com/code-enforcement-building-department/

Q54 Which inspections are required, and in what order? Core Stages & sequence

Structural final, Electrical rough, and Electrical final (photovoltaic systems); Plumbing rough and Plumbing final for solar-thermal systems. A copy of the recorded Notice of Commencement must be provided at the first inspection.

Why the confidence is not higherSolar Submittal Checklist, 'INSPECTIONS' section, lists these exactly for PV vs. solar-thermal.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q55 Is a rough-in or mid-roof inspection required? Stages & sequence

Yes -- an Electrical rough inspection is required before Electrical final for PV; no separately-named 'mid-roof' inspection is published.

Why the confidence is not higherSolar Submittal Checklist lists 'Electrical rough' and 'Electrical final' as distinct required inspections for photovoltaic systems.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q56 Does the inspector verify labels and listings? Core What is checked

Nothing published by this authority.

Where we lookedSearched the Solar Submittal Checklist and the fee schedule's inspection section for an explicit statement that the inspector checks equipment labels/listings during a solar inspection; neither document states this as a discrete checklist item (it may occur in practice as part of a general code-compliance final, but is not written down).

https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q57 Is there a published inspection checklist? Core What is checked

Yes

Why the confidence is not higherThe Village publishes a dedicated 'Solar (Thermal/Photovoltaic) Submittal Checklist' PDF on its own department page, current and specific to solar.

authority's own published checklist checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q58 What must be on site at inspection? Core Documents on site

A copy of the recorded Notice of Commencement must be on site at first inspection. The fee schedule's re-inspection-fee trigger list also implies approved permit documents must be on site at every inspection ('Approved permit documents are not on site' is one of the listed causes for a chargeable re-inspection).

Why the confidence is not higherSolar Submittal Checklist ('Copy of recorded notice of commencement at first inspection') and fee schedule Reinspection Fee section.

authority's own published checklist + fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2020/09/Permitting-and-Inspection-Checklist.pdf

Q59 Is there a re-inspection fee? Corrections & re-inspection

$75 (1st occurrence) / $100 (2nd occurrence) / $125 (3rd+ occurrence, qualifier must meet inspector on site) per trade, per re-inspection.

Why the confidence is not higherFee schedule, 'INSPECTION PERMIT FEES / Reinspection Fee' table, triggered by repairs/corrections not made, work not ready, plans not on site, or no access.

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q60 How are corrections issued and cleared? Corrections & re-inspection

Corrections are cleared by requesting and paying for a re-inspection (escalating $75/$100/$125 fee ladder by occurrence count); payment of the re-inspection fee is required before any further permits will be issued or further inspections performed. At the 3rd-and-subsequent occurrence, 'qualifier must meet inspector on job for re-inspection.'

Why the confidence is not higherFee schedule, 'INSPECTION PERMIT FEES / Reinspection Fee' section, verbatim.

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q61 What is issued on pass? Core Final sign-off & PTO

Certificate of Occupancy (new construction/mandatory at >=$15,000 job value) or Certificate of Completion (alteration to an existing structure, also mandatory at >=$15,000); a Temporary CO/CC (30-day) is also available. A typical residential PV retrofit on an existing home would receive a Certificate of Completion.

Why the confidence is not higherFee schedule, 'CERTIFICATE FEES' section: distinct CO ($150 single-family/duplex, $200 commercial) and CC ($150/$200) fee lines, each mandatory for job value >= $15,000, each with a $75/$100 temporary version.

authority's own fee schedule checked 2026-09-13 https://elportalvillage.com/wp-content/uploads/2021/12/New-Permit-Fees-2021.pdf

Q62 Who notifies the utility for PTO? Core Final sign-off & PTO

Installer/customer notifies FPL for permission to operate, using the Village's final approval as the trigger.

Why the confidence is not higherNot stated in any El Portal document (the Village's role ends at its own final inspection/CO-CC). Inferred from FAC 25-6.065(7)(d): the customer must execute the Standard Interconnection Agreement and the utility completes its own physical inspection within 30 days of that execution before parallel operation begins -- in Florida IOU practice this step is customer/installer-initiated, not AHJ-initiated. Not independently confirmed against FPL's own process page this run (FPL URLs 404'd on every route tried).

Florida Administrative Code (state rule); FPL's own process page not reached this run checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc

Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.

No change record for this authority yet. Values arrive here as they are researched, and each one is dated.

Labels & placards for this authority

Wording None%

Size, colour & material None%

Where they go None%

What the utility wants on top 50%

Yes, per prior first-hand-verified findings in this survey for FPL (not independently re-confirmed this run): an engraved meter-can placard under FPL's DG tariff Sec. XIII.A.6 applies regardless of Tier, and Sec. A.5 imposes an additional requirement whenever the interconnection uses a line-side tap, regardless of tier.

Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.

Their website
Solar Requirements
Notes
Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/ --- Fetch failed: HTTPError: 403 Client Error: Forbidden for url: https://elportalvillage.com/code-enforcement-building-department/
Average approval time — application to PTO

From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.

About this authority
Type
Village
County
Miami-Dade County
Regions covered
Authority Contact
Building Department
Booking & Scheduling