Village of Islamorada is a village authority in the State of Florida. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for Village of Islamorada against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
Village of Islamorada is the authority having jurisdiction 92% confidence
- Holds
- Building and Electrical — the Village's own Building Services Department (a Chief Building Official plus dedicated Building and Electrical Plans Examiners) reviews plans, issues permits, and performs its own inspections for residential PV. Fire Prevention plan review/inspection is also a Village function (its own fee schedule line). Zoning/land-development review under Ch. 30 (setbacks, historic-district status if applicable) also sits with the Village's Planning & Development Services. Monroe County has no permitting role inside Islamorada — Monroe County's own FAQ states the County is AHJ only for the unincorporated Keys and that Islamorada is one of five municipalities that self-permit.
- Overridden by
- FKEC (Florida Keys Electric Cooperative) gates the process at both ends: its own engineering review and 'approved for PV construction' stamp are required BEFORE a Village permit can even be pulled, and its own post-inspection meter-swap (PTO) happens AFTER the Village's final inspection — so the utility, not the Village, controls both entry into and completion of the process, even though the Village issues the permit itself. Separately, HB 803 (2025, F.S. 553.79(1)(c)/125.56(4)(d), effective 1 Jul 2026) sets a statewide one-year minimum permit validity that the Village's own 180-day floodplain-permit-expiration clause and 90-day/6-month extension fee products have not yet been re-published to match — see Q19.
- Why not higher
- Confirmed from Islamorada's own Building Services page (own Chief Building Official, own Building/Electrical Plans Examiners, own CityView permit portal), the Village's own fee resolution (Res. 25-12-137, adopted 9 Dec 2025), and Village Code Sec. 6-31/6-68 (adopting the FBC/FFPC and performing/allowing private-provider inspections). FKEC's own 'Procedures for Solar Contractors' page independently confirms the utility-brackets-the-permit sequence. Checked 2026-09-12.
- Permit required
- Yes, a permit is required. The Village's own 'Permit Required' list states a permit is ALWAYS required for 'NEW ELECTRICAL,' and Village Code Sec.95%
- Permit cost
- Under the current fee resolution (Res. 25-12-137, adopted 9 Dec 2025, in effect through 30 Sep 2026),80%
- Portal
- CityView Portal (cvportal.us/CityViewPortal) — all Islamorada building/electrical permit applications, inspections, contractor registration, and payments are handled through this portal.95%
- Electrical code
- Not stated as a specific year anywhere in Village Code — Sec. 6-31 adopts only 'the current edition of the Florida Building Code,55%
- Own placard wording
- No specific placard wording is prescribed by the Village. FKEC's placard requirement (Sec. 5.3 of the Tier 1 Agreement) specifies only what the placard must communicate (the location of the…60%
- Booking an inspection
- Portal — 'All inspections must be requested through the CityView Portal,' per the Building Services page;95%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes, a permit is required. The Village's own 'Permit Required' list states a permit is ALWAYS required for 'NEW ELECTRICAL,' and Village Code Sec. Q3 Electrical and building permits — Either — the Village's single 'Application for Building Permit' form has checkboxes for Building, Electrical, Plumbing, Mechanical, Roofing, Gas, Demolition, Q4 Where you file — CityView Portal (cvportal.us/CityViewPortal) — all Islamorada building/electrical permit applications, inspections, contractor registration, Q20
- Permit required
- Yes, a permit is required. The Village's own 'Permit Required' list states a permit is ALWAYS required for 'NEW ELECTRICAL,' and Village Code Sec.95% source
- What it costs
- Under the current fee resolution (Res. 25-12-137, adopted 9 Dec 2025, in effect through 30 Sep 2026), a residential solar/PV electrical permit — filed as an 'individual trade permit' — would be…80% source
- Key document
- department page + fee schedule cited by 4 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes — Islamorada, Village of Islands is its own AHJ for residential solar; it is one of the five Monroe County municipalities that self-permit (Monroe County's own FAQ states the County is AHJ only for the unincorporated Keys and lists Islamorada among the municipalities with their own building departments). 95% · department page
- What does this authority permit itself, and what does it delegate? Both — Islamorada's own Building Services Department issues and reviews both Building and Electrical permits and performs its own inspections; nothing is delegated to Monroe County for a rooftop PV system in the Village. Fire Prevention plan review/inspection also sits with the Village (own fee schedule for 'Fire Safety Plan Review, Permit and Inspection'). The Village's Building Permit Allocation System (BPAS, the Village's ROGO-equivalent) is a separate function that gates NEW construction/dwelling-unit allocations, not retrofits such as adding PV to an existing house. 90% · department page + fee schedule
- Is a permit required for a residential rooftop PV system? Yes, a permit is required. The Village's own 'Permit Required' list states a permit is ALWAYS required for 'NEW ELECTRICAL,' and Village Code Sec. 6-61 requires permits as provided in the Florida Building Code for all work not specifically exempted (exemptions are limited to minor repairs <$2,500, small roofing, small satellite dishes, minimal vegetation removal — none of which describe a PV installation). 95% · published permit-requirement handout
- Is there a separate electrical permit, or is it combined? Either — the Village's single 'Application for Building Permit' form has checkboxes for Building, Electrical, Plumbing, Mechanical, Roofing, Gas, Demolition, Right-of-Way, and Change of Occupancy, all check-all-that-apply on ONE application; the fee schedule also prices 'individual trade permits' separately ($20.00/$1,000 valuation, same rate as new construction), so a stand-alone Electrical permit can be pulled apart from a Building permit for the same job. 85% · permit application form + fee schedule
- Is a HOA or architectural approval required first? No Village-administered HOA or architectural-review approval is required before a building permit for PV can be issued — no such requirement appears in Village Code Chapter 30 (Land Development Regulations) or Chapter 6 (Building). A private HOA/deed restriction could still separately require its own approval, but that is not a Village function and Florida law (F.S. 163.04) limits — without eliminating — what an HOA/deed restriction can prohibit for solar. 65% · ordinance (absence proved with controls)
- Is there a historic-district review? Yes, but only for properties that are formally designated as a Historic Landmark or within a designated Historic District (a Certificate of Appropriateness is then required under Village Code Sec. 30-1696) — this is a designation-based process (Sec. 30-1691 et seq., Historic Preservation Commission), not a village-wide historic-district review that would automatically apply to an ordinary residential PV permit. 85% · ordinance
- Is a wind or windstorm certification required? No separate, stand-alone 'windstorm certification' document requirement was found beyond ordinary Florida Building Code structural/wind-load compliance (which is judged through the normal plan-review/engineering-seal process, not a distinct certificate). The Village's Building Permit Allocation System (BPAS) awards bonus competitive-scoring points for NEW residential construction designed to a peak wind speed of 160 mph or 175 mph 'as certified by a qualified engineer or architect' — but this is an optional scoring incentive for the ROGO-equivalent allocation system for new dwelling units, not a requirement applicable to adding PV to an existing home. 60% · ordinance (BPAS scoring criteria)
- Is a Specific Use Permit or Council approval ever required? No — a routine residential rooftop PV retrofit on an existing single-family home does not trigger BPAS/Council allocation (BPAS applies to new construction/new dwelling units on vacant land, per the Village's own BPAS page) or a Specific Use Permit. A Council-level review would only be triggered if the property is a designated Historic Landmark/District (Certificate of Appropriateness, Sec. 30-1696) or if the work is bundled with new construction that independently requires BPAS. 65% · department page
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed electrical contractor (or licensed electrician) — Village Code Sec. 6-63 makes it unlawful for anyone to act as a contractor/subcontractor/journeyman in the Village without a current, valid state or Monroe County certificate of competency. The general permit application has a dedicated 'Electrical' sub-contractor line requiring the business name and license number, and the Village's own Electrical Safety Inspection Affidavit form requires the inspection be performed by a 'Licensed Electrical Contractor' or licensed engineer/architect. 90% · ordinance + permit forms
- Must the contractor be registered with this authority before applying? Yes — contractors must first create a CityView contractor file and complete Village contractor registration (state/county license, liability and workers'-comp insurance naming the Village as certificate holder, local business tax receipt, $50 initial fee/$31 annual renewal) BEFORE they can pull permits. 95% · published contractor-registration checklist
- Is a homeowner permitted to self-install and self-permit? Owner-builder self-permitting exists generally at the Village (an 'Owner-Builder Disclosure Statement' form is published, and the general Building Permit Application allows an owner-builder to sign as the responsible party), but nothing in the Village's own documents specifically addresses whether a homeowner may self-install/self-permit a PV system as opposed to conventional construction. 55% · published form (general, not solar-specific)
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Based on the Village's own permit-submittal matrix, the closest analogous permit type ('Electric Service — change or upgrade') requires: a completed Permit Application, a Property Record Card, a scaled Site Plan, and a Floor Plan (scaled); the matrix also shows the job must be routed to FKEC (utility) — there is no 'Sealed Drawing' requirement on that row, unlike new-construction rows. No PV/solar-specific row exists on this matrix (Village staff note the matrix is 'a general guideline... staff may request additional information'). 75% · published submittal-requirements matrix
- How many copies, and in what format? Electronic only, through the CityView Portal — the Building Services page states plainly: 'Permit applications are only accepted electronically through CityView portal.' No paper-copy count is specified because paper submittal is not accepted. 90% · department page
- Is a site plan required, and what must it show? Yes, a scaled site plan is required as part of the standard submittal package for electrical-service and most other permit types per the Village's own submittal matrix; the matrix does not itemize what the site plan must show specifically for a rooftop PV system (no PV-specific line exists on the matrix). 70% · published submittal-requirements matrix
- Is a structural PE stamp required, and at what threshold? Not required on the Village's standard submittal checklist for the closest analogous category ('Electric Service — change or upgrade' does not have the 'Sealed Drawing' column checked), unlike new-construction/SFR rows which do require a sealed drawing. The Village reserves the right to request additional information on a case-by-case basis, so a structural PE stamp could still be requested for a given roof-mount PV installation, but there is no published threshold. 55% · published submittal-requirements matrix
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? CityView Portal (cvportal.us/CityViewPortal) — all Islamorada building/electrical permit applications, inspections, contractor registration, and payments are handled through this portal. 95% · permit portal landing page
- Can the whole application be completed online? Yes — the Village states permit applications are ONLY accepted electronically through the CityView Portal (no paper intake), and inspections, NOC uploads, and both in-person and online (ACH/debit/credit) payments can all be completed through the same portal. 90% · department page
- What does a residential solar permit cost? Under the current fee resolution (Res. 25-12-137, adopted 9 Dec 2025, in effect through 30 Sep 2026), a residential solar/PV electrical permit — filed as an 'individual trade permit' — would be charged at $20.00 per $1,000 of job valuation, subject to a $150.00 minimum permit fee, PLUS an $11.00 Education Fee, a 1.5% DBPR surcharge, a 1% Florida DEO surcharge, and a non-refundable 0.1%-of-job-value application/processing fee (minimum $150). There is no PV-specific fee line in the schedule. 80% · fee resolution (OCR'd, scanned attachment)
- How is the fee calculated? Valuation — the Village's fee schedule prices building/trade permits at $20.00 per $1,000 of job value (subject to a $150 minimum), not a flat, per-kW, or per-panel rate. 85% · fee resolution
- Is there a separate plan-check fee? Yes — the fee resolution lists a separate, non-refundable 'Application review/processing fee' of 0.1% of job value with a $150 minimum, charged in addition to the permit fee itself; Planning/Biologist/Stormwater plan reviews are also billed separately ($50 minimum-fee permits / $150 others) although that line is aimed at land-development rather than building-trade review. 80% · fee resolution
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- How long is an issued permit valid before it expires? The Village's own Floodplain Management article (Village Code Sec. 6-9x, Article 6-III) states a building permit/floodplain approval 'shall become invalid unless the work authorized... is commenced within 180 days after its issuance,' with extensions of up to 180 days each on written request; the fee schedule correspondingly prices a '90-Day Permit Extension: $100' and a 'One-time six (6) month building permit extension: $350.' This 180-day framework conflicts with the new statewide floor: HB 803 (2025) amended F.S. 553.79(1)(c) and F.S. 125.56(4)(d) to require a minimum ONE-YEAR permit validity for local-government-issued permits, effective 1 Jul 2026 — before today's check date. The Village's own fee/extension products still reflect the older 180-day cycle rather than a republished 1-year default. 75% · ordinance (floodplain article) + fee schedule, compared against state statute
- Which utility handles interconnection here? Florida Keys Electric Cooperative (FKEC) — NOT Florida Power & Light. Islamorada sits in FKEC's Upper/Middle Keys service territory (Ocean Reef to the Seven Mile Bridge). 95% · authority's own budget document + permit forms
- Where does the utility sit in the sequence? The utility sits BOTH before and after the Village permit — FKEC's own 'Procedures for Solar Contractors' describe a 4-step sequence: (1) contractor submits PV plans + the applicable Net Metering Tier Agreement to FKEC for engineering review BEFORE any permit is pulled; (2) FKEC stamps the plans 'approved for PV construction' and the stamped plans are then taken 'to the appropriate municipality... to be reviewed for permitting and obtain a permit'; (3) system is installed and inspected by the AHJ; (4) the AHJ inspection report is submitted back to FKEC (Net Meter Application Phase 2), after which FKEC performs its own inspection, installs a sticker, and enables the bi-directional (net) meter for PTO. So FKEC design-approval precedes the Village permit, and FKEC's own final inspection/meter-swap follows the Village's final inspection. 92% · utility's own published procedure page
28 questions answered against Village of Islamorada’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes — Islamorada, Village of Islands is its own AHJ for residential solar; it is one of the five Monroe County municipalities that self-permit (Monroe County's own FAQ states the County is AHJ only for the unincorporated Keys and lists Islamorada among the municipalities with their own building departments).
Why the confidence is not higherConfirmed independently from Islamorada's own site: Building Services page names a Village Chief Building Official, Building/Electrical Plans Examiners, and a Village-specific CityView permit portal; the Village's own fee resolution (Res. 25-12-137, adopted 9 Dec 2025) sets Village building-permit fees. Checked 2026-09-12.
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
Both — Islamorada's own Building Services Department issues and reviews both Building and Electrical permits and performs its own inspections; nothing is delegated to Monroe County for a rooftop PV system in the Village. Fire Prevention plan review/inspection also sits with the Village (own fee schedule for 'Fire Safety Plan Review, Permit and Inspection'). The Village's Building Permit Allocation System (BPAS, the Village's ROGO-equivalent) is a separate function that gates NEW construction/dwelling-unit allocations, not retrofits such as adding PV to an existing house.
Why the confidence is not higherBuilding Services page lists a Chief Building Official, a Building Plans Examiner AND an Electrical Plans Examiner on Village staff, and the fee resolution has its own 'FIRE SAFETY PLAN REVIEW, PERMIT AND INSPECTION FEES' section. BPAS page states it applies to 'new construction on VACANT land' / dwelling-unit allocations, not to retrofit work on an existing structure.
department page + fee schedule checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes, a permit is required. The Village's own 'Permit Required' list states a permit is ALWAYS required for 'NEW ELECTRICAL,' and Village Code Sec. 6-61 requires permits as provided in the Florida Building Code for all work not specifically exempted (exemptions are limited to minor repairs <$2,500, small roofing, small satellite dishes, minimal vegetation removal — none of which describe a PV installation).
Why the confidence is not higherPERMIT_REQUIRED.pdf item 10 'NEW ELECTRICAL' is in the always-a-permit list; Village Code Sec. 6-61 'Work Requiring Building Permit' confirmed via the Village's own code platform (islamorada.municipalcodeonline.com), with a positive control ('electrical' = 10 hits in Chapter 6) and fabricated control ('zzqqx' = 0 hits) proving the code-reader worked.
published permit-requirement handout checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/115/PERMIT_REQUIRED
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Either — the Village's single 'Application for Building Permit' form has checkboxes for Building, Electrical, Plumbing, Mechanical, Roofing, Gas, Demolition, Right-of-Way, and Change of Occupancy, all check-all-that-apply on ONE application; the fee schedule also prices 'individual trade permits' separately ($20.00/$1,000 valuation, same rate as new construction), so a stand-alone Electrical permit can be pulled apart from a Building permit for the same job.
Why the confidence is not higherApplication for Building Permit (Rev. 2/25/2026) permit-type block reads 'PERMIT TYPE (Check all that apply): Building / Electrical / Plumbing / Mechanical / Roofing / Gas / Demolition / Right-of-Way / Change of Occupancy'; fee resolution lists 'individual trade permits $20.00/$1000' as its own fee line.
permit application form + fee schedule checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/340/Building-Permit-Application-Fillable-Rev-2252026
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed electrical contractor (or licensed electrician) — Village Code Sec. 6-63 makes it unlawful for anyone to act as a contractor/subcontractor/journeyman in the Village without a current, valid state or Monroe County certificate of competency. The general permit application has a dedicated 'Electrical' sub-contractor line requiring the business name and license number, and the Village's own Electrical Safety Inspection Affidavit form requires the inspection be performed by a 'Licensed Electrical Contractor' or licensed engineer/architect.
Why the confidence is not higherVillage Code Sec. 6-63 'Certificates of Competency'; General Building Permit Application sub-contractor block; Electrical Safety Inspection Affidavit form fields.
ordinance + permit forms checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes — contractors must first create a CityView contractor file and complete Village contractor registration (state/county license, liability and workers'-comp insurance naming the Village as certificate holder, local business tax receipt, $50 initial fee/$31 annual renewal) BEFORE they can pull permits.
Why the confidence is not higherVillage's own 'Contractor Checklist' (Rev. 6/17/26): 'Contractors must first create a CityView Contractor file... Use a Business Email address... create/activate a Portal Account for your Business and pay the registration fee' — this is required before permits can be applied for.
published contractor-registration checklist checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/343/Contractor-Checklist-Rev-61726
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Owner-builder self-permitting exists generally at the Village (an 'Owner-Builder Disclosure Statement' form is published, and the general Building Permit Application allows an owner-builder to sign as the responsible party), but nothing in the Village's own documents specifically addresses whether a homeowner may self-install/self-permit a PV system as opposed to conventional construction.
Why the confidence is not higherOwner-Builder Disclosure Statement form exists on the Forms page and the Contractor Checklist itself refers to 'Contractor or Owner/Builder' as an alternative applicant; no PV-specific carve-out or restriction found in Chapter 6 (searched with 'electrical'=10-hit positive control, 'zzqqx'=0 fabricated control).
published form (general, not solar-specific) checked 2026-09-12 https://www.islamorada.fl.us/392/Forms
Q8 What documents make up a complete submittal? Core Submittal package
Based on the Village's own permit-submittal matrix, the closest analogous permit type ('Electric Service — change or upgrade') requires: a completed Permit Application, a Property Record Card, a scaled Site Plan, and a Floor Plan (scaled); the matrix also shows the job must be routed to FKEC (utility) — there is no 'Sealed Drawing' requirement on that row, unlike new-construction rows. No PV/solar-specific row exists on this matrix (Village staff note the matrix is 'a general guideline... staff may request additional information').
Why the confidence is not higherISLAMORADA PERMIT APPLICATION - SUBMITTALS matrix (undated, on Forms page): 'Electric Service (change or upgrade)' row has X marks aligned to Permit Application, Property Record Card, Site Plan, Floor Plan and FKEC columns only, decoded from the PDF's column header offsets.
published submittal-requirements matrix checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/2131/Submittals
Q9 How many copies, and in what format? Submittal package
Electronic only, through the CityView Portal — the Building Services page states plainly: 'Permit applications are only accepted electronically through CityView portal.' No paper-copy count is specified because paper submittal is not accepted.
Why the confidence is not higherBuilding Services page, 'WHEN A PERMIT IS REQUIRED' section: 'Permit applications are only accepted electronically through CityView portal.'
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q10 Is a site plan required, and what must it show? Core Submittal package
Yes, a scaled site plan is required as part of the standard submittal package for electrical-service and most other permit types per the Village's own submittal matrix; the matrix does not itemize what the site plan must show specifically for a rooftop PV system (no PV-specific line exists on the matrix).
Why the confidence is not higherSubmittals matrix column 'Site Plan (scaled)' is marked required (X) for the 'Electric Service (change or upgrade)' row, the closest analogous category to a PV electrical permit.
published submittal-requirements matrix checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/2131/Submittals
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Nothing published by this authority.
Where we lookedSearched the Village's Building Services page, the general Building Permit Application, the Forms page (no solar/PV-specific checklist exists), and Village Code Chapter 6 (0 hits for 'solar' with 'electrical'=10-hit positive control and 'zzqqx'=0 fabricated control proving the search worked) for a one-line/three-line diagram requirement; none found. No solar-specific submittal checklist exists to check against.
https://www.islamorada.fl.us/DocumentCenter/View/2131/Submittals
Q12 Are string and conductor calculations required? Drawings & calculations
Nothing published by this authority.
Where we lookedSame search as Q11 — no solar-specific submittal checklist or ordinance language addressing string/conductor calculations found in Chapter 6, the Forms page, or the general submittal matrix.
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Not required on the Village's standard submittal checklist for the closest analogous category ('Electric Service — change or upgrade' does not have the 'Sealed Drawing' column checked), unlike new-construction/SFR rows which do require a sealed drawing. The Village reserves the right to request additional information on a case-by-case basis, so a structural PE stamp could still be requested for a given roof-mount PV installation, but there is no published threshold.
Why the confidence is not higherSubmittals matrix: 'Electric Service (change or upgrade)' row does not have an X under 'Sealed Drawing,' while 'SFR/Commercial Building' and 'Addition' rows do. Matrix disclaimer: 'IF DEEMED NECESSARY... VILLAGE STAFF MAY REQUEST ADDITIONAL INFORMATION.'
published submittal-requirements matrix checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/2131/Submittals
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
Nothing published by this authority.
Where we lookedSearched Chapter 6 (Building Code) and the general submittal matrix for an electrical PE-stamp threshold specific to PV; none published. Village Code Sec. 6-63/6-64 discuss certificates of competency and after-the-fact permits requiring an engineer/architect seal only in the after-the-fact-permit context, not for routine PV submittals.
Q15 What does a residential solar permit cost? Core Fees
Under the current fee resolution (Res. 25-12-137, adopted 9 Dec 2025, in effect through 30 Sep 2026), a residential solar/PV electrical permit — filed as an 'individual trade permit' — would be charged at $20.00 per $1,000 of job valuation, subject to a $150.00 minimum permit fee, PLUS an $11.00 Education Fee, a 1.5% DBPR surcharge, a 1% Florida DEO surcharge, and a non-refundable 0.1%-of-job-value application/processing fee (minimum $150). There is no PV-specific fee line in the schedule.
Why the confidence is not higherBldg-Permits-Fee-Resolution-25-12-137 (OCR'd from scanned pages): 'Minimum Permit Fee $150.00'; 'individual trade permits $20.00/$1000'; 'Education Fee $11.00'; 'DBPR 1.5% of permit fee'; 'Florida surcharges/DEO 1% of permit fee'; 'Application review/processing fee .1% of job value; $150.00/min (non-refundable deposit).' No line item names solar/PV specifically, so this is the general trade-permit valuation formula applied to a PV job.
fee resolution (OCR'd, scanned attachment) checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/5162/Bldg-Permits-Fee-Resolution-25-12-137
Q16 How is the fee calculated? Core Fees
Valuation — the Village's fee schedule prices building/trade permits at $20.00 per $1,000 of job value (subject to a $150 minimum), not a flat, per-kW, or per-panel rate.
Why the confidence is not higherFee Resolution 25-12-137: 'Residential Building Permit Fees $20.00/$1000'; 'individual trade permits $20.00/$1000.'
fee resolution checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/5162/Bldg-Permits-Fee-Resolution-25-12-137
Q17 Is there a separate plan-check fee? Fees
Yes — the fee resolution lists a separate, non-refundable 'Application review/processing fee' of 0.1% of job value with a $150 minimum, charged in addition to the permit fee itself; Planning/Biologist/Stormwater plan reviews are also billed separately ($50 minimum-fee permits / $150 others) although that line is aimed at land-development rather than building-trade review.
Why the confidence is not higherFee Resolution 25-12-137: 'Application review/processing fee .1% of job value; $150.00/min (non-refundable deposit)' is listed as a distinct line from the base permit-fee formula.
fee resolution checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/5162/Bldg-Permits-Fee-Resolution-25-12-137
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedSearched the Building Services department page and the Forms page (including the 'Plan Review Time Waiver' form, which addresses waiving review time rather than stating a turnaround) for a stated number of business days for plan review; none published. The Village's page only references the Live Local Act's requirement to give expedited-processing applications 'first priority,' without quantifying ordinary turnaround.
Q19 How long is an issued permit valid before it expires? Timeline & validity
The Village's own Floodplain Management article (Village Code Sec. 6-9x, Article 6-III) states a building permit/floodplain approval 'shall become invalid unless the work authorized... is commenced within 180 days after its issuance,' with extensions of up to 180 days each on written request; the fee schedule correspondingly prices a '90-Day Permit Extension: $100' and a 'One-time six (6) month building permit extension: $350.' This 180-day framework conflicts with the new statewide floor: HB 803 (2025) amended F.S. 553.79(1)(c) and F.S. 125.56(4)(d) to require a minimum ONE-YEAR permit validity for local-government-issued permits, effective 1 Jul 2026 — before today's check date. The Village's own fee/extension products still reflect the older 180-day cycle rather than a republished 1-year default.
Why the confidence is not higherVillage Code Article 6-III floodplain-permit expiration clause ('180 days'); Fee Resolution 25-12-137 extension line items ('90-Day - $100 per extension'; 'One-time six (6) month building permit extension: $350'). HB 803 enrolled text (F.S. 553.79(1)(c), F.S. 125.56(4)(d)), effective 1 Jul 2026, requires a local-government-issued permit remain valid at least one year. Recorded as a conflict, not resolved.
ordinance (floodplain article) + fee schedule, compared against state statute checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q20 Which permit portal does this authority use? Core Portal & process
CityView Portal (cvportal.us/CityViewPortal) — all Islamorada building/electrical permit applications, inspections, contractor registration, and payments are handled through this portal.
Why the confidence is not higherBuilding Services page: 'Permit applications are only accepted electronically through CityView portal'; 'All inspections must be requested through the CityView Portal'; Contractor Checklist: 'create a CityView Contractor file... via https://cvportal.us/cityviewportal.'
permit portal landing page checked 2026-09-12 https://cvportal.us/CityViewPortal
Q21 Can the whole application be completed online? Core Portal & process
Yes — the Village states permit applications are ONLY accepted electronically through the CityView Portal (no paper intake), and inspections, NOC uploads, and both in-person and online (ACH/debit/credit) payments can all be completed through the same portal.
Why the confidence is not higherBuilding Services page: 'Permit applications are only accepted electronically through CityView portal'; 'Online. Online payments by check ("ACH"), debit card, or credit card may be made through the CityView portal.'
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Keys Electric Cooperative (FKEC) — NOT Florida Power & Light. Islamorada sits in FKEC's Upper/Middle Keys service territory (Ocean Reef to the Seven Mile Bridge).
Why the confidence is not higherIslamorada's own FY 2025-26 Final Budget lists 'FKEC (Electric)' as the electricity line item across multiple Village departments/funds (Parks, Public Works, Wastewater, Fire, etc.); the Village's own Building Permit Submittals matrix carries an 'FKEC' column that the closest PV-analogous row ('Electric Service') is routed through; the Village's own 'Pre-Power Request' form has an office-use field 'Date emailed to FKEC.' FKEC's own website independently confirms its territory runs 'from Ocean Reef to the Seven Mile Bridge,' which includes Islamorada.
authority's own budget document + permit forms checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/4958/FY-25-26-Final-Budget
Q23 Where does the utility sit in the sequence? Core Utility interconnection
The utility sits BOTH before and after the Village permit — FKEC's own 'Procedures for Solar Contractors' describe a 4-step sequence: (1) contractor submits PV plans + the applicable Net Metering Tier Agreement to FKEC for engineering review BEFORE any permit is pulled; (2) FKEC stamps the plans 'approved for PV construction' and the stamped plans are then taken 'to the appropriate municipality... to be reviewed for permitting and obtain a permit'; (3) system is installed and inspected by the AHJ; (4) the AHJ inspection report is submitted back to FKEC (Net Meter Application Phase 2), after which FKEC performs its own inspection, installs a sticker, and enables the bi-directional (net) meter for PTO. So FKEC design-approval precedes the Village permit, and FKEC's own final inspection/meter-swap follows the Village's final inspection.
Why the confidence is not higherFKEC 'Procedures for Solar Contractors' page, quoted verbatim: 'Take the stamped plans to the appropriate municipality or to Monroe County to be reviewed for permitting and obtain a permit' (Step 2) and 'Once FKEC receives the inspection report from the appropriate government agency, FKEC will perform an inspection, install sticker, and enable bi-directional meter' (Step 4).
utility's own published procedure page checked 2026-09-12 https://www.fkec.com/energy-efficiency/green-power/solar-net-metering/procedures-for-solar-contractors/
Q24 Is a HOA or architectural approval required first? Overlays & special cases
No Village-administered HOA or architectural-review approval is required before a building permit for PV can be issued — no such requirement appears in Village Code Chapter 30 (Land Development Regulations) or Chapter 6 (Building). A private HOA/deed restriction could still separately require its own approval, but that is not a Village function and Florida law (F.S. 163.04) limits — without eliminating — what an HOA/deed restriction can prohibit for solar.
Why the confidence is not higherSearched Chapter 30 (Land Development Regulations, ~1.25M characters of extracted text) for 'homeowners association' / 'architectural review' — no general pre-permit HOA/ARB sign-off requirement found; deed-restriction hits found relate only to the Village's affordable-housing program, not solar. Controls: 'setback' = 241 hits (positive control), fabricated 'zzqqx' = 0 hits.
ordinance (absence proved with controls) checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_30_LAND_DEVELOPMENT_REGULATIONS
Q25 Is there a historic-district review? Overlays & special cases
Yes, but only for properties that are formally designated as a Historic Landmark or within a designated Historic District (a Certificate of Appropriateness is then required under Village Code Sec. 30-1696) — this is a designation-based process (Sec. 30-1691 et seq., Historic Preservation Commission), not a village-wide historic-district review that would automatically apply to an ordinary residential PV permit.
Why the confidence is not higherVillage Code Ch. 30, Article on 'Historic and Archaeological Sites': 'Sec 30-1693 Historic Preservation Commission,' 'Sec 30-1694 Criteria For The Designation Of A Historic Landmark Or Historic District,' 'Sec 30-1696 Certificates Of Appropriateness.'
ordinance checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_30_LAND_DEVELOPMENT_REGULATIONS
Q26 Is a wind or windstorm certification required? Overlays & special cases
No separate, stand-alone 'windstorm certification' document requirement was found beyond ordinary Florida Building Code structural/wind-load compliance (which is judged through the normal plan-review/engineering-seal process, not a distinct certificate). The Village's Building Permit Allocation System (BPAS) awards bonus competitive-scoring points for NEW residential construction designed to a peak wind speed of 160 mph or 175 mph 'as certified by a qualified engineer or architect' — but this is an optional scoring incentive for the ROGO-equivalent allocation system for new dwelling units, not a requirement applicable to adding PV to an existing home.
Why the confidence is not higherVillage Code Ch. 30, BPAS scoring criteria: '+1 per application which proposes a dwelling unit designed to meet a minimum peak wind speed of 160 miles per hour as certified by a qualified engineer or architect... +1 additional point... 175 miles per hour.' No PV-specific or general windstorm-certificate mandate found elsewhere in Ch. 6 or Ch. 30 (controls: 'setback' = 241 hits, 'zzqqx' = 0 hits).
ordinance (BPAS scoring criteria) checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_30_LAND_DEVELOPMENT_REGULATIONS
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
No — a routine residential rooftop PV retrofit on an existing single-family home does not trigger BPAS/Council allocation (BPAS applies to new construction/new dwelling units on vacant land, per the Village's own BPAS page) or a Specific Use Permit. A Council-level review would only be triggered if the property is a designated Historic Landmark/District (Certificate of Appropriateness, Sec. 30-1696) or if the work is bundled with new construction that independently requires BPAS.
Why the confidence is not higherBPAS page: 'When all allocations are awarded, no building permits will be issued for new construction on VACANT land' — describing BPAS's scope as new construction, not retrofits.
department page checked 2026-09-12 https://www.islamorada.fl.us/308/Building-Permit-Allocation-System-BPAS
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Nothing published by this authority.
Where we lookedSearched Village Code Chapter 30 (Land Development Regulations, ~1.25M characters) for a kW/generation-size cap on residential solar; no hits for 'kilowatt', 'kW', 'net metering', or 'photovoltaic' (fabricated control 'zzqqx' also returned 0, and 'setback' returned 241 hits, confirming the search mechanism worked). Any generation-size cap that exists is set by the utility (FKEC ties system size to 90% of service rating / net-zero annual usage, not a fixed kW figure) rather than the Village.
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? Not stated as a specific year anywhere in Village Code — Sec. 6-31 adopts only 'the current edition of the Florida Building Code, as amended from time to time' (which pulls in NEC/NFPA 70 by reference through the FBC's electrical chapter), and the Fire Prevention chapter references the 'National Electric Code' generically (in the context of unsafe-structure standards) without naming an edition. As of the 2026 statewide FBC 8th Edition (2023) cycle (adopted via Rule 61G20-1.001, F.A.C., which itself names no specific NFPA 70 edition), the practical answer floats with whatever edition the state cycle currently incorporates rather than being fixed by Village ordinance. 55% · ordinance (edition floats — no year stated)
- Which building code edition is in force? The current edition of the Florida Building Code, as amended from time to time — the Village Code does not fix a specific edition year by ordinance; the general Building Permit Application form itself has a blank fill-in field ('20__ Florida Building Code in effect') completed at the time of each submission rather than a pre-printed year. 85% · ordinance
- Which fire code edition is in force? The current edition of the Florida Fire Prevention Code, as amended from time to time — same floating-citation pattern as the building code; no specific edition year is fixed in Village ordinance. 85% · ordinance
- Are there local amendments to any of the above? Yes, generally — Article 6-II of the Village Code is structured with dedicated 'Building Code Administrative Amendments' and 'Building Code Technical Amendments' divisions, so the Village does locally amend the FBC. However, no solar/PV-specific local amendment was found in Chapter 6, Chapter 26 (Fire Prevention), or Chapter 30 (Land Development) — searched all three with 'solar' returning 0/0/5 hits respectively (the 5 Ch. 30 hits are height-limit exclusions and a mechanical-equipment definition, not installation amendments), against a positive control ('electrical' = 10 hits in Ch. 6) and fabricated control ('zzqqx' = 0 hits). 75% · ordinance (structure confirmed; solar-specific content absence proved with controls)
- What is the installation judged against? The current editions of the Florida Building Code and Florida Fire Prevention Code (as locally amended under Ch. 6 Divisions 3-4, though no solar-specific local amendment was found) govern the installation generally; for the interconnection-facing portions, FKEC's own Standards of Electrical Service and Interconnection Agreement require compliance with IEEE 1547, IEEE 1547.1, NEC 690, NEC 705, NEC 706, and UL 1741 listing. 75% · ordinance + utility interconnection agreement
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for Village of Islamorada on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Not stated as a Village-specific requirement in any Village document found; rapid shutdown (NEC 690.12) would apply only through whatever NEC edition the state's 'current' Florida Building Code cycle incorporates by reference (Village Code Sec. 6-31 adopts the FBC's 'current edition... as amended from time to time' with no NEC year named — see Q29). No Village ordinance or handout independently restates a rapid-shutdown requirement. 50% · ordinance (inferred from code adoption, not a direct statement)
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? No AHJ-specific PV placard/labeling spec was found in Village Code or on the Building Services/Forms pages (0 solar-specific hits across Chapters 6, 26, 30, and 24 site-search results for 'solar' were all about municipal park solar streetlights, not a PV labeling document). The utility, FKEC, does specify one placard: a permanent weatherproof placard identifying the location of the manual AC disconnect switch, required when that switch cannot be mounted immediately adjacent to the FKEC meter socket. 70% · utility interconnection agreement (Village itself publishes none found)
- Does the authority specify placard wording of its own? No specific placard wording is prescribed by the Village. FKEC's placard requirement (Sec. 5.3 of the Tier 1 Agreement) specifies only what the placard must communicate (the location of the manual disconnect) and its physical characteristics (permanent, weatherproof), not exact wording. 60% · utility interconnection agreement
- Does it specify letter height, colour or material? FKEC specifies the placard must be 'permanent' and 'weather-proof' (i.e., a durable, weatherproof material) but does not specify letter height or color. No Village document specifies letter height, color, or material for any PV-related placard. 60% · utility interconnection agreement
- Does the UTILITY specify placards beyond the AHJ's? Yes — FKEC (the utility) requires a permanent weatherproof placard identifying the alternate location of the manual AC disconnect switch whenever that switch cannot be mounted immediately adjacent to the FKEC meter socket; this is a utility-imposed labeling requirement layered on top of whatever the AHJ requires (and the Village itself was not found to publish any PV placard spec of its own — see Q38). 85% · utility interconnection agreement
- Where must the labels be placed? Per FKEC's own agreement, the disconnect-location placard must be placed 'adjacent to FKEC's meter socket.' The manual disconnect switch itself must be 'mounted separately from, but adjacent to, the FKEC meter socket' as the default rule (see Q48); no Village-specific label-placement rule beyond code was found. 80% · utility interconnection agreement
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Per FKEC's Interconnection Agreement, the manual AC disconnect switch (where required) must be 'mounted separately from, but adjacent to, the FKEC meter socket,' readily accessible to FKEC, and capable of being locked in the open position with a single FKEC utility padlock. If FKEC determines that an adjacent location is impractical for safety/design reasons, the switch may instead be placed at an agreed alternate location, PROVIDED the member installs a permanent weatherproof placard adjacent to the meter socket indicating where the disconnect actually is. 90% · utility interconnection agreement
- Must equipment be on a specific approved list? Yes, per the utility — FKEC's Interconnection Agreement requires that member-owned renewable generation equipment be 'submitted by a manufacturer to a nationally recognized testing and certification laboratory and... tested and listed by the laboratory for continuous interactive operation with an electric distribution system in compliance with the applicable codes and standards of IEEE 1547, IEEE 1547.1, NEC 690, NEC 705, NEC 706, and UL 1741.' No separate Village-maintained approved-equipment list was found. 85% · utility interconnection agreement
- Are batteries permitted, and under what conditions? Batteries/ESS are permitted, governed primarily through FKEC's interconnection rules rather than a Village ordinance: FKEC's 'Solar & Energy Storage Design Criteria' require ANSI/IEEE-standard components and NESC/NEC compliance; an independent ESS capable of exporting to the grid needs an interconnection agreement, while a battery-only backup system that cannot export and is not paired with a renewable generation system does not (FKEC still must be notified). No Village Code hits for 'battery' or 'energy storage' were found in Chapters 6, 26, or 30, so the Village itself appears to rely on the (undated-year) Florida Fire Prevention Code's own ESS provisions rather than a local ESS ordinance. 75% · utility procedure page (Village Code silent, absence proved with controls)
- Is there a separate ESS permit or inspection? No separate ESS permit type was found — the Village's general Building Permit Application offers only Building / Electrical / Plumbing / Mechanical / Roofing / Gas / Demolition / Right-of-Way / Change-of-Occupancy checkboxes, with no distinct battery/ESS permit box, so an ESS would presumably be filed under Electrical or Building. 60% · permit application form (absence inferred from form's fixed checkbox list)
- Is a ground mount treated as a structure? Ambiguous, and likely 'mechanical equipment' rather than a full 'structure' — Village Code Chapter 30's definitions section classifies 'solar collectors panels' as 'Mechanical equipment' (alongside heat pumps, A/C units, pool pumps and generators), and the Setback Encroachments section (Sec. 30-930) gives 'mechanical equipment' its own, more permissive setback-encroachment allowance (may encroach up to 4 feet into a side/rear yard setback, provided it sits at the principal structure's minimum finished-floor elevation and is screened with native vegetation from ground view) that is separate from the rules for accessory structures. This suggests ground-mounted PV equipment would be treated under the Village's 'mechanical equipment' framework rather than as a structure requiring full structural setbacks, but no Village document says this in so many words for PV specifically. 60% · ordinance
20 questions answered against Village of Islamorada’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
Not stated as a specific year anywhere in Village Code — Sec. 6-31 adopts only 'the current edition of the Florida Building Code, as amended from time to time' (which pulls in NEC/NFPA 70 by reference through the FBC's electrical chapter), and the Fire Prevention chapter references the 'National Electric Code' generically (in the context of unsafe-structure standards) without naming an edition. As of the 2026 statewide FBC 8th Edition (2023) cycle (adopted via Rule 61G20-1.001, F.A.C., which itself names no specific NFPA 70 edition), the practical answer floats with whatever edition the state cycle currently incorporates rather than being fixed by Village ordinance.
Why the confidence is not higherVillage Code Sec. 6-31 'Adoption Of Applicable Codes': 'The current edition of the Florida Building Code, as amended from time to time, is hereby adopted...'; Sec. 6-96 references 'the standards of the Florida Building Code and the National Electric Code' with no year given.
ordinance (edition floats — no year stated) checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q30 Which building code edition is in force? Core Code editions in force
The current edition of the Florida Building Code, as amended from time to time — the Village Code does not fix a specific edition year by ordinance; the general Building Permit Application form itself has a blank fill-in field ('20__ Florida Building Code in effect') completed at the time of each submission rather than a pre-printed year.
Why the confidence is not higherVillage Code Sec. 6-31: 'Florida Building Code adopted. The current edition of the Florida Building Code, as amended from time to time, is hereby adopted as the village's building code as if fully set forth herein.' Corroborated by the blank-year field on the Village's own Application for Building Permit form.
ordinance checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q31 Which fire code edition is in force? Code editions in force
The current edition of the Florida Fire Prevention Code, as amended from time to time — same floating-citation pattern as the building code; no specific edition year is fixed in Village ordinance.
Why the confidence is not higherVillage Code Sec. 6-31: 'Florida Fire Prevention Code adopted. The current edition of the Florida Fire Prevention Code as amended from time to time, is adopted as the fire safety code for the village as if fully set forth herein.'
ordinance checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes, generally — Article 6-II of the Village Code is structured with dedicated 'Building Code Administrative Amendments' and 'Building Code Technical Amendments' divisions, so the Village does locally amend the FBC. However, no solar/PV-specific local amendment was found in Chapter 6, Chapter 26 (Fire Prevention), or Chapter 30 (Land Development) — searched all three with 'solar' returning 0/0/5 hits respectively (the 5 Ch. 30 hits are height-limit exclusions and a mechanical-equipment definition, not installation amendments), against a positive control ('electrical' = 10 hits in Ch. 6) and fabricated control ('zzqqx' = 0 hits).
Why the confidence is not higherVillage Code Article 6-II division headings: 'DIVISION 6-II-3 BUILDING CODE ADMINISTRATIVE AMENDMENTS,' 'DIVISION 6-II-4 BUILDING CODE TECHNICAL AMENDMENTS.' Solar-specific search returned no PV-focused amendment text in any of the three chapters searched.
ordinance (structure confirmed; solar-specific content absence proved with controls) checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q33 What is the installation judged against? Core Electrical
The current editions of the Florida Building Code and Florida Fire Prevention Code (as locally amended under Ch. 6 Divisions 3-4, though no solar-specific local amendment was found) govern the installation generally; for the interconnection-facing portions, FKEC's own Standards of Electrical Service and Interconnection Agreement require compliance with IEEE 1547, IEEE 1547.1, NEC 690, NEC 705, NEC 706, and UL 1741 listing.
Why the confidence is not higherVillage Code Sec. 6-31 (FBC/FFPC 'current edition' adoption); FKEC Tier 1 Standard Interconnection Agreement Sec. 3.1: 'tested and listed by the laboratory for continuous interactive operation with an electric distribution system in compliance with the applicable codes and standards of IEEE 1547, IEEE 1547.1, NEC 690, NEC 705, NEC 706, and UL 1741.'
ordinance + utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedSearched Village Code Chapter 6 for a local rule on service upgrades or busbar/panel sizing specific to PV interconnection (e.g., 120%-rule language); none found locally. FKEC's Tier 1 Interconnection Agreement discusses service-rating limits (system max 90% of service size) but that is a utility interconnection rule, not a Village busbar-sizing ordinance.
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Nothing published by this authority.
Where we lookedSearched Village Code Chapter 6 and Chapter 30 for a specific mounting-system or attachment-spacing standard for PV racking; none found (0 'solar' hits in Ch. 6; the 5 Ch. 30 'solar' hits are unrelated definitions/height exclusions). Given the Village's extreme design wind speeds, mounting compliance is presumably handled through FBC structural review / product approval (state Florida Product Approval or Miami-Dade NOA) rather than a Village-specific ordinance, but no Village document states this explicitly.
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedSearched Chapter 26 (Fire Prevention and Protection) for a ridge-setback or fire-access-pathway requirement for rooftop PV; 0 hits for 'solar', 'photovoltaic', 'ridge' near PV context, or 'access pathway'. The chapter defers generally to the 'current edition' Florida Fire Prevention Code (which itself incorporates NFPA 1's solar PV access/pathway requirements by reference) without a published local amendment specific to PV.
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Not stated as a Village-specific requirement in any Village document found; rapid shutdown (NEC 690.12) would apply only through whatever NEC edition the state's 'current' Florida Building Code cycle incorporates by reference (Village Code Sec. 6-31 adopts the FBC's 'current edition... as amended from time to time' with no NEC year named — see Q29). No Village ordinance or handout independently restates a rapid-shutdown requirement.
Why the confidence is not higherInference from Village Code Sec. 6-31's floating FBC/NEC adoption; no direct Village statement of a rapid-shutdown requirement was located (0 'solar' hits in Ch. 6, with 'electrical' = 10-hit positive control proving the search worked).
ordinance (inferred from code adoption, not a direct statement) checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
No AHJ-specific PV placard/labeling spec was found in Village Code or on the Building Services/Forms pages (0 solar-specific hits across Chapters 6, 26, 30, and 24 site-search results for 'solar' were all about municipal park solar streetlights, not a PV labeling document). The utility, FKEC, does specify one placard: a permanent weatherproof placard identifying the location of the manual AC disconnect switch, required when that switch cannot be mounted immediately adjacent to the FKEC meter socket.
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 5.3: '...the member shall install a permanent weather-proof placard adjacent to FKEC's meter socket indicating the location of the manual disconnect switch or switches.' Village-side absence confirmed via site search (24 hits for 'solar', all Founders Park solar-streetlight records) and Chapter 6/26/30 keyword searches.
utility interconnection agreement (Village itself publishes none found) checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
No specific placard wording is prescribed by the Village. FKEC's placard requirement (Sec. 5.3 of the Tier 1 Agreement) specifies only what the placard must communicate (the location of the manual disconnect) and its physical characteristics (permanent, weatherproof), not exact wording.
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 5.3 (see Q38); no Village ordinance located specifying placard text.
utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
FKEC specifies the placard must be 'permanent' and 'weather-proof' (i.e., a durable, weatherproof material) but does not specify letter height or color. No Village document specifies letter height, color, or material for any PV-related placard.
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 5.3: '...permanent weather-proof placard...'
utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSearched Village Code Chapter 6 and the Building Services/Forms pages for a site-plan/facility-map placard requirement (NEC 705.10-style); none found. No Village document was located that addresses a facility/directory map placard for PV.
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Yes — FKEC (the utility) requires a permanent weatherproof placard identifying the alternate location of the manual AC disconnect switch whenever that switch cannot be mounted immediately adjacent to the FKEC meter socket; this is a utility-imposed labeling requirement layered on top of whatever the AHJ requires (and the Village itself was not found to publish any PV placard spec of its own — see Q38).
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 5.3 (quoted at Q38/40).
utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q43 Where must the labels be placed? Core Labels Signage & labelling
Per FKEC's own agreement, the disconnect-location placard must be placed 'adjacent to FKEC's meter socket.' The manual disconnect switch itself must be 'mounted separately from, but adjacent to, the FKEC meter socket' as the default rule (see Q48); no Village-specific label-placement rule beyond code was found.
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 5.2-5.3.
utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q44 Must equipment be on a specific approved list? Equipment listing
Yes, per the utility — FKEC's Interconnection Agreement requires that member-owned renewable generation equipment be 'submitted by a manufacturer to a nationally recognized testing and certification laboratory and... tested and listed by the laboratory for continuous interactive operation with an electric distribution system in compliance with the applicable codes and standards of IEEE 1547, IEEE 1547.1, NEC 690, NEC 705, NEC 706, and UL 1741.' No separate Village-maintained approved-equipment list was found.
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 3.1.
utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Batteries/ESS are permitted, governed primarily through FKEC's interconnection rules rather than a Village ordinance: FKEC's 'Solar & Energy Storage Design Criteria' require ANSI/IEEE-standard components and NESC/NEC compliance; an independent ESS capable of exporting to the grid needs an interconnection agreement, while a battery-only backup system that cannot export and is not paired with a renewable generation system does not (FKEC still must be notified). No Village Code hits for 'battery' or 'energy storage' were found in Chapters 6, 26, or 30, so the Village itself appears to rely on the (undated-year) Florida Fire Prevention Code's own ESS provisions rather than a local ESS ordinance.
Why the confidence is not higherFKEC 'Procedures for Solar Contractors' page: '...an interconnection agreement is not required if the battery is not part of solar system... Submit designs with battery backup only by email to Engineering.' Village Code chapters 6/26/30 searched with 0 hits for 'battery'/'energy storage' (positive control 'electrical'/'setback' hit; fabricated 'zzqqx' returned 0).
utility procedure page (Village Code silent, absence proved with controls) checked 2026-09-12 https://www.fkec.com/energy-efficiency/green-power/solar-net-metering/procedures-for-solar-contractors/
Q46 Is there a separate ESS permit or inspection? Battery / ESS
No separate ESS permit type was found — the Village's general Building Permit Application offers only Building / Electrical / Plumbing / Mechanical / Roofing / Gas / Demolition / Right-of-Way / Change-of-Occupancy checkboxes, with no distinct battery/ESS permit box, so an ESS would presumably be filed under Electrical or Building.
Why the confidence is not higherApplication for Building Permit (Rev. 2/25/2026) permit-type checklist (see Q4) has no ESS/battery-specific box.
permit application form (absence inferred from form's fixed checkbox list) checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/340/Building-Permit-Application-Fillable-Rev-2252026
Q47 Is a ground mount treated as a structure? Core Ground mount
Ambiguous, and likely 'mechanical equipment' rather than a full 'structure' — Village Code Chapter 30's definitions section classifies 'solar collectors panels' as 'Mechanical equipment' (alongside heat pumps, A/C units, pool pumps and generators), and the Setback Encroachments section (Sec. 30-930) gives 'mechanical equipment' its own, more permissive setback-encroachment allowance (may encroach up to 4 feet into a side/rear yard setback, provided it sits at the principal structure's minimum finished-floor elevation and is screened with native vegetation from ground view) that is separate from the rules for accessory structures. This suggests ground-mounted PV equipment would be treated under the Village's 'mechanical equipment' framework rather than as a structure requiring full structural setbacks, but no Village document says this in so many words for PV specifically.
Why the confidence is not higherVillage Code Ch. 30 definitions: 'Mechanical equipment. Equipment for the use of functioning mechanical or electrical systems including but not limited to: heat pumps, air conditioning units, pool pumps, solar collectors panels, and permanently installed generators.' Sec. 30-930 Setback Encroachments: 'Mechanical equipment or decks may encroach up to four feet into any required side yard or rear yard setback... Mechanical equipment must be located at the minimum finished floor elevation required for the principal structure... and must be screened with native vegetation from ground view.'
ordinance checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_30_LAND_DEVELOPMENT_REGULATIONS
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Per FKEC's Interconnection Agreement, the manual AC disconnect switch (where required) must be 'mounted separately from, but adjacent to, the FKEC meter socket,' readily accessible to FKEC, and capable of being locked in the open position with a single FKEC utility padlock. If FKEC determines that an adjacent location is impractical for safety/design reasons, the switch may instead be placed at an agreed alternate location, PROVIDED the member installs a permanent weatherproof placard adjacent to the meter socket indicating where the disconnect actually is.
Why the confidence is not higherFKEC Tier 1 Standard Interconnection Agreement Sec. 5.2-5.3 (quoted above).
utility interconnection agreement checked 2026-09-12 https://www.fkec.com/wp-content/uploads/Tier-1-Standard-Interconnection-Agreement-040926.pdf
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Portal — 'All inspections must be requested through the CityView Portal,' per the Building Services page; Initial Registration and account activation are required before an inspection can be requested. 95% · department page
- How much notice is required? Effectively same-day-to-next-business-day, not a multi-day advance-notice window: 'Inspections submitted after 7:00 a.m. will be performed for the next business day. If an inspection is submitted prior to 7:00 a.m. it will be performed on the same business day.' 90% · department page
- Are same-day or AM/PM windows offered? Same-day service is available if the inspection request is submitted before 7:00 a.m.; the Village's page does not describe AM/PM appointment windows, only the same-day/next-business-day cutoff. 75% · department page
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes, generally the Village performs its own final inspections through Village building inspectors — Village Code Sec. 6-68 states 'All inspections shall be conducted by village building inspectors OR as provided by F.S. § 553.791' (Florida's private-provider statute), so an applicant may instead elect the state's private-provider alternative rather than a Village inspector. 90% · ordinance
- If delegated, to whom? Where delegated, it is to a state-licensed Private Provider (F.S. § 553.791) chosen and paid for by the applicant/owner — not a delegation initiated by the Village. The Village publishes multiple Private-Provider forms (Duly-Authorized-Employment Affidavit, Plan-Compliance Affidavit, Certificate of Inspection Compliance, Inspection Report, a Registration Checklist, and 'Notice to Building Official for Private Provider') confirming this route is actively supported. 85% · ordinance + published forms
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
Nothing recorded for Village of Islamorada on this step yet — 2 questions checked and found unpublished. The guidance above is general.
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- What must be on site at inspection? A recorded Notice of Commencement (for improvements ≥$5,000, per Ch. 713 F.S.) must be provided to the Building Services Department and is required on site/on record before the FIRST inspection can be requested — failure to provide it 'will result in cancellation of requested inspection.' Beyond the NOC, the Village's page does not itemize a full on-site document list (e.g., approved plans/permit card), though that is standard Village practice. 75% · department page
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? A Final inspection approval — a rooftop PV addition to an existing single-family home is not new construction or a change of occupancy, so a Certificate of Occupancy would not apply; the Village's own inspection process (electrical/building final sign-off through CityView) issues final inspection approval rather than a CO for this permit type. A Temporary Certificate of Occupancy line exists in the fee schedule but is a distinct product for occupancy-triggering projects. 60% · fee schedule (inferred)
- Who notifies the utility for PTO? The installer/member — per FKEC's own 'Procedures for Solar Contractors,' the member (via their contractor) submits the government inspection report to FKEC as Phase 2 of the Net Metering Application; FKEC only proceeds to its own inspection/meter-swap 'once FKEC receives the inspection report from the appropriate government agency,' which the member/installer is responsible for supplying, not the Village. 80% · utility's own published procedure page
- Is there a re-inspection fee? $100 flat — 'Reinspection Fee: Re-inspection fee due to rejection of work due to faulty construction, inspection requested and work not ready, failure to call for inspection and work covered up, work not per plans and no access to jobsite flat fee: $100.' 90% · fee resolution
- How are corrections issued and cleared? Not explicitly documented beyond the re-inspection fee mechanism: a failed inspection triggers the $100 flat re-inspection fee (see Q59); corrections are presumably communicated back to the contractor/owner through the CityView Portal (the portal is the sole channel for inspection requests and permit correspondence per the Building Services page), but no Village document spells out a formal corrections-notice-and-clearance procedure. 55% · fee resolution + department page (inferred process)
14 questions answered against Village of Islamorada’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Portal — 'All inspections must be requested through the CityView Portal,' per the Building Services page; Initial Registration and account activation are required before an inspection can be requested.
Why the confidence is not higherBuilding Services page, 'INSPECTIONS' section: 'All inspections must be requested through the CityView Portal.'
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q50 How much notice is required? Core Booking & scheduling
Effectively same-day-to-next-business-day, not a multi-day advance-notice window: 'Inspections submitted after 7:00 a.m. will be performed for the next business day. If an inspection is submitted prior to 7:00 a.m. it will be performed on the same business day.'
Why the confidence is not higherBuilding Services page, 'INSPECTIONS' section (verbatim quote above).
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
Same-day service is available if the inspection request is submitted before 7:00 a.m.; the Village's page does not describe AM/PM appointment windows, only the same-day/next-business-day cutoff.
Why the confidence is not higherBuilding Services page, 'INSPECTIONS' section (same quote as Q50); no AM/PM window language found.
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes, generally the Village performs its own final inspections through Village building inspectors — Village Code Sec. 6-68 states 'All inspections shall be conducted by village building inspectors OR as provided by F.S. § 553.791' (Florida's private-provider statute), so an applicant may instead elect the state's private-provider alternative rather than a Village inspector.
Why the confidence is not higherVillage Code Sec. 6-68 'Inspections': 'All inspections shall be conducted by village building inspectors or as provided by F.S. § 553.791, and chapter 1 of the Florida Building Code as adopted by the village and as amended.'
ordinance checked 2026-09-12 https://islamorada.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_6_BUILDINGS_AND_BUILDING_REGULATIONS
Q53 If delegated, to whom? Core Who inspects
Where delegated, it is to a state-licensed Private Provider (F.S. § 553.791) chosen and paid for by the applicant/owner — not a delegation initiated by the Village. The Village publishes multiple Private-Provider forms (Duly-Authorized-Employment Affidavit, Plan-Compliance Affidavit, Certificate of Inspection Compliance, Inspection Report, a Registration Checklist, and 'Notice to Building Official for Private Provider') confirming this route is actively supported.
Why the confidence is not higherVillage Code Sec. 6-68 citing F.S. § 553.791; Forms page lists 'Private Provider Certificate of Inspection Compliance,' 'Private Provider Duly Authorized Employment Affidavit,' 'Private Provider Inspection Report,' 'Private Provider Plan Compliance Affidavit,' 'Private Provider Procedures,' 'Private Provider Registration Checklist,' and 'Notice to Building Official for Private Provider.'
ordinance + published forms checked 2026-09-12 https://www.islamorada.fl.us/392/Forms
Q54 Which inspections are required, and in what order? Core Stages & sequence
Nothing published by this authority.
Where we lookedSearched the Building Services page and Forms page for a published, ordered list of required inspections for an electrical/PV job (e.g., rough-in then final); none found. The Village's general inspection guidance (CityView Portal registration/scheduling, NOC-before-first-inspection) describes process mechanics, not a stage sequence.
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Nothing published by this authority.
Where we lookedSame search as Q54 — no published statement on whether a rough-in or mid-roof inspection is required for a PV/electrical job.
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedNo Village document was found stating explicitly that inspectors verify labels and equipment listings during a final electrical/PV inspection (this is standard code-compliance practice generally, but no Village-specific statement was located to cite).
Q57 Is there a published inspection checklist? Core What is checked
Nothing published by this authority.
Where we lookedSearched the Forms page and Building Services page for a published PV or electrical inspection checklist; none found (the only checklist-type document found, the 'Contractor Checklist,' addresses contractor registration, not field inspection items).
Q58 What must be on site at inspection? Core Documents on site
A recorded Notice of Commencement (for improvements ≥$5,000, per Ch. 713 F.S.) must be provided to the Building Services Department and is required on site/on record before the FIRST inspection can be requested — failure to provide it 'will result in cancellation of requested inspection.' Beyond the NOC, the Village's page does not itemize a full on-site document list (e.g., approved plans/permit card), though that is standard Village practice.
Why the confidence is not higherBuilding Services page, 'INSPECTIONS' section: '...a Notice of Commencement (NOC) shall be recorded... Please ensure a copy of filed Notice of Commencement has been provided to the Building Services Department prior to requesting the first inspection... Failure to provide a Notice of Commencement will result in cancellation of requested inspection.'
department page checked 2026-09-12 https://www.islamorada.fl.us/157/Building-Services
Q59 Is there a re-inspection fee? Corrections & re-inspection
$100 flat — 'Reinspection Fee: Re-inspection fee due to rejection of work due to faulty construction, inspection requested and work not ready, failure to call for inspection and work covered up, work not per plans and no access to jobsite flat fee: $100.'
Why the confidence is not higherFee Resolution 25-12-137 (OCR'd), Reinspection Fee line.
fee resolution checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/5162/Bldg-Permits-Fee-Resolution-25-12-137
Q60 How are corrections issued and cleared? Corrections & re-inspection
Not explicitly documented beyond the re-inspection fee mechanism: a failed inspection triggers the $100 flat re-inspection fee (see Q59); corrections are presumably communicated back to the contractor/owner through the CityView Portal (the portal is the sole channel for inspection requests and permit correspondence per the Building Services page), but no Village document spells out a formal corrections-notice-and-clearance procedure.
Why the confidence is not higherFee Resolution 25-12-137 Reinspection Fee line; Building Services page establishes CityView Portal as the sole communication/request channel.
fee resolution + department page (inferred process) checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/5162/Bldg-Permits-Fee-Resolution-25-12-137
Q61 What is issued on pass? Core Final sign-off & PTO
A Final inspection approval — a rooftop PV addition to an existing single-family home is not new construction or a change of occupancy, so a Certificate of Occupancy would not apply; the Village's own inspection process (electrical/building final sign-off through CityView) issues final inspection approval rather than a CO for this permit type. A Temporary Certificate of Occupancy line exists in the fee schedule but is a distinct product for occupancy-triggering projects.
Why the confidence is not higherInferred from the fee schedule's separate 'Temporary certificate of occupancy: $250' line (implying COs are for occupancy-triggering permits) and the general CityView final-inspection process described on the Building Services page; no PV-specific 'what is issued' statement was found.
fee schedule (inferred) checked 2026-09-12 https://www.islamorada.fl.us/DocumentCenter/View/5162/Bldg-Permits-Fee-Resolution-25-12-137
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
The installer/member — per FKEC's own 'Procedures for Solar Contractors,' the member (via their contractor) submits the government inspection report to FKEC as Phase 2 of the Net Metering Application; FKEC only proceeds to its own inspection/meter-swap 'once FKEC receives the inspection report from the appropriate government agency,' which the member/installer is responsible for supplying, not the Village.
Why the confidence is not higherFKEC 'Procedures for Solar Contractors' page, Step 4: 'Complete: Phase 2 of the Net Meter Application. This form includes: Submitting contractor information [and] the FKEC member's signature... Once FKEC receives the inspection report from the appropriate government agency, FKEC will perform an inspection, install sticker, and enable bi-directional meter.'
utility's own published procedure page checked 2026-09-12 https://www.fkec.com/energy-efficiency/green-power/solar-net-metering/procedures-for-solar-contractors/
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording 60%
No specific placard wording is prescribed by the Village. FKEC's placard requirement (Sec. 5.3 of the Tier 1 Agreement) specifies only what the placard must communicate (the location of the manual disconnect) and its physical characteristics (permanent, weatherproof), not exact wording.
Size, colour & material 60%
FKEC specifies the placard must be 'permanent' and 'weather-proof' (i.e., a durable, weatherproof material) but does not specify letter height or color. No Village document specifies letter height, color, or material for any PV-related placard.
Where they go 80%
Per FKEC's own agreement, the disconnect-location placard must be placed 'adjacent to FKEC's meter socket.' The manual disconnect switch itself must be 'mounted separately from, but adjacent to, the FKEC meter socket' as the default rule (see Q48); no Village-specific label-placement rule beyond code was found.
What the utility wants on top 85%
Yes — FKEC (the utility) requires a permanent weatherproof placard identifying the alternate location of the manual AC disconnect switch whenever that switch cannot be mounted immediately adjacent to the FKEC meter socket; this is a utility-imposed labeling requirement layered on top of whatever the AHJ requires (and the Village itself was not found to publish any PV placard spec of its own — see Q38).
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.