Village of Key Biscayne is a village authority in the State of Florida, serving 14,809 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for Village of Key Biscayne against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
Village of Key Biscayne is the authority having jurisdiction 88% confidence
- Holds
- Building, Electrical, Plumbing, Mechanical permitting AND inspection, plus Zoning/Planning review, all in-house under one Village department ("Building, Zoning, Planning and Public Works" / "BZP"). The Village's own staff directory names a Building Official (Rene Velazco), Chief Building Inspector (Joseph Garcell), Chief Electrical Inspector (Evaristo "Rey" Crucet), a second Building Inspector (George Peon), a Structural Engineer (Osiris Quintana, P.E.), a Plumbing Inspector, a Zoning Plans Reviewer & Planner, and dedicated Permit Clerks — every one on a @keybiscayne.fl.gov email. No PDCS/SAFEbuilt/CAP/Bureau-Veritas-style private outsourcing signature (no contracted-firm letterhead, no outside email domain) was found anywhere in the Village's forms or staff list. Fire protection is a separate but also in-house Village department, Key Biscayne Fire Rescue (KBFR), operating since 1 Oct 1993 with 39 uniformed personnel out of one station at 560 Crandon Blvd — NOT Miami-Dade Fire Rescue, though KBFR's own page states it partners with the CITY OF MIAMI Fire-Rescue Department (not Miami-Dade County Fire Rescue) for capability beyond its one-station response. Water/sewer is Miami-Dade County WASD (county utility, unrelated to solar/electric). The Village's own floodplain code (Ch. 10, Sec. 10-63) defines "Florida Building Code" as the FBC "as amended through the local technical amendments of Article III 'Florida Building Code' of Chapter 8 'Building Code' of the Miami-Dade County Code of Ordinances" — i.e. the Village adopts the FBC AS LOCALLY AMENDED BY the county's BORA chapter, without itself codifying a separate electrical/building chapter (Village Code Chapter 6 'Buildings and Building Regulations' contains only 4 sections — moratorium, construction debris, permit fees, trash containers — no NEC/FBC adoption text of its own).
- Overridden by
- (1) JURISDICTION IS SPLIT GEOGRAPHICALLY, NOT JUST BY RULE: Key Biscayne is a barrier island of which the Village occupies only the middle third. Crandon Park to the north is Miami-Dade County park land (not Village jurisdiction) and Bill Baggs Cape Florida State Park to the south is Florida state park land under the Florida Dept. of Environmental Protection (not Village jurisdiction) — the Village's own site links a 'Zoning Map' ArcGIS tool (https://vkb.maps.arcgis.com/apps/webappviewer/index.html?id=3f62ff51f8db446fa2daa35dbaa25981) as the parcel-level source of truth for Village limits, which this run did not independently render (JS ArcGIS webapp), so the EXACT boundary line is carried at reduced confidence rather than GIS-verified this session. (2) Miami-Dade County Code Chapter 8 (BORA) local technical amendments to the FBC apply per the Village's own Sec. 10-63 definition, exactly as settled for Miami-Dade generally. (3) The Coastal Construction Control Line (Fla. Stat. § 161.053) is a codified, separate FDEP state permitting layer — defined verbatim in the Village's own Sec. 10-63 floodplain definitions chapter ('the line established by the State of Florida pursuant to F.S. § 161.053 ... which defines that portion of the beach-dune system subject to severe fluctuations'). (4) FL PSC Rule 25-6.065 (state floor for investor-owned utilities) requires local code-official inspection/approval before FPL allows parallel operation — the Village's inspection gates FPL's energization, not the reverse.
- Why not higher
- Direct evidence: the Village's own Permitting page (keybiscayne.fl.gov/services/building_zoning_and_planning), staff directory, Accela portal (all Village-branded, no outside operator), Solar Permit Form and Solar Systems Permit Checklist (Village letterhead, 'Department of Building, Zoning, Planning and Public Works'), and a REAL final permit pulled from the Village's own public Accela portal (B20-024034, 235 Ridgewood Rd, inspected and approved by named Village staff Joseph Garcell and George Peon) all show a fully in-house department. Held at 88 rather than higher because: (a) the exact Village-limits polygon was not independently verified against the ArcGIS zoning map this session (JS-rendered map, not opened), so the CRANDON PARK / BILL BAGGS carve-outs are stated from well-documented public geography rather than a rendered GIS layer; (b) the Land Development/Zoning ordinance (Chapter 30) is Municode-hosted and was only partially searched via the search index rather than read end-to-end.
https://keybiscayne.fl.gov/services/building_zoning_and_planning/index.php
- Permit required
- Yes. The Village publishes a dedicated 'Solar Permit Form.pdf' (HVHZ Electronic Solar Permit Form) and a 'Solar Systems Permit Checklist.pdf', both current (created/posted 21 Apr 2025),95%
- Permit cost
- No PV-specific fee line exists (confirmed: 'electrical' returns 8+ hits and 'zzqqx' returns 0 hits in the fee-schedule PDF,78%
- Portal
- Accela Citizen Access ('ACA'), at https://aca-prod.accela.com/keybiscayne/Default.aspx, branded 'Village of Key Biscayne' throughout.95%
- Electrical code
- Not stated by name/year in any Village document found. Per the statewide baseline (independently corroborated from floridabuilding.org across this survey): NEC 2020,55%
- Own placard wording
- Only the battery placard has fixed wording from FPL: 'Battery storage utilized in this facility.' No wording is specified for a general PV placard, at either the Village or FPL level.65%
- Booking an inspection
- Through the Accela Citizen Access portal, which lists 'Schedule' as a top-level navigation item (inspection scheduling) alongside phone-based booking through the Building Department.75%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes. The Village publishes a dedicated 'Solar Permit Form.pdf' (HVHZ Electronic Solar Permit Form) and a 'Solar Systems Permit Checklist.pdf', Q3 Electrical and building permits — The intake is combined under one Master Building Permit with trade sub-permits: the general Permit Application form has a single 'Select One Trade: Building /… Q4 Where you file — Accela Citizen Access ('ACA'), at https://aca-prod.accela.com/keybiscayne/Default.aspx, branded 'Village of Key Biscayne' throughout. Q20
- Permit required
- Yes. The Village publishes a dedicated 'Solar Permit Form.pdf' (HVHZ Electronic Solar Permit Form) and a 'Solar Systems Permit Checklist.pdf', both current (created/posted 21 Apr 2025),95% source
- What it costs
- No PV-specific fee line exists (confirmed: 'electrical' returns 8+ hits and 'zzqqx' returns 0 hits in the fee-schedule PDF,78% source
- Key document
- solar-specific submittal checklist (locally current but apparently stale threshold) cited by 6 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes — the Village of Key Biscayne's own Building, Zoning, Planning and Public Works Department is the AHJ for residential building AND electrical permitting/inspection within Village limits, including rooftop PV. It is not delegated to Miami-Dade County for permitting purposes (though Miami-Dade County Code Ch. 8 local amendments to the FBC apply, and Miami-Dade WASD/DERM/GIS remain separate county functions referenced on the Village's own permitting page). 90% · staff directory
- What does this authority permit itself, and what does it delegate? The Village permits and inspects Building, Electrical, Plumbing and Mechanical itself, and reviews Zoning/Planning itself. It references (but does not itself perform) Miami-Dade County DERM environmental review and Miami-Dade Dept. of Health review as separate county-level steps named on its own Permitting page, and Miami-Dade WASD provides water/sewer (unrelated to solar). 85% · department page
- Is a permit required for a residential rooftop PV system? Yes. The Village publishes a dedicated 'Solar Permit Form.pdf' (HVHZ Electronic Solar Permit Form) and a 'Solar Systems Permit Checklist.pdf', both current (created/posted 21 Apr 2025), confirming rooftop PV requires a standard permit — there is no PV exemption. 95% · solar permit form
- Is there a separate electrical permit, or is it combined? The intake is combined under one Master Building Permit with trade sub-permits: the general Permit Application form has a single 'Select One Trade: Building / Electrical / Plumbing / Mechanical / Other' field, and a real recovered permit (B20-024034) was issued as a 'Master Building Permit' covering the PV install. So building and electrical are sub-permits pulled under/alongside one master record rather than two fully separate application processes. 72% · live permit portal record
- Is a HOA or architectural approval required first? Requested as a courtesy, not enforced as a hard precondition to permit issuance. The Permit Application Submittal Checklist states: 'HOA Authorization/Landlord Authorization: As a courtesy, we request proof of HOA Authorization.' Separately, the Early Start Permitting Guidelines list 'HOA Letter' among documents to submit with the base permit application, and the general Building Permit Application disclaims that permit issuance does not itself authorize violating deed restrictions, placing the burden on the owner to secure HOA/association approval independently. 78% · submittal checklist
- Is there a historic-district review? No historic-district review or Certificate-of-Appropriateness process exists in the Village's code. A full-text Municode search for 'historic' (7 hits, positive/fabricated controls both passing) surfaces only: a FEMA floodplain exemption for 'Historic Structures' (Ch. 10), a private-club zoning clause about preserving archeological artifacts/historic sites (Sec. 30-107), and an unrelated debris-ordinance renumbering note — no historic preservation board, no historic overlay district, and no Certificate of Appropriateness requirement anywhere in the code. 78% · codified ordinance full-text search (absence proved by enumeration)
- Is a wind or windstorm certification required? Yes, embedded directly in the HVHZ Solar Permit Form itself rather than as a separate 'windstorm certification' document: the form requires the ASCE-7 Wind Exposure Category (C or D), and either calculated roof-uplift pressures per ASCE-7 OR the RAS-127 (steep-slope, >=2:12) / RAS-128 (low-slope, <2:12) prescriptive Test Protocols for High-Velocity Hurricane Zones, for both the panel field (P1) and perimeter (P2) zones of the roof. 90% · solar-specific permit form
- Is a Specific Use Permit or Council approval ever required? No — solar panels are addressed in the Zoning and Land Development Regulations as a permitted feature subject only to a screening/setback rule, not as a Specific Use Permit or Village Council approval item. Sec. 30-100 (Single Family and Two-Family districts) lists 'Solar panels that are screened from the public right-of-way' and Sec. 30-110 (allowable encroachments into required yards, all other districts) allows 'Solar heating panels' provided they are 'visually screened from the adjacent Rights-of-Way, or set into the roof so that the solar panel is flush with the upper roof' — both are administrative design standards, not a discretionary approval process. 72% · codified zoning ordinance
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed electrical contractor pulls the electrical permit/sub-permit. Confirmed live: on real permit B20-024034 (235 Ridgewood Rd, 'SOLAR PHOTOVOLTAIC INSTALL'), the Licensed Professional of record is Rafael A Gonzales of Unlimited Solar Technology Corp, FL Electrical License EC13009583. 88% · live permit portal record
- Must the contractor be registered with this authority before applying? Yes. The Village's Permit Application Submittal Checklist states plainly: 'Contractor Registration: All contractors must be registered with the village. A valid contractor's license, liability insurance, business tax receipt, and worker's compensation insurance or exemption are required.' A dedicated 'Change of Contractor Request' form (signed off by the Building Official) also exists, confirming an active village-side contractor-registration record is maintained per job. 88% · submittal checklist
- Is a homeowner permitted to self-install and self-permit? The Village publishes a generic (not solar-specific) 'Owner Builder Affidavit' implementing the statewide FS 489.103/489.503 owner-builder exemption for a single- or two-family residence the owner occupies; it does not separately address whether an owner may self-pull the electrical sub-permit for a PV system versus needing a licensed electrical contractor for that trade. 55% · owner-builder affidavit (general, not solar-specific)
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Per the Village's own Solar Systems Permit Checklist: a roof plan diagram (dimensions, total roof area, roof edges/walls/parapets/expansion joints/rooftop equipment), the solar-array location and size on the roof, wind uplift zone and pressure per ASCE-7, perimeter width per ASCE-7, roof deck type, roof-assembly condition (new/re-roof/existing, each with fire-rating implications), roofing material, roof-clearance documentation, a roof-penetration flashing detail, a Florida Solar Energy Center (FSEC) PV system certification approval form, a completed owner's solar-system disclosure form, signed-and-sealed structural drawings with design calculations (wind load, uplift/lateral forces on framing, added dead load, connection design), and a complete electrical diagram per NEC Article 690 in its entirety with a floor plan showing equipment locations and load calculations. 95% · solar-specific submittal checklist
- How many copies, and in what format? Electronic only, through the Accela Citizen Access ('ACA') online portal (PDF format); the Village states it 'will continue its regular practice of accepting hardcopy (paper) submittal' as an alternative, with a scanning fee possibly applying to paper larger than 8.5x11 or 11x17. 78% · permit portal home page
- Is a site plan required, and what must it show? For solar specifically, a roof plan diagram (not a full property site plan) is required per the Solar Systems Permit Checklist, showing roof dimensions/edges/equipment and the array's roof-top location, size and area. A full property site plan/survey is the Village's separate GENERAL new-construction requirement and was not shown to apply to a simple PV retrofit. 75% · solar-specific submittal checklist
- Is a one-line / three-line diagram required? Yes. The Solar Systems Permit Checklist requires: 'Submit a complete Electrical Diagram: Designed in accordance to the NEC Article 690 Solar Photovoltaic Systems, in its entirety' plus a floor plan showing all electrical equipment locations. 95% · solar-specific submittal checklist
- Are string and conductor calculations required? Load calculations are explicitly required ('Submit load calculations'); string/conductor sizing calculations are not separately named but are implied by the requirement that the electrical diagram comply with 'NEC Article 690 ... in its entirety', which itself mandates conductor/string sizing documentation. 75% · solar-specific submittal checklist
- Is a structural PE stamp required, and at what threshold? Yes, and with NO stated dollar threshold: the Solar Systems Permit Checklist's 'Structural Design Requirements for Solar Systems' section requires 'signed and sealed drawings along with design calculations' for wind load, uplift/lateral forces on framing, added dead load, and connection design — stated as an unconditional requirement, not one that only kicks in above a value/amperage trigger (unlike the electrical PE trigger in Q14). 82% · solar-specific submittal checklist
- Is an electrical PE stamp required, and at what threshold? The Village's OWN current Solar Systems Permit Checklist states an Electrical Engineer must sign and seal plans if the system value exceeds $50,000, OR the aggregate residential service capacity is 600 amps (240V) or more, OR the aggregate commercial/industrial service capacity is 800 amps (240V) or more. THIS $50,000 VALUE THRESHOLD APPEARS STALE against the current statewide floor set by FS 471.003(2)(h) — $125,000/600A (240V) residential — which is the same stale-threshold pattern already documented at the Miami-Dade County level (the county's own Solar Systems Guideline). Record both figures; an installer following the Village's own current document would over-trigger a PE seal by value versus the current state floor. 88% · solar-specific submittal checklist (locally current but apparently stale threshold)
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Accela Citizen Access ('ACA'), at https://aca-prod.accela.com/keybiscayne/Default.aspx, branded 'Village of Key Biscayne' throughout. 95% · permit portal home page
- Can the whole application be completed online? Yes for registered users — the portal's home page states: 'The Building Department is now accepting electronic submittal of permit applications and construction plans. We encourage all applicants to take advantage of this new service.' A GENERAL (unauthenticated) search of Building Permit Records is also available with no login, which is how a real, finaled solar permit (B20-024034) was recovered for this run. 90% · live permit portal (tested)
- What does a residential solar permit cost? No PV-specific fee line exists (confirmed: 'electrical' returns 8+ hits and 'zzqqx' returns 0 hits in the fee-schedule PDF, but 'solar'/'photovoltaic' return 0 hits — the search tool itself is working, PV is simply unlisted). A residential PV job is billed under the Village's GENERAL Building Base Permit Fee: for permits not calculated by floor area (which a PV retrofit would be), 2.53% of the value of construction, minimum $100 per discipline ($150 if only one trade is pulled), maximum $27,500 — PLUS a $33 non-refundable Processing Fee and a Submittal Fee equal to 50% of the base permit fee (credited back at issuance). 78% · fee schedule
- How is the fee calculated? Valuation-based (2.53% of the value of construction for non-area-based permit types, which a PV retrofit falls under), not a flat fee or a per-watt/per-kW formula. 78% · fee schedule
- Is there a separate plan-check fee? Yes. A $33 non-refundable Processing Fee applies to all applications at submittal, and a separate Submittal Fee equal to 50% of the base permit fee is also charged at submittal for additions/alterations (credited toward the base permit fee upon issuance). Additional Plan Review time beyond the first review and one follow-up is billed at $27.50 per quarter hour ($44.00/qtr-hr if expedited). 85% · fee schedule
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- How long is an issued permit valid before it expires? Not stated in the documents reviewed; however the fee schedule's existence of a 'Permit Renewal' fee ($110 plus 13.75% of the original base permit fee 'when renewing expired permits') confirms permits DO expire, without giving the length of validity. 45% · fee schedule (indirect evidence only)
- Which utility handles interconnection here? Florida Power & Light Company (FPL) — proved from the Village's OWN CURRENT CODIFIED ELECTRIC FRANCHISE GRANT, not merely a franchise-fee line or a taxpayer schedule. 96% · codified franchise ordinance (Village's own Code, Appendix A)
- Where does the utility sit in the sequence? The Village's own building/electrical inspection and approval must occur BEFORE FPL allows the system to operate in parallel with the grid. FPL's own current Net Metering Guidelines state: 'All interconnection applications must be approved prior to installation and operation of the renewable energy system,' and that once construction is complete the customer must provide FPL a copy of the approved permit showing 'Electrical and mechanical inspection signed off / approved by the local inspector' before FPL will install the required bi-directional meter — operating before that meter is installed is 'strictly prohibited.' 90% · utility's own published guidelines
28 questions answered against Village of Key Biscayne’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes — the Village of Key Biscayne's own Building, Zoning, Planning and Public Works Department is the AHJ for residential building AND electrical permitting/inspection within Village limits, including rooftop PV. It is not delegated to Miami-Dade County for permitting purposes (though Miami-Dade County Code Ch. 8 local amendments to the FBC apply, and Miami-Dade WASD/DERM/GIS remain separate county functions referenced on the Village's own permitting page).
Why the confidence is not higherStaff directory names an in-house Building Official, Chief Building/Electrical Inspectors, and Permit Clerks, all @keybiscayne.fl.gov; a real permit pulled from the Village's own Accela portal was inspected and approved by named Village staff.
staff directory checked 2026-09-12 https://keybiscayne.fl.gov/services/human_resources/staff_directory/building_zoning_planning.php
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
The Village permits and inspects Building, Electrical, Plumbing and Mechanical itself, and reviews Zoning/Planning itself. It references (but does not itself perform) Miami-Dade County DERM environmental review and Miami-Dade Dept. of Health review as separate county-level steps named on its own Permitting page, and Miami-Dade WASD provides water/sewer (unrelated to solar).
Why the confidence is not higherVillage Permitting page lists 'Building', 'Miami-Dade County Department of Environmental Resources Management (DERM)' and 'Department of Health' as distinct items under 'Permitting', with Building handled by the Village's own portal/staff.
department page checked 2026-09-12 https://keybiscayne.fl.gov/services/building_zoning_and_planning/index.php
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes. The Village publishes a dedicated 'Solar Permit Form.pdf' (HVHZ Electronic Solar Permit Form) and a 'Solar Systems Permit Checklist.pdf', both current (created/posted 21 Apr 2025), confirming rooftop PV requires a standard permit — there is no PV exemption.
Why the confidence is not higherBoth documents are the Village's own current forms, headed 'Village of Key Biscayne — Department of Building, Zoning, Planning and Public Works', hosted on the Village's own Document Center.
solar permit form checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Permit%20Form.pdf
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
The intake is combined under one Master Building Permit with trade sub-permits: the general Permit Application form has a single 'Select One Trade: Building / Electrical / Plumbing / Mechanical / Other' field, and a real recovered permit (B20-024034) was issued as a 'Master Building Permit' covering the PV install. So building and electrical are sub-permits pulled under/alongside one master record rather than two fully separate application processes.
Why the confidence is not higherDerived from the Village's general Permit Application form structure and the structure of a real, finaled solar permit record (B20-024034, status 'Final', described as 'Master Building Permit') pulled from the Village's own Accela portal; not a solar-specific statement.
live permit portal record checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed electrical contractor pulls the electrical permit/sub-permit. Confirmed live: on real permit B20-024034 (235 Ridgewood Rd, 'SOLAR PHOTOVOLTAIC INSTALL'), the Licensed Professional of record is Rafael A Gonzales of Unlimited Solar Technology Corp, FL Electrical License EC13009583.
Why the confidence is not higherDirectly observed on a real, finaled permit record in the Village's own public Accela portal.
live permit portal record checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes. The Village's Permit Application Submittal Checklist states plainly: 'Contractor Registration: All contractors must be registered with the village. A valid contractor's license, liability insurance, business tax receipt, and worker's compensation insurance or exemption are required.' A dedicated 'Change of Contractor Request' form (signed off by the Building Official) also exists, confirming an active village-side contractor-registration record is maintained per job.
Why the confidence is not higherDirect quote from the Village's own current Permit Application Submittal Checklist (created 21 Apr 2025).
submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Permit%20Application%20Submittal%20Checklist.pdf
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
The Village publishes a generic (not solar-specific) 'Owner Builder Affidavit' implementing the statewide FS 489.103/489.503 owner-builder exemption for a single- or two-family residence the owner occupies; it does not separately address whether an owner may self-pull the electrical sub-permit for a PV system versus needing a licensed electrical contractor for that trade.
Why the confidence is not higherThe Owner Builder Affidavit is a generic statewide-form document (revision stamp '07/14'), not PV-specific; no solar-specific owner-builder carve-out or exclusion was found.
owner-builder affidavit (general, not solar-specific) checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Owner%20Builder%20Affidavit.pdf
Q8 What documents make up a complete submittal? Core Submittal package
Per the Village's own Solar Systems Permit Checklist: a roof plan diagram (dimensions, total roof area, roof edges/walls/parapets/expansion joints/rooftop equipment), the solar-array location and size on the roof, wind uplift zone and pressure per ASCE-7, perimeter width per ASCE-7, roof deck type, roof-assembly condition (new/re-roof/existing, each with fire-rating implications), roofing material, roof-clearance documentation, a roof-penetration flashing detail, a Florida Solar Energy Center (FSEC) PV system certification approval form, a completed owner's solar-system disclosure form, signed-and-sealed structural drawings with design calculations (wind load, uplift/lateral forces on framing, added dead load, connection design), and a complete electrical diagram per NEC Article 690 in its entirety with a floor plan showing equipment locations and load calculations.
Why the confidence is not higherRead directly, verbatim, from the Village's own current Solar Systems Permit Checklist (created 21 Apr 2025).
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q9 How many copies, and in what format? Submittal package
Electronic only, through the Accela Citizen Access ('ACA') online portal (PDF format); the Village states it 'will continue its regular practice of accepting hardcopy (paper) submittal' as an alternative, with a scanning fee possibly applying to paper larger than 8.5x11 or 11x17.
Why the confidence is not higherStated on the Accela portal's own home/announcement banner for Key Biscayne; general (not solar-specific) but is the Village's stated universal submittal policy.
permit portal home page checked 2026-09-12 https://aca-prod.accela.com/keybiscayne/Default.aspx
Q10 Is a site plan required, and what must it show? Core Submittal package
For solar specifically, a roof plan diagram (not a full property site plan) is required per the Solar Systems Permit Checklist, showing roof dimensions/edges/equipment and the array's roof-top location, size and area. A full property site plan/survey is the Village's separate GENERAL new-construction requirement and was not shown to apply to a simple PV retrofit.
Why the confidence is not higherSolar Systems Permit Checklist explicitly requires a roof plan diagram; no PV-specific full site-plan/survey requirement was found distinct from that roof plan.
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Yes. The Solar Systems Permit Checklist requires: 'Submit a complete Electrical Diagram: Designed in accordance to the NEC Article 690 Solar Photovoltaic Systems, in its entirety' plus a floor plan showing all electrical equipment locations.
Why the confidence is not higherDirect quote from the Village's own current solar-specific checklist.
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q12 Are string and conductor calculations required? Drawings & calculations
Load calculations are explicitly required ('Submit load calculations'); string/conductor sizing calculations are not separately named but are implied by the requirement that the electrical diagram comply with 'NEC Article 690 ... in its entirety', which itself mandates conductor/string sizing documentation.
Why the confidence is not higherDirect requirement for load calculations from the Village's own checklist; string-calc requirement is inferred from the 'NEC 690 in its entirety' clause rather than separately spelled out.
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Yes, and with NO stated dollar threshold: the Solar Systems Permit Checklist's 'Structural Design Requirements for Solar Systems' section requires 'signed and sealed drawings along with design calculations' for wind load, uplift/lateral forces on framing, added dead load, and connection design — stated as an unconditional requirement, not one that only kicks in above a value/amperage trigger (unlike the electrical PE trigger in Q14).
Why the confidence is not higherThe Village's own current checklist lists the structural sealed-drawing requirement as a flat list of items with no dollar or amperage threshold attached, in contrast to the electrical section immediately below it which does state a threshold.
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
The Village's OWN current Solar Systems Permit Checklist states an Electrical Engineer must sign and seal plans if the system value exceeds $50,000, OR the aggregate residential service capacity is 600 amps (240V) or more, OR the aggregate commercial/industrial service capacity is 800 amps (240V) or more. THIS $50,000 VALUE THRESHOLD APPEARS STALE against the current statewide floor set by FS 471.003(2)(h) — $125,000/600A (240V) residential — which is the same stale-threshold pattern already documented at the Miami-Dade County level (the county's own Solar Systems Guideline). Record both figures; an installer following the Village's own current document would over-trigger a PE seal by value versus the current state floor.
Why the confidence is not higherDirectly quoted from the Village's own current (created 21 Apr 2025) Solar Systems Permit Checklist; flagged as apparently stale against FS 471.003(2)(h)'s $125,000/600A statewide floor, verified against the Florida Legislature's own statute text.
solar-specific submittal checklist (locally current but apparently stale threshold) checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q15 What does a residential solar permit cost? Core Fees
No PV-specific fee line exists (confirmed: 'electrical' returns 8+ hits and 'zzqqx' returns 0 hits in the fee-schedule PDF, but 'solar'/'photovoltaic' return 0 hits — the search tool itself is working, PV is simply unlisted). A residential PV job is billed under the Village's GENERAL Building Base Permit Fee: for permits not calculated by floor area (which a PV retrofit would be), 2.53% of the value of construction, minimum $100 per discipline ($150 if only one trade is pulled), maximum $27,500 — PLUS a $33 non-refundable Processing Fee and a Submittal Fee equal to 50% of the base permit fee (credited back at issuance).
Why the confidence is not higherFee schedule is the Village's own 'Fee Schedule, Effective March 1, 2022' PDF; positive control ('electrical') and fabricated control ('zzqqx') both passed, and no solar-specific line exists, so this is the general formula applied by inference, held below 90 because the schedule itself is dated 2022 and could not be cross-checked against a newer version.
fee schedule checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/VKB%20Permit%20Fee%20Schedule.pdf
Q16 How is the fee calculated? Core Fees
Valuation-based (2.53% of the value of construction for non-area-based permit types, which a PV retrofit falls under), not a flat fee or a per-watt/per-kW formula.
Why the confidence is not higherSame fee schedule as Q15; PV is not called out separately so this is the general non-area-based formula.
fee schedule checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/VKB%20Permit%20Fee%20Schedule.pdf
Q17 Is there a separate plan-check fee? Fees
Yes. A $33 non-refundable Processing Fee applies to all applications at submittal, and a separate Submittal Fee equal to 50% of the base permit fee is also charged at submittal for additions/alterations (credited toward the base permit fee upon issuance). Additional Plan Review time beyond the first review and one follow-up is billed at $27.50 per quarter hour ($44.00/qtr-hr if expedited).
Why the confidence is not higherDirect quotes from the Village's own current fee schedule.
fee schedule checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/VKB%20Permit%20Fee%20Schedule.pdf
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Nothing published by this authority.
Where we lookedPermitting page, Solar Permit Form, Solar Systems Permit Checklist, VKB Permit Fee Schedule — none states a residential plan-review turnaround
https://keybiscayne.fl.gov/services/building_zoning_and_planning/index.php
Q19 How long is an issued permit valid before it expires? Timeline & validity
Not stated in the documents reviewed; however the fee schedule's existence of a 'Permit Renewal' fee ($110 plus 13.75% of the original base permit fee 'when renewing expired permits') confirms permits DO expire, without giving the length of validity.
Why the confidence is not higherThe renewal-fee line proves expiration exists as a concept but does not itself state the validity period, so this is recorded at reduced confidence rather than as a full answer.
fee schedule (indirect evidence only) checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/VKB%20Permit%20Fee%20Schedule.pdf
Q20 Which permit portal does this authority use? Core Portal & process
Accela Citizen Access ('ACA'), at https://aca-prod.accela.com/keybiscayne/Default.aspx, branded 'Village of Key Biscayne' throughout.
Why the confidence is not higherDirectly confirmed by loading the live portal, which names the Village and its Building/Zoning/Planning Department on its own home page.
permit portal home page checked 2026-09-12 https://aca-prod.accela.com/keybiscayne/Default.aspx
Q21 Can the whole application be completed online? Core Portal & process
Yes for registered users — the portal's home page states: 'The Building Department is now accepting electronic submittal of permit applications and construction plans. We encourage all applicants to take advantage of this new service.' A GENERAL (unauthenticated) search of Building Permit Records is also available with no login, which is how a real, finaled solar permit (B20-024034) was recovered for this run.
Why the confidence is not higherDirectly confirmed: this run submitted a live, unauthenticated 'General Search' on the Village's own Accela portal (Project Name = 'solar') and it returned a genuine finaled permit record with contractor, owner, and inspection detail.
live permit portal (tested) checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapHome.aspx?module=Building&TabName=Building
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Power & Light Company (FPL) — proved from the Village's OWN CURRENT CODIFIED ELECTRIC FRANCHISE GRANT, not merely a franchise-fee line or a taxpayer schedule.
Why the confidence is not higherVillage Code of Ordinances, Appendix A — Franchises, Article III — Florida Power & Light Company, codifies Ordinance No. 2019-7 in full: 'AN ORDINANCE OF THE VILLAGE OF KEY BISCAYNE, FLORIDA GRANTING TO FLORIDA POWER & LIGHT COMPANY, ITS SUCCESSORS AND ASSIGNS, A NON-EXCLUSIVE ELECTRIC FRANCHISE.' Section 2 grants FPL a 30-year franchise from the ordinance's effective date (timed to succeed the prior Miami-Dade County/FPL franchise, per Sec. 14 and Sec. 17 of the same ordinance) to construct/operate/maintain electric facilities in Village rights-of-way; Section 6 sets a 6.0% franchise fee on FPL's billed residential/commercial/industrial revenue within Village boundaries. This is the strongest possible utility proof per this survey's ranking (a first-party, current, codified FRANCHISE GRANT itself — stronger even than a franchise-fee/utility-tax budget line), and per Section 17 the franchise's effective date was timed to the expiration of the prior county-level FPL franchise, so — applying the Niceville lesson of checking TERM AND EXPIRY, not just the grantee — this franchise is current and not stale (30 years from a ~2019-2020 effective date runs to roughly 2049-2050).
codified franchise ordinance (Village's own Code, Appendix A) checked 2026-09-12 https://library.municode.com/fl/key_biscayne/codes/code_of_ordinances?nodeId=APXAFR_ARTIIIFLPOLICO
Q23 Where does the utility sit in the sequence? Core Utility interconnection
The Village's own building/electrical inspection and approval must occur BEFORE FPL allows the system to operate in parallel with the grid. FPL's own current Net Metering Guidelines state: 'All interconnection applications must be approved prior to installation and operation of the renewable energy system,' and that once construction is complete the customer must provide FPL a copy of the approved permit showing 'Electrical and mechanical inspection signed off / approved by the local inspector' before FPL will install the required bi-directional meter — operating before that meter is installed is 'strictly prohibited.'
Why the confidence is not higherFetched directly from FPL's own current Net Metering Guidelines page today (not the generic PSC rule, and not carried forward from a prior run).
utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Requested as a courtesy, not enforced as a hard precondition to permit issuance. The Permit Application Submittal Checklist states: 'HOA Authorization/Landlord Authorization: As a courtesy, we request proof of HOA Authorization.' Separately, the Early Start Permitting Guidelines list 'HOA Letter' among documents to submit with the base permit application, and the general Building Permit Application disclaims that permit issuance does not itself authorize violating deed restrictions, placing the burden on the owner to secure HOA/association approval independently.
Why the confidence is not higherDirect quotes from two of the Village's own current forms; held below 90 because the 'courtesy' framing means it is not a stated hard gate on issuance.
submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Permit%20Application%20Submittal%20Checklist.pdf
Q25 Is there a historic-district review? Overlays & special cases
No historic-district review or Certificate-of-Appropriateness process exists in the Village's code. A full-text Municode search for 'historic' (7 hits, positive/fabricated controls both passing) surfaces only: a FEMA floodplain exemption for 'Historic Structures' (Ch. 10), a private-club zoning clause about preserving archeological artifacts/historic sites (Sec. 30-107), and an unrelated debris-ordinance renumbering note — no historic preservation board, no historic overlay district, and no Certificate of Appropriateness requirement anywhere in the code.
Why the confidence is not higherProved by enumeration: full-text search with a passing positive control ('electrical', 28 hits) and passing fabricated control ('zzqqx', 0 hits) in the same Municode session, then a dedicated 'historic' search reviewed hit-by-hit.
codified ordinance full-text search (absence proved by enumeration) checked 2026-09-12 https://library.municode.com/search?stateId=9&clientId=10536&searchText=historic&searchMode=CLIENTMODE&contentTypeId=CODES
Q26 Is a wind or windstorm certification required? Overlays & special cases
Yes, embedded directly in the HVHZ Solar Permit Form itself rather than as a separate 'windstorm certification' document: the form requires the ASCE-7 Wind Exposure Category (C or D), and either calculated roof-uplift pressures per ASCE-7 OR the RAS-127 (steep-slope, >=2:12) / RAS-128 (low-slope, <2:12) prescriptive Test Protocols for High-Velocity Hurricane Zones, for both the panel field (P1) and perimeter (P2) zones of the roof.
Why the confidence is not higherRead directly from the Village's own current 'HVHZ Electronic Solar Permit Form.'
solar-specific permit form checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Permit%20Form.pdf
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
No — solar panels are addressed in the Zoning and Land Development Regulations as a permitted feature subject only to a screening/setback rule, not as a Specific Use Permit or Village Council approval item. Sec. 30-100 (Single Family and Two-Family districts) lists 'Solar panels that are screened from the public right-of-way' and Sec. 30-110 (allowable encroachments into required yards, all other districts) allows 'Solar heating panels' provided they are 'visually screened from the adjacent Rights-of-Way, or set into the roof so that the solar panel is flush with the upper roof' — both are administrative design standards, not a discretionary approval process.
Why the confidence is not higherDirect text from the two sections of the Village's zoning code that mention solar by name (Chapter 30, Article V — Schedule of District, Use and Setback Regulations); no separate special-exception or Council-approval clause naming solar was found in the same search.
codified zoning ordinance checked 2026-09-12 https://library.municode.com/fl/key_biscayne/codes/code_of_ordinances?nodeId=PTIICO_CH30ZOLADERE_ARTVSCDIUSSERE_S30-110ALENINREYAALDIEXSIFAPSPARE
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Nothing published by this authority.
Where we lookedChapter 30 zoning sections naming solar (30-100, 30-110), Solar Permit Form, Solar Systems Permit Checklist, FPL franchise ordinance — no residential system-size (kW) cap found at Village level
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which NEC edition is in force? Not stated by name/year in any Village document found. Per the statewide baseline (independently corroborated from floridabuilding.org across this survey): NEC 2020, effective 31 December 2023. The Village's Accela portal banner confirms only the FBC cycle ('Florida Building Code (FBC) 2023 - 8th Edition Is Now In effect As Of 12/31/2023') — which is the FBC label, not the NEC edition — so this is carried forward as the state floor, not independently confirmed as a Village-stated fact. 55% · permit portal banner (FBC cycle only; NEC year not locally stated)
- Which building code edition is in force? Florida Building Code, 8th Edition (2023), in effect as of 12/31/2023. 92% · permit portal banner
- Are there local amendments to any of the above? Yes — the Village adopts the Florida Building Code 'as amended through the local technical amendments of Article III "Florida Building Code" of Chapter 8 "Building Code" of the Miami-Dade County Code of Ordinances', per the Village's own floodplain-chapter definition of 'Florida Building Code.' The Village does not codify a separate local electrical/building chapter of its own (Village Code Ch. 6 has only 4 sections: moratorium, construction debris, permit fees, non-residential trash containers) — all substantive local amendment sits at the COUNTY (Miami-Dade Ch. 8/BORA) level, adopted by reference. 85% · codified ordinance definition
- What is the installation judged against? Florida Building Code 8th Edition (2023) as locally amended via Miami-Dade County Code Chapter 8 (BORA), NEC (edition not locally named; statewide floor NEC 2020), ASCE-7 wind loads and ASCE-24 flood-resistant design (both referenced in the Village's own floodplain code and Solar Permit Form), and — because this is a Miami-Dade HVHZ jurisdiction — RAS-127/RAS-128 prescriptive uplift tables in place of an NOA category for PV modules/racking (per this survey's settled Miami-Dade/HVHZ findings). 78% · solar-specific permit form
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
- What ridge setback and access pathways are required? No fire-code ridge-setback or fire-access-pathway rule (in the NFPA/IFC 'access pathway' sense) was found in any Village document. The Village's Solar Permit Form does define wind-uplift PERIMETER zones (P2, P3) where panels/PVL modules may not be installed in roof corners — a structural/wind-uplift concept under RAS-127/128, distinct from a fire-access clearance requirement, and it is not labelled as one. 40% · solar-specific permit form (partial/adjacent, not a direct answer)
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
- Is rapid shutdown required, and to which NEC edition? Not named by edition. The Village's own Solar Systems Permit Checklist requires the electrical diagram to comply with 'NEC Article 690 Solar Photovoltaic Systems, in its entirety' — which would incorporate 690.12 rapid-shutdown by reference — but no document found states which NEC edition (i.e., which version of the 690.12 rapid-shutdown requirement) governs. 60% · solar-specific submittal checklist (inference)
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? The Village itself publishes no placard/label list for PV. At the utility level, FPL's own current Net Metering Guidelines require: (a) a warning sign at the meter noting the disconnect location (for Tier 2/3, where a disconnect is required) reading that both sides of the switch may be energized; and (b) for battery storage, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility.' 70% · utility's own published guidelines (utility-level, not Village)
- Does the authority specify placard wording of its own? Only the battery placard has fixed wording from FPL: 'Battery storage utilized in this facility.' No wording is specified for a general PV placard, at either the Village or FPL level. 65% · utility's own published guidelines (utility-level, not Village)
- Does it specify letter height, colour or material? No letter height, colour, or material is specified by the Village or, per FPL's own current guidelines, by FPL either. 55% · not_found (checked utility and Village)
- Does the UTILITY specify placards beyond the AHJ's? Yes — FPL requires its own placards/signage beyond anything the Village specifies: a disconnect-location warning sign (Tier 2/3 systems) and the battery-storage placard described in Q38/Q39, both from FPL's own current Net Metering Guidelines rather than from any Village document. 75% · utility's own published guidelines
- Where must the labels be placed? Per FPL's own guidelines: the disconnect-warning sign is placed at/near the meter location alongside the disconnect switch; the battery placard is 'permanently affixed to the meter enclosure.' No placement instruction exists at the Village level. 72% · utility's own published guidelines
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Governed by FPL, not the Village. Per FPL's own current guidelines: Tier 1 (<=10 kW, the great majority of residential rooftop PV) has NO stated AC-disconnect requirement at all; Tier 2 (>10-100 kW) and Tier 3 (>100 kW-2,000 kW) require a manual, visible load-break-type disconnect switch mounted SEPARATE FROM BUT ADJACENT TO the FPL meter socket, always accessible to FPL, and capable of being locked in the open position with a single FPL padlock. No specific distance (e.g., FPL's often-cited 'within 10 feet') is stated on this particular current guidelines page — 'adjacent to' is the operative language. 88% · utility's own published guidelines
- Must equipment be on a specific approved list? Yes — a Florida Solar Energy Center (FSEC) photovoltaic system certification/approval form is explicitly required for the proposed solar system (and separately for solar water heaters), per the Village's own Solar Systems Permit Checklist. UL 1703 module listing and UL 2703 racking listing are not named in the Village's own document but are the settled statewide/HVHZ standard (no HVHZ NOA category exists for PV modules or racking). 85% · solar-specific submittal checklist
- Are batteries permitted, and under what conditions? Not addressed in any Village document found (no battery/ESS-specific permitting language in the Solar Permit Form, the Solar Systems Permit Checklist, or a Municode search for 'battery'/'energy storage'). At the utility level, FPL permits customer battery storage behind the meter subject to UL 1741 certification and the placard in Q39, and treats a stand-alone backup battery (no renewable generation, no export) as not requiring an interconnection agreement at all. 45% · utility's own published guidelines (utility-level; Village itself is silent)
- Is a specific mounting system or attachment spacing required? Yes, in unusual structural depth for a Florida municipality: the HVHZ Solar Permit Form itself specifies roof-top mounting bracket type (stand-off vs. support), mount-spacing in the field (P1) vs. perimeter (P2), support-mount height above the finished roof, number of fasteners per mount, minimum fastener embedment of 2.5 inches with a required pilot hole, total roof attachment points and calculated weight per attachment point, and (for rail systems) support-rail height above the roof and rail counts in field vs. perimeter zones. 95% · solar-specific permit form
20 questions answered against Village of Key Biscayne’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
Not stated by name/year in any Village document found. Per the statewide baseline (independently corroborated from floridabuilding.org across this survey): NEC 2020, effective 31 December 2023. The Village's Accela portal banner confirms only the FBC cycle ('Florida Building Code (FBC) 2023 - 8th Edition Is Now In effect As Of 12/31/2023') — which is the FBC label, not the NEC edition — so this is carried forward as the state floor, not independently confirmed as a Village-stated fact.
Why the confidence is not higherCARRIED-FORWARD BASELINE CONTENT: the NEC 2020/eff. 12-31-2023 figure is the statewide adoption established across 95 prior Florida runs and corroborated from the Florida Building Commission's own site, not a figure this Village's own documents state by year.
permit portal banner (FBC cycle only; NEC year not locally stated) checked 2026-09-12 https://aca-prod.accela.com/keybiscayne/Default.aspx
Q30 Which building code edition is in force? Core Code editions in force
Florida Building Code, 8th Edition (2023), in effect as of 12/31/2023.
Why the confidence is not higherStated directly and prominently on the Village's own live Accela permit-portal home page: 'Florida Building Code (FBC) 2023 - 8th Edition Is Now In effect As Of 12/31/2023', repeated in the sidebar announcement.
permit portal banner checked 2026-09-12 https://aca-prod.accela.com/keybiscayne/Default.aspx
Q31 Which fire code edition is in force? Code editions in force
Nothing published by this authority.
Where we lookedFire Rescue department index page and Fire Prevention & Safety pages — no Florida Fire Prevention Code edition/year stated
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes — the Village adopts the Florida Building Code 'as amended through the local technical amendments of Article III "Florida Building Code" of Chapter 8 "Building Code" of the Miami-Dade County Code of Ordinances', per the Village's own floodplain-chapter definition of 'Florida Building Code.' The Village does not codify a separate local electrical/building chapter of its own (Village Code Ch. 6 has only 4 sections: moratorium, construction debris, permit fees, non-residential trash containers) — all substantive local amendment sits at the COUNTY (Miami-Dade Ch. 8/BORA) level, adopted by reference.
Why the confidence is not higherDirect quote from the Village's own current Code of Ordinances, Ch. 10, Sec. 10-63 ('Florida Building Code' definition); corroborated by Chapter 6's four-section table of contents showing no independent NEC/FBC adoption text.
codified ordinance definition checked 2026-09-12 https://library.municode.com/fl/key_biscayne/codes/code_of_ordinances?nodeId=PTICO_CH10FLMA_ARTIIDE_DIV2DE_S10-63DE
Q33 What is the installation judged against? Core Electrical
Florida Building Code 8th Edition (2023) as locally amended via Miami-Dade County Code Chapter 8 (BORA), NEC (edition not locally named; statewide floor NEC 2020), ASCE-7 wind loads and ASCE-24 flood-resistant design (both referenced in the Village's own floodplain code and Solar Permit Form), and — because this is a Miami-Dade HVHZ jurisdiction — RAS-127/RAS-128 prescriptive uplift tables in place of an NOA category for PV modules/racking (per this survey's settled Miami-Dade/HVHZ findings).
Why the confidence is not higherComposite of the Village's own Solar Permit Form (ASCE-7, RAS-127/128), the floodplain chapter's FBC/ASCE-24 definitions, and the settled statewide/Miami-Dade HVHZ baseline for the parts not independently re-derived this run.
solar-specific permit form checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Permit%20Form.pdf
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedSolar Permit Form, Solar Systems Permit Checklist, Municode full-text search of Ch. 30/Ch. 10 for 'busbar' and 'service upgrade' — no Village-specific service-upgrade/busbar rule found beyond the general amperage-based PE-stamp trigger already recorded
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Yes, in unusual structural depth for a Florida municipality: the HVHZ Solar Permit Form itself specifies roof-top mounting bracket type (stand-off vs. support), mount-spacing in the field (P1) vs. perimeter (P2), support-mount height above the finished roof, number of fasteners per mount, minimum fastener embedment of 2.5 inches with a required pilot hole, total roof attachment points and calculated weight per attachment point, and (for rail systems) support-rail height above the roof and rail counts in field vs. perimeter zones.
Why the confidence is not higherRead directly from the Village's own current HVHZ Electronic Solar Permit Form, Page 2 of 3.
solar-specific permit form checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Permit%20Form.pdf
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
No fire-code ridge-setback or fire-access-pathway rule (in the NFPA/IFC 'access pathway' sense) was found in any Village document. The Village's Solar Permit Form does define wind-uplift PERIMETER zones (P2, P3) where panels/PVL modules may not be installed in roof corners — a structural/wind-uplift concept under RAS-127/128, distinct from a fire-access clearance requirement, and it is not labelled as one.
Why the confidence is not higherThe only roof-perimeter-clearance concept found is structural (wind uplift), not fire-access; recorded at low confidence as a partial, clearly-labelled non-answer rather than conflating the two concepts.
solar-specific permit form (partial/adjacent, not a direct answer) checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Permit%20Form.pdf
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Not named by edition. The Village's own Solar Systems Permit Checklist requires the electrical diagram to comply with 'NEC Article 690 Solar Photovoltaic Systems, in its entirety' — which would incorporate 690.12 rapid-shutdown by reference — but no document found states which NEC edition (i.e., which version of the 690.12 rapid-shutdown requirement) governs.
Why the confidence is not higherRapid shutdown is not named explicitly; inferred only from the 'NEC 690 in its entirety' clause in the Village's own checklist, with no stated edition year anywhere in Village material (see Q29).
solar-specific submittal checklist (inference) checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
The Village itself publishes no placard/label list for PV. At the utility level, FPL's own current Net Metering Guidelines require: (a) a warning sign at the meter noting the disconnect location (for Tier 2/3, where a disconnect is required) reading that both sides of the switch may be energized; and (b) for battery storage, a placard permanently affixed to the meter enclosure reading 'Battery storage utilized in this facility.'
Why the confidence is not higherThe Village's own solar documents are silent on placards; the FPL figures were fetched fresh today (not carried forward) from FPL's own current guidelines page, and are explicitly UTILITY-level, not authority-level.
utility's own published guidelines (utility-level, not Village) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Only the battery placard has fixed wording from FPL: 'Battery storage utilized in this facility.' No wording is specified for a general PV placard, at either the Village or FPL level.
Why the confidence is not higherSame FPL source as Q38, fetched fresh today; Village publishes no placard wording of its own.
utility's own published guidelines (utility-level, not Village) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
No letter height, colour, or material is specified by the Village or, per FPL's own current guidelines, by FPL either.
Why the confidence is not higherAbsence checked against both the Village's solar documents and FPL's current guidelines page (fetched today); neither specifies letter height/colour/material for any required sign or placard.
not_found (checked utility and Village) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSolar Permit Form, Solar Systems Permit Checklist, FPL Net Metering Guidelines — no site-plan/facility-map placard requirement found distinct from the design-submittal roof plan
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Yes — FPL requires its own placards/signage beyond anything the Village specifies: a disconnect-location warning sign (Tier 2/3 systems) and the battery-storage placard described in Q38/Q39, both from FPL's own current Net Metering Guidelines rather than from any Village document.
Why the confidence is not higherDirectly fetched from FPL's own current guidelines page today; the Village's own solar forms are silent on placards altogether, so the entire placard answer set sits at utility level for this authority.
utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q43 Where must the labels be placed? Core Labels Signage & labelling
Per FPL's own guidelines: the disconnect-warning sign is placed at/near the meter location alongside the disconnect switch; the battery placard is 'permanently affixed to the meter enclosure.' No placement instruction exists at the Village level.
Why the confidence is not higherDirect quotes from FPL's current guidelines, fetched today.
utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q44 Must equipment be on a specific approved list? Equipment listing
Yes — a Florida Solar Energy Center (FSEC) photovoltaic system certification/approval form is explicitly required for the proposed solar system (and separately for solar water heaters), per the Village's own Solar Systems Permit Checklist. UL 1703 module listing and UL 2703 racking listing are not named in the Village's own document but are the settled statewide/HVHZ standard (no HVHZ NOA category exists for PV modules or racking).
Why the confidence is not higherFSEC requirement is a direct quote from the Village's current checklist; the UL 1703/2703 detail is carried forward from this survey's settled HVHZ findings, not independently re-derived this run.
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Not addressed in any Village document found (no battery/ESS-specific permitting language in the Solar Permit Form, the Solar Systems Permit Checklist, or a Municode search for 'battery'/'energy storage'). At the utility level, FPL permits customer battery storage behind the meter subject to UL 1741 certification and the placard in Q39, and treats a stand-alone backup battery (no renewable generation, no export) as not requiring an interconnection agreement at all.
Why the confidence is not higherVillage silence confirmed by document review; the FPL detail is fresh from FPL's own guidelines today but is utility-level, not an authority answer.
utility's own published guidelines (utility-level; Village itself is silent) checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Nothing published by this authority.
Where we lookedSolar Permit Form, Solar Systems Permit Checklist, full 56-item Document Center forms list — no ESS-specific permit type or inspection found
https://www.keybiscayne.fl.gov/services/building_zoning_and_planning/resources/index.php
Q47 Is a ground mount treated as a structure? Core Ground mount
Nothing published by this authority.
Where we lookedChapter 30 zoning search results for 'solar' (2 hits, both roof/right-of-way screening) and 'ground mount' (0 hits) — genuinely silent on ground-mount classification
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Governed by FPL, not the Village. Per FPL's own current guidelines: Tier 1 (<=10 kW, the great majority of residential rooftop PV) has NO stated AC-disconnect requirement at all; Tier 2 (>10-100 kW) and Tier 3 (>100 kW-2,000 kW) require a manual, visible load-break-type disconnect switch mounted SEPARATE FROM BUT ADJACENT TO the FPL meter socket, always accessible to FPL, and capable of being locked in the open position with a single FPL padlock. No specific distance (e.g., FPL's often-cited 'within 10 feet') is stated on this particular current guidelines page — 'adjacent to' is the operative language.
Why the confidence is not higherFetched directly from FPL's own current Net Metering Guidelines page today, not carried forward from a prior run; the Village itself has no AC-disconnect rule of its own.
utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Through the Accela Citizen Access portal, which lists 'Schedule' as a top-level navigation item (inspection scheduling) alongside phone-based booking through the Building Department. 75% · permit portal
- Are same-day or AM/PM windows offered? No AM/PM windows are described; instead a fixed daily inspection window is posted: 'Inspections are daily from 10:30 a.m. to 2:00 p.m., except Friday with no Plumbing, Mechanical or Fire' inspections offered. 85% · permit portal banner
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes. Named, in-house Village staff perform the final inspection: a real, finaled solar permit (B20-024034, 235 Ridgewood Rd) shows every inspection (Notice of Commencement, Framing, Final Building) resulted, rescheduled, or approved by named Village employees — George Peon (Building Inspector) and Joseph Garcell (Chief Building Inspector) — with no third-party or delegated inspection agency appearing anywhere in the record. 92% · live permit portal record (inspection history)
- If delegated, to whom? N/A — not delegated; the Village's own Building Division performs the inspection (see Q52). 88% · live permit portal record
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? From a REAL, finaled residential solar permit pulled off the Village's own live public portal — B20-024034, Master Building Permit, 235 Ridgewood Rd, Key Biscayne, applicant Unlimited Solar Technology Corp (FL Electrical Lic. EC13009583), owner Massimo Grimaldi — the recorded inspection sequence was: Notice of Commencement -> Framing (structural/rough-in for the roof attachment) -> Final Building. (Framing and the first Notice of Commencement attempt were each rescheduled/cancelled once before being approved on 3/30/2021; Final Building was rejected twice — 4/30/2021 and 5/5/2021 — before final approval on 9/8/2021, at which point the record's overall status changed to 'Final.') This single master-permit record did not itself display a separate 'Final Electrical' inspection line, which may sit on a companion electrical sub-permit record not captured in this pull. 85% · live permit portal record (inspection history)
- Is a rough-in or mid-roof inspection required? Yes — the real permit reviewed for Q54 shows a 'Framing' inspection (structural rough-in for the roof/mounting) approved on 3/30/2021, prior to the Final Building inspection. 82% · live permit portal record (inspection history)
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? The Village's Solar Systems Permit Checklist functions primarily as a plan-submittal (design-review) checklist rather than a field-inspection checklist, but it is the closest thing to a published PV-specific checklist this authority has, and covers many items (roof clearance, penetration flashing, disclosure form, FSEC certification) that would also be verified at inspection. 60% · solar-specific submittal checklist
- What must be on site at inspection? Not stated specifically for solar. Village-wide, the general Building Permit Application warns: 'A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION,' and the Early Start Permitting Guidelines separately require the Early Start Permit card be 'post[ed] ... in a conspicuous place' when that optional program is used, with 'installation instructions corresponding to the Product Approval Specification Sheet' available to the inspector per the general SFR requirements. 62% · general permit application (not solar-specific)
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? Not a formal Certificate of Occupancy for a PV retrofit on an existing home — the record's own 'Record Status' field is what changes, from active/in-review states to 'Final,' once the Final Building inspection is approved. (The Village's fee schedule does list a distinct 'Certificate of Occupancy or Completion (CO or CC)' fee category, but that applies to new construction/additions, not evidently to a like-for-like PV retrofit.) 70% · live permit portal record
- Who notifies the utility for PTO? The customer/installer, not the Village. Per FPL's own current guidelines, once construction and inspection are complete the customer must submit to FPL a copy of the approved permit (or a screen print from the local portal) showing the inspection sign-off, the work description, address, permit number and building department name — after which FPL installs the required bi-directional meter; only then may the system operate in parallel/net-metered. 75% · utility's own published guidelines
- Is there a re-inspection fee? $82.50 per re-inspection (for disapproved work) or $82.50 per additional inspection of the same type for partial work. 90% · fee schedule
- How are corrections issued and cleared? Observed directly on a real permit: a rejected inspection (e.g., 'Rejected Final Building') is followed by a 'Rescheduled' entry for the same inspection type, and then a new attempt is logged until it is 'Approved.' On the sampled record, Final Building was rejected twice (4/30/2021, 5/5/2021), rescheduled each time (once by the contractor, 'unlimited solar technology,' and once by Village staff), before being approved on 9/8/2021. 75% · live permit portal record (inspection history)
14 questions answered against Village of Key Biscayne’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Through the Accela Citizen Access portal, which lists 'Schedule' as a top-level navigation item (inspection scheduling) alongside phone-based booking through the Building Department.
Why the confidence is not higherThe Village's live Accela portal exposes a 'Schedule' tab in its main navigation (Home / Search / Schedule) alongside a General Search of records; the Village's own home page separately gives a Building Department phone number (305-365-5512) for permitting/inspection questions.
permit portal checked 2026-09-12 https://aca-prod.accela.com/keybiscayne/Default.aspx
Q50 How much notice is required? Core Booking & scheduling
Nothing published by this authority.
Where we lookedAccela portal home page and Building Department contact/hours information — no stated inspection-notice lead time
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
No AM/PM windows are described; instead a fixed daily inspection window is posted: 'Inspections are daily from 10:30 a.m. to 2:00 p.m., except Friday with no Plumbing, Mechanical or Fire' inspections offered.
Why the confidence is not higherDirect quote from the Village's own current Accela portal home-page announcement.
permit portal banner checked 2026-09-12 https://aca-prod.accela.com/keybiscayne/Default.aspx
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes. Named, in-house Village staff perform the final inspection: a real, finaled solar permit (B20-024034, 235 Ridgewood Rd) shows every inspection (Notice of Commencement, Framing, Final Building) resulted, rescheduled, or approved by named Village employees — George Peon (Building Inspector) and Joseph Garcell (Chief Building Inspector) — with no third-party or delegated inspection agency appearing anywhere in the record.
Why the confidence is not higherDirectly observed on a real, live, public permit record in the Village's own Accela portal, not inferred from a staff-directory listing alone.
live permit portal record (inspection history) checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE&IsToShowInspection=
Q53 If delegated, to whom? Core Who inspects
N/A — not delegated; the Village's own Building Division performs the inspection (see Q52).
Why the confidence is not higherFollows directly from the real permit record reviewed for Q52, which shows no delegation.
live permit portal record checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE&IsToShowInspection=
Q54 Which inspections are required, and in what order? Core Stages & sequence
From a REAL, finaled residential solar permit pulled off the Village's own live public portal — B20-024034, Master Building Permit, 235 Ridgewood Rd, Key Biscayne, applicant Unlimited Solar Technology Corp (FL Electrical Lic. EC13009583), owner Massimo Grimaldi — the recorded inspection sequence was: Notice of Commencement -> Framing (structural/rough-in for the roof attachment) -> Final Building. (Framing and the first Notice of Commencement attempt were each rescheduled/cancelled once before being approved on 3/30/2021; Final Building was rejected twice — 4/30/2021 and 5/5/2021 — before final approval on 9/8/2021, at which point the record's overall status changed to 'Final.') This single master-permit record did not itself display a separate 'Final Electrical' inspection line, which may sit on a companion electrical sub-permit record not captured in this pull.
Why the confidence is not higherDirectly read from the Inspections tab of a real, live, public Accela permit record for this authority — genuine dated first-party evidence, the strongest form of evidence this survey collects for an inspection-sequence question, held below 95 only because a possible companion electrical-trade record was not separately located.
live permit portal record (inspection history) checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE&IsToShowInspection=
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Yes — the real permit reviewed for Q54 shows a 'Framing' inspection (structural rough-in for the roof/mounting) approved on 3/30/2021, prior to the Final Building inspection.
Why the confidence is not higherDirectly observed in the same live permit record's inspection history as Q54.
live permit portal record (inspection history) checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE&IsToShowInspection=
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedSolar Systems Permit Checklist (a submittal, not field, checklist) and the public inspection log on a real permit record (shows type/result/who/when only, not what was verified)
Q57 Is there a published inspection checklist? Core What is checked
The Village's Solar Systems Permit Checklist functions primarily as a plan-submittal (design-review) checklist rather than a field-inspection checklist, but it is the closest thing to a published PV-specific checklist this authority has, and covers many items (roof clearance, penetration flashing, disclosure form, FSEC certification) that would also be verified at inspection.
Why the confidence is not higherThe document exists and is current, but its own content and structure (organized as 'submit', 'provide', 'submit a complete...') identify it as a pre-permit submittal checklist rather than a day-of-inspection field checklist.
solar-specific submittal checklist checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Solar%20Systems%20Permit%20Checklist.pdf
Q58 What must be on site at inspection? Core Documents on site
Not stated specifically for solar. Village-wide, the general Building Permit Application warns: 'A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION,' and the Early Start Permitting Guidelines separately require the Early Start Permit card be 'post[ed] ... in a conspicuous place' when that optional program is used, with 'installation instructions corresponding to the Product Approval Specification Sheet' available to the inspector per the general SFR requirements.
Why the confidence is not higherThese are general (not solar-specific) Village-wide on-site document requirements, applied by inference to a solar job.
general permit application (not solar-specific) checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/Permit%20Application.pdf
Q59 Is there a re-inspection fee? Corrections & re-inspection
$82.50 per re-inspection (for disapproved work) or $82.50 per additional inspection of the same type for partial work.
Why the confidence is not higherDirect quote from the Village's own current fee schedule; not solar-specific but is the Village's general re-inspection fee applying to all trades.
fee schedule checked 2026-09-12 https://www.keybiscayne.fl.gov/Documents/Services/Building%20Zoning%20and%20Planning/Resources/Forms%202025/VKB%20Permit%20Fee%20Schedule.pdf
Q60 How are corrections issued and cleared? Corrections & re-inspection
Observed directly on a real permit: a rejected inspection (e.g., 'Rejected Final Building') is followed by a 'Rescheduled' entry for the same inspection type, and then a new attempt is logged until it is 'Approved.' On the sampled record, Final Building was rejected twice (4/30/2021, 5/5/2021), rescheduled each time (once by the contractor, 'unlimited solar technology,' and once by Village staff), before being approved on 9/8/2021.
Why the confidence is not higherDirectly observed workflow on a real, live permit record's inspection history; the underlying written correction-notice process itself (what a rejection notice contains) was not separately documented.
live permit portal record (inspection history) checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE&IsToShowInspection=
Q61 What is issued on pass? Core Final sign-off & PTO
Not a formal Certificate of Occupancy for a PV retrofit on an existing home — the record's own 'Record Status' field is what changes, from active/in-review states to 'Final,' once the Final Building inspection is approved. (The Village's fee schedule does list a distinct 'Certificate of Occupancy or Completion (CO or CC)' fee category, but that applies to new construction/additions, not evidently to a like-for-like PV retrofit.)
Why the confidence is not higherDirectly observed: the real sampled permit (B20-024034) shows 'Record Status: Final' as its own field, flipping to that state once Final Building was approved on 9/8/2021 — this is the closest first-party evidence of what 'passing' produces for this record type.
live permit portal record checked 2026-09-12 https://aca-prod.accela.com/KEYBISCAYNE/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=002F6&agencyCode=KEYBISCAYNE&IsToShowInspection=
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
The customer/installer, not the Village. Per FPL's own current guidelines, once construction and inspection are complete the customer must submit to FPL a copy of the approved permit (or a screen print from the local portal) showing the inspection sign-off, the work description, address, permit number and building department name — after which FPL installs the required bi-directional meter; only then may the system operate in parallel/net-metered.
Why the confidence is not higherDirectly quoted from FPL's own current Net Metering Guidelines, fetched today; the Village's own material never states that it notifies the utility, consistent with the customer-driven process FPL describes.
utility's own published guidelines checked 2026-09-12 https://www.fpl.com/clean-energy/net-metering/guidelines.html
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording 65%
Only the battery placard has fixed wording from FPL: 'Battery storage utilized in this facility.' No wording is specified for a general PV placard, at either the Village or FPL level.
Size, colour & material 55%
No letter height, colour, or material is specified by the Village or, per FPL's own current guidelines, by FPL either.
Where they go 72%
Per FPL's own guidelines: the disconnect-warning sign is placed at/near the meter location alongside the disconnect switch; the battery placard is 'permanently affixed to the meter enclosure.' No placement instruction exists at the Village level.
What the utility wants on top 75%
Yes — FPL requires its own placards/signage beyond anything the Village specifies: a disconnect-location warning sign (Tier 2/3 systems) and the battery-storage placard described in Q38/Q39, both from FPL's own current Net Metering Guidelines rather than from any Village document.
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.