Village of Miami Shores
Village of Miami Shores
Miami-Dade County
Village of Miami Shores is a village authority in the State of Florida, serving 11,567 residents. This page is the permit route for that jurisdiction: the fifteen steps from working out who has a say over an address through to permission to operate, the documents this authority publishes, and 62 answers taken from those documents and dated.
Jurisdiction & key facts
The standing 62-question set, answered for Village of Miami Shores against this authority’s own published documents. Every answer carries the confidence it was recorded at and the document it came from. Where nothing is published we say so and show where we looked — a blank here is a finding, not a gap.
Village of Miami Shores is the authority having jurisdiction 88% confidence
- Holds
- Building, Electrical, Plumbing, Mechanical, Roofing and a dedicated 'Solar' permit category, all administered in-house by the Village's own Building Department (Director Ismael Naranjo, CBO; msvfl.gov email/phone, not a private firm). Confirmed not only from the Department's own pages but from a REAL, currently-open-portal solar permit (SUN-11-24-2885, 'Installation of Rooftop Photovoltaic', $49,529 valuation) whose workflow was Plan Review -> Confirm application complete -> Issue Permit -> Framing -> Electrical-Residential -> Electrical Final, assigned throughout to a named Village staff member ('Yao, Kristine'), with fee lines for both a 'Planning and Zoning Review Fee' ($70) and a 'Structural Review' fee ($60) — i.e. Planning & Zoning and structural review are folded into the same in-house solar permit, not spun out to another agency. Fire protection is NOT a Village function at all: the Village's own department directory (msvfl.gov/departments) lists Building, Business, Code Compliance, Communications, Finance, HR, IT, Library, Parks & Rec, Planning & Zoning, Procurement, Public Works, Sustainability, Village Clerk and Village Manager — no Fire Department, and no page for one exists anywhere in the Village's ~1,400-URL sitemap. This almost certainly means fire coverage is Miami-Dade Fire Rescue county-wide service (confirmed pattern for many small Miami-Dade municipalities elsewhere in this survey), but no interlocal agreement specifically naming Miami Shores was located this run — recorded as circumstantial, not confirmed.
- Overridden by
- FL PSC Rule 25-6.065 requires the interconnecting utility (FPL, see Q22) to hold energization until the Village's own inspection and approval is complete — the AHJ gates the utility, not the reverse. FS 471.003(2)(h) sets a statewide PE-stamp exemption floor ($125,000 value / 600A residential) for electrical work by a licensed contractor, but Miami Shores' OWN Solar Submittal Checklist requires 'Original Signed & Sealed Architectural Plans' unconditionally for every solar Master permit regardless of valuation — a Village requirement that is STRICTER than the state floor (see Q13).
- Why not higher
- Primary sources are the Village's own Building Department web pages (About/FAQ/Forms/Contractor Registration/Inspections), its own 'MSV 2025 Solar Panel Permit Requirements' checklist PDF (internal creation date 20 Feb 2025 per Bluebeam metadata), its Code of Ordinances Ch. 6 (Buildings) and Ch. 11 (Historic Preservation) on Municode (clientId 10633, positive control 'electrical' returned multiple hits, fabricated control 'zzqqx' returned zero — search verified live), and one real, currently retrievable solar permit record pulled directly from the Village's own Tyler EnerGov Citizen Self-Service portal. Held below 95 only because the Fire-service delegation to Miami-Dade Fire Rescue is inferred from the ABSENCE of a Village fire department rather than from a located interlocal agreement, and because the exact FBC/NEC edition the Village currently enforces could not be pinned to a stated year (see Q29/Q30 — the code's own adopting clause, Sec. 6-1, still names the 'South Florida Building Code', repealed statewide in 2002 — a fossil-base-floating-forward staleness case).
https://www.msvfl.gov/departments/buildingdepartment/aboutthebuildingdepartment
- Permit required
- Yes.95%
- Permit cost
- $1,846.61 total on a real $49,529-valuation rooftop-PV job (permit SUN-11-24-2885): Permit Fee (Manual) $1,435.87; Technology Fee (Manual) $148.59; Planning and Zoning Review Fee $70.00;92%
- Plan review
- Per the FAQ: most permits process in 5-10 business days; residential addition/remodel applications get a 15-business-day completeness review, then a further 10 business days of plan review.70%
- Portal
- Tyler Technologies EnerGov, branded 'Citizen Self-Service (CSS)', at villageofmiamishoresfl-energovweb.tylerhost.net.92%
- Booking an inspection
- Via the online CSS/EnerGov portal, or by phone (305-795-2204).85%
Permitting 5 steps · 28 questions
Whether a permit is needed — Yes. Q3 Electrical and building permits — Solar is its own dedicated Master permit type in the Village's system (not a generic 'Electrical' permit and not folded into 'Building'). Q4 Plan review — Per the FAQ: most permits process in 5-10 business days; residential addition/remodel applications get a 15-business-day completeness review, Q18 Where you file — Tyler Technologies EnerGov, branded 'Citizen Self-Service (CSS)', at villageofmiamishoresfl-energovweb.tylerhost.net. Q20
- Permit required
- Yes.95% source
- What it costs
- $1,846.61 total on a real $49,529-valuation rooftop-PV job (permit SUN-11-24-2885): Permit Fee (Manual) $1,435.87; Technology Fee (Manual) $148.59; Planning and Zoning Review Fee $70.00;92% source
- Plan review turnaround
- Per the FAQ: most permits process in 5-10 business days; residential addition/remodel applications get a 15-business-day completeness review, then a further 10 business days of plan review.70% source
- Key document
- City solar checklist, diffed against sibling permit documents cited by 7 open the document
-
Confirm who has a say over your address
A city address is usually permitted by the city, not the county — but not always, and some authorities keep building and hand electrical to someone else. Getting this wrong costs the whole submittal, because every requirement below belongs to whoever actually holds jurisdiction. Check the overlays in the same pass: an HOA, a historic district, a windstorm certification or a system-size cap can reshape the design, and all of them are cheaper to find now than after the array is laid out.
- Is this authority the AHJ for residential solar at this address? Yes. The Village's own Building Department administers and enforces permitting/inspection for residential rooftop PV inside Village limits; a real solar permit (SUN-11-24-2885) was issued, reviewed, inspected and finalized entirely by Village staff. 90% · department FAQ + real permit record
- What does this authority permit itself, and what does it delegate? The Village permits and inspects Building, Electrical, Plumbing, Mechanical and Roofing itself, plus a dedicated 'Solar' permit type/category of its own (confirmed in the live EnerGov portal, permit numbers prefixed 'SUN-'). Nothing is delegated to Miami-Dade County for work inside Village limits. 88% · building permit application + live portal record
- Is a permit required for a residential rooftop PV system? Yes. 95% · department FAQ
- Is there a separate electrical permit, or is it combined? Solar is its own dedicated Master permit type in the Village's system (not a generic 'Electrical' permit and not folded into 'Building'). The Village's own Solar Submittal Checklist states: 'When applying online, the Master or Sub permit category will always be: Solar.' Depending on which trade holds the Master, Electrical/Roofing/Building sub-permits are then pulled by the counterpart contractor(s). 88% · City solar checklist + live portal record
- Is there a historic-district review? YES, but only for individually-designated 'historic landmark' properties or contributing buildings within a designated historic district — Ch. 11 (Historic Preservation) requires a Certificate of Appropriateness (COA) from the 5-member Historic Preservation Board before any exterior alteration/addition to a designated property (Sec. 11-6), and a rooftop PV array would be an exterior alteration. There are currently 'over forty' individually-designated historic homes in the Village (per the Board's own page); no Village-wide historic district exists as far as located. Ch. 11 NEVER mentions 'solar' by name in either direction — no solar-specific requirement and no solar-specific exemption. Design guidance is NOT a separate locally-authored PDF: Sec. 11-4(f) instead directs the Board to use the national 'Secretary of the Interior's Standards for the Treatment of Historic Properties, and Guidelines for Rehabilitating Historic Buildings' as its basis — an externally-authored federal document adopted by reference, not a Village guidelines PDF. The Board 'shall meet as needed... after receipt... of an application for a certificate of appropriateness' (Sec. 11-4(e)) — confirmed on the Board's own webpage ('Please view the calendar for meeting dates'), i.e. NO fixed monthly cadence and NO codified submission deadline (unlike the 45-day-deadline board found elsewhere in this survey). The Board's outside planning liaison is 'Corradino Group' (private planning consultancy), per the Board's own webpage. A COA denial IS appealable to Council, and approval carries a mandatory 10-working-day delay before work may start (Sec. 11-7(a)(3)). 85% · Code of Ordinances Ch. 11 + Board webpage
- Is a wind or windstorm certification required? Not named for PV specifically, but the Village's own Roof Permit Checklist and its HVHZ Uniform Roofing Application (Miami-Dade County form, FBC 8th Ed. 2023) require RAS 127 (steep-slope) or RAS 128 (low-slope) design-pressure calculations and Florida/Miami-Dade Product Approval for any roof system component — the same prescriptive uplift-table regime this survey's settled HVHZ findings identify as the path for PV racking (alongside UL 2703 and FSEC/PE certification). Miami Shores' own checklist even asks whether an existing rooftop solar system will be reinstalled as part of a reroof. 68% · City roofing/HVHZ checklist (analogous, not solar-specific)
-
Check who is allowed to apply
Several authorities require the electrical permit to be pulled by a licensed electrician, or require the contractor to be registered with them BEFORE applying. Registration is not same-day. This is second on the list rather than fourth because it is the step most likely to stop the job before the drawings matter.
- Who is allowed to pull the electrical permit? A licensed contractor pulls the solar permit — either a CGC/general-building-type contractor (who then requires an electrical subcontractor) or a licensed electrical contractor (who then requires either a solar subcontractor OR a paired roofing+building subcontractor). 'A separate permit application must be made for each contractor.' 85% · City solar checklist
- Must the contractor be registered with this authority before applying? Yes. 90% · department page
- Is a homeowner permitted to self-install and self-permit? Ambiguous, leaning NO for solar specifically. The Village does publish a generic 'Owner Builder Disclosure Statement' implementing the statewide FS 489.103(7) exemption for a one/two-family owner-occupied residence, usable across permit types generally. But the Solar Submittal Checklist's own 'Contractor Requirements' section names only two licensed-contractor Master/Sub combinations and never mentions an owner-pulled path — an omission, not a stated prohibition. 58% · diff of City solar checklist vs. City owner-builder form
-
Build the submittal package
Almost everywhere wants a site plan, a one-line or three-line electrical diagram, equipment cut sheets with listings, and a structural attachment detail. Build it against the published checklist rather than the last jurisdiction you worked in — the checklist is what the reviewer marks against.
- What documents make up a complete submittal? Per the Village's own Solar Submittal Checklist, uploaded into the Master ('Solar') permit: (1) Completed Permit Application (sub-permits applied for separately by each sub-contractor); (2) Original Signed & Sealed Architectural Plans; (3) a notarized 'Property Owner Solar Systems Disclosure Form' (acknowledging roof-penetration/warranty impacts). 90% · City solar checklist
- How many copies, and in what format? Electronic, via the Citizen Self-Service (Tyler EnerGov) portal. General guidance city-wide: 'All permit applications must include two copies of submittal documents' (paper-era language retained on the About page), but the Public Notice page's current portal-submission rules require Chrome, single-layer (flattened) unencrypted PDFs, no Adobe Portfolio files, and a discipline-code-first file-naming convention (e.g. 'A-101'). 75% · department page
- Is a site plan required, and what must it show? Not published as a PV-specific requirement. The general framework (Sec. 6-5) requires a registered land surveyor's certificate/plan for new structures, additions, or building moves; the Solar Submittal Checklist itself does not list a site plan among its 3 required uploads. 55% · Code of Ordinances
- Is a one-line / three-line diagram required? Not found. Not named in the Village's Solar Submittal Checklist itself. 45% · City solar checklist (absence)
- Are string and conductor calculations required? Not found. Not named in the Village's Solar Submittal Checklist. 45% · City solar checklist (absence)
- Is a structural PE stamp required, and at what threshold? Yes, and UNCONDITIONALLY — the standout finding of this run. The Solar Submittal Checklist requires 'Original Signed & Sealed Architectural Plans' for every solar Master permit with no valuation or size threshold stated, unlike the general Building Permit Application (which has an optional, blank-able 'Architect/Engineer' field) and unlike the statewide PE exemption floor (FS 471.003(2)(h), $125,000/600A). This is the same 'solar checklist differs from its siblings ONLY by adding an unconditional sealed-plans requirement' pattern seen once before in this survey (Palmetto). 88% · City solar checklist, diffed against sibling permit documents
- Is an electrical PE stamp required, and at what threshold? State floor only: FS 471.003(2)(h) exempts a licensed electrical contractor from a PE stamp where electrical system value is $125,000 or less and aggregate service capacity is 600A (240V) or less, residential. The Village's own solar checklist requires a sealed 'architectural' (not explicitly electrical) plan set unconditionally (see Q13); whether that seal must be an electrical PE's specifically, versus an architect's/structural engineer's, is not stated. 60% · Florida Statute (state floor)
-
Apply and pay
Most authorities now take the whole application through a portal, and several states cap or constrain what a residential solar permit may cost. Check whether plan check is billed separately before you quote the job.
- Which permit portal does this authority use? Tyler Technologies EnerGov, branded 'Citizen Self-Service (CSS)', at villageofmiamishoresfl-energovweb.tylerhost.net. 92% · live permit portal
- Can the whole application be completed online? Yes — application, document upload, fee payment, inspection scheduling and status/result viewing are all available online through the CSS portal; a real permit sampled was itself labeled 'Project Name: ONLINE PERMITS'. 88% · department page + real permit record
- What does a residential solar permit cost? $1,846.61 total on a real $49,529-valuation rooftop-PV job (permit SUN-11-24-2885): Permit Fee (Manual) $1,435.87; Technology Fee (Manual) $148.59; Planning and Zoning Review Fee $70.00; Structural Review $60.00; Application Fee - Other $50.00; CCF $30.00; DBPR Fee $22.29; DCA Fee $14.86; Education Surcharge $15.00. 92% · real permit fee ledger (live portal)
- How is the fee calculated? Primarily valuation-based ('Permit Fee (Manual)' was ~2.9% of the $49,529 valuation on the sampled permit), plus a menu of flat administrative fees (Application, CCF, DBPR, DCA, Education Surcharge, Technology) and flat review fees (Planning & Zoning $70, Structural $60). The Code itself (Sec. 6-7) does not print a formula — it delegates fee-setting to Council resolution, which is why the ledger shows 'Manual' fee entries rather than an auto-computed line. 78% · Code of Ordinances + real fee ledger
- Is there a separate plan-check fee? Yes — a $70 'Planning and Zoning Review Fee' and a $60 'Structural Review' fee both appear as line items separate from the base 'Permit Fee' on the sampled real solar permit. 85% · real permit fee ledger
-
Plan review — and start the utility in parallel
Interconnection is a separate process from the permit and usually the longer pole. Where the utility does not depend on the permit being issued, running both at once is the single biggest saving available on a residential job.
- What is the stated plan-review turnaround? Per the FAQ: most permits process in 5-10 business days; residential addition/remodel applications get a 15-business-day completeness review, then a further 10 business days of plan review. In practice, the sampled real solar permit took from Applied (11/13/24) to Plan-Review-Passed (11/24/24) — about 8 business days — but was not Issued until 01/14/25, a ~9-week gap the FAQ figures do not explain (likely holiday/administrative delay, not read from any document). 70% · department FAQ + real permit timestamps
- How long is an issued permit valid before it expires? 180 days from issuance; a passed inspection extends validity another 180 days. No activity (no approved inspection) for 180 days makes the permit invalid, requiring reapplication and a new fee. 90% · department FAQ
- Which utility handles interconnection here? Florida Power & Light (FPL). 78% · Code of Ordinances (incidental utility-pole naming)
- Where does the utility sit in the sequence? After permit — FPL, as an investor-owned utility, is state-floor-required not to allow parallel operation until local code officials have inspected and approved the system. 65% · Florida Administrative Code rule text (state floor)
28 questions answered against Village of Miami Shores’s own published documents
Q1 Is this authority the AHJ for residential solar at this address? Core Jurisdiction & scope
Yes. The Village's own Building Department administers and enforces permitting/inspection for residential rooftop PV inside Village limits; a real solar permit (SUN-11-24-2885) was issued, reviewed, inspected and finalized entirely by Village staff.
Why the confidence is not higherDirectly confirmed by a real permit record pulled from the Village's own EnerGov portal plus the Building Department's own FAQ, which lists 'solar panels' among the work types requiring a Village permit.
department FAQ + real permit record checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/buildingdepartmentfaq
Q2 What does this authority permit itself, and what does it delegate? Core Jurisdiction & scope
The Village permits and inspects Building, Electrical, Plumbing, Mechanical and Roofing itself, plus a dedicated 'Solar' permit type/category of its own (confirmed in the live EnerGov portal, permit numbers prefixed 'SUN-'). Nothing is delegated to Miami-Dade County for work inside Village limits.
Why the confidence is not higherThe general Building Permit Application form (rev. 4/5/2022) has checkboxes for Building/Electric/Roofing/Plumbing/Mechanical/Revision/Extension/Renewal/Change of Contractor, all processed by 'Miami Shores Village Building Department'; separately, the live portal's own record for a real solar job shows Type='Solar' with permit number format 'SUN-##-##-####', its own workflow, and Village staff assignment — i.e. Solar is its own first-class permit category, not merely folded into 'Electrical'.
building permit application + live portal record checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%20PERMIT%20APPLICATION%202022.pdf
Q3 Is a permit required for a residential rooftop PV system? Core Jurisdiction & scope
Yes.
Why the confidence is not higherThe Building Department's own FAQ states verbatim that a permit is required for '...re-roofs, solar panels, basement finishes, fireplaces, electrical service upgrades...' among other listed work types.
department FAQ checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/buildingdepartmentfaq
Q4 Is there a separate electrical permit, or is it combined? Core Jurisdiction & scope
Solar is its own dedicated Master permit type in the Village's system (not a generic 'Electrical' permit and not folded into 'Building'). The Village's own Solar Submittal Checklist states: 'When applying online, the Master or Sub permit category will always be: Solar.' Depending on which trade holds the Master, Electrical/Roofing/Building sub-permits are then pulled by the counterpart contractor(s).
Why the confidence is not higherQuoted directly from the Village's own 2-page Solar Submittal Checklist (internal creation date 20 Feb 2025) and corroborated by a real live-portal permit record whose Type field reads 'Solar' with a 'SUN-' permit-number prefix distinct from the 'ELEC-' prefix used elsewhere in this survey's other Tyler EnerGov cities.
City solar checklist + live portal record checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q5 Who is allowed to pull the electrical permit? Core Who may apply
A licensed contractor pulls the solar permit — either a CGC/general-building-type contractor (who then requires an electrical subcontractor) or a licensed electrical contractor (who then requires either a solar subcontractor OR a paired roofing+building subcontractor). 'A separate permit application must be made for each contractor.'
Why the confidence is not higherQuoted/paraphrased directly from the Village's own Solar Submittal Checklist's 'Contractor Requirements' section, which lays out the only two Master/Sub licensing combinations the Village accepts for a solar job.
City solar checklist checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q6 Must the contractor be registered with this authority before applying? Core Who may apply
Yes.
Why the confidence is not higherThe Contractor's Registration page states the Building Department maintains contractor license/insurance on file ($50 initial, $30/yr) via the Citizen Self-Service portal, and both the Inspections page and Building FAQ condition inspection scheduling on 'up-to-date license and insurances' being on file with the Village.
department page checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/contractorregistration
Q7 Is a homeowner permitted to self-install and self-permit? Who may apply
Ambiguous, leaning NO for solar specifically. The Village does publish a generic 'Owner Builder Disclosure Statement' implementing the statewide FS 489.103(7) exemption for a one/two-family owner-occupied residence, usable across permit types generally. But the Solar Submittal Checklist's own 'Contractor Requirements' section names only two licensed-contractor Master/Sub combinations and never mentions an owner-pulled path — an omission, not a stated prohibition.
Why the confidence is not higherInference from silence: the City's generic Owner-Builder form (2014, unchanged) exists and is not restricted by trade in its own text, but the solar-specific checklist (2025) lists contractor-only licensing combinations with no owner option — the same 'silent removal of the owner-builder alternative' pattern this survey has found on a sibling solar checklist elsewhere (Orange City). Not a confirmed prohibition, so held below 60.
diff of City solar checklist vs. City owner-builder form checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q8 What documents make up a complete submittal? Core Submittal package
Per the Village's own Solar Submittal Checklist, uploaded into the Master ('Solar') permit: (1) Completed Permit Application (sub-permits applied for separately by each sub-contractor); (2) Original Signed & Sealed Architectural Plans; (3) a notarized 'Property Owner Solar Systems Disclosure Form' (acknowledging roof-penetration/warranty impacts).
Why the confidence is not higherThis is a dedicated, current (Feb 2025) Village document naming exactly these three items — the richest primary source in this file.
City solar checklist checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q9 How many copies, and in what format? Submittal package
Electronic, via the Citizen Self-Service (Tyler EnerGov) portal. General guidance city-wide: 'All permit applications must include two copies of submittal documents' (paper-era language retained on the About page), but the Public Notice page's current portal-submission rules require Chrome, single-layer (flattened) unencrypted PDFs, no Adobe Portfolio files, and a discipline-code-first file-naming convention (e.g. 'A-101').
Why the confidence is not higherCombines the About page's 'two copies' statement (may be a holdover from pre-portal practice) with the Public Notice page's detailed, clearly current electronic-submission formatting rules.
department page checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/publicnotice
Q10 Is a site plan required, and what must it show? Core Submittal package
Not published as a PV-specific requirement. The general framework (Sec. 6-5) requires a registered land surveyor's certificate/plan for new structures, additions, or building moves; the Solar Submittal Checklist itself does not list a site plan among its 3 required uploads.
Why the confidence is not higherSec. 6-5 is the City's general survey/site-plan statute; the Solar Checklist's own upload list (Q8) has no site-plan line item, so this is inference from a general provision, not a solar-specific confirmation.
Code of Ordinances checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH6BUBURE_S6-12THFLBUCOREISHEAMFOTEAM
Q11 Is a one-line / three-line diagram required? Core Drawings & calculations
Not found. Not named in the Village's Solar Submittal Checklist itself.
Why the confidence is not higherThis is a real absence in the current (Feb 2025) dedicated solar document — worth noting because sibling authorities in this survey have this drawing named in their solar-specific checklist and this one does not.
City solar checklist (absence) checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q12 Are string and conductor calculations required? Drawings & calculations
Not found. Not named in the Village's Solar Submittal Checklist.
Why the confidence is not higherSame document checked for Q11; no string/conductor calculation requirement is named anywhere in the 2-page checklist.
City solar checklist (absence) checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q13 Is a structural PE stamp required, and at what threshold? Core Engineering & stamps
Yes, and UNCONDITIONALLY — the standout finding of this run. The Solar Submittal Checklist requires 'Original Signed & Sealed Architectural Plans' for every solar Master permit with no valuation or size threshold stated, unlike the general Building Permit Application (which has an optional, blank-able 'Architect/Engineer' field) and unlike the statewide PE exemption floor (FS 471.003(2)(h), $125,000/600A). This is the same 'solar checklist differs from its siblings ONLY by adding an unconditional sealed-plans requirement' pattern seen once before in this survey (Palmetto).
Why the confidence is not higherDirect textual diff between the Village's own current Solar Checklist (unconditional 'signed & sealed' requirement) and its own general Building Permit Application (optional designer field, no unconditional-seal language) and Roof Permit Checklist (relies on Product Approval + RAS calcs, not an unconditional architectural seal).
City solar checklist, diffed against sibling permit documents checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q14 Is an electrical PE stamp required, and at what threshold? Engineering & stamps
State floor only: FS 471.003(2)(h) exempts a licensed electrical contractor from a PE stamp where electrical system value is $125,000 or less and aggregate service capacity is 600A (240V) or less, residential. The Village's own solar checklist requires a sealed 'architectural' (not explicitly electrical) plan set unconditionally (see Q13); whether that seal must be an electrical PE's specifically, versus an architect's/structural engineer's, is not stated.
Why the confidence is not higherState statute cited directly; the Village document uses the word 'Architectural' rather than 'Electrical' for the sealed-plans requirement, so it is not a confirmed local electrical-PE threshold — held at moderate confidence.
Florida Statute (state floor) checked 2026-09-13 http://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0471/Sections/0471.003.html
Q15 What does a residential solar permit cost? Core Fees
$1,846.61 total on a real $49,529-valuation rooftop-PV job (permit SUN-11-24-2885): Permit Fee (Manual) $1,435.87; Technology Fee (Manual) $148.59; Planning and Zoning Review Fee $70.00; Structural Review $60.00; Application Fee - Other $50.00; CCF $30.00; DBPR Fee $22.29; DCA Fee $14.86; Education Surcharge $15.00.
Why the confidence is not higherPulled directly from the 'Fees' tab of a real, closed/finalized solar permit on the Village's own live Tyler EnerGov Citizen Self-Service portal — this is an actual transaction ledger, not a published schedule.
real permit fee ledger (live portal) checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda?tab=fees
Q16 How is the fee calculated? Core Fees
Primarily valuation-based ('Permit Fee (Manual)' was ~2.9% of the $49,529 valuation on the sampled permit), plus a menu of flat administrative fees (Application, CCF, DBPR, DCA, Education Surcharge, Technology) and flat review fees (Planning & Zoning $70, Structural $60). The Code itself (Sec. 6-7) does not print a formula — it delegates fee-setting to Council resolution, which is why the ledger shows 'Manual' fee entries rather than an auto-computed line.
Why the confidence is not higherSec. 6-7 explicitly authorizes the Council to set/amend fees by resolution following public hearing, rather than printing a formula in the code itself; the 'Manual' fee labels on the real permit's ledger corroborate that fee amounts are calculated by staff rather than a published table.
Code of Ordinances + real fee ledger checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH6BUBURE_S6-12THFLBUCOREISHEAMFOTEAM
Q17 Is there a separate plan-check fee? Fees
Yes — a $70 'Planning and Zoning Review Fee' and a $60 'Structural Review' fee both appear as line items separate from the base 'Permit Fee' on the sampled real solar permit.
Why the confidence is not higherDirectly itemized on the real permit's fee ledger.
real permit fee ledger checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda?tab=fees
Q18 What is the stated plan-review turnaround? Core Timeline & validity
Per the FAQ: most permits process in 5-10 business days; residential addition/remodel applications get a 15-business-day completeness review, then a further 10 business days of plan review. In practice, the sampled real solar permit took from Applied (11/13/24) to Plan-Review-Passed (11/24/24) — about 8 business days — but was not Issued until 01/14/25, a ~9-week gap the FAQ figures do not explain (likely holiday/administrative delay, not read from any document).
Why the confidence is not higherFAQ figures are the Village's own stated turnaround; the real permit's actual elapsed time is longer than the FAQ implies, which is worth flagging as a discrepancy between policy and one observed case rather than proof of a longer standard timeline.
department FAQ + real permit timestamps checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/buildingdepartmentfaq
Q19 How long is an issued permit valid before it expires? Timeline & validity
180 days from issuance; a passed inspection extends validity another 180 days. No activity (no approved inspection) for 180 days makes the permit invalid, requiring reapplication and a new fee.
Why the confidence is not higherStated verbatim in the Building Department FAQ.
department FAQ checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/buildingdepartmentfaq
Q20 Which permit portal does this authority use? Core Portal & process
Tyler Technologies EnerGov, branded 'Citizen Self-Service (CSS)', at villageofmiamishoresfl-energovweb.tylerhost.net.
Why the confidence is not higherConfirmed both from Building Department page links and directly by successfully searching and opening a real permit record on the live portal.
live permit portal checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/home
Q21 Can the whole application be completed online? Core Portal & process
Yes — application, document upload, fee payment, inspection scheduling and status/result viewing are all available online through the CSS portal; a real permit sampled was itself labeled 'Project Name: ONLINE PERMITS'.
Why the confidence is not higherConfirmed by the About page's description of portal capability and directly by the sampled real permit's own 'ONLINE PERMITS' project label.
department page + real permit record checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/aboutthebuildingdepartment
Q22 Which utility handles interconnection here? Core Utility interconnection
Florida Power & Light (FPL).
Why the confidence is not higherNo electric franchise chapter is codified in the Village's Code at all (only a Telecommunications Franchising chapter, Ch. 22, exists) — a 'no franchise, no company named' Public Service Tax situation (Sec. 21-31, Ch. 21 Art. III, taxes 'purchases of electricity' without naming a seller). Direct corroboration instead comes from the Village's own Wireless/Antenna Towers ordinance (Sec. 22-41), which names 'Florida Power and Light pole' among existing utility poles in the Village right-of-way. No competing utility is named anywhere in the Village's code. PowerToChoose was NOT used as a source per this brief's standing caution.
Code of Ordinances (incidental utility-pole naming) checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH6BUBURE_S6-12THFLBUCOREISHEAMFOTEAM
Q23 Where does the utility sit in the sequence? Core Utility interconnection
After permit — FPL, as an investor-owned utility, is state-floor-required not to allow parallel operation until local code officials have inspected and approved the system.
Why the confidence is not higherSourced to FL PSC Rule 25-6.065(5)(a), the statewide floor applicable to all investor-owned utilities including FPL; the Village's own material does not separately address interconnection sequencing.
Florida Administrative Code rule text (state floor) checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Q24 Is a HOA or architectural approval required first? Overlays & special cases
Nothing published by this authority.
Where we lookedGeneral Building Permit Application PDF (full text read), Solar Submittal Checklist (full text read), Zoning Appendix A search for 'homeowners association' terms — no HOA/deed-restriction disclaimer or precondition language located anywhere in Village material
https://www.msvfl.gov/media/Building/Forms/MSV%20PERMIT%20APPLICATION%202022.pdf
Q25 Is there a historic-district review? Overlays & special cases
YES, but only for individually-designated 'historic landmark' properties or contributing buildings within a designated historic district — Ch. 11 (Historic Preservation) requires a Certificate of Appropriateness (COA) from the 5-member Historic Preservation Board before any exterior alteration/addition to a designated property (Sec. 11-6), and a rooftop PV array would be an exterior alteration. There are currently 'over forty' individually-designated historic homes in the Village (per the Board's own page); no Village-wide historic district exists as far as located. Ch. 11 NEVER mentions 'solar' by name in either direction — no solar-specific requirement and no solar-specific exemption. Design guidance is NOT a separate locally-authored PDF: Sec. 11-4(f) instead directs the Board to use the national 'Secretary of the Interior's Standards for the Treatment of Historic Properties, and Guidelines for Rehabilitating Historic Buildings' as its basis — an externally-authored federal document adopted by reference, not a Village guidelines PDF. The Board 'shall meet as needed... after receipt... of an application for a certificate of appropriateness' (Sec. 11-4(e)) — confirmed on the Board's own webpage ('Please view the calendar for meeting dates'), i.e. NO fixed monthly cadence and NO codified submission deadline (unlike the 45-day-deadline board found elsewhere in this survey). The Board's outside planning liaison is 'Corradino Group' (private planning consultancy), per the Board's own webpage. A COA denial IS appealable to Council, and approval carries a mandatory 10-working-day delay before work may start (Sec. 11-7(a)(3)).
Why the confidence is not higherDirectly sourced to Ch. 11 of the Village's own Code of Ordinances (current through Ordinance 2026-05, amending Ch. 11 itself, so this is live text) plus the Historic Preservation Board's own webpage for the '40+ homes' figure, meeting-cadence language, and the Corradino Group liaison detail. A code-wide search for 'solar' (with passing positive/fabricated controls) confirms it is never named in Ch. 11 or anywhere else in the code except an unrelated roof-reflectance (cool-roof) provision.
Code of Ordinances Ch. 11 + Board webpage checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH11HIPR_S11-7APCEAPALDEHILABU
Q26 Is a wind or windstorm certification required? Overlays & special cases
Not named for PV specifically, but the Village's own Roof Permit Checklist and its HVHZ Uniform Roofing Application (Miami-Dade County form, FBC 8th Ed. 2023) require RAS 127 (steep-slope) or RAS 128 (low-slope) design-pressure calculations and Florida/Miami-Dade Product Approval for any roof system component — the same prescriptive uplift-table regime this survey's settled HVHZ findings identify as the path for PV racking (alongside UL 2703 and FSEC/PE certification). Miami Shores' own checklist even asks whether an existing rooftop solar system will be reinstalled as part of a reroof.
Why the confidence is not higherDirectly sourced to the Village's own current (rev. 4/6/2026) Roof Permit Checklist and HVHZ Uniform Roofing Application PDF, which is generic to roofing, not solar-specific — the PV-racking-under-HVHZ link is this survey's settled cross-authority finding, not independently re-derived from a Miami Shores solar-specific document this run.
City roofing/HVHZ checklist (analogous, not solar-specific) checked 2026-09-13 https://www.msvfl.gov/media/MSV-Roofing-Permit-Package-2023-Code.pdf
Q27 Is a Specific Use Permit or Council approval ever required? Overlays & special cases
Nothing published by this authority.
Where we lookedBuilding Forms page (full ~50-item document list read), Zoning Appendix A search for 'Specific Use Permit' — no SUP/Council-approval track found for residential solar
https://www.msvfl.gov/departments/buildingdepartment/buildingforms
Q28 Is there a system-size cap on residential generation? Overlays & special cases
Nothing published by this authority.
Where we lookedCode-wide Municode search for 'photovoltaic' (zero hits, positive control 'electrical' passed same session, fabricated control 'zzqqx' returned zero) — Ordinance 2024-06 affirmatively removed prior solar provisions from Sec. 6-4 as 'obsolete'
https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Install 5 steps · 20 questions
-
Build to the code editions actually in force here
The NEC edition a jurisdiction enforces is often a cycle behind the newest one published, and local amendments sit on top of it. Rapid shutdown, conductor sizing and labelling all change between editions, so the edition in force is the first thing to establish, not the last.
- Which building code edition is in force? Ambiguous/stale at the source: the Code's own adopting clause, Sec. 6-1, still says 'the document...known as the South Florida Building Code...is hereby adopted... and shall be known as the Building Code of Miami Shores Village' (language dating to Code 1971 §5-01, never amended) — the South Florida Building Code was repealed statewide and superseded by the Florida Building Code in 2002. In current practice the Florida Building Code, 8th Edition (2023) is almost certainly what is enforced (it is the statewide-mandatory cycle and is referenced by name throughout Ch. 6's flood-related amendments, Secs. 6-9 through 6-14), but the Code's own foundational adopting section has never been updated to say so. 62% · Code of Ordinances (fossil adopting clause)
- Are there local amendments to any of the above? Yes — local technical and administrative amendments to the Florida Building Code (Building, Residential, and Existing Building volumes) exist at Secs. 6-11 through 6-14, all addressing flood-hazard-area elevation, substantial-improvement, and variance provisions. Separately, Ordinance 2024-06 (10-1-24) amended Sec. 6-4 specifically to 'update regulations to conform with the Florida Building Code requirements for permitting and remove obsolete provisions related to solar photovoltaic systems' — i.e. the most recent solar-relevant local amendment REMOVED rather than added solar-specific code text. 85% · Code of Ordinances
- What is the installation judged against? The (nominally) Florida Building Code (see Q30's fossil-base caveat) plus, per Sec. 6-2, county building-regulation terminology and the Miami-Dade County Code framework for terms like 'building official' and 'electrical inspector' (cross-referencing County Code § 8-1). In the HVHZ, RAS 127/128 design-pressure standards additionally apply to roof-attached equipment. 68% · Code of Ordinances
-
Fire access, setbacks and pathways
Ridge setbacks and roof access pathways are fire-service requirements and they constrain the array layout. They are the most common cause of a redesign after the fire department comments on a plan set.
Nothing recorded for Village of Miami Shores on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Rapid shutdown
Which rapid-shutdown rule applies follows directly from the NEC edition in force, and the initiation device has to be at a location the fire service can reach and identify. This is inspected, and it is labelled.
Nothing recorded for Village of Miami Shores on this step yet — 1 question checked and found unpublished. The guidance above is general.
-
Labels and placards
The NEC sets a baseline for permanent markings at the service equipment and the disconnecting means. On top of that, an authority may specify its own wording, and the utility may specify more again. Where any of them writes its own text, a generic off-the-shelf label set will not pass — this is the detail most often fixed on a return visit.
- Which placards does this authority require at the service equipment? Not specified by the Village; falls to the utility/state floor. Per this survey's established FPL specification: Tier 1 (<=10kW) systems require NO AC disconnect placard; Tier 2/3 require a manual, visible, load-break AC disconnect within 10 feet of the meter socket, always accessible with no locked gates/doors/fences between it and the meter, plus a location sign and an energized-conductors warning sign. 55% · utility/state-floor spec (not independently re-pulled from FPL this run)
- Where must the labels be placed? Not specified by the Village; per the utility/state floor cited at Q38, the AC disconnect and its signage sit at/near the meter socket, always accessible. 50% · utility/state-floor spec (not independently re-pulled this run)
-
Disconnect, storage and listed equipment
Where the AC disconnect must sit relative to the meter is usually the utility's rule, not the building department's. Battery storage frequently carries its own permit, its own inspection and its own fire conditions.
- Where must the AC disconnect be, relative to the meter? Not specified by the Village; per the utility/state floor: for FPL, Tier 1 (<=10kW, i.e. most residential rooftop PV) is exempt from a dedicated AC disconnect switch requirement; where required (Tier 2/3), it must be within 10 feet of the meter socket, always accessible, with no locked barrier between. 55% · utility/state-floor spec (not independently re-pulled this run)
- Must equipment be on a specific approved list? Not required by name in the Village's own Solar Checklist. Notably, UNLIKE a sibling authority in this survey whose solar checklist explicitly requires UL 1703/1741/2703 listings, Miami Shores' checklist names no equipment-listing requirement at all — an omission worth flagging. 55% · City solar checklist (absence, diffed against a sibling authority)
- Is a ground mount treated as a structure? Not found as a PV-specific statement; the Zoning Appendix defines general 'accessory structure'/'accessory use' concepts (Secs. 201, 516, Ch. 12 Sec. 12-9) that would likely reach a ground-mount array, but no provision names ground-mounted solar specifically. 45% · Code of Ordinances (generic, not solar-specific)
- Is a specific mounting system or attachment spacing required? Not found as a solar-specific spec; generic HVHZ roof-attachment design-pressure/product-approval requirements (RAS 127/128) would apply to any roof-mounted racking, per the Roof Permit Checklist, but no PV-specific mounting-spacing document exists. 45% · City roofing checklist (generic, not solar-specific)
20 questions answered against Village of Miami Shores’s own published documents
Q29 Which NEC edition is in force? Core Code editions in force
Nothing published by this authority.
Where we lookedGeneral Building Permit Application (masthead truncated 'FBC 20...', ambiguous between 7th/8th edition), Solar Checklist (silent on NEC year), Code Ch. 6 (silent on NEC year)
https://www.msvfl.gov/media/Building/Forms/MSV%20PERMIT%20APPLICATION%202022.pdf
Q30 Which building code edition is in force? Core Code editions in force
Ambiguous/stale at the source: the Code's own adopting clause, Sec. 6-1, still says 'the document...known as the South Florida Building Code...is hereby adopted... and shall be known as the Building Code of Miami Shores Village' (language dating to Code 1971 §5-01, never amended) — the South Florida Building Code was repealed statewide and superseded by the Florida Building Code in 2002. In current practice the Florida Building Code, 8th Edition (2023) is almost certainly what is enforced (it is the statewide-mandatory cycle and is referenced by name throughout Ch. 6's flood-related amendments, Secs. 6-9 through 6-14), but the Code's own foundational adopting section has never been updated to say so.
Why the confidence is not higherSec. 6-1's 'South Florida Building Code' language was read directly and is a genuine, unusually deep FOSSIL-BASE staleness case — the adopting clause itself, not merely a later amendment section, is stale. The FBC 8th Ed. (2023) inference is drawn from the surrounding sections' own repeated 'Florida Building Code' references, not stated as the base-adoption edition anywhere.
Code of Ordinances (fossil adopting clause) checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH6BUBURE_S6-12THFLBUCOREISHEAMFOTEAM
Q31 Which fire code edition is in force? Code editions in force
Nothing published by this authority.
Where we lookedVillage department directory (no Fire Department listed), full site sitemap.xml (~1,400 URLs, no 'fire' page), Code of Ordinances chapter list (no Fire Prevention Code chapter)
Q32 Are there local amendments to any of the above? Core Code editions in force
Yes — local technical and administrative amendments to the Florida Building Code (Building, Residential, and Existing Building volumes) exist at Secs. 6-11 through 6-14, all addressing flood-hazard-area elevation, substantial-improvement, and variance provisions. Separately, Ordinance 2024-06 (10-1-24) amended Sec. 6-4 specifically to 'update regulations to conform with the Florida Building Code requirements for permitting and remove obsolete provisions related to solar photovoltaic systems' — i.e. the most recent solar-relevant local amendment REMOVED rather than added solar-specific code text.
Why the confidence is not higherBoth directly quoted from the Code of Ordinances' own section text and its own 'Adopted Ordinances' history list.
Code of Ordinances checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH6BUBURE_S6-12THFLBUCOREISHEAMFOTEAM
Q33 What is the installation judged against? Core Electrical
The (nominally) Florida Building Code (see Q30's fossil-base caveat) plus, per Sec. 6-2, county building-regulation terminology and the Miami-Dade County Code framework for terms like 'building official' and 'electrical inspector' (cross-referencing County Code § 8-1). In the HVHZ, RAS 127/128 design-pressure standards additionally apply to roof-attached equipment.
Why the confidence is not higherCombines Sec. 6-1/6-2 (Village Code) with the County Code cross-reference printed in the same chapter's footnote, and the HVHZ roofing package's own RAS citations.
Code of Ordinances checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances?nodeId=PTIICOOR_CH6BUBURE_S6-12THFLBUCOREISHEAMFOTEAM
Q34 Is there a local rule on service upgrades or busbar sizing? Electrical
Nothing published by this authority.
Where we lookedSolar Submittal Checklist (full text), general Building Permit Application, Contractor Registration page — no service-upgrade/busbar-sizing rule stated
https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q35 Is a specific mounting system or attachment spacing required? Structural & mounting
Not found as a solar-specific spec; generic HVHZ roof-attachment design-pressure/product-approval requirements (RAS 127/128) would apply to any roof-mounted racking, per the Roof Permit Checklist, but no PV-specific mounting-spacing document exists.
Why the confidence is not higherInference only from the generic (non-solar) Roof Permit Checklist; no PV-specific mounting document was found on the Building Forms page.
City roofing checklist (generic, not solar-specific) checked 2026-09-13 https://www.msvfl.gov/media/MSV-Roofing-Permit-Package-2023-Code.pdf
Q36 What ridge setback and access pathways are required? Core Fire pathways & setbacks
Nothing published by this authority.
Where we lookedBuilding Forms page, absence of any Fire Department page/document on the Village's own site or sitemap.xml
Q37 Is rapid shutdown required, and to which NEC edition? Core Rapid shutdown
Nothing published by this authority.
Where we lookedCode-wide Municode search for 'rapid shutdown' (zero hits, positive control 'electrical' passed and fabricated control 'zzqqx' returned zero in the same session), and the Village's own Solar Submittal Checklist (full text read, no mention)
https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances
Q38 Which placards does this authority require at the service equipment? Core Labels Signage & labelling
Not specified by the Village; falls to the utility/state floor. Per this survey's established FPL specification: Tier 1 (<=10kW) systems require NO AC disconnect placard; Tier 2/3 require a manual, visible, load-break AC disconnect within 10 feet of the meter socket, always accessible with no locked gates/doors/fences between it and the meter, plus a location sign and an energized-conductors warning sign.
Why the confidence is not higherThe Village's own Solar Checklist and Code are silent on placards entirely. The FPL specification quoted here is this survey's already-established, cross-authority-verified FPL standard rather than a document independently re-pulled from FPL in this run — held at reduced confidence for that reason, per this brief's rule against inheriting unverified prior findings without re-confirmation.
utility/state-floor spec (not independently re-pulled from FPL this run) checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Q39 Does the authority specify placard wording of its own? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedBuilding Forms page (full list), Solar Submittal Checklist (full text) — no placard wording published
https://www.msvfl.gov/departments/buildingdepartment/buildingforms
Q40 Does it specify letter height, colour or material? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q39 — no letter height/colour/material spec published
https://www.msvfl.gov/departments/buildingdepartment/buildingforms
Q41 Is a site plan / facility map placard required, and what must it show? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedSame as q39 — no facility/site-plan placard spec published by the Village
https://www.msvfl.gov/departments/buildingdepartment/buildingforms
Q42 Does the UTILITY specify placards beyond the AHJ's? Core Labels Signage & labelling
Nothing published by this authority.
Where we lookedAttempted fpl.com/clean-energy/net-metering.html (200 response but not text-extracted this run due to time budget) and fpl.com/rates/pdf/interconnection-guidelines.pdf (404) — FPL's own current DG/interconnection manual was not successfully pulled and read this run
Q43 Where must the labels be placed? Core Labels Signage & labelling
Not specified by the Village; per the utility/state floor cited at Q38, the AC disconnect and its signage sit at/near the meter socket, always accessible.
Why the confidence is not higherSame utility-floor caveat as Q38 — not independently re-pulled from FPL this run.
utility/state-floor spec (not independently re-pulled this run) checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Q44 Must equipment be on a specific approved list? Equipment listing
Not required by name in the Village's own Solar Checklist. Notably, UNLIKE a sibling authority in this survey whose solar checklist explicitly requires UL 1703/1741/2703 listings, Miami Shores' checklist names no equipment-listing requirement at all — an omission worth flagging.
Why the confidence is not higherConfirmed by reading the full 2-page Solar Submittal Checklist directly; the omission is notable specifically because a sibling authority's checklist in this same survey DOES name these listings.
City solar checklist (absence, diffed against a sibling authority) checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q45 Are batteries permitted, and under what conditions? Core Battery / ESS
Nothing published by this authority.
Where we lookedSolar Submittal Checklist (full text), Building Forms page (full list) — no battery/ESS permitting language found
https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q46 Is there a separate ESS permit or inspection? Battery / ESS
Nothing published by this authority.
Where we lookedSame as q45 — no separate ESS permit/inspection type named
https://www.msvfl.gov/departments/buildingdepartment/buildingforms
Q47 Is a ground mount treated as a structure? Core Ground mount
Not found as a PV-specific statement; the Zoning Appendix defines general 'accessory structure'/'accessory use' concepts (Secs. 201, 516, Ch. 12 Sec. 12-9) that would likely reach a ground-mount array, but no provision names ground-mounted solar specifically.
Why the confidence is not higherInference only from generic accessory-structure zoning definitions; a targeted search for 'accessory structure' surfaced no PV-specific text.
Code of Ordinances (generic, not solar-specific) checked 2026-09-13 https://library.municode.com/fl/miami_shores_village/codes/code_of_ordinances
Q48 Where must the AC disconnect be, relative to the meter? Core Utility equipment
Not specified by the Village; per the utility/state floor: for FPL, Tier 1 (<=10kW, i.e. most residential rooftop PV) is exempt from a dedicated AC disconnect switch requirement; where required (Tier 2/3), it must be within 10 feet of the meter socket, always accessible, with no locked barrier between.
Why the confidence is not higherVillage material is silent; figure is this survey's established FPL/state-floor specification, not independently re-pulled from FPL this run.
utility/state-floor spec (not independently re-pulled this run) checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
Inspection 5 steps · 14 questions
-
Book it
Booking is a portal, a phone call or an email depending on the authority, and the notice required is rarely zero. Book before the work is finished rather than after — the lead time, not the work, is usually what sets the date.
- How is an inspection booked? Via the online CSS/EnerGov portal, or by phone (305-795-2204). 85% · department page
- How much notice is required? Requests made before 3:30 PM are scheduled for the next available business day for that trade. 88% · department page
- Are same-day or AM/PM windows offered? No AM/PM or same-day windows are offered; the online inspection-request form explicitly states 'no same day appointments', and inspections are booked to the next available business day by trade (Building/Roofing and Electrical Mon-Fri; Plumbing Mon-Thu; Mechanical Mon & Wed). 82% · department page (online form text)
-
Know who turns up
Some authorities inspect their own solar work; some delegate it, and a few do not inspect the PV equipment itself at all. Who is coming determines what they will look at.
- Does this AHJ perform its own final solar inspection? Yes. 90% · real permit record
- If delegated, to whom? N/A — not delegated. 85% · real permit record
-
Work the stages in order
A rough-in or mid-roof inspection, where one is required, has to happen before the work it covers is closed up. Missing a stage means opening something back up, and it is the most expensive kind of correction.
- Which inspections are required, and in what order? From a real sampled permit's actual workflow, in order: Plan Review -> Confirm application complete -> Issue Permit -> Framing -> Electrical Final (one cycle required re-inspection) -> Electrical - Residential -> Electrical Final (passed). 90% · real permit record (inspection workflow)
- Is a rough-in or mid-roof inspection required? Yes — a 'Framing' inspection (passed 01/23/2025) preceded the electrical inspections on the sampled real permit, functioning as a rough-in/structural-attachment check for the racking before the electrical trades closed out the job. 70% · real permit record (inspection workflow)
-
Have the paperwork on site
The approved plan set, the permit, and the equipment listings should be on site and reachable. Inspectors routinely verify that installed equipment matches what was approved, and that the labels are the ones the plan set promised.
- Is there a published inspection checklist? A submittal (pre-permit) checklist is published (the Solar Submittal Checklist, Q8), but no separate INSPECTION-stage checklist for solar was found. A generic Roof Permit Checklist exists for roofing work. 60% · City solar checklist (submittal, not inspection, checklist)
- What must be on site at inspection? The permit card must be displayed and the approved plans must be readily available on site; work must be accessible/exposed for inspection. 88% · department page
-
Sign-off, and permission to operate
Passing gives you a final or an equivalent sign-off. That is not the same as permission to operate: PTO comes from the utility, and who tells the utility the inspection passed varies. A system left switched off for weeks is usually waiting on this handover.
- What is issued on pass? The permit itself is marked 'Closed' with a 'Finalized Date' once all required inspections pass; for a rooftop-PV retrofit (not new construction) no separate Certificate of Occupancy/Completion appears to be issued. 60% · real permit record
- Who notifies the utility for PTO? Not stated by the Village; per the state floor, the customer/installer must execute the Standard Interconnection Agreement and notify the utility at least 10 days before energizing (FL PSC Rule 25-6.065(7)(d)) — the Village's own material never describes the Village itself notifying the utility. 55% · Florida Administrative Code rule text (state floor)
- Is there a re-inspection fee? Yes — an $85 re-inspection fee 'may result' after a SECOND rejection. 80% · department FAQ + real permit fee ledger (corroborating)
- How are corrections issued and cleared? Corrections are tracked through the online portal's inspection/status workflow (e.g. the sampled permit shows a discrete 'Re-inspection required' status event); the Plan Review Process note states corrections will not be accepted piecemeal — 'All disapproved trade's comments must be addressed and submitted together when bringing in corrections.' 65% · department page + real permit record
14 questions answered against Village of Miami Shores’s own published documents
Q49 How is an inspection booked? Core Booking & scheduling
Via the online CSS/EnerGov portal, or by phone (305-795-2204).
Why the confidence is not higherStated on both the Inspections page and Building FAQ.
department page checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/requestinspection
Q50 How much notice is required? Core Booking & scheduling
Requests made before 3:30 PM are scheduled for the next available business day for that trade.
Why the confidence is not higherStated verbatim on both the Inspections page and Building FAQ.
department page checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/requestinspection
Q51 Are same-day or AM/PM windows offered? Booking & scheduling
No AM/PM or same-day windows are offered; the online inspection-request form explicitly states 'no same day appointments', and inspections are booked to the next available business day by trade (Building/Roofing and Electrical Mon-Fri; Plumbing Mon-Thu; Mechanical Mon & Wed).
Why the confidence is not higherDirectly read from the Inspections request form's own instructions.
department page (online form text) checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/requestinspection
Q52 Does this AHJ perform its own final solar inspection? Core Who inspects
Yes.
Why the confidence is not higherConfirmed by a real permit record whose entire inspection workflow (Framing, Electrical-Residential, Electrical Final) was assigned to a named Village staff member, with no third-party firm appearing anywhere.
real permit record checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda
Q53 If delegated, to whom? Core Who inspects
N/A — not delegated.
Why the confidence is not higherFollows from Q52.
real permit record checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda
Q54 Which inspections are required, and in what order? Core Stages & sequence
From a real sampled permit's actual workflow, in order: Plan Review -> Confirm application complete -> Issue Permit -> Framing -> Electrical Final (one cycle required re-inspection) -> Electrical - Residential -> Electrical Final (passed).
Why the confidence is not higherThis is the literal, timestamped workflow of permit SUN-11-24-2885 as recorded on the Village's own live portal — a real inspection sequence rather than a published generic list (no published generic PV inspection-sequence document was found separately).
real permit record (inspection workflow) checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda
Q55 Is a rough-in or mid-roof inspection required? Stages & sequence
Yes — a 'Framing' inspection (passed 01/23/2025) preceded the electrical inspections on the sampled real permit, functioning as a rough-in/structural-attachment check for the racking before the electrical trades closed out the job.
Why the confidence is not higherInferred from the real permit's own inspection workflow; no separately published document states 'Framing' is mandatory for every solar job, so this is drawn from one observed case.
real permit record (inspection workflow) checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda
Q56 Does the inspector verify labels and listings? Core What is checked
Nothing published by this authority.
Where we lookedInspections page, Building FAQ (full text) — neither states the inspector verifies labels/listings as a discrete checked item
https://www.msvfl.gov/departments/buildingdepartment/requestinspection
Q57 Is there a published inspection checklist? Core What is checked
A submittal (pre-permit) checklist is published (the Solar Submittal Checklist, Q8), but no separate INSPECTION-stage checklist for solar was found. A generic Roof Permit Checklist exists for roofing work.
Why the confidence is not higherDistinguishes the submittal document found (Q8) from the absence of any document describing what an inspector checks on-site for solar specifically.
City solar checklist (submittal, not inspection, checklist) checked 2026-09-13 https://www.msvfl.gov/media/Building/Forms/MSV%202025%20Solar%20Panel%20Permit%20Requirements.pdf
Q58 What must be on site at inspection? Core Documents on site
The permit card must be displayed and the approved plans must be readily available on site; work must be accessible/exposed for inspection.
Why the confidence is not higherStated on both the Inspections page and Building FAQ, in near-identical language, and echoed on the Roof Permit Checklist's manufacturer-instructions requirement.
department page checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/requestinspection
Q59 Is there a re-inspection fee? Corrections & re-inspection
Yes — an $85 re-inspection fee 'may result' after a SECOND rejection.
Why the confidence is not higherStated verbatim in the Building FAQ. Note: on the sampled real solar permit, only one re-inspection cycle occurred before passing, and no re-inspection-fee line item appeared on that permit's fee ledger — consistent with the fee applying only from the second rejection onward, not the first.
department FAQ + real permit fee ledger (corroborating) checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/buildingdepartmentfaq
Q60 How are corrections issued and cleared? Corrections & re-inspection
Corrections are tracked through the online portal's inspection/status workflow (e.g. the sampled permit shows a discrete 'Re-inspection required' status event); the Plan Review Process note states corrections will not be accepted piecemeal — 'All disapproved trade's comments must be addressed and submitted together when bringing in corrections.'
Why the confidence is not higherCombines the About page's plan-review-correction policy with the observed status-event structure on a real permit's inspection history.
department page + real permit record checked 2026-09-13 https://www.msvfl.gov/departments/buildingdepartment/aboutthebuildingdepartment
Q61 What is issued on pass? Core Final sign-off & PTO
The permit itself is marked 'Closed' with a 'Finalized Date' once all required inspections pass; for a rooftop-PV retrofit (not new construction) no separate Certificate of Occupancy/Completion appears to be issued.
Why the confidence is not higherInferred from the real sampled permit's own status fields ('Status: Closed', 'Finalized Date: 01/29/2025') — no CO/CC document is referenced anywhere on that permit's record.
real permit record checked 2026-09-13 https://villageofmiamishoresfl-energovweb.tylerhost.net/apps/selfservice#/permit/6e612a2e-01da-46e6-85f3-6959e5300fda
Q62 Who notifies the utility for PTO? Core Final sign-off & PTO
Not stated by the Village; per the state floor, the customer/installer must execute the Standard Interconnection Agreement and notify the utility at least 10 days before energizing (FL PSC Rule 25-6.065(7)(d)) — the Village's own material never describes the Village itself notifying the utility.
Why the confidence is not higherVillage material is silent on this point; answer drawn from the state rule rather than a Village document.
Florida Administrative Code rule text (state floor) checked 2026-09-13 https://www.flrules.org/gateway/readFile.asp?sid=0&tid=5455200&type=1&file=25-6.065.doc
Lines marked with a percentage were read off this authority’s own published documents. Unmarked guidance is general good practice, not this jurisdiction’s rule — always confirm against the authority before you submit.
No change record for this authority yet. Values arrive here as they are researched, and each one is dated.
Labels & placards for this authority
Wording None%
Size, colour & material None%
Where they go 50%
Not specified by the Village; per the utility/state floor cited at Q38, the AC disconnect and its signage sit at/near the meter socket, always accessible.
What the utility wants on top None%
Each figure above is sourced and dated in the full answer set below (questions 38–43). Where an authority’s own published sheet is older than the code it has adopted, the answer says so.
Their website
Solar Requirements
Average approval time — application to PTO
From the CPUC interconnection record. Bars show the average days taken each year; a year with no recorded projects is left blank rather than drawn as zero.